ML14225A608: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:SRRS: 3D.105 (when utilized for operator initial or continuing training) | {{#Wiki_filter:SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
Page 1 of 9 Exelon Nuclear Job Performance Measure Initiate Standby Liquid Control with Failure to Inject JPM Number: | Page 1 of 9 Exelon Nuclear Job Performance Measure Initiate Standby Liquid Control with Failure to Inject JPM Number: 2014 ILT NRC JPM a Revision Number: 00 Date: 02/27/14 Developed By: | ||
Instructor Date | Instructor Date Validated By: | ||
Validated By: | |||
SME or Instructor Date Reviewed By: | SME or Instructor Date Reviewed By: | ||
Operations Representative Date Approved By: | Operations Representative Date Approved By: | ||
| Line 26: | Line 24: | ||
2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training) | 2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon | Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | ||
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | ||
: 1. | |||
Procedure QCOP 1100-02 Rev: 12 | Task description and number, JPM description and number are identified. | ||
: 2. | |||
SME / Instructor Date | Knowledge and Abilities (K/A) references are included. | ||
: 3. | |||
SME / Instructor Date | Performance location specified. (in-plant, control room, simulator, or other) | ||
: 4. | |||
SME / Instructor Date | Initial setup conditions are identified. | ||
: 5. | |||
Initiating cue (and terminating cue if required) are properly identified. | |||
: 6. | |||
Task standards identified and verified by SME review. | |||
: 7. | |||
Critical steps meet the criteria for critical steps and are identified with an asterisk (*). | |||
: 8. | |||
If an alternate path is used, the task standard contains criteria for successful completion. | |||
: 9. | |||
Verify the procedure(s) referenced by this JPM reflects the current revision: | |||
Procedure QCOP 1100-02 Rev: 12 Procedure Rev: | |||
Procedure Rev: | |||
: 10. Verify cues both verbal and visual are free of conflict. | |||
: 11. Verify performance time is accurate | |||
: 12. If the JPM cannot be performed as written with proper responses, then revise the JPM. | |||
: 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | |||
SME / Instructor Date SME / Instructor Date SME / Instructor Date | |||
2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training) | 2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
| Line 41: | Line 56: | ||
Revision 00, Renamed 2014 ILT NRC JPM a. Restarted revision numbering accordingly. | Revision 00, Renamed 2014 ILT NRC JPM a. Restarted revision numbering accordingly. | ||
Previous changes were: | Previous changes were: | ||
Revision 06, Reworded to match wording of LS | Revision 06, Reworded to match wording of LS-008-I, the non-faulted version of the same JPM. | ||
-008-I, the non-faulted version of the same JPM. | |||
Revision 07, JPM revised to reflect procedure changes. | Revision 07, JPM revised to reflect procedure changes. | ||
Revision 08, JPM revised to reflect | Revision 08, JPM revised to reflect simulator setup commands and new average performance time. | ||
Revision 09, JPM revised to reflect procedure changes. | Revision 09, JPM revised to reflect procedure changes. | ||
Revision 10, JPM revised to reflect single | Revision 10, JPM revised to reflect single pump injection, procedure change, and removal of one critical task. | ||
2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training) | 2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS 1. Reset the simulator to any IC at power > 20% | Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS | ||
: 1. Reset the simulator to any IC at power > 20% | |||
: 2. Manual Actuation: | : 2. Manual Actuation: | ||
Ensure the SBLC key is in the Control switch. | Ensure the SBLC key is in the Control switch. | ||
: 3. Malfunctions (contained in caep file | : 3. Malfunctions (contained in caep file A caep.cae) | ||
