ML18086A984: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 10/27/1981 | | issue date = 10/27/1981 | ||
| title = Forwards Responses to NRC 810923 Request for Addl Info Re Reactor Vessel Level Instrumentation & Conformance W/ NUREG-0737,Item II.F.2.3.Level Instruments Will Utilize Microprocessor for Data Processing | | title = Forwards Responses to NRC 810923 Request for Addl Info Re Reactor Vessel Level Instrumentation & Conformance W/ NUREG-0737,Item II.F.2.3.Level Instruments Will Utilize Microprocessor for Data Processing | ||
| author name = | | author name = Liden E | ||
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY | | author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY | ||
| addressee name = | | addressee name = Varga S | ||
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | | addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | ||
| docket = 05000272, 05000311 | | docket = 05000272, 05000311 | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:I_ | {{#Wiki_filter:I_ | ||
PS~G* | |||
Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 Phone 201/430-7000 Mailing Address: | |||
P.O. Box 570; Newark~ N.J. | |||
07101 October 27~ 1981 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda; MD 20014 Attention: | |||
Mr. Steven A. Varga; Chief Operating Reactors Branch 1 Division of Licensing Gentlemen: | Mr. Steven A. Varga; Chief Operating Reactors Branch 1 Division of Licensing Gentlemen: | ||
TMI TOPIC II.F.2.3 NO. 1 AND 2 UNITS SALEM NUCLEAR GENERATING STATION DOCKET NO. 50-272 AND 50-311 PSE&G hereby submits; in the enclosure to this letter; its response to your request for additional information dated September 23; 1981 concerning the reactor vessel level strument. | TMI TOPIC II.F.2.3 NO. 1 AND 2 UNITS SALEM NUCLEAR GENERATING STATION DOCKET NO. 50-272 AND 50-311 PSE&G hereby submits; in the enclosure to this letter; its response to your request for additional information dated September 23; 1981 concerning the reactor vessel level in-strument. | ||
The Salem level instruments will utilize a processor for data processing. | The Salem level instruments will utilize a micro-processor for data processing. | ||
Should you have any questions in this do not tate to contact us. A. Liden ager -Nuclear Licensing FM :srd Attachment CC: Mr. Leif Norrholm Senior Resident Inspector Mr. Gary c. Meyer Licensing Project Manager FK31/l ( 8110300319 81102772\1 | Should you have any questions in this regard~ do not hesi-tate to contact us. | ||
* PDR ADOCK 050002 | A ve~ | ||
. . ; l 0258Q:l | A. Liden ager - | ||
SUMMA.RY RE PORT ( µ Processor) | Nuclear Licensing FM :srd Attachment CC: | ||
. ,,,/ I I Item 1 | Mr. Leif Norrholm Senior Resident Inspector Mr. Gary c. Meyer Licensing Project Manager FK31/l | ||
( 8110300319 81102772\\1 | |||
0236Q | * PDR ADOCK 050002 | ||
. p PDR e 95-0942 | |||
Describe the location of the level system displays in the Control Room with respect to other plant instrument displays related to ICC monitoring in particular, the saturation meter display and the exit thermocouple display. Response The primary reactor vessel level display will be located on a section of the circular console adjacent to the saturation meter display and the core exit thermocouple display. The secondary reactor vessel level display will be located on a upright panel directly behind the location of the primary reactor vessel display. | |||
I | ~.. | ||
Response 3. In general, the system electronics .are verified, maintained and calibrated on-line by placing one of the redundant trains into a test and calibrate mode while leaving the other train in operation to monitor inadequate core cooling. A general verification is performed before shipment, but plant specific data is not used. The capability exists for the operator to verify the operation of the system. This would involve necting khe sensors at the RVLIS electronics, providing an ficial. input, and observing the response of the system on the front panel and remote display. On-line calibration of the system is made possible by the controls available on the main processing unit. The calibration consists of entering constants into the non-volatile RAM along with adjusting the potentiometers on the analog to digital conversion cards. The initial calibration is done when the system is installed, but quent calibrations can be per.formed as described in the Technical Manual to maintain system accuracy. | ; l 0258Q:l I | ||
The RVLIS system requires the normal maintenance given to other control and protection systems within the plant. On-line nance is accomplished by placing only one of the two redundant trains into maintenance at a time this will allow continued toring of inadequate core cooling. In addition, software programs are provided so that the front panel controls and display can be used to perform a functional test, *serial data link tests, calibration tests and deadman timer tests. These tests are considered part of the operator maintenance dures .and should be performed monthly. For additional details of procedures see "Attachment A 11 | RESPONSES TO NRC'REQUEST FOR ADDITIONAL INFORMATION ON THE WESTINGHOUSE R.V.L.I.S. | ||
SUMMA.RY RE PORT | |||
2-2. PREREQUISITES o The lines have been vacuum filled, per the tions of section 4. o Ensure that the hydraulic isolators are zeroed (within plus or minus 0.1 in.3). o Calibrate the d/p cells per instructions of ITT Barton Manual for Model 752, Level B, transmitters. | ( µ Processor) | ||
.,,,/ | |||
~/ | |||
I I | |||
Item 1 Justify that the single upper head penetration meets the single failure requirement of NUREG-0737 and shO'n' that it does not negate the redun-dancy *of the two instrument trains. | |||
===Response=== | |||
: 1. Redundancy is l"()t compromised by having a shared tap since it is not conceivable that the tap will fail either from plugging or break-ing. Freedom from plugging is enhanced by, 1) use of stainless steel connections which preclude corrosion products and, 2) absence of mechanisms, such as, flow for concentrating boric acid. It is also inconceivable that the tap.will break because it is in a pro-tected area. | |||
It should also be pointed out that in other cases where s~aring of a tap occurs in the RCS, we know of no prior experience reporting deleterious malfunctions of the shared tap. | |||
Also, even if the shared tap does fail,. it should be recognized that RVLIS is l"()t a Protection System initiating automatic action, but a monitoring system with adequate backup monitoring such as by core exit thermocouples for operator correlation. | |||
0236Q | |||
Item 2 Response to NRC Request for Additional Information on the Westinghouse R.V.L.I.S. | |||
Describe the location of the level system displays in the Control Room with respect to other plant instrument displays related to ICC monitoring in particular, the saturation meter display and the cor~ exit thermocouple display. | |||
===Response=== | |||
The primary reactor vessel level display will be located on a section of the circular console adjacent to the saturation meter display and the core exit thermocouple display. | |||
The secondary reactor vessel level display will be located on a upright panel directly behind the location of the primary reactor vessel display. | |||
I Item 3 Describe the provisions and procedures for on-line verification, cali-bration and maintenance. | |||
===Response=== | |||
: 3. | |||
In general, the system electronics.are verified, maintained and calibrated on-line by placing one of the redundant trains into a test and calibrate mode while leaving the other train in operation to monitor inadequate core cooling. | |||
A general verification is performed before shipment, but plant specific data is not used. | |||
The capability exists for the operator to verify the operation of the system. This would involve discon-necting khe sensors at the RVLIS electronics, providing an arti-ficial. input, and observing the response of the system on the front panel and remote display. | |||
On-line calibration of the system is made possible by the controls available on the main processing unit. The calibration consists of entering constants into the non-volatile RAM along with adjusting the potentiometers on the analog to digital conversion cards. The initial calibration is done when the system is installed, but subse-quent calibrations can be per.formed as described in the Technical Manual to maintain system accuracy. | |||
The RVLIS system requires the normal maintenance given to other control and protection systems within the plant. On-line mainte-nance is accomplished by placing only one of the two redundant trains into maintenance at a time this will allow continued moni-toring of inadequate core cooling. | |||
In addition, software programs are provided so that the front panel controls and display can be used to perform a functional test, | |||
*serial data link tests, calibration tests and deadman timer tests. | |||
These tests are considered part of the operator maintenance proce-dures.and should be performed monthly. For additional details of procedures see "Attachment A 11 | |||
ATIACHMENT A SYSTEMS OPERATING PROCEDURES 2-L PURPOSE The objectives of these instructions are to establish the requirements for the use of the Reactor Vessel Level Instrumentation System (RVLIS) for various plant conditions and to specify the maintainability require- | |||
.ffients of the system equipment. | |||
2-2. | |||
PREREQUISITES o | |||
The capi~lary lines have been vacuum filled, per the instruc-tions of section 4. | |||
o Ensure that the hydraulic isolators are zeroed (within plus or minus 0.1 in.3). | |||
o Calibrate the d/p cells per instructions of ITT Barton Manual for Model 752, Level B, transmitters. | |||
o The process equipment must be scaled using the appropriate scaling document. | o The process equipment must be scaled using the appropriate scaling document. | ||
o Determine the height of the upper top piping above the inside top of the vessel. 2-3. INITIALIZATION With the plant less than 200°F and less than 430 psig, obtain the following data for trains A and B: 0236Q | o Determine the height of the upper top piping above the inside top of the vessel. | ||
2-3. | |||
o Thot o RCS pressure o d/p transmitter output o Signal to the remote display (2) Manually record: o level indication readings o Hydraulic isolator_dial readings o Reference leg RTD output (3) Record the above data for the following reactor coolant pump operations: | INITIALIZATION With the plant less than 200°F and less than 430 psig, obtain the following data for trains A and B: | ||
NOTE Upper plenum will read offscale if pump is running in the instrumented loop; narrow range will read offscale with one or more pumps running. o No pumps running NOTE An indication of 100 percent reading sents a level to the inside top of the vessel. The height of the upper top piping above the inside top of the vessel will result in a reading than 100 cent. This added height is plant specific and must be determined prior to adjusting the process equipment (upper plenum and* narrow range) for full scale indication. | 0236Q | ||
------=----* | |||
I' 0236Q (1) | |||
With an automatic data logger, record the following: | |||
Data of step (2) should be recorded at 3500F and at Tavg no-load. Adjust process electronics for density compensation at Tavg no-load. Verify that wide range indication reads 100 percent. (5) Trip all pumps and record data per steps (1) and (2). Verify that upper plenum and narrow range indication is in agreement with the reading of step (3) "No pumps running". | o Thot o RCS pressure o d/p transmitter output o Signal to the remote display (2) Manually record: | ||
(6) Restart pumps in sequence and record wide range readings for both trains for each pump combination. | o level indication readings o Hydraulic isolator_dial readings o Reference leg RTD output (3) Record the above data for the following reactor coolant pump operations: | ||
(7) Enter into the equipment prograrrrning the expected percent level for the various purrp combinations per the processor instruction manual. 2-4. NORMAL PLANT OPERATION With the plant at power, the level readings should be as follows: Wide range 0258Q:l percent (wide range reading will increase from 100 percent to approximately 110 percent with all pumps running, as reactor power is increased from zero to 100 percent) | NOTE The various configurations should be obtained through the normal startup if possible. | ||
NOTE Upper plenum will read offscale if pump is running in the instrumented loop; narrow range will read offscale with one or more pumps running. | |||
(3) e e Provide temporary plugs for the pipe ends of the removable section and stationary sections. | o No pumps running NOTE An indication of 100 percent reading repre-sents a level to the inside top of the vessel. The height of the upper top piping above the inside top of the vessel will result in a reading ~reater than 100 per-cent. This added height is plant specific and must be determined prior to adjusting the process equipment (upper plenum and* | ||
Restore the RVLIS after reactor vessel head installation as follows: (1) Remove pipe end plugs and reconnect piping section. (2) With the isolation valve open, backfill the piping from sensors by attaching a water source to the sensor vent. (3) Disconnect waterfill | narrow range) for full scale indication. | ||
_apparatus. | ------=----*- | ||
(4) At startup {450 psig, <2QQOF), visually inspect piping/ coupling of the reinstalled piping for leakage. (5) At full system pressure, repeat inspection. | ~-:---~--**.. -* *-** | ||
2-6. PERIODIC TESTING 2-7. Plant at Power Perform monthly calibration checks of the process electronics in dance with the process equipment instruction manual. 2-8. Refueling Outages 02360 (1) For the d/p transmitters, perform zero check of each d/p transmitter by closing the respective isolation valves and opening the bypass valve. If zero reading differs from the last recorded reading by percent, then recalibrate d/p transmiter using instructions of Barton Instruction Manual {Model 752) and the instructions contained in the RVLIS system manual and the appropriate equipment instruction manuals. | |||
. ' | o One noninstrumented loop pump running o Two noninstrumented loop pumps running o Two noninstrumented loop pumps and one instrumented loop purrp running o All pumps running -- Adjust process equipment so that wide range indication reads 100 percent. | ||
Readings should be within plus or minus 0.1 in.3. (3) Perfonn the calibration check of the process electronics in accordance with the equipment technical manual. (4) Verify the operability of* the RVLIS System during* the startup/heatup of plant following a refueling or major plant outage by tracking the displays of the two trains. Readings should be within percent of the previous recorded readings. | (4) With all pumps running, increase RCS pressure - temperature to Tavg no-load and record data refer to step (1) every 500F increment. | ||
Every Other Refueling Outage In addition' to the steps of paragraph 2-8, perform the following every other refueling outage: 0236Q (1) At the process equipment cabinets, read the impulse line RTD resistances. | Data of step (2) should be recorded at 3500F and at Tavg no-load. Adjust process electronics for density compensation at Tavg no-load. | ||
Verify that wide range indication reads 100 percent. | |||
(5) Trip all pumps and record data per steps (1) and (2). | |||
Verify that upper plenum and narrow range indication is in agreement with the reading of step (3) "No pumps running". | |||
(6) | |||
Restart pumps in sequence and record wide range readings for both trains for each pump combination. | |||
(7) | |||
Enter into the equipment prograrrrning the expected percent level for the various purrp combinations per the micro-processor instruction manual. | |||
2-4. | |||
NORMAL PLANT OPERATION With the plant at power, the level readings should be as follows: | |||
Wide range 0258Q:l | |||
~110 percent (wide range reading will increase from 100 percent to approximately 110 percent with all pumps running, as reactor power is increased from zero to 100 percent) | |||
Narrow range Upper plenum Off Scale - High | |||
*off Scale - Low (RCP status light on main | |||
*control board is off) | |||
Any reduction in wide range expected readings (with all pumps running) can only be caused by the presence of voids in the circulating water. | |||
Voids will not exist without reduced pressure which could trip the reactor, so all accident conditions will proceed from a condition of zero power (100 percent reading on the wide range). | |||
Check that the pressure has decreased or that subcooling meter confirms saturation conditions exist; then readings below 100 percent are an indication of voids in the coolant. | |||
If the actual readings differ from the expected readings by 3 percent for a single train, refer to troubleshooting (paragraph 2-10). | |||
*If the indication for both trains differs from the expected readi.ngs, refer to the emergency operating instructions for irrmediate and subse-quent action. | |||
2-5. | |||
REFUELING After depressurization and prior to lifting the reactor vessel head, perform the following steps to prepare the RVLIS: | |||
(1) Close reactor vessel level head connection isolation valve. | |||
(2) Disconnect piping between the isolation valve and the sensors. | |||
0236Q NOTE Contaminated water residue may be in the pipe. | |||
/ | |||
(3) e e | |||
