IR 05000361/2013004: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 11/04/2013 | | issue date = 11/04/2013 | ||
| title = IR 05000361-13-004 and 05000362-13-004, 6/24/2013 - 9/23/2013, San Onofre Nuclear Generating Station - NRC Integrated Inspection Report | | title = IR 05000361-13-004 and 05000362-13-004, 6/24/2013 - 9/23/2013, San Onofre Nuclear Generating Station - NRC Integrated Inspection Report | ||
| author name = Lantz R | | author name = Lantz R | ||
| author affiliation = NRC/RGN-IV/DRP/RPB-D | | author affiliation = NRC/RGN-IV/DRP/RPB-D | ||
| addressee name = Dietrich P | | addressee name = Dietrich P | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:November 4, 2013 | ||
==SUBJECT:== | |||
- | SAN ONOFRE NUCLEAR GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000361/2013004 and 05000362/2013004 | ||
==Dear Mr. Dietrich:== | |||
On September 23, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the San Onofre Nuclear Generating Station Units 2 and 3 facility. The enclosed inspection report documents the inspection results which were discussed on September 17, 2013, with Mr. Rich St. Onge, Director, Nuclear Regulatory Affairs, and other members of your staff. | |||
The inspections examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. | |||
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | |||
No findings were identified during this inspection. | No findings were identified during this inspection. | ||
By letter dated June 12, 2013, Southern California Edison (SCE) | By letter dated June 12, 2013, Southern California Edison (SCE) submitted a Certification of Permanent Cessation of Power Operations to the NRC certifying that Units 2 and 3 have permanently ceased power operations (ADAMS Accession No. ML131640201). On June 28 and July 22, 2013, SCE certified that all fuel had been permanently removed from the Units 3 and 2 reactors, respectively (ADAMS Accession Nos. ML13183A391 and ML13204A304). On September 3, 2013, the NRC notified SCE that the Operating Reactor Assessment Program had ceased and that implementation of the Decommissioning Power Reactor Inspection Program began, effective July 23, 2013 (ADAMS Accession No. ML13246A435). | ||
submitted a Certification of Permanent Cessation of Power Operations to the NRC certifying that Units 2 and 3 have permanently ceased power operations (ADAMS Accession No. ML131640201). On June 28 and July 22, 2013, SCE certified that all fuel had been permanently removed from the | |||
UNITED STATES NUCLEAR REGULATORY COMMISSION | |||
==REGION IV== | |||
1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | Sincerely, | ||
/RA/ B. Hagar for Ryan E. Lantz, Chief Project Branch D Division of Reactor Projects Docket Nos.: 50 | /RA/ B. Hagar for | ||
-361, 50-362 License Nos: NPF | |||
-10, NPF-15 Enclosure: Inspection Report 05000361/ | Ryan E. Lantz, Chief Project Branch D Division of Reactor Projects | ||
Docket Nos.: 50-361, 50-362 License Nos: NPF-10, NPF-15 | |||
Enclosure: Inspection Report 05000361/2013004 and 05000362/2013004 | |||
w/ Attachment: Supplemental Information cc w/ encl: Electronic Distribution | |||
}} | }} | ||
Latest revision as of 03:49, 11 January 2025
| ML13308C438 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 11/04/2013 |
| From: | Ryan Lantz NRC/RGN-IV/DRP/RPB-D |
| To: | Peter Dietrich Southern California Edison Co |
| Lantz R | |
| References | |
| IR-13-004 | |
| Download: ML13308C438 (12) | |
Text
November 4, 2013
SUBJECT:
SAN ONOFRE NUCLEAR GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000361/2013004 and 05000362/2013004
Dear Mr. Dietrich:
On September 23, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the San Onofre Nuclear Generating Station Units 2 and 3 facility. The enclosed inspection report documents the inspection results which were discussed on September 17, 2013, with Mr. Rich St. Onge, Director, Nuclear Regulatory Affairs, and other members of your staff.
The inspections examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings were identified during this inspection.
By letter dated June 12, 2013, Southern California Edison (SCE) submitted a Certification of Permanent Cessation of Power Operations to the NRC certifying that Units 2 and 3 have permanently ceased power operations (ADAMS Accession No. ML131640201). On June 28 and July 22, 2013, SCE certified that all fuel had been permanently removed from the Units 3 and 2 reactors, respectively (ADAMS Accession Nos. ML13183A391 and ML13204A304). On September 3, 2013, the NRC notified SCE that the Operating Reactor Assessment Program had ceased and that implementation of the Decommissioning Power Reactor Inspection Program began, effective July 23, 2013 (ADAMS Accession No. ML13246A435).
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION IV
1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/ B. Hagar for
Ryan E. Lantz, Chief Project Branch D Division of Reactor Projects
Docket Nos.: 50-361, 50-362 License Nos: NPF-10, NPF-15
Enclosure: Inspection Report 05000361/2013004 and 05000362/2013004
w/ Attachment: Supplemental Information cc w/ encl: Electronic Distribution