{{#Wiki_filter:Davis-Besse Initial License Exam 2015 Admin JPM RO-A 1.1 Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO
{{#Wiki_filter:Davis-Besse Initial License Exam 2015 Admin JPM RO-A1.1
-A1.1 AG 1 of 10   Facility:             Davis-Besse   Task No: 002-003-02-0100   Task Title
 
:      Perform manual RCS Leakage Calculation K/A  
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG 1 of 10 Facility: Davis-Besse Task No:
002-003-02-0100 Task
 
==Title:==
Perform manual RCS Leakage Calculation K/A  


==Reference:==
==Reference:==
 
2.1.20 (4.6)
2.1.20 (4.6) Job Performance Measure No
Job Performance Measure No: RO-A1.1 (New)
:     RO-A1.1 (New)   Examinee:           NRC Examiner:
Examinee:
Date:       Method of testing:
NRC Examiner:
Simulated Performance
Date:
___  Actual Performance
Method of testing:
_X_ Classroom
Simulated Performance ___
_X_  Simulator
Actual Performance _X_
___  Plant ___
Classroom _X_
Simulator ___
Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure w ill be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Line 40: Line 46:


==References:==
==References:==
 
None Initiating Cue:
None Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
Time Critical Task:
No   Alternate Path:
No Alternate Path:
No Validation Time:
No Validation Time: 35 minutes  
35 minutes
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO
-A1.1 AG  2 of 10  EXAMINER COPY INITIAL CONDITIONS
:  The Plant is at 100% Power Makeup Tank Pressure is 25 psig
 
The Computer is unavailable INITIATION CUE:
The Unit Supervisor has directed you to perform ste p s 4.2.2.a through 4.2.2.k of DB-SP-03357, RCS Water Inventory Balance, manually calculate RCS l eak rate on Attachment 2, RCS/MU and Purification Leak Rate Calculation Sheet.
NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2
- page 1 of 3, 2 of 3, 3 of 3 and 4 of 4)
(Hand Candidate a copy of the DB-SP-0 3357 , RCS Water Inventory Balance Procedure and DB-PF-06703, Miscellaneous Curves CC 3.1 and CC 3.2a to CC3.2k


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG 2 of 10 EXAMINER COPY INITIAL CONDITIONS:
-A1.1 AG 3 of 10 CANDIDATE COPY INITIAL CONDITIONS
The Plant is at 100% Power Makeup Tank Pressure is 25 psig The Computer is unavailable INITIATION CUE:
The Plant is at 100% Power Makeup Tank Pressure is 25 psig The Computer is unavailable INITIATION CUE:
The Unit Supervisor has directed you to perform steps 4.2.2.a through 4.2.2.k of DB-SP-03357, RCS Water Inventory Balance, manually calculate RCS leak rate on Attachment 2, RCS/MU and Purification Leak Rate Calculation Sheet.
The Unit Supervisor has directed you to perform step s 4.2.2.a through 4.2.2.k of DB-SP-03357, RCS Water Inventory Balance, manually calculate RCS leak rate on Attachment 2, RCS/MU and Purification Leak Rate Calculation Sheet.
NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2 -
NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2  
page 1 of 3, 2 of 3, 3 of 3 and 4 of 4)
- page 1 of 3, 2 of 3, 3 of 3 and 4 of 4)
(Hand Candidate a copy of the DB-SP-03357, RCS Water Inventory Balance Procedure and DB-PF-06703, Miscellaneous Curves CC 3.1 and CC 3.2a to CC3.2k.


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG 3 of 10 CANDIDATE COPY INITIAL CONDITIONS:
-A1.1 AG 4 of 10 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
The Plant is at 100% Power Makeup Tank Pressure is 25 psig The Computer is unavailable INITIATION CUE:
START TIME:  _______
The Unit Supervisor has directed you to perform steps 4.2.2.a through 4.2.2.k of DB-SP-03357, RCS Water Inventory Balance, manually calculate RCS leak rate on Attachment 2, RCS/MU and Purification Leak Rate Calculation Sheet.
: 1. PERFORMANCE STEP: Performs step 4.2.2.a, Record Makeup Tank Water Density from Attachment 4
NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2 -
  ........C........
page 1 of 3, 2 of 3, 3 of 3 and 4 of 4)


STANDARD: Identifies that Makeup Tank initial and final temperature is 100 °F, locates Attachment 4 and determines the MU Tank Water Density is 62.0038 lbm/ft 3 and records this on Attachment 2 step 4.2.2.a.
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG 4 of 10 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
COMMENT:   CUE: None       __________
START TIME: _______
SAT UNSAT
: 1.
: 2. PERFORMANCE STEP: Complete the Initial Makeup Tank Inventory equations step 4.2.2.b ........C........
PERFORMANCE STEP: Performs step 4.2.2.a, Record Makeup Tank Water Density from
........C........
STANDARD:
Identifies that Makeup Tank initial and final temperature is 100 °F, locates and determines the MU Tank Water Density is 62.0038 lbm/ft3 and records this on Attachment 2 step 4.2.2.a.
COMMENT:
CUE: None SAT UNSAT
: 2.
PERFORMANCE STEP: Complete the Initial Makeup Tank Inventory equations step 4.2.2.b  
........C........
STANDARD: Water Inventory = (Tank level
STANDARD: Water Inventory = (Tank level
* 4.124 ft³/in
* 4.124 ft³/in
* Calibration Density) + (77.85 ft³
* Calibration Density) + (77.85 ft³
* Water Density)  
* Water Density)  
        = (Tank level
= (Tank level
* 4.124 ft³/in
* 4.124 ft³/in
* 62.325lbm/ ft³) + (77.85 ft³
* 62.325lbm/ ft³) + (77.85 ft³
Line 86: Line 87:
Initial:
Initial:
( __67__ in.* 257 lbm/in ) + ( 77.85 ft³
( __67__ in.* 257 lbm/in ) + ( 77.85 ft³
* _62.0038   lbm/ft³) = _22046 (+/- 1 0)_ lbm   CUE: Another Operator will perform the Independent Verification of the calculation
* _62.0038 lbm/ft³) = _22046 (+/- 10)_ lbm CUE: Another Operator will perform the Independent Verification of the calculation SAT UNSAT  
__________
SAT UNSAT
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO
-A1.1 AG  5 of 10  3. PERFORMANCE STEP: Complete the Final Makeup Tank Inventory equations step 4.2.2.b  ........C........


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG 5 of 10
: 3.
PERFORMANCE STEP: Complete the Final Makeup Tank Inventory equations step 4.2.2.b
........C........
STANDARD: Water Inventory = (Tank level
STANDARD: Water Inventory = (Tank level
* 4.124 ft³/in
* 4.124 ft³/in
* Calibration Density) + (77.85 ft³
* Calibration Density) + (77.85 ft³
* Water Density)  
* Water Density)  
        = (Tank level
= (Tank level
* 4.124 ft³/in
* 4.124 ft³/in
* 62.325lbm/ ft³) + (77.85 ft³
* 62.325lbm/ ft³) + (77.85 ft³
* Water Density)
* Water Density)
Final:     ( __6 4__ in.* 257 lbm/in ) + ( 77.85 ft³
Final:
* _62.0038   lbm/ft³) =
( __64__ in.* 257 lbm/in ) + ( 77.85 ft³
_21275 (+/- 10)_ lbm   CUE: Another Operator will perform the Independent Verification of the calculation
* _62.0038 lbm/ft³) = _21275 (+/- 10)_ lbm CUE: Another Operator will perform the Independent Verification of the calculation SAT UNSAT
__________
: 4.
SAT UNSAT
PERFORMANCE STEP: Determine Pressurizer Inventory Water and Steam Density values using the initial and final values and Attachment 6, per step 4.2.2.c  
: 4. PERFORMANCE STEP: Determine Pressurizer Inventory Water and Steam Density values using the initial and final values and Attachment 6, per step 4.2.2.c
........C.......
  ........C....... STANDARD: Locates Attachment 6, uses initial RCS pressure value of 2156 psig and final RCS pressure value of 2161 psig to record Density values in step 4.2.2.c of Attachment 2 Pressurizer Inventory Density (from Attachment 6)
STANDARD:
Water Initial ___37.71________ lbm/ft³ Steam Initial ____6.02_________ lbm/ft³ Water Final ____37.68________ lbm/ft³ Steam Final ____6.04_________ lbm/ft³ CUE: None       __________
Locates Attachment 6, uses initial RCS pressure value of 2156 psig and final RCS pressure value of 2161 psig to record Density values in step 4.2.2.c of Attachment 2 Pressurizer Inventory Density (from Attachment 6)
SAT UNSAT
Water Initial ___37.71________ lbm/ft³ Steam Initial ____6.02_________ lbm/ft³ Water Final ____37.68________ lbm/ft³ Steam Final ____6.04_________ lbm/ft³ CUE:
: 5. PERFORMANCE STEP: Complete the Initial Pressurizer Inventory equation for Water Inventory step 4.2.2.d
None SAT UNSAT
  ........C........
: 5.
STANDARD: Water Inventory = (level
PERFORMANCE STEP: Complete the Initial Pressurizer Inventory equation for Water Inventory step 4.2.2.d  
........C........
STANDARD:
Water Inventory = (level
* 3.173 ft³/in + 239.6 ft³)
* 3.173 ft³/in + 239.6 ft³)
* Water Density Water Initial:
* Water Density Water Initial:
[(_218_ in.
[(_218_ in.
* 3.173 ft³/in) + 239.6 ft³]
* 3.173 ft³/in) + 239.6 ft³]
* 37.71 lbm/ft³ = _35119.85 (+/- 250) lbm   CUE: None       __________
* 37.71 lbm/ft³ = _35119.85 (+/- 250) lbm CUE:
SAT UNSAT
None SAT UNSAT  


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG 6 of 10
-A1.1 AG 6 of 10 6. PERFORMANCE STEP: Complete the Final Pressurizer Inventory equation for Water Inventory step 4.2.2.d
: 6.
  ........C........
PERFORMANCE STEP: Complete the Final Pressurizer Inventory equation for Water Inventory step 4.2.2.d  
 
........C........
STANDARD: Water Inventory = (level
STANDARD:
Water Inventory = (level
* 3.173 ft³/in + 239.6 ft³)
* 3.173 ft³/in + 239.6 ft³)
* Water Density Water Final
* Water Density Water Final:
[(_2 22_ in.
[(_222_ in.
* 3.173 ft³/in) + 239.6 ft³]
* 3.173 ft³/in) + 239.6 ft³]
* 37.68 lbm/ft³ = _
* 37.68 lbm/ft³ = _35570.146 (+/- 250 ) lbm CUE:
35 570.146 (+/- 250 ) lbm   CUE: None       __________
None SAT UNSAT
SAT UNSAT
: 7.
: 7. PERFORMANCE STEP: Complete the Initial Pressurizer Inventory equation for Steam Inventory step 4.2.2.d
PERFORMANCE STEP: Complete the Initial Pressurizer Inventory equation for Steam Inventory step 4.2.2.d  
  ........C........
........C........
STANDARD: Steam Inventory =[((320  
STANDARD:
- level)
Steam Inventory =[((320 - level)
* 3.173 ft³/in) + 242.2 ft³]
* 3.173 ft³/in) + 242.2 ft³]
* Steam Density Steam Initial:   [((320 - 218 in)
* Steam Density Steam Initial:
[((320 - 218 in)
* 3.173 ft³/in) + 242.2 ft³]
* 3.173 ft³/in) + 242.2 ft³]
* 6.02 lbm/ft³) = _3406.393 (+/
* 6.02 lbm/ft³) = _3406.393 (+/-50) lbm CUE:
-5 0) lbm CUE: None       __________
None SAT UNSAT
SAT UNSAT
: 8.
: 8. PERFORMANCE STEP: Complete the Final Pressurizer Inventory equation for Steam Inventory step 4.2.2.d
PERFORMANCE STEP: Complete the Final Pressurizer Inventory equation for Steam Inventory step 4.2.2.d  
  ........C........
........C........
 
STANDARD:
STANDARD: Steam Inventory =[((320  
Steam Inventory =[((320 - level)
- level)
* 3.173 ft³/in) + 242.2 ft³]
* 3.173 ft³/in) + 242.2 ft³]
* Steam Density Steam Final:   [((320 - 2 22 in)
* Steam Density Steam Final:
[((320 - 222 in)
* 3.173 ft³/in) + 242.2 ft³]
* 3.173 ft³/in) + 242.2 ft³]
* 6.0 4 lbm/ft³) = _
* 6.04 lbm/ft³) = _3341.05 (+/-50) lbm CUE:
3341.05 (+/-5 0) lbm   CUE: None       __________
None SAT UNSAT  
SAT UNSAT


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG 7 of 10
-A1.1 AG 7 of 10 9. PERFORMANCE STEP: Input the Power Correction Factor data on Attachment 2 step 4.2.2.e ........C........
: 9.
PERFORMANCE STEP: Input the Power Correction Factor data on Attachment 2 step 4.2.2.e  
........C........
STANDARD:
Power is 100% from initial conditions, refers to DB-PF-06703 Curve CC3.1 to obtain the Power Correction Factors 4.2.2.e Power Correction Factor Initial __135_(+/ 5) _ lbm Final 135 (+/-5) lbm CUE:
None SAT UNSAT
: 10. PERFORMANCE STEP: Input the Temperature Correction Factor data on Attachment 2 step 4.2.2.f
........C........
STANDARD:
Initial Temperature is 581.8 °F and Final Temperature is 582.3 °F from, refers to DB-PF-06703 Curve CC3.1 to obtain the Power Correction Factors 4.2.2.f Temperature Correction Factor (Tave 528 °F)
Initial __-35200 (+/- 50) _ lbm Final -35600 (+/- 50) lbm CUE:
None SAT UNSAT
: 11. PERFORMANCE STEP: If Tave is less than 528 °F, then complete Temperature Factor Equation per step 4.2.2.g STANDARD:
Determines step 4.2.2.g is N/A since temperature is greater than 528 °F CUE:
None SAT UNSAT


STANDARD: Power is 100% from initial conditions, refers to DB
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG 8 of 10
-PF-06703 Curve CC3.1 to obtain the Power Correction Factors
: 12. PERFORMANCE STEP: Complete the RCS Inventory Table to determine Initial and Final total RCS Inventory per step 4.2.2.h  
 
........C........
4.2.2.e Power Correction Factor Initial __135_(+/ 5)  _ lbm Final      135  (+/-5)  lbm CUE: None      __________
STANDARD:
SAT  UNSAT
Transfers data calculated to the RCS Inventory Table and calculates the Initial and Final RCS Water Inventory MU Tank Inventory (lbm)  
 
+
1 0. PERFORMANCE STEP: Input the Temperature Correction Factor data on Attachment 2 step  4.2.2.f
Pzr Steam Inventory (lbm)  
  ........C........
+
 
Pzr Water Inventory (lbm)  
STANDARD: Initial Temperature is 581.8
+
°F and Final Temperature is 582.3
Power Correction (lbm)  
°F from Attachment 2, refers to DB
+
-PF-06703 Curve CC3.1 to obtain the Power Correction Factors 4.2.2.f Temperature Correction Factor (Tave  °F)  Initial __-35 200 (+/- 5 0) _ lbm Final      -35 6 00 (+/- 5 0)  lbm CUE: None      __________
Temperature Correction (lbm)  
SAT  UNSAT
=
: 11. PERFORMANCE STEP: If Tave is less than 528 °F, then complete Temperature Factor Equation per step 4.2.2.g STANDARD: Determines step 4.2.2.g is N/A since temperature is greater than 528
Water Inventory (lbm)
°F  CUE: None      __________
Initial:
SAT  UNSAT
22046 lbm +
 
3406.393 lbm +
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO
35119.85 lbm +
-A1.1 AG 8 of 10 1 2. PERFORMANCE STEP: Complete the RCS Inventory Table to determine Initial and Final total RCS Inventory per step 4.2.2.h
135 lbm +  
  ........C........
-35200 lbm =
STANDARD: Transfers data calculated to the RCS Inventor y Table and calculate s the Initial and Final RCS Water Inventory MU Tank Inventory (lbm) + Pzr Steam Inventory (lbm) + Pzr Water Inventory (lbm) + Power Correction (lbm) + Temperature Correction (lbm) = Water Inventory (lbm) Initial: 22046 lbm +   3406.393 lbm +   35119.85 lbm +   135 lbm +   -352 00  lbm =   25507.243 (+/- 250) lbm Final: 21275 lbm +   3341.05 lbm +   35570.146 lbm +   135 lbm +   -356 00  lbm =   2 4721.196   (+/- 250) lbm   CUE: None       __________
25507.243
SAT UNSAT 1 3. PERFORMANCE STEP: Calculates the Change in RCS Inventory
(+/- 250) lbm Final:
  ........C........
21275 lbm +
STANDARD: Completes step 4.2.2.i to determine RCS Inventory Change Change = Initial inventory  
3341.05 lbm +
- Final inventory Change = 25507.243 lbm - 2 4721.196_ lbm = 7 86.0 47 (+/- 8 0)_ lbm   CUE: Another Operator will perform the Independent Verification of the calculation
35570.146 lbm +
__________
135 lbm +  
SAT UNSAT
-35600 lbm =
 
24721.196
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO
(+/- 250) lbm CUE:
-A1.1 AG  9 of 10  1 4. PERFORMANCE STEP: Calculates the Time Period  .......C......... STANDARD: Completes step 4.2.2.
None SAT UNSAT
j by subtracting Initial Time from the Final Time Period  = Final time
: 13. PERFORMANCE STEP: Calculates the Change in RCS Inventory  
- Initial time Period = [(23 hr x 60) + (  11  min)] - [(_19 hr x 60) + (5  min)]  = _
........C........
246__ min  CUE: Another Operator will perform the Independent Verification of the calculation
STANDARD:
__________
Completes step 4.2.2.i to determine RCS Inventory Change Change = Initial inventory - Final inventory Change = 25507.243 lbm - 24721.196_ lbm = 786.047 (+/- 80)_ lbm CUE: Another Operator will perform the Independent Verification of the calculation SAT UNSAT  
SAT  UNSAT 1 5. PERFORMANCE STEP: Calculates the Total RCS Leak Rate per step 4.2.2.k
  .......C.........


STANDARD: Completes step 4.2.2.k by subtracting Initial Time from the Final Time lbm 62.32 ft x ftgallons 7.481 x timeInventory  RCSin  Change   Leakrate 3 3   Leakrate = ( 7 86.0 47 lbm) ÷ ( 246 min) x (0.120 gal/lbm)
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG 9 of 10
: 14. PERFORMANCE STEP: Calculates the Time Period
.......C.........
STANDARD:
Completes step 4.2.2.j by subtracting Initial Time from the Final Time Period = Final time - Initial time Period = [(23 hr x 60) + ( 11 min)] - [(_19 hr x 60) + (5 min)] = _246__ min CUE: Another Operator will perform the Independent Verification of the calculation SAT UNSAT
: 15. PERFORMANCE STEP: Calculates the Total RCS Leak Rate per step 4.2.2.k
.......C.........
STANDARD:
Completes step 4.2.2.k by subtracting Initial Time from the Final Time lbm 62.32 ft x
ft gallons 7.481 x
time Inventory RCS in Change Leakrate 3
3
=
Leakrate = (
786.047 lbm) ÷ (
246 min) x (0.120 gal/lbm)
Leakrate =
Leakrate =
0.3 8 3 (+/- 0.05) gpm CUE: Another Operator will perform the Independent Verification of the calculation
0.383 (+/- 0.05) gpm CUE: Another Operator will perform the Independent Verification of the calculation SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)
__________
END TIME  
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examine r)       __________
END TIME


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG 10 of 10 Verification of Completion Job Performance Measure No.
-A1.1 AG 10 of 10   Verification of Completion Job Performance Measure No.
Examinees Name:
Examinee's Name:
Examiners Name:
Examiner's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:  
Time to Complete:
 
Question Documentation:
Question Documentation:  
 
Question:_____________________________________________________________
Question:_____________________________________________________________
____________________________________________________________________________
________________________________________________________________
Response:_____________________________________________________________
Response:_____________________________________________________________
___________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
___________________________


______________________________________________________________________
20 Revision ATTACHMENT 2:
______________________________________________________________________
Result:  Satisfactory/Unsatisfactory Examiner's signature and date:
_______________________________________
 
20   Revision   ATTACHMENT 2:
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 1 of 3 Note: For parameters which utilize averaging of redundant channels, eliminate inoperable channels from the average and reduce the denominator accordingly.
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 1 of 3 Note: For parameters which utilize averaging of redundant channels, eliminate inoperable channels from the average and reduce the denominator accordingly.
If a Th or Tc point is unavailable, eliminate it and the opposing point (Tc or Th) from the same loop, and reduce the denominator by 2.
If a Th or Tc point is unavailable, eliminate it and the opposing point (Tc or Th) from the same loop, and reduce the denominator by 2.
ITEM PARAMETER SOURCE UNITS INITIAL VALUE FINAL VALUE 1 Time Control Room clock or computer hr:min Step 4.1.4 Step 4.1.10 1905 2311 2 Makeup Tank Temp T769 or TI MU8 °F 100 100 3 Makeup Tank Level (2 channel ave)
ITEM PARAMETER SOURCE UNITS INITIAL VALUE FINAL VALUE 1
[L761+L763] 2, or LR MU16 in. 67 64 4 RCS Pressure (4 ch ave)
Time Control Room clock or computer hr:min Step 4.1.4 Step 4.1.10 1905 2311 2
[P721+P722+P729+P730] 4, PRS RC2A2, or PRS RC2B (1) ps i 2156 2161 5 Pressurizer Level LRS RC14 or L768 in. 218 222 6 Ave Power [R795+R804+R814+R820] 4,C913, or NR NI6 % 100 100 7 Tave (8 ch ave)
Makeup Tank Temp T769 or TI MU8  
TI RC7, or: [T719+T720+T728+T729+
°F 100 100 3
T780+T800+T820+T840] 8 (2) °F 581.8 582.3 (1) If less than 1700 psig RCS Pressure use the average of P725 and P732 (loop 1 and loop 2 WR Pressure).
Makeup Tank Level (2 channel ave)
(2) If less than 520°F RCS Temperature then average T753 and T782 (loop 1 and loop 2 WR Temperature).  
[L761+L763]÷2, or LR MU16 in.
 
67 64 4
RCS Pressure (4 ch ave)
[P721+P722+P729+P730]÷4, PRSRC2A2, or PRSRC2B (1) psi 2156 2161 5
Pressurizer Level LRS RC14 or L768 in.
218 222 6
Ave Power
[R795+R804+R814+R820]÷4, C913, or NR NI6 100 100 7
Tave (8 ch ave)
TI RC7, or:
[T719+T720+T728+T729+
T780+T800+T820+T840]÷8 (2)  
°F 581.8 582.3 (1) If less than 1700 psig RCS Pressure use the average of P725 and P732 (loop 1 and loop 2 WR Pressure).
(2) If less than 520°F RCS Temperature then average T753 and T782 (loop 1 and loop 2 WR Temperature).
4.2.2.a Makeup Tank Water Density (from Attachment 4)
4.2.2.a Makeup Tank Water Density (from Attachment 4)
Initial ____62.0038______ lbm/ft³ Final   ___ 62.0038______ lbm/ft³ 4.2.2.b Makeup Tank Inventory Note: 77.85 ft³ accounts for water volume below the level indicating range.
Initial ____62.0038______ lbm/ft³ Final ___ 62.0038______ lbm/ft³ 4.2.2.b Makeup Tank Inventory Note: 77.85 ft³ accounts for water volume below the level indicating range.
Water Inventory = (Tank level
Water Inventory = (Tank level
* 4.124 ft³/in
* 4.124 ft³/in
* Calibration Density) + (77.85 ft³
* Calibration Density) + (77.85 ft³
* Water Density)  
* Water Density)  
        = (Tank level
= (Tank level
* 4.124 ft³/in
* 4.124 ft³/in
* 62.325lbm/ ft³) + (77.85 ft³
* 62.325lbm/ ft³) + (77.85 ft³
Line 248: Line 277:
Initial:
Initial:
( ___67______ in.* 257 lbm/in ) + ( 77.85 ft³
( ___67______ in.* 257 lbm/in ) + ( 77.85 ft³
* _62.0038   lbm/ft³) =
* _62.0038 lbm/ft³) = _22046_ lbm IV Final:
_22046_ lbm ________ IV Final:     (___64______ in.* 257 lbm/in ) + ( 77.85 ft³
(___64______ in.* 257 lbm/in ) + ( 77.85 ft³
* _62.0038   lbm/ft³) =
* _62.0038 lbm/ft³) = _21275_ lbm IV  
_2 1275_ lbm ________ IV 21   Revision   ATTACHMENT 2:
 
21 Revision ATTACHMENT 2:
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 2 of 3 4.2.2.c Pressurizer Inventory Density (from Attachment 6)
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 2 of 3 4.2.2.c Pressurizer Inventory Density (from Attachment 6)
Water Initial ___37.71________ lbm/ft³ Steam Initial ____6.02_________ lbm/ft³ Water Final ____37.68________ lbm/ft³ Steam Final ____6.04_________ lbm/ft³ 4.2.2.d Pressurizer Inventory Note: 239.6 ft³ accounts for water volume below the level indicating range.
Water Initial ___37.71________ lbm/ft³ Steam Initial ____6.02_________ lbm/ft³ Water Final ____37.68________ lbm/ft³ Steam Final ____6.04_________ lbm/ft³ 4.2.2.d Pressurizer Inventory Note:
239.6 ft³ accounts for water volume below the level indicating range.
242.2 ft³ accounts for steam volume above the level indicating range.
242.2 ft³ accounts for steam volume above the level indicating range.
Water Inventory = (level
Water Inventory = (level
Line 260: Line 291:
[(___218_____ in.
[(___218_____ in.
* 3.173 ft³/in) + 239.6 ft³]
* 3.173 ft³/in) + 239.6 ft³]
* 37.71 lbm/ft³ = _
* 37.71 lbm/ft³ = _35119.85 lbm IV Water Final:
35119.85 lbm ________ IV Water Final:
[(___222_____ in.
[(___222_____ in.
* 3.173 ft³/in) + 239.6 ft³]
* 3.173 ft³/in) + 239.6 ft³]
* 3 7.68   lbm/ft³ = _
* 37.68 lbm/ft³ = _35570.146 lbm IV Steam Inventory =[((320 - level)
35 570.146 lbm ________ IV Steam Inventory =[((320  
- level)
* 3.173 ft³/in) + 242.2 ft³]
* 3.173 ft³/in) + 242.2 ft³]
* Steam Density Steam Initial:
* Steam Density Steam Initial:
[((320 - _218__in)
[((320 - _218__in)
* 3.173 ft³/in) + 242.2 ft³]
* 3.173 ft³/in) + 242.2 ft³]
* 6.02 lbm/ft³) = _3406.393________ lbm
* 6.02 lbm/ft³) = _3406.393________ lbm IV Steam Final:
________ IV Steam Final:
[((320 - __222__in)
[((320 - __222__in)
* 3.173 ft³/in) + 242.2 ft³]
* 3.173 ft³/in) + 242.2 ft³]
* 6.04   lbm/ft³) = _
* 6.04 lbm/ft³) = _3341.05 __ lbm IV 4.2.2.e Power Correction Factor Initial _____135_____________ lbm Final _____135____________ lbm 4.2.2.f Temperature Correction Factor (Tave >528°)
3 341.05         __ lbm ________ IV 4.2.2.e Power Correction Factor Initial _____
Initial ______-35200___________ lbm Final _____-35600___________ lbm  
135_____________ lbm Final   _____
135____________ lbm 4.2.2.f Temperature Correction Factor (Tave >528°)   Initial ______
-35 2 00___________ lbm Final   _____
-35 6 00___________ lbm
 
22    Revision  ATTACHMENT 2:
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 3 of 3 4.2.2.g Temperature Correction Factor (Tave <528&deg;)  Reactor Coolant System Density (from Attachment 5)
N/A  At initial Tave ___________________ lbm/ft&#xb3;
 
At final Tave ___________________ lbm/ft&#xb3; Temperature Correction Factor (TCF)


22 Revision ATTACHMENT 2:
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 3 of 3 4.2.2.g Temperature Correction Factor (Tave <528&deg;)
Reactor Coolant System Density (from Attachment 5)
N/A At initial Tave
___________________ lbm/ft&#xb3; At final Tave
___________________ lbm/ft&#xb3; Temperature Correction Factor (TCF)
TCF = [(10,277 + (0.24828
TCF = [(10,277 + (0.24828
* Tave))
* Tave))
* Reactor Coolant System Density]  
* Reactor Coolant System Density] - 498,800 Initial: [(10,277 ft&#xb3; + (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
- 498,800 Initial: [(10,277 ft&#xb3; + (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
* _______ lbm/ft&#xb3;] - 498,800 lbm = _______ lbm IV Final: [(10,277 ft&#xb3; + (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
* _______ lbm/ft&#xb3;]  
* _______ lbm/ft&#xb3;] - 498,800 lbm = _______ lbm IV 4.2.2.h RCS Inventory MU Tank Inventory (lbm)  
- 498,800 lbm = _______ lbm
+
________ IV Final: [(10,277 ft&#xb3; + (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
Pzr Steam Inventory (lbm)  
* _______ lbm/ft&#xb3;]  
+
- 498,800 lbm = _______ lbm
Pzr Water Inventory (lbm)  
________ IV 4.2.2.h RCS Inventory MU Tank Inventory (lbm) + Pzr Steam Inventory (lbm) + Pzr Water Inventory (lbm) + Power Correction (lbm) + Temperature Correction (lbm) = Water Inventory (lbm) Initial: 22046 lbm +   3406.393 lbm +   35119.85 lbm +   135 lbm +   -35 2 00  lbm =   25507.243 lbm Final: 21275 lbm +   3341.05 lbm +   35570.146 lbm +   135 lbm +   -35 6 00  lbm =   24721.196 lbm 4.2.2.i Change in RCS Inventory Change = Initial inventory  
+
- Final inventory Change = 25507.243_ lbm - 24721.196 lbm = 786.047_ lbm ________ IV 23    Revision  ATTACHMENT 2:
Power Correction (lbm)  
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 4 of 4  4.2.2.j Time period Period  = Final time
+
- Initial time Period = [(_
Temperature Correction (lbm)  
23___ hr x 60) + (  11      min)] - [(__19__ hr x 60) + ( 5    min)]  =  _
=
246____ min ________ IV 4.2.2.k  Total RCS Leak Rate    lbm 62.32 ft  x  ftgallons 7.481  x  timeInventory  RCSin  Change    Leakrate 3 3    Leakrate =  ( 7 86.047  lbm) &#xf7; (  246 min) x  (0.120 gal/lbm)
Water Inventory (lbm)
Leakrate =
Initial:
.3 8 3  gpm  ________ IV Independent Verification Completed by _________________________________ Date ______
22046 lbm +
3406.393 lbm +
35119.85 lbm +
135 lbm +  
-35200 lbm =
25507.243 lbm Final:
21275 lbm +
3341.05 lbm +
35570.146 lbm +
135 lbm +  
-35600 lbm =
24721.196 lbm 4.2.2.i Change in RCS Inventory Change = Initial inventory - Final inventory Change = 25507.243_ lbm - 24721.196 lbm = 786.047_ lbm IV  


24   Revision   ATTACHMENT 3:
23 Revision ATTACHMENT 2:
UNIDENTIFIED RCS LEAKAGE CALCULATION SHEET Page 1 of 1 4.2.1.f RCP Seals Leak Rate from computer printout, or from Attachment
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 4 of 4 4.2.2.j Time period Period = Final time - Initial time Period = [(_23___ hr x 60) + ( 11 min)] - [(__19__ hr x 60) + ( 5 min)] = _246____ min IV 4.2.2.k Total RCS Leak Rate lbm 62.32 ft x
: 1. (4.2.1.e)   __________ gpm 4.2.1.j Quench Tank In-Leakage Rate from computer printout, or from Attachment 1. (4.2.1.i). Only record Positive values (exclude negative values by entering 0.000).
ft gallons 7.481 x
__________ gpm 4.2.2.l RCS Total Leak Rate from computer printout, or from Attachment
time Inventory RCS in Change Leakrate 3
: 2. ___.383___ gpm   4.2.3.a Primary to Secondary Tube Leakage from computer printout, or from most recent entry in RCS Leakage Log, RO Log, or as determined by Chemistry.
3
=
Leakrate = (
786.047 lbm) &#xf7; (
246 min) x (0.120 gal/lbm)
Leakrate =.383 gpm IV Independent Verification Completed by _________________________________ Date ______
 
24 Revision ATTACHMENT 3:
UNIDENTIFIED RCS LEAKAGE CALCULATION SHEET Page 1 of 1 4.2.1.f RCP Seals Leak Rate from computer printout, or from Attachment 1. (4.2.1.e)
__________ gpm 4.2.1.j Quench Tank In-Leakage Rate from computer printout, or from Attachment 1. (4.2.1.i). Only record Positive values (exclude negative values by entering 0.000).
__________ gpm 4.2.2.l RCS Total Leak Rate from computer printout, or from Attachment 2.
___.383___ gpm 4.2.3.a Primary to Secondary Tube Leakage from computer printout, or from most recent entry in RCS Leakage Log, RO Log, or as determined by Chemistry.
__________ gpm (0.104 allowed) 4.2.3.b Other Identified Leakage, or from RCS Leakage Log.
__________ gpm (0.104 allowed) 4.2.3.b Other Identified Leakage, or from RCS Leakage Log.
__________ gpm 4.2.3.c Total Identified Leak Rate from computer printout, or from; RCP Seals + Quench Tk + Pri to Sec + Other                                           ( 4.2.1.e + 4.2.1.i [positive values only] +   4.2.3.a + 4.2.3.b ). ________      IV __________ gpm (10 gpm allowed) 4.2.3.d Unidentified Leak Rate from computer printout, or from; Total Leak Rate  
__________ gpm 4.2.3.c Total Identified Leak Rate from computer printout, or from; RCP Seals + Quench Tk + Pri to Sec + Other
- Total Identified Leak Rate
( 4.2.1.e + 4.2.1.i [positive values only] + 4.2.3.a + 4.2.3.b ).
( 4.2.2.k - 4.2.3.c ) ________      IV __________ gpm (1 gpm allowed) 4.2.3.e Reactor Coolant Pressure Boundary Leakage
IV
__________ gpm (10 gpm allowed) 4.2.3.d Unidentified Leak Rate from computer printout, or from; Total Leak Rate - Total Identified Leak Rate
( 4.2.2.k - 4.2.3.c )
IV
__________ gpm (1 gpm allowed) 4.2.3.e Reactor Coolant Pressure Boundary Leakage
__________ gpm (0 gpm allowed)
__________ gpm (0 gpm allowed)
Independent Verification Completed by _________________________________ Date ______
Independent Verification Completed by _________________________________ Date ______
Performed by:
Performed by:
Date:
Date:  
Davis-Besse Initial License Exam 2015 Admin JPM RO-A 1.2 Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 1.2 AG 1 of 6   Facility:             Davis-Besse   Task No: 119-002-03-0100   Task Title
 
:      Determine Maintenance of Active License Status K/A  
Davis-Besse Initial License Exam 2015 Admin JPM RO-A1.2
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG 1 of 6 Facility: Davis-Besse Task No:
119-002-03-0100 Task
 
==Title:==
Determine Maintenance of Active License Status K/A  


==Reference:==
==Reference:==
 
2.1.4 (3.3)
2.1.4 (3.3) Job Performance Measure No
Job Performance Measure No: RO-A1.2 (JPM New)
:     RO-A1.2 (JPM New)   Examinee:           NRC Examiner:
Examinee:
Date:       Method of testing:
NRC Examiner:
Simulated Performance
Date:
___  Actual Performance
Method of testing:
_X_ Classroom
Simulated Performance ___
_X_  Simulator
Actual Performance _X_
___  Plant ___
Classroom _X_
Simulator ___
Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Line 338: Line 394:
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard: Determine active license status is not maintained, evaluate whether each shift meets the requirements.
Task Standard:
 
Determine active license status is not maintained, evaluate whether each shift meets the requirements.
Required Materials:
Required Materials:
DBBP-TRAN-0014, License Requirements for Licensed Individuals NT-OT-07001, Training and Qualification of Operations Personnel General  
DBBP-TRAN-0014, License Requirements for Licensed Individuals NT-OT-07001, Training and Qualification of Operations Personnel General  


==References:==
==References:==
 
None Initiating Cue:
None Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
Time Critical Task:
No   Alternate Path:
No Alternate Path:
No Validation Time:
No Validation Time:
20 minutes
20 minutes  


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 1.2 AG 2 of 6   EXAMINER COPY INITIAL CONDITIONS
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG 2 of 6 EXAMINER COPY INITIAL CONDITIONS:
Today is 7/1/15. You are a Reactor Operator.
Today is 7/1/15. You are a Reactor Operator. You are scheduled to stand a Reactor Operator ATC watch tomorrow. Your work history for the previous quarter is as follows:
You are scheduled to stand a Reactor Operator ATC watch tomorrow.
4/12/15 Worked 12 hours as BOP in Mode 1 (day shift). Took turnover at the beginning of shift and gave turnover at end of shift.
Your work history for the previous quarter is as follows
4/13/15 Worked 8 hours as BOP in Mode 1 (day shift). Took turnover at beginning of shift and did NOT give turnover at end of shift.
4/12/1 5 Worked 12 hours as BOP in Mode 1 (day shift). Took turnover at the beginning of shift and gave turnover at end of shift.
4/14/15 Worked 6 hours in Mode 1 as ATC and 6 hours ATC doing Crew JIT training on Simulator (day shift). Took turnover at beginning and gave turnover at end of both of these assignments.
 