Provide temporary plugs for the pipe ends of the removable section and stationary sections. | |||
Restore the RVLIS after reactor vessel head installation as follows: | |||
(1) | |||
Remove pipe end plugs and reconnect piping section. | |||
(2) With the isolation valve open, backfill the piping from sensors by attaching a water source to the sensor vent. | |||
(3) | |||
Disconnect waterfill _apparatus. | |||
(4) At startup {450 psig, <2QQOF), visually inspect piping/ coupling of the reinstalled piping for leakage. | |||
(5) | |||
At full system pressure, repeat inspection. | |||
2-6. | |||
PERIODIC TESTING 2-7. | |||
Plant at Power Perform monthly calibration checks of the process electronics in accor-dance with the process equipment instruction manual. | |||
2-8. | |||
Refueling Outages 02360 (1) | |||
For the d/p transmitters, perform zero check of each d/p transmitter by closing the respective isolation valves and opening the bypass valve. If zero reading differs from the last recorded reading by percent, then recalibrate d/p transmiter using instructions of Barton Instruction Manual | |||
{Model 752) and the instructions contained in the RVLIS system manual and the appropriate equipment instruction manuals. | |||
.~'. | |||
2-9. | |||
(2) | |||
Record tne appropriate hydraulic isolato-dial readings and compare results with prev'ious cold shutdown readings. | |||
Readings should be within plus or minus 0.1 in.3. | |||
(3) | |||
Perfonn the calibration check of the process electronics in accordance with the equipment technical manual. | |||
(4) Verify the operability of* the RVLIS System during* the startup/heatup of plant following a refueling or major plant outage by tracking the displays of the two trains. | |||
Readings should be within percent of the previous recorded readings. | |||
Every Other Refueling Outage In addition' to the steps of paragraph 2-8, perform the following every other refueling outage: | |||
0236Q (1) | |||
At the process equipment cabinets, read the impulse line RTD resistances. | |||
NOTE Take the ambient temperature reading near the RTD and adjust the measured resistance accordingly. | NOTE Take the ambient temperature reading near the RTD and adjust the measured resistance accordingly. | ||
Compare the adjusted tance to the original results or the previous recorded data. (2) Employing a pneumatics calibration, per instructions of* section 4 at the sensor vent ports, check the calibration of the transmitters and perform a time response check of the system. The calibration results should be within plus or minus percent of instrument span of the previous ded data. The time response of the system should be within 10 seconds. This is the time required for the display instrument to reach the midpoint of a SO*percent step input variable change. | Compare the adjusted resis-tance to the original results or the previous recorded data. | ||
2-10. TROUBLESHOOT!t. | (2) | ||
L".NT AT POWER If single indication varies from the expected value, check the following: | Employing a pneumatics calibration, per instructions of* | ||
section 4 at the sensor vent ports, check the calibration of the transmitters and perform a time response check of the system. The calibration results should be within plus or minus percent of instrument span of the previous recor-ded data. The time response of the system should be within 10 seconds. This is the time required for the display instrument to reach the midpoint of a SO*percent step input variable change. | |||
2-10. | |||
TROUBLESHOOT!t. L".NT AT POWER If single indication varies from the expected value, check the following: | |||
{1) Call for the sensor status display for any abnormalities. | {1) Call for the sensor status display for any abnormalities. | ||
(2) Compare hydraulic isolator dial reading with reading taken from diverse train and those taken at Tavg no-load tions. Dial readings deviating by more than plus or minus 0.1 in.3 may be indicative of potential capillary line leakage; however, it may not be the reason for the tion in the display reading until the isolator reached the valve-off point. (3) Perform a calibration check of the process equipment, per the appropriate instruction manual. (4) Perform a zero check of the appropiate d/p transmitter. | (2) | ||
Compare hydraulic isolator dial reading with reading taken from diverse train and those taken at Tavg no-load condi-tions. Dial readings deviating by more than plus or minus 0.1 in.3 may be indicative of potential capillary line leakage; however, it may not be the reason for the devia-tion in the display reading until the isolator reached the valve-off point. | |||
(3) Perform a calibration check of the process equipment, per the appropriate instruction manual. | |||
(4) | |||
Perform a zero check of the appropiate d/p transmitter. | |||
If more than one indicator/display deviates from the diverse train or from Tavg no-load readings, check the following: | If more than one indicator/display deviates from the diverse train or from Tavg no-load readings, check the following: | ||
o Conman isolator dial readings versus previous reading o d/p transmitter valve lineup o Process equipment power supplies If repairs are required to the capillary lines, the system must be vacuum-filled and calibrated per the instructions contained in section 4 and the appropriate equipment instruction manuals. 0236Q' | o Conman isolator dial readings versus previous reading o d/p transmitter valve lineup o Process equipment power supplies If repairs are required to the capillary lines, the system must be vacuum-filled and calibrated per the instructions contained in section 4 and the appropriate equipment instruction manuals. | ||
0236Q' | |||
Response The microprocessor based RVLIS performs internal diagnostic checks of *the non-volatile RAM, non-volatile PROM and other microprocessor nents. No operator interface is required for these internal checks which are performed in each cycle. A "deadman" circuit is provided to detect microprocessor This circuit will indicate a processor problem on the front panel of the unit and automatically reset the CPU to restart the microprocessor. | |||
The remote display unit of the RVLIS indicates the status of the input sensors. If any sensor is out of range or dis"abled a symbol will follow the affected level reading on the su1TTTiary display page. In addition, software programs are provided so that the front panel controls and display can be used to perform .a tional test, serial data link tests, calibration tests and deadman timer test. These tests are considered part of the operator maintenance cedures and should be performed monthly. 0236Q | Item 4 Describe the diagnostic techniques and criteria to be used to identify malfunctioning components. | ||
The provisions for this maintenance are included in the technical manual. Based on the assumption of normal conditions and proper maintenance of the components, the only limitation to the in-service life will be the availability of replacement parts. It is estimated that in 20 years, some of the components will be technically obsolete and nd longer produced. | ===Response=== | ||
Consequently, the cards may have to be modified in the future to accontnodate the current technology. | The microprocessor based RVLIS performs internal diagnostic checks of | ||
Thus, any individual component failures are regarded as maintenance considerations and their replacement is necessary to prolong in-service life. In-Service life which is different than Design Life and Qualified Life is dependent upon implementing a scheduled preventative maintenance program including periodic overhaul of the equipment. this manner, the equipment is restored to a level that continual operatibility is ensured. In developing the maintenance program, repair costs may necessitate replacement of the equipment. | *the non-volatile RAM, non-volatile PROM and other microprocessor compo-nents. | ||
No operator interface is required for these internal checks which are performed in each cycle. A "deadman" circuit is provided to detect microprocessor fail~re. This circuit will indicate a processor problem on the front panel of the unit and automatically reset the CPU to restart the microprocessor. The remote display unit of the RVLIS indicates the status of the input sensors. If any sensor is out of range or dis"abled a symbol will follow the affected level reading on the su1TTTiary display page. | |||
In addition, software programs are provided so that the front panel controls and display can be used to perform.a func-tional test, serial data link tests, calibration tests and deadman timer test. These tests are considered part of the operator maintenance pro-cedures and should be performed monthly. | |||
0236Q | |||
Item 5 Estimate the in-service life under conditions of normal plant operations and describe the methods used to make the estimate, and the data and sources used. | |||
===Response=== | |||
The in-service life of the RVLIS Microprocessor based electronics is | |||
;dependent upon proper maintenance, including the replacement of individual component parts when necessary. The provisions for this maintenance are included in the technical manual. | |||
Based on the assumption of normal conditions and proper maintenance of the components, the only limitation to the in-service life will be the availability of replacement parts. It is estimated that in 20 years, some of the components will be technically obsolete and nd longer produced. | |||
Consequently, the cards may have to be modified in the future to accontnodate the current technology. Thus, any individual component failures are regarded as maintenance considerations and their replacement is necessary to prolong in-service life. | |||
In-Service life which is different than Design Life and Qualified Life is dependent upon implementing a scheduled preventative maintenance program including periodic overhaul of the equipment. | |||
~n this manner, the equipment is restored to a level that continual operatibility is ensured. | |||
In developing the maintenance program, repair costs may necessitate replacement of the equipment. | |||
If the maintenance program is followed there is no apparent reason that operation of the equipment cannot be extended. | If the maintenance program is followed there is no apparent reason that operation of the equipment cannot be extended. | ||
Some of the equipment is similar to equipment installed in present Westinghouse plants that have been operating for 10-15 years. 0236Q | Some of the equipment is similar to equipment installed in present Westinghouse plants that have been operating for 10-15 years. | ||
0236Q | |||
for the Reactor Vessel Level Instrumentati0n System for Beaver Valley Unit No. 1: W Design Code W Valve ID filt Manufacturer Specification Applicability 3/4 T 78 4 Rockwell G-952855; Rev *o ASME B&PV Class 1/4 x 281 10 Autoclave Engineers G-955230; Rev 2 N & S 1/4 N 28!* 6 Autoclave Engineers G-955230; Rev 2 N & S | |||
* Shut off valve which is part of the transmitter access assembly. | i I | ||
The vave is a hermetically sealed valve, designed to be maintenance free with no consumable materials making a pressure boundary seal. The instrumentation valves (_!i Valve ID's 1/4 x 28! and 1/4 N28I) stainless steel, manually operated valves, designed to meet the requirements of the above referenced specification, which calls for zero leakage (environmentally and across the seats), minimal fluid displacement during stoke and a 1000 cycle life. For normal plant operating conditions, the metallic parts are designed for a 40 year service life. The consumable items, where *applicable, are identified in the appropriate drawings and instruction manuals, with recoITTTlended maintenance schedules. | I I | ||
0236Q II | I e | ||
, ' The following valves have | |||
*:~en supplied by Westingho! for the Reactor Vessel Level Instrumentati0n System for Beaver Valley Unit No. 1: | |||
W Design Code W Valve ID filt Manufacturer Specification Applicability 3/4 T 78 4 | |||
Rockwell G-952855; Rev *o ASME B&PV Class 1/4 x 281 10 Autoclave Engineers G-955230; Rev 2 N & S 1/4 N 28!* | |||
6 Autoclave Engineers G-955230; Rev 2 N & S | |||
* Shut off valve which is part of the transmitter access assembly. | |||
The 3/4 T78 valve is a stainless steel, manually operated globe valve | |||
*whose basic function is to isolate the flCJn' of fluid. The valve. is designed for a cycle life of 4000 cycles over the 40 year de.sign life, which satisfies the nonnal plant operating requirements established in above referenced specification. The vave is a hermetically sealed valve, designed to be maintenance free with no consumable materials making a pressure boundary seal. | |||
The instrumentation valves (_!i Valve ID's 1/4 x 28! and 1/4 N28I) stainless steel, manually operated valves, designed to meet the requirements of the above referenced specification, which calls for zero leakage (environmentally and across the seats), minimal fluid displacement during stoke and a 1000 cycle life. For normal plant operating conditions, the metallic parts are designed for a 40 year service life. The consumable items, where *applicable, are identified in the appropriate drawings and instruction manuals, with recoITTTlended maintenance schedules. | |||
0236Q II | |||
I I | |||
Item 6 Explain how the value of the system accuracy (given as +/- 6% was derived. | |||
How were the uncertainties from the individual components of the system combined? | |||
What were the random and systematic errors assumed for each component? | What were the random and systematic errors assumed for each component? | ||
What were the sources of these estimates? | What were the sources of these estimates? | ||
Response 6. The system accuracy of.!. 6% water level was a target value established during the conceptual design and was related to the dimensions of the reactor vessel (12% from nozzles to top of core) and core (30%), and the usefulness of the measurement during an accident. | |||
Subsequent analyses have established a system accuracy based on the uncertainties introduced by each component in the | ===Response=== | ||
Some of the individual vary with conditions such as system pressure. | : 6. The system accuracy of.!. 6% water level was a target value established during the conceptual design and was related to the dimensions of the reactor vessel (12% from nozzles to top of core) and core (30%), and the usefulness of the measurement during an accident. Subsequent analyses have established a system accuracy based on the uncertainties introduced by each component in the instrument system. | ||
The following table identifies the individual uncertainties for the narrow range measurement while at a system pressure of 1200 psia. Component and Uncertainty Definition | The individual uncertainties, resulting from random* effects, were combined statistically to obtain the overall instrument system accuracy. | ||
: a. Differential pressure transmitter calibration and drift allowance, (_: 1.5% of span) multiplied by the ratio of ambient to operating water density. b. Differential pressure transmitter allowance for change in calibration due to ambient temperature change 0236Q 0.5% of span for .:_ SOOF) multiplied by the density ratio. Uncertainty | Some of the individual unce~tainties vary with conditions such as system pressure. The following table identifies the individual uncertainties for the narrow range measurement while at a system pressure of 1200 psia. | ||
% Level + 2.1 + 0.7 | Component and Uncertainty Definition | ||
: a. | |||
(:_ 0.5% of span)* multiplied by density ratio. e. Reference leg temperature instrument (RTD) uncertainty of :_ soF and or allowance of + SOF for the difference between the measurement and the true average temperature of the reference leg, applied to each vertical section of the reference leg where a measurement is made. Stated uncertainty is based on a maximum containment temperature of 420°F, and a typical reference leg i nsta 11 ati on. f. Reactor coolant density based on tioneering for highest water density obtained from hot leg temperature 02360 (+ GOF) or system pressure (+ 60 psi). Magnitude of uncertainty varies with system pressure and water level, with largest uncertainty occurring when the reactor vessel is full. + 0.34 + 0.7 + 0.64 + 2.3 | Differential pressure transmitter calibration and drift allowance, | ||
(_: 1.5% of span) multiplied by the ratio of ambient to operating water density. | |||
: b. Differential pressure transmitter allowance for change in calibration due to ambient temperature change 0236Q | |||
The changes; such as pressure or temperature, tend to cancel, i.e., the bellows associated with each measurement move in the same direction. | {~ 0.5% of span for.:_ SOOF) multiplied by the density ratio. | ||
Maximum expected error due to differences in capillary line volume and local tures is equivalent to a level change of about 5 inches, multiplied by the density ratio. | Uncertainty | ||
3.6% at' 400 psia Uncertainty*=.:!:. | % Level | ||
4.2% at 2000 psia | + 2.1 | ||
+ 0.7 | |||
e | |||
: c. Differential pressure transmitter allowance for change in calibration due to change in system pressure | |||
(:_ 0.2% of span per 1000 psi change) multiplied by the density ratio. | |||
: d. _Differential pressure transmitter allowance for change in calibration due to exposure to long-tenn overrange | |||
(:_ 0.5% of span)* multiplied by th~ | |||
density ratio. | |||
: e. Reference leg temperature instrument (RTD) uncertainty of :_ soF and or allowance of + SOF for the difference between the measurement and the true average temperature of the reference leg, applied to each vertical section of the reference leg where a measurement is made. | |||
Stated uncertainty is based on a maximum containment temperature of 420°F, and a typical reference leg i nsta 11 ati on. | |||
: f. Reactor coolant density based on auc-tioneering for highest water density obtained from hot leg temperature 02360 | |||
(+ GOF) or system pressure (+ 60 psi). | |||
Magnitude of uncertainty varies with system pressure and water level, with largest uncertainty occurring when the reactor vessel is full. | |||
+ 0.34 | |||
+ 0.7 | |||
+ 0.64 | |||
+ 2.3 | |||
I' e | |||
: g. | |||
Sensor and hydraulic isolator bellows displacements due to system pressure changes or reference leg temperature changes will introduce minor errors in the level measurement due to the small volumes and small bellows spring constants. The changes; such as pressure or temperature, tend to cancel, i.e., the bellows associated with each measurement move in the same direction. | |||
Maximum expected error due to differences in capillary line volume and local tempera-tures is equivalent to a level change of about 5 inches, multiplied by the density ratio. | |||
: h. | |||
Density function generator output mis-match with ASME Steam Tables limited to a maximum of: | |||
: i. Electronics system calibration, overall uncertainty limited to less than: | |||
: j. Control board indicator resolution; microprocessor digital readout to nearest percent of level span. | |||
+ 1.46 | |||
+ 0.50 | |||
+ 1.0 | |||
+ 0.5 The statistical combination of (square root of the sum of the squares).of the individual uncertainties described above results in an overall system instrumentation uncertainty of+ 3.9% of the level span. | |||
For the narrow range indication of approximately 40 feet, or | |||
+ 1.5 feet, at a system pressure of 1200 psia. Examples of the uncertainty at other system pressures are: | |||
0236Q Uncertainty=.:!:. 3.6% at' 400 psia Uncertainty*=.:!:. 4.2% at 2000 psia | |||
Item 7 Assume a range of sizes for "small break" LOCA's. | |||
What are the relative times available for each size break for the operator to initiate action to recover the plant from the accident and prevent damage to the core? | |||
What is the dividing line between a "small break" and a "large break"? | |||
===Response=== | |||
: 7. Inadequate core coolant {ICC) was defined in WCAP-9754, "Indequate Core Cooling Studies of Scenario With Feedwater Available Using the NOTRUMP Computer Code", as a high temperature condition in the core such that the operator is required to take action to cool the core before significant damage occurs. During the design basis small loss of coolant accident, the operator is not required to take any action to recover the pl ant other than to verify the operable status of the safeguards equipment, trip the reactor coolant pump (RCPs) when the primary side pressure has decreased to a specific point, and initiate cold and hot leg recirculation procedures as required. | |||
In the design basis small LOCA, a period of cladding heatup may occur prior to automatic core recovery by the safeguards equipment. | In the design basis small LOCA, a period of cladding heatup may occur prior to automatic core recovery by the safeguards equipment. | ||
The heat up period is dependent upon the break size and -ECCS mance. An ICC condition may arise if there is a failure of the safeguards equipment beyond the design basis. In that case, adequate mentation exists in the Beaver Valley plant to diagnose the onset of ICC and to determine the effectiveness of the mitigation actions taken. The instrumentation which may be used to determine the quacy of core cooling consists of a subcooling meter, Core Exit Thermocouples (T/Cs), and the Reactor Vessel Level Instrumentation System (RVLI S). For a LOCA of an equivalent size equal to approximately six inches or less, an ICC condition can only occur if two or more failures occur in the ECCS. As indicated in WCAP-9754, an ICC condition can be calculated by hypothesizing the failure of all high head safety 0236Q. | The heat up period is dependent upon the break size and -ECCS perfor-mance. | ||
An ICC condition may arise if there is a failure of the safeguards equipment beyond the design basis. In that case, adequate instru-mentation exists in the Beaver Valley plant to diagnose the onset of ICC and to determine the effectiveness of the mitigation actions taken. | |||
The first i ndi ca ti on of a possible ICC situation is the indication that some of the ECCS pumps | The instrumentation which may be used to determine the ade-quacy of core cooling consists of a subcooling meter, Core Exit Thermocouples (T/Cs), and the Reactor Vessel Level Instrumentation System (RVLI S). | ||
For a LOCA of an equivalent size equal to approximately six inches or less, an ICC condition can only occur if two or more failures occur in the ECCS. | |||
As indicated in WCAP-9754, an ICC condition can be calculated by hypothesizing the failure of all high head safety 0236Q. | |||
injection (HPSI) ! LOCAs of approximately one i! in size. For a 4 inch equivalent size LOCA one can hypothesize an ICC condition by assuming the failure of all HPSI as well as the failure of the passive accumulator system (a truly incredible sequence of events). | |||
For LOCAs of sizes of six inches or less, the approach to ICC is unambiguous to the reactor operators. The first i ndi ca ti on of a possible ICC situation is the indication that some of the ECCS pumps have failed to start or are not delivering flow. | |||
The second indica-tion of a possible ICC situation is the occurrence of a saturation condition in the primary coolant system as indicated on the subcool-ing monitor. | |||
Shortly after the second indication, the RVLIS would start to indicate the presence of steam voids in the vessel. | |||
At some point in time the RVLIS will indicate a collapsed liquid level below the top of the core. The core exit thermocouples will begin to indicate superheated steam conditions. | |||
If appropriate the RVLIS and core exit T/C behavior will provide unambiguous indications to operator to follow the ICC mitigation procedure. | If appropriate the RVLIS and core exit T/C behavior will provide unambiguous indications to operator to follow the ICC mitigation procedure. | ||
WCAP-9754 indicates that the selected core exit T/Cs will read 1200°F at approximately 11000 seconds after the initiation of a 1-inch_LOCA with the loss of all HPSI. The Generic Westinghouse EOP Guideline instruct operator to pursue ICC mitigation procedures.when these conditions are reached. The 4-inch LOCA will indicate 1200°F at about 1350 seconds.. | WCAP-9754 indicates that the selected core exit T/Cs will read 1200°F at approximately 11000 seconds after the initiation of a 1-inch_LOCA with the loss of all HPSI. | ||
By following the Westinghouse recorrrnended Emergency Operating Procedures (EOPs), the operators will have earlier indication of a possible ICC situation. | The Generic Westinghouse EOP Guideline instruct operator to pursue ICC mitigation procedures.when these conditions are reached. The 4-inch LOCA will indicate 1200°F at about 1350 seconds.. | ||
Recovery procedures to depressurize the primary below the core pressure safety injection shutoff head may be followed. | By following the Westinghouse recorrrnended Emergency Operating Procedures (EOPs), the operators will have earlier indication of a possible ICC situation. Recovery procedures to depressurize the primary below the core pressure safety injection shutoff head may be followed. | ||
These procedures include correction of the HPSI failure, opening steam dump, or ing pressurizer PORVs. The RCPs may be restarted to provide tional steam cooling flow. Large break LOCAs consist of LOCAs in which the fluid behavior is inertially dominated. | These procedures include correction of the HPSI failure, opening steam dump, or open-ing pressurizer PORVs. | ||
Small break LOCAs, on the other hand, have 0236Q | The RCPs may be restarted to provide addi-tional steam cooling flow. | ||
Large break LOCAs consist of LOCAs in which the fluid behavior is inertially dominated. | |||
No early manual action is useful in recovering from ICC. Analyses for LOCAs in this range indicate ambiguous behavior of the core exit T/Cs and RVLIS early in the accident due to dynamic blowdown effects. This behavior is temporary and the core exit T/Cs and the RVLIS will indicate the progress being made by the ECCS in ing the core. When the core e_xit T /Cs and RVLI S may be temporarily providing ambiguous indications, no manual action is needed or ful. Later in the accident when manual action may be useful, the core exit T/Cs and RVLIS will provide an unambiguous indication of ICC if it exists. This unambiguous indication may be present as early as 30 seconds after the initiation of the LOCA for a double ended guillotine rupture or a main coolant pipe. It follows from the above discussion that, for ICC considerations, a reasonable definition of large breaks are breaks that are cantly larger than an equivalent 6 inch break. All other breaks are sma 11 breaks. 0236Q ----- | Small break LOCAs, on the other hand, have 0236Q | ||
- | |||
I I Item 8 Describe how the system response time was estimated. | th f 1. d b h | ||
Explain how the response times of the _various components ( differential pressure ducers, connecting lines and isolators) affect the response time. Response 8. The microprocessor reads all the inputs every five seconds and updates the digital display and analog outputs within four seconds after the inputs are read. Thus, a worst case time from anal'og input change to display and analog output change is 9 seconds. Any analog delays due to the front end electronics, sensor electronics, sensor mechanics, impulse lines, hydraulic isolators, etc., have five seconds to .settle out. Thus, analog delays only add to the 9 | . -do., d 1 f - | ||
*Of the microprocessor system has a time constant less than 0.5 seconds, and the total analog due to the sensor electronics, mechanics, impulse lines and hydraulic lators are less than 3 seconds. Therefore, the worst case response time is 9 seconds for the system. 0236Q | CA e | ||
u1 e av1or m1nate by gravitat1ona e fects. | |||
For LO s | |||
Response q_ Blockage in the core will increase the frictional pressure drop and increase the total differential pressure across the vessel. This will be reflected as a higher RVLIS indication. | which are significantly larger than an equivalent 6-inch break, the ECCS has the maximum potential for flow delivery since the primary coolant system is at low pressure. | ||
The increase in | No early manual action is useful in recovering from ICC. | ||
In order for blockage to be the core would have to have been uncovered for a prolonged period of time. A low RVLIS indication along with a high core exit thermocouple indication would have been indicated during this time. If the RCP's had been operating throughout the transient, there would have been sufficient coolinq to prevent significant core damage. Therefore, for significant blockage to exist during pump operation, the operator would have restarted the pumps after an ICC condition had existed for a period of time. Based on the history of the transient, the operator WJuld know that the RVLIS would read higher than expected. | Analyses for LOCAs in this range indicate ambiguous behavior of the core exit T/Cs and RVLIS early in the accident due to dynamic blowdown effects. This behavior is temporary and the core exit T/Cs and the RVLIS will indicate the progress being made by the ECCS in recover-ing the core. | ||
When the core e_xit T /Cs and RVLI S may be temporarily providing ambiguous indications, no manual action is needed or use-ful. Later in the accident when manual action may be useful, the core exit T/Cs and RVLIS will provide an unambiguous indication of ICC if it exists. This unambiguous indication may be present as early as 30 seconds after the initiation of the LOCA for a double ended guillotine rupture or a main coolant pipe. | |||
It follows from the above discussion that, for ICC considerations, a reasonable definition of large breaks are breaks that are signifi-cantly larger than an equivalent 6 inch break. All other breaks are sma 11 breaks. | |||
0236Q | |||
~-~~-* | |||
**~ ----- | |||
*--------~----* - | |||
---~ | |||
I I | |||
Item 8 Describe how the system response time was estimated. Explain how the response times of the _various components ( differential pressure trans-ducers, connecting lines and isolators) affect the response time. | |||
===Response=== | |||
: 8. The microprocessor reads all the inputs every five seconds and updates the digital display and analog outputs within four seconds after the inputs are read. Thus, a worst case time from anal'og input change to display and analog output change is 9 seconds. | |||
Any analog delays due to the front end electronics, sensor electronics, sensor mechanics, impulse lines, hydraulic isolators, etc., have five seconds to.settle out. Thus, analog delays only add to the 9 second worst case response time if they are longer than 5 seconds. | |||
The front end electronics *Of the microprocessor system has a time constant less than 0.5 seconds, and the total analog del~ys due to the sensor electronics, mechanics, impulse lines and hydraulic iso-lators are less than 3 seconds. Therefore, the worst case response time is 9 seconds for the system. | |||
0236Q | |||
I I tern 9 There are indicat.ions that the TMI-2 core may be up to 95% blocked. | |||
Estimate the effect of partial blockage in the core on the differential oressure measurements for a range of values from 0 to 95% blockage. | |||
===Response=== | |||
q_ | |||
Blockage in the core will increase the frictional pressure drop and increase the total differential pressure across the vessel. This will be reflected as a higher RVLIS indication. | |||
The increase in the RVLIS will be most significant under forced flow conditions when the reactor coolant pumps are operating. | |||
In order for blockage to be pres~nt, the core would have to have been uncovered for a prolonged period of time. | |||
A low RVLIS indication along with a high core exit thermocouple indication would have been indicated during this time. | |||
If the RCP's had been operating throughout the transient, there would have been sufficient coolinq to prevent significant core damage. | |||
Therefore, for significant blockage to exist during pump operation, the operator would have restarted the pumps after an ICC condition had existed for a period of time. | |||
Based on the history of the transient, the operator WJuld know that the RVLIS would read higher than expected. | |||
Althouqh the RVLIS would read high, it would still follow the trend in vessel inventory. | Althouqh the RVLIS would read high, it would still follow the trend in vessel inventory. | ||
The operator would be able to monitor the recovery with the RVLIS. Under natural circulation conditions, the impact of core blockage is not expected to be large. Although the RVLIS indication will read slightly higher than normal, the RVLIS will still trend with the vessel inventory and provide useful information for monitoring the recovery from ICC. ICC will have been indicated at an earlier time; before a significant amount of core blockage has occurred. | The operator would be able to monitor the recovery with the RVLIS. | ||
The operator will know that the RVLIS could read slightly high, based on the history of the transient. | Under natural circulation conditions, the impact of core blockage is not expected to be large. Although the RVLIS indication will read slightly higher than normal, the RVLIS will still trend with the vessel inventory and provide useful information for monitoring the recovery from ICC. | ||
ICC will have been indicated at an earlier time; before a significant amount of core blockage has occurred. | |||
The operator will know that the RVLIS could read slightly high, based on the history of the transient. | |||
Large reverse flow rates may occur early in the blowdown transient for large diameter breaks but, as is discussed in the response to Item 7, it is not necessary to use the RVLIS as a basis for operator action for breaks in this range. | |||
I l | |||
Based upon th is experience and test data we expect .to prove stati tica lly that reliable measurements can be made by the selected ranged instrument designs used for RVLIS. On line calibration bility is provided if needed to support gathering of. statistical data. 02360 | I' Item 10 Describe the effects of reverse flows within the reactor vessel on the indicated l eve 1. | ||
Resoonse | |||
: 10. Reverse flows in the vessel will tend to decrease the DP across the vessel which would cause the RVLIS to indicate a lower collapsed level than actually exists. The low indication would not cause the operator to take unnecessary actions, since the RVLIS would be used along with the core exit thermocouples to indicate the approach to I CC. | |||
It is imoortant to note that 1 arge reverse flows are not expected to occur for breaks smaller than 611 in diameter during the time that the core is uncovered. | |||
Discuss the nature.of the ambiguities for 1. accumulator | Large reverse flow rates may occur early in the blowdown transient for large diameter breaks but, as is discussed in the response to Item 7, it is not necessary to use the RVLIS as a basis for operator action for breaks in this range. | ||
Resoonse l 2. 1.. When the downcomer is highly voirled and the accumlators inject, the cold accumulator water condenses some of the steam in the downcomer which causes a local depressurization. | 0~3nQ | ||
The local depressurization will lower the pressure at the bottom of the vessel which will lower the DP across the vessel, causing an apparent decrease in level indication. | |||
The lower pressure in the downcomer also causes the mixture in the core to flow to the lower plenum, causing an actual decrease in level. The period of time when the RVLIS indication is lower than the actual collapsed liquid level will be brief. An example of when this phenomenon may occur is when the reactor coolant pumps are running for a long period of time in a small break transient. | Item 11 What is the experience, if any, of ma i nta *: ni ng O/p ce 11 s at 300% over-range for long periods of time? | ||
After the RCS loops have drained and the pumps are circulating mostly steam, the level in the downcomer will be depressed. | |||
A large volume of steam will be present in the downcomer, above the low mixture level, which allows a large amount of condensation to occur. For most small break transients, the reactor coolant pumps will be tripped early in the transient and the downcomer mixture level will remain high, even in cases where ICC occurs. When the downcomer level is high the effect of accumulator injection on the RVLIS indication w i 11 be mi nor. | ===Response=== | ||
I | : 11. Experience in overranging of D/p Instruments has been obtained in previous applications of D/p capsules similar to those used in RVLIS. | ||
In Dual Range Flow (D/p) Applications the "Low Flow" trans-mitter (and/or gages) are overranged to 300% or greater by nonTial flow rates yet provide reliable metering when required for startup. | |||
While the upper. head; is behaving like a pres.surizer, the vessel differential pressure is reduced and the RVLIS indicates a lower than actual collapsed liquid level. This phenomenon is djscussed in the summary report on the RVLIS* relative to the three inch cold leg break. Since that ti,me, the upper head modeling has been investigated in more detail. It was found that the modeling used at that time assumed a flow resistance that was too high for the guide tubes. Subsequent analyses have shown that the pressurizer effect has less impact on the vessel dp than was originally shown. There is very little impact on the results after the level drains below the top of the guide tubes. The pressurizer effect is still believed to exist and it becomes more significant as break size increases. | Also, test data exists on the basic transmitter design showing about 0.5% effect on calibration with 24 hours exposure to 3000 psig over-range. | ||
The interval of time when the upper head behaves li'<e a pressurizer is brief and the RVLIS will *resume trending | All units are similarly exposed to this overrange for 5 min-utes in both directions as a part of factory testing. | ||
* with the vessel level after the top of the guide tubes uncover. The reduced RVLIS indication will not cause the operator to take any unnecessary action, even if a level below the top of the core is indicated since the core exit thermocouples are used as a corroborative indication of the approach to ICC. Westinghouse Electric Corporation, "Westinghouse Reactor Vessel Level Instrumentation System for Monitoring Inadequate Core r.oo ling, 11 December 1980. 0?.3110 . -*-:--**--*H*--;- | There have been instances involving accidental overrange of these instruments (including RVLIS) as the result of leakage or operator errors where full line pressure overranges have occurred for up to several weeks with minimal effect on instrument accuracy. | ||
------' **-----* .... 0 | Based upon th is experience and test data we expect.to prove stati s-tica lly that reliable measurements can be made by the selected over-ranged instrument designs used for RVLIS. | ||
On line calibration capa-bility is provided if needed to support gathering of. statistical data. | |||
The RVLIS may not accurately trend with vessel level during the initial start of UPI. During this short period of time, the cold water being injected will mix with the steam in the plenum causing condensation. | 02360 | ||
This condensation will occur faster than the system response. | |||
The system will equilibrate after a short period of time. Upon equilibrating, the system will continue to accurately trend with the vessel level. In the range of break sizes where RVLIS is most useful in detecting the approach to ICC, the system pressure will equilibrate at a level above the pressure where UPI will nonrta11y occur. It is important to note that the flow from the low head pumps is sufficient to recover the core and no operator action based on the RVLIS indication will be necessary. | I I | ||
For the vast majority of small breaks, the condition of upper plenum injection does not cause a significant impact. For the remainder, the impact is very small and within tolerable limits. 4. During the time when the distribution of voids in the is chanqing rapidly, there be a large change in the two-phase mixture level with very little change in collapsed mixture level. The use of the RVLIS, in conjunction with the core exit thennocouples, is still valid for this situation, however. The only event that has been identified which could cause a large void redistribuition is when the reactor coolant pumps are tripped when the vessel mixture is .highly voided. After the pump perfonnance has degraded enouqh that the flow pressure drop 023110 | I Item 12 Five conditions were identified which could cause t~e DP level system to give ambiguous indications. Discuss the nature.of the ambiguities for | ||
: 1. accumulator in.i~ction into a highly voided downcomer, 2. when the upper head behaves like a pressurizer, 3. upper plenum injection, and | |||
: 4. periods of void redistribution. | |||
Resoonse l 2. 1.. | |||
When the downcomer is highly voirled and the accumlators inject, the cold accumulator water condenses some of the steam in the downcomer which causes a local depressurization. The local depressurization will lower the pressure at the bottom of the vessel which will lower the DP across the vessel, causing an apparent decrease in level indication. The lower pressure in the downcomer also causes the mixture in the core to flow to the lower plenum, causing an actual decrease in level. The period of time when the RVLIS indication is lower than the actual collapsed liquid level will be brief. | |||
An example of when this phenomenon may occur is when the reactor coolant pumps are running for a long period of time in a small break transient. After the RCS loops have drained and the pumps are circulating mostly steam, the level in the downcomer will be depressed. | |||
A large volume of steam will be present in the downcomer, above the low mixture level, which allows a large amount of condensation to occur. | |||
For most small break transients, the reactor coolant pumps will be tripped early in the transient and the downcomer mixture level will remain high, even in cases where ICC occurs. | |||
When the downcomer level is high the effect of accumulator injection on the RVLIS indication w i 11 be mi nor. | |||
I | |||
: 2. | |||
When the uoper.ead begins to drain, the pres9e in the upper head decreases at a slower rate than the pressure in the rest of the ~CS. This is due to the upper head region behaving much like the pressurizer~- | |||
The higher resistance across the upper suoport plate relative to the rest of the RCS prevents the upper head from draining qµic~ly. This situation only exists until the mixture level in'the upper head falls below the top of the guide tubes. | |||
At thik time, steam is allowed to flow from the upper plenum to the upper head and the pressure equilibrates. | |||
While the upper. head; is behaving like a pres.surizer, the vessel differential pressure is reduced and the RVLIS indicates a lower than actual collapsed liquid level. | |||
This phenomenon is djscussed in the summary report on the RVLIS* | |||
relative to the three inch cold leg break. | |||
Since that ti,me, the upper head modeling has been investigated in more detail. It was found that the modeling used at that time assumed a flow resistance that was too high for the guide tubes. | |||
Subsequent analyses have shown that the pressurizer effect has less impact on the vessel dp than was originally shown. | |||
There is very little impact on the results after the level drains below the top of the guide tubes. | |||
The pressurizer effect is still believed to exist and it becomes more significant as break size increases. The interval of time when the upper head behaves li'<e a pressurizer is brief and the RVLIS will *resume trending | |||
* with the vessel level after the top of the guide tubes uncover. | |||
The reduced RVLIS indication will not cause the operator to take any unnecessary action, even if a level below the top of the core is indicated since the core exit thermocouples are used as a corroborative indication of the approach to ICC. | |||
Westinghouse Electric Corporation, "Westinghouse Reactor Vessel Level Instrumentation System for Monitoring Inadequate Core r.oo ling, 11 December 1980. | |||
0?.3110 | |||
. - *-:--**--*H*--;- ---- - - ' **--- --*.... 0 | |||
: 3. The normal con.ion for continuous upper ple. injection (UPI) occurs only with the operation' of the low head safety injection pumps, which does not occur until a pressure of under 200 psi is realized. The RVLIS may not accurately trend with vessel level during the initial start of UPI. | |||
During this short period of time, the cold water being injected will mix with the steam in the up~er plenum causing condensation. This condensation will occur faster than the system response. The system will equilibrate after a short period of time. | |||
Upon equilibrating, the system will continue to accurately trend with the vessel level. | |||
In the range of break sizes where RVLIS is most useful in detecting the approach to ICC, the system pressure will equilibrate at a level above the pressure where UPI will nonrta11y occur. It is important to note that the flow from the low head pumps is sufficient to recover the core and no operator action based on the RVLIS indication will be necessary. | |||
For the vast majority of small breaks, the condition of upper plenum injection does not cause a significant impact. | |||
For the remainder, the impact is very small and within tolerable limits. | |||
: 4. | |||
During the time when the distribution of voids in the ves~el is chanqing rapidly, there ~an be a large change in the two-phase mixture level with very little change in collapsed mixture level. The use of the RVLIS, in conjunction with the core exit thennocouples, is still valid for this situation, however. | |||
The only event that has been identified which could cause a large void redistribuition is when the reactor coolant pumps are tripped when the vessel mixture is.highly voided. | |||
After the pump perfonnance has degraded enouqh that the flow pressure drop 023110 | |||
023~n contribution t,the vessel differential pressil is small, the change in RVLIS indication will be small when the pumps are tripped. | |||
As discussed in the su111nary report, the approach to ICC would be indicated when the wide range indication read 33 percent. If the pumps were tripped at this time, the core would still be covered. | |||
The operator would know that the core may uncover. if the pumps were tripped with a wide range indication lower than 33 percent. Prior to pump trip, the core will remain adequately cooled due to forced circulation of the mixture. | |||
When the pumps trip the two phase level may equillibrate at a level below the top of the_ core. The narrow range indication will provide an indication of core coolability at this time. | |||
Item 20 Describe the behavior of the level measurement system when the upper head is full, but the lower vessel is not. | |||
===Response=== | |||
: 20. During the course of a LOCA transient, the upper plenum will experience voiding before the upper head. | |||
The voids in the upper plenum will be indicated by a lower RVLIS reading. The RVLIS will not indicate where the voiding is occurring, but at this point in the transient, it is not necessary to know where the region of voiding is. In the early part of the transient when the mixture level is above the top of the guide tube in the upper head, it is sufficient for the operator to knO'f{ that the vessel inventory is decreaging, irrespective of the region where voiding is occurring. | |||
As discussed in the response to Item 21, the fluid in the upper head does not affect the RVLIS indication after the upper head has drained to below the top of the guide tubes. As discussed in the response to Item 19, the uipper head will drain before the onset of ICC and there will not be an ambiguous indication during the period of time when RVLIS will be used. | |||
0236Q | |||
Item 13 No recorrrnendations are made as to the uncertainties of the pressure or temperature transducers to be used, but the choice appears to be left to the owner or AE. | |||
What is the upper limit of uncertainties that should be allowed? | |||
Describe the effect of these uncertainties on the measure-ment of level. What would be the effect on the level measurement should these uncertainties be exceeded? | |||
. Response | |||
*13. The reactor coolant pressure and temperature signals originate from the existing wide range pressure and hot leg RTD's already installed in the plant, and the uncertainties for these instruments are understood. | |||
As indicated in the response to question 6, the pressure uncertainty is +/-. 60 psi and the temperature uncertainty is | |||
_:: 60F, resulting in a maximum level uncertainty contribution of | |||
+ 2.3~ when the vessel is full. This uncertainty is smaller when the level is at the elevation of the reactor core. This contribution to the total uncertainty would increase roughly in proportion to an increase in the pressure or temperature measurement uncertainty. | |||
02360 | |||
I' Item 14 Only single RTD sensors on each vertical run are indicated to determine the temperatures of the impulse lines. Where are they to be located? | |||
What are the expected temperature gradients along each line under normal operating conditions and under a design basis accident? What is the worst case error that could result from only determining the temperature at a single point on each line? | |||
===Response=== | |||
: 14. RTD sensors are installed on every independently run vertical sec-tion of impulse line, to provide a measurement for density compensa-tion of the reference leg. If the vertical section of impulse line runs through two compartments separated by a solid floor, an RTD | |||
~ | |||
sensor 1s installed in each compartment. | |||
The RTD is installed at the midpoint of each vertical section, based on the assumption that the temperature in the compartment is uniform or that the temperature distribution is linear in the vicinity of the impulse line. | |||
As stated in the _response to question 6, an allowance for the true average impulse line temperature to differ from the RTD measurement by SOF is included in the measurement uncertainty analysis. This allowance permits a significant devia-tion from a linear gradient, *e.g., 20% of the impulse line could be up to. 250F different from a linear gradient without exceeding the allowance. | |||
During normal operation, forced circulation from cooling fans is expected to maintain compartment temperatures reasonably uniform. | |||
During the LOCA, turbulence within a compartment due to release of steam \\liQuld also produce a reasonably uniform tempera-ture. Note that the impulse lines are protected from direct jet impingement by metal instrument tubing channels. | |||
0236Q | |||
* J Item 15 What is the source of the tables or relationships used to calculate density corrections for the level system? | |||
===Response=== | |||
The relationships used in the microprocessor based RVLIS system to cal- | |||
.c.ul ate density corrections are used on the ASME Steam Tables dated 1967 * | |||
. 'These relationships are implemented in the system using two fourth order polynomials, end to end, fit :to approximate the tables above. | |||
02360 | |||
~. | |||
Item 16 The microprocessor system is stated to display the statui of the sensor input. Describe how is this indicated and what this actually means with respect to the status of the sensor itself and the reliability of the indication. | |||
===Response=== | |||
The remote display unit of RVLIS indicates the status of the input sensors. If any sensors are out qf range~ regardless of the reason, a symbol allows the affected level reading on the summary display page. | |||
The particular sensor that is out of range is identified at the bottom of the surmlary display page. | |||
Due to the redundant sensors and trains it is possible for the operator to disable some of the sensors without affecting the system reliability. The display indicates which level readings are affected. The disabled sensors are also displayed at the | |||
*bottom of the summary page. | |||
A separate sensor status page can be dis-played showing all sensors which are disabled or out of range and their affected level readings. | |||
0236Q | |||