Setup for a jpml00:00:00l00 Fail the SBLC pumps to work (2 commands)l00:00:00l01 | Setup for a jpml00:00:00l00 Fail the SBLC pumps to work (2 commands)l00:00:00l01 imf SL01Al00:00:02l02 imf SL01Bl00:00:04l03 Set triggers 1 and 2 true when both squib lights are outl00:00:04l04 trgset 1(.NOT. ZLOHS11130301(2)).AND. (.NOT. ZLOHS11130301(4)) l00:00:06l05 trgset 2(.NOT. ZLOHS11130301(2)).AND. (.NOT. ZLOHS11130301(4)) l00:00:08l06 When triggers 1 and 2 true, delete the pump tripsl00:00:00l07 trg 1 dmf sl01a l00:00:10l08 trg 2 dmf sl01b l00:00:12l09 | ||
: 4. Remotes: | |||
imf SL01Al00:00:02l02 | NONE | ||
: 5. Overrides: | |||
imf SL01Bl00:00:04l03 | NONE | ||
: 6. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist. | |||
Set triggers 1 and 2 true when both squib lights are outl00:00:04l04 trgset 1 | : 7. This completes the setup for this JPM. | ||
(.NOT. ZLOHS11130301(4)) | A caep.cae JPM A QCOP 1100-02, Rev 012, IN | ||
2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training) | 2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
Page 5 of 9 INITIAL CONDITIONS U-1 has experienced an ATWS. The following conditions exist: | Page 5 of 9 INITIAL CONDITIONS U-1 has experienced an ATWS. The following conditions exist: | ||
| Line 74: | Line 85: | ||
The Unit Supervisor has determined that SBLC must be initiated per QGA 101. | The Unit Supervisor has determined that SBLC must be initiated per QGA 101. | ||
This JPM is not time critical. | This JPM is not time critical. | ||
INITIATING CUE Inject the Standby Liquid | INITIATING CUE Inject the Standby Liquid Control System per the hard card. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
* Denotes critical | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. | ||
Some operations that are | Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | |||
2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training) | 2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
Page 6 of 9 JPM Start Time: | Page 6 of 9 JPM Start Time: | ||
STEP ELEMENT STANDARD SAT UNSAT Comment Number | STEP ELEMENT STANDARD SAT UNSAT Comment Number Obtain procedure to be used. | ||
*F.2. *Determines SBLC NOT injecting. | Obtains procedure QCOP 1100-02 hard card for injecting SBLC. | ||
F.1. | |||
Select System 1 or 2 with keylock switch A and B SELECT. | |||
the following indications: SBLC flow light NOT lit. | Positions SBLC keylock switch to System 1 or 2. | ||
SBLC tank level is NOT decreasing. | EVALUATOR NOTE: Initial cue states no LOCA in progress, candidate should only inject with one pump at a time. | ||
*F.3. *Attempt to inject SBLC with the opposite switch position. | *F.2. | ||
*Determines SBLC NOT injecting.* | |||
Determines SBLC NOT injecting by any one or more of the following indications: | |||
that was initially selected. | SBLC flow light NOT lit. | ||
JPM Stop Time: | SBLC tank level is NOT decreasing. (LI-1-1140-2) | ||
Pump discharge press < Rx press. (PI-1-1140-1) | |||
Verify neutron flux NOT decreasing. (APRM recorders) | |||
EVALUATOR NOTE: Alternate path starts here. | |||
*F.3. | |||
*Attempt to inject SBLC with the opposite switch position.* | |||
Repositions SBLC keylock switch to the opposite position that was initially selected. | |||
SIMULATOR OPERATOR NOTE: When operator takes switch to the opposite position, verify triggers 1 and 2 go true and malfunctions SL01A and SL01B are deleted. | |||
Reports SBLC is injecting. | |||
Informs US that SBLC is injecting. | |||
EVALUATOR: The candidate should inform you that the task is complete. | |||
JPM Stop Time: | |||
2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training) | 2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
| Line 101: | Line 125: | ||
==SUMMARY== | ==SUMMARY== | ||
Operators Name: | |||
Job | |||
SR-1100-P02 | |||
==Title:== | |||
EO RO SRO FS STA/IA SRO Cert JPM | |||
==Title:== | |||
Initiate Standby Liquid Control with Failure to Inject JPM Number: | |||
2014 ILT NRC JPM a Revision Number: 00 Task Number and | |||
==Title:== | |||
SR-1100-P02 (Freq: LIC=A) (ILT-MP) Given a reactor plant with an ATWS, inject boron prior to exceeding 110 degrees torus water temperature OR if core instability is observed in accordance with QGA 101 and QCOP 1100-02. | |||
