IR 05000424/2016406: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 06/23/2016 | | issue date = 06/23/2016 | ||
| title = U.S. Nuclear Regulatory Commission Inspection Procedure 95001 Supplemental Inspection Report 05000424/2016406 and 05000425/2016406 and Closed Regulatory Performance Meeting - OUO Removed | | title = U.S. Nuclear Regulatory Commission Inspection Procedure 95001 Supplemental Inspection Report 05000424/2016406 and 05000425/2016406 and Closed Regulatory Performance Meeting - OUO Removed | ||
| author name = Desai | | author name = Desai B | ||
| author affiliation = NRC/RGN-IV/DRS/PSB-2 | | author affiliation = NRC/RGN-IV/DRS/PSB-2 | ||
| addressee name = | | addressee name = Mcgavin S | ||
| addressee affiliation = Southern Nuclear Operating Co, Inc | | addressee affiliation = Southern Nuclear Operating Co, Inc | ||
| docket = 05000424, 05000425 | | docket = 05000424, 05000425 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:June 23, 2016 | ||
==SUBJECT:== | |||
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 - | |||
U.S. NUCLEAR REGULATORY COMMISSION INSPECTION PROCEDURE 95001 SUPPLEMENTAL INSPECTION REPORT 05000424/2016406 AND 05000425/2016406 AND CLOSED REGULATORY PERFORMANCE MEETING | |||
==Dear Mr. McGavin:== | |||
On May 26, 2016 the U.S. Nuclear Regulatory Commission (NRC) completed a supplemental inspection pursuant to Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, at your Vogtle Electric Generating Plant, Units 1 and 2. The enclosed inspection report documents the inspection results which were discussed on May 26, 2016, with Mr. Keith Taber and other members of your staff. | |||
In accordance with the NRC Reactor Oversight Process Action Matrix, this supplemental inspection was performed to follow-up on a greater than green finding with low to moderate safety significance which was issued in the first quarter of 2016. This issue was previously documented and assessed in NRC Inspection Report 05000424, 425/2016405. The NRC was informed on April 14, 2016 of your staffs readiness for this inspection. | |||
The objectives of this supplemental inspection were to provide assurance that: (1) the root causes and the contributing causes for the risk-significant issues were understood; (2) the extent of condition and extent of cause of the issues were identified; and (3) corrective actions were or will be sufficient to address and preclude repetition of the root and contributing causes. | |||
Based on the results of this inspection, the NRC has concluded that you have adequately completed a root cause analysis of the issue, and have identified appropriate corrective actions to prevent recurrence of the issue. No findings were identified concerning the root cause evaluation and corrective actions. The NRC has determined that inspection objectives stated above have been met. As a result, the violation is considered closed. Therefore in accordance with IMC 0305, Operating Reactor Assessment Program, the performance issue shall not be considered in the Action Matrix after the end of the fourth quarter 2016. | |||
In accordance with the NRC | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), which is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS components of NRCs ADAMS. If you choose to provide a response, and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390 (b)(1), the NRC is waiving the affidavit requirements for your response. | |||
If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.22. Otherwise, mark your entire response Security-Related Information Withhold Under 10 CFR 2.327 and follow the instructions for withholding in 10 CFR 2.327(b)(1). | |||
Sincerely, | |||
/RA/ | |||
Binoy B. Desai, Chief | |||
Plant Support Branch 2 | |||
Division of Reactor Safety | |||
Docket Nos. 50-424 and 50-425 License Nos. NPF-68 and NPF-81 | Docket Nos. 50-424 and 50-425 License Nos. NPF-68 and NPF-81 | ||
| Line 53: | Line 55: | ||
cc: (See page 3) | cc: (See page 3) | ||
_________________________ | _________________________ | ||
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRP RII:DRS | |||
SIGNATURE JOB2 JOB2 FOR JCS3 SRS5 BBD | |||
NAME JBROWN JSHEHEE SSANDAL BDESAI | |||
DATE 6/20/2016 6/20/2016 6/21/2016 6/23/2016 | |||
E-MAIL COPY? | |||
YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Stephen from Binoy B. Desai dated June 23, 2016. | |||
SUBJECT: | |||
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 - U.S. NUCLEAR REGULATORY COMMISSION INSPECTION PROCEDURE 95001 SUPPLEMENTAL INSPECTION REPORT 05000424/2016406 AND 05000425/2016406 AND CLOSED REGULATORY PERFORMANCE MEETING | |||
RidsNrrDirs Resource Public (OUO Removed) cc: | DISTRIBUTION: | ||
V. McCree, OEDO Region II Regional Coordinator, OEDO W. Dean, NRR C. Scott, OGC M. Johnson, OEDO E. Julian, SECY D. Decker, OCA All Regions Enforcement Coordinators H. Harrington, OPA K. Fowler, OI H. Bell, OIG L. Casey, NRR D. Furs, OE L. Wert, RII M. Franke, RII B. Desai, RII S. Sandal, RII A. Gody, RII R. Hannah, RII J. Ledford, RII J. Pelchat, RII S. Price, RII D. Gamberoni, RII L. Gibson, RII OEMAIL Resource RidsNrrDirs Resource Public (OUO Removed) cc: | |||