Item 17 Describe the prov;s1ons for preventing the draining of either the upper head or hot leg impulse lines during an accident. | |||
What would be the resultant errors in the level indications should such draining occur? | |||
===Response=== | |||
: 17. The layout of the impulse lines from the upper head and hot leg are arranged to prevent or minimize the impact of drainage during an accident. In general, however, the water in the impulse lines will be cooler than the water in the reactor or hot leg, and there will be sufficient subcooling overpressure in the lines so that very little, if any, of the water would flash to steam during a depres-surization or containment heatup. Heat conduction along the small diameter piping and tubing would be insufficient to result in flash-ing in a significant length of piping. | |||
The connection to the upper head from a spare control rod drive mechanism port or vessel vent line drops or slopes down from the highest point of the vessel connection to the sensor bellows mounted on the refueling canal wall, so water would be retained *in this piping. Draining of the vertical section i1TTTiediately above the reactor vessel has no effect on the level measuremept, since thi.s section is included in the operating range of the instrument. | |||
In general, however, the water in the impulse lines will be cooler than the water in the reactor or hot leg, and there will be sufficient subcooling overpressure in the lines so that very little, if any, of the water would flash to steam during a surization or containment heatup. Heat conduction along the small diameter piping and tubing would be insufficient to result in ing in a significant length of piping. The connection to the upper head from a spare control rod drive mechanism port or vessel vent line drops or slopes down from the highest point of the vessel connection to the sensor bellows mounted on the refueling canal wall, so water would be retained *in this piping. Draining of the vertical section i1TTTiediately above the reactor vessel has no effect on the level measuremept, since thi.s section is included in the operating range of the instrument. | |||
Draining of the horizontal portion of vessel vent piping above the vessel also has no effect on the measurement since no elevation head is involved. | Draining of the horizontal portion of vessel vent piping above the vessel also has no effect on the measurement since no elevation head is involved. | ||
The connection from the hot leg to the sensor bellows is a tal run of tubing, so draining of this tubing has no effect on the measurement since no elevation head is involved. | The connection from the hot leg to the sensor bellows is a horizon-tal run of tubing, so draining of this tubing has no effect on the measurement since no elevation head is involved. | ||
The majority of the impulse line length is in capillary tubing sealed .at both ends with a bellows (sensor bellows at the reactor end, hydraulic isolator at the containment penetration end); so 0236Q . --------.. -*.** -. -*--___ , __ ---- | The majority of the impulse line length is in capillary tubing sealed.at both ends with a bellows (sensor bellows at the reactor end, hydraulic isolator at the containment penetration end); so 0236Q. -- --- -- -.. -*.** -. -*- -___, __ ~ - -- - | ||
I I water would be retained in this at all times. The water will be pressurized by reactor pressure, and since the reactor ture will be higher thar1 containment temperature during an accident, the water in the sealed capillary lines cannot flash. 0236Q | ~ | ||
) | |||
Since there is no mechanism for concentration of gases at the top of the reactor vessel during normal operation, the connection to the top of the vessel would contain, at most, the normal quantity of dissolved gases in the coolant, and the ing pressure during an accident would maintain this quantity of gas in so 1 ut ion. 0236Q | |||
I I | |||
0236Q In the Beaver Valley plant, the core exit T/Cs protrude slightly from the bottom of the support columns ,In this location, they measure the temperature of the fluid leaving the core region through the flCPfl passages in the upper core plate. Flow from the upper head must* enter the upper plenum via the guide tube before being able to enter the upper core plate flCPfl passages. | water would be retained in this s~stem at all times. The water will be pressurized by reactor pressure, and since the reactor tempera-ture will be higher thar1 containment temperature during an accident, the water in the sealed capillary lines cannot flash. | ||
In addition, the LOCA blowdown depressurization behavior must_ be such that there is a flCPfl reversal for the core exit T/Cs to detect the upper head fluid temperature. | 0236Q | ||
The upper head fluid is expected to mix with the upper plenum fluid as it drains from the upper head. The potential for core exit T/C cooling from colder upper head fluid, while the core has an appreciable void fraction is not viewed as a potential problem for the detection of an inadequate core ing situation. | |||
Although some Semi-scale tests indicated core ing while the upper head was liquid solid that does not imply that the core exit T/Cs would give an ambigious indication of ICC. Calculations for a Westinghouse PWR and consideration of the core exit T/C design would not result in ambigious ICC indications. | Item 18 Discuss the effect on the level measurement of the release of dissolved, noncondensible gases in the impulse lines in the event of a depressuri-zation. | ||
0236Q I I Item 21 One discussion of the system that water in the upper head is not reflected in the plot. Does this mean that there is no water in the upper head or that the system is indifferent to water in the upper head under these conditions? | |||
Response 21. The discussion in the system description is contained in the section describing the analysis of the system performance. | ===Response=== | ||
The statement in question is referring to the WFLASH code calculation of mixture level, rather than how the RVLIS will respond to water in the upper head. The computer code includes calculation of water mass and pressure in the upper head, but this water mass is not included in | : 18. The majority of the impulse lines are sealed capillary tubes vacuum filled with demineralized, deaerated water. The* lines contain no noncondensible gases and are not in a radiation environment suffi-cient for the disassociation of water. | ||
The short runs of impulse line connected directly to the primary system will behave as described in the response to question 17. | |||
There would be ro error due to gases in the hot leg line since the line is horizontal. Since there is no mechanism for concentration of gases at the top of the reactor vessel during normal operation, the connection to the top of the vessel would contain, at most, the normal quantity of dissolved gases in the coolant, and the subcool-ing pressure during an accident would maintain this quantity of gas in so 1 ut ion. | |||
0236Q | |||
Io Item 19 In some tests at Semi-scale, voiding was observ~d in the core while the upper head was still filled with water. Discuss the possibility of cooling the core-exit thermocouples by water draining down out of the upper head during or after core voiding with a solid upper head. | |||
===Response=== | |||
: 19. One of the indicators of an approach to an Inadequate Core Cooling (ICC) situation is the response of the core exit thermocouples (T/Cs) to the presence of super-heated steam. | |||
The core exit thermo-couples will not provide an indication of the amount of core void-ing. Response of the core exit T/Cs provides a direct indication of the existence of ICC, the effectiveness of ICC recovery actions, and restoration of adequate core cooling. | |||
The core is adequately cooled whenev~r the vessel mixture level is above the top of the core and the core may have a significant void fraction and still be ade-quately cooled. | |||
Realistically, an indication of an ICC condition would not.occur until the primary coolant system has drained sufficiently for the reactor vessel mixture level to fall below the top of the core. - | |||
Westinghouse has perf onned analyses which indicate that the upper head will drain below the top of the guide tubes before ICC condi-tions. exist. The guide tubes are the only flow path from the upper head to the upper plenum. | |||
In WCAP-9754, "Inadequate Core Cooling Studies of Scenarios With Feedwater Available, Using the NOTRUMP Computer Code", it was found that inadequate core cooling situations woul not result for LOCAs of an equivalent size or equal to approxi-mately 6 inches or less without two or more failures in the ECCS. | |||
In both specific scenarios examined in WCAP-9759, a 1-inch and 4-inch small LOCA, the upper head and upper plenum had completely drained before the onset of an ICC condition. | |||
0236Q | |||
In the Beaver Valley plant, the core exit T/Cs protrude slightly from the bottom of the support columns | |||
,In this location, they measure the temperature of the fluid leaving the core region through the flCPfl passages in the upper core plate. Flow from the upper head must* enter the upper plenum via the guide tube before being able to enter the upper core plate flCPfl passages. | |||
In addition, the LOCA blowdown depressurization behavior must_ be such that there is a flCPfl reversal for the core exit T/Cs to detect the upper head fluid temperature. The upper head fluid is expected to mix with the upper plenum fluid as it drains from the upper head. | |||
The potential for core exit T/C cooling from colder upper head fluid, while the core has an appreciable void fraction is not viewed as a potential problem for the detection of an inadequate core cool-ing situation. Although some Semi-scale tests indicated core void-ing while the upper head was liquid solid that does not imply that the core exit T/Cs would give an ambigious indication of ICC. | |||
Calculations for a Westinghouse PWR and consideration of the core exit T/C design would not result in ambigious ICC indications. | |||
0236Q | |||
I I | |||
Item 21 One discussion of the micropr9~esor system sta~s that water in the upper head is not reflected in the plot. Does this mean that there is no water in the upper head or that the system is indifferent to water in the upper head under these conditions? | |||
===Response=== | |||
: 21. The discussion in the system description is contained in the section describing the analysis of the system performance. The statement in question is referring to the WFLASH code calculation of mixture level, rather than how the RVLIS will respond to water in the upper head. | |||
The computer code includes calculation of water mass and pressure in the upper head, but this water mass is not included in the calculation of mixture level; hence, the mixture level is indi-cated only below the elevation of the upper support plate. | |||
The RVLIS measurement from top to bottom of the vessel will measure the. level in the following regions: | |||
top of vessel to top of guide tube; inside guide tube from top to.upper support plate; upper plenum; reactor core; lower plenum. | |||
During a LOCA, the RVLIS will measure the water level in the upper head only until the level drops to the top of the guide tubes; RVLIS would then measure level -reduc-tion in the guide tubes and upper plenum. | |||
The water remaining in the upper head below the top of the guide tubes would not be mea-sured by RVLIS. | |||
This water wou)d eventually drain through small holes into the guide tubes and downcomer, and this draining would be accomplished within a few minutes, depending on the accident. | |||
In any case, the water temporarily retained in the upper head would have no effect on the RVLIS indication. | In any case, the water temporarily retained in the upper head would have no effect on the RVLIS indication. | ||
--0236Q -----*=--'=---==.o.*--=--=-- | - - 0236Q | ||
=**=- | -----*=--'=---==.o.*--=--=--=**=-::::::.,,,-=~"'-".!_**=--=-=--~-*-=-::........:.....::__ _ | ||
::........:.....::__ | |||
~- | |||
.t Item 22 Describe the details of the pump flow/Op calculation. Discuss the pos-sible errors. | |||
Discuss the sible errors. Response 22. Calculations are performed to obtain an estimate of the differential pressure that the wide range instrument will measure with all pumps operating, from ambient temperature to operating temperature | ===Response=== | ||
*. The calculations employ the same methods used to estimate reactor ant flow for plant design and safety analysis. | : 22. Calculations are performed to obtain an estimate of the differential pressure that the wide range instrument will measure with all pumps operating, from ambient temperature to operating temperature *. The calculations employ the same methods used to estimate reactor cool-ant flow for plant design and safety analysis. These calculations are used primarily to define the instrument span and to provide an estimate for the function that compensates the differential pressure signal over the full temperature range, i.e., that results in the wide range display indicating 100% over the full temperature range with all pumps operating, pumping subcooled coolant. During the initial plant startup following installation of the instrumentation, wide range differential pressure data would be obtained and used to confirm or revise the compensation function so that a 100% output is obtained at all temperatures. Since the calculated compensation function is verified by plant operating data, any uncertainties in the flow and differential pressure estimates are eliminated. | ||
These calculations are used primarily to define the instrument span and to provide an estimate for the function that compensates the differential pressure signal over the full temperature range, i.e., that results in the wide range display indicating 100% over the full temperature range with all pumps operating, pumping subcooled coolant. During the initial plant startup following installation of the instrumentation, wide range differential pressure data would be obtained and used to confirm or revise the compensation function so that a 100% output is obtained at all temperatures. | 0236Q | ||
Since the calculated compensation function is verified by plant operating data, any uncertainties in the flow and differential pressure estimates are eliminated. | |||
0236Q Item 23 Have tests been run with voids in the vessel? Describe the results of these tests. Response 23. At present a Westinghouse RVLIS is* installed at the Semiscale Test Facility in Idaho. Small break loss-of-coolant experiments are being conducted at this facility by EG&G for the NRC. The results of these tests are used to compare the RVLIS measurements with Semi- | Item 23 Have tests been run with voids in the vessel? Describe the results of these tests. | ||
To date, after | |||
In cooperation with the NRC, EG&G and ORNL, Westinghouse is preparing a report ing the RVLIS performance during selected Semiscale tests. 0236Q -***---------------**----*-*---.----- | ===Response=== | ||
_,_ _______ ... | : 23. At present a Westinghouse RVLIS is* installed at the Semiscale Test Facility in Idaho. | ||
... ". l | Small break loss-of-coolant experiments are being conducted at this facility by EG&G for the NRC. | ||
ment. Uncertainties due to reference leg temperature measurements and sensor and hydraulic isolator displacements are included in the accuracy analysis. | The results of these tests are used to compare the RVLIS measurements with Semi-scale differential pressure measurements, garrrna densitometer data and core cladding surface thermocouple indications. To date, after correcting for differences between PWR reactor vessel internals and Semiscale modeling, good correlation between Semiscale level indica-tions and RVLIS measurements has been observed. | ||
02 36 | In cooperation with the NRC, EG&G and ORNL, Westinghouse is preparing a report su!TITiariz-ing the RVLIS performance during selected Semiscale tests. | ||
0236Q -***---------------**----*-*---.----- _,_ _______... | |||
... ". l Item 24 Estimate the expected accuracy of the system after an ICC event. | |||
===Response=== | |||
: 24. The accuracy of the system as described in the response to_question 6 would be the same for any LOCA-type incident, including an ICC event, cau,sing a temperature increase within the reactor contain-. | |||
ment. | |||
Uncertainties due to reference leg temperature measurements and sensor and hydraulic isolator displacements are included in the accuracy analysis. | |||
02 36....____~-------'----- | |||
Item 25 Describe how the conversion of RTD resistance to temperature made in the analog level: system. | |||
===Response=== | |||
The RTD is connected such that an analog voltage which is proportional to RTD temperature, is input to the microprocessor system. This analog voltage is converted to temperature by using a curve stored in memory which relates voltage to RTD temperature. | |||
0236Q | |||
----------~----------'---'------'---------}} | |||
Latest revision as of 04:59, 6 January 2025
| ML18086A984 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 10/27/1981 |
| From: | Liden E Public Service Enterprise Group |
| To: | Varga S Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.2, TASK-TM NUDOCS 8110300319 | |
| Download: ML18086A984 (44) | |
Text
I_
PS~G*
Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 Phone 201/430-7000 Mailing Address:
P.O. Box 570; Newark~ N.J.