4/13/15 Worked 8 hours as BOP in Mode 1 (day shift). Took turnover at beginning of shift and did NOT give turnover at end of shift
. 4/14/15 Worked 6 hours in Mode 1 as ATC and 6 hours ATC doing Crew JIT training on Simulator (day shift). Took turnover at beginning and gave turnover at end of both of these assignments.
5/19/15 Worked 12 hours in Mode 5 as BOP (night shift). Took turnover at beginning of shift and gave turnover at end of shift.
5/19/15 Worked 12 hours in Mode 5 as BOP (night shift). Took turnover at beginning of shift and gave turnover at end of shift.
5/20/15 Worked 12 hours in Mode 5 as ATC (night shift). Took turnover at beginning of shift an d gave turnover at end of shift 5/21/15 Worked 12 hours in Mode 3 as BOP (night shift). Took turnover at beginning of shift and did gave turnover at end of shift.
5/20/15 Worked 12 hours in Mode 5 as ATC (night shift). Took turnover at beginning of shift and gave turnover at end of shift 5/21/15 Worked 12 hours in Mode 3 as BOP (night shift). Took turnover at beginning of shift and did gave turnover at end of shift.
6/27/15 Worked 12 hours I Mode 1 as the 3rd RO in the Control Room (day shift). Took turnover at beginning of shift and gave turnover at end of shift.
6/27/15 Worked 12 hours I Mode 1 as the 3rd RO in the Control Room (day shift). Took turnover at beginning of shift and gave turnover at end of shift.
INITIATION CUE:
INITIATION CUE:
Determine if your license status is active or inactive based on the previous quarters work history and document as ACTIVE or INACTIVE on this page. Report whether each shift meets the watch credit or not.
Determine if your license status is active or inactive based on the previous quarters work history and document as ACTIVE or INACTIVE on this page. Report whether each shift meets the watch credit or not.
(Provide copy of DBBP
(Provide copy of DBBP-TRAN-0014, License Requirements for Licensed Individuals and NT-OT-07001, Training and Qualification of Operations Personnel)
-TRAN-0014, License Requirements for Licensed Individuals and NT-OT-07001, Training and Qualification of Operations Personnel)
RESULTS:  
RESULTS:
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 1.2 AG 3 of 6 CANDIDATE COPY INITIAL CONDITIONS
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG 3 of 6 CANDIDATE COPY INITIAL CONDITIONS:
Today is 7/1/15. You are a Reactor Operator.
Today is 7/1/15. You are a Reactor Operator. You are scheduled to stand a Reactor Operator ATC watch tomorrow. Your work history for the previous quarter is as follows:
You are scheduled to stand a Reactor Operator ATC watch tomorrow.
4/12/15 Worked 12 hours as BOP in Mode 1 (day shift). Took turnover at the beginning of shift and gave turnover at end of shift.
Your work history for the previous quarter is as follows
4/12/1 5 Worked 12 hours as BOP in Mode 1 (day shift). Took turnover at the beginning of shift and gave turnover at end of shift.
4/13/15 Worked 8 hours as BOP in Mode 1 (day shift). Took turnover at beginning of shift and did NOT give turnover at end of shift.
4/13/15 Worked 8 hours as BOP in Mode 1 (day shift). Took turnover at beginning of shift and did NOT give turnover at end of shift.
4/14/15 Worked 6 hours in Mode 1 as ATC and 6 hours ATC doing Crew JIT training on Simulator (day shift). Took turnover at beginning and gave turnover at end of both of these assignments.
4/14/15 Worked 6 hours in Mode 1 as ATC and 6 hours ATC doing Crew JIT training on Simulator (day shift). Took turnover at beginning and gave turnover at end of both of these assignments.
5/19/15 Worked 12 hours in Mode 5 as BOP (night shift). Took turnover at beginning of shift and gave turnover at end of shift.
5/19/15 Worked 12 hours in Mode 5 as BOP (night shift). Took turnover at beginning of shift and gave turnover at end of shift.
5/20/15 Worked 12 hours in Mode 5 as ATC (night shift). Took turnover at beginning of shift an d gave turnover at end of shift 5/21/15 Worked 12 hours in Mode 3 as BOP (night shift). Took turnover at beginning of shift and did gave turnover at end of shift.
5/20/15 Worked 12 hours in Mode 5 as ATC (night shift). Took turnover at beginning of shift and gave turnover at end of shift 5/21/15 Worked 12 hours in Mode 3 as BOP (night shift). Took turnover at beginning of shift and did gave turnover at end of shift.
 
6/27/15 Worked 12 hours I Mode 1 as the 3rd RO in the Control Room (day shift). Took turnover at beginning of shift and gave turnover at end of shift.
6/27/15 Worked 12 hours I Mode 1 as the 3rd RO in the Control Room (day shift). Took turnover at beginning of shift and gave turnover at end of shift.
INITIATION CUE:
INITIATION CUE:
Determine if your license status is active or inactive based on the previous quarters work history and document as ACTIVE or INACTIVE on this page. Report whether each shift meets t he watch credit or not. RESULTS:
Determine if your license status is active or inactive based on the previous quarters work history and document as ACTIVE or INACTIVE on this page. Report whether each shift meets the watch credit or not.
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 1.2 AG  4 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
RESULTS:  
START TIME:  _______
: 1. PERFORMANCE STEP: Evaluate 4/12/15 work period
  ........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is met
. CUE: None      __________
SAT  UNSAT
: 2. PERFORMANCE STEP: Evaluate 4/13/15 work period
  ........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. Did not stand complete watch  CUE: None        __________
SAT  UNSAT
: 3. PERFORMANCE STEP: Evaluate 4/14/15 work period
  ........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. No credit is given for Simulator time CUE: None      __________
SAT  UNSAT
: 4. PERFORMANCE STEP: Evaluate 5/19/15 work period
  ........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. Credit for BOP is not given in Mode 5. CUE: None        __________
SAT  UNSAT


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 1.2 AG 5 of 6 5. PERFORMANCE STEP: Evaluate 5/20/15 work period
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG 4 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
  ........C........
START TIME: _______
: 1.
PERFORMANCE STEP: Evaluate 4/12/15 work period  
........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is met.
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is met.
CUE: None       __________
CUE: None SAT UNSAT
SAT UNSAT
: 2.
: 6. PERFORMANCE STEP: Evaluate 5/21/15 work period
PERFORMANCE STEP: Evaluate 4/13/15 work period
  ........C........
........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is met CUE: None       __________
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. Did not stand complete watch CUE: None SAT UNSAT
SAT UNSAT
: 3.
: 7. PERFORMANCE STEP: Evaluate 6/27/15 work period
PERFORMANCE STEP: Evaluate 4/14/15 work period
  ........C........
........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. No credit is given for 3 rd Reactor Operator CUE: None       __________
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. No credit is given for Simulator time CUE: None SAT UNSAT
SAT UNSAT
: 4.
: 8. PERFORMANCE STEP: Evaluates credited time versus required time
PERFORMANCE STEP: Evaluate 5/19/15 work period
  ........C........
........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. Credit for BOP is not given in Mode 5.
CUE: None SAT UNSAT
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG 5 of 6
: 5.
PERFORMANCE STEP: Evaluate 5/20/15 work period
........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is met.
CUE: None SAT UNSAT
: 6.
PERFORMANCE STEP: Evaluate 5/21/15 work period  
........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is met CUE: None SAT UNSAT
: 7.
PERFORMANCE STEP: Evaluate 6/27/15 work period  
........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. No credit is given for 3rd Reactor Operator CUE: None SAT UNSAT
: 8.
PERFORMANCE STEP: Evaluates credited time versus required time  
........C........
STANDARD: Determines there are only three 12 hour shifts that can be credited and therefore minimum requirements to maintain active Reactor Operator license are not met.
STANDARD: Determines there are only three 12 hour shifts that can be credited and therefore minimum requirements to maintain active Reactor Operator license are not met.
CUE:
None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)
END TIME


CUE: None      __________
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG 6 of 6 Verification of Completion Job Performance Measure No.
SAT  UNSAT TERMINATING CUES:  This JPM is complete (Terminated by the examine r)        __________
Examinees Name:
END TIME Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 1.2 AG 6 of 6   Verification of Completion Job Performance Measure No.
Examiners Name:
Examinee's Name:
Examiner's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:  
Time to Complete:
 
Question Documentation:
Question Documentation:  
 
Question:_____________________________________________________________
Question:_____________________________________________________________
____________________________________________________________________________
________________________________________________________________
Response:_____________________________________________________________
Response:_____________________________________________________________
___________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
___________________________


______________________________________________________________________
Davis-Besse Initial License Exam 2015 Admin JPM RO-A2
______________________________________________________________________
Result:  Satisfactory/Unsatisfactory Examiner's signature and date:
____________
___________________________


Davis-Besse Initial License Exam 2015 Admin JPM RO-A2 Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 2 AG 1 of 7   Facility:             Davis-Besse   Task No:   119-035-0100   Task Title
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A2 AG 1 of 7 Facility: Davis-Besse Task No:
Determine isolation boundary and effect on plant equipment K/A  
119-035-0100 Task
 
==Title:==
Determine isolation boundary and effect on plant equipment K/A  


==Reference:==
==Reference:==
 
2.2.41 (3.5)
2.2.41 (3.5) Job Performance Measure No
Job Performance Measure No: RO-A2 (NEW)
:     RO-A 2 (NEW)   Examinee:           NRC Examiner:
Examinee:
Date:       Method of testing:
NRC Examiner:
Simulated Performance
Date:
___  Actual Performance
Method of testing:
_X_ Classroom
Simulated Performance ___
_X_  Simulator
Actual Performance _X_
___  Plant ___
Classroom _X_
Simulator ___
Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Line 465: Line 512:
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard: Identify boundary for leaking Turbine Plant Cooling Water Valve and determine isolation will  
Task Standard:
 
Identify boundary for leaking Turbine Plant Cooling Water Valve and determine isolation will result in loss of cooling to bearing lube oil for both Main Feedwater Pumps Required Materials:
result in loss of cooling to bearing lube oil for both Main Feedwater Pump s
OS-022, Turbine Plant Cooling Water System General  
Required Materials:
OS-022, Turbine Plant Cooling Water System
 
General  


==References:==
==References:==
 
11x17 Copy of Operational Schematics Initiating Cue:
11x17 Copy of Operation al Schematics Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
Time Critical Task: No Alternate Path: No Validation Time: 15 minutes  
No Alternate Path:
No Validation Time:
15 minutes
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 2 AG  2 of 7  EXAMINER COPY INITIAL CONDITIONS
:  The Plant is at 100% Power


CW112 , MFPT LUBE OIL COOLER 1-2-2 INLET ISOLATION is spraying water from a leak in the valve body. The valve has been closed and is still leaking.
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A2 AG 2 of 7 EXAMINER COPY INITIAL CONDITIONS:
INITIATION CUE:
The Plant is at 100% Power CW112, MFPT LUBE OIL COOLER 1-2-2 INLET ISOLATION is spraying water from a leak in the valve body. The valve has been closed and is still leaking.
The Shift Manager directs you to determine how CW112 can be isolated and what equipment will be affected. List isolation boundaries and equipment impacts on this page below.  (Hand Candidate 11x17  Copy of Operational Schematics
)
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 2 AG  3 of 7 CANDIDATE COPY INITIAL CONDITIONS
The Plant is at 100% Power CW112 , MFPT LUBE OIL COOLER 1-2-2 INLET ISOLATION is spraying water from a leak in the valve body. The valve has been closed and is still leaking.
INITIATION CUE:
INITIATION CUE:
The Shift Manager directs you to determine how CW112 can be isolated and what equipment will be affected. List isolation boundaries and equipment impacts on this page below.
The Shift Manager directs you to determine how CW112 can be isolated and what equipment will be affected. List isolation boundaries and equipment impacts on this page below.
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 2 AG  4 of 7 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
(Hand Candidate 11x17 Copy of Operational Schematics)
START TIME:  _______
NOTE: STEPS CAN BE PERFORMED IN ANY SEQUENCE
: 1. PERFORMANCE STEP: Locates plant drawing OS
-022 Turbine Plant Cooling Water System    STANDARD: References drawing index, identifies and locates drawing OS
-022 or equivalent drawing


COMMENT: Once drawing is located, provide a copy for markup.
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A2 AG 3 of 7 CANDIDATE COPY INITIAL CONDITIONS:
CUE: None        __________
The Plant is at 100% Power CW112, MFPT LUBE OIL COOLER 1-2-2 INLET ISOLATION is spraying water from a leak in the valve body. The valve has been closed and is still leaking.
SAT  UNSAT
INITIATION CUE:
: 2. PERFORMANCE STEP: Determines that valve CW-106 must be closed
The Shift Manager directs you to determine how CW112 can be isolated and what equipment will be affected. List isolation boundaries and equipment impacts on this page below.  
  ........C........
STANDARD: Identifies CW
-106 supply side isolation valve will be closed CUE: None      __________
SAT  UNSAT
: 3. PERFORMANCE STEP: Determines that valve CW
-107 must be closed
  ........C........
STANDARD: Identifies CW
-107 supply side isolation valve will be closed, due to cross connected piping CUE: None      __________
SAT  UNSAT


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 2 AG 5 of 7 4. PERFORMANCE STEP: Determines that either valve CW
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A2 AG 4 of 7 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
-114 OR CW-1254B must be closed ........C........
START TIME: _______
NOTE: STEPS CAN BE PERFORMED IN ANY SEQUENCE
: 1.
PERFORMANCE STEP: Locates plant drawing OS-022 Turbine Plant Cooling Water System STANDARD: References drawing index, identifies and locates drawing OS-022 or equivalent drawing COMMENT: Once drawing is located, provide a copy for markup.
CUE:
None SAT UNSAT
: 2.
PERFORMANCE STEP: Determines that valve CW-106 must be closed
........C........
STANDARD: Identifies CW-106 supply side isolation valve will be closed CUE:
None SAT UNSAT
: 3.
PERFORMANCE STEP: Determines that valve CW-107 must be closed  
........C........
STANDARD: Identifies CW-107 supply side isolation valve will be closed, due to cross connected piping CUE:
None SAT UNSAT


STANDARD: Identifies CW
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A2 AG 5 of 7
-114 OR CW-1254B downstream isolation side valve will be closed COMMENT: Either valve will provide downstream isolation.
: 4.
CUE: None       __________
PERFORMANCE STEP: Determines that either valve CW-114 OR CW-1254B must be closed
SAT UNSAT
........C........
: 5. PERFORMANCE STEP: Determines that valve CW
STANDARD: Identifies CW-114 OR CW-1254B downstream isolation side valve will be closed COMMENT: Either valve will provide downstream isolation.
-113 must be closed ........C........
CUE:
None SAT UNSAT
: 5.
PERFORMANCE STEP: Determines that valve CW-113 must be closed
........C........
STANDARD: Identifies CW-113 supply side valve to MFPT Lube Oil Cooler 1-2-1 will be closed COMMENT: Another downstream valve will accomplish this isolation, if another valve is selected evaluate the isolation point as an alternative.
CUE:
None SAT UNSAT
: 6.
PERFORMANCE STEP: Determines that valve CW-125 must be closed  
........C........
STANDARD: Identifies CW-125 supply side valve supply valve to MFPT Lube Oil Cooler 1-1-1 will be closed COMMENT: Another downstream valve will accomplish this isolation, if another valve is selected evaluate the isolation point as an alternative.
CUE:
None SAT UNSAT


STANDARD: Identifies CW
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A2 AG 6 of 7
-113 supply side valve to MFPT Lube Oil Cooler 1 1 will be closed   COMMENT: Another downstream valve will accomplish this isolation, if another valve is selected evaluate the isolation point as an alternative. CUE: None       __________
: 7.
SAT UNSAT
PERFORMANCE STEP: Determines that valve CW-124 must be closed
: 6. PERFORMANCE STEP: Determines that valve CW
........C........
-125 must be closed
STANDARD: Identifies CW-124 supply side valve supply valve to MFPT Lube Oil Cooler 1-1-2 will be closed COMMENT: Another downstream isolation valve will accomplish this isolation, if another valve is selected evaluate the isolation point as an alternative.
  ........C........
CUE:
STANDARD: Identifies CW
None SAT UNSAT
-1 25 supply side valve supply valve to MFPT Lube Oil Cooler 1 1 will be closed COMMENT: Another downstream valve will accomplish this isolation, if another valve is selected evaluate the isolation point as an alternative.
: 8.
PERFORMANCE STEP: Determines that valve CW-196 must remain closed  
........C........
STANDARD: Identifies CW-196 cooler bypass valve will remain closed COMMENT: This valve is normally shut.
CUE:
None SAT UNSAT
: 9.
PERFORMANCE STEP: Identifies the effect of isolating CW-112 will have on plant equipment
........C........
STANDARD: Determines that stopping the water leak on valve CW-112 will isolate all cooling water flow to the MFP Lube Oil Coolers for both MFPs CUE:
None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examinee)
END TIME


CUE: None      __________
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A2 AG 7 of 7 Verification of Completion Job Performance Measure No.
SAT  UNSAT
Examinees Name:
 
Examiners Name:
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 2 AG  6 of 7  7. PERFORMANCE STEP: Determines that valve CW
-1 24 must be closed
  ........C........
STANDARD: Identifies CW
-124 supply side valve supply valve to MFPT Lube Oil Cooler 1 2 will be closed COMMENT:  Another downstream isolation valve will accomplish this isolation, if another valve is selected evaluate the isolation point as an alternative.
CUE: None      __________
SAT  UNSAT
: 8. PERFORMANCE STEP: Determines that valve CW
-1 96 must remain closed  ........C........
STANDARD: Identifies CW
-1 96 cooler bypass valve will remain closed  COMMENT:  This valve is normally shut
. CUE: None      __________
SAT  UNSAT
: 9. PERFORMANCE STEP: Identif ies the effect of isolating CW
-112 will have on plant equipment  ........C........
STANDARD: Determines that stopping the water leak on valve CW-112 will isolate all cooling water flow to the MFP Lube Oil Coolers for both MFPs CUE: None      __________
SAT  UNSAT TERMINATING CUES:  This JPM is complete (Terminated by the examine e)        __________
END TIME Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 2 AG 7 of 7   Verification of Completion Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:  
Time to Complete:
 
Question Documentation:
Question Documentation:  
Question:_____________________________________________________________
Response:_____________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________


Question:_____________________________________________________________
ANSWER KEY
____________________________________________________________________________
________________________________________________________________
Response:__________________________________
___________________________
______________________________________________________________________


______________________________________________________________________
Davis-Besse Initial License Exam 2015 Admin JPM RO-A4
______________________________________________________________________
Result:  Satisfactory/Unsatisfactory Examiner's signature and date:
_______________________________________


ANSWER KEY
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A4 AG Page 1 of 7 Facility: Davis-Besse Task No:
085-002-01-0100 Task


Davis-Besse Initial License Exam 2015 Admin JPM RO-A 4 Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 4 AG  Page 1 of 7  Facility:            Davis-Besse    Task No: 085-002-01-0100    Task Title
==Title:==
:      Emergency Plan Notification of Off
Emergency Plan Notification of Off-Site Agencies K/A  
-Site Agencies K/A  


==Reference:==
==Reference:==
 
2.4.43 (3.2)
2.4.43 (3.2) Job Performance Measure No
Job Performance Measure No: RO-A4 (JPM 241)
:     RO-A 4 (JPM 241)   Examinee:           NRC Examiner:
Examinee:
Date:       Method of testing:
NRC Examiner:
Simulated Performance
Date:
___  Actual Performance
Method of testing:
_X_ Classroom
Simulated Performance ___
_X_   Simulator
Actual Performance _X_
_X_  Plant ___
Classroom _X_
Simulator _X_
Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Line 598: Line 629:
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard: Emergency notification of Ottawa and Lucas County within 15 minutes and Emergency notification of State of Ohio.
Task Standard:
 
Emergency notification of Ottawa and Lucas County within 15 minutes and Emergency notification of State of Ohio.
Required Materials:
Required Materials:
Form DBEP-010 Form DBEP-012 (General References listed below required if performing in classroom)
Form DBEP-010 Form DBEP-012 (General References listed below required if performing in classroom)
Line 606: Line 637:


==References:==
==References:==
RA-EP-02110, Emergency Notification Davis-Besse Emergency Plan Telephone Directory Initiating Cue:
RA-EP-02110, Emergency Notification Davis-Besse Emergency Plan Telephone Directory Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
Time Critical Task: Yes Alternate Path: No Validation Time: 15 minutes  
Yes   Alternate Path:
No Validation Time:
15 minutes
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 4 AG  Page 2 of 7  EXAMINER COPY INITIAL CONDITIONS
:  You are a third Reactor Operator in the Control Room.


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A4 AG Page 2 of 7 EXAMINER COPY INITIAL CONDITIONS:
You are a third Reactor Operator in the Control Room.
The plant is being shut down due to Reactor Coolant System leak calculated to be 35 gpm.
The plant is being shut down due to Reactor Coolant System leak calculated to be 35 gpm.
5 minutes ago the Shift Manager declared an Unusual Event based on the leakage INITIATING CUES:
You are to locate and review RA-EP-02110, Emergency Notifications Procedure while the Shift Manager completes the Initial Notification form. Be prepared to start the notifications of the Offsite Agencies in 5 minutes.
CUE: This is a time critical JPM.
NOTES TO EVALUATOR Write the current time minus 5 minutes in the declaration time (item 3a) on the Initial Notification form Five minutes after reading the Initiating Cues hand the Initial Notification forms to the candidate.


5 minutes ago the Shift Manager declared an Unusual Event based on the leakage INITIATING CUES
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A4 AG Page 3 of 7 CANDIDATE COPY INITIAL CONDITIONS:
:
You are a third Reactor Operator in the Control Room.
You are to locate and review RA
-EP-02110, Emergency Notifications Procedure while the Shift Manager completes the Initial Notification form. Be prepared to start the notifications of the Offsite Agencies in 5 minutes.
 
CUE:  This is a time critical JPM.
NOTES TO EVALUATOR Write the current time minus 5 minutes in the declaration time (item 3a) on the Initial Notification form Five minutes after reading the Initiating Cues hand the Initial Notification form s to the candidate.
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 4 AG   Page 3 of 7 CANDIDATE COPY INITIAL CONDITIONS
You are a third Reactor Operator in the Control Room.
The plant is being shut down due to Reactor Coolant System leak calculated to be 35 gpm.
The plant is being shut down due to Reactor Coolant System leak calculated to be 35 gpm.
5 minutes ago the Shift Manager declared an Unusual Event based on the leakage
5 minutes ago the Shift Manager declared an Unusual Event based on the leakage INITIATING CUES:
 
You are to locate and review RA-EP-02110, Emergency Notifications Procedure while the Shift Manager completes the Initial Notification form. Be prepared to start the notifications of the Offsite Agencies in 5 minutes.
INITIATING CUES
CUE: This is a time critical JPM. The clock starts now, the form will be available in five minutes.  
:    You are to locate and review RA
-EP-02110, Emergency Notifications Procedure while the Shift Manager completes the Initial Notification form. Be prepared to start the notifications of the Offsite Agencies in 5 minutes.
 
CUE: This is a time critical JPM. The clock starts now, the form will be available in five minutes.      


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 4 AG   Page 4 of 7 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C".
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A4 AG Page 4 of 7 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
START TIME: _______
: 1.
: 1. PERFORMANCE STEP: Locate the correct procedure for emergency notification.
PERFORMANCE STEP: Locate the correct procedure for emergency notification.
STANDARD: Obtains RA-EP-02110, Emergency Notification. CUE: When located hand candidate copy of RA-EP-02110, Emergency Notification (5 minutes after providing the initiating cue) hand Initial Notification forms to Candidate and state: "Shift Manager directs you to notify Ottawa and Lucas Counties and the State of Ohio of the emergency in accordance with RA
STANDARD: Obtains RA-EP-02110, Emergency Notification.
-EP-02110, Emergency Notifications"
CUE: When located hand candidate copy of RA-EP-02110, Emergency Notification (5 minutes after providing the initiating cue) hand Initial Notification forms to Candidate and state: Shift Manager directs you to notify Ottawa and Lucas Counties and the State of Ohio of the emergency in accordance with RA-EP-02110, Emergency Notifications SAT UNSAT
__________
: 2.
SAT UNSAT
PERFORMANCE STEP: Make Initial Notification using the 4-Way Ring-Down Circuit  
: 2. PERFORMANCE STEP: Make Initial Notification using the 4
........C........
-Way Ring-Down Circuit
STANDARD: Picks up the 4-Way Ring-Down phone in the Control Room. When the two parties answer, reads the Initial Notification information. Documents the time notified on the Davis-Besse Notification Cover Sheet (DBEP-012).
  ........C........
COMMENT: Notification must be made within 15 minutes of the event declaration time; Record the time the first Sheriffs Dispatcher answers the phone. This stops the critical time clock.
STANDARD: Picks up the 4-Way Ring-Down phone in the Control Room. When the two parties answer, reads the Initial Notification information. Documents the time notified on the Davis
CUE:
-Besse Notification Cover Sheet (DBEP
Ottawa Country Sheriff's Dispatcher and the Lucas County Sheriffs Dispatcher answer the phone.
-012).
NOTE: Ohio State Highway Patrol Dispatcher does NOT answer.
COMMENT: Notification must be made within 15 minutes of the event declaration time; Record the time the first Sheriff's Dispatcher answers the phone. This stops the "critical time" clock.
Repeat back the information as it is communicated.
CUE: "Ottawa Country Sheriff's Dispatcher and the Lucas County Sheriff's Dispatcher answer the phone."
NOTE: Ohio State Highway Patrol Dispatcher does NOT answer.       Repeat back the information as it is communicated.
Time: __________
Time: __________
__________
SAT UNSAT  
SAT UNSAT


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 4 AG   Page 5 of 7 3. PERFORMANCE STEP: Notify Shift Manager that the Ohio State Highway Patrol Dispatcher was not notified.
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A4 AG Page 5 of 7
STANDARD: Informs Shift Manager that the Ohio State Highway Patrol Dispatcher did not answer the 4
: 3.
-Way Ring-Down Circuit.
PERFORMANCE STEP: Notify Shift Manager that the Ohio State Highway Patrol Dispatcher was not notified.
STANDARD: Informs Shift Manager that the Ohio State Highway Patrol Dispatcher did not answer the 4-Way Ring-Down Circuit.
COMMENT: This step may not be needed if operator proceeds to use alternate notification methods without being prompted.
COMMENT: This step may not be needed if operator proceeds to use alternate notification methods without being prompted.
CUE: If notified, tell the operator to continue with notifications as directed by procedure RA
CUE:
-EP-02110, Emergency Notification.
If notified, tell the operator to continue with notifications as directed by procedure RA-EP-02110, Emergency Notification.
 
SAT UNSAT
__________
: 4.
SAT UNSAT
PERFORMANCE STEP: Contact Ohio State Highway Patrol Dispatcher.  
: 4. PERFORMANCE STEP: Contact Ohio State Highway Patrol Dispatcher.
........C........
  ........C........
STANDARD: Locates the Ohio State Highway Patrol Dispatcher or Administrative Office telephone number.
STANDARD: Locates the Ohio State Highway Patrol Dispatcher or Administrative Office telephone number.
COMMENT: The phone numbers are located in the Immediate Notification Numbers tab of the Davis-Besse Emergency Plan Telephone Directory. Have the examinee point out and then dial one of the correct numbers.
COMMENT: The phone numbers are located in the Immediate Notification Numbers tab of the Davis-Besse Emergency Plan Telephone Directory. Have the examinee point out and then dial one of the correct numbers.
(614) 4 6 6-2660 OR (614) 644
(614) 466-2660 OR (614) 644-7622 CUE:
-7622     CUE: Answer the phone as either the Ohio Highway Patrol Dispatcher or the Administrative Office depending on who was dialed.
Answer the phone as either the Ohio Highway Patrol Dispatcher or the Administrative Office depending on who was dialed.
__________
SAT UNSAT
SAT UNSAT
: 4.
: 4. PERFORMANCE STEP: Make Initial Notification to the Ohio State Highway Patrol.
PERFORMANCE STEP: Make Initial Notification to the Ohio State Highway Patrol.  
  ........C........     STANDARD: Reads Initial Notification information to the Ohio State Highway Patrol Dispatcher or Administrative Office staffer. Documents the time notified on the Davis-Besse Notification Cover Sheet (DBEP
........C........
-012). Examinee should also request a call back from the person receiving the information.
STANDARD: Reads Initial Notification information to the Ohio State Highway Patrol Dispatcher or Administrative Office staffer. Documents the time notified on the Davis-Besse Notification Cover Sheet (DBEP-012). Examinee should also request a call back from the person receiving the information.
COMMENT: Requesting callback is not critical CUE: Repeat back information as it is communicated. Provide your name as requested by the caller.
COMMENT: Requesting callback is not critical CUE:
__________
Repeat back information as it is communicated. Provide your name as requested by the caller.
SAT UNSAT
SAT UNSAT  
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 4 AG  Page 6 of 7 5. PERFORMANCE STEP: Notify Shift Manager that the Ohio State Highway Patrol or Administrative Office was notified.
STANDARD:  Informs the Shift Manager that all notifications have all been completed. This notification may be done after step 7. CUE: Acknowledge the report.
__________
SAT  UNSAT
: 6. PERFORMANCE STEP: Receive call back from State of Ohio representative.
STANDARD: Answers the phone and acknowledges the Ohio State Highway Patrol or Administrative Office call back to verify the information came from Davis
-Besse. Documents the time of the call and the name of the caller on the Davis-Besse Notification Cover Sheet (DBEP
-012). CUE: Call the simulator Control Room phone and indicate you are calling back to verify the notification of the emergency is real and came from Davis
-Besse.        If needed, prompt the operator to answer the phone.


