IR 05000237/2017406: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 5: | Line 5: | ||
| author name = Cameron J | | author name = Cameron J | ||
| author affiliation = NRC/RGN-III/DRP/B4 | | author affiliation = NRC/RGN-III/DRP/B4 | ||
| addressee name = Hanson B | | addressee name = Hanson B | ||
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | ||
| docket = 05000237, 05000249 | | docket = 05000237, 05000249 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:July 19, 2017 | ||
SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND | ==SUBJECT:== | ||
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000237/2017406; 05000249/2017406 | |||
==Dear Mr. Hanson:== | ==Dear Mr. Hanson:== | ||
On June 23, | On June 23, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Dresden Nuclear Power Station, Units 2 and 3 and the NRC inspectors discussed the results of this inspection with Mr. J. Washko, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report. | ||
The | The NRC inspectors did not identify any findings or violations of more than minor significance. | ||
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. | |||
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). | |||
Sincerely, | |||
/RA/ | |||
Jamnes Cameron, Chief | |||
Branch 4 | |||
Division of Reactor Projects | |||
Docket Nos. 50-237; 50-249 License Nos. NPF-19; NPF-25 | |||
Nonpublic Enclosure: | |||
IR 05000237/2017406; 05000249/2017406 cc: L. Antos, Security Director, Dresden | |||
J. Klinger, State Liaison Officer, Illinois Emergency Management Agency cc w/o encl: Distribution via LISTSERV | |||
}} | }} | ||
Latest revision as of 16:54, 8 January 2025
| ML17202G452 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 07/19/2017 |
| From: | Jamnes Cameron Reactor Projects Region 3 Branch 4 |
| To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
| References | |
| IR 2017406 | |
| Download: ML17202G452 (4) | |
Text
July 19, 2017
SUBJECT:
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000237/2017406; 05000249/2017406
Dear Mr. Hanson:
On June 23, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Dresden Nuclear Power Station, Units 2 and 3 and the NRC inspectors discussed the results of this inspection with Mr. J. Washko, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any findings or violations of more than minor significance.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
Jamnes Cameron, Chief
Branch 4
Division of Reactor Projects
Docket Nos. 50-237; 50-249 License Nos. NPF-19; NPF-25
Nonpublic Enclosure:
IR 05000237/2017406; 05000249/2017406 cc: L. Antos, Security Director, Dresden
J. Klinger, State Liaison Officer, Illinois Emergency Management Agency cc w/o encl: Distribution via LISTSERV