07101 October 27~ 1981 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda; MD 20014 Attention:
Mr. Steven A. Varga; Chief Operating Reactors Branch 1 Division of Licensing Gentlemen:
TMI TOPIC II.F.2.3 NO. 1 AND 2 UNITS SALEM NUCLEAR GENERATING STATION DOCKET NO. 50-272 AND 50-311 PSE&G hereby submits; in the enclosure to this letter; its response to your request for additional information dated September 23; 1981 concerning the reactor vessel level in-strument.
The Salem level instruments will utilize a micro-processor for data processing.
Should you have any questions in this regard~ do not hesi-tate to contact us.
A ve~
A. Liden ager -
Nuclear Licensing FM :srd Attachment CC:
Mr. Leif Norrholm Senior Resident Inspector Mr. Gary c. Meyer Licensing Project Manager FK31/l
( 8110300319 81102772\\1
- PDR ADOCK 050002
. p PDR e 95-0942
~..
- l 0258Q
- l I
RESPONSES TO NRC'REQUEST FOR ADDITIONAL INFORMATION ON THE WESTINGHOUSE R.V.L.I.S.
SUMMA.RY RE PORT
( µ Processor)
.,,,/
~/
I I
Item 1 Justify that the single upper head penetration meets the single failure requirement of NUREG-0737 and shO'n' that it does not negate the redun-dancy *of the two instrument trains.
Response
- 1. Redundancy is l"()t compromised by having a shared tap since it is not conceivable that the tap will fail either from plugging or break-ing. Freedom from plugging is enhanced by, 1) use of stainless steel connections which preclude corrosion products and, 2) absence of mechanisms, such as, flow for concentrating boric acid. It is also inconceivable that the tap.will break because it is in a pro-tected area.
It should also be pointed out that in other cases where s~aring of a tap occurs in the RCS, we know of no prior experience reporting deleterious malfunctions of the shared tap.
Also, even if the shared tap does fail,. it should be recognized that RVLIS is l"()t a Protection System initiating automatic action, but a monitoring system with adequate backup monitoring such as by core exit thermocouples for operator correlation.
0236Q
Item 2 Response to NRC Request for Additional Information on the Westinghouse R.V.L.I.S.
Describe the location of the level system displays in the Control Room with respect to other plant instrument displays related to ICC monitoring in particular, the saturation meter display and the cor~ exit thermocouple display.
Response
The primary reactor vessel level display will be located on a section of the circular console adjacent to the saturation meter display and the core exit thermocouple display.
The secondary reactor vessel level display will be located on a upright panel directly behind the location of the primary reactor vessel display.
I Item 3 Describe the provisions and procedures for on-line verification, cali-bration and maintenance.
Response
- 3.
In general, the system electronics.are verified, maintained and calibrated on-line by placing one of the redundant trains into a test and calibrate mode while leaving the other train in operation to monitor inadequate core cooling.
A general verification is performed before shipment, but plant specific data is not used.
The capability exists for the operator to verify the operation of the system. This would involve discon-necting khe sensors at the RVLIS electronics, providing an arti-ficial. input, and observing the response of the system on the front panel and remote display.
On-line calibration of the system is made possible by the controls available on the main processing unit. The calibration consists of entering constants into the non-volatile RAM along with adjusting the potentiometers on the analog to digital conversion cards. The initial calibration is done when the system is installed, but subse-quent calibrations can be per.formed as described in the Technical Manual to maintain system accuracy.
The RVLIS system requires the normal maintenance given to other control and protection systems within the plant. On-line mainte-nance is accomplished by placing only one of the two redundant trains into maintenance at a time this will allow continued moni-toring of inadequate core cooling.
In addition, software programs are provided so that the front panel controls and display can be used to perform a functional test,
- serial data link tests, calibration tests and deadman timer tests.
These tests are considered part of the operator maintenance proce-dures.and should be performed monthly. For additional details of procedures see "Attachment A 11
ATIACHMENT A SYSTEMS OPERATING PROCEDURES 2-L PURPOSE The objectives of these instructions are to establish the requirements for the use of the Reactor Vessel Level Instrumentation System (RVLIS) for various plant conditions and to specify the maintainability require-
.ffients of the system equipment.
2-2.
PREREQUISITES o
The capi~lary lines have been vacuum filled, per the instruc-tions of section 4.
o Ensure that the hydraulic isolators are zeroed (within plus or minus 0.1 in.3).
o Calibrate the d/p cells per instructions of ITT Barton Manual for Model 752, Level B, transmitters.
o The process equipment must be scaled using the appropriate scaling document.
o Determine the height of the upper top piping above the inside top of the vessel.
2-3.
INITIALIZATION With the plant less than 200°F and less than 430 psig, obtain the following data for trains A and B:
0236Q
I' 0236Q (1)
With an automatic data logger, record the following:
o Thot o RCS pressure o d/p transmitter output o Signal to the remote display (2) Manually record:
o level indication readings o Hydraulic isolator_dial readings o Reference leg RTD output (3) Record the above data for the following reactor coolant pump operations:
NOTE The various configurations should be obtained through the normal startup if possible.
NOTE Upper plenum will read offscale if pump is running in the instrumented loop; narrow range will read offscale with one or more pumps running.
o No pumps running NOTE An indication of 100 percent reading repre-sents a level to the inside top of the vessel. The height of the upper top piping above the inside top of the vessel will result in a reading ~reater than 100 per-cent. This added height is plant specific and must be determined prior to adjusting the process equipment (upper plenum and*
narrow range) for full scale indication.
=----*-
~-:---~--**.. -* *-**
o One noninstrumented loop pump running o Two noninstrumented loop pumps running o Two noninstrumented loop pumps and one instrumented loop purrp running o All pumps running -- Adjust process equipment so that wide range indication reads 100 percent.
(4) With all pumps running, increase RCS pressure - temperature to Tavg no-load and record data refer to step (1) every 500F increment.
Data of step (2) should be recorded at 3500F and at Tavg no-load. Adjust process electronics for density compensation at Tavg no-load.
Verify that wide range indication reads 100 percent.
(5) Trip all pumps and record data per steps (1) and (2).
Verify that upper plenum and narrow range indication is in agreement with the reading of step (3) "No pumps running".
(6)
Restart pumps in sequence and record wide range readings for both trains for each pump combination.
(7)
Enter into the equipment prograrrrning the expected percent level for the various purrp combinations per the micro-processor instruction manual.
2-4.
NORMAL PLANT OPERATION With the plant at power, the level readings should be as follows:
Wide range 0258Q:l
~110 percent (wide range reading will increase from 100 percent to approximately 110 percent with all pumps running, as reactor power is increased from zero to 100 percent)
Narrow range Upper plenum Off Scale - High
- off Scale - Low (RCP status light on main
- control board is off)
Any reduction in wide range expected readings (with all pumps running) can only be caused by the presence of voids in the circulating water.
Voids will not exist without reduced pressure which could trip the reactor, so all accident conditions will proceed from a condition of zero power (100 percent reading on the wide range).
Check that the pressure has decreased or that subcooling meter confirms saturation conditions exist; then readings below 100 percent are an indication of voids in the coolant.
If the actual readings differ from the expected readings by 3 percent for a single train, refer to troubleshooting (paragraph 2-10).
- If the indication for both trains differs from the expected readi.ngs, refer to the emergency operating instructions for irrmediate and subse-quent action.
2-5.
REFUELING After depressurization and prior to lifting the reactor vessel head, perform the following steps to prepare the RVLIS:
(1) Close reactor vessel level head connection isolation valve.
(2) Disconnect piping between the isolation valve and the sensors.
0236Q NOTE Contaminated water residue may be in the pipe.
/
(3) e e
Provide temporary plugs for the pipe ends of the removable section and stationary sections.
Restore the RVLIS after reactor vessel head installation as follows:
(1)
Remove pipe end plugs and reconnect piping section.
(2) With the isolation valve open, backfill the piping from sensors by attaching a water source to the sensor vent.
(3)
Disconnect waterfill _apparatus.
(4) At startup {450 psig, <2QQOF), visually inspect piping/ coupling of the reinstalled piping for leakage.
(5)
At full system pressure, repeat inspection.
2-6.
PERIODIC TESTING 2-7.
Plant at Power Perform monthly calibration checks of the process electronics in accor-dance with the process equipment instruction manual.
2-8.
Refueling Outages 02360 (1)
For the d/p transmitters, perform zero check of each d/p transmitter by closing the respective isolation valves and opening the bypass valve. If zero reading differs from the last recorded reading by percent, then recalibrate d/p transmiter using instructions of Barton Instruction Manual
{Model 752) and the instructions contained in the RVLIS system manual and the appropriate equipment instruction manuals.
.~'.
2-9.
(2)
Record tne appropriate hydraulic isolato-dial readings and compare results with prev'ious cold shutdown readings.
Readings should be within plus or minus 0.1 in.3.
(3)
Perfonn the calibration check of the process electronics in accordance with the equipment technical manual.
(4) Verify the operability of* the RVLIS System during* the startup/heatup of plant following a refueling or major plant outage by tracking the displays of the two trains.
Readings should be within percent of the previous recorded readings.
Every Other Refueling Outage In addition' to the steps of paragraph 2-8, perform the following every other refueling outage:
0236Q (1)
At the process equipment cabinets, read the impulse line RTD resistances.
NOTE Take the ambient temperature reading near the RTD and adjust the measured resistance accordingly.
Compare the adjusted resis-tance to the original results or the previous recorded data.
(2)
Employing a pneumatics calibration, per instructions of*
section 4 at the sensor vent ports, check the calibration of the transmitters and perform a time response check of the system. The calibration results should be within plus or minus percent of instrument span of the previous recor-ded data. The time response of the system should be within 10 seconds. This is the time required for the display instrument to reach the midpoint of a SO*percent step input variable change.
2-10.
TROUBLESHOOT!t. L".NT AT POWER If single indication varies from the expected value, check the following:
{1) Call for the sensor status display for any abnormalities.
(2)
Compare hydraulic isolator dial reading with reading taken from diverse train and those taken at Tavg no-load condi-tions. Dial readings deviating by more than plus or minus 0.1 in.3 may be indicative of potential capillary line leakage; however, it may not be the reason for the devia-tion in the display reading until the isolator reached the valve-off point.
(3) Perform a calibration check of the process equipment, per the appropriate instruction manual.
(4)
Perform a zero check of the appropiate d/p transmitter.
If more than one indicator/display deviates from the diverse train or from Tavg no-load readings, check the following:
o Conman isolator dial readings versus previous reading o d/p transmitter valve lineup o Process equipment power supplies If repairs are required to the capillary lines, the system must be vacuum-filled and calibrated per the instructions contained in section 4 and the appropriate equipment instruction manuals.
0236Q'
Item 4 Describe the diagnostic techniques and criteria to be used to identify malfunctioning components.
Response
The microprocessor based RVLIS performs internal diagnostic checks of
- the non-volatile RAM, non-volatile PROM and other microprocessor compo-nents.
No operator interface is required for these internal checks which are performed in each cycle. A "deadman" circuit is provided to detect microprocessor fail~re. This circuit will indicate a processor problem on the front panel of the unit and automatically reset the CPU to restart the microprocessor. The remote display unit of the RVLIS indicates the status of the input sensors. If any sensor is out of range or dis"abled a symbol will follow the affected level reading on the su1TTTiary display page.
In addition, software programs are provided so that the front panel controls and display can be used to perform.a func-tional test, serial data link tests, calibration tests and deadman timer test. These tests are considered part of the operator maintenance pro-cedures and should be performed monthly.
0236Q
Item 5 Estimate the in-service life under conditions of normal plant operations and describe the methods used to make the estimate, and the data and sources used.
Response
The in-service life of the RVLIS Microprocessor based electronics is
- dependent upon proper maintenance, including the replacement of individual component parts when necessary. The provisions for this maintenance are included in the technical manual.
Based on the assumption of normal conditions and proper maintenance of the components, the only limitation to the in-service life will be the availability of replacement parts. It is estimated that in 20 years, some of the components will be technically obsolete and nd longer produced.
Consequently, the cards may have to be modified in the future to accontnodate the current technology. Thus, any individual component failures are regarded as maintenance considerations and their replacement is necessary to prolong in-service life.
In-Service life which is different than Design Life and Qualified Life is dependent upon implementing a scheduled preventative maintenance program including periodic overhaul of the equipment.
~n this manner, the equipment is restored to a level that continual operatibility is ensured.
In developing the maintenance program, repair costs may necessitate replacement of the equipment.
If the maintenance program is followed there is no apparent reason that operation of the equipment cannot be extended.
Some of the equipment is similar to equipment installed in present Westinghouse plants that have been operating for 10-15 years.
0236Q
i I
I I
I e
, ' The following valves have
- ~en supplied by Westingho! for the Reactor Vessel Level Instrumentati0n System for Beaver Valley Unit No. 1:
W Design Code W Valve ID filt Manufacturer Specification Applicability 3/4 T 78 4
Rockwell G-952855; Rev *o ASME B&PV Class 1/4 x 281 10 Autoclave Engineers G-955230; Rev 2 N & S 1/4 N 28!*
6 Autoclave Engineers G-955230; Rev 2 N & S
- Shut off valve which is part of the transmitter access assembly.
The 3/4 T78 valve is a stainless steel, manually operated globe valve
- whose basic function is to isolate the flCJn' of fluid. The valve. is designed for a cycle life of 4000 cycles over the 40 year de.sign life, which satisfies the nonnal plant operating requirements established in above referenced specification. The vave is a hermetically sealed valve, designed to be maintenance free with no consumable materials making a pressure boundary seal.
The instrumentation valves (_!i Valve ID's 1/4 x 28! and 1/4 N28I) stainless steel, manually operated valves, designed to meet the requirements of the above referenced specification, which calls for zero leakage (environmentally and across the seats), minimal fluid displacement during stoke and a 1000 cycle life. For normal plant operating conditions, the metallic parts are designed for a 40 year service life. The consumable items, where *applicable, are identified in the appropriate drawings and instruction manuals, with recoITTTlended maintenance schedules.
0236Q II
I I
Item 6 Explain how the value of the system accuracy (given as +/- 6% was derived.
How were the uncertainties from the individual components of the system combined?
What were the random and systematic errors assumed for each component?
What were the sources of these estimates?