(Important PRA Operator Action - starting SBLC terminates 1 of the top 100 most probable Core Damage Sequences and has a RAW of 17.3) | |||
K/A Number and Importance: | K/A Number and Importance: | ||
K/A: 211000 A4.02 Rating: 4.2/4.2 Suggested Testing Environment: Simulator | K/A: | ||
211000 A4.02 Rating: | |||
Alternate Path: | 4.2/4.2 Suggested Testing Environment: Simulator Alternate Path: | ||
Simulator Control Room In-Plant | Yes No SRO Only: | ||
Yes No Time Critical: | |||
Yes No Reference(s): QCOP 1100-02, Rev. 12, INJECTION OF STANDBY LIQUID CONTROL Actual Testing Environment: | |||
Simulator Control Room In-Plant Other Testing Method: | |||
Simulate Perform Estimated Time to Complete: 6.0 minutes Actual Time Used: | |||
minutes EVALUATION | minutes EVALUATION | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? | |||
Were all the Critical Elements performed satisfactorily? | Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: | ||
Satisfactory Unsatisfactory Comments: | |||
Evaluators Name: | |||
(Print) | |||
Evaluators Signature: | |||
Date: | |||
[If this page is an odd numbered page, a blank page is automatically generated after this page to keep the student cue sheet separate from this page] | |||
SRRS: 3D.105 (when utilized for operator initial or continuing training) | SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
| Line 125: | Line 166: | ||
The Unit Supervisor has determined that SBLC must be initiated per QGA 101. | The Unit Supervisor has determined that SBLC must be initiated per QGA 101. | ||
This JPM is not time critical. | This JPM is not time critical. | ||
INITIATING CUE Inject the Standby Liquid | INITIATING CUE Inject the Standby Liquid Control System per the hard card.}} | ||
Latest revision as of 17:25, 10 January 2025
| ML14225A608 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 04/27/2013 |
| From: | NRC/RGN-III |
| To: | Exelon Generation Co |
| Bruce Palagi | |
| Shared Package | |
| ML13093A388 | List: |
| References | |
| Download: ML14225A608 (9) | |
Text
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 1 of 9 Exelon Nuclear Job Performance Measure Initiate Standby Liquid Control with Failure to Inject JPM Number: 2014 ILT NRC JPM a Revision Number: 00 Date: 02/27/14 Developed By:
Instructor Date Validated By:
SME or Instructor Date Reviewed By:
Operations Representative Date Approved By:
Training Department Date
2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
- 1.
Task description and number, JPM description and number are identified.
- 2.
Knowledge and Abilities (K/A) references are included.
- 3.
Performance location specified. (in-plant, control room, simulator, or other)
- 4.
Initial setup conditions are identified.
- 5.
Initiating cue (and terminating cue if required) are properly identified.
- 6.
Task standards identified and verified by SME review.
- 7.
Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
- 8.
If an alternate path is used, the task standard contains criteria for successful completion.
- 9.
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure QCOP 1100-02 Rev: 12 Procedure Rev:
Procedure Rev:
- 10. Verify cues both verbal and visual are free of conflict.
- 11. Verify performance time is accurate
- 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date
2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 9 Revision Record (Summary)
Revision 00, Renamed 2014 ILT NRC JPM a. Restarted revision numbering accordingly.
Previous changes were:
Revision 06, Reworded to match wording of LS-008-I, the non-faulted version of the same JPM.
Revision 07, JPM revised to reflect procedure changes.
Revision 08, JPM revised to reflect simulator setup commands and new average performance time.
Revision 09, JPM revised to reflect procedure changes.
Revision 10, JPM revised to reflect single pump injection, procedure change, and removal of one critical task.
2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any IC at power > 20%
- 2. Manual Actuation:
Ensure the SBLC key is in the Control switch.