Michael P. Long Fleet Nuclear Security Operations Manager Southern Nuclear Operating Co., Inc. | Michael P. Long Fleet Nuclear Security Operations Manager Southern Nuclear Operating Co., Inc. | ||
40 Inverness Center Parkway (Bin B042) | 40 Inverness Center Parkway (Bin B042) | ||
Birmingham, AL 35242 | Birmingham, AL 35242 | ||
Steven M. Shipman Southern Nuclear Operating Co., Inc. | Steven M. Shipman Southern Nuclear Operating Co., Inc. | ||
40 Inverness Center Parkway (Bin B042) | |||
Birmingham, AL 35242 | Birmingham, AL 35242 | ||
}} | }} | ||
Latest revision as of 22:07, 9 January 2025
| ML16178A018 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 06/23/2016 |
| From: | Binoy Desai NRC/RGN-IV/DRS/PSB-2 |
| To: | Mcgavin S Southern Nuclear Operating Co |
| References | |
| IR 2016406 | |
| Download: ML16178A018 (5) | |
Text
June 23, 2016
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 -
U.S. NUCLEAR REGULATORY COMMISSION INSPECTION PROCEDURE 95001 SUPPLEMENTAL INSPECTION REPORT 05000424/2016406 AND 05000425/2016406 AND CLOSED REGULATORY PERFORMANCE MEETING
Dear Mr. McGavin:
On May 26, 2016 the U.S. Nuclear Regulatory Commission (NRC) completed a supplemental inspection pursuant to Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, at your Vogtle Electric Generating Plant, Units 1 and 2. The enclosed inspection report documents the inspection results which were discussed on May 26, 2016, with Mr. Keith Taber and other members of your staff.
In accordance with the NRC Reactor Oversight Process Action Matrix, this supplemental inspection was performed to follow-up on a greater than green finding with low to moderate safety significance which was issued in the first quarter of 2016. This issue was previously documented and assessed in NRC Inspection Report 05000424, 425/2016405. The NRC was informed on April 14, 2016 of your staffs readiness for this inspection.
The objectives of this supplemental inspection were to provide assurance that: (1) the root causes and the contributing causes for the risk-significant issues were understood; (2) the extent of condition and extent of cause of the issues were identified; and (3) corrective actions were or will be sufficient to address and preclude repetition of the root and contributing causes.
Based on the results of this inspection, the NRC has concluded that you have adequately completed a root cause analysis of the issue, and have identified appropriate corrective actions to prevent recurrence of the issue. No findings were identified concerning the root cause evaluation and corrective actions. The NRC has determined that inspection objectives stated above have been met. As a result, the violation is considered closed. Therefore in accordance with IMC 0305, Operating Reactor Assessment Program, the performance issue shall not be considered in the Action Matrix after the end of the fourth quarter 2016.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), which is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS components of NRCs ADAMS. If you choose to provide a response, and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390 (b)(1), the NRC is waiving the affidavit requirements for your response.
If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.22. Otherwise, mark your entire response Security-Related Information Withhold Under 10 CFR 2.327 and follow the instructions for withholding in 10 CFR 2.327(b)(1).
Sincerely,
/RA/
Binoy B. Desai, Chief
Plant Support Branch 2
Division of Reactor Safety
Docket Nos. 50-424 and 50-425 License Nos. NPF-68 and NPF-81
Enclosure:
IR 05000424/2016406 and 05000425/2016406 w/Attachment: Supplementary Information (OUO)
cc: (See page 3)
_________________________
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRP RII:DRS
SIGNATURE JOB2 JOB2 FOR JCS3 SRS5 BBD
NAME JBROWN JSHEHEE SSANDAL BDESAI
DATE 6/20/2016 6/20/2016 6/21/2016 6/23/2016
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Stephen from Binoy B. Desai dated June 23, 2016.
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 - U.S. NUCLEAR REGULATORY COMMISSION INSPECTION PROCEDURE 95001 SUPPLEMENTAL INSPECTION REPORT 05000424/2016406 AND 05000425/2016406 AND CLOSED REGULATORY PERFORMANCE MEETING
DISTRIBUTION:
V. McCree, OEDO Region II Regional Coordinator, OEDO W. Dean, NRR C. Scott, OGC M. Johnson, OEDO E. Julian, SECY D. Decker, OCA All Regions Enforcement Coordinators H. Harrington, OPA K. Fowler, OI H. Bell, OIG L. Casey, NRR D. Furs, OE L. Wert, RII M. Franke, RII B. Desai, RII S. Sandal, RII A. Gody, RII R. Hannah, RII J. Ledford, RII J. Pelchat, RII S. Price, RII D. Gamberoni, RII L. Gibson, RII OEMAIL Resource RidsNrrDirs Resource Public (OUO Removed) cc:
Michael P. Long Fleet Nuclear Security Operations Manager Southern Nuclear Operating Co., Inc.
40 Inverness Center Parkway (Bin B042)
Birmingham, AL 35242
Steven M. Shipman Southern Nuclear Operating Co., Inc.
40 Inverness Center Parkway (Bin B042)
Birmingham, AL 35242