Response
- 6. The system accuracy of.!. 6% water level was a target value established during the conceptual design and was related to the dimensions of the reactor vessel (12% from nozzles to top of core) and core (30%), and the usefulness of the measurement during an accident. Subsequent analyses have established a system accuracy based on the uncertainties introduced by each component in the instrument system.
The individual uncertainties, resulting from random* effects, were combined statistically to obtain the overall instrument system accuracy.
Some of the individual unce~tainties vary with conditions such as system pressure. The following table identifies the individual uncertainties for the narrow range measurement while at a system pressure of 1200 psia.
Component and Uncertainty Definition
- a.
Differential pressure transmitter calibration and drift allowance,
(_: 1.5% of span) multiplied by the ratio of ambient to operating water density.
- b. Differential pressure transmitter allowance for change in calibration due to ambient temperature change 0236Q
{~ 0.5% of span for.:_ SOOF) multiplied by the density ratio.
Uncertainty
% Level
+ 2.1
+ 0.7
e
- c. Differential pressure transmitter allowance for change in calibration due to change in system pressure
(:_ 0.2% of span per 1000 psi change) multiplied by the density ratio.
- d. _Differential pressure transmitter allowance for change in calibration due to exposure to long-tenn overrange
(:_ 0.5% of span)* multiplied by th~
density ratio.
- e. Reference leg temperature instrument (RTD) uncertainty of :_ soF and or allowance of + SOF for the difference between the measurement and the true average temperature of the reference leg, applied to each vertical section of the reference leg where a measurement is made.
Stated uncertainty is based on a maximum containment temperature of 420°F, and a typical reference leg i nsta 11 ati on.
- f. Reactor coolant density based on auc-tioneering for highest water density obtained from hot leg temperature 02360
(+ GOF) or system pressure (+ 60 psi).
Magnitude of uncertainty varies with system pressure and water level, with largest uncertainty occurring when the reactor vessel is full.
+ 0.34
+ 0.7
+ 0.64
+ 2.3
I' e
- g.
Sensor and hydraulic isolator bellows displacements due to system pressure changes or reference leg temperature changes will introduce minor errors in the level measurement due to the small volumes and small bellows spring constants. The changes; such as pressure or temperature, tend to cancel, i.e., the bellows associated with each measurement move in the same direction.
Maximum expected error due to differences in capillary line volume and local tempera-tures is equivalent to a level change of about 5 inches, multiplied by the density ratio.
- h.
Density function generator output mis-match with ASME Steam Tables limited to a maximum of:
- i. Electronics system calibration, overall uncertainty limited to less than:
- j. Control board indicator resolution; microprocessor digital readout to nearest percent of level span.
+ 1.46
+ 0.50
+ 1.0
+ 0.5 The statistical combination of (square root of the sum of the squares).of the individual uncertainties described above results in an overall system instrumentation uncertainty of+ 3.9% of the level span.
For the narrow range indication of approximately 40 feet, or
+ 1.5 feet, at a system pressure of 1200 psia. Examples of the uncertainty at other system pressures are:
0236Q Uncertainty=.:!:. 3.6% at' 400 psia Uncertainty*=.:!:. 4.2% at 2000 psia
Item 7 Assume a range of sizes for "small break" LOCA's.
What are the relative times available for each size break for the operator to initiate action to recover the plant from the accident and prevent damage to the core?
What is the dividing line between a "small break" and a "large break"?
Response
- 7. Inadequate core coolant {ICC) was defined in WCAP-9754, "Indequate Core Cooling Studies of Scenario With Feedwater Available Using the NOTRUMP Computer Code", as a high temperature condition in the core such that the operator is required to take action to cool the core before significant damage occurs. During the design basis small loss of coolant accident, the operator is not required to take any action to recover the pl ant other than to verify the operable status of the safeguards equipment, trip the reactor coolant pump (RCPs) when the primary side pressure has decreased to a specific point, and initiate cold and hot leg recirculation procedures as required.
In the design basis small LOCA, a period of cladding heatup may occur prior to automatic core recovery by the safeguards equipment.
The heat up period is dependent upon the break size and -ECCS perfor-mance.
An ICC condition may arise if there is a failure of the safeguards equipment beyond the design basis. In that case, adequate instru-mentation exists in the Beaver Valley plant to diagnose the onset of ICC and to determine the effectiveness of the mitigation actions taken.
The instrumentation which may be used to determine the ade-quacy of core cooling consists of a subcooling meter, Core Exit Thermocouples (T/Cs), and the Reactor Vessel Level Instrumentation System (RVLI S).
For a LOCA of an equivalent size equal to approximately six inches or less, an ICC condition can only occur if two or more failures occur in the ECCS.
As indicated in WCAP-9754, an ICC condition can be calculated by hypothesizing the failure of all high head safety 0236Q.
injection (HPSI) ! LOCAs of approximately one i! in size. For a 4 inch equivalent size LOCA one can hypothesize an ICC condition by assuming the failure of all HPSI as well as the failure of the passive accumulator system (a truly incredible sequence of events).
For LOCAs of sizes of six inches or less, the approach to ICC is unambiguous to the reactor operators. The first i ndi ca ti on of a possible ICC situation is the indication that some of the ECCS pumps have failed to start or are not delivering flow.
The second indica-tion of a possible ICC situation is the occurrence of a saturation condition in the primary coolant system as indicated on the subcool-ing monitor.
Shortly after the second indication, the RVLIS would start to indicate the presence of steam voids in the vessel.
At some point in time the RVLIS will indicate a collapsed liquid level below the top of the core. The core exit thermocouples will begin to indicate superheated steam conditions.
If appropriate the RVLIS and core exit T/C behavior will provide unambiguous indications to operator to follow the ICC mitigation procedure.
WCAP-9754 indicates that the selected core exit T/Cs will read 1200°F at approximately 11000 seconds after the initiation of a 1-inch_LOCA with the loss of all HPSI.
The Generic Westinghouse EOP Guideline instruct operator to pursue ICC mitigation procedures.when these conditions are reached. The 4-inch LOCA will indicate 1200°F at about 1350 seconds..
By following the Westinghouse recorrrnended Emergency Operating Procedures (EOPs), the operators will have earlier indication of a possible ICC situation. Recovery procedures to depressurize the primary below the core pressure safety injection shutoff head may be followed.
These procedures include correction of the HPSI failure, opening steam dump, or open-ing pressurizer PORVs.
The RCPs may be restarted to provide addi-tional steam cooling flow.
Large break LOCAs consist of LOCAs in which the fluid behavior is inertially dominated.
Small break LOCAs, on the other hand, have 0236Q
th f 1. d b h
. -do., d 1 f -
CA e
u1 e av1or m1nate by gravitat1ona e fects.
For LO s
which are significantly larger than an equivalent 6-inch break, the ECCS has the maximum potential for flow delivery since the primary coolant system is at low pressure.
No early manual action is useful in recovering from ICC.
Analyses for LOCAs in this range indicate ambiguous behavior of the core exit T/Cs and RVLIS early in the accident due to dynamic blowdown effects. This behavior is temporary and the core exit T/Cs and the RVLIS will indicate the progress being made by the ECCS in recover-ing the core.
When the core e_xit T /Cs and RVLI S may be temporarily providing ambiguous indications, no manual action is needed or use-ful. Later in the accident when manual action may be useful, the core exit T/Cs and RVLIS will provide an unambiguous indication of ICC if it exists. This unambiguous indication may be present as early as 30 seconds after the initiation of the LOCA for a double ended guillotine rupture or a main coolant pipe.
It follows from the above discussion that, for ICC considerations, a reasonable definition of large breaks are breaks that are signifi-cantly larger than an equivalent 6 inch break. All other breaks are sma 11 breaks.
0236Q
~-~~-*
- ~ -----
- --------~----* -
---~
I I
Item 8 Describe how the system response time was estimated. Explain how the response times of the _various components ( differential pressure trans-ducers, connecting lines and isolators) affect the response time.
Response
- 8. The microprocessor reads all the inputs every five seconds and updates the digital display and analog outputs within four seconds after the inputs are read. Thus, a worst case time from anal'og input change to display and analog output change is 9 seconds.
Any analog delays due to the front end electronics, sensor electronics, sensor mechanics, impulse lines, hydraulic isolators, etc., have five seconds to.settle out. Thus, analog delays only add to the 9 second worst case response time if they are longer than 5 seconds.
The front end electronics *Of the microprocessor system has a time constant less than 0.5 seconds, and the total analog del~ys due to the sensor electronics, mechanics, impulse lines and hydraulic iso-lators are less than 3 seconds. Therefore, the worst case response time is 9 seconds for the system.
0236Q
I I tern 9 There are indicat.ions that the TMI-2 core may be up to 95% blocked.
Estimate the effect of partial blockage in the core on the differential oressure measurements for a range of values from 0 to 95% blockage.
Response
q_
Blockage in the core will increase the frictional pressure drop and increase the total differential pressure across the vessel. This will be reflected as a higher RVLIS indication.
The increase in the RVLIS will be most significant under forced flow conditions when the reactor coolant pumps are operating.
In order for blockage to be pres~nt, the core would have to have been uncovered for a prolonged period of time.
A low RVLIS indication along with a high core exit thermocouple indication would have been indicated during this time.
If the RCP's had been operating throughout the transient, there would have been sufficient coolinq to prevent significant core damage.
Therefore, for significant blockage to exist during pump operation, the operator would have restarted the pumps after an ICC condition had existed for a period of time.
Based on the history of the transient, the operator WJuld know that the RVLIS would read higher than expected.
Althouqh the RVLIS would read high, it would still follow the trend in vessel inventory.
The operator would be able to monitor the recovery with the RVLIS.
Under natural circulation conditions, the impact of core blockage is not expected to be large. Although the RVLIS indication will read slightly higher than normal, the RVLIS will still trend with the vessel inventory and provide useful information for monitoring the recovery from ICC.
ICC will have been indicated at an earlier time; before a significant amount of core blockage has occurred.
The operator will know that the RVLIS could read slightly high, based on the history of the transient.
I l
I' Item 10 Describe the effects of reverse flows within the reactor vessel on the indicated l eve 1.
Resoonse
- 10. Reverse flows in the vessel will tend to decrease the DP across the vessel which would cause the RVLIS to indicate a lower collapsed level than actually exists. The low indication would not cause the operator to take unnecessary actions, since the RVLIS would be used along with the core exit thermocouples to indicate the approach to I CC.
It is imoortant to note that 1 arge reverse flows are not expected to occur for breaks smaller than 611 in diameter during the time that the core is uncovered.
Large reverse flow rates may occur early in the blowdown transient for large diameter breaks but, as is discussed in the response to Item 7, it is not necessary to use the RVLIS as a basis for operator action for breaks in this range.
0~3nQ
Item 11 What is the experience, if any, of ma i nta *: ni ng O/p ce 11 s at 300% over-range for long periods of time?
Response
- 11. Experience in overranging of D/p Instruments has been obtained in previous applications of D/p capsules similar to those used in RVLIS.
In Dual Range Flow (D/p) Applications the "Low Flow" trans-mitter (and/or gages) are overranged to 300% or greater by nonTial flow rates yet provide reliable metering when required for startup.
Also, test data exists on the basic transmitter design showing about 0.5% effect on calibration with 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> exposure to 3000 psig over-range.
All units are similarly exposed to this overrange for 5 min-utes in both directions as a part of factory testing.
There have been instances involving accidental overrange of these instruments (including RVLIS) as the result of leakage or operator errors where full line pressure overranges have occurred for up to several weeks with minimal effect on instrument accuracy.
Based upon th is experience and test data we expect.to prove stati s-tica lly that reliable measurements can be made by the selected over-ranged instrument designs used for RVLIS.
On line calibration capa-bility is provided if needed to support gathering of. statistical data.
02360
I I
I Item 12 Five conditions were identified which could cause t~e DP level system to give ambiguous indications. Discuss the nature.of the ambiguities for
- 1. accumulator in.i~ction into a highly voided downcomer, 2. when the upper head behaves like a pressurizer, 3. upper plenum injection, and
- 4. periods of void redistribution.
Resoonse l 2. 1..
When the downcomer is highly voirled and the accumlators inject, the cold accumulator water condenses some of the steam in the downcomer which causes a local depressurization. The local depressurization will lower the pressure at the bottom of the vessel which will lower the DP across the vessel, causing an apparent decrease in level indication. The lower pressure in the downcomer also causes the mixture in the core to flow to the lower plenum, causing an actual decrease in level. The period of time when the RVLIS indication is lower than the actual collapsed liquid level will be brief.
An example of when this phenomenon may occur is when the reactor coolant pumps are running for a long period of time in a small break transient. After the RCS loops have drained and the pumps are circulating mostly steam, the level in the downcomer will be depressed.
A large volume of steam will be present in the downcomer, above the low mixture level, which allows a large amount of condensation to occur.
For most small break transients, the reactor coolant pumps will be tripped early in the transient and the downcomer mixture level will remain high, even in cases where ICC occurs.
When the downcomer level is high the effect of accumulator injection on the RVLIS indication w i 11 be mi nor.
I
- 2.
When the uoper.ead begins to drain, the pres9e in the upper head decreases at a slower rate than the pressure in the rest of the ~CS. This is due to the upper head region behaving much like the pressurizer~-
The higher resistance across the upper suoport plate relative to the rest of the RCS prevents the upper head from draining qµic~ly. This situation only exists until the mixture level in'the upper head falls below the top of the guide tubes.
At thik time, steam is allowed to flow from the upper plenum to the upper head and the pressure equilibrates.
While the upper. head; is behaving like a pres.surizer, the vessel differential pressure is reduced and the RVLIS indicates a lower than actual collapsed liquid level.
This phenomenon is djscussed in the summary report on the RVLIS*
relative to the three inch cold leg break.
Since that ti,me, the upper head modeling has been investigated in more detail. It was found that the modeling used at that time assumed a flow resistance that was too high for the guide tubes.
Subsequent analyses have shown that the pressurizer effect has less impact on the vessel dp than was originally shown.
There is very little impact on the results after the level drains below the top of the guide tubes.
The pressurizer effect is still believed to exist and it becomes more significant as break size increases. The interval of time when the upper head behaves li'<e a pressurizer is brief and the RVLIS will *resume trending
- with the vessel level after the top of the guide tubes uncover.
The reduced RVLIS indication will not cause the operator to take any unnecessary action, even if a level below the top of the core is indicated since the core exit thermocouples are used as a corroborative indication of the approach to ICC.
Westinghouse Electric Corporation, "Westinghouse Reactor Vessel Level Instrumentation System for Monitoring Inadequate Core r.oo ling, 11 December 1980.