__________
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A4 AG Page 6 of 7
SAT UNSAT
: 5.
: 7. PERFORMANCE STEP: Complete form DBEP
PERFORMANCE STEP: Notify Shift Manager that the Ohio State Highway Patrol or Administrative Office was notified.
-0012. STANDARD: Signs form DBEP
STANDARD: Informs the Shift Manager that all notifications have all been completed.
-0012 and checks Control Room. Returns form to Shift Manager. CUE: If required, tell the examinee not to fax form DBEP
This notification may be done after step 7.
-0010 to the EOF.
CUE: Acknowledge the report.
__________
SAT UNSAT
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examine r)
: 6.
__________
PERFORMANCE STEP: Receive call back from State of Ohio representative.
END TIME Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A 4 AG  Page 7 of 7  Verification of Completion Job Performance Measure No.
STANDARD: Answers the phone and acknowledges the Ohio State Highway Patrol or Administrative Office call back to verify the information came from Davis-Besse. Documents the time of the call and the name of the caller on the Davis-Besse Notification Cover Sheet (DBEP-012).
CUE:
Call the simulator Control Room phone and indicate you are calling back to verify the notification of the emergency is real and came from Davis-Besse.
If needed, prompt the operator to answer the phone.
SAT UNSAT
: 7.
PERFORMANCE STEP: Complete form DBEP-0012.
STANDARD: Signs form DBEP-0012 and checks Control Room. Returns form to Shift Manager.
CUE: If required, tell the examinee not to fax form DBEP-0010 to the EOF.
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)
END TIME  


Examinee's Name:
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A4 AG Page 7 of 7 Verification of Completion Job Performance Measure No.
Examiner's Name:
Examinees Name:
Examiners Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:  
Time to Complete:
 
Question Documentation:
Question Documentation:  
 
Question:_____________________________________________________________
Question:_____________________________________________________________
____________________________________________________________________________
Response:_____________________________________________________________
________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
Response:__________________________________
___________________________
______________________________________________________________________


______________________________________________________________________
FENOC NUCLEAR POWER PLANT INITIAL NOTIFICATION FORM Davis Besse DBEP-010-10 USE FOR:
______________________________________________________________________
INITIAL CLASSIFICATIONS, CHANGES IN CLASSIFICATIONS, CHANGES IN PROTECTIVE ACTION RECOMMENDATIONS.
Result:  Satisfactory/Unsatisfactory Examiner's signature and date:
EVENT TERMINATION STATE / COUNTY USE ONLY DATE:
_______________________________________
TIME:
 
MESSAGE NO:
FENOC NUCLEAR POWER PLANT INITIAL NOTIFICATION FORM Davis Besse DBEP-010-10 USE FOR: INITIAL CLASSIFICATIONS, CHANGES IN CLASSIFICATIONS,   CHANGES IN PROTECTIVE ACTION RECOMMENDATIONS.
EVENT TERMINATION STATE / COUNTY USE ONLY DATE: TIME: MESSAGE NO:
____________
: 1. This is the:
: 1. This is the:
Davis-Besse Nuclear Power Station
Davis-Besse Nuclear Power Station
: 2. This is:   An Actual Emergency A Drill   3. a. A(n) GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT was declared at:
: 2. This is:
______ on _Today based on EAL:
An Actual Emergency A Drill
__SU7__     (TIME) (DATE)     b. The Emergency situation has been terminated at:
: 3.
______ on ______    (TIME) (DATE)     c. The Protective Action Recommendation is being changed at:
: a. A(n)
______ on ______  (TIME) (DATE) 4. Brief non-technical description of event:
GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT was declared at:
Reactor Coolant System leak of 35 gallons per minute       5. The radiological conditions are:
on
_Today based on EAL:
__SU7__
(TIME)
(DATE)
: b. The Emergency situation has been terminated at:
on (TIME)
(DATE)
: c. The Protective Action Recommendation is being changed at:
on (TIME)
(DATE)
: 4. Brief non-technical description of event:
Reactor Coolant System leak of 35 gallons per minute
: 5. The radiological conditions are:
: a. A non-routine release of radioactive material, as a result of this event, is in progress
: a. A non-routine release of radioactive material, as a result of this event, is in progress
: b. The release of radioactive material associated with this event has been terminated.
: b. The release of radioactive material associated with this event has been terminated.
: c. NO Radiological Release in progress as a result of this event.
: c. NO Radiological Release in progress as a result of this event.
: 6. Utility Protective Action Recommendations (PAR's):
: 6. Utility Protective Action Recommendations (PARs):
: a. Evacuation:
: a. Evacuation:
(check applicable subareas) 1       2       3       4       5       6       7       8       9       10       11       12 AND that potassium iodide (KI) be administered to the general public in accordance with State procedures. The general public in unaffected areas should be advised to go indoors and monitor EAS broadcasts.
(check applicable subareas) 1 2
3 4
5 6
7 8
9 10 11 12 AND that potassium iodide (KI) be administered to the general public in accordance with State procedures. The general public in unaffected areas should be advised to go indoors and monitor EAS broadcasts.
: b. Sheltering:
: b. Sheltering:
(check applicable subareas) 1       2       3       4       5       6       7       8       9 11 AND that potassium iodide (KI) be administered to the general public in accordance with State procedures. The general public in unaffected areas should be advised to go indoors and monitor EAS broadcasts.
(check applicable subareas) 1 2
: c. None           For Utility Use Only Approved:
3 4
_   __________________      
5 6
7 8
9 11 AND that potassium iodide (KI) be administered to the general public in accordance with State procedures. The general public in unaffected areas should be advised to go indoors and monitor EAS broadcasts.
: c. None For Utility Use Only Approved: _ __________________  


DAVIS-BESSE EMERGENCY NOTIFICATION COVER SHEET DBEP-012-09   INITIAL NOTIFICATION ACTUAL EMERGENCY USE FOR: INITIAL CLASSIFICATIONS, CHANGES IN CLASSIFICATION,   CHANGES IN PROTECTIVE ACTION RECOMMENDATIONS.
DAVIS-BESSE EMERGENCY NOTIFICATION COVER SHEET DBEP-012-09 INITIAL NOTIFICATION ACTUAL EMERGENCY USE FOR:
INITIAL CLASSIFICATIONS, CHANGES IN CLASSIFICATION, CHANGES IN PROTECTIVE ACTION RECOMMENDATIONS.
(Check Actual Emergency only if a real plant emergency exists)
(Check Actual Emergency only if a real plant emergency exists)
PERIODIC UPDATE DRILL USE ONLY FOR UPDATING STATUS OF CURRENT CLASSIFICATION.
PERIODIC UPDATE DRILL USE ONLY FOR UPDATING STATUS OF CURRENT CLASSIFICATION.
DO NOT USE FOR CHANGING CLASSIFICATIONS OR CHANGING PROTECTIVE ACTION RECOMMENDATIONS
DO NOT USE FOR CHANGING CLASSIFICATIONS OR CHANGING PROTECTIVE ACTION RECOMMENDATIONS.
. Initial Notification Form
Initial Notification Form / Periodic Update Form completed by:
/ Periodic Update Form completed by:
Joe Shift Manager Initial Notification Form / Periodic Update Form accuracy verified by:
Joe Shift Manager Initial Notification Form / Periodic Update Form accuracy verified by:
John Shift Technical Advisor Communicator:
John Shift Technical Advisor Communicator:
: 1. Ensure the Emergency Director has signed the Initial Notification Form / Periodic Update Form.
: 1. Ensure the Emergency Director has signed the Initial Notification Form / Periodic Update Form.
: 2. Initiate the 4
: 2. Initiate the 4-Way Ringdown.
-Way Ringdown.
: 3. As parties answer, identify yourself and your facility.
: 3. As parties answer, identify yourself and your facility.
: 4. Obtain and fill in information below:
: 4. Obtain and fill in information below:
TIME INITIAL CONTACT MADE COMPLETION TIME OF CALL 4-WAY RINGDOWN USED? YES           NO TIME OF CALLBACK (IF 4-WAY NOT USED) INDIVIDUAL CALLING BACK (IF 4-WAY NOT USED)
TIME INITIAL CONTACT MADE COMPLETION TIME OF CALL 4-WAY RINGDOWN USED?
OTTAWA COUNTY
YES NO TIME OF CALLBACK (IF 4-WAY NOT USED)
 
INDIVIDUAL CALLING BACK (IF 4-WAY NOT USED)
LUCAS COUNTY
OTTAWA COUNTY LUCAS COUNTY STATE OF OHIO
 
STATE OF OHIO
: 5. Initial Notification Form: Read information on the attached Initial Notification Form over the phone, document above the time lines 1 through 6 have been communicated, and then fax the form to Ottawa Co, Lucas Co, and the State of Ohio.
: 5. Initial Notification Form: Read information on the attached Initial Notification Form over the phone, document above the time lines 1 through 6 have been communicated, and then fax the form to Ottawa Co, Lucas Co, and the State of Ohio.
OR Periodic Update Form: Fax the attached Periodic Update Form to Ottawa Co, Lucas Co, and the State of Ohio, and then verify the information over the phone.
OR Periodic Update Form: Fax the attached Periodic Update Form to Ottawa Co, Lucas Co, and the State of Ohio, and then verify the information over the phone.
NOTE: This coversheet should NOT be FAXED offsite. Control Room Emergency Operations Facility Signature of Communicator transmitting information
NOTE: This coversheet should NOT be FAXED offsite.
Control Room Emergency Operations Facility Signature of Communicator transmitting information  


ANSWER KEY DO NOT GIVE TO CANDIDATE DAVIS-BESSE EMERGENCY NOTIFICATION COVER SHEET DBEP-012-09   INITIAL NOTIFICATION ACTUAL EMERGENCY USE FOR: INITIAL CLASSIFICATIONS, CHANGES IN CLASSIFICATION,   CHANGES IN PROTECTIVE ACTION RECOMMENDATIONS.
ANSWER KEY DO NOT GIVE TO CANDIDATE DAVIS-BESSE EMERGENCY NOTIFICATION COVER SHEET DBEP-012-09 INITIAL NOTIFICATION ACTUAL EMERGENCY USE FOR:
INITIAL CLASSIFICATIONS, CHANGES IN CLASSIFICATION, CHANGES IN PROTECTIVE ACTION RECOMMENDATIONS.
(Check Actual Emergency only if a real plant emergency exists)
(Check Actual Emergency only if a real plant emergency exists)
PERIODIC UPDATE DRILL USE ONLY FOR UPDATING STATUS OF CURRENT CLASSIFICATION.
PERIODIC UPDATE DRILL USE ONLY FOR UPDATING STATUS OF CURRENT CLASSIFICATION.
DO NOT USE FOR CHANGING CLASSIFICATIONS OR CHANGING PROTECTIVE ACTION RECOMMENDATIONS.
DO NOT USE FOR CHANGING CLASSIFICATIONS OR CHANGING PROTECTIVE ACTION RECOMMENDATIONS.
Initial Notification Form
Initial Notification Form / Periodic Update Form completed by:
/ Periodic Update Form completed by:
Joe Shift Manager Initial Notification Form / Periodic Update Form accuracy verified by:
Joe Shift Manager Initial Notification Form / Periodic Update Form accuracy verified by:
John Shift Technical Advisor Communicator:
John Shift Technical Advisor Communicator:
: 1. Ensure the Emergency Director has signed the Initial Notification Form / Periodic Update Form.
: 1. Ensure the Emergency Director has signed the Initial Notification Form / Periodic Update Form.
: 2. Initiate the 4
: 2. Initiate the 4-Way Ringdown.
-Way Ringdown.
: 3. As parties answer, identify yourself and your facility.
: 3. As parties answer, identify yourself and your facility.
: 4. Obtain and fill in information below:
: 4. Obtain and fill in information below:
TIME INITIAL CONTACT MADE COMPLETION TIME OF CALL 4-WAY RINGDOWN USED? YES           NO TIME OF CALLBACK (IF 4-WAY NOT USED) INDIVIDUAL CALLING BACK (IF 4-WAY NOT USED)
TIME INITIAL CONTACT MADE COMPLETION TIME OF CALL 4-WAY RINGDOWN USED?
OTTAWA COUNTY
YES NO TIME OF CALLBACK (IF 4-WAY NOT USED)
  < 15 min T ime LUCAS COUNTY
INDIVIDUAL CALLING BACK (IF 4-WAY NOT USED)
  < 15 min Time STATE OF OHIO Time Time Name   5. Initial Notification Form: Read information on the attached Initial Notification Form over the phone, document above the time lines 1 through 6 have been communicated, and then fax the form to Ottawa Co, Lucas Co, and the State of Ohio.
OTTAWA COUNTY  
OR Periodic Update Form: Fax the attached Periodic Update Form to Ottawa Co, Lucas Co, and the State of Ohio, and then verify the information over the phone.
< 15 min Time LUCAS COUNTY  
NOTE: This coversheet should NOT be FAXED offsite.
< 15 min Time STATE OF OHIO Time Time Name
Signature of Communicator Control Room Emergency Operations Facility Signature of Communicator transmitting information
: 5. Initial Notification Form: Read information on the attached Initial Notification Form over the phone, document above the time lines 1 through 6 have been communicated, and then fax the form to Ottawa Co, Lucas Co, and the State of Ohio.
OR Periodic Update Form: Fax the attached Periodic Update Form to Ottawa Co, Lucas Co, and the State of Ohio, and then verify the information over the phone.
NOTE: This coversheet should NOT be FAXED offsite.
Signature of Communicator Control Room Emergency Operations Facility Signature of Communicator transmitting information  


Davis-Besse Initial License Exam 2015 Admin JPM SRO-A 1.1 Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 2 of 8   Facility:             Davis-Besse   Task No: 332-004-02-0300   Task Title
Davis-Besse Initial License Exam 2015 Admin JPM SRO-A1.1
:      Review manual RCS Leakage Calculation K/A  
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 2 of 8 Facility: Davis-Besse Task No:
332-004-02-0300 Task
 
==Title:==
Review manual RCS Leakage Calculation K/A  


==Reference:==
==Reference:==
 
2.1.20 (4.6)
2.1.20 (4.6) Job Performance Measure No
Job Performance Measure No: SRO-A1.1 (New)
:     SRO-A1.1 (New)   Examinee:           NRC Examiner:
Examinee:
Date:       Method of testing:
NRC Examiner:
Simulated Performance
Date:
___  Actual Performance
Method of testing:
_X_ Classroom
Simulated Performance ___
_X_  Simulator
Actual Performance _X_
___  Plant ___
Classroom _X_
Simulator ___
Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure w ill be satisfied.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Line 814: Line 849:


==References:==
==References:==
Technical Specifications Initiating Cue:
Technical Specifications Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
Time Critical Task:
No   Alternate Path:
No Alternate Path:
No Validation Time:
No Validation Time: 50 minutes  
50 minutes


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 3 of 8   EXAMINER COPY INITIAL CONDITIONS
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 3 of 8 EXAMINER COPY INITIAL CONDITIONS:
The Plant is at 100% Power Makeup Tank Pressure is 25 psig
The Plant is at 100% Power Makeup Tank Pressure is 25 psig The Computer is unavailable INITIATION CUE:
A Reactor Operator has performed a Manual Calculation of Leakage Rates per step 4.2.2 of DB SP-03357, RCS Water Inventory Balance.
DB SP-03357 Section 4.1, Data Acquisition section data was verified correct and transferred to from another procedure.
Review the completed calculations for correctness. Correct any errors, if necessary, and determine if there are any Technical Specifications implications NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2 -
page 1 of 3, 2 of 3, 3 of 3 and 4 of 4)
DOCUMENT THE RESULTS OF YOUR REVIEW ON THIS CUE SHEET (Hand Candidate the following:
DB-SP-03357, RCS Water Inventory Balance with step 4.2.2 and Attachment 2 completed DB-PF-06703, Miscellaneous Curves CC 3.1 and CC 3.2a to CC3.2k)


The Computer is unavailable INITIATION CUE:
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 4 of 8 CANDIDATE COPY INITIAL CONDITIONS:
A Reactor Operator has performed a Manual Calculation of Leakage Rates per step 4.2.2 of DB SP-03357, RCS Water Inventory Balance
The Plant is at 100% Power Makeup Tank Pressure is 25 psig The Computer is unavailable INITIATION CUE:
. DB SP-03357 Section 4.1, Data Acquisition section data was verified correct and transferred to Attachment 3 from another procedure.
Review the completed calculation s for correctness. Correct any errors, if necessary, and determine if there are any Technical Specifications implications NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2
- page 1 of 3, 2 of 3, 3 of 3 and 4 of 4)  DOCUMENT THE RESULTS OF YOU R REVIEW ON THIS CUE SHEET  (Hand Candidate the following:
DB-SP-0 3357 , RCS Water Inventory Balance with step 4.2.2 and Attachment 2 completed DB-PF-06703, Miscellaneous Curves CC 3.1 and CC 3.2a to CC3.2k
)
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 4 of 8 CANDIDATE COPY INITIAL CONDITIONS
The Plant is at 100% Power Makeup Tank Pressure is 25 psig The Computer is unavailable INITIATION CUE:
A Reactor Operator has performed a Manual Calculation of Leakage Rates per step 4.2.2 of DB SP-03357, RCS Water Inventory Balance.
A Reactor Operator has performed a Manual Calculation of Leakage Rates per step 4.2.2 of DB SP-03357, RCS Water Inventory Balance.
DB SP-03357 Section 4.1, Data Acquisition section data was verified correct and transferred to Attachment 3 from another procedure.
DB SP-03357 Section 4.1, Data Acquisition section data was verified correct and transferred to from another procedure.
Review the completed calculations for correctness. Correct any errors, if necessary, and determine if there are any Technical Specifications implications
Review the completed calculations for correctness. Correct any errors, if necessary, and determine if there are any Technical Specifications implications NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2 -
page 1 of 3, 2 of 3, 3 of 3 and 4 of 4)
DOCUMENT THE RESULTS OF YOUR REVIEW ON THIS CUE SHEET


NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 5 of 8 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
- page 1 of 3, 2 of 3, 3 of 3 and 4 of 4)
START TIME: _______
DOCUMENT THE RESULTS OF YOU R REVIEW ON THIS C UE SHEET Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 5 of 8 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
: 1.
START TIME: _______
PERFORMANCE STEP: Reviews the Initial Makeup Tank Inventory equations step 4.2.2.b  
: 1. PERFORMANCE STEP: Reviews the Initial Makeup Tank Inventory equations step 4.2.2.b
........C........
  ........C........
STANDARD: Recognize 67 inches was used versus 71 and corrects calculation:
STANDARD: Recognize 67 inches was used versus 71 and corrects calculation:
Water Inventory = (Tank level
Water Inventory = (Tank level
* 4.124 ft&#xb3;/in
* 4.124 ft&#xb3;/in
* Calibration Density) + (77.85 ft&#xb3;
* Calibration Density) + (77.85 ft&#xb3;
* Water Density)  
* Water Density)  
        = (Tank level
= (Tank level
* 4.124 ft&#xb3;/in
* 4.124 ft&#xb3;/in
* 62.325lbm/ ft&#xb3;) + (77.85 ft&#xb3;
* 62.325lbm/ ft&#xb3;) + (77.85 ft&#xb3;
Line 856: Line 888:
Initial:
Initial:
( __71__ in.* 257 lbm/in ) + ( 77.85 ft&#xb3;
( __71__ in.* 257 lbm/in ) + ( 77.85 ft&#xb3;
* _62.0038   lbm/ft&#xb3;) =
* _62.0038 lbm/ft&#xb3;) = _23074 (+/- 10)_ lbm CUE:
_2 3074 (+/- 10)_ lbm   CUE: None       __________
None SAT UNSAT
SAT UNSAT
: 2.
: 2. PERFORMANCE STEP: Reviews the Temperature Correction Factor data on Attachment 2 step 4.2.2.f
PERFORMANCE STEP: Reviews the Temperature Correction Factor data on Attachment 2 step 4.2.2.f  
  ........C........
........C........
STANDARD:
Recognize curve was read incorrectly and corrects:
Temperature Correction Factor (Tave 528 &deg;F)
Initial __-34350_(+/-50) _ lbm Final -35600 (+/-50) lbm COMMENT: Error results from reading curve at 581.8 instead of 580.8 CUE:
None SAT UNSAT


STANDARD: Recognize curve was read incorrectly and corrects:
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 6 of 8
Temperature Correction Factor (Tave  &deg;F) Initial __-34350_(+/-5 0) _ lbm Final     -35 6 00  (+/-5 0)     lbm COMMENT: Error results from reading curve at 581.8 instead of 580.8 CUE: None       __________
: 3.
SAT UNSAT
PERFORMANCE STEP: Reviews the RCS Inventory Table to determine Initial and Final total RCS Inventory per step 4.2.2.h
........C........
STANDARD:
Corrects data entered in the RCS Inventory Table and calculates the Initial and Final RCS Water Inventory MU Tank Inventory (lbm)
+
Pzr Steam Inventory (lbm)
+
Pzr Water Inventory (lbm)
+
Power Correction (lbm)
+
Temperature Correction (lbm)  
=
Water Inventory (lbm)
Initial:
23074 lbm +
3406.393 lbm +
35119.85 lbm +
135 lbm +
-34350 lbm =
27385.243
(+/- 250) lbm Final:
21275 lbm +
3341.05 lbm +
35570.146 lbm +
135 lbm +
-35600 lbm =
24721.196
(+/- 250) lbm CUE:
None SAT UNSAT
: 4.
PERFORMANCE STEP: Reviews Change in RCS Inventory calculation
.......C.........
STANDARD:
Recognizes error and corrects step 4.2.2.i to determine RCS Inventory Change Change = Initial inventory - Final inventory Change = 27385.243_ lbm - _24721.196 lbm 2664.047 (+/- 40)_ lbm CUE: None SAT UNSAT  


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 6 of 8 3. PERFORMANCE STEP: Reviews the RCS Inventory Table to determine Initial and Final total RCS Inventory per step 4.2.2.h
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 7 of 8
  ........C........
: 5.
PERFORMANCE STEP: Verifies the Total RCS Leak Rate calculation per step 4.2.2.k
.......C.........
STANDARD:
Corrects step 4.2.2.k error to determine correct Leak Rate lbm 62.32 ft x
ft gallons 7.481 x
time Inventory RCS in Change Leakrate 3
3
=
Leakrate = (
2664.047 lbm) &#xf7; (
246 min) x (0.120 gal/lbm)
Leakrate =
1.299 (+/- 0.02) gpm CUE: None SAT UNSAT
: 6.
PERFORMANCE STEP: Determines Unidentified Leakage
.......C.........
STANDARD: Determines Unidentified Leakage is 1.288 (+/-.2) gpm 1.299 gpm (Total Leak Rate from Attachment 2)
- Identified leakage 0.011 gpm (Given) = 1.288 gpm CUE: None SAT UNSAT
: 7.
PERFORMANCE STEP: Reviews Technical Specification applicability
.......C.........
STANDARD: Determines Technical Specification 3.4.13 RCS Operational Leakage applies for LCO 3.4.13 b. Condition A should be entered for unidentified leakage greater than 1.0 GPM CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)
END TIME


STANDARD: Corrects data entered in the RCS Inventor y Table and calculate s the Initial and Final RCS Water Inventory MU Tank Inventory (lbm) + Pzr Steam Inventory (lbm) + Pzr Water Inventory (lbm) + Power Correction (lbm) + Temperature Correction (lbm) = Water Inventory (lbm) Initial:  23074  lbm +  3406.393  lbm +
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 8 of 8 Verification of Completion Job Performance Measure No.
35119.85  lbm +  135  lbm +  -34350  lbm =  27385.2 43 (+/- 250) lbm Final:  21275  lbm +  3341.05  lbm +  35570.146  lbm +  135  lbm +  -35 6 00  lbm =  24721.1 96 (+/- 250) lbm CUE: None      __________
Examinees Name:
SAT  UNSAT
Examiners Name:
: 4. PERFORMANCE STEP: Reviews Change in RCS Inventory calculation
  .......C.........
STANDARD: Recognizes error and corrects step 4.2.2.i to determine RCS Inventory Change  Change  = Initial inventory
- Final inventory Change = 27385.243_ lbm - _24721.196 lbm 2664.0 47 (+/- 40)_ lbm    CUE: None      __________
SAT  UNSAT
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 7 of 8  5. PERFORMANCE STEP: Verifies the Total RCS Leak Rate calculation per step 4.2.2.k
  .......C.........
STANDARD: Corrects step 4.2.2.k error to determine correct Leak Rate lbm 62.32 ft  x  ftgallons 7.481  x  timeInventory  RCSin  Change    Leakrate 3 3    Leakrate =  ( 2664.047 lbm) &#xf7; (  246 min) x  (0.120 gal/lbm)    Leakrate =
1.299 (+/- 0.02)  gpm    CUE: None      __________
SAT  UNSAT
: 6. PERFORMANCE STEP: Determines Unidentified Leakage
  .......C.........
STANDARD: Determines Unidentified Leakage is 1.288 (+/- .2) gpm 1.299 gpm (Total Leak Rate from Attachment 2)
    - Identified leakage 0.011 gpm (Given) = 1.288 gpm  CUE: None      __________
SAT  UNSAT
: 7. PERFORMANCE STEP: Reviews Technical Specification applicability
  .......C.........
STANDARD: Determines Technical Specification 3.4.13 RCS Operational Leakage applies  for LCO 3.4.13 b. Condition A should be entered for unidentified leakage greater than 1.0 GPM    CUE: None      __________
SAT  UNSAT TERMINATING CUES:  This JPM is complete (Terminated by the examine r)        __________
END TIME Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG  Page 8 of 8 Verification of Completion Job Performance Measure No.
Examinee's Name:  
 
Examiner's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:  
Time to Complete:
 
Question Documentation:
Question Documentation:  
 
Question:_____________________________________________________________
Question:_____________________________________________________________
____________________________________________________________________________
Response:_____________________________________________________________
 
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
_________________________________________________________
_______  Response:_____________________________________________________________
______________________________________________________________________
______________________________________________________________________
__________________________________
____________________________________
Result: Satisfactory/Unsatisfactory


Examiner's signature and date:
20 Revision ATTACHMENT 2:
_______________________________________
 
20   Revision   ATTACHMENT 2:
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 1 of 3 Note: For parameters which utilize averaging of redundant channels, eliminate inoperable channels from the average and reduce the denominator accordingly.
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 1 of 3 Note: For parameters which utilize averaging of redundant channels, eliminate inoperable channels from the average and reduce the denominator accordingly.
If a Th or Tc point is unavailable, eliminate it and the opposing point (Tc or Th) from the same loop, and reduce the denominator by 2.
If a Th or Tc point is unavailable, eliminate it and the opposing point (Tc or Th) from the same loop, and reduce the denominator by 2.
ITEM PARAMETER SOURCE UNITS INITIAL VALUE FINAL VALUE 1 Time Control Room clock or computer hr:min Step 4.1.4 Step 4.1.10 1905 2311 2 Makeup Tank Temp T769 or TI MU8 &deg;F 100 100 3 Makeup Tank Level (2 channel ave)
ITEM PARAMETER SOURCE UNITS INITIAL VALUE FINAL VALUE 1
[L761+L763] 2, or LR MU16 in. 71 64 4 RCS Pressure (4 ch ave)
Time Control Room clock or computer hr:min Step 4.1.4 Step 4.1.10 1905 2311 2
[P721+P722+P729+P730] 4, PRS RC2A2, or PRS RC2B (1) psi 2156 2161 5 Pressurizer Level LRS RC14 or L768 in. 218 222 6 Ave Power [R795+R804+R814+R820] 4,C913, or NR NI6 % 100 100 7 Tave (8 ch ave)
Makeup Tank Temp T769 or TI MU8  
TI RC7, or: [T719+T720+T728+T729+
&deg;F 100 100 3
T780+T800+T820+T840] 8 (2) &deg;F 58 0.8 582.3 (1) If less than 1700 psig RCS Pressure use the average of P725 and P732 (loop 1 and loop 2 WR Pressure).
Makeup Tank Level (2 channel ave)
(2) If less than 520&deg;F RCS Temperature then average T753 and T782 (loop 1 and loop 2 WR Temperature).  
[L761+L763]&#xf7;2, or LR MU16 in.
 