- 3. Malfunctions (contained in caep file A caep.cae)
Setup for a jpml00:00:00l00 Fail the SBLC pumps to work (2 commands)l00:00:00l01 imf SL01Al00:00:02l02 imf SL01Bl00:00:04l03 Set triggers 1 and 2 true when both squib lights are outl00:00:04l04 trgset 1(.NOT. ZLOHS11130301(2)).AND. (.NOT. ZLOHS11130301(4)) l00:00:06l05 trgset 2(.NOT. ZLOHS11130301(2)).AND. (.NOT. ZLOHS11130301(4)) l00:00:08l06 When triggers 1 and 2 true, delete the pump tripsl00:00:00l07 trg 1 dmf sl01a l00:00:10l08 trg 2 dmf sl01b l00:00:12l09
- 4. Remotes:
NONE
- 5. Overrides:
NONE
- 6. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
- 7. This completes the setup for this JPM.
A caep.cae JPM A QCOP 1100-02, Rev 012, IN
2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 9 INITIAL CONDITIONS U-1 has experienced an ATWS. The following conditions exist:
o Reactor power > 5%.
o Both Recirc pumps were tripped per QGA 101.
There is no LOCA in progress.
The SBLC system is in standby lineup.
The Unit Supervisor has determined that SBLC must be initiated per QGA 101.
This JPM is not time critical.
INITIATING CUE Inject the Standby Liquid Control System per the hard card.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 9 JPM Start Time:
STEP ELEMENT STANDARD SAT UNSAT Comment Number Obtain procedure to be used.
Obtains procedure QCOP 1100-02 hard card for injecting SBLC.
F.1.
Select System 1 or 2 with keylock switch A and B SELECT.
Positions SBLC keylock switch to System 1 or 2.
EVALUATOR NOTE: Initial cue states no LOCA in progress, candidate should only inject with one pump at a time.
- F.2.
- Determines SBLC NOT injecting.*
Determines SBLC NOT injecting by any one or more of the following indications:
SBLC flow light NOT lit.
SBLC tank level is NOT decreasing. (LI-1-1140-2)
Pump discharge press < Rx press. (PI-1-1140-1)
Verify neutron flux NOT decreasing. (APRM recorders)
EVALUATOR NOTE: Alternate path starts here.
- F.3.
- Attempt to inject SBLC with the opposite switch position.*
Repositions SBLC keylock switch to the opposite position that was initially selected.
SIMULATOR OPERATOR NOTE: When operator takes switch to the opposite position, verify triggers 1 and 2 go true and malfunctions SL01A and SL01B are deleted.
Reports SBLC is injecting.
Informs US that SBLC is injecting.
EVALUATOR: The candidate should inform you that the task is complete.
JPM Stop Time:
2014 ILT NRC JPM a - Rev. 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 7 of 9 JPM
SUMMARY
Operators Name:
Job
Title:
EO RO SRO FS STA/IA SRO Cert JPM
Title:
Initiate Standby Liquid Control with Failure to Inject JPM Number:
2014 ILT NRC JPM a Revision Number: 00 Task Number and
Title:
SR-1100-P02 (Freq: LIC=A) (ILT-MP) Given a reactor plant with an ATWS, inject boron prior to exceeding 110 degrees torus water temperature OR if core instability is observed in accordance with QGA 101 and QCOP 1100-02.
(Important PRA Operator Action - starting SBLC terminates 1 of the top 100 most probable Core Damage Sequences and has a RAW of 17.3)
K/A Number and Importance:
K/A:
211000 A4.02 Rating:
4.2/4.2 Suggested Testing Environment: Simulator Alternate Path:
Yes No SRO Only:
Yes No Time Critical:
Yes No Reference(s): QCOP 1100-02, Rev. 12, INJECTION OF STANDBY LIQUID CONTROL Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete: 6.0 minutes Actual Time Used:
minutes EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name:
(Print)
Evaluators Signature:
Date:
[If this page is an odd numbered page, a blank page is automatically generated after this page to keep the student cue sheet separate from this page]
SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS U-1 has experienced an ATWS. The following conditions exist:
o Reactor power > 5%.
o Both Recirc pumps were tripped per QGA 101.
o There is no LOCA in progress The SBLC system is in standby lineup.
The Unit Supervisor has determined that SBLC must be initiated per QGA 101.
This JPM is not time critical.
INITIATING CUE Inject the Standby Liquid Control System per the hard card.