0?.3110
. - *-:--**--*H*--;- ---- - - ' **--- --*.... 0
- 3. The normal con.ion for continuous upper ple. injection (UPI) occurs only with the operation' of the low head safety injection pumps, which does not occur until a pressure of under 200 psi is realized. The RVLIS may not accurately trend with vessel level during the initial start of UPI.
During this short period of time, the cold water being injected will mix with the steam in the up~er plenum causing condensation. This condensation will occur faster than the system response. The system will equilibrate after a short period of time.
Upon equilibrating, the system will continue to accurately trend with the vessel level.
In the range of break sizes where RVLIS is most useful in detecting the approach to ICC, the system pressure will equilibrate at a level above the pressure where UPI will nonrta11y occur. It is important to note that the flow from the low head pumps is sufficient to recover the core and no operator action based on the RVLIS indication will be necessary.
For the vast majority of small breaks, the condition of upper plenum injection does not cause a significant impact.
For the remainder, the impact is very small and within tolerable limits.
- 4.
During the time when the distribution of voids in the ves~el is chanqing rapidly, there ~an be a large change in the two-phase mixture level with very little change in collapsed mixture level. The use of the RVLIS, in conjunction with the core exit thennocouples, is still valid for this situation, however.
The only event that has been identified which could cause a large void redistribuition is when the reactor coolant pumps are tripped when the vessel mixture is.highly voided.
After the pump perfonnance has degraded enouqh that the flow pressure drop 023110
023~n contribution t,the vessel differential pressil is small, the change in RVLIS indication will be small when the pumps are tripped.
As discussed in the su111nary report, the approach to ICC would be indicated when the wide range indication read 33 percent. If the pumps were tripped at this time, the core would still be covered.
The operator would know that the core may uncover. if the pumps were tripped with a wide range indication lower than 33 percent. Prior to pump trip, the core will remain adequately cooled due to forced circulation of the mixture.
When the pumps trip the two phase level may equillibrate at a level below the top of the_ core. The narrow range indication will provide an indication of core coolability at this time.
Item 20 Describe the behavior of the level measurement system when the upper head is full, but the lower vessel is not.
Response
- 20. During the course of a LOCA transient, the upper plenum will experience voiding before the upper head.
The voids in the upper plenum will be indicated by a lower RVLIS reading. The RVLIS will not indicate where the voiding is occurring, but at this point in the transient, it is not necessary to know where the region of voiding is. In the early part of the transient when the mixture level is above the top of the guide tube in the upper head, it is sufficient for the operator to knO'f{ that the vessel inventory is decreaging, irrespective of the region where voiding is occurring.
As discussed in the response to Item 21, the fluid in the upper head does not affect the RVLIS indication after the upper head has drained to below the top of the guide tubes. As discussed in the response to Item 19, the uipper head will drain before the onset of ICC and there will not be an ambiguous indication during the period of time when RVLIS will be used.
0236Q
Item 13 No recorrrnendations are made as to the uncertainties of the pressure or temperature transducers to be used, but the choice appears to be left to the owner or AE.
What is the upper limit of uncertainties that should be allowed?
Describe the effect of these uncertainties on the measure-ment of level. What would be the effect on the level measurement should these uncertainties be exceeded?
. Response
- 13. The reactor coolant pressure and temperature signals originate from the existing wide range pressure and hot leg RTD's already installed in the plant, and the uncertainties for these instruments are understood.
As indicated in the response to question 6, the pressure uncertainty is +/-. 60 psi and the temperature uncertainty is
_:: 60F, resulting in a maximum level uncertainty contribution of
+ 2.3~ when the vessel is full. This uncertainty is smaller when the level is at the elevation of the reactor core. This contribution to the total uncertainty would increase roughly in proportion to an increase in the pressure or temperature measurement uncertainty.
02360
I' Item 14 Only single RTD sensors on each vertical run are indicated to determine the temperatures of the impulse lines. Where are they to be located?
What are the expected temperature gradients along each line under normal operating conditions and under a design basis accident? What is the worst case error that could result from only determining the temperature at a single point on each line?
Response
- 14. RTD sensors are installed on every independently run vertical sec-tion of impulse line, to provide a measurement for density compensa-tion of the reference leg. If the vertical section of impulse line runs through two compartments separated by a solid floor, an RTD
~
sensor 1s installed in each compartment.
The RTD is installed at the midpoint of each vertical section, based on the assumption that the temperature in the compartment is uniform or that the temperature distribution is linear in the vicinity of the impulse line.
As stated in the _response to question 6, an allowance for the true average impulse line temperature to differ from the RTD measurement by SOF is included in the measurement uncertainty analysis. This allowance permits a significant devia-tion from a linear gradient, *e.g., 20% of the impulse line could be up to. 250F different from a linear gradient without exceeding the allowance.
During normal operation, forced circulation from cooling fans is expected to maintain compartment temperatures reasonably uniform.
During the LOCA, turbulence within a compartment due to release of steam \\liQuld also produce a reasonably uniform tempera-ture. Note that the impulse lines are protected from direct jet impingement by metal instrument tubing channels.
0236Q
- J Item 15 What is the source of the tables or relationships used to calculate density corrections for the level system?
Response
The relationships used in the microprocessor based RVLIS system to cal-
.c.ul ate density corrections are used on the ASME Steam Tables dated 1967 *
. 'These relationships are implemented in the system using two fourth order polynomials, end to end, fit :to approximate the tables above.
02360
~.
Item 16 The microprocessor system is stated to display the statui of the sensor input. Describe how is this indicated and what this actually means with respect to the status of the sensor itself and the reliability of the indication.
Response
The remote display unit of RVLIS indicates the status of the input sensors. If any sensors are out qf range~ regardless of the reason, a symbol allows the affected level reading on the summary display page.
The particular sensor that is out of range is identified at the bottom of the surmlary display page.
Due to the redundant sensors and trains it is possible for the operator to disable some of the sensors without affecting the system reliability. The display indicates which level readings are affected. The disabled sensors are also displayed at the
- bottom of the summary page.
A separate sensor status page can be dis-played showing all sensors which are disabled or out of range and their affected level readings.
0236Q
Item 17 Describe the prov;s1ons for preventing the draining of either the upper head or hot leg impulse lines during an accident.
What would be the resultant errors in the level indications should such draining occur?
Response
- 17. The layout of the impulse lines from the upper head and hot leg are arranged to prevent or minimize the impact of drainage during an accident. In general, however, the water in the impulse lines will be cooler than the water in the reactor or hot leg, and there will be sufficient subcooling overpressure in the lines so that very little, if any, of the water would flash to steam during a depres-surization or containment heatup. Heat conduction along the small diameter piping and tubing would be insufficient to result in flash-ing in a significant length of piping.
The connection to the upper head from a spare control rod drive mechanism port or vessel vent line drops or slopes down from the highest point of the vessel connection to the sensor bellows mounted on the refueling canal wall, so water would be retained *in this piping. Draining of the vertical section i1TTTiediately above the reactor vessel has no effect on the level measuremept, since thi.s section is included in the operating range of the instrument.
Draining of the horizontal portion of vessel vent piping above the vessel also has no effect on the measurement since no elevation head is involved.
The connection from the hot leg to the sensor bellows is a horizon-tal run of tubing, so draining of this tubing has no effect on the measurement since no elevation head is involved.
The majority of the impulse line length is in capillary tubing sealed.at both ends with a bellows (sensor bellows at the reactor end, hydraulic isolator at the containment penetration end); so 0236Q. -- --- -- -.. -*.** -. -*- -___, __ ~ - -- -
~
)
I I
water would be retained in this s~stem at all times. The water will be pressurized by reactor pressure, and since the reactor tempera-ture will be higher thar1 containment temperature during an accident, the water in the sealed capillary lines cannot flash.
0236Q
Item 18 Discuss the effect on the level measurement of the release of dissolved, noncondensible gases in the impulse lines in the event of a depressuri-zation.
Response
- 18. The majority of the impulse lines are sealed capillary tubes vacuum filled with demineralized, deaerated water. The* lines contain no noncondensible gases and are not in a radiation environment suffi-cient for the disassociation of water.
The short runs of impulse line connected directly to the primary system will behave as described in the response to question 17.
There would be ro error due to gases in the hot leg line since the line is horizontal. Since there is no mechanism for concentration of gases at the top of the reactor vessel during normal operation, the connection to the top of the vessel would contain, at most, the normal quantity of dissolved gases in the coolant, and the subcool-ing pressure during an accident would maintain this quantity of gas in so 1 ut ion.
0236Q
Io Item 19 In some tests at Semi-scale, voiding was observ~d in the core while the upper head was still filled with water. Discuss the possibility of cooling the core-exit thermocouples by water draining down out of the upper head during or after core voiding with a solid upper head.
Response
- 19. One of the indicators of an approach to an Inadequate Core Cooling (ICC) situation is the response of the core exit thermocouples (T/Cs) to the presence of super-heated steam.
The core exit thermo-couples will not provide an indication of the amount of core void-ing. Response of the core exit T/Cs provides a direct indication of the existence of ICC, the effectiveness of ICC recovery actions, and restoration of adequate core cooling.
The core is adequately cooled whenev~r the vessel mixture level is above the top of the core and the core may have a significant void fraction and still be ade-quately cooled.
Realistically, an indication of an ICC condition would not.occur until the primary coolant system has drained sufficiently for the reactor vessel mixture level to fall below the top of the core. -
Westinghouse has perf onned analyses which indicate that the upper head will drain below the top of the guide tubes before ICC condi-tions. exist. The guide tubes are the only flow path from the upper head to the upper plenum.
In WCAP-9754, "Inadequate Core Cooling Studies of Scenarios With Feedwater Available, Using the NOTRUMP Computer Code", it was found that inadequate core cooling situations woul not result for LOCAs of an equivalent size or equal to approxi-mately 6 inches or less without two or more failures in the ECCS.
In both specific scenarios examined in WCAP-9759, a 1-inch and 4-inch small LOCA, the upper head and upper plenum had completely drained before the onset of an ICC condition.
0236Q
In the Beaver Valley plant, the core exit T/Cs protrude slightly from the bottom of the support columns
,In this location, they measure the temperature of the fluid leaving the core region through the flCPfl passages in the upper core plate. Flow from the upper head must* enter the upper plenum via the guide tube before being able to enter the upper core plate flCPfl passages.
In addition, the LOCA blowdown depressurization behavior must_ be such that there is a flCPfl reversal for the core exit T/Cs to detect the upper head fluid temperature. The upper head fluid is expected to mix with the upper plenum fluid as it drains from the upper head.
The potential for core exit T/C cooling from colder upper head fluid, while the core has an appreciable void fraction is not viewed as a potential problem for the detection of an inadequate core cool-ing situation. Although some Semi-scale tests indicated core void-ing while the upper head was liquid solid that does not imply that the core exit T/Cs would give an ambigious indication of ICC.
Calculations for a Westinghouse PWR and consideration of the core exit T/C design would not result in ambigious ICC indications.
0236Q
I I
Item 21 One discussion of the micropr9~esor system sta~s that water in the upper head is not reflected in the plot. Does this mean that there is no water in the upper head or that the system is indifferent to water in the upper head under these conditions?
Response
- 21. The discussion in the system description is contained in the section describing the analysis of the system performance. The statement in question is referring to the WFLASH code calculation of mixture level, rather than how the RVLIS will respond to water in the upper head.
The computer code includes calculation of water mass and pressure in the upper head, but this water mass is not included in the calculation of mixture level; hence, the mixture level is indi-cated only below the elevation of the upper support plate.
The RVLIS measurement from top to bottom of the vessel will measure the. level in the following regions:
top of vessel to top of guide tube; inside guide tube from top to.upper support plate; upper plenum; reactor core; lower plenum.
During a LOCA, the RVLIS will measure the water level in the upper head only until the level drops to the top of the guide tubes; RVLIS would then measure level -reduc-tion in the guide tubes and upper plenum.
The water remaining in the upper head below the top of the guide tubes would not be mea-sured by RVLIS.
This water wou)d eventually drain through small holes into the guide tubes and downcomer, and this draining would be accomplished within a few minutes, depending on the accident.
In any case, the water temporarily retained in the upper head would have no effect on the RVLIS indication.
- - 0236Q
*=--'=---==.o.*--=--=--=**=-::::::.,,,-=~"'-".!_**=--=-=--~-*-=-::........:.....::__ _
~-
.t Item 22 Describe the details of the pump flow/Op calculation. Discuss the pos-sible errors.
Response
- 22. Calculations are performed to obtain an estimate of the differential pressure that the wide range instrument will measure with all pumps operating, from ambient temperature to operating temperature *. The calculations employ the same methods used to estimate reactor cool-ant flow for plant design and safety analysis. These calculations are used primarily to define the instrument span and to provide an estimate for the function that compensates the differential pressure signal over the full temperature range, i.e., that results in the wide range display indicating 100% over the full temperature range with all pumps operating, pumping subcooled coolant. During the initial plant startup following installation of the instrumentation, wide range differential pressure data would be obtained and used to confirm or revise the compensation function so that a 100% output is obtained at all temperatures. Since the calculated compensation function is verified by plant operating data, any uncertainties in the flow and differential pressure estimates are eliminated.
0236Q
Item 23 Have tests been run with voids in the vessel? Describe the results of these tests.
Response
- 23. At present a Westinghouse RVLIS is* installed at the Semiscale Test Facility in Idaho.
Small break loss-of-coolant experiments are being conducted at this facility by EG&G for the NRC.
The results of these tests are used to compare the RVLIS measurements with Semi-scale differential pressure measurements, garrrna densitometer data and core cladding surface thermocouple indications. To date, after correcting for differences between PWR reactor vessel internals and Semiscale modeling, good correlation between Semiscale level indica-tions and RVLIS measurements has been observed.
In cooperation with the NRC, EG&G and ORNL, Westinghouse is preparing a report su!TITiariz-ing the RVLIS performance during selected Semiscale tests.
0236Q -***---------------**----*-*---.----- _,_ _______...
... ". l Item 24 Estimate the expected accuracy of the system after an ICC event.
Response
- 24. The accuracy of the system as described in the response to_question 6 would be the same for any LOCA-type incident, including an ICC event, cau,sing a temperature increase within the reactor contain-.
ment.
Uncertainties due to reference leg temperature measurements and sensor and hydraulic isolator displacements are included in the accuracy analysis.
02 36....____~-------'-----
Item 25 Describe how the conversion of RTD resistance to temperature made in the analog level: system.
Response
The RTD is connected such that an analog voltage which is proportional to RTD temperature, is input to the microprocessor system. This analog voltage is converted to temperature by using a curve stored in memory which relates voltage to RTD temperature.
0236Q
~----------'---'------'---------