71 64 4
RCS Pressure (4 ch ave)
[P721+P722+P729+P730]&#xf7;4, PRSRC2A2, or PRSRC2B (1) psi 2156 2161 5
Pressurizer Level LRS RC14 or L768 in.
218 222 6
Ave Power
[R795+R804+R814+R820]&#xf7;4, C913, or NR NI6 100 100 7
Tave (8 ch ave)
TI RC7, or:
[T719+T720+T728+T729+
T780+T800+T820+T840]&#xf7;8 (2)  
&deg;F 580.8 582.3 (1) If less than 1700 psig RCS Pressure use the average of P725 and P732 (loop 1 and loop 2 WR Pressure).
(2) If less than 520&deg;F RCS Temperature then average T753 and T782 (loop 1 and loop 2 WR Temperature).
4.2.2.a Makeup Tank Water Density (from Attachment 4)
4.2.2.a Makeup Tank Water Density (from Attachment 4)
Initial ____62.0038______ lbm/ft&#xb3; Final   ___ 62.0038______ lbm/ft&#xb3; 4.2.2.b Makeup Tank Inventory Note: 77.85 ft&#xb3; accounts for water volume below the level indicating range.
Initial ____62.0038______ lbm/ft&#xb3; Final ___ 62.0038______ lbm/ft&#xb3; 4.2.2.b Makeup Tank Inventory Note: 77.85 ft&#xb3; accounts for water volume below the level indicating range.
Water Inventory = (Tank level
Water Inventory = (Tank level
* 4.124 ft&#xb3;/in
* 4.124 ft&#xb3;/in
* Calibration Density) + (77.85 ft&#xb3;
* Calibration Density) + (77.85 ft&#xb3;
* Water Density)  
* Water Density)  
        = (Tank level
= (Tank level
* 4.124 ft&#xb3;/in
* 4.124 ft&#xb3;/in
* 62.325lbm/ ft&#xb3;) + (77.85 ft&#xb3;
* 62.325lbm/ ft&#xb3;) + (77.85 ft&#xb3;
Line 940: Line 1,009:
Initial:
Initial:
( ___67______ in.* 257 lbm/in ) + ( 77.85 ft&#xb3;
( ___67______ in.* 257 lbm/in ) + ( 77.85 ft&#xb3;
* _62.0038   lbm/ft&#xb3;) = _22046_ lbm __mlk__ IV Final:     (___64______
* _62.0038 lbm/ft&#xb3;) = _22046_ lbm
in.* 257 lbm/in ) + ( 77.85 ft&#xb3;
__mlk__
* _62.0038   lbm/ft&#xb3;) = _21275_ lbm __mlk__ IV 21   Revision   ATTACHMENT 2:
IV Final:
(___64______ in.* 257 lbm/in ) + ( 77.85 ft&#xb3;
* _62.0038 lbm/ft&#xb3;) = _21275_ lbm
__mlk__
IV  
 
21 Revision ATTACHMENT 2:
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 2 of 3 4.2.2.c Pressurizer Inventory Density (from Attachment 6)
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 2 of 3 4.2.2.c Pressurizer Inventory Density (from Attachment 6)
Water Initial ___37.71________ lbm/ft&#xb3; Steam Initial ____6.02_________ lbm/ft&#xb3; Water Final ____37.68________ lbm/ft&#xb3; Steam Final ____6.04_________ lbm/ft&#xb3; 4.2.2.d Pressurizer Inventory Note: 239.6 ft&#xb3; accounts for water volume below the level indicating range.
Water Initial ___37.71________ lbm/ft&#xb3; Steam Initial ____6.02_________ lbm/ft&#xb3; Water Final ____37.68________ lbm/ft&#xb3; Steam Final ____6.04_________ lbm/ft&#xb3; 4.2.2.d Pressurizer Inventory Note:
239.6 ft&#xb3; accounts for water volume below the level indicating range.
242.2 ft&#xb3; accounts for steam volume above the level indicating range.
242.2 ft&#xb3; accounts for steam volume above the level indicating range.
Water Inventory = (level
Water Inventory = (level
* 3.173 ft&#xb3;/in + 239.6 ft&#xb3;)
* 3.173 ft&#xb3;/in + 239.6 ft&#xb3;)
* Water Density Water Initial:   [(___218_____ in.
* Water Density Water Initial:
[(___218_____ in.
* 3.173 ft&#xb3;/in) + 239.6 ft&#xb3;]
* 3.173 ft&#xb3;/in) + 239.6 ft&#xb3;]
* 37.71 lbm/ft&#xb3; = _35119.85 lbm __mlk__ IV Water Final:
* 37.71 lbm/ft&#xb3; = _35119.85 lbm
__mlk__
IV Water Final:
[(___222_____ in.
[(___222_____ in.
* 3.173 ft&#xb3;/in) + 239.6 ft&#xb3;]
* 3.173 ft&#xb3;/in) + 239.6 ft&#xb3;]
* 37.68   lbm/ft&#xb3; = _35570.146 lbm __mlk__ IV Steam Inventory =[((320  
* 37.68 lbm/ft&#xb3; = _35570.146 lbm
- level)
__mlk__
IV Steam Inventory =[((320 - level)
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* Steam Density Steam Initial:
* Steam Density Steam Initial:
Line 960: Line 1,040:
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* 6.02 lbm/ft&#xb3;) = _3406.393________ lbm
* 6.02 lbm/ft&#xb3;) = _3406.393________ lbm
__mlk__ IV Steam Final:
__mlk__
IV Steam Final:
[((320 - __222__in)
[((320 - __222__in)
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* 6.04   lbm/ft&#xb3;) = _3341.05
* 6.04 lbm/ft&#xb3;) = _3341.05 __ lbm
__ lbm __mlk__ IV 4.2.2.e Power Correction Factor Initial _____
__mlk__
135____________ lbm Final   _____
IV 4.2.2.e Power Correction Factor Initial _____135____________ lbm Final _____135____________ lbm 4.2.2.f Temperature Correction Factor (Tave >528&deg;)
135____________ lbm 4.2.2.f Temperature Correction Factor (Tave >528&deg;)   Initial ______-35 2 00________ lbm Final   _____
Initial ______-35200________ lbm Final _____-35600_________ lbm  
-356 00_________ lbm


22   Revision   ATTACHMENT 2:
22 Revision ATTACHMENT 2:
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 3 of 3 4.2.2.g Temperature Correction Factor (Tave <528&deg;) Reactor Coolant System Density (from Attachment 5)
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 3 of 3 4.2.2.g Temperature Correction Factor (Tave <528&deg;)
N/A   At initial Tave ___________________ lbm/ft&#xb3;
Reactor Coolant System Density (from Attachment 5)
N/A At initial Tave
___________________ lbm/ft&#xb3; At final Tave
___________________ lbm/ft&#xb3; Temperature Correction Factor (TCF)
TCF = [(10,277 + (0.24828
* Tave))
* Reactor Coolant System Density] - 498,800 Initial: [(10,277 ft&#xb3; + (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
* _______ lbm/ft&#xb3;] - 498,800 lbm = _______ lbm IV Final: [(10,277 ft&#xb3; + (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
* _______ lbm/ft&#xb3;] - 498,800 lbm = _______ lbm IV 4.2.2.h RCS Inventory MU Tank Inventory (lbm)
+
Pzr Steam Inventory (lbm)
+
Pzr Water Inventory (lbm)
+
Power Correction (lbm)
+
Temperature Correction (lbm)
=
Water Inventory (lbm)
Initial:
22046 lbm +
3406.393 lbm +
35119.85 lbm +
135 lbm +
-35200 lbm =
25507.243 lbm Final:
21275 lbm +
3341.05 lbm +
35570.146 lbm +
135 lbm +
-35600 lbm =
24721.196 lbm 4.2.2.i Change in RCS Inventory Change = Initial inventory - Final inventory Change = 25507.243_ lbm - 24721.196 lbm = 786.047_ lbm
__mlk__
IV


At final Tave ___________________ lbm/ft&#xb3; Temperature Correction Factor (TCF)
23 Revision ATTACHMENT 2:
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 4 of 4 4.2.2.j Time period Period = Final time - Initial time Period = [(_23___ hr x 60) + ( 11 min)] - [(__19__ hr x 60) + ( 5 min)] = _246____ min
__mlk__
IV 4.2.2.k Total RCS Leak Rate lbm 62.32 ft x
ft gallons 7.481 x
time Inventory RCS in Change Leakrate 3
3
=
Leakrate = (
786.047 lbm) &#xf7; (
246 min) x (0.120 gal/lbm)
Leakrate =.383 gpm
__mlk__
IV Independent Verification Completed by ___MLKlein__________________________ Date Today


TCF = [(10,277 + (0.24828
24 Revision ATTACHMENT 3:
* Tave))
UNIDENTIFIED RCS LEAKAGE CALCULATION SHEET Page 1 of 1 4.2.1.f RCP Seals Leak Rate from computer printout, or from Attachment 1. (4.2.1.e)
* Reactor Coolant System Density]
___.011___ gpm 4.2.1.j Quench Tank In-Leakage Rate from computer printout, or from Attachment 1. (4.2.1.i). Only record Positive values (exclude negative values by entering 0.000).
- 498,800  Initial: [(10,277 ft&#xb3;
_____.0___ gpm 4.2.2.l RCS Total Leak Rate from computer printout, or from Attachment 2.
+ (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
___.383___ gpm 4.2.3.a Primary to Secondary Tube Leakage from computer printout, or from most recent entry in RCS Leakage Log, RO Log, or as determined by Chemistry.
* _______ lbm/ft&#xb3;]
- 498,800 lbm = _______ lbm
________ IV Final: [(10,277 ft&#xb3; + (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
* _______ lbm/ft&#xb3;]
- 498,800 lbm = _______ lbm
________ IV 4.2.2.h RCS Inventory  MU Tank Inventory (lbm) + Pzr Steam Inventory (lbm) + Pzr Water Inventory (lbm) + Power Correction (lbm) + Temperature Correction (lbm) = Water Inventory (lbm) Initial:  22046  lbm +  3406.393  lbm +  35119.85  lbm +  135  lbm +  -352 00  lbm =  25507.243  lbm Final:
21275  lbm +  3341.05  lbm +  35570.146  lbm +  135  lbm +  -356 00  lbm =  24721.196  lbm  4.2.2.i  Change in RCS Inventory Change  = Initial inventory
- Final inventory Change = 25507.243_ lbm - 24721.196 lbm =  786.047_ lbm  __mlk__ IV 23    Revision  ATTACHMENT 2:
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 4 of 4 4.2.2.j Time period Period  = Final time
- Initial time Period = [(_
23___ hr x 60)
+ (  11      min)] - [(__19__ hr x 60) + ( 5    min)]  =  _
246____ min __mlk__ IV 4.2.2.k  Total RCS Leak Rate lbm 62.32 ft  x  ftgallons 7.481  x  timeInventory  RCSin  Change    Leakrate 3 3    Leakrate =  ( 7 86.047  lbm) &#xf7; (  246 min) x  (0.120 gal/lbm)
Leakrate =
.3 8 3  gpm  __mlk__ IV Independent Verification Completed by ___MLKlein__________________________ Date  Today 24   Revision   ATTACHMENT 3:
UNIDENTIFIED RCS LEAKAGE CALCULATION SHEET Page 1 of 1 4.2.1.f RCP Seals Leak Rate from computer printout, or from Attachment
: 1. (4.2.1.e)   ___.011___ gpm   4.2.1.j Quench Tank In
-Leakage Rate from computer printout, or from Attachment 1. (4.2.1.i). Only record Positive values (exclude negative values by entering 0.000).
_____.0___ gpm 4.2.2.l RCS Total Leak Rate from computer printout, or from Attachment
: 2. ___.383___ gpm   4.2.3.a Primary to Secondary Tube Leakage from computer printout, or from most recent entry in RCS Leakage Log, RO Log, or as determined by Chemistry.
_____.0___ gpm (0.104 allowed) 4.2.3.b Other Identified Leakage, or from RCS Leakage Log.
_____.0___ gpm (0.104 allowed) 4.2.3.b Other Identified Leakage, or from RCS Leakage Log.
_____.0___ gpm   4.2.3.c Total Identified Leak Rate from computer printout, or from; RCP Seals + Quench Tk + Pri to Sec + Other                                           ( 4.2.1.e + 4.2.1.i [positive values only] +   4.2.3.a + 4.2.3.b ). ___mlk___       IV ____.011__ gpm   (10 gpm allowed) 4.2.3.d Unidentified Leak Rate from computer printout, or from; Total Leak Rate  
_____.0___ gpm 4.2.3.c Total Identified Leak Rate from computer printout, or from; RCP Seals + Quench Tk + Pri to Sec + Other
- Total Identified Leak Rate                                       ( 4.2.2.k - 4.2.3.c ) ___mlk____       IV ____.382__ gpm   (1 gpm allowed) 4.2.3.e Reactor Coolant Pressure Boundary Leakage
( 4.2.1.e + 4.2.1.i [positive values only] + 4.2.3.a + 4.2.3.b ).
___mlk___
IV
____.011__ gpm (10 gpm allowed) 4.2.3.d Unidentified Leak Rate from computer printout, or from; Total Leak Rate - Total Identified Leak Rate
( 4.2.2.k - 4.2.3.c )
___mlk____
IV
____.382__ gpm (1 gpm allowed) 4.2.3.e Reactor Coolant Pressure Boundary Leakage
_____.0___ gpm (0 gpm allowed)
_____.0___ gpm (0 gpm allowed)
Independent Verification Completed by ___MLKlein________Date Today Performed by: Rx Operator Date: Today


Independent Verification Completed by
20 Revision ATTACHMENT 2:
___MLKlein________Date    Toda y  Performed by:
Rx Operator Date:    Today 20   Revision   ATTACHMENT 2:
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 1 of 3 Note: For parameters which utilize averaging of redundant channels, eliminate inoperable channels from the average and reduce the denominator accordingly.
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 1 of 3 Note: For parameters which utilize averaging of redundant channels, eliminate inoperable channels from the average and reduce the denominator accordingly.
If a Th or Tc point is unavailable, eliminate it and the opposing point (Tc or Th) from the same loop, and reduce the denominator by 2.
If a Th or Tc point is unavailable, eliminate it and the opposing point (Tc or Th) from the same loop, and reduce the denominator by 2.
ITEM PARAMETER SOURCE UNITS INITIAL VALUE FINAL VALUE 1 Time Control Room clock or computer hr:min Step 4.1.4 Step 4.1.10 1905 2311 2 Makeup Tank Temp T769 or TI MU8 &deg;F 100 100 3 Makeup Tank Level (2 channel ave)
ITEM PARAMETER SOURCE UNITS INITIAL VALUE FINAL VALUE 1
[L761+L763] 2, or LR MU16 in. 71 64 4 RCS Pressure (4 ch ave)
Time Control Room clock or computer hr:min Step 4.1.4 Step 4.1.10 1905 2311 2
[P721+P722+P729+P730] 4, PRS RC2A2, or PRS RC2B (1) psi 2156 2161 5 Pressurizer Level LRS RC14 or L768 in. 218 222 6 Ave Power [R795+R804+R814+R820] 4,C913, or NR NI6 % 100 100 7 Tave (8 ch ave)
Makeup Tank Temp T769 or TI MU8  
TI RC7, or: [T719+T720+T728+T729+
&deg;F 100 100 3
T780+T800+T820+T840] 8 (2) &deg;F 58 0.8 582.3 (1) If less than 1700 psig RCS Pressure use the average of P725 and P732 (loop 1 and loop 2 WR Pressure).
Makeup Tank Level (2 channel ave)
(2) If less than 520&deg;F RCS Temperature then average T753 and T782 (loop 1 and loop 2 WR Temperature).  
[L761+L763]&#xf7;2, or LR MU16 in.
 
71 64 4
RCS Pressure (4 ch ave)
[P721+P722+P729+P730]&#xf7;4, PRSRC2A2, or PRSRC2B (1) psi 2156 2161 5
Pressurizer Level LRS RC14 or L768 in.
218 222 6
Ave Power
[R795+R804+R814+R820]&#xf7;4, C913, or NR NI6 100 100 7
Tave (8 ch ave)
TI RC7, or:
[T719+T720+T728+T729+
T780+T800+T820+T840]&#xf7;8 (2)  
&deg;F 580.8 582.3 (1) If less than 1700 psig RCS Pressure use the average of P725 and P732 (loop 1 and loop 2 WR Pressure).
(2) If less than 520&deg;F RCS Temperature then average T753 and T782 (loop 1 and loop 2 WR Temperature).
4.2.2.a Makeup Tank Water Density (from Attachment 4)
4.2.2.a Makeup Tank Water Density (from Attachment 4)
Initial ____62.0038______ lbm/ft&#xb3; Final   ___ 62.0038______ lbm/ft&#xb3; 4.2.2.b Makeup Tank Inventory Note: 77.85 ft&#xb3; accounts for water volume below the level indicating range.
Initial ____62.0038______ lbm/ft&#xb3; Final ___ 62.0038______ lbm/ft&#xb3; 4.2.2.b Makeup Tank Inventory Note: 77.85 ft&#xb3; accounts for water volume below the level indicating range.
Water Inventory = (Tank level
Water Inventory = (Tank level
* 4.124 ft&#xb3;/in
* 4.124 ft&#xb3;/in
* Calibration Density) + (77.85 ft&#xb3;
* Calibration Density) + (77.85 ft&#xb3;
* Water Density)  
* Water Density)  
        = (Tank level
= (Tank level
* 4.124 ft&#xb3;/in
* 4.124 ft&#xb3;/in
* 62.325lbm/ ft&#xb3;) + (77.85 ft&#xb3;
* 62.325lbm/ ft&#xb3;) + (77.85 ft&#xb3;
Line 1,029: Line 1,153:
Initial:
Initial:
( ___71______ in.* 257 lbm/in ) + ( 77.85 ft&#xb3;
( ___71______ in.* 257 lbm/in ) + ( 77.85 ft&#xb3;
* _62.0038   lbm/ft&#xb3;) = _23074_ lbm __mlk__ IV Final:     (___64______
* _62.0038 lbm/ft&#xb3;) = _23074_ lbm
in.* 257 lbm/in ) + ( 77.85 ft&#xb3;
__mlk__
* _62.0038   lbm/ft&#xb3;) = _21275_ lbm __mlk__ IV 21   Revision   ATTACHMENT 2:
IV Final:
(___64______ in.* 257 lbm/in ) + ( 77.85 ft&#xb3;
* _62.0038 lbm/ft&#xb3;) = _21275_ lbm
__mlk__
IV  
 
21 Revision ATTACHMENT 2:
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 2 of 3 4.2.2.c Pressurizer Inventory Density (from Attachment 6)
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 2 of 3 4.2.2.c Pressurizer Inventory Density (from Attachment 6)
Water Initial ___37.71________ lbm/ft&#xb3; Steam Initial ____6.02_________ lbm/ft&#xb3; Water Final ____37.68________ lbm/ft&#xb3; Steam Final ____6.04_________ lbm/ft&#xb3; 4.2.2.d Pressurizer Inventory Note: 239.6 ft&#xb3; accounts for water volume below the level indicating range.
Water Initial ___37.71________ lbm/ft&#xb3; Steam Initial ____6.02_________ lbm/ft&#xb3; Water Final ____37.68________ lbm/ft&#xb3; Steam Final ____6.04_________ lbm/ft&#xb3; 4.2.2.d Pressurizer Inventory Note:
239.6 ft&#xb3; accounts for water volume below the level indicating range.
242.2 ft&#xb3; accounts for steam volume above the level indicating range.
242.2 ft&#xb3; accounts for steam volume above the level indicating range.
Water Inventory = (level
Water Inventory = (level
* 3.173 ft&#xb3;/in + 239.6 ft&#xb3;)
* 3.173 ft&#xb3;/in + 239.6 ft&#xb3;)
* Water Density Water Initial:   [(___218_____ in.
* Water Density Water Initial:
[(___218_____ in.
* 3.173 ft&#xb3;/in) + 239.6 ft&#xb3;]
* 3.173 ft&#xb3;/in) + 239.6 ft&#xb3;]
* 37.71 lbm/ft&#xb3; = _35119.85 lbm ___mlk__ IV Water Final:
* 37.71 lbm/ft&#xb3; = _35119.85 lbm
___mlk__
IV Water Final:
[(___222_____ in.
[(___222_____ in.
* 3.173 ft&#xb3;/in) + 239.6 ft&#xb3;]
* 3.173 ft&#xb3;/in) + 239.6 ft&#xb3;]
* 37.68   lbm/ft&#xb3; = _35570.146 lbm __mlk__ IV Steam Inventory =[((320  
* 37.68 lbm/ft&#xb3; = _35570.146 lbm
- level)
__mlk__
IV Steam Inventory =[((320 - level)
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* Steam Density Steam Initial:
* Steam Density Steam Initial:
Line 1,049: Line 1,184:
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* 6.02 lbm/ft&#xb3;) = _3406.393________ lbm
* 6.02 lbm/ft&#xb3;) = _3406.393________ lbm
__mlk__ IV Steam Final:
__mlk__
IV Steam Final:
[((320 - __222__in)
[((320 - __222__in)
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* 3.173 ft&#xb3;/in) + 242.2 ft&#xb3;]
* 6.04   lbm/ft&#xb3;) = _3341.05
* 6.04 lbm/ft&#xb3;) = _3341.05 __ lbm
__ lbm __mlk__ IV 4.2.2.e Power Correction Factor Initial _____
__mlk__
135_____________ lbm Final   _____
IV 4.2.2.e Power Correction Factor Initial _____135_____________ lbm Final _____135____________ lbm 4.2.2.f Temperature Correction Factor (Tave >528&deg;)
135____________ lbm 4.2.2.f Temperature Correction Factor (Tave >528&deg;)   Initial ______
Initial ______-34350___________ lbm Final _____-35600___________ lbm  
-3 4350___________ lbm Final   _____
-35 6 00___________ lbm


22   Revision   ATTACHMENT 2:
22 Revision ATTACHMENT 2:
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 3 of 3 4.2.2.g Temperature Correction Factor (Tave <528&deg;) Reactor Coolant System Density (from Attachment 5)
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 3 of 3 4.2.2.g Temperature Correction Factor (Tave <528&deg;)
N/A   At initial Tave ___________________ lbm/ft&#xb3;
Reactor Coolant System Density (from Attachment 5)
N/A At initial Tave
___________________ lbm/ft&#xb3; At final Tave
___________________ lbm/ft&#xb3; Temperature Correction Factor (TCF)
TCF = [(10,277 + (0.24828
* Tave))
* Reactor Coolant System Density] - 498,800 Initial: [(10,277 ft&#xb3; + (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
* _______ lbm/ft&#xb3;] - 498,800 lbm = _______ lbm IV Final: [(10,277 ft&#xb3; + (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
* _______ lbm/ft&#xb3;] - 498,800 lbm = _______ lbm IV 4.2.2.h RCS Inventory MU Tank Inventory (lbm)
+
Pzr Steam Inventory (lbm)
+
Pzr Water Inventory (lbm)
+
Power Correction (lbm)
+
Temperature Correction (lbm)
=
Water Inventory (lbm)
Initial:
23074 lbm +
3406.393 lbm +
35119.85 lbm +
135 lbm
+
-34350 lbm =
27385.243 lbm Final:
21275 lbm +
3341.05 lbm +
35570.146 lbm +
135 lbm +
-35600 lbm =
24721.196 lbm 4.2.2.i Change in RCS Inventory Change = Initial inventory - Final inventory Change = 27385.243_ lbm - 24721.196 lbm = 2664.047_ lbm
__mlk__
IV


At final Tave ___________________ lbm/ft&#xb3; Temperature Correction Factor (TCF)
23 Revision ATTACHMENT 2:
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 4 of 4 4.2.2.j Time period Period = Final time - Initial time Period = [(_23___ hr x 60) + ( 11 min)] - [(__19__ hr x 60) + ( 5 min)] = _246____ min
__mlk__
IV 4.2.2.k Total RCS Leak Rate lbm 62.32 ft x
ft gallons 7.481 x
time Inventory RCS in Change Leakrate 3
3
=
Leakrate = (
2664.047 lbm) &#xf7; (
246 min) x (0.120 gal/lbm)
Leakrate = 1.299 gpm
__mlk__
IV Independent Verification Completed by MLKlein__________________________ Date Today


TCF = [(10,277 + (0.24828
24 Revision ATTACHMENT 3:
* Tave))
UNIDENTIFIED RCS LEAKAGE CALCULATION SHEET Page 1 of 1 4.2.1.f RCP Seals Leak Rate from computer printout, or from Attachment 1. (4.2.1.e)
* Reactor Coolant System Density]
_____.011_ gpm 4.2.1.j Quench Tank In-Leakage Rate from computer printout, or from Attachment 1. (4.2.1.i). Only record Positive values (exclude negative values by entering 0.000).
- 498,800  Initial: [(10,277 ft&#xb3; + (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
_____.0___ gpm 4.2.2.l RCS Total Leak Rate from computer printout, or from Attachment 2.
* _______ lbm/ft&#xb3;]
___1.299__ gpm 4.2.3.a Primary to Secondary Tube Leakage from computer printout, or from most recent entry in RCS Leakage Log, RO Log, or as determined by Chemistry.
- 498,800 lbm = _______ lbm
____.0 ___ gpm (0.104 allowed) 4.2.3.b Other Identified Leakage, or from RCS Leakage Log.
________ IV Final: [(10,277 ft&#xb3; + (0.24828 ft&#xb3;/&deg;F* _______&deg;F))
____.0____ gpm 4.2.3.c Total Identified Leak Rate from computer printout, or from; RCP Seals + Quench Tk + Pri to Sec + Other
* _______ lbm/ft&#xb3;]
( 4.2.1.e + 4.2.1.i [positive values only] + 4.2.3.a + 4.2.3.b ).
- 498,800 lbm = _______ lbm
__mlk__
________ IV 4.2.2.h RCS Inventory MU Tank Inventory (lbm) + Pzr Steam Inventory (lbm) + Pzr Water Inventory (lbm) + Power Correction (lbm) + Temperature Correction (lbm) = Water Inventory (lbm) Initial:  23074  lbm +  3406.393  lbm +  35119.85  lbm +  135  lbm +  -34350  lbm =  2 7 385.243  lbm Final:
IV
21275  lbm +  3341.05  lbm +  35570.146  lbm +  135  lbm +  -356 00  lbm =  24721.196  lbm  4.2.2.i  Change in RCS Inventory Change  = Initial inventory
_____.011_ gpm (10 gpm allowed) 4.2.3.d Unidentified Leak Rate from computer printout, or from; Total Leak Rate - Total Identified Leak Rate
- Final inventory Change = 27385.243_ lbm - 24721.196 lbm =  2664.047_ lbm  __mlk__ IV 23    Revision  ATTACHMENT 2:
( 4.2.2.k - 4.2.3.c )
RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 4 of 4 4.2.2.j Time period Period  = Final time
__mlk__
- Initial time Period = [
IV
(_23___ hr x 60) + (  11      min)] - [(__19__ hr x 60) + ( 5    min)]  =  _
___1.288__ gpm (1 gpm allowed) 4.2.3.e Reactor Coolant Pressure Boundary Leakage
246____ min __mlk__ IV 4.2.2.k  Total RCS Leak Rate lbm 62.32 ft  x  ftgallons 7.481  x  timeInventory  RCSin  Change    Leakrate 3 3    Leakrate =  ( 2664.047  lbm) &#xf7; (  246 min) x  (0.120 gal/lb m)    Leakrate =
1.299  gpm  __mlk__ IV Independent Verification Completed by MLKlein__________________________ Date  Today 24   Revision   ATTACHMENT 3:
UNIDENTIFIED RCS LEAKAGE CALCULATION SHEET Page 1 of 1 4.2.1.f RCP Seals Leak Rate from computer printout, or from Attachment
: 1. (4.2.1.e)   _____.011_ gpm   4.2.1.j Quench Tank In
-Leakage Rate from computer printout, or from Attachment 1. (4.2.1.i). Only record Positive values (exclude negative values by entering 0.000).
_____.0___ gpm 4.2.2.l RCS Total Leak Rate from computer printout, or from Attachment
: 2. ___1.299__ gpm   4.2.3.a Primary to Secondary Tube Leakage from computer printout, or from most recent entry in RCS Leakage Log, RO Log, or as determined by Chemistry.
____.0 ___ gpm (0.104 allowed) 4.2.3.b Other Identified Leakage, or from RCS Leakage Log.
____.0____ gpm 4.2.3.c Total Identified Leak Rate from computer printout, or from; RCP Seals + Quench Tk + Pri to Sec + Other                                           ( 4.2.1.e + 4.2.1.i [positive values only] +   4.2.3.a + 4.2.3.b ). __mlk__       IV _____.011_ gpm   (10 gpm allowed) 4.2.3.d Unidentified Leak Rate from computer printout, or from; Total Leak Rate  
- Total Identified Leak Rate                                       ( 4.2.2.k - 4.2.3.c ) __mlk__       IV ___1.288__ gpm   (1 gpm allowed) 4.2.3.e Reactor Coolant Pressure Boundary Leakage
____.0 ____ gpm (0 gpm allowed)
____.0 ____ gpm (0 gpm allowed)
Independent Verification Completed by ___MLKlein________Date Today Performed by: Rx Operator Date: Today
Davis-Besse Initial License Exam 2015 Admin JPM SRO-A1.2
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG 1 of 6 Facility: Davis-Besse Task No:
336-004-03-0300 Task


Independent Verification Completed by
==Title:==
___MLKlein________Date Toda y  Performed by:
Determine Maintenance of Active License Status K/A  
Rx Operator Date:    Today Davis-Besse Initial License Exam 2015 Admin JPM SRO-A 1.2 Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A 1.2 AG  1 of 6  Facility:            Davis-Besse    Task No: 336-004-03-0300    Task Title
:      Determine Maintenance of Active License Status K/A  


==Reference:==
==Reference:==
 
2.1.4 (3.8)
2.1.4 (3.8) Job Performance Measure No
Job Performance Measure No: SRO-A1.2 (JPM New)
:   SRO-A 1.2 (JPM New)     Examinee:           NRC Examiner:
Examinee:
Date:       Method of testing:
NRC Examiner:
Simulated Performance
Date:
___  Actual Performance
Method of testing:
_X_ Classroom
Simulated Performance ___
_X_  Simulator
Actual Performance _X_
___  Plant ___
Classroom _X_
Simulator ___
Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Line 1,112: Line 1,289:
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard: Determine SRO 1 and SRO 3 are Inactive. Determine SRO 2 and SRO 4 are Active.
Task Standard:
Determine SRO 1 and SRO 3 are Inactive. Determine SRO 2 and SRO 4 are Active.
Required Materials:
Required Materials:
DBBP-TRAN-0014, License Requirements for Licensed Individuals NT-OT-07001, Training and Qualification of Operations Personnel General  
DBBP-TRAN-0014, License Requirements for Licensed Individuals NT-OT-07001, Training and Qualification of Operations Personnel General  


==References:==
==References:==
 
None Initiating Cue:
None Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
No Alternate Path:
No Validation Time:
15 minutes


Time Critical Task:
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG 2 of 6 EXAMINER COPY INITIAL CONDITIONS:
No    Alternate Path:
It is 7/1/15. Four Senior Reactor Operators have the following work history for the second quarter of 2015 (Plant was in Mode 1 the entire quarter):
No  Validation Time:
SRO 1 Entered second quarter with active license 4/01/2015 Worked 0700-1900 as Command SRO 4/02/2015 Worked 0700-1900 as Command SRO 4/03/2015 Worked 0700-1900 as Command SRO 4/07/2015 Worked 0700-1900 as Command SRO. Was relieved for 3 hours to obtain required biennial License Physical at the Health Center 4/08/2015 Worked 0700-1900 as Command SRO SRO 2 Entered second quarter with inactive license Completed all requirements for license reactivation 4/15/15 through 4/20/15 4/23/15 Worked 0700-1900 as Command SRO 4/24/15 Worked 0700-1900 as Command SRO 4/28/15 Worked 0700-1900 as Shift Technical Advisor SRO 3 Entered second quarter with active license 4/10/15 Worked 0700-1900 as Shift Manager 4/11/15 Worked 0700-1900 as Shift Manager 4/18/15 Worked 0700-1900 as Shift Manager 4/19/15 Worked 0700-1900 as Shift Technical Advisor 4/20/15 Worked 0700-1900 as Shift Manager SRO 4 License issued at the beginning of the second quarter 5/1/15 Worked 0700-1900 as Command SRO 5/2/15 Worked 0700-1900 as Command SRO 5/3/15 Worked 0700-1900 as Command SRO 5/9/15 Worked 0700-1900 as Command SRO 5/10/15 Worked 0700-1900 as Shift Technical Advisor INITIATION CUE:
15 minutes
Based on the previous quarters work history determine the license status as of today, 7/1/15, for each Senior Reactor Operator and document as ACTIVE or INACTIVE on this page.
(Provide copy of DBBP-TRAN-0014, License Requirements for Licensed Individuals and NT-OT-07001, Training and Qualification of Operations Personnel)


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A 1.2 AG 2 of 6   EXAMINER COPY INITIAL CONDITIONS
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG 3 of 6 CANDIDATE COPY INITIAL CONDITIONS:
It is 7/1/15. Four Senior Reactor Operators have the following work history for the second quarter of 2015 (Plant was in Mode 1 the entire quarter)
It is 7/1/15. Four Senior Reactor Operators have the following work history for the second quarter of 2015 (Plant was in Mode 1 the entire quarter):
SRO 1 Entered second quarter with active license 4/01/2015 Worked 0700
SRO 1 Entered second quarter with active license 4/01/2015 Worked 0700-1900 as Command SRO 4/02/2015 Worked 0700-1900 as Command SRO 4/03/2015 Worked 0700-1900 as Command SRO 4/07/2015 Worked 0700-1900 as Command SRO. Was relieved for 3 hours to obtain required biennial License Physical at the Health Center 4/08/2015 Worked 0700-1900 as Command SRO SRO 2 Entered second quarter with inactive license Completed all requirements for license reactivation 4/15/15 through 4/20/15 4/23/15 Worked 0700-1900 as Command SRO 4/24/15 Worked 0700-1900 as Command SRO 4/28/15 Worked 0700-1900 as Shift Technical Advisor SRO 3 Entered second quarter with active license 4/10/15 Worked 0700-1900 as Shift Manager 4/11/15 Worked 0700-1900 as Shift Manager 4/18/15 Worked 0700-1900 as Shift Manager 4/19/15 Worked 0700-1900 as Shift Technical Advisor 4/20/15 Worked 0700-1900 as Shift Manager SRO 4 License issued at the beginning of the second quarter 5/1/15 Worked 0700-1900 as Command SRO 5/2/15 Worked 0700-1900 as Command SRO 5/3/15 Worked 0700-1900 as Command SRO 5/9/15 Worked 0700-1900 as Command SRO 5/10/15 Worked 0700-1900 as Shift Technical Advisor INITIATION CUE:
-1900 as Command SRO 4/02/2015 Worked 0700
Based on the previous quarters work history determine the license status as of today, 7/1/15, for each Senior Reactor Operator and document as ACTIVE or INACTIVE on this page.
-1900 as Command SRO 4/03/2015 Worked 0700
-1900 as Command SRO 4/07/2015 Worked 0700
-1900 as Command SRO. Was relieved for 3 hours to obtain required biennial License Physical at the Health Center 4/08/2015 Worked 0700
-1900 as Command SRO SRO 2 Entered second quarter with inactive license Complete d all requirements for license reactivation 4/15/15 through 4/20/15 4/23/15 Worked 0700
-1900 as Command SRO 4/24/15 Worked 0700
-1900 as Command SRO 4/28/15 Worked 0700
-1900 as Shift Technical Advisor SRO 3 Entered second quarter with active license 4/10/15 Worked 0700
-1900 as Shift Manager 4/11/15 Worked 0700
-1900 as Shift Manager 4/18/15 Worked 0700
-1900 as Shift Manager 4/19/15 Worked 0700
-1900 as Shift Technical Advisor 4/20/15 Worked 0700
-1900 as Shift Manager SRO 4 License issued at the beginning of the second quarter 5/1/15 Worked 0700
-1900 as Command SRO 5/2/15 Worked 0700
-1900 as Command SRO 5/3/15 Worked 0700
-1900 as Command SRO 5/9/15 Worked 0700
-1900 as Command SRO 5/10/15 Worked 0700
-1900 as Shift Technical Advisor INITIATION CUE:


Based on the previous quarters work history determine the license status as of today, 7/1/15 , for each Senior Reactor Operator and document as ACTIVE or INACTIVE on this page. (Provide copy of DBBP
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG 4 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
-TRAN-0014, License Requirements for Licensed Individuals and NT-OT-07001, Training and Qualification of Operations Personnel)
START TIME: _______
: 1.
PERFORMANCE STEP: Evaluate SRO 1 work history  
........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines license is Inactive.
COMMENT: Credit not received for complete watch due to absence to Health Center CUE: None SAT UNSAT
: 2.
PERFORMANCE STEP: Evaluate SRO 2 work History
........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines license is Active COMMENT: Reactivation meets proficiency requirements for the quarter CUE: None SAT UNSAT
: 3.
PERFORMANCE STEP: Evaluate SRO 3 work history
........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines license is Inactive COMMENT: No credit given for Shift Technical position CUE: None SAT UNSAT


