ML091320221: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 05/12/2009 | | issue date = 05/12/2009 | ||
| title = Request No. BV1-IWE-2-2 Acceptance Review Results (ME1166) | | title = Request No. BV1-IWE-2-2 Acceptance Review Results (ME1166) | ||
| author name = Morgan N | | author name = Morgan N | ||
| author affiliation = NRC/NRR/DORL/LPLI-1 | | author affiliation = NRC/NRR/DORL/LPLI-1 | ||
| addressee name = | | addressee name = | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:From: Nadiyah Morgan Sent: Tuesday, May 12, 2009 10:25 AM To: 'sarvers@firstenergycorp.com' | {{#Wiki_filter:From: | ||
Nadiyah Morgan Sent: | |||
Tuesday, May 12, 2009 10:25 AM To: | |||
'sarvers@firstenergycorp.com' | |||
==Subject:== | ==Subject:== | ||
Beaver Valley - 1, Request No. BV1-IWE-2-2 Acceptance Review Results (ME01166) | Beaver Valley - 1, Request No. BV1-IWE-2-2 Acceptance Review Results (ME01166) | ||
Steve, | : Steve, By {{letter dated|date=April 28, 2009|text=letter dated April 28, 2009}}, FirstEnergy Nuclear Operating Company submitted a relief request for Beaver Valley Power Station, Unit No. 1. The proposed relief request would authorize an alternative to the detailed visual examination requirement of American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section Xl, sub-article IWE-5240 during the pressure test of the containment liner pressure boundary repair weld during the current maintenance and refueling outage. The purpose of this letter is to provide the results of the Nuclear Regulatory Commission (NRC) staff=s acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | ||
=s acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | Pursuant to Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety. | ||
Pursuant to Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety. | |||
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence. | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence. | ||
Thanks, Dee Nadiyah S. Morgan Beaver Valley Project Manager Nuclear Regulatory Commission (301) 415-1016 Nadiyah.Morgan@NRC.GOV E-mail Properties Mail Envelope Properties () | : Thanks, Dee Nadiyah S. Morgan Beaver Valley Project Manager Nuclear Regulatory Commission (301) 415-1016 Nadiyah.Morgan@NRC.GOV E-mail Properties Mail Envelope Properties () | ||
==Subject:== | ==Subject:== | ||
Beaver Valley - 1, Request No. BV1-IWE-2-2 Acceptance Review Results | Beaver Valley - 1, Request No. BV1-IWE-2-2 Acceptance Review Results | ||
Sensitivity: | (ME01166) | ||
Sent Date: 05/12/2009 10:04:06 AM Received Date: 05/12/2009 10:24:00 AM From: Nadiyah Morgan Created By: Nadiyah.Morgan@nrc.gov Recipients: | |||
sarvers@firstenergycorp.com ('sarvers@firstenergycorp.com') | |||
Tracking Status: None Post Office: | |||
Files Size Date & Time MESSAGE 10543 05/12/2009 Options Expiration Date: | |||
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received:}} | |||
Latest revision as of 11:54, 14 January 2025
| ML091320221 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 05/12/2009 |
| From: | Nadiyah Morgan Plant Licensing Branch 1 |
| To: | FirstEnergy Corp |
| morgan n | |
| References | |
| BV1-IWE-2-2, TAC ME1166 | |
| Download: ML091320221 (2) | |
Text
From:
Nadiyah Morgan Sent:
Tuesday, May 12, 2009 10:25 AM To:
'sarvers@firstenergycorp.com'
Subject:
Beaver Valley - 1, Request No. BV1-IWE-2-2 Acceptance Review Results (ME01166)
- Steve, By letter dated April 28, 2009, FirstEnergy Nuclear Operating Company submitted a relief request for Beaver Valley Power Station, Unit No. 1. The proposed relief request would authorize an alternative to the detailed visual examination requirement of American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section Xl, sub-article IWE-5240 during the pressure test of the containment liner pressure boundary repair weld during the current maintenance and refueling outage. The purpose of this letter is to provide the results of the Nuclear Regulatory Commission (NRC) staff=s acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Pursuant to Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.
- Thanks, Dee Nadiyah S. Morgan Beaver Valley Project Manager Nuclear Regulatory Commission (301) 415-1016 Nadiyah.Morgan@NRC.GOV E-mail Properties Mail Envelope Properties ()
Subject:
Beaver Valley - 1, Request No. BV1-IWE-2-2 Acceptance Review Results
(ME01166)
Sent Date: 05/12/2009 10:04:06 AM Received Date: 05/12/2009 10:24:00 AM From: Nadiyah Morgan Created By: Nadiyah.Morgan@nrc.gov Recipients:
sarvers@firstenergycorp.com ('sarvers@firstenergycorp.com')
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 10543 05/12/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: