NL-08-1182, Transmittal of Response to Regulatory Issue Summary 2008-16, Preparation and Scheduling of Operator Licensing Examinations: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 08/07/2008 | | issue date = 08/07/2008 | ||
| title = Transmittal of Response to Regulatory Issue Summary 2008-16, Preparation and Scheduling of Operator Licensing Examinations | | title = Transmittal of Response to Regulatory Issue Summary 2008-16, Preparation and Scheduling of Operator Licensing Examinations | ||
| author name = Ajluni M | | author name = Ajluni M | ||
| author affiliation = Southern Nuclear Operating Co, Inc | | author affiliation = Southern Nuclear Operating Co, Inc | ||
| addressee name = | | addressee name = | ||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Southern Nuclear Operating Company, Inc. Post Office Box 1295 Birmingham. | {{#Wiki_filter:Southern Nuclear Operating Company, Inc. | ||
Alabama 35201-1295 Tel 205.992.5000 August 7, 2008 SOUTHERN'\ | Post Office Box 1295 Birmingham. Alabama 35201-1295 Tel 205.992.5000 August 7, 2008 SOUTHERN'\\ | ||
COMPANY Energy to Serve Your WorldS" Docket Nos.: 50-321 50-366 50-348 50-364 50-424 50-425 NL-08-1182 U. S. Nuclear Regulato ATTN: Document Control Desk Washington. | COMPANY Energy to Serve Your WorldS" Docket Nos.: 50-321 50-366 50-348 50-364 50-424 50-425 NL-08-1182 U. S. Nuclear Regulato ATTN: Document Control Desk Washington. D. C. 205 ry Commission 55-0001 Edwin I. Hatch Nuclear Plant Joseph M. Farley Nuclear Plant Vogtle Electric Generating Plant Response to Regulatory Issue Summary 2008-16 Preparation and Scheduling of Operator Licensing Examinations On June 27,2008, the NRC issued Regulatory Issue Summary (RIS) 2008-16, "Preparation and Scheduling of Operator Licensing Examinations." RIS 2008-16 requests that addressees voluntarily submit estimates regarding operator licensing examinations. In the enclosure to this letter, Southern Nuclear Operating Company (SNC) provides the requested information on NRC Form 536 for the Edwin I. Hatch Nuclear Plant (HNP), the Joseph M. Farley Nuclear Plant (FNP) and the Vogtle Electric Generating Plant (VEGP). | ||
D. C. 205 ry Commission 55-0001 Edwin I. Hatch Nuclear Plant Joseph M. Farley Nuclear Plant Vogtle Electric Generating Plant Response to Regulatory Issue Summary 2008-16 Preparation and Scheduling of Operator Licensing Examinations On June 27,2008, the NRC issued Regulatory Issue Summary (RIS) 2008-16, "Preparation and Scheduling of Operator Licensing Examinations." RIS 2008-16 requests that addressees voluntarily submit estimates regarding operator licensing examinations. | The provided estimates are not commitments and may change. If you have any questions, please advise. | ||
In the enclosure to this letter, Southern Nuclear Operating Company (SNC) provides the requested information on NRC Form 536 for the Edwin I. Hatch Nuclear Plant (HNP), the Joseph M. Farley Nuclear Plant (FNP) and the Vogtle Electric Generating Plant (VEGP). The provided estimates are not commitments and may change. If you have any questions, please advise. Sincerely, M. J. Ajluni Manager, Nuclear Licensing MJAlDWD/phr | Sincerely, M. J. Ajluni Manager, Nuclear Licensing MJAlDWD/phr | ||
==Enclosure:== | |||
NRC Form 536 Operator Licensing Examination Data for HNP, FNP and VEGP | |||
U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator | U. S. Nuclear Regulatory Commission NL-08-1182 Page 2 cc: | ||
Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, Vice President - Farley Mr. D. R. Madison., Vice President - Hatch Mr. T. E. Tynan, Vice President - Vogtle Mr. D. H. Jones, Vice President - Engineering RType: CFA04.054; CHA02.004; CVC7000; LC# 14815 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. R. A. Jervey, NRR Project Manager - Farley Mr. R. E. Martin, NRR Project Manager - Hatch Mr. R. A. Jervey, NRR Project Manager - Vogtle Mr. E. L. Crowe, Senior Resident Inspector - Farley Mr. J. A. Hickey, Senior Resident Inspector - Hatch Mr. G. J. McCoy, Senior Resident Inspector - Vogtle | |||
NRC FORM 536 | NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION (8-2005) | ||
OPERATOR LICENSING EXAMINATION DATA APPROVED BY 0MB NO 3150-0131 EXPIRES O8/3I/2OO8 Estimated burden per response to comply with this voluntary information coIlection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5F53), U. S. | |||
Nuclear Regulatory Commission, Washington, DC 20555-0001 or by internet email to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. | |||
FACILITY Edwin I. Hatch Nuclear Plant Units 1 & 2 NRC REGION II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 2 | |||
1 1 | |||