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A 1.2 AG 3 of 6 CANDIDATE COPY INITIAL CONDITIONS
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG 5 of 6
: It is 7/1/15. Four Senior Reactor Operators have the following work history for the second quarter of 2015 (Plant was in Mode 1 the entire quarter):
: 4.
SRO 1 Entered second quarter with active license 4/01/2015 Worked 0700
PERFORMANCE STEP: Evaluate SRO 4 work history  
-1900 as Command SRO 4/02/2015 Worked 0700
........C........
-1900 as Command SRO 4/03/2015 Worked 0700
STANDARD: Reviews DBBP-TRAN-0014, License Requirements and NT-OT-01007, Training and Qualification of Operations Personnel for Licensed Individuals and determines license is Active.
-1900 as Command SRO 4/07/2015 Worked 0700
COMMENT: A newly issued license meets the proficiency requirement for the quarter in which it was issued CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)
-1900 as Command SRO. Was relieved for 3 hours to obtain required biennial License Physical at the Health Center 4/08/2015 Worked 0700
END TIME
-1900 as Command SRO SRO 2 Entered second quarter with inactive license Complete d all requirements for license reactivation 4/15/15 through 4/20/15 4/23/15 Worked 0700
-1900 as Command SRO 4/24/15 Worked 0700
-1900 as Command SRO 4/28/15 Worked 0700
-1900 as Shift Technical Advisor SRO 3 Entered second quarter with active license 4/10/15 Worked 0700
-1900 as Shift Manager 4/11/15 Worked 0700
-1900 as Shift Manager 4/18/15 Worked 0700
-1900 as Shift Manager 4/19/15 Worked 0700
-1900 as Shift Technical Advisor 4/20/15 Worked 0700
-1900 as Shift Manager SRO 4 License issued at the beginning of the second quarter 5/1/15 Worked 0700
-1900 as Command SRO 5/2/15 Worked 0700
-1900 as Command SRO 5/3/15 Worked 0700-1900 as Command SRO 5/9/15 Worked 0700
-1900 as Command SRO 5/10/15 Worked 0700
-1900 as Shift Technical Advisor INITIATION CUE:
Based on the previous quarters work history determine the license status as of today, 7/1/15, for each Senior Reactor Operator and document as ACTIVE or INACTIVE on this page
.
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A 1.2 AG  4 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME:  _______
: 1. PERFORMANCE STEP: Evaluate SRO 1 work history  
  ........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines license is Inactive
.
COMMENT: Credit not received for complete watch due to absence to Health Center CUE: None      __________
SAT  UNSAT
: 2. PERFORMANCE STEP: Evaluate SRO 2 work History
  ........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines license is Active COMMENT: Reactivation meets proficiency requirements for the quarter CUE: None       __________
SAT UNSAT
: 3. PERFORMANCE STEP: Evaluate SRO 3 work history
  ........C........
STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines license is Inactive COMMENT: No credit given for Shift Technical position CUE: None      __________
SAT  UNSAT


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A 1.2 AG 5 of 6  4. PERFORMANCE STEP: Evaluate SRO 4 work history
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG 6 of 6 Verification of Completion Job Performance Measure No.
  ........C........
Examinees Name:
STANDARD: Reviews DBBP-TRAN-0014, License Requirements and NT-OT-01007 , Training and Qualification of Operations Personnel for Licensed Individuals and determines license is Active.
Examiners Name:
COMMENT: A newly issued license meets the proficiency requirement for the quarter in which it was issued CUE: None        __________
SAT  UNSAT TERMINATING CUES:  This JPM is complete (Terminated by the examine r)        __________
END TIME Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A 1.2 AG  6 of 6   Verification of Completion Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:  
Time to Complete:
 
Question Documentation:
Question Documentation:  
Question:_____________________________________________________________
Response:_____________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________


Question:_____________________________________________________________
Davis-Besse Initial License Exam 2015 Admin JPM SRO-A2
____________________________________________________________________________
________________________________________________________________
Response:___________________________________________
__________________
______________________________________________________________________


______________________________________________________________________
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A2 AG 1 of 6 Facility: Davis-Besse Task No:
______________________________________________________________________
331-041-02-0300 Task
Result: Satisfactory/Unsatisfactory Examiner's signature and date:
_______________________________________


Davis-Besse Initial License Exam 2015 Admin JPM SRO-A 2 Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A2 AG  1 of 6  Facility:            Davis-Besse    Task No: 331-041-02-0300    Task Title
==Title:==
:      Perform Risk Assessment K/A  
Perform Risk Assessment K/A  


==Reference:==
==Reference:==
 
2.2.17 (3.8)
2.2.17 (3.8) Job Performance Measure No
Job Performance Measure No: SRO-A2 (JPM New)
:     SRO-A 2 (JPM New)   Examinee:           NRC Examiner:       Date:       Method of testing:
Examinee:
Simulated Performance
NRC Examiner:
___  Actual Performance
Date:
_X_ Classroom
Method of testing:
_X_  Simulator
Simulated Performance ___
___  Plant ___
Actual Performance _X_
Classroom _X_
Simulator ___
Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Task Standard:
Evaluate Generation Risk as Orange. Determine Director of Site Operations approval with documentation in Unit Log is required Determine Supervisor continuous job site coverage is required Required Materials:
Evaluate Generation Risk as Orange.
Determine Director of Site Operations approval with documentation in Unit Log is required Determine Supervisor continuous job site coverage is required Required Materials:
NOP-OP-1007, Risk Management DB-OP-06011, High Pressure Injection System, section 4.1 General  
NOP-OP-1007, Risk Management DB-OP-06011, High Pressure Injection System, section 4.1 General  


==References:==
==References:==
Technical Specifications Initiating Cue:
Technical Specifications Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
Time Critical Task: No Alternate Path: No Validation Time: 25 minutes  
No Alternate Path:
No Validation Time:
25 minutes


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A2 AG 2 of 6   EXAMINER COPY INITIAL CONDITIONS
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A2 AG 2 of 6 EXAMINER COPY INITIAL CONDITIONS:
The Plant is at 100% Power. All systems normal.
The Plant is at 100% Power. All systems normal.
INITIATION CUE:
INITIATION CUE:
Engineering has discovered a design question potentially affecting long term Operability of High Pressure Injection Pump (HPI) 1. Engineering requests HPI Pump 1 be placed on recirculation through the flow test line per DB
Engineering has discovered a design question potentially affecting long term Operability of High Pressure Injection Pump (HPI) 1. Engineering requests HPI Pump 1 be placed on recirculation through the flow test line per DB-OP-06011, High Pressure Injection System, section 4.1 for 48 hours to gather data.
-OP-06011, High Pressure Injection System, section 4.1 for 48 hours to gather data.
The Shift Manager directs you to perform a Risk Assessment for the Non-Emergent work per DB-OP-1007, Risk Assessment to determine the following only:
The Shift Manager directs you to perform a Risk Assessment for the Non
: 1. Risk Level
-Emergent work per DB-OP-1007, Risk Assessment to determine the following only: 1. Risk Level
: 2. Permission required and documentation method
: 2. Permission required and documentation method 3. Level of Supervision required Document your results on this page (Provide a copy of DB-OP-06011, Section 4.1 and NOP
: 3. Level of Supervision required Document your results on this page (Provide a copy of DB-OP-06011, Section 4.1 and NOP-OP-1007. Make Technical Specifications available)  
-OP-1007. Make Technical Specifications available
)


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A2 AG 3 of 6 CANDIDATE COPY INITIAL CONDITIONS
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A2 AG 3 of 6 CANDIDATE COPY INITIAL CONDITIONS:
The Plant is at 100% Power. All systems normal. INITIATION CUE:
The Plant is at 100% Power. All systems normal.
Engineering has discovered a design question potentially affecting long term Operability of High Pressure Injection Pump (HPI) 1. Engineering requests HPI Pump 1 be placed on recirculation through the flow test line per DB
INITIATION CUE:
-OP-06011, High Pressure Injection System, section 4.1 for 48 hours to gather data.
Engineering has discovered a design question potentially affecting long term Operability of High Pressure Injection Pump (HPI) 1. Engineering requests HPI Pump 1 be placed on recirculation through the flow test line per DB-OP-06011, High Pressure Injection System, section 4.1 for 48 hours to gather data.
The Shift Manager directs you to perform a Risk Assessment for the N on-Emergent work per DB-OP-1007, Risk Assessment to determine the following only: 1. Risk Level
The Shift Manager directs you to perform a Risk Assessment for the Non-Emergent work per DB-OP-1007, Risk Assessment to determine the following only:
: 1. Risk Level
: 2. Permission required and documentation method
: 2. Permission required and documentation method
: 3. Level of Supervision required Document your results on this page
: 3. Level of Supervision required Document your results on this page  


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A2 AG 4 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A2 AG 4 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
START TIME: _______
NOTE: STEPS CAN BE PERFORMED IN ANY SEQUENCE
NOTE: STEPS CAN BE PERFORMED IN ANY SEQUENCE
: 1. PERFORMANCE STEP: Evaluate effect on HPI Train 1 STANDARD: Reviews DB
: 1.
-OP-06011, section 4.1 and determines HPI 1 will be Inoperable while line d up through the flow test line
PERFORMANCE STEP: Evaluate effect on HPI Train 1 STANDARD: Reviews DB-OP-06011, section 4.1 and determines HPI 1 will be Inoperable while lined up through the flow test line CUE: None SAT UNSAT
 
: 2.
CUE: None       __________
PERFORMANCE STEP: Reviews Technical Specification 3.5.2 for HPI Pump 1 STANDARD: Determines 72 hour action statement will be entered CUE:
SAT UNSAT
None SAT UNSAT
: 2. PERFORMANCE STEP: Reviews Technical Specification 3.5.2 for HPI Pump 1 STANDARD: Determines 72 hour action statement will be entered
: 3.
 
PERFORMANCE STEP: Determines Risk Level  
CUE: None       __________
........C........
SAT UNSAT
: 3. PERFORMANCE STEP: Determines Risk Level
  ........C........
STANDARD: Refers to Attachment 2 and/or 3 of NOP-OP-1007, Risk Assessment and identifies Risk level will be Orange COMMENT: Greater than 50% of a shutdown LCO action time (for less than 14 day LCO) requires Orange Risk. HPI 1 will be Inoperable for 48 hours which is greater than 50% of the 72 hour shutdown LCO.
STANDARD: Refers to Attachment 2 and/or 3 of NOP-OP-1007, Risk Assessment and identifies Risk level will be Orange COMMENT: Greater than 50% of a shutdown LCO action time (for less than 14 day LCO) requires Orange Risk. HPI 1 will be Inoperable for 48 hours which is greater than 50% of the 72 hour shutdown LCO.
CUE: None
CUE: None SAT UNSAT  
__________
SAT UNSAT


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A2 AG 5 of 6 4. PERFORMANCE STEP: Determines Approval required and method of documentation
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A2 AG 5 of 6
  ........C........
: 4.
PERFORMANCE STEP: Determines Approval required and method of documentation  
........C........
STANDARD: Reviews Attachment 2 and/or step 4.3.3.3 of NOP-OP-1007, Risk Assessment and determines the Director of Site Operations (or designee) approval is required and documented in the Work Implementation Schedule.
STANDARD: Reviews Attachment 2 and/or step 4.3.3.3 of NOP-OP-1007, Risk Assessment and determines the Director of Site Operations (or designee) approval is required and documented in the Work Implementation Schedule.
CUE: None       __________
CUE: None SAT UNSAT
SAT UNSAT
: 5.
: 5. PERFORMANCE STEP: Determines level of Supervision required
PERFORMANCE STEP: Determines level of Supervision required  
  ........C........
........C........
STANDARD: Reviews Attachment 2 and/or step 4.3.3.3 of NOP-OP-1007, Risk Assessment and determines Supervisor continuous job site coverage is required   CUE: None       __________
STANDARD: Reviews Attachment 2 and/or step 4.3.3.3 of NOP-OP-1007, Risk Assessment and determines Supervisor continuous job site coverage is required CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examine r)
END TIME  
__________
 
END TIME Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A2 AG 6 of 6   Verification of Completion Job Performance Measure No.
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A2 AG 6 of 6 Verification of Completion Job Performance Measure No.
Examinee's Name:
Examinees Name:
Examiner's Name:
Examiners Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:  
Time to Complete:
Question Documentation:
Question:_____________________________________________________________
Response:_____________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________


Question Documentation:
Davis-Besse Initial License Exam 2015 Admin JPM SRO-A3


Question:_____________________________________________________________
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A3 AG 1 of 6 Facility: Davis-Besse Task No:
____________________________________________________________________________
334-005-05-0300 Task
________________________________________________________________
Response:__________________________________
___________________________
______________________________________________________________________


______________________________________________________________________
==Title:==
______________________________________________________________________
Emergency Dose Authorization K/A  
Result:  Satisfactory/Unsatisfactory Examiner's signature and date:
_______________________________________
 
Davis-Besse Initial License Exam 2015 Admin JPM S RO-A 3 Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO
-A3 AG  1 of 6  Facility:            Davis-Besse    Task No: 334-005-05-0300    Task Title
:      Emergency Dose Authorization K/A  


==Reference:==
==Reference:==
 
2.3.4 (3.7)
2.3.4 (3.7) Job Performance Measure No
Job Performance Measure No: SRO-A3 (JPM New)
:     S RO-A 3 (JPM New)   Examinee:           NRC Examiner:       Date:       Method of testing:
Examinee:
Simulated Performance
NRC Examiner:
___  Actual Performance
Date:
_X_ Classroom
Method of testing:
_X_  Simulator
Simulated Performance ___
___  Plant ___
Actual Performance _X_
Classroom _X_
Simulator ___
Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Task Standard:
 
Select the two mechanic method and authorize Emergency dose for mechanic 2 and 4 only Required Materials:
Select the two mechanic method and authorize Emergency dose for mechanic 2 and 4 only
RA-EP-02620, Emergency Dose Control and Potassium Iodide Distribution Emergency Dose Authorization form for each mechanic Calculator General  
 
Required Materials:
RA-EP-02620 , Emergency Dose Control and Potassium Iodide Distribution Emergency Dose Authorization form for each mechanic Calculator General  


==References:==
==References:==
 
None Initiating Cue:
None Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
Time Critical Task: No Alternate Path: No Validation Time: 25 minutes  
No Alternate Path:
No Validation Time:
25 minutes
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO
-A3 AG  2 of 6  EXAMINER COPY INITIAL CONDITIONS
:  The Plant has experienced a Loss of Coolant Accident and fuel damage. Emergency Core Cooling Train (ECCS) 1 is in operation at full flow. Low Pressure Injection Pump (LPI) 2 is out of service for maintenance. Just before the accident it was determined LPI Pump 1 was losing oil through a loose bearing housing. Plans were being made to tighten the housing and add oil. It is determined that this task is required to be performed immediately to prevent pump failure.


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A3 AG 2 of 6 EXAMINER COPY INITIAL CONDITIONS:
The Plant has experienced a Loss of Coolant Accident and fuel damage. Emergency Core Cooling Train (ECCS) 1 is in operation at full flow. Low Pressure Injection Pump (LPI) 2 is out of service for maintenance. Just before the accident it was determined LPI Pump 1 was losing oil through a loose bearing housing. Plans were being made to tighten the housing and add oil. It is determined that this task is required to be performed immediately to prevent pump failure.
INITIATION CUE:
INITIATION CUE:
You are an extra SRO on shift. The ERO is not yet activated. The Shift Manager acting as the Emergency Director in the Control Room has directed you to prepare an Emergency Dose Authorization, using the following information.
You are an extra SRO on shift. The ERO is not yet activated. The Shift Manager acting as the Emergency Director in the Control Room has directed you to prepare an Emergency Dose Authorization, using the following information.
Radiation levels in ECCS Room 1 are indicating 50 Rem/hr These two tasks (tighten the housing and add oil) can be performed by the mechanic(s) working in series or two mechanics working in parallel.
Radiation levels in ECCS Room 1 are indicating 50 Rem/hr These two tasks (tighten the housing and add oil) can be performed by the mechanic(s) working in series or two mechanics working in parallel.
One mechanic would obtain 48 minutes of exposure Two mechanics simultaneously would obtain 24 minutes of exposure each Three mechanics in rotation would obtain 18 minutes of exposure each Four mechanics in rotation would obtain 12 minutes of exposure each Four Mechanics have volunteered to perform this work:
* Mechanic 1 is a 52 year old male with 2 Rem lifetime dose and no dose for current year.
This individual also received a 28 Rem dose during a lifesaving rescue 10 years ago at another plant
* Mechanic 2 is a 27 year old male with 600 mrem lifetime dose and 5 mrem for current year
* Mechanic 3 is a 34 year old female, who has a declared pregnancy, with 125 mrem lifetime dose and no dose for current year
* Mechanic 4 is a 37 year old male with 4.2 mrem lifetime and 700 mrem for the current year Select the method desired and mechanic(s) to perform this task and document (up to the review and approval signatures) on the attached Emergency Dose Authorization Forms. The remainder of each form will be completed if necessary when the Emergency RP Manager has been contacted.
(Hand Candidate a copy of RA-EP-02620, Emergency Dose Control and Potassium Iodide Distribution and the four recommended Emergency Dose Authorization Forms)


One mechanic would obtain 48 minutes of exposure Two mechanics simultaneously would obtain 24 minutes of exposure each Three mechanics in rotation would obtain 18 minutes of exposure each Four mechanics in rotation would obtain 12 minutes of exposure each
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A3 AG 3 of 6 CANDIDATE COPY INITIAL CONDITIONS:
 
The Plant has experienced a Loss of Coolant Accident and fuel damage. Emergency Core Cooling Train (ECCS) 1 is in operation at full flow. Low Pressure Injection Pump (LPI) 2 is out of service for maintenance. Just before the accident it was determined LPI Pump 1 was losing oil through a loose bearing housing. Plans were being made to tighten the housing and add oil. It is determined that this task is required to be performed immediately to prevent pump failure.
Four Mechanics have volunteered to perform this work:
Mechanic 1 is a 52 year old male with 2 Rem lifetime dose and no dose for current year. This individual also received a 28 Rem dose during a lifesaving rescue 10 years ago at another plant Mechanic 2 is a 27 year old male with 600 mrem lifetime dose and 5 mrem for current year Mechanic 3 is a 34 year old female, who has a declared pregnancy, with 125 mrem lifetime dose and no dose for current yea r    Mechanic 4 is a 37 year old male with 4.2 mrem lifetime and 700 mrem for the current year
 
Select the method desired and mechanic(s) to perform this task and document (up to the review and approval signatures) on the attached Emergency Dose Authorization Forms
. The remainder of each form will be completed if necessary when the Emergency RP Manager has been contacted.
(Hand Candidate a copy of RA-EP-02620, Emergency Dose Control and Potassium Iodide Distribution and the four recommended Emergency Dose Authorization Forms)
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO
-A3 AG 3 of 6 CANDIDATE COPY INITIAL CONDITIONS
The Plant has experienced a Loss of Coolant Accident and fuel damage. Emergency Core Cooling Train (ECCS) 1 is in operation at full flow. Low Pressure Injection Pump (LPI) 2 is out of service for maintenance. Just before the accident it was determined LPI Pump 1 was losing oil through a loose bearing housing. Plans were being made to tighten the housing and add oil. It is determined that this task is required to be performed immediately to prevent pump failure.
INITIATION CUE:
INITIATION CUE:
You are acting as the Emergency Director in the Control Room and the ERO is not yet activated.
You are acting as the Emergency Director in the Control Room and the ERO is not yet activated.
Radiation levels in ECCS Room 1 are indicating 50 Rem/hr These two tasks (tighten the housing and add oil) can be performed by the mechanic(s) working in series or two mechanics working in parallel.
Radiation levels in ECCS Room 1 are indicating 50 Rem/hr These two tasks (tighten the housing and add oil) can be performed by the mechanic(s) working in series or two mechanics working in parallel.
One mechanic would obtain 48 minutes of exposure Two mechanics simultaneously would obtain 24 minutes of exposure each Three mechanics in rotation would obtain 18 minutes of exposure each Four mechanics in rotation would obtain 12 minutes of exposure each Four Mechanics have volunteered to perform this work:
One mechanic would obtain 48 minutes of exposure Two mechanics simultaneously would obtain 24 minutes of exposure each Three mechanics in rotation would obtain 18 minutes of exposure each Four mechanics in rotation would obtain 12 minutes of exposure each Four Mechanics have volunteered to perform this work:
Mechanic 1 is a 52 year old male with 2 Rem lifetime dose and no dose for current year. This individual also received a 28 Rem dose during a lifesaving rescue 10 years ago at another plant Mechanic 2 is a 27 year old male with 600 mrem lifetime dose and 5 mrem for current year Mechanic 3 is a 34 year old female, who has a declared pregnancy, with 125 mrem lifetime dose and no dose for current yea r    Mechanic 4 is a 37 year old male with 4.2 mrem lifetime and 700 mrem for the current year Select the method desired and mechanic(s) to perform this task and document on this form. Authorize Emergency Dose if necessary per RA
* Mechanic 1 is a 52 year old male with 2 Rem lifetime dose and no dose for current year.
-EP-02620, Emergency Dose Control and Potassium Iodide Distribution by signing for Emergency Director Approval on the appropriate Emergency Dose Authorization Forms. The remainder of each form will be completed if necessary when the Emergency RP Manager has been contacted.
This individual also received a 28 Rem dose during a lifesaving rescue 10 years ago at another plant
 
* Mechanic 2 is a 27 year old male with 600 mrem lifetime dose and 5 mrem for current year
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO
* Mechanic 3 is a 34 year old female, who has a declared pregnancy, with 125 mrem lifetime dose and no dose for current year
-A3 AG  4 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
* Mechanic 4 is a 37 year old male with 4.2 mrem lifetime and 700 mrem for the current year Select the method desired and mechanic(s) to perform this task and document on this form.
START TIME:  _______
Authorize Emergency Dose if necessary per RA-EP-02620, Emergency Dose Control and Potassium Iodide Distribution by signing for Emergency Director Approval on the appropriate Emergency Dose Authorization Forms. The remainder of each form will be completed if necessary when the Emergency RP Manager has been contacted.  
: 1. PERFORMANCE STEP: Evaluate the dose that would be received for each method
 
STANDARD: One mechanic would obtain 40 Rem    Two mechanics simultaneously would obtain 20 Rem each Three mechanics in rotation would obtain 15 Rem each Four mechanics in rotation would obtain 10 Rem each
 
COMMENT: JPM step sequence not critical. May evaluate mechanics and select method first in which case only the method selected will need dose evaluated CUE: None      __________
SAT  UNSAT
: 2. PERFORMANCE STEP: Evaluate Mechanic 1 acceptability for receiving Emergency Dose STANDARD:. Determines Mechanic 1 should not be authorized to receive emergency dose


CUE: If asked - "received 2 8 Rem 10 years ago at previous place of employment during a lifesaving rescue"
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A3 AG 4 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
: 1.
PERFORMANCE STEP: Evaluate the dose that would be received for each method STANDARD: One mechanic would obtain 40 Rem Two mechanics simultaneously would obtain 20 Rem each Three mechanics in rotation would obtain 15 Rem each Four mechanics in rotation would obtain 10 Rem each COMMENT: JPM step sequence not critical. May evaluate mechanics and select method first in which case only the method selected will need dose evaluated CUE: None SAT UNSAT
: 2.
PERFORMANCE STEP: Evaluate Mechanic 1 acceptability for receiving Emergency Dose STANDARD:. Determines Mechanic 1 should not be authorized to receive emergency dose CUE:
If asked - received 28 Rem 10 years ago at previous place of employment during a lifesaving rescue SAT UNSAT
: 3.
PERFORMANCE STEP: Evaluate Mechanic 2 acceptability for receiving Emergency Dose STANDARD: Determines Mechanic 2 can be authorized for Emergency Dose CUE: If asked - have never received emergency dose SAT UNSAT


__________
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A3 AG 5 of 6
SAT UNSAT
: 4.
: 3. PERFORMANCE STEP: Evaluate Mechanic 2 acceptability for receiving Emergency Dose STANDARD: Determines Mechanic 2 can be authorized for Emergency Dose CUE: If asked - "have never received emergency dose"
PERFORMANCE STEP: Evaluate Mechanic 3 acceptability for receiving Emergency Dose STANDARD: Determines Mechanic 3 SHALL NOT be authorized to receive emergency dose. Since mechanic is female, and is a declared pregnant worker CUE: If asked - have never received emergency dose If asked - have just found out is pregnant SAT UNSAT
__________
: 5.
SAT UNSAT
PERFORMANCE STEP: Evaluate Mechanic 4 acceptability for receiving Emergency Dose STANDARD: Determines Mechanic 4 can be authorized for Emergency Dose CUE: If asked - have never received emergency dose SAT UNSAT
: 6.
PERFORMANCE STEP: Determine method for repair
........C........
STANDARD: Determines 2 mechanics in parallel is proper method due to condition in RA-EP-02620, step 6.1.3.b 25,000 mrem TEDE CUE:
None SAT UNSAT
: 7.
PERFORMANCE STEP: Select Mechanic 2 and Mechanic 4 to perform work
........C........
STANDARD: Recommend Emergency Dose for Mechanic 2 and Mechanic 4 CUE:
None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)
END TIME


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A3 AG 6 of 6 Verification of Completion Job Performance Measure No.
-A3 AG  5 of 6  4. PERFORMANCE STEP: Evaluate Mechanic 3 acceptability for receiving Emergency Dose STANDARD:  Determines Mechanic 3 SHALL NOT be authorized to receive emergency dose. Since mechanic is female, and is a declared pregnant worker      CUE: If asked - "have never received emergency dose" If asked - "have just found out is pregnant"
Examinees Name:
__________
Examiners Name:
SAT  UNSAT
: 5. PERFORMANCE STEP: Evaluate Mechanic 4 acceptability for receiving Emergency Dose
 
STANDARD:  Determines Mechanic 4 can be authorized for Emergency Dose CUE: If asked - "have never received emergency dose"      __________
SAT  UNSAT
: 6. PERFORMANCE STEP: Determine method for repair
  ........C........
STANDARD: Determines 2 mechanics in parallel is proper method due to condition in RA
-EP-02620, step 6.1.3.b 25,000 mrem TEDE CUE: None      __________      SAT  UNSAT
: 7. PERFORMANCE STEP: Select Mechanic 2 and Mechanic 4 to perform work
  ........C........
STANDARD: Recommend Emergency Dose for Mechanic 2 and Mechanic 4 CUE: None      __________
SAT  UNSAT TERMINATING CUES:  This JPM is complete (Terminated by the examine r)
__________
END TIME Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO
-A3 AG 6 of 6   Verification of Completion Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:  
Time to Complete:
 
Question Documentation:
Question Documentation:  
 
Question:_____________________________________________________________
Question:_____________________________________________________________
____________________________________________________________________________
_____________________________
___________________________________
Response:_____________________________________________________________
Response:_____________________________________________________________
______________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________


______________________________________________________________________
EMERGENCY DOSE AUTHORIZATION DBEP-204-01 INDIVIDUAL (Last, First, Middle)
______________________________________________________________________
Mechanic 1 SOCIAL SECURITY NUMBER 111-11-1111 DATE Today TLD NO.
Result:  Satisfactory/Unsatisfactory Examiner's signature and date:
1 EMPLOYER FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION YES NO RECOMMENDED EMERGENCY DOSE LIMIT REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE) }
_______________________________________
COMMENTS EMERGENCY RP MANAGER RECOMMENDATION (Signature)
 
EMERGENCY DOSE AUTHORIZATION DBEP-204-01   INDIVIDUAL (Last, First, Middle)
Mechanic 1 SOCIAL SECURITY NUMBER 111-11-1111 DATE Today TLD NO. 1 EMPLOYER FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION YES   NO RECOMMENDED EMERGENCY DOSE LIMIT REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE)
} COMMENTS         EMERGENCY RP MANAGER RECOMMENDATION (Signature)
EMERGENCY DIRECTOR APPROVAL (Signature)
EMERGENCY DIRECTOR APPROVAL (Signature)
AUTHORIZATION DATE AUTHORIZATION LIMIT REM { TEDE } I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.
AUTHORIZATION DATE AUTHORIZATION LIMIT REM { TEDE }
I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.
INDIVIDUAL (Signature)
INDIVIDUAL (Signature)
DATE       BRIEFED BY (Signature)
DATE BRIEFED BY (Signature)
DATE       (TOTAL DOSE  
DATE (TOTAL DOSE - TEDE) =
- TEDE) =       (EXTERNAL  
(EXTERNAL - DDE)
- DDE)       PLUS (INTERNAL  
PLUS (INTERNAL - CEDE)
- CEDE)       RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature)
RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature)
DATE       EMERGENCY DIRECTOR REVIEW (Signature)
DATE EMERGENCY DIRECTOR REVIEW (Signature)
DATE EMERGENCY DOSE AUTHORIZATION DBEP-204-01   INDIVIDUAL (Last, First, Middle)
DATE  
Mechanic 2 SOCIAL SECURITY NUMBER 222-22-2222 DATE Today TLD NO. 2 EMPLOYER FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION YES   NO RECOMMENDED EMERGENCY DOSE LIMIT REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE)
 
} COMMENTS             EMERGENCY RP MANAGER RECOMMENDATION (Signature)
EMERGENCY DOSE AUTHORIZATION DBEP-204-01 INDIVIDUAL (Last, First, Middle)
Mechanic 2 SOCIAL SECURITY NUMBER 222-22-2222 DATE Today TLD NO.
2 EMPLOYER FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION YES NO RECOMMENDED EMERGENCY DOSE LIMIT REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE) }
COMMENTS EMERGENCY RP MANAGER RECOMMENDATION (Signature)
EMERGENCY DIRECTOR APPROVAL (Signature)
EMERGENCY DIRECTOR APPROVAL (Signature)
AUTHORIZATION DATE AUTHORIZATION LIMIT REM { TEDE } I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.
AUTHORIZATION DATE AUTHORIZATION LIMIT REM { TEDE }
I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.
INDIVIDUAL (Signature)
INDIVIDUAL (Signature)
DATE       BRIEFED BY (Signature)
DATE BRIEFED BY (Signature)
DATE       (TOTAL DOSE  
DATE (TOTAL DOSE - TEDE) =
- TEDE) =       (EXTERNAL  
(EXTERNAL - DDE)
- DDE)       PLUS (INTERNAL  
PLUS (INTERNAL - CEDE)
- CEDE)       RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature)
RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature)
DATE       EMERGENCY DIRECTOR REVIEW (Signature)
DATE EMERGENCY DIRECTOR REVIEW (Signature)
DATE EMERGENCY DOSE AUTHORIZATION DBEP-204-01   INDIVIDUAL (Last, First, Middle)
DATE  
Mechanic 3 SOCIAL SECURITY NUMBER 333-33-3333 DATE Today TLD NO. 3 EMPLOYER FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION YES   NO RECOMMENDED EMERGENCY DOSE LIMIT REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE)
 
} COMMENTS             EMERGENCY RP MANAGER RECOMMENDATION (Signature)
EMERGENCY DOSE AUTHORIZATION DBEP-204-01 INDIVIDUAL (Last, First, Middle)
Mechanic 3 SOCIAL SECURITY NUMBER 333-33-3333 DATE Today TLD NO.
3 EMPLOYER FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION YES NO RECOMMENDED EMERGENCY DOSE LIMIT REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE) }
COMMENTS EMERGENCY RP MANAGER RECOMMENDATION (Signature)
EMERGENCY DIRECTOR APPROVAL (Signature)
EMERGENCY DIRECTOR APPROVAL (Signature)
AUTHORIZATION DATE AUTHORIZATION LIMIT REM { TEDE } I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.
AUTHORIZATION DATE AUTHORIZATION LIMIT REM { TEDE }
I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.
INDIVIDUAL (Signature)
INDIVIDUAL (Signature)
DATE       BRIEFED BY (Signature)
DATE BRIEFED BY (Signature)
DATE       (TOTAL DOSE  
DATE (TOTAL DOSE - TEDE) =
- TEDE) =       (EXTERNAL  
(EXTERNAL - DDE)
- DDE)       PLUS (INTERNAL  
PLUS (INTERNAL - CEDE)
- CEDE)       RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature)
RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature)
DATE       EMERGENCY DIRECTOR REVIEW (Signature)
DATE EMERGENCY DIRECTOR REVIEW (Signature)
DATE EMERGENCY DOSE AUTHORIZATION DBEP-204-01   INDIVIDUAL (Last, First, Middle)
DATE  
Mechanic 4 SOCIAL SECURITY NUMBER 444-44-4444 DATE Today TLD NO. 4 EMPLOYER FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION YES   NO RECOMMENDED EMERGENCY DOSE LIMIT REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE)
 
} COMMENTS             EMERGENCY RP MANAGER RECOMMENDATION (Signature)
EMERGENCY DOSE AUTHORIZATION DBEP-204-01 INDIVIDUAL (Last, First, Middle)
Mechanic 4 SOCIAL SECURITY NUMBER 444-44-4444 DATE Today TLD NO.
4 EMPLOYER FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION YES NO RECOMMENDED EMERGENCY DOSE LIMIT REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE) }
COMMENTS EMERGENCY RP MANAGER RECOMMENDATION (Signature)
EMERGENCY DIRECTOR APPROVAL (Signature)
EMERGENCY DIRECTOR APPROVAL (Signature)
AUTHORIZATION DATE AUTHORIZATION LIMIT REM { TEDE } I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.
AUTHORIZATION DATE AUTHORIZATION LIMIT REM { TEDE }
I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.
INDIVIDUAL (Signature)
INDIVIDUAL (Signature)
DATE       BRIEFED BY (Signature)
DATE BRIEFED BY (Signature)
DATE       (TOTAL DOSE  
DATE (TOTAL DOSE - TEDE) =
- TEDE) =       (EXTERNAL  
(EXTERNAL - DDE)
- DDE)       PLUS (INTERNAL  
PLUS (INTERNAL - CEDE)
- CEDE)       RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature)
RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature)
DATE       EMERGENCY DIRECTOR REVIEW (Signature)
DATE EMERGENCY DIRECTOR REVIEW (Signature)
DATE Davis-Besse Initial License Exam 2015 Admin JPM S RO-A 4 Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A 4 AG 1 of 8   Facility:             Davis-Besse   Task No: 334-004-05-0300   Task Title
DATE  
Emergency Response Organization Notification K/A  
 
Davis-Besse Initial License Exam 2015 Admin JPM SRO-A4
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG 1 of 8 Facility: Davis-Besse Task No:
334-004-05-0300 Task
 
==Title:==
Emergency Response Organization Notification K/A  


==Reference:==
==Reference:==
 
2.4.43 (3.8)
2.4.43 (3.8
Job Performance Measure No: SRO-A4 (JPM 253)
) Job Performance Measure No
Examinee:
:     S RO-A 4 (JPM 253)   Examinee:           NRC Examiner:
NRC Examiner:
Date:       Method of testing:
Date:
Simulated Performance
Method of testing:
___  Actual Performance
Simulated Performance ___
_X_  Classroom
Actual Performance _X_
___  Simulator
Classroom ___
_X_  Plant ___
Simulator _X_
Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Task Standard:
Activate the ERO Numeric Group Page Required Materials:
Activate the ERO Numeric Group Page Required Materials:
RA-EP-01700, Alert RA-EP-02110, Emergency Notification Davis- Besse Emergency Plan Telephone Directory Phone General  
RA-EP-01700, Alert RA-EP-02110, Emergency Notification Davis-Besse Emergency Plan Telephone Directory Phone General  


==References:==
==References:==
Initiating Cue:
Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task:
Time Critical Task:
No   Alternate Path:
No Alternate Path:
No Validation Time:
No Validation Time: 10 minutes  
10 minutes


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A 4 AG 2 of 8   EXAMINER COPY INITIAL CONDITIONS:
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG 2 of 8 EXAMINER COPY INITIAL CONDITIONS:
You are an extra Senior Reactor Operator in the Control Room.
You are an extra Senior Reactor Operator in the Control Room.
The plant is in Mode 1 operating at 100% power.
The plant is in Mode 1 operating at 100% power.
The Shift Manager has declared an Alert on EAL HA3 due to an Operating Basis Earthquake being detected at the plant and he has assumed the Emergency Director position.
The Shift Manager has declared an Alert on EAL HA3 due to an Operating Basis Earthquake being detected at the plant and he has assumed the Emergency Director position.
The Unit Supervisor is directing plant responses in accordance with RA-EP-02820, Earthquake.
INITIATING CUES:
Due to performing plant walk-downs and responding to other issues associated with response to the earthquake, Security personnel are not available to make any emergency notifications.
The Emergency Director directs you to notify the Emergency Response Organization in accordance with RA-EP-02110.
(Provide RA-EP-2110 and the Emergency Plan Telephone Directory)


The Unit Supervisor is directing plant responses in accordance with RA
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG 3 of 8 CANDIDATE COPY INITIAL CONDITIONS:
-EP-02820, Earthquake.
INITIATING CUES:
Due to performing plant walk
-downs and responding to other issues associated with response to the earthquake, Security personnel are not available to make any emergency notifications. The Emergency Director directs you to notify the Emergency Response Organization in accordance with RA
-EP-02110.  (Provide RA
-EP-2110 and the Emergency Plan Telep hone Directory)
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A 4 AG 3 of 8 CANDIDATE COPY INITIAL CONDITIONS:
You are an extra Senior Reactor Operator in the Control Room.
You are an extra Senior Reactor Operator in the Control Room.
The plant is in Mode 1 operating at 100% power.
The plant is in Mode 1 operating at 100% power.
The Shift Manager has declared an Alert on EAL HA3 due to an Operating Basis Earthquake being detected at the plant and he has assumed the Emergency Director position.
The Shift Manager has declared an Alert on EAL HA3 due to an Operating Basis Earthquake being detected at the plant and he has assumed the Emergency Director position.
 
The Unit Supervisor is directing plant responses in accordance with RA-EP-02820, Earthquake.
The Unit Supervisor is directing plant responses in accordance with RA
-EP-02820, Earthquake.
INITIATING CUES:
INITIATING CUES:
Due to performing plant walk
Due to performing plant walk-downs and responding to other issues associated with response to the earthquake, Security personnel are not available to make any emergency notifications.
-downs and responding to other issues associated with response to the earthquake, Security personnel are not available to make any emergency notifications.
The Emergency Director directs you to notify the Emergency Response Organization in accordance with RA-EP-02110.  
The Emergency Director directs you to notify the Emergency Response Organization in accordance with RA
-EP-02110.  


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A 4 AG 4 of 8 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG 4 of 8 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
  . START TIME: _______
START TIME: _______
: 1. PERFORMANCE STEP
: 1. PERFORMANCE STEP: Reviews the procedure.
: Reviews the procedure.
STANDARD: Reviews RA-EP-02110, Emergency Notification, for notifying the Emergency Response Organization and off-site agencies.
STANDARD: Reviews RA-EP-02110, Emergency Notification, for notifying the Emergency Response Organization and off
CUE: If asked, a security event is NOT in progress.
-site agencies.
SAT UNSAT
CUE:   If asked, a security event is NOT in progress.
: 2. PERFORMANCE STEP: Obtain CANS access numbers from Davis-Besse Emergency Plan Telephone Directory and dial them.
STANDARD: Locates the ERO Notification Flow Chart behind the Immediate Notification Numbers tab in the Davis-Besse Emergency Plan Telephone Directory.
CUE: Provide a copy of the Emergency Plan Telephone directory only if the JPM is NOT performed in the simulator.
SAT UNSAT
: 3.
PERFORMANCE STEP: Dial the primary CANS access number.
STANDARD: Locates a touch tone phone and correctly dials the primary CANS number.
COMMENT: The primary CANS number is 9-1-877-686-7612.
IF the incorrect number is dialed, THEN say, The phone continues to ring.
CUE: Say, You hear a busy signal.
SAT UNSAT


__________
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG 5 of 8
SAT  UNSAT
: 4.
: 2. PERFORMANCE STEP:   Obtain CANS access numbers from Davis
PERFORMANCE STEP: Dial the backup CANS access number.
-Besse Emergency Plan Telephone Directory and dial them.
STANDARD: Locates a touch tone phone and correctly dials the backup CANS number.
STANDARD: Locate s the ERO Notification Flow Chart behind the Immediate Notification Numbers tab in the Davis-Besse Emergency Plan Telephone Directory. CUE:   Provide a copy of the Emergency Plan Telephone directory only if the JPM is NOT performed in the simulator.
COMMENT: The CANS backup number is 9-1-866-334-6556.
__________
CUE: The phone continues to ring.
SAT UNSAT
SAT UNSAT
: 3. PERFORMANCE STEP: Dial the primary CANS access number.
: 5. PERFORMANCE STEP: Determine the need to activate a group page.
STANDARD: Locate s a touch tone phone and correctly dials the primary CANS number.
STANDARD: Locates the ERO Numeric Group Page instructions in the ERO Notification Flow Chart behind the Immediate Notification Numbers tab in the Davis-Besse Emergency Plan Telephone Directory.
COMMENT: The primary CANS number is 9 877-686-7612.     IF the incorrect number is dialed,     THEN say, "The phone continues to ring."
COMMENT: The Group Pager number is 9-1-800-405-4758.
CUE: None.
SAT UNSAT
: 6. PERFORMANCE STEP: Contact the Group Pager system.
........C........
STANDARD: Locates a touch tone phone and correctly dials 9-1-800-405-4758.
CUE: IF the correct number is dialed, THEN say, This is the Remote Activation Module. Please enter a pager number.
IF any other number is dialed, THEN say, The number you have dialed is no longer in service. Please check the number and try again SAT UNSAT
: 7. PERFORMANCE STEP: Enter the pager number.
........C........
STANDARD: Enters pager number 2533024.
CUE: IF pager number 2533024 is entered, THEN say, Please enter the event code followed by the pound key.
IF the wrong pager number is entered, THEN say, The number you entered is not valid, please check the number and try again.
SAT UNSAT


CUE: Say, "You hear a "busy" signal."
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG 6 of 8
__________
: 8. PERFORMANCE STEP: Enter the event code.
SAT UNSAT
........C........
STANDARD: Enters 2222#.
CUE: IF the # is not entered, THEN say, Your input is not valid, Please enter the event code followed by the pound key.
SAT UNSAT
: 9. PERFORMANCE STEP: Terminate the call.
STANDARD: Hangs up the telephone.
COMMENT: The E-Plant Telephone Directory step directs the operator to Send the page two times. The second page actions are not critical if the first page was SAT.
CUE: None.
SAT UNSAT
: 10. PERFORMANCE STEP: Contact the pager system.
STANDARD: Locates a touch tone phone and correctly dials 9-1-800-405-4758.
CUE: IF the correct number is dialed, THEN say, This is the Remote Activation Module. Please enter a pager number.
IF any other number is dialed, THEN say, The number you have dialed is no longer in service. Please check the number and try again SAT UNSAT
: 11. PERFORMANCE STEP: Enter the pager number.
STANDARD: Enters pager number 2533024.
CUE: IF pager number 2533024 is entered, THEN say, Please enter the event code followed by the pound key.
IF the wrong pager number is entered, THEN say, The number you entered is not valid, please check the number and try again.
SAT UNSAT  


Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A 4 AG 5 of 8 4. PERFORMANCE STEP: Dial the backup CANS access number.
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG 7 of 8 12 PERFORMANCE STEP: Enter the event code.
STANDARD: Locate s a touch tone phone and correctly dials the backup CANS number.
STANDARD: Enters 2222#.
CUE: IF the # is not entered, THEN say, Your input is not valid, Please enter the event code followed by the pound key.
SAT UNSAT 13 PERFORMANCE STEP: Terminate the call.
STANDARD: Hangs up the telephone.
CUE: None.
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by Evaluator)
END TIME


COMMENT: The CANS backup number is 9 866-334-6556. CUE: "The phone continues to ring."
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG 8 of 8 Verification of Completion Job Performance Measure No.
__________
Examinees Name:
SAT  UNSAT
Examiners Name:
: 5. PERFORMANCE STEP:  Determine the need to activate a group page.
STANDARD:  Locates the ERO Numeric Group Page instructions in the ERO Notification Flow Chart behind the Immediate Notification Numbers tab in the Davis-Besse Emergency Plan Telephone Directory
. COMMENT:  The Group Pager number is 9 800-405-4758. CUE:  None.                  __________
SAT  UNSAT
: 6. PERFORMANCE STEP:  Contact the Group Pager system.                                                 
........C........
STANDARD:  Locate s a touch tone phone and correctly dials 9-1-800-405-4758. CUE:  IF the correct number is dialed,  THEN say, "This is the Remote Activation Module. Please enter a pager number."  IF any other number is dialed,  THEN say, "The number you have dialed is no longer in service. Please check the number and try again"
__________
SAT  UNSAT
: 7. PERFORMANCE STEP:  Enter the pager number.                                                     
........C........
STANDARD:  Enters pager number "2533024."
CUE:  IF pager number 2533024 is entered,  THEN say , "Please enter the event code followed by the pound key."
IF the wrong pager number is entered,  THEN say, "The number you entered is not valid,  please check the number and try again."
__________
SAT  UNSAT
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A 4 AG  6 of 8  8. PERFORMANCE STEP:  Enter the event code.                                         
........C........
STANDARD:  Enters 2222#.
CUE:  IF the # is not entered, THEN say, "Your input is not valid, Please enter the event code followed by the pound key."
__________
SAT  UNSAT
: 9. PERFORMANCE STEP:  Terminate the call.                                                     
 
STANDARD:  Hangs up the telephone.
COMMENT:  The E-Plant Telephone Directory step directs the operator to "Send the page two times."  The second page actions are not critical if the first page was SAT.
CUE:  None.                  __________
SAT  UNSAT
: 10. PERFORMANCE STEP:  Contact the pager system.
STANDARD:  Locate s a touch tone phone and correctly dials 9-1-800-405-4758. CUE:  IF the correct number is dialed,  THEN say, "This is the Remote Activation Module. Please enter a pager number."  IF any other number is dialed,  THEN say, "The number you have dialed is no longer in service. Please check the number and try again"
__________
SAT  UNSAT
: 11. PERFORMANCE STEP:  Enter the pager number.
STANDARD:  Enters pager number "2533024."
CUE:  IF pager number 2533024 is entered,  THEN say , "Please enter the event code followed by the pound key."
IF the wrong pager number is entered,  THEN say, "The number you entered is not valid,  please check the number and try again."
__________
SAT  UNSAT
 
Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A 4 AG  7 of 8  12  PERFORMANCE STEP:  Enter the event code.                                         
 
STANDARD:  Enters 2222#.
CUE:  IF the # is not entered, THEN say, "Your input is not valid, Please enter the event code followed by the pound key."
__________
SAT  UNSAT 13  PERFORMANCE STEP:  Terminate the call.                                                     
 
STANDARD:  Hangs up the telephone.
CUE:  None.        __________
SAT  UNSAT TERMINATING CUES:  This JPM is complete (Terminated by Evaluator)
__________
END TIME Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM S RO-A 4 AG 8 of 8   Verification of Completion Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:  
Time to Complete:
 
Question Documentation:
Question Documentation:  
 
Question:_____________________________________________________________
Question:_____________________________________________________________
____________________________________________________________________________
________________________________________________________________
Response:_____________________________________________________________
Response:_____________________________________________________________
______________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________}}
 
______________________________________________________________________
____________________________________________________
__________________
Result: Satisfactory/Unsatisfactory Examiner's signature and date:
_______________________________________}}

Latest revision as of 08:47, 10 January 2025

2015 Davis-Besse Nuclear Power Station Initial License Examination As-Administered RO-SRO Admin JPMs
ML15245A271
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/22/2015
From:
Division of Reactor Safety III
To:
FirstEnergy Nuclear Operating Co
Reeser, D W
Shared Package
ML15217A121 List:
References
Download: ML15245A271 (95)


Text

Davis-Besse Initial License Exam 2015 Admin JPM RO-A1.1

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG 1 of 10 Facility: Davis-Besse Task No:

002-003-02-0100 Task

Title:

Perform manual RCS Leakage Calculation K/A

Reference:

2.1.20 (4.6)

Job Performance Measure No: RO-A1.1 (New)

Examinee:

NRC Examiner:

Date:

Method of testing:

Simulated Performance ___

Actual Performance _X_

Classroom _X_

Simulator ___

Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Perform manual RCS Leakage calculation and determine RCS Leakage within 0.5 gpm Required Materials:

DB-SP-03357, RCS Water Inventory Balance with Attachment 2 table values documented Curves CC 3.1 and CC 3.2a to CC3.2k from DB-PF-06703, Miscellaneous Curves Straight edge Calculator General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

No Validation Time: 35 minutes

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG 2 of 10 EXAMINER COPY INITIAL CONDITIONS:

The Plant is at 100% Power Makeup Tank Pressure is 25 psig The Computer is unavailable INITIATION CUE:

The Unit Supervisor has directed you to perform steps 4.2.2.a through 4.2.2.k of DB-SP-03357, RCS Water Inventory Balance, manually calculate RCS leak rate on Attachment 2, RCS/MU and Purification Leak Rate Calculation Sheet.

NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2 -

page 1 of 3, 2 of 3, 3 of 3 and 4 of 4)

(Hand Candidate a copy of the DB-SP-03357, RCS Water Inventory Balance Procedure and DB-PF-06703, Miscellaneous Curves CC 3.1 and CC 3.2a to CC3.2k.

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG 3 of 10 CANDIDATE COPY INITIAL CONDITIONS:

The Plant is at 100% Power Makeup Tank Pressure is 25 psig The Computer is unavailable INITIATION CUE:

The Unit Supervisor has directed you to perform steps 4.2.2.a through 4.2.2.k of DB-SP-03357, RCS Water Inventory Balance, manually calculate RCS leak rate on Attachment 2, RCS/MU and Purification Leak Rate Calculation Sheet.

NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2 -

page 1 of 3, 2 of 3, 3 of 3 and 4 of 4)

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG 4 of 10 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1.

PERFORMANCE STEP: Performs step 4.2.2.a, Record Makeup Tank Water Density from

........C........

STANDARD:

Identifies that Makeup Tank initial and final temperature is 100 °F, locates and determines the MU Tank Water Density is 62.0038 lbm/ft3 and records this on Attachment 2 step 4.2.2.a.

COMMENT:

CUE: None SAT UNSAT

2.

PERFORMANCE STEP: Complete the Initial Makeup Tank Inventory equations step 4.2.2.b

........C........

STANDARD: Water Inventory = (Tank level

  • 4.124 ft³/in
  • Calibration Density) + (77.85 ft³
  • Water Density)

= (Tank level

  • 4.124 ft³/in
  • 62.325lbm/ ft³) + (77.85 ft³
  • Water Density)

Initial:

( __67__ in.* 257 lbm/in ) + ( 77.85 ft³

  • _62.0038 lbm/ft³) = _22046 (+/- 10)_ lbm CUE: Another Operator will perform the Independent Verification of the calculation SAT UNSAT

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG 5 of 10

3.

PERFORMANCE STEP: Complete the Final Makeup Tank Inventory equations step 4.2.2.b

........C........

STANDARD: Water Inventory = (Tank level

  • 4.124 ft³/in
  • Calibration Density) + (77.85 ft³
  • Water Density)

= (Tank level

  • 4.124 ft³/in
  • 62.325lbm/ ft³) + (77.85 ft³
  • Water Density)

Final:

( __64__ in.* 257 lbm/in ) + ( 77.85 ft³

  • _62.0038 lbm/ft³) = _21275 (+/- 10)_ lbm CUE: Another Operator will perform the Independent Verification of the calculation SAT UNSAT
4.

PERFORMANCE STEP: Determine Pressurizer Inventory Water and Steam Density values using the initial and final values and Attachment 6, per step 4.2.2.c

........C.......

STANDARD:

Locates Attachment 6, uses initial RCS pressure value of 2156 psig and final RCS pressure value of 2161 psig to record Density values in step 4.2.2.c of Attachment 2 Pressurizer Inventory Density (from Attachment 6)

Water Initial ___37.71________ lbm/ft³ Steam Initial ____6.02_________ lbm/ft³ Water Final ____37.68________ lbm/ft³ Steam Final ____6.04_________ lbm/ft³ CUE:

None SAT UNSAT

5.

PERFORMANCE STEP: Complete the Initial Pressurizer Inventory equation for Water Inventory step 4.2.2.d

........C........

STANDARD:

Water Inventory = (level

  • 3.173 ft³/in + 239.6 ft³)
  • Water Density Water Initial:

[(_218_ in.

  • 3.173 ft³/in) + 239.6 ft³]
  • 37.71 lbm/ft³ = _35119.85 (+/- 250) lbm CUE:

None SAT UNSAT

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG 6 of 10

6.

PERFORMANCE STEP: Complete the Final Pressurizer Inventory equation for Water Inventory step 4.2.2.d

........C........

STANDARD:

Water Inventory = (level

  • 3.173 ft³/in + 239.6 ft³)
  • Water Density Water Final:

[(_222_ in.

  • 3.173 ft³/in) + 239.6 ft³]
  • 37.68 lbm/ft³ = _35570.146 (+/- 250 ) lbm CUE:

None SAT UNSAT

7.

PERFORMANCE STEP: Complete the Initial Pressurizer Inventory equation for Steam Inventory step 4.2.2.d

........C........

STANDARD:

Steam Inventory =[((320 - level)

  • 3.173 ft³/in) + 242.2 ft³]
  • Steam Density Steam Initial:

[((320 - 218 in)

  • 3.173 ft³/in) + 242.2 ft³]
  • 6.02 lbm/ft³) = _3406.393 (+/-50) lbm CUE:

None SAT UNSAT

8.

PERFORMANCE STEP: Complete the Final Pressurizer Inventory equation for Steam Inventory step 4.2.2.d

........C........

STANDARD:

Steam Inventory =[((320 - level)

  • 3.173 ft³/in) + 242.2 ft³]
  • Steam Density Steam Final:

[((320 - 222 in)

  • 3.173 ft³/in) + 242.2 ft³]
  • 6.04 lbm/ft³) = _3341.05 (+/-50) lbm CUE:

None SAT UNSAT

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG 7 of 10

9.

PERFORMANCE STEP: Input the Power Correction Factor data on Attachment 2 step 4.2.2.e

........C........

STANDARD:

Power is 100% from initial conditions, refers to DB-PF-06703 Curve CC3.1 to obtain the Power Correction Factors 4.2.2.e Power Correction Factor Initial __135_(+/ 5) _ lbm Final 135 (+/-5) lbm CUE:

None SAT UNSAT

10. PERFORMANCE STEP: Input the Temperature Correction Factor data on Attachment 2 step 4.2.2.f

........C........

STANDARD:

Initial Temperature is 581.8 °F and Final Temperature is 582.3 °F from, refers to DB-PF-06703 Curve CC3.1 to obtain the Power Correction Factors 4.2.2.f Temperature Correction Factor (Tave 528 °F)

Initial __-35200 (+/- 50) _ lbm Final -35600 (+/- 50) lbm CUE:

None SAT UNSAT

11. PERFORMANCE STEP: If Tave is less than 528 °F, then complete Temperature Factor Equation per step 4.2.2.g STANDARD:

Determines step 4.2.2.g is N/A since temperature is greater than 528 °F CUE:

None SAT UNSAT

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG 8 of 10

12. PERFORMANCE STEP: Complete the RCS Inventory Table to determine Initial and Final total RCS Inventory per step 4.2.2.h

........C........

STANDARD:

Transfers data calculated to the RCS Inventory Table and calculates the Initial and Final RCS Water Inventory MU Tank Inventory (lbm)

+

Pzr Steam Inventory (lbm)

+

Pzr Water Inventory (lbm)

+

Power Correction (lbm)

+

Temperature Correction (lbm)

=

Water Inventory (lbm)

Initial:

22046 lbm +

3406.393 lbm +

35119.85 lbm +

135 lbm +

-35200 lbm =

25507.243

(+/- 250) lbm Final:

21275 lbm +

3341.05 lbm +

35570.146 lbm +

135 lbm +

-35600 lbm =

24721.196

(+/- 250) lbm CUE:

None SAT UNSAT

13. PERFORMANCE STEP: Calculates the Change in RCS Inventory

........C........

STANDARD:

Completes step 4.2.2.i to determine RCS Inventory Change Change = Initial inventory - Final inventory Change = 25507.243 lbm - 24721.196_ lbm = 786.047 (+/- 80)_ lbm CUE: Another Operator will perform the Independent Verification of the calculation SAT UNSAT

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG 9 of 10

14. PERFORMANCE STEP: Calculates the Time Period

.......C.........

STANDARD:

Completes step 4.2.2.j by subtracting Initial Time from the Final Time Period = Final time - Initial time Period = [(23 hr x 60) + ( 11 min)] - [(_19 hr x 60) + (5 min)] = _246__ min CUE: Another Operator will perform the Independent Verification of the calculation SAT UNSAT

15. PERFORMANCE STEP: Calculates the Total RCS Leak Rate per step 4.2.2.k

.......C.........

STANDARD:

Completes step 4.2.2.k by subtracting Initial Time from the Final Time lbm 62.32 ft x

ft gallons 7.481 x

time Inventory RCS in Change Leakrate 3

3

=

Leakrate = (

786.047 lbm) ÷ (

246 min) x (0.120 gal/lbm)

Leakrate =

0.383 (+/- 0.05) gpm CUE: Another Operator will perform the Independent Verification of the calculation SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.1 AG 10 of 10 Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

20 Revision ATTACHMENT 2:

RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 1 of 3 Note: For parameters which utilize averaging of redundant channels, eliminate inoperable channels from the average and reduce the denominator accordingly.

If a Th or Tc point is unavailable, eliminate it and the opposing point (Tc or Th) from the same loop, and reduce the denominator by 2.

ITEM PARAMETER SOURCE UNITS INITIAL VALUE FINAL VALUE 1

Time Control Room clock or computer hr:min Step 4.1.4 Step 4.1.10 1905 2311 2

Makeup Tank Temp T769 or TI MU8

°F 100 100 3

Makeup Tank Level (2 channel ave)

[L761+L763]÷2, or LR MU16 in.

67 64 4

RCS Pressure (4 ch ave)

[P721+P722+P729+P730]÷4, PRSRC2A2, or PRSRC2B (1) psi 2156 2161 5

Pressurizer Level LRS RC14 or L768 in.

218 222 6

Ave Power

[R795+R804+R814+R820]÷4, C913, or NR NI6 100 100 7

Tave (8 ch ave)

TI RC7, or:

[T719+T720+T728+T729+

T780+T800+T820+T840]÷8 (2)

°F 581.8 582.3 (1) If less than 1700 psig RCS Pressure use the average of P725 and P732 (loop 1 and loop 2 WR Pressure).

(2) If less than 520°F RCS Temperature then average T753 and T782 (loop 1 and loop 2 WR Temperature).

4.2.2.a Makeup Tank Water Density (from Attachment 4)

Initial ____62.0038______ lbm/ft³ Final ___ 62.0038______ lbm/ft³ 4.2.2.b Makeup Tank Inventory Note: 77.85 ft³ accounts for water volume below the level indicating range.

Water Inventory = (Tank level

  • 4.124 ft³/in
  • Calibration Density) + (77.85 ft³
  • Water Density)

= (Tank level

  • 4.124 ft³/in
  • 62.325lbm/ ft³) + (77.85 ft³
  • Water Density)

Initial:

( ___67______ in.* 257 lbm/in ) + ( 77.85 ft³

  • _62.0038 lbm/ft³) = _22046_ lbm IV Final:

(___64______ in.* 257 lbm/in ) + ( 77.85 ft³

  • _62.0038 lbm/ft³) = _21275_ lbm IV

21 Revision ATTACHMENT 2:

RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 2 of 3 4.2.2.c Pressurizer Inventory Density (from Attachment 6)

Water Initial ___37.71________ lbm/ft³ Steam Initial ____6.02_________ lbm/ft³ Water Final ____37.68________ lbm/ft³ Steam Final ____6.04_________ lbm/ft³ 4.2.2.d Pressurizer Inventory Note:

239.6 ft³ accounts for water volume below the level indicating range.

242.2 ft³ accounts for steam volume above the level indicating range.

Water Inventory = (level

  • 3.173 ft³/in + 239.6 ft³)
  • Water Density Water Initial:

[(___218_____ in.

  • 3.173 ft³/in) + 239.6 ft³]
  • 37.71 lbm/ft³ = _35119.85 lbm IV Water Final:

[(___222_____ in.

  • 3.173 ft³/in) + 239.6 ft³]
  • 37.68 lbm/ft³ = _35570.146 lbm IV Steam Inventory =[((320 - level)
  • 3.173 ft³/in) + 242.2 ft³]
  • Steam Density Steam Initial:

[((320 - _218__in)

  • 3.173 ft³/in) + 242.2 ft³]
  • 6.02 lbm/ft³) = _3406.393________ lbm IV Steam Final:

[((320 - __222__in)

  • 3.173 ft³/in) + 242.2 ft³]
  • 6.04 lbm/ft³) = _3341.05 __ lbm IV 4.2.2.e Power Correction Factor Initial _____135_____________ lbm Final _____135____________ lbm 4.2.2.f Temperature Correction Factor (Tave >528°)

Initial ______-35200___________ lbm Final _____-35600___________ lbm

22 Revision ATTACHMENT 2:

RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 3 of 3 4.2.2.g Temperature Correction Factor (Tave <528°)

Reactor Coolant System Density (from Attachment 5)

N/A At initial Tave

___________________ lbm/ft³ At final Tave

___________________ lbm/ft³ Temperature Correction Factor (TCF)

TCF = [(10,277 + (0.24828

  • Tave))
  • _______ lbm/ft³] - 498,800 lbm = _______ lbm IV Final: [(10,277 ft³ + (0.24828 ft³/°F* _______°F))
  • _______ lbm/ft³] - 498,800 lbm = _______ lbm IV 4.2.2.h RCS Inventory MU Tank Inventory (lbm)

+

Pzr Steam Inventory (lbm)

+

Pzr Water Inventory (lbm)

+

Power Correction (lbm)

+

Temperature Correction (lbm)

=

Water Inventory (lbm)

Initial:

22046 lbm +

3406.393 lbm +

35119.85 lbm +

135 lbm +

-35200 lbm =

25507.243 lbm Final:

21275 lbm +

3341.05 lbm +

35570.146 lbm +

135 lbm +

-35600 lbm =

24721.196 lbm 4.2.2.i Change in RCS Inventory Change = Initial inventory - Final inventory Change = 25507.243_ lbm - 24721.196 lbm = 786.047_ lbm IV

23 Revision ATTACHMENT 2:

RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 4 of 4 4.2.2.j Time period Period = Final time - Initial time Period = [(_23___ hr x 60) + ( 11 min)] - [(__19__ hr x 60) + ( 5 min)] = _246____ min IV 4.2.2.k Total RCS Leak Rate lbm 62.32 ft x

ft gallons 7.481 x

time Inventory RCS in Change Leakrate 3

3

=

Leakrate = (

786.047 lbm) ÷ (

246 min) x (0.120 gal/lbm)

Leakrate =.383 gpm IV Independent Verification Completed by _________________________________ Date ______

24 Revision ATTACHMENT 3:

UNIDENTIFIED RCS LEAKAGE CALCULATION SHEET Page 1 of 1 4.2.1.f RCP Seals Leak Rate from computer printout, or from Attachment 1. (4.2.1.e)

__________ gpm 4.2.1.j Quench Tank In-Leakage Rate from computer printout, or from Attachment 1. (4.2.1.i). Only record Positive values (exclude negative values by entering 0.000).

__________ gpm 4.2.2.l RCS Total Leak Rate from computer printout, or from Attachment 2.

___.383___ gpm 4.2.3.a Primary to Secondary Tube Leakage from computer printout, or from most recent entry in RCS Leakage Log, RO Log, or as determined by Chemistry.

__________ gpm (0.104 allowed) 4.2.3.b Other Identified Leakage, or from RCS Leakage Log.

__________ gpm 4.2.3.c Total Identified Leak Rate from computer printout, or from; RCP Seals + Quench Tk + Pri to Sec + Other

( 4.2.1.e + 4.2.1.i [positive values only] + 4.2.3.a + 4.2.3.b ).

IV

__________ gpm (10 gpm allowed) 4.2.3.d Unidentified Leak Rate from computer printout, or from; Total Leak Rate - Total Identified Leak Rate

( 4.2.2.k - 4.2.3.c )

IV

__________ gpm (1 gpm allowed) 4.2.3.e Reactor Coolant Pressure Boundary Leakage

__________ gpm (0 gpm allowed)

Independent Verification Completed by _________________________________ Date ______

Performed by:

Date:

Davis-Besse Initial License Exam 2015 Admin JPM RO-A1.2

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG 1 of 6 Facility: Davis-Besse Task No:

119-002-03-0100 Task

Title:

Determine Maintenance of Active License Status K/A

Reference:

2.1.4 (3.3)

Job Performance Measure No: RO-A1.2 (JPM New)

Examinee:

NRC Examiner:

Date:

Method of testing:

Simulated Performance ___

Actual Performance _X_

Classroom _X_

Simulator ___

Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Determine active license status is not maintained, evaluate whether each shift meets the requirements.

Required Materials:

DBBP-TRAN-0014, License Requirements for Licensed Individuals NT-OT-07001, Training and Qualification of Operations Personnel General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

No Validation Time:

20 minutes

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG 2 of 6 EXAMINER COPY INITIAL CONDITIONS:

Today is 7/1/15. You are a Reactor Operator. You are scheduled to stand a Reactor Operator ATC watch tomorrow. Your work history for the previous quarter is as follows:

4/12/15 Worked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> as BOP in Mode 1 (day shift). Took turnover at the beginning of shift and gave turnover at end of shift.

4/13/15 Worked 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> as BOP in Mode 1 (day shift). Took turnover at beginning of shift and did NOT give turnover at end of shift.

4/14/15 Worked 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> in Mode 1 as ATC and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> ATC doing Crew JIT training on Simulator (day shift). Took turnover at beginning and gave turnover at end of both of these assignments.

5/19/15 Worked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in Mode 5 as BOP (night shift). Took turnover at beginning of shift and gave turnover at end of shift.

5/20/15 Worked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in Mode 5 as ATC (night shift). Took turnover at beginning of shift and gave turnover at end of shift 5/21/15 Worked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in Mode 3 as BOP (night shift). Took turnover at beginning of shift and did gave turnover at end of shift.

6/27/15 Worked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> I Mode 1 as the 3rd RO in the Control Room (day shift). Took turnover at beginning of shift and gave turnover at end of shift.

INITIATION CUE:

Determine if your license status is active or inactive based on the previous quarters work history and document as ACTIVE or INACTIVE on this page. Report whether each shift meets the watch credit or not.

(Provide copy of DBBP-TRAN-0014, License Requirements for Licensed Individuals and NT-OT-07001, Training and Qualification of Operations Personnel)

RESULTS:

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG 3 of 6 CANDIDATE COPY INITIAL CONDITIONS:

Today is 7/1/15. You are a Reactor Operator. You are scheduled to stand a Reactor Operator ATC watch tomorrow. Your work history for the previous quarter is as follows:

4/12/15 Worked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> as BOP in Mode 1 (day shift). Took turnover at the beginning of shift and gave turnover at end of shift.

4/13/15 Worked 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> as BOP in Mode 1 (day shift). Took turnover at beginning of shift and did NOT give turnover at end of shift.

4/14/15 Worked 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> in Mode 1 as ATC and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> ATC doing Crew JIT training on Simulator (day shift). Took turnover at beginning and gave turnover at end of both of these assignments.

5/19/15 Worked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in Mode 5 as BOP (night shift). Took turnover at beginning of shift and gave turnover at end of shift.

5/20/15 Worked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in Mode 5 as ATC (night shift). Took turnover at beginning of shift and gave turnover at end of shift 5/21/15 Worked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in Mode 3 as BOP (night shift). Took turnover at beginning of shift and did gave turnover at end of shift.

6/27/15 Worked 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> I Mode 1 as the 3rd RO in the Control Room (day shift). Took turnover at beginning of shift and gave turnover at end of shift.

INITIATION CUE:

Determine if your license status is active or inactive based on the previous quarters work history and document as ACTIVE or INACTIVE on this page. Report whether each shift meets the watch credit or not.

RESULTS:

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG 4 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1.

PERFORMANCE STEP: Evaluate 4/12/15 work period

........C........

STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is met.

CUE: None SAT UNSAT

2.

PERFORMANCE STEP: Evaluate 4/13/15 work period

........C........

STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. Did not stand complete watch CUE: None SAT UNSAT

3.

PERFORMANCE STEP: Evaluate 4/14/15 work period

........C........

STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. No credit is given for Simulator time CUE: None SAT UNSAT

4.

PERFORMANCE STEP: Evaluate 5/19/15 work period

........C........

STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. Credit for BOP is not given in Mode 5.

CUE: None SAT UNSAT

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG 5 of 6

5.

PERFORMANCE STEP: Evaluate 5/20/15 work period

........C........

STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is met.

CUE: None SAT UNSAT

6.

PERFORMANCE STEP: Evaluate 5/21/15 work period

........C........

STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is met CUE: None SAT UNSAT

7.

PERFORMANCE STEP: Evaluate 6/27/15 work period

........C........

STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines requirement for credit is not met. No credit is given for 3rd Reactor Operator CUE: None SAT UNSAT

8.

PERFORMANCE STEP: Evaluates credited time versus required time

........C........

STANDARD: Determines there are only three 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts that can be credited and therefore minimum requirements to maintain active Reactor Operator license are not met.

CUE:

None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A1.2 AG 6 of 6 Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

Davis-Besse Initial License Exam 2015 Admin JPM RO-A2

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A2 AG 1 of 7 Facility: Davis-Besse Task No:

119-035-0100 Task

Title:

Determine isolation boundary and effect on plant equipment K/A

Reference:

2.2.41 (3.5)

Job Performance Measure No: RO-A2 (NEW)

Examinee:

NRC Examiner:

Date:

Method of testing:

Simulated Performance ___

Actual Performance _X_

Classroom _X_

Simulator ___

Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Identify boundary for leaking Turbine Plant Cooling Water Valve and determine isolation will result in loss of cooling to bearing lube oil for both Main Feedwater Pumps Required Materials:

OS-022, Turbine Plant Cooling Water System General

References:

11x17 Copy of Operational Schematics Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task: No Alternate Path: No Validation Time: 15 minutes

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A2 AG 2 of 7 EXAMINER COPY INITIAL CONDITIONS:

The Plant is at 100% Power CW112, MFPT LUBE OIL COOLER 1-2-2 INLET ISOLATION is spraying water from a leak in the valve body. The valve has been closed and is still leaking.

INITIATION CUE:

The Shift Manager directs you to determine how CW112 can be isolated and what equipment will be affected. List isolation boundaries and equipment impacts on this page below.

(Hand Candidate 11x17 Copy of Operational Schematics)

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A2 AG 3 of 7 CANDIDATE COPY INITIAL CONDITIONS:

The Plant is at 100% Power CW112, MFPT LUBE OIL COOLER 1-2-2 INLET ISOLATION is spraying water from a leak in the valve body. The valve has been closed and is still leaking.

INITIATION CUE:

The Shift Manager directs you to determine how CW112 can be isolated and what equipment will be affected. List isolation boundaries and equipment impacts on this page below.

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A2 AG 4 of 7 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

NOTE: STEPS CAN BE PERFORMED IN ANY SEQUENCE

1.

PERFORMANCE STEP: Locates plant drawing OS-022 Turbine Plant Cooling Water System STANDARD: References drawing index, identifies and locates drawing OS-022 or equivalent drawing COMMENT: Once drawing is located, provide a copy for markup.

CUE:

None SAT UNSAT

2.

PERFORMANCE STEP: Determines that valve CW-106 must be closed

........C........

STANDARD: Identifies CW-106 supply side isolation valve will be closed CUE:

None SAT UNSAT

3.

PERFORMANCE STEP: Determines that valve CW-107 must be closed

........C........

STANDARD: Identifies CW-107 supply side isolation valve will be closed, due to cross connected piping CUE:

None SAT UNSAT

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A2 AG 5 of 7

4.

PERFORMANCE STEP: Determines that either valve CW-114 OR CW-1254B must be closed

........C........

STANDARD: Identifies CW-114 OR CW-1254B downstream isolation side valve will be closed COMMENT: Either valve will provide downstream isolation.

CUE:

None SAT UNSAT

5.

PERFORMANCE STEP: Determines that valve CW-113 must be closed

........C........

STANDARD: Identifies CW-113 supply side valve to MFPT Lube Oil Cooler 1-2-1 will be closed COMMENT: Another downstream valve will accomplish this isolation, if another valve is selected evaluate the isolation point as an alternative.

CUE:

None SAT UNSAT

6.

PERFORMANCE STEP: Determines that valve CW-125 must be closed

........C........

STANDARD: Identifies CW-125 supply side valve supply valve to MFPT Lube Oil Cooler 1-1-1 will be closed COMMENT: Another downstream valve will accomplish this isolation, if another valve is selected evaluate the isolation point as an alternative.

CUE:

None SAT UNSAT

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A2 AG 6 of 7

7.

PERFORMANCE STEP: Determines that valve CW-124 must be closed

........C........

STANDARD: Identifies CW-124 supply side valve supply valve to MFPT Lube Oil Cooler 1-1-2 will be closed COMMENT: Another downstream isolation valve will accomplish this isolation, if another valve is selected evaluate the isolation point as an alternative.

CUE:

None SAT UNSAT

8.

PERFORMANCE STEP: Determines that valve CW-196 must remain closed

........C........

STANDARD: Identifies CW-196 cooler bypass valve will remain closed COMMENT: This valve is normally shut.

CUE:

None SAT UNSAT

9.

PERFORMANCE STEP: Identifies the effect of isolating CW-112 will have on plant equipment

........C........

STANDARD: Determines that stopping the water leak on valve CW-112 will isolate all cooling water flow to the MFP Lube Oil Coolers for both MFPs CUE:

None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examinee)

END TIME

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A2 AG 7 of 7 Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

ANSWER KEY

Davis-Besse Initial License Exam 2015 Admin JPM RO-A4

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A4 AG Page 1 of 7 Facility: Davis-Besse Task No:

085-002-01-0100 Task

Title:

Emergency Plan Notification of Off-Site Agencies K/A

Reference:

2.4.43 (3.2)

Job Performance Measure No: RO-A4 (JPM 241)

Examinee:

NRC Examiner:

Date:

Method of testing:

Simulated Performance ___

Actual Performance _X_

Classroom _X_

Simulator _X_

Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Emergency notification of Ottawa and Lucas County within 15 minutes and Emergency notification of State of Ohio.

Required Materials:

Form DBEP-010 Form DBEP-012 (General References listed below required if performing in classroom)

(Phone for simulation required if performing in classroom)

General

References:

RA-EP-02110, Emergency Notification Davis-Besse Emergency Plan Telephone Directory Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task: Yes Alternate Path: No Validation Time: 15 minutes

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A4 AG Page 2 of 7 EXAMINER COPY INITIAL CONDITIONS:

You are a third Reactor Operator in the Control Room.

The plant is being shut down due to Reactor Coolant System leak calculated to be 35 gpm.

5 minutes ago the Shift Manager declared an Unusual Event based on the leakage INITIATING CUES:

You are to locate and review RA-EP-02110, Emergency Notifications Procedure while the Shift Manager completes the Initial Notification form. Be prepared to start the notifications of the Offsite Agencies in 5 minutes.

CUE: This is a time critical JPM.

NOTES TO EVALUATOR Write the current time minus 5 minutes in the declaration time (item 3a) on the Initial Notification form Five minutes after reading the Initiating Cues hand the Initial Notification forms to the candidate.

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A4 AG Page 3 of 7 CANDIDATE COPY INITIAL CONDITIONS:

You are a third Reactor Operator in the Control Room.

The plant is being shut down due to Reactor Coolant System leak calculated to be 35 gpm.

5 minutes ago the Shift Manager declared an Unusual Event based on the leakage INITIATING CUES:

You are to locate and review RA-EP-02110, Emergency Notifications Procedure while the Shift Manager completes the Initial Notification form. Be prepared to start the notifications of the Offsite Agencies in 5 minutes.

CUE: This is a time critical JPM. The clock starts now, the form will be available in five minutes.

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A4 AG Page 4 of 7 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1.

PERFORMANCE STEP: Locate the correct procedure for emergency notification.

STANDARD: Obtains RA-EP-02110, Emergency Notification.

CUE: When located hand candidate copy of RA-EP-02110, Emergency Notification (5 minutes after providing the initiating cue) hand Initial Notification forms to Candidate and state: Shift Manager directs you to notify Ottawa and Lucas Counties and the State of Ohio of the emergency in accordance with RA-EP-02110, Emergency Notifications SAT UNSAT

2.

PERFORMANCE STEP: Make Initial Notification using the 4-Way Ring-Down Circuit

........C........

STANDARD: Picks up the 4-Way Ring-Down phone in the Control Room. When the two parties answer, reads the Initial Notification information. Documents the time notified on the Davis-Besse Notification Cover Sheet (DBEP-012).

COMMENT: Notification must be made within 15 minutes of the event declaration time; Record the time the first Sheriffs Dispatcher answers the phone. This stops the critical time clock.

CUE:

Ottawa Country Sheriff's Dispatcher and the Lucas County Sheriffs Dispatcher answer the phone.

NOTE: Ohio State Highway Patrol Dispatcher does NOT answer.

Repeat back the information as it is communicated.

Time: __________

SAT UNSAT

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A4 AG Page 5 of 7

3.

PERFORMANCE STEP: Notify Shift Manager that the Ohio State Highway Patrol Dispatcher was not notified.

STANDARD: Informs Shift Manager that the Ohio State Highway Patrol Dispatcher did not answer the 4-Way Ring-Down Circuit.

COMMENT: This step may not be needed if operator proceeds to use alternate notification methods without being prompted.

CUE:

If notified, tell the operator to continue with notifications as directed by procedure RA-EP-02110, Emergency Notification.

SAT UNSAT

4.

PERFORMANCE STEP: Contact Ohio State Highway Patrol Dispatcher.

........C........

STANDARD: Locates the Ohio State Highway Patrol Dispatcher or Administrative Office telephone number.

COMMENT: The phone numbers are located in the Immediate Notification Numbers tab of the Davis-Besse Emergency Plan Telephone Directory. Have the examinee point out and then dial one of the correct numbers.

(614) 466-2660 OR (614) 644-7622 CUE:

Answer the phone as either the Ohio Highway Patrol Dispatcher or the Administrative Office depending on who was dialed.

SAT UNSAT

4.

PERFORMANCE STEP: Make Initial Notification to the Ohio State Highway Patrol.

........C........

STANDARD: Reads Initial Notification information to the Ohio State Highway Patrol Dispatcher or Administrative Office staffer. Documents the time notified on the Davis-Besse Notification Cover Sheet (DBEP-012). Examinee should also request a call back from the person receiving the information.

COMMENT: Requesting callback is not critical CUE:

Repeat back information as it is communicated. Provide your name as requested by the caller.

SAT UNSAT

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A4 AG Page 6 of 7

5.

PERFORMANCE STEP: Notify Shift Manager that the Ohio State Highway Patrol or Administrative Office was notified.

STANDARD: Informs the Shift Manager that all notifications have all been completed.

This notification may be done after step 7.

CUE: Acknowledge the report.

SAT UNSAT

6.

PERFORMANCE STEP: Receive call back from State of Ohio representative.

STANDARD: Answers the phone and acknowledges the Ohio State Highway Patrol or Administrative Office call back to verify the information came from Davis-Besse. Documents the time of the call and the name of the caller on the Davis-Besse Notification Cover Sheet (DBEP-012).

CUE:

Call the simulator Control Room phone and indicate you are calling back to verify the notification of the emergency is real and came from Davis-Besse.

If needed, prompt the operator to answer the phone.

SAT UNSAT

7.

PERFORMANCE STEP: Complete form DBEP-0012.

STANDARD: Signs form DBEP-0012 and checks Control Room. Returns form to Shift Manager.

CUE: If required, tell the examinee not to fax form DBEP-0010 to the EOF.

SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM RO-A4 AG Page 7 of 7 Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

FENOC NUCLEAR POWER PLANT INITIAL NOTIFICATION FORM Davis Besse DBEP-010-10 USE FOR:

INITIAL CLASSIFICATIONS, CHANGES IN CLASSIFICATIONS, CHANGES IN PROTECTIVE ACTION RECOMMENDATIONS.

EVENT TERMINATION STATE / COUNTY USE ONLY DATE:

TIME:

MESSAGE NO:

1. This is the:

Davis-Besse Nuclear Power Station

2. This is:

An Actual Emergency A Drill

3.
a. A(n)

GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT was declared at:

on

_Today based on EAL:

__SU7__

(TIME)

(DATE)

b. The Emergency situation has been terminated at:

on (TIME)

(DATE)

c. The Protective Action Recommendation is being changed at:

on (TIME)

(DATE)

4. Brief non-technical description of event:

Reactor Coolant System leak of 35 gallons per minute

5. The radiological conditions are:
a. A non-routine release of radioactive material, as a result of this event, is in progress
b. The release of radioactive material associated with this event has been terminated.
c. NO Radiological Release in progress as a result of this event.
6. Utility Protective Action Recommendations (PARs):
a. Evacuation:

(check applicable subareas) 1 2

3 4

5 6

7 8

9 10 11 12 AND that potassium iodide (KI) be administered to the general public in accordance with State procedures. The general public in unaffected areas should be advised to go indoors and monitor EAS broadcasts.

b. Sheltering:

(check applicable subareas) 1 2

3 4

5 6

7 8

9 11 AND that potassium iodide (KI) be administered to the general public in accordance with State procedures. The general public in unaffected areas should be advised to go indoors and monitor EAS broadcasts.

c. None For Utility Use Only Approved: _ __________________

DAVIS-BESSE EMERGENCY NOTIFICATION COVER SHEET DBEP-012-09 INITIAL NOTIFICATION ACTUAL EMERGENCY USE FOR:

INITIAL CLASSIFICATIONS, CHANGES IN CLASSIFICATION, CHANGES IN PROTECTIVE ACTION RECOMMENDATIONS.

(Check Actual Emergency only if a real plant emergency exists)

PERIODIC UPDATE DRILL USE ONLY FOR UPDATING STATUS OF CURRENT CLASSIFICATION.

DO NOT USE FOR CHANGING CLASSIFICATIONS OR CHANGING PROTECTIVE ACTION RECOMMENDATIONS.

Initial Notification Form / Periodic Update Form completed by:

Joe Shift Manager Initial Notification Form / Periodic Update Form accuracy verified by:

John Shift Technical Advisor Communicator:

1. Ensure the Emergency Director has signed the Initial Notification Form / Periodic Update Form.
2. Initiate the 4-Way Ringdown.
3. As parties answer, identify yourself and your facility.
4. Obtain and fill in information below:

TIME INITIAL CONTACT MADE COMPLETION TIME OF CALL 4-WAY RINGDOWN USED?

YES NO TIME OF CALLBACK (IF 4-WAY NOT USED)

INDIVIDUAL CALLING BACK (IF 4-WAY NOT USED)

OTTAWA COUNTY LUCAS COUNTY STATE OF OHIO

5. Initial Notification Form: Read information on the attached Initial Notification Form over the phone, document above the time lines 1 through 6 have been communicated, and then fax the form to Ottawa Co, Lucas Co, and the State of Ohio.

OR Periodic Update Form: Fax the attached Periodic Update Form to Ottawa Co, Lucas Co, and the State of Ohio, and then verify the information over the phone.

NOTE: This coversheet should NOT be FAXED offsite.

Control Room Emergency Operations Facility Signature of Communicator transmitting information

ANSWER KEY DO NOT GIVE TO CANDIDATE DAVIS-BESSE EMERGENCY NOTIFICATION COVER SHEET DBEP-012-09 INITIAL NOTIFICATION ACTUAL EMERGENCY USE FOR:

INITIAL CLASSIFICATIONS, CHANGES IN CLASSIFICATION, CHANGES IN PROTECTIVE ACTION RECOMMENDATIONS.

(Check Actual Emergency only if a real plant emergency exists)

PERIODIC UPDATE DRILL USE ONLY FOR UPDATING STATUS OF CURRENT CLASSIFICATION.

DO NOT USE FOR CHANGING CLASSIFICATIONS OR CHANGING PROTECTIVE ACTION RECOMMENDATIONS.

Initial Notification Form / Periodic Update Form completed by:

Joe Shift Manager Initial Notification Form / Periodic Update Form accuracy verified by:

John Shift Technical Advisor Communicator:

1. Ensure the Emergency Director has signed the Initial Notification Form / Periodic Update Form.
2. Initiate the 4-Way Ringdown.
3. As parties answer, identify yourself and your facility.
4. Obtain and fill in information below:

TIME INITIAL CONTACT MADE COMPLETION TIME OF CALL 4-WAY RINGDOWN USED?

YES NO TIME OF CALLBACK (IF 4-WAY NOT USED)

INDIVIDUAL CALLING BACK (IF 4-WAY NOT USED)

OTTAWA COUNTY

< 15 min Time LUCAS COUNTY

< 15 min Time STATE OF OHIO Time Time Name

5. Initial Notification Form: Read information on the attached Initial Notification Form over the phone, document above the time lines 1 through 6 have been communicated, and then fax the form to Ottawa Co, Lucas Co, and the State of Ohio.

OR Periodic Update Form: Fax the attached Periodic Update Form to Ottawa Co, Lucas Co, and the State of Ohio, and then verify the information over the phone.

NOTE: This coversheet should NOT be FAXED offsite.

Signature of Communicator Control Room Emergency Operations Facility Signature of Communicator transmitting information

Davis-Besse Initial License Exam 2015 Admin JPM SRO-A1.1

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 2 of 8 Facility: Davis-Besse Task No:

332-004-02-0300 Task

Title:

Review manual RCS Leakage Calculation K/A

Reference:

2.1.20 (4.6)

Job Performance Measure No: SRO-A1.1 (New)

Examinee:

NRC Examiner:

Date:

Method of testing:

Simulated Performance ___

Actual Performance _X_

Classroom _X_

Simulator ___

Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Perform manual RCS Leakage calculation and determine RCS Leakage within 0.5 gpm Required Materials:

DB-SP-03357, RCS Water Inventory Balance with step 4.2.2 and Attachment 2 completed Curves CC 3.1 and CC 3.2a to CC3.2k from DB-PF-06703, Miscellaneous Curves Straight edge Calculator General

References:

Technical Specifications Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

No Validation Time: 50 minutes

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 3 of 8 EXAMINER COPY INITIAL CONDITIONS:

The Plant is at 100% Power Makeup Tank Pressure is 25 psig The Computer is unavailable INITIATION CUE:

A Reactor Operator has performed a Manual Calculation of Leakage Rates per step 4.2.2 of DB SP-03357, RCS Water Inventory Balance.

DB SP-03357 Section 4.1, Data Acquisition section data was verified correct and transferred to from another procedure.

Review the completed calculations for correctness. Correct any errors, if necessary, and determine if there are any Technical Specifications implications NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2 -

page 1 of 3, 2 of 3, 3 of 3 and 4 of 4)

DOCUMENT THE RESULTS OF YOUR REVIEW ON THIS CUE SHEET (Hand Candidate the following:

DB-SP-03357, RCS Water Inventory Balance with step 4.2.2 and Attachment 2 completed DB-PF-06703, Miscellaneous Curves CC 3.1 and CC 3.2a to CC3.2k)

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 4 of 8 CANDIDATE COPY INITIAL CONDITIONS:

The Plant is at 100% Power Makeup Tank Pressure is 25 psig The Computer is unavailable INITIATION CUE:

A Reactor Operator has performed a Manual Calculation of Leakage Rates per step 4.2.2 of DB SP-03357, RCS Water Inventory Balance.

DB SP-03357 Section 4.1, Data Acquisition section data was verified correct and transferred to from another procedure.

Review the completed calculations for correctness. Correct any errors, if necessary, and determine if there are any Technical Specifications implications NOTE: DB-SP-03357, Attachment 2 has 4 pages (there is a page count error on Attachment 2 -

page 1 of 3, 2 of 3, 3 of 3 and 4 of 4)

DOCUMENT THE RESULTS OF YOUR REVIEW ON THIS CUE SHEET

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 5 of 8 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1.

PERFORMANCE STEP: Reviews the Initial Makeup Tank Inventory equations step 4.2.2.b

........C........

STANDARD: Recognize 67 inches was used versus 71 and corrects calculation:

Water Inventory = (Tank level

  • 4.124 ft³/in
  • Calibration Density) + (77.85 ft³
  • Water Density)

= (Tank level

  • 4.124 ft³/in
  • 62.325lbm/ ft³) + (77.85 ft³
  • Water Density)

Initial:

( __71__ in.* 257 lbm/in ) + ( 77.85 ft³

  • _62.0038 lbm/ft³) = _23074 (+/- 10)_ lbm CUE:

None SAT UNSAT

2.

PERFORMANCE STEP: Reviews the Temperature Correction Factor data on Attachment 2 step 4.2.2.f

........C........

STANDARD:

Recognize curve was read incorrectly and corrects:

Temperature Correction Factor (Tave 528 °F)

Initial __-34350_(+/-50) _ lbm Final -35600 (+/-50) lbm COMMENT: Error results from reading curve at 581.8 instead of 580.8 CUE:

None SAT UNSAT

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 6 of 8

3.

PERFORMANCE STEP: Reviews the RCS Inventory Table to determine Initial and Final total RCS Inventory per step 4.2.2.h

........C........

STANDARD:

Corrects data entered in the RCS Inventory Table and calculates the Initial and Final RCS Water Inventory MU Tank Inventory (lbm)

+

Pzr Steam Inventory (lbm)

+

Pzr Water Inventory (lbm)

+

Power Correction (lbm)

+

Temperature Correction (lbm)

=

Water Inventory (lbm)

Initial:

23074 lbm +

3406.393 lbm +

35119.85 lbm +

135 lbm +

-34350 lbm =

27385.243

(+/- 250) lbm Final:

21275 lbm +

3341.05 lbm +

35570.146 lbm +

135 lbm +

-35600 lbm =

24721.196

(+/- 250) lbm CUE:

None SAT UNSAT

4.

PERFORMANCE STEP: Reviews Change in RCS Inventory calculation

.......C.........

STANDARD:

Recognizes error and corrects step 4.2.2.i to determine RCS Inventory Change Change = Initial inventory - Final inventory Change = 27385.243_ lbm - _24721.196 lbm 2664.047 (+/- 40)_ lbm CUE: None SAT UNSAT

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 7 of 8

5.

PERFORMANCE STEP: Verifies the Total RCS Leak Rate calculation per step 4.2.2.k

.......C.........

STANDARD:

Corrects step 4.2.2.k error to determine correct Leak Rate lbm 62.32 ft x

ft gallons 7.481 x

time Inventory RCS in Change Leakrate 3

3

=

Leakrate = (

2664.047 lbm) ÷ (

246 min) x (0.120 gal/lbm)

Leakrate =

1.299 (+/- 0.02) gpm CUE: None SAT UNSAT

6.

PERFORMANCE STEP: Determines Unidentified Leakage

.......C.........

STANDARD: Determines Unidentified Leakage is 1.288 (+/-.2) gpm 1.299 gpm (Total Leak Rate from Attachment 2)

- Identified leakage 0.011 gpm (Given) = 1.288 gpm CUE: None SAT UNSAT

7.

PERFORMANCE STEP: Reviews Technical Specification applicability

.......C.........

STANDARD: Determines Technical Specification 3.4.13 RCS Operational Leakage applies for LCO 3.4.13 b. Condition A should be entered for unidentified leakage greater than 1.0 GPM CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.1 AG Page 8 of 8 Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

20 Revision ATTACHMENT 2:

RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 1 of 3 Note: For parameters which utilize averaging of redundant channels, eliminate inoperable channels from the average and reduce the denominator accordingly.

If a Th or Tc point is unavailable, eliminate it and the opposing point (Tc or Th) from the same loop, and reduce the denominator by 2.

ITEM PARAMETER SOURCE UNITS INITIAL VALUE FINAL VALUE 1

Time Control Room clock or computer hr:min Step 4.1.4 Step 4.1.10 1905 2311 2

Makeup Tank Temp T769 or TI MU8

°F 100 100 3

Makeup Tank Level (2 channel ave)

[L761+L763]÷2, or LR MU16 in.

71 64 4

RCS Pressure (4 ch ave)

[P721+P722+P729+P730]÷4, PRSRC2A2, or PRSRC2B (1) psi 2156 2161 5

Pressurizer Level LRS RC14 or L768 in.

218 222 6

Ave Power

[R795+R804+R814+R820]÷4, C913, or NR NI6 100 100 7

Tave (8 ch ave)

TI RC7, or:

[T719+T720+T728+T729+

T780+T800+T820+T840]÷8 (2)

°F 580.8 582.3 (1) If less than 1700 psig RCS Pressure use the average of P725 and P732 (loop 1 and loop 2 WR Pressure).

(2) If less than 520°F RCS Temperature then average T753 and T782 (loop 1 and loop 2 WR Temperature).

4.2.2.a Makeup Tank Water Density (from Attachment 4)

Initial ____62.0038______ lbm/ft³ Final ___ 62.0038______ lbm/ft³ 4.2.2.b Makeup Tank Inventory Note: 77.85 ft³ accounts for water volume below the level indicating range.

Water Inventory = (Tank level

  • 4.124 ft³/in
  • Calibration Density) + (77.85 ft³
  • Water Density)

= (Tank level

  • 4.124 ft³/in
  • 62.325lbm/ ft³) + (77.85 ft³
  • Water Density)

Initial:

( ___67______ in.* 257 lbm/in ) + ( 77.85 ft³

  • _62.0038 lbm/ft³) = _22046_ lbm

__mlk__

IV Final:

(___64______ in.* 257 lbm/in ) + ( 77.85 ft³

  • _62.0038 lbm/ft³) = _21275_ lbm

__mlk__

IV

21 Revision ATTACHMENT 2:

RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 2 of 3 4.2.2.c Pressurizer Inventory Density (from Attachment 6)

Water Initial ___37.71________ lbm/ft³ Steam Initial ____6.02_________ lbm/ft³ Water Final ____37.68________ lbm/ft³ Steam Final ____6.04_________ lbm/ft³ 4.2.2.d Pressurizer Inventory Note:

239.6 ft³ accounts for water volume below the level indicating range.

242.2 ft³ accounts for steam volume above the level indicating range.

Water Inventory = (level

  • 3.173 ft³/in + 239.6 ft³)
  • Water Density Water Initial:

[(___218_____ in.

  • 3.173 ft³/in) + 239.6 ft³]
  • 37.71 lbm/ft³ = _35119.85 lbm

__mlk__

IV Water Final:

[(___222_____ in.

  • 3.173 ft³/in) + 239.6 ft³]
  • 37.68 lbm/ft³ = _35570.146 lbm

__mlk__

IV Steam Inventory =[((320 - level)

  • 3.173 ft³/in) + 242.2 ft³]
  • Steam Density Steam Initial:

[((320 - _218__in)

  • 3.173 ft³/in) + 242.2 ft³]
  • 6.02 lbm/ft³) = _3406.393________ lbm

__mlk__

IV Steam Final:

[((320 - __222__in)

  • 3.173 ft³/in) + 242.2 ft³]
  • 6.04 lbm/ft³) = _3341.05 __ lbm

__mlk__

IV 4.2.2.e Power Correction Factor Initial _____135____________ lbm Final _____135____________ lbm 4.2.2.f Temperature Correction Factor (Tave >528°)

Initial ______-35200________ lbm Final _____-35600_________ lbm

22 Revision ATTACHMENT 2:

RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 3 of 3 4.2.2.g Temperature Correction Factor (Tave <528°)

Reactor Coolant System Density (from Attachment 5)

N/A At initial Tave

___________________ lbm/ft³ At final Tave

___________________ lbm/ft³ Temperature Correction Factor (TCF)

TCF = [(10,277 + (0.24828

  • Tave))
  • _______ lbm/ft³] - 498,800 lbm = _______ lbm IV Final: [(10,277 ft³ + (0.24828 ft³/°F* _______°F))
  • _______ lbm/ft³] - 498,800 lbm = _______ lbm IV 4.2.2.h RCS Inventory MU Tank Inventory (lbm)

+

Pzr Steam Inventory (lbm)

+

Pzr Water Inventory (lbm)

+

Power Correction (lbm)

+

Temperature Correction (lbm)

=

Water Inventory (lbm)

Initial:

22046 lbm +

3406.393 lbm +

35119.85 lbm +

135 lbm +

-35200 lbm =

25507.243 lbm Final:

21275 lbm +

3341.05 lbm +

35570.146 lbm +

135 lbm +

-35600 lbm =

24721.196 lbm 4.2.2.i Change in RCS Inventory Change = Initial inventory - Final inventory Change = 25507.243_ lbm - 24721.196 lbm = 786.047_ lbm

__mlk__

IV

23 Revision ATTACHMENT 2:

RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 4 of 4 4.2.2.j Time period Period = Final time - Initial time Period = [(_23___ hr x 60) + ( 11 min)] - [(__19__ hr x 60) + ( 5 min)] = _246____ min

__mlk__

IV 4.2.2.k Total RCS Leak Rate lbm 62.32 ft x

ft gallons 7.481 x

time Inventory RCS in Change Leakrate 3

3

=

Leakrate = (

786.047 lbm) ÷ (

246 min) x (0.120 gal/lbm)

Leakrate =.383 gpm

__mlk__

IV Independent Verification Completed by ___MLKlein__________________________ Date Today

24 Revision ATTACHMENT 3:

UNIDENTIFIED RCS LEAKAGE CALCULATION SHEET Page 1 of 1 4.2.1.f RCP Seals Leak Rate from computer printout, or from Attachment 1. (4.2.1.e)

___.011___ gpm 4.2.1.j Quench Tank In-Leakage Rate from computer printout, or from Attachment 1. (4.2.1.i). Only record Positive values (exclude negative values by entering 0.000).

_____.0___ gpm 4.2.2.l RCS Total Leak Rate from computer printout, or from Attachment 2.

___.383___ gpm 4.2.3.a Primary to Secondary Tube Leakage from computer printout, or from most recent entry in RCS Leakage Log, RO Log, or as determined by Chemistry.

_____.0___ gpm (0.104 allowed) 4.2.3.b Other Identified Leakage, or from RCS Leakage Log.

_____.0___ gpm 4.2.3.c Total Identified Leak Rate from computer printout, or from; RCP Seals + Quench Tk + Pri to Sec + Other

( 4.2.1.e + 4.2.1.i [positive values only] + 4.2.3.a + 4.2.3.b ).

___mlk___

IV

____.011__ gpm (10 gpm allowed) 4.2.3.d Unidentified Leak Rate from computer printout, or from; Total Leak Rate - Total Identified Leak Rate

( 4.2.2.k - 4.2.3.c )

___mlk____

IV

____.382__ gpm (1 gpm allowed) 4.2.3.e Reactor Coolant Pressure Boundary Leakage

_____.0___ gpm (0 gpm allowed)

Independent Verification Completed by ___MLKlein________Date Today Performed by: Rx Operator Date: Today

20 Revision ATTACHMENT 2:

RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 1 of 3 Note: For parameters which utilize averaging of redundant channels, eliminate inoperable channels from the average and reduce the denominator accordingly.

If a Th or Tc point is unavailable, eliminate it and the opposing point (Tc or Th) from the same loop, and reduce the denominator by 2.

ITEM PARAMETER SOURCE UNITS INITIAL VALUE FINAL VALUE 1

Time Control Room clock or computer hr:min Step 4.1.4 Step 4.1.10 1905 2311 2

Makeup Tank Temp T769 or TI MU8

°F 100 100 3

Makeup Tank Level (2 channel ave)

[L761+L763]÷2, or LR MU16 in.

