ML091520300: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML091520300
| number = ML091520300
| issue date = 07/07/2008
| issue date = 07/07/2008
| title = NRC Region Iii, Initial License Exam, Job Performance Measure, JPM: RO System a, Title: Terminate from Emergency Boration
| title = NRC Region III, Initial License Exam, Job Performance Measure, JPM: RO System a, Title: Terminate from Emergency Boration
| author name =  
| author name =  
| author affiliation = NRC/RGN-III
| author affiliation = NRC/RGN-III
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE  
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:
RO SYSTEM a TITLE:
TERMINATE FROM EMERGENCY BORATION CANDIDATE:
EXAMINER:


JPM: RO SYSTEM a TITLE: TERMINATE FROM EMERGENCY BORATION 
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 2 of 8 JULY 2008 JOB PERFORMANCE MEASURE DATA PAGE Task:
 
Align Charging Pump Suction to SIRWT (Safety Injection Refueling Water Tank)
CANDIDATE: _____________________________________________
Alternate Path: NO Facility JPM #: PL-OPS-EOP-032J K/A: 004A4.18 Importance:
 
RO: 4.3 SRO: 4.1 K/A Statement: Ability to manually operate and/or monitor in the control room:
EXAMINER: _____________________________________________
Emergency borate valve Task Standard: Emergency Boration secured with Charging Pump suction to the SIRWT and all Charging Pumps operating.
 
Preferred Evaluation Location: Simulator
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 2 of 8 JULY 2008 JOB PERFORMANCE MEASURE DATA PAGE Task: Align Charging Pump Suction to SIRWT (Safety Injection Refueling Water Tank)
__X__
Alternate Path: NO  
In Plant Preferred Evaluation Method:
 
Perform
Facility JPM #: PL-OPS-EOP-032J  
__X__
 
Simulate  
K/A: 004A4.18   Importance: RO: 4.3   SRO: 4.1  
 
K/A Statement: Ability to manually operate and/or monitor in the control room: Emergency borate valve  
 
Task Standard: Emergency Boration secured with Charging Pump suction to the SIRWT and all Charging Pumps operating.  
 
Preferred Evaluation Location: Simulator __X__ In Plant _____
 
Preferred Evaluation Method: Perform __X__ Simulate _____


==References:==
==References:==
EOP-4.0, Loss Of Coolant Recovery     EOP Supplement 40, Charging Pump Suction Alignment  
EOP-4.0, Loss Of Coolant Recovery EOP Supplement 40, Charging Pump Suction Alignment Validation Time: 5 minutes Time Critical:
 
NO Candidate: ___________________________________________________
Validation Time: 5 minutes Time Critical: NO  
Time Start: ________
 
Time Finish:
Candidate: ___________________________________________________  
Performance Time:
 
________ minutes Performance Rating:
Time Start: ________ Time Finish: ________
SAT______
 
UNSAT ______
Performance Time: ________ minutes  
Comments:
 
Examiner: _______________________________
Performance Rating: SAT______ UNSAT ______  
Date:
 
Signature  
Comments:  
 
Examiner: _______________________________ Date: ______________ Signature JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 3 of 8 JULY 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
EOP Supplement 40, Charging Pump Suction Alignment, Rev. 5
 
Also see Simulator Operator Instructions (last page of this document).
 
READ TO CANDIDATE
 
DIRECTION TO CANDIDATE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.


JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 3 of 8 JULY 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
EOP Supplement 40, Charging Pump Suction Alignment, Rev. 5 Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE DIRECTION TO CANDIDATE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* A Loss of Coolant Accident has occurred.
* A Loss of Coolant Accident has occurred.
* SIS and CHR have occurred.
* SIS and CHR have occurred.
* PCS boron concentration has been verified greater than the required concentration per EOP Supplement 35, Determination of Emergency Boration Requirements.  
* PCS boron concentration has been verified greater than the required concentration per EOP Supplement 35, Determination of Emergency Boration Requirements.
 
INITIATING CUES:
INITIATING CUES:
* During performance of EOP-4.0, "Loss of Coolant Accident Recovery," Step 22, the Control Room Supervisor directs you to secure Emergency Boration per EOP Supplement 40 aligning Charging Pump suction to the SIRWT with all Charging Pumps left operating.  
* During performance of EOP-4.0, Loss of Coolant Accident Recovery, Step 22, the Control Room Supervisor directs you to secure Emergency Boration per EOP Supplement 40 aligning Charging Pump suction to the SIRWT with all Charging Pumps left operating.  
 
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 4 of 8 JULY 2008 Proc. Step TASK ELEMENT 1 STANDARD Graden/a Locate EOP Supplement 40, Charging Pump Suction Alignment EOP Supplement 40 located.
S  U Comment:  Evaluator hands operator a Working Copy.
 
Proc. Step TASK ELEMENT 2 STANDARD Grade2.01 Open Charging Pumps Suction From SIRWT Valve, MO-2160 MO-2160 handswitch taken to the open position (valve opens).
S  U Comment:  Note: MO-2160 will take a little time to stroke open.
CRITICAL STEP
 
Proc. Step TASK ELEMENT 3 STANDARD Grade2.02 Stop the Boric Acid Pumps. P-56A  P-56B  P-56A AND P-56B handswitches to the trip position (Pumps off).
S  U Comment:
CRITICAL STEP


JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 5 of 8 JULY 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade2.03 Close the following valves: Boric Acid Pump Feed Valve, MO-2140  Gravity Feed Valves  MO-2169  MO-2170  MO-2140, MO-2169, and MO-2170 handswitches taken to the closed position (valves close)
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 4 of 8 JULY 2008 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Locate EOP Supplement 40, Charging Pump Suction Alignment EOP Supplement 40 located.
S U Comment: Note: MO-2140, MO-2169, and MO-2170 will take a little time to stroke closed.
S U Comment:
CRITICAL STEP
Evaluator hands operator a Working Copy.
Proc. Step TASK ELEMENT 2 STANDARD Grade 2.01 Open Charging Pumps Suction From SIRWT Valve, MO-2160 MO-2160 handswitch taken to the open position (valve opens).
S U Comment:
Note: MO-2160 will take a little time to stroke open.
CRITICAL STEP Proc. Step TASK ELEMENT 3 STANDARD Grade 2.02 Stop the Boric Acid Pumps.
P-56A P-56B P-56A AND P-56B handswitches to the trip position (Pumps off).
S U Comment:
CRITICAL STEP  


Proc. Step TASK ELEMENT 5 STANDARD Grade2.04 Ensure closed Charging Pumps Suction VCT Outlet Valve, MO-2087.
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 5 of 8 JULY 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade 2.03 Close the following valves:
Boric Acid Pump Feed Valve, MO-2140 Gravity Feed Valves MO-2169 MO-2170 MO-2140, MO-2169, and MO-2170 handswitches taken to the closed position (valves close)
S U Comment:
Note: MO-2140, MO-2169, and MO-2170 will take a little time to stroke closed.
CRITICAL STEP Proc. Step TASK ELEMENT 5 STANDARD Grade 2.04 Ensure closed Charging Pumps Suction VCT Outlet Valve, MO-2087.
MO-2087 verified closed.
MO-2087 verified closed.
S U Comment:
S U Comment:
 
Proc. Step TASK ELEMENT 6 STANDARD Grade 2.05 Operate each Charging Pump for at least five minutes.
Proc. Step TASK ELEMENT 6 STANDARD Grade2.05 Operate each Charging Pump for at least five minutes.
Determines that all Charging pumps will be left in-service (given in initial conditions).
Determines that all Charging pumps will be left in-service (given in initial conditions).
S U Comment:
S U Comment:  


JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 6 of 8 JULY 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade2.06 WHEN each pump has been operated at least five minutes, -.
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 6 of 8 JULY 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade 2.06 WHEN each pump has been operated at least five minutes,.
Determines that all Charging pumps will be left in-service (given in initial conditions).
Determines that all Charging pumps will be left in-service (given in initial conditions).
S U Comment: Evaluator Cue: Inform Operator that another Operator will perform this step.  
S U Comment:
 
Evaluator Cue: Inform Operator that another Operator will perform this step.
Proc. Step TASK ELEMENT 8 STANDARD Graden/a EOP Supplement 40 is Signed, Dated/Timed EOP Supplement 40 Signed, Dated/Timed S U Comment:
Proc. Step TASK ELEMENT 8 STANDARD Grade n/a EOP Supplement 40 is Signed, Dated/Timed EOP Supplement 40 Signed, Dated/Timed S U Comment:
 
Proc. Step TASK ELEMENT 9 STANDARD Grade n/a Notify CRS of the completion of EOP Supplement 40 CRS notified that EOP Supplement 40 complete S U Comment:
Proc. Step TASK ELEMENT 9 STANDARD Grade n/a Notify CRS of the completion of EOP Supplement 40 CRS notified that EOP Supplement 40 complete S U Comment:
 
END OF TASK  
END OF TASK  


JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 7 of 8 JULY 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)  
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 7 of 8 JULY 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
 
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* A Loss of Coolant Accident has occurred.
* A Loss of Coolant Accident has occurred.
* SIS and CHR have occurred.
* SIS and CHR have occurred.
* PCS boron concentration has been verified greater than the required concentration per EOP Supplement 35, Determination of Emergency Boration Requirements.  
* PCS boron concentration has been verified greater than the required concentration per EOP Supplement 35, Determination of Emergency Boration Requirements.
 
INITIATING CUES:
INITIATING CUES:
* During performance of EOP-4.0, "Loss of Coolant Accident Recovery," Step 22, the Control Room Supervisor directs you to secure Emergency Boration per EOP Supplement 40 aligning Charging Pump suction to the SIRWT with all Charging Pumps left operating.  
* During performance of EOP-4.0, Loss of Coolant Accident Recovery, Step 22, the Control Room Supervisor directs you to secure Emergency Boration per EOP Supplement 40 aligning Charging Pump suction to the SIRWT with all Charging Pumps left operating.  
 
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 8 of 8 JULY 2008 SIMULATOR OPERATOR INSTRUCTIONS


USE IC-79}}
JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 8 of 8 JULY 2008 SIMULATOR OPERATOR INSTRUCTIONS USE IC-79}}

Latest revision as of 11:35, 14 January 2025

NRC Region III, Initial License Exam, Job Performance Measure, JPM: RO System a, Title: Terminate from Emergency Boration
ML091520300
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/07/2008
From:
NRC/RGN-III
To:
Entergy Nuclear Palisades
Shared Package
ML082200311 List:
References
Download: ML091520300 (8)


Text

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:

RO SYSTEM a TITLE:

TERMINATE FROM EMERGENCY BORATION CANDIDATE:

EXAMINER:

JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 2 of 8 JULY 2008 JOB PERFORMANCE MEASURE DATA PAGE Task:

Align Charging Pump Suction to SIRWT (Safety Injection Refueling Water Tank)

Alternate Path: NO Facility JPM #: PL-OPS-EOP-032J K/A: 004A4.18 Importance:

RO: 4.3 SRO: 4.1 K/A Statement: Ability to manually operate and/or monitor in the control room:

Emergency borate valve Task Standard: Emergency Boration secured with Charging Pump suction to the SIRWT and all Charging Pumps operating.

Preferred Evaluation Location: Simulator

__X__

In Plant Preferred Evaluation Method:

Perform

__X__