1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSING EXAMINATIONS PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 NUMBER OF REACTOR OPERATORS Exam 1: 1 Exam 2: 4 2 | |||
5 5 | |||
NUMBER OF SENIOR REACTOR OPERATORS-INSTANT Exam 1: 7 Exam 2: 10 10 9 | |||
9 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE Ex 1: 04/20/09 Ex 2: 10/26/09 12/06/2010 12/05/2011 12/10/2012 ALTERNATE DATE Ex 1: 03/23/09 Ex 2: 11/09/09 01/24/2011 01/23/2012 01/28/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 14 16 NRC FORM 536 (8-2005) | |||
Estimated burden per response to comply with this voluntary information coIlection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5F53), U. S. Nuclear Regulatory Commission, | NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION (8-2005) | ||
FACILITY | OPERATOR LICENSING EXAMINATION DATA APPROVED BY 0MB NO 3150-0131 EXPIRES O8/3I/2OO8 Estimated burden per response to comply with this voluntary information coIlection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5F53), U. S. | ||
Nuclear Regulatory Commission, Washington, DC 20555-0001 or by internet email to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. | |||
FACILITY Joseph M. Farley Nuclear Plant Units 1 & 2 NRC REGION II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 2 | |||
1 1 | |||
ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSING EXAMINATIONS PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 NUMBER OF REACTOR OPERATORS 6 | |||
Exam 1: 6 Exam 2: 6 6 | |||
6 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 8 | |||
Exam 1: 8 Exam 2: 8 8 | |||
8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 | |||
Exam 1: 1 Exam 2: 1 2 | |||
2 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 10/27/2008 03/03/2010 10/25/2010 10/24/2011 10/29/2012 ALTERNATE DATE 11/10/2008 03/10/2010 11/01/2010 10/31/2011 11/05/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 14 14 NRC FORM 536 (8-2005) | |||
NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION (8-2005) | |||
OPERATOR LICENSING EXAMINATION DATA APPROVED BY 0MB NO 3150-0131 EXPIRES O8/3I/2OO8 Estimated burden per response to comply with this voluntary information coIlection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5F53), U. S. | |||
Nuclear Regulatory Commission, Washington, DC 20555-0001 or by internet email to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. | |||
FACILITY Vogtle Electric Generating Plant Units 1 & 2 (*Unit 3) | |||
NRC REGION II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012* | |||
Estimated burden per response to comply with this voluntary information coIlection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5F53), U. S. Nuclear Regulatory Commission, | ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 | ||
FACILITY | 1 1 | ||
NRC REGION II | ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 1 | ||
B. INITIAL OPERATOR LICENSING EXAMINATIONS PROPOSED NUMBER CY 2009 CY 2011 CY 2012 CY 2012* | |||
NUMBER OF REACTOR OPERATORS 6 | |||
8 8 | |||
6 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 9 | |||
11 11 12 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 | |||
2 2 | |||
NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 06/01/2009 03/14/2011 04/09/2012 11/05/2012 ALTERNATE DATE 06/15/2009 04/22/2011 04/30/2012 11/19/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 16 19 NRC FORM 536 (8-2005)}} | |||
Latest revision as of 15:39, 14 January 2025
| ML082210476 | |
| Person / Time | |
|---|---|
| Site: | Hatch, Vogtle, Farley |
| Issue date: | 08/07/2008 |
| From: | Ajluni M Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NL-08-1182, RIS-08-016 | |
| Download: ML082210476 (5) | |
Text
Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham. Alabama 35201-1295 Tel 205.992.5000 August 7, 2008 SOUTHERN'\\
COMPANY Energy to Serve Your WorldS" Docket Nos.: 50-321 50-366 50-348 50-364 50-424 50-425 NL-08-1182 U. S. Nuclear Regulato ATTN: Document Control Desk Washington. D. C. 205 ry Commission 55-0001 Edwin I. Hatch Nuclear Plant Joseph M. Farley Nuclear Plant Vogtle Electric Generating Plant Response to Regulatory Issue Summary 2008-16 Preparation and Scheduling of Operator Licensing Examinations On June 27,2008, the NRC issued Regulatory Issue Summary (RIS) 2008-16, "Preparation and Scheduling of Operator Licensing Examinations." RIS 2008-16 requests that addressees voluntarily submit estimates regarding operator licensing examinations. In the enclosure to this letter, Southern Nuclear Operating Company (SNC) provides the requested information on NRC Form 536 for the Edwin I. Hatch Nuclear Plant (HNP), the Joseph M. Farley Nuclear Plant (FNP) and the Vogtle Electric Generating Plant (VEGP).