71 64 4

RCS Pressure (4 ch ave)

[P721+P722+P729+P730]÷4, PRSRC2A2, or PRSRC2B (1) psi 2156 2161 5

Pressurizer Level LRS RC14 or L768 in.

218 222 6

Ave Power

[R795+R804+R814+R820]÷4, C913, or NR NI6 100 100 7

Tave (8 ch ave)

TI RC7, or:

[T719+T720+T728+T729+

T780+T800+T820+T840]÷8 (2)

°F 580.8 582.3 (1) If less than 1700 psig RCS Pressure use the average of P725 and P732 (loop 1 and loop 2 WR Pressure).

(2) If less than 520°F RCS Temperature then average T753 and T782 (loop 1 and loop 2 WR Temperature).

4.2.2.a Makeup Tank Water Density (from Attachment 4)

Initial ____62.0038______ lbm/ft³ Final ___ 62.0038______ lbm/ft³ 4.2.2.b Makeup Tank Inventory Note: 77.85 ft³ accounts for water volume below the level indicating range.

Water Inventory = (Tank level

  • 4.124 ft³/in
  • Calibration Density) + (77.85 ft³
  • Water Density)

= (Tank level

  • 4.124 ft³/in
  • 62.325lbm/ ft³) + (77.85 ft³
  • Water Density)

Initial:

( ___71______ in.* 257 lbm/in ) + ( 77.85 ft³

  • _62.0038 lbm/ft³) = _23074_ lbm

__mlk__

IV Final:

(___64______ in.* 257 lbm/in ) + ( 77.85 ft³

  • _62.0038 lbm/ft³) = _21275_ lbm

__mlk__

IV

21 Revision ATTACHMENT 2:

RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 2 of 3 4.2.2.c Pressurizer Inventory Density (from Attachment 6)

Water Initial ___37.71________ lbm/ft³ Steam Initial ____6.02_________ lbm/ft³ Water Final ____37.68________ lbm/ft³ Steam Final ____6.04_________ lbm/ft³ 4.2.2.d Pressurizer Inventory Note:

239.6 ft³ accounts for water volume below the level indicating range.

242.2 ft³ accounts for steam volume above the level indicating range.

Water Inventory = (level

  • 3.173 ft³/in + 239.6 ft³)
  • Water Density Water Initial:

[(___218_____ in.

  • 3.173 ft³/in) + 239.6 ft³]
  • 37.71 lbm/ft³ = _35119.85 lbm

___mlk__

IV Water Final:

[(___222_____ in.

  • 3.173 ft³/in) + 239.6 ft³]
  • 37.68 lbm/ft³ = _35570.146 lbm

__mlk__

IV Steam Inventory =[((320 - level)

  • 3.173 ft³/in) + 242.2 ft³]
  • Steam Density Steam Initial:

[((320 - _218__in)

  • 3.173 ft³/in) + 242.2 ft³]
  • 6.02 lbm/ft³) = _3406.393________ lbm

__mlk__

IV Steam Final:

[((320 - __222__in)

  • 3.173 ft³/in) + 242.2 ft³]
  • 6.04 lbm/ft³) = _3341.05 __ lbm

__mlk__

IV 4.2.2.e Power Correction Factor Initial _____135_____________ lbm Final _____135____________ lbm 4.2.2.f Temperature Correction Factor (Tave >528°)

Initial ______-34350___________ lbm Final _____-35600___________ lbm

22 Revision ATTACHMENT 2:

RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 3 of 3 4.2.2.g Temperature Correction Factor (Tave <528°)

Reactor Coolant System Density (from Attachment 5)

N/A At initial Tave

___________________ lbm/ft³ At final Tave

___________________ lbm/ft³ Temperature Correction Factor (TCF)

TCF = [(10,277 + (0.24828

  • Tave))
  • _______ lbm/ft³] - 498,800 lbm = _______ lbm IV Final: [(10,277 ft³ + (0.24828 ft³/°F* _______°F))
  • _______ lbm/ft³] - 498,800 lbm = _______ lbm IV 4.2.2.h RCS Inventory MU Tank Inventory (lbm)

+

Pzr Steam Inventory (lbm)

+

Pzr Water Inventory (lbm)

+

Power Correction (lbm)

+

Temperature Correction (lbm)

=

Water Inventory (lbm)

Initial:

23074 lbm +

3406.393 lbm +

35119.85 lbm +

135 lbm

+

-34350 lbm =

27385.243 lbm Final:

21275 lbm +

3341.05 lbm +

35570.146 lbm +

135 lbm +

-35600 lbm =

24721.196 lbm 4.2.2.i Change in RCS Inventory Change = Initial inventory - Final inventory Change = 27385.243_ lbm - 24721.196 lbm = 2664.047_ lbm

__mlk__

IV

23 Revision ATTACHMENT 2:

RCS/MU AND PURIFICATION LEAK RATE CALCULATION SHEET Page 4 of 4 4.2.2.j Time period Period = Final time - Initial time Period = [(_23___ hr x 60) + ( 11 min)] - [(__19__ hr x 60) + ( 5 min)] = _246____ min

__mlk__

IV 4.2.2.k Total RCS Leak Rate lbm 62.32 ft x

ft gallons 7.481 x

time Inventory RCS in Change Leakrate 3

3

=

Leakrate = (

2664.047 lbm) ÷ (

246 min) x (0.120 gal/lbm)

Leakrate = 1.299 gpm

__mlk__

IV Independent Verification Completed by MLKlein__________________________ Date Today

24 Revision ATTACHMENT 3:

UNIDENTIFIED RCS LEAKAGE CALCULATION SHEET Page 1 of 1 4.2.1.f RCP Seals Leak Rate from computer printout, or from Attachment 1. (4.2.1.e)

_____.011_ gpm 4.2.1.j Quench Tank In-Leakage Rate from computer printout, or from Attachment 1. (4.2.1.i). Only record Positive values (exclude negative values by entering 0.000).

_____.0___ gpm 4.2.2.l RCS Total Leak Rate from computer printout, or from Attachment 2.

___1.299__ gpm 4.2.3.a Primary to Secondary Tube Leakage from computer printout, or from most recent entry in RCS Leakage Log, RO Log, or as determined by Chemistry.

____.0 ___ gpm (0.104 allowed) 4.2.3.b Other Identified Leakage, or from RCS Leakage Log.

____.0____ gpm 4.2.3.c Total Identified Leak Rate from computer printout, or from; RCP Seals + Quench Tk + Pri to Sec + Other

( 4.2.1.e + 4.2.1.i [positive values only] + 4.2.3.a + 4.2.3.b ).

__mlk__

IV

_____.011_ gpm (10 gpm allowed) 4.2.3.d Unidentified Leak Rate from computer printout, or from; Total Leak Rate - Total Identified Leak Rate

( 4.2.2.k - 4.2.3.c )

__mlk__

IV

___1.288__ gpm (1 gpm allowed) 4.2.3.e Reactor Coolant Pressure Boundary Leakage

____.0 ____ gpm (0 gpm allowed)

Independent Verification Completed by ___MLKlein________Date Today Performed by: Rx Operator Date: Today

Davis-Besse Initial License Exam 2015 Admin JPM SRO-A1.2

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG 1 of 6 Facility: Davis-Besse Task No:

336-004-03-0300 Task

Title:

Determine Maintenance of Active License Status K/A

Reference:

2.1.4 (3.8)

Job Performance Measure No: SRO-A1.2 (JPM New)

Examinee:

NRC Examiner:

Date:

Method of testing:

Simulated Performance ___

Actual Performance _X_

Classroom _X_

Simulator ___

Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Determine SRO 1 and SRO 3 are Inactive. Determine SRO 2 and SRO 4 are Active.

Required Materials:

DBBP-TRAN-0014, License Requirements for Licensed Individuals NT-OT-07001, Training and Qualification of Operations Personnel General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

No Validation Time:

15 minutes

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG 2 of 6 EXAMINER COPY INITIAL CONDITIONS:

It is 7/1/15. Four Senior Reactor Operators have the following work history for the second quarter of 2015 (Plant was in Mode 1 the entire quarter):

SRO 1 Entered second quarter with active license 4/01/2015 Worked 0700-1900 as Command SRO 4/02/2015 Worked 0700-1900 as Command SRO 4/03/2015 Worked 0700-1900 as Command SRO 4/07/2015 Worked 0700-1900 as Command SRO. Was relieved for 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> to obtain required biennial License Physical at the Health Center 4/08/2015 Worked 0700-1900 as Command SRO SRO 2 Entered second quarter with inactive license Completed all requirements for license reactivation 4/15/15 through 4/20/15 4/23/15 Worked 0700-1900 as Command SRO 4/24/15 Worked 0700-1900 as Command SRO 4/28/15 Worked 0700-1900 as Shift Technical Advisor SRO 3 Entered second quarter with active license 4/10/15 Worked 0700-1900 as Shift Manager 4/11/15 Worked 0700-1900 as Shift Manager 4/18/15 Worked 0700-1900 as Shift Manager 4/19/15 Worked 0700-1900 as Shift Technical Advisor 4/20/15 Worked 0700-1900 as Shift Manager SRO 4 License issued at the beginning of the second quarter 5/1/15 Worked 0700-1900 as Command SRO 5/2/15 Worked 0700-1900 as Command SRO 5/3/15 Worked 0700-1900 as Command SRO 5/9/15 Worked 0700-1900 as Command SRO 5/10/15 Worked 0700-1900 as Shift Technical Advisor INITIATION CUE:

Based on the previous quarters work history determine the license status as of today, 7/1/15, for each Senior Reactor Operator and document as ACTIVE or INACTIVE on this page.

(Provide copy of DBBP-TRAN-0014, License Requirements for Licensed Individuals and NT-OT-07001, Training and Qualification of Operations Personnel)

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG 3 of 6 CANDIDATE COPY INITIAL CONDITIONS:

It is 7/1/15. Four Senior Reactor Operators have the following work history for the second quarter of 2015 (Plant was in Mode 1 the entire quarter):

SRO 1 Entered second quarter with active license 4/01/2015 Worked 0700-1900 as Command SRO 4/02/2015 Worked 0700-1900 as Command SRO 4/03/2015 Worked 0700-1900 as Command SRO 4/07/2015 Worked 0700-1900 as Command SRO. Was relieved for 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> to obtain required biennial License Physical at the Health Center 4/08/2015 Worked 0700-1900 as Command SRO SRO 2 Entered second quarter with inactive license Completed all requirements for license reactivation 4/15/15 through 4/20/15 4/23/15 Worked 0700-1900 as Command SRO 4/24/15 Worked 0700-1900 as Command SRO 4/28/15 Worked 0700-1900 as Shift Technical Advisor SRO 3 Entered second quarter with active license 4/10/15 Worked 0700-1900 as Shift Manager 4/11/15 Worked 0700-1900 as Shift Manager 4/18/15 Worked 0700-1900 as Shift Manager 4/19/15 Worked 0700-1900 as Shift Technical Advisor 4/20/15 Worked 0700-1900 as Shift Manager SRO 4 License issued at the beginning of the second quarter 5/1/15 Worked 0700-1900 as Command SRO 5/2/15 Worked 0700-1900 as Command SRO 5/3/15 Worked 0700-1900 as Command SRO 5/9/15 Worked 0700-1900 as Command SRO 5/10/15 Worked 0700-1900 as Shift Technical Advisor INITIATION CUE:

Based on the previous quarters work history determine the license status as of today, 7/1/15, for each Senior Reactor Operator and document as ACTIVE or INACTIVE on this page.

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG 4 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1.

PERFORMANCE STEP: Evaluate SRO 1 work history

........C........

STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines license is Inactive.

COMMENT: Credit not received for complete watch due to absence to Health Center CUE: None SAT UNSAT

2.

PERFORMANCE STEP: Evaluate SRO 2 work History

........C........

STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines license is Active COMMENT: Reactivation meets proficiency requirements for the quarter CUE: None SAT UNSAT

3.

PERFORMANCE STEP: Evaluate SRO 3 work history

........C........

STANDARD: Reviews DBBP-TRAN-0014, License Requirements for Licensed Individuals and determines license is Inactive COMMENT: No credit given for Shift Technical position CUE: None SAT UNSAT

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG 5 of 6

4.

PERFORMANCE STEP: Evaluate SRO 4 work history

........C........

STANDARD: Reviews DBBP-TRAN-0014, License Requirements and NT-OT-01007, Training and Qualification of Operations Personnel for Licensed Individuals and determines license is Active.

COMMENT: A newly issued license meets the proficiency requirement for the quarter in which it was issued CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A1.2 AG 6 of 6 Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

Davis-Besse Initial License Exam 2015 Admin JPM SRO-A2

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A2 AG 1 of 6 Facility: Davis-Besse Task No:

331-041-02-0300 Task

Title:

Perform Risk Assessment K/A

Reference:

2.2.17 (3.8)

Job Performance Measure No: SRO-A2 (JPM New)

Examinee:

NRC Examiner:

Date:

Method of testing:

Simulated Performance ___

Actual Performance _X_

Classroom _X_

Simulator ___

Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Evaluate Generation Risk as Orange.

Determine Director of Site Operations approval with documentation in Unit Log is required Determine Supervisor continuous job site coverage is required Required Materials:

NOP-OP-1007, Risk Management DB-OP-06011, High Pressure Injection System, section 4.1 General

References:

Technical Specifications Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task: No Alternate Path: No Validation Time: 25 minutes

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A2 AG 2 of 6 EXAMINER COPY INITIAL CONDITIONS:

The Plant is at 100% Power. All systems normal.

INITIATION CUE:

Engineering has discovered a design question potentially affecting long term Operability of High Pressure Injection Pump (HPI) 1. Engineering requests HPI Pump 1 be placed on recirculation through the flow test line per DB-OP-06011, High Pressure Injection System, section 4.1 for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to gather data.

The Shift Manager directs you to perform a Risk Assessment for the Non-Emergent work per DB-OP-1007, Risk Assessment to determine the following only:

1. Risk Level
2. Permission required and documentation method
3. Level of Supervision required Document your results on this page (Provide a copy of DB-OP-06011, Section 4.1 and NOP-OP-1007. Make Technical Specifications available)

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A2 AG 3 of 6 CANDIDATE COPY INITIAL CONDITIONS:

The Plant is at 100% Power. All systems normal.

INITIATION CUE:

Engineering has discovered a design question potentially affecting long term Operability of High Pressure Injection Pump (HPI) 1. Engineering requests HPI Pump 1 be placed on recirculation through the flow test line per DB-OP-06011, High Pressure Injection System, section 4.1 for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to gather data.

The Shift Manager directs you to perform a Risk Assessment for the Non-Emergent work per DB-OP-1007, Risk Assessment to determine the following only:

1. Risk Level
2. Permission required and documentation method
3. Level of Supervision required Document your results on this page

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A2 AG 4 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

NOTE: STEPS CAN BE PERFORMED IN ANY SEQUENCE

1.

PERFORMANCE STEP: Evaluate effect on HPI Train 1 STANDARD: Reviews DB-OP-06011, section 4.1 and determines HPI 1 will be Inoperable while lined up through the flow test line CUE: None SAT UNSAT

2.

PERFORMANCE STEP: Reviews Technical Specification 3.5.2 for HPI Pump 1 STANDARD: Determines 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement will be entered CUE:

None SAT UNSAT

3.

PERFORMANCE STEP: Determines Risk Level

........C........

STANDARD: Refers to Attachment 2 and/or 3 of NOP-OP-1007, Risk Assessment and identifies Risk level will be Orange COMMENT: Greater than 50% of a shutdown LCO action time (for less than 14 day LCO) requires Orange Risk. HPI 1 will be Inoperable for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> which is greater than 50% of the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> shutdown LCO.

CUE: None SAT UNSAT

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A2 AG 5 of 6

4.

PERFORMANCE STEP: Determines Approval required and method of documentation

........C........

STANDARD: Reviews Attachment 2 and/or step 4.3.3.3 of NOP-OP-1007, Risk Assessment and determines the Director of Site Operations (or designee) approval is required and documented in the Work Implementation Schedule.

CUE: None SAT UNSAT

5.

PERFORMANCE STEP: Determines level of Supervision required

........C........

STANDARD: Reviews Attachment 2 and/or step 4.3.3.3 of NOP-OP-1007, Risk Assessment and determines Supervisor continuous job site coverage is required CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A2 AG 6 of 6 Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

Davis-Besse Initial License Exam 2015 Admin JPM SRO-A3

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A3 AG 1 of 6 Facility: Davis-Besse Task No:

334-005-05-0300 Task

Title:

Emergency Dose Authorization K/A

Reference:

2.3.4 (3.7)

Job Performance Measure No: SRO-A3 (JPM New)

Examinee:

NRC Examiner:

Date:

Method of testing:

Simulated Performance ___

Actual Performance _X_

Classroom _X_

Simulator ___

Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Select the two mechanic method and authorize Emergency dose for mechanic 2 and 4 only Required Materials:

RA-EP-02620, Emergency Dose Control and Potassium Iodide Distribution Emergency Dose Authorization form for each mechanic Calculator General

References:

None Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task: No Alternate Path: No Validation Time: 25 minutes

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A3 AG 2 of 6 EXAMINER COPY INITIAL CONDITIONS:

The Plant has experienced a Loss of Coolant Accident and fuel damage. Emergency Core Cooling Train (ECCS) 1 is in operation at full flow. Low Pressure Injection Pump (LPI) 2 is out of service for maintenance. Just before the accident it was determined LPI Pump 1 was losing oil through a loose bearing housing. Plans were being made to tighten the housing and add oil. It is determined that this task is required to be performed immediately to prevent pump failure.

INITIATION CUE:

You are an extra SRO on shift. The ERO is not yet activated. The Shift Manager acting as the Emergency Director in the Control Room has directed you to prepare an Emergency Dose Authorization, using the following information.

Radiation levels in ECCS Room 1 are indicating 50 Rem/hr These two tasks (tighten the housing and add oil) can be performed by the mechanic(s) working in series or two mechanics working in parallel.

One mechanic would obtain 48 minutes of exposure Two mechanics simultaneously would obtain 24 minutes of exposure each Three mechanics in rotation would obtain 18 minutes of exposure each Four mechanics in rotation would obtain 12 minutes of exposure each Four Mechanics have volunteered to perform this work:

  • Mechanic 1 is a 52 year old male with 2 Rem lifetime dose and no dose for current year.

This individual also received a 28 Rem dose during a lifesaving rescue 10 years ago at another plant

  • Mechanic 2 is a 27 year old male with 600 mrem lifetime dose and 5 mrem for current year
  • Mechanic 3 is a 34 year old female, who has a declared pregnancy, with 125 mrem lifetime dose and no dose for current year
  • Mechanic 4 is a 37 year old male with 4.2 mrem lifetime and 700 mrem for the current year Select the method desired and mechanic(s) to perform this task and document (up to the review and approval signatures) on the attached Emergency Dose Authorization Forms. The remainder of each form will be completed if necessary when the Emergency RP Manager has been contacted.

(Hand Candidate a copy of RA-EP-02620, Emergency Dose Control and Potassium Iodide Distribution and the four recommended Emergency Dose Authorization Forms)

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A3 AG 3 of 6 CANDIDATE COPY INITIAL CONDITIONS:

The Plant has experienced a Loss of Coolant Accident and fuel damage. Emergency Core Cooling Train (ECCS) 1 is in operation at full flow. Low Pressure Injection Pump (LPI) 2 is out of service for maintenance. Just before the accident it was determined LPI Pump 1 was losing oil through a loose bearing housing. Plans were being made to tighten the housing and add oil. It is determined that this task is required to be performed immediately to prevent pump failure.

INITIATION CUE:

You are acting as the Emergency Director in the Control Room and the ERO is not yet activated.

Radiation levels in ECCS Room 1 are indicating 50 Rem/hr These two tasks (tighten the housing and add oil) can be performed by the mechanic(s) working in series or two mechanics working in parallel.

One mechanic would obtain 48 minutes of exposure Two mechanics simultaneously would obtain 24 minutes of exposure each Three mechanics in rotation would obtain 18 minutes of exposure each Four mechanics in rotation would obtain 12 minutes of exposure each Four Mechanics have volunteered to perform this work:

  • Mechanic 1 is a 52 year old male with 2 Rem lifetime dose and no dose for current year.

This individual also received a 28 Rem dose during a lifesaving rescue 10 years ago at another plant

  • Mechanic 2 is a 27 year old male with 600 mrem lifetime dose and 5 mrem for current year
  • Mechanic 3 is a 34 year old female, who has a declared pregnancy, with 125 mrem lifetime dose and no dose for current year
  • Mechanic 4 is a 37 year old male with 4.2 mrem lifetime and 700 mrem for the current year Select the method desired and mechanic(s) to perform this task and document on this form.

Authorize Emergency Dose if necessary per RA-EP-02620, Emergency Dose Control and Potassium Iodide Distribution by signing for Emergency Director Approval on the appropriate Emergency Dose Authorization Forms. The remainder of each form will be completed if necessary when the Emergency RP Manager has been contacted.

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A3 AG 4 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1.

PERFORMANCE STEP: Evaluate the dose that would be received for each method STANDARD: One mechanic would obtain 40 Rem Two mechanics simultaneously would obtain 20 Rem each Three mechanics in rotation would obtain 15 Rem each Four mechanics in rotation would obtain 10 Rem each COMMENT: JPM step sequence not critical. May evaluate mechanics and select method first in which case only the method selected will need dose evaluated CUE: None SAT UNSAT

2.

PERFORMANCE STEP: Evaluate Mechanic 1 acceptability for receiving Emergency Dose STANDARD:. Determines Mechanic 1 should not be authorized to receive emergency dose CUE:

If asked - received 28 Rem 10 years ago at previous place of employment during a lifesaving rescue SAT UNSAT

3.

PERFORMANCE STEP: Evaluate Mechanic 2 acceptability for receiving Emergency Dose STANDARD: Determines Mechanic 2 can be authorized for Emergency Dose CUE: If asked - have never received emergency dose SAT UNSAT

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A3 AG 5 of 6

4.

PERFORMANCE STEP: Evaluate Mechanic 3 acceptability for receiving Emergency Dose STANDARD: Determines Mechanic 3 SHALL NOT be authorized to receive emergency dose. Since mechanic is female, and is a declared pregnant worker CUE: If asked - have never received emergency dose If asked - have just found out is pregnant SAT UNSAT

5.

PERFORMANCE STEP: Evaluate Mechanic 4 acceptability for receiving Emergency Dose STANDARD: Determines Mechanic 4 can be authorized for Emergency Dose CUE: If asked - have never received emergency dose SAT UNSAT

6.

PERFORMANCE STEP: Determine method for repair

........C........

STANDARD: Determines 2 mechanics in parallel is proper method due to condition in RA-EP-02620, step 6.1.3.b 25,000 mrem TEDE CUE:

None SAT UNSAT

7.

PERFORMANCE STEP: Select Mechanic 2 and Mechanic 4 to perform work

........C........

STANDARD: Recommend Emergency Dose for Mechanic 2 and Mechanic 4 CUE:

None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examiner)

END TIME

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A3 AG 6 of 6 Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________

EMERGENCY DOSE AUTHORIZATION DBEP-204-01 INDIVIDUAL (Last, First, Middle)

Mechanic 1 SOCIAL SECURITY NUMBER 111-11-1111 DATE Today TLD NO.

1 EMPLOYER FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION YES NO RECOMMENDED EMERGENCY DOSE LIMIT REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE) }

COMMENTS EMERGENCY RP MANAGER RECOMMENDATION (Signature)

EMERGENCY DIRECTOR APPROVAL (Signature)

AUTHORIZATION DATE AUTHORIZATION LIMIT REM { TEDE }

I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.

INDIVIDUAL (Signature)

DATE BRIEFED BY (Signature)

DATE (TOTAL DOSE - TEDE) =

(EXTERNAL - DDE)

PLUS (INTERNAL - CEDE)

RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature)

DATE EMERGENCY DIRECTOR REVIEW (Signature)

DATE

EMERGENCY DOSE AUTHORIZATION DBEP-204-01 INDIVIDUAL (Last, First, Middle)

Mechanic 2 SOCIAL SECURITY NUMBER 222-22-2222 DATE Today TLD NO.

2 EMPLOYER FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION YES NO RECOMMENDED EMERGENCY DOSE LIMIT REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE) }

COMMENTS EMERGENCY RP MANAGER RECOMMENDATION (Signature)

EMERGENCY DIRECTOR APPROVAL (Signature)

AUTHORIZATION DATE AUTHORIZATION LIMIT REM { TEDE }

I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.

INDIVIDUAL (Signature)

DATE BRIEFED BY (Signature)

DATE (TOTAL DOSE - TEDE) =

(EXTERNAL - DDE)

PLUS (INTERNAL - CEDE)

RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature)

DATE EMERGENCY DIRECTOR REVIEW (Signature)

DATE

EMERGENCY DOSE AUTHORIZATION DBEP-204-01 INDIVIDUAL (Last, First, Middle)

Mechanic 3 SOCIAL SECURITY NUMBER 333-33-3333 DATE Today TLD NO.

3 EMPLOYER FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION YES NO RECOMMENDED EMERGENCY DOSE LIMIT REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE) }

COMMENTS EMERGENCY RP MANAGER RECOMMENDATION (Signature)

EMERGENCY DIRECTOR APPROVAL (Signature)

AUTHORIZATION DATE AUTHORIZATION LIMIT REM { TEDE }

I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.

INDIVIDUAL (Signature)

DATE BRIEFED BY (Signature)

DATE (TOTAL DOSE - TEDE) =

(EXTERNAL - DDE)

PLUS (INTERNAL - CEDE)

RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature)

DATE EMERGENCY DIRECTOR REVIEW (Signature)

DATE

EMERGENCY DOSE AUTHORIZATION DBEP-204-01 INDIVIDUAL (Last, First, Middle)

Mechanic 4 SOCIAL SECURITY NUMBER 444-44-4444 DATE Today TLD NO.

4 EMPLOYER FENOC BRIEF DESCRIPTION OF TASK RECOMMENDED EMERGENCY DOSE AUTHORIZATION YES NO RECOMMENDED EMERGENCY DOSE LIMIT REM { TOTAL EFFECTIVE DOSE EQUIVALENT (TEDE) }

COMMENTS EMERGENCY RP MANAGER RECOMMENDATION (Signature)

EMERGENCY DIRECTOR APPROVAL (Signature)

AUTHORIZATION DATE AUTHORIZATION LIMIT REM { TEDE }

I have been briefed on the radiological consequences and hazards associated with the authorized emergency dose and I have volunteered to perform the above described task.

INDIVIDUAL (Signature)

DATE BRIEFED BY (Signature)

DATE (TOTAL DOSE - TEDE) =

(EXTERNAL - DDE)

PLUS (INTERNAL - CEDE)

RADIOBIOASSAY RESULTS EMERGENCY RP MANAGER REVIEW (Signature)

DATE EMERGENCY DIRECTOR REVIEW (Signature)

DATE

Davis-Besse Initial License Exam 2015 Admin JPM SRO-A4

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG 1 of 8 Facility: Davis-Besse Task No:

334-004-05-0300 Task

Title:

Emergency Response Organization Notification K/A

Reference:

2.4.43 (3.8)

Job Performance Measure No: SRO-A4 (JPM 253)

Examinee:

NRC Examiner:

Date:

Method of testing:

Simulated Performance ___

Actual Performance _X_

Classroom ___

Simulator _X_

Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Activate the ERO Numeric Group Page Required Materials:

RA-EP-01700, Alert RA-EP-02110, Emergency Notification Davis-Besse Emergency Plan Telephone Directory Phone General

References:

Initiating Cue:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Time Critical Task:

No Alternate Path:

No Validation Time: 10 minutes

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG 2 of 8 EXAMINER COPY INITIAL CONDITIONS:

You are an extra Senior Reactor Operator in the Control Room.

The plant is in Mode 1 operating at 100% power.

The Shift Manager has declared an Alert on EAL HA3 due to an Operating Basis Earthquake being detected at the plant and he has assumed the Emergency Director position.

The Unit Supervisor is directing plant responses in accordance with RA-EP-02820, Earthquake.

INITIATING CUES:

Due to performing plant walk-downs and responding to other issues associated with response to the earthquake, Security personnel are not available to make any emergency notifications.

The Emergency Director directs you to notify the Emergency Response Organization in accordance with RA-EP-02110.

(Provide RA-EP-2110 and the Emergency Plan Telephone Directory)

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG 3 of 8 CANDIDATE COPY INITIAL CONDITIONS:

You are an extra Senior Reactor Operator in the Control Room.

The plant is in Mode 1 operating at 100% power.

The Shift Manager has declared an Alert on EAL HA3 due to an Operating Basis Earthquake being detected at the plant and he has assumed the Emergency Director position.

The Unit Supervisor is directing plant responses in accordance with RA-EP-02820, Earthquake.

INITIATING CUES:

Due to performing plant walk-downs and responding to other issues associated with response to the earthquake, Security personnel are not available to make any emergency notifications.

The Emergency Director directs you to notify the Emergency Response Organization in accordance with RA-EP-02110.

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG 4 of 8 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

1. PERFORMANCE STEP: Reviews the procedure.

STANDARD: Reviews RA-EP-02110, Emergency Notification, for notifying the Emergency Response Organization and off-site agencies.

CUE: If asked, a security event is NOT in progress.

SAT UNSAT

2. PERFORMANCE STEP: Obtain CANS access numbers from Davis-Besse Emergency Plan Telephone Directory and dial them.

STANDARD: Locates the ERO Notification Flow Chart behind the Immediate Notification Numbers tab in the Davis-Besse Emergency Plan Telephone Directory.

CUE: Provide a copy of the Emergency Plan Telephone directory only if the JPM is NOT performed in the simulator.

SAT UNSAT

3.

PERFORMANCE STEP: Dial the primary CANS access number.

STANDARD: Locates a touch tone phone and correctly dials the primary CANS number.

COMMENT: The primary CANS number is 9-1-877-686-7612.

IF the incorrect number is dialed, THEN say, The phone continues to ring.

CUE: Say, You hear a busy signal.

SAT UNSAT

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG 5 of 8

4.

PERFORMANCE STEP: Dial the backup CANS access number.

STANDARD: Locates a touch tone phone and correctly dials the backup CANS number.

COMMENT: The CANS backup number is 9-1-866-334-6556.

CUE: The phone continues to ring.

SAT UNSAT

5. PERFORMANCE STEP: Determine the need to activate a group page.

STANDARD: Locates the ERO Numeric Group Page instructions in the ERO Notification Flow Chart behind the Immediate Notification Numbers tab in the Davis-Besse Emergency Plan Telephone Directory.

COMMENT: The Group Pager number is 9-1-800-405-4758.

CUE: None.

SAT UNSAT

6. PERFORMANCE STEP: Contact the Group Pager system.

........C........

STANDARD: Locates a touch tone phone and correctly dials 9-1-800-405-4758.

CUE: IF the correct number is dialed, THEN say, This is the Remote Activation Module. Please enter a pager number.

IF any other number is dialed, THEN say, The number you have dialed is no longer in service. Please check the number and try again SAT UNSAT

7. PERFORMANCE STEP: Enter the pager number.

........C........

STANDARD: Enters pager number 2533024.

CUE: IF pager number 2533024 is entered, THEN say, Please enter the event code followed by the pound key.

IF the wrong pager number is entered, THEN say, The number you entered is not valid, please check the number and try again.

SAT UNSAT

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG 6 of 8

8. PERFORMANCE STEP: Enter the event code.

........C........

STANDARD: Enters 2222#.

CUE: IF the # is not entered, THEN say, Your input is not valid, Please enter the event code followed by the pound key.

SAT UNSAT

9. PERFORMANCE STEP: Terminate the call.

STANDARD: Hangs up the telephone.

COMMENT: The E-Plant Telephone Directory step directs the operator to Send the page two times. The second page actions are not critical if the first page was SAT.

CUE: None.

SAT UNSAT

10. PERFORMANCE STEP: Contact the pager system.

STANDARD: Locates a touch tone phone and correctly dials 9-1-800-405-4758.

CUE: IF the correct number is dialed, THEN say, This is the Remote Activation Module. Please enter a pager number.

IF any other number is dialed, THEN say, The number you have dialed is no longer in service. Please check the number and try again SAT UNSAT

11. PERFORMANCE STEP: Enter the pager number.

STANDARD: Enters pager number 2533024.

CUE: IF pager number 2533024 is entered, THEN say, Please enter the event code followed by the pound key.

IF the wrong pager number is entered, THEN say, The number you entered is not valid, please check the number and try again.

SAT UNSAT

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG 7 of 8 12 PERFORMANCE STEP: Enter the event code.

STANDARD: Enters 2222#.

CUE: IF the # is not entered, THEN say, Your input is not valid, Please enter the event code followed by the pound key.

SAT UNSAT 13 PERFORMANCE STEP: Terminate the call.

STANDARD: Hangs up the telephone.

CUE: None.

SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by Evaluator)

END TIME

Appendix C Job Performance Measure Form ES-C-1 Worksheet Admin JPM SRO-A4 AG 8 of 8 Verification of Completion Job Performance Measure No.

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:_____________________________________________________________

Response:_____________________________________________________________