The provided estimates are not commitments and may change. If you have any questions, please advise.
Sincerely, M. J. Ajluni Manager, Nuclear Licensing MJAlDWD/phr
Enclosure:
NRC Form 536 Operator Licensing Examination Data for HNP, FNP and VEGP
U. S. Nuclear Regulatory Commission NL-08-1182 Page 2 cc:
Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, Vice President - Farley Mr. D. R. Madison., Vice President - Hatch Mr. T. E. Tynan, Vice President - Vogtle Mr. D. H. Jones, Vice President - Engineering RType: CFA04.054; CHA02.004; CVC7000; LC# 14815 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. R. A. Jervey, NRR Project Manager - Farley Mr. R. E. Martin, NRR Project Manager - Hatch Mr. R. A. Jervey, NRR Project Manager - Vogtle Mr. E. L. Crowe, Senior Resident Inspector - Farley Mr. J. A. Hickey, Senior Resident Inspector - Hatch Mr. G. J. McCoy, Senior Resident Inspector - Vogtle
NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION (8-2005)
OPERATOR LICENSING EXAMINATION DATA APPROVED BY 0MB NO 3150-0131 EXPIRES O8/3I/2OO8 Estimated burden per response to comply with this voluntary information coIlection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5F53), U. S.
Nuclear Regulatory Commission, Washington, DC 20555-0001 or by internet email to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY Edwin I. Hatch Nuclear Plant Units 1 & 2 NRC REGION II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 2
1 1
1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSING EXAMINATIONS PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 NUMBER OF REACTOR OPERATORS Exam 1: 1 Exam 2: 4 2
5 5
NUMBER OF SENIOR REACTOR OPERATORS-INSTANT Exam 1: 7 Exam 2: 10 10 9
9 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE Ex 1: 04/20/09 Ex 2: 10/26/09 12/06/2010 12/05/2011 12/10/2012 ALTERNATE DATE Ex 1: 03/23/09 Ex 2: 11/09/09 01/24/2011 01/23/2012 01/28/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 14 16 NRC FORM 536 (8-2005)
NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION (8-2005)
OPERATOR LICENSING EXAMINATION DATA APPROVED BY 0MB NO 3150-0131 EXPIRES O8/3I/2OO8 Estimated burden per response to comply with this voluntary information coIlection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5F53), U. S.
Nuclear Regulatory Commission, Washington, DC 20555-0001 or by internet email to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY Joseph M. Farley Nuclear Plant Units 1 & 2 NRC REGION II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 2
1 1
ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSING EXAMINATIONS PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 NUMBER OF REACTOR OPERATORS 6
Exam 1: 6 Exam 2: 6 6
6 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 8
Exam 1: 8 Exam 2: 8 8
8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1
Exam 1: 1 Exam 2: 1 2
2 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 10/27/2008 03/03/2010 10/25/2010 10/24/2011 10/29/2012 ALTERNATE DATE 11/10/2008 03/10/2010 11/01/2010 10/31/2011 11/05/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 14 14 NRC FORM 536 (8-2005)
NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION (8-2005)
OPERATOR LICENSING EXAMINATION DATA APPROVED BY 0MB NO 3150-0131 EXPIRES O8/3I/2OO8 Estimated burden per response to comply with this voluntary information coIlection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5F53), U. S.
Nuclear Regulatory Commission, Washington, DC 20555-0001 or by internet email to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY Vogtle Electric Generating Plant Units 1 & 2 (*Unit 3)
NRC REGION II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012*
ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1
1 1
ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 1
B. INITIAL OPERATOR LICENSING EXAMINATIONS PROPOSED NUMBER CY 2009 CY 2011 CY 2012 CY 2012*
NUMBER OF REACTOR OPERATORS 6
8 8
6 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 9
11 11 12 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1
2 2
NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 06/01/2009 03/14/2011 04/09/2012 11/05/2012 ALTERNATE DATE 06/15/2009 04/22/2011 04/30/2012 11/19/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 16 19 NRC FORM 536 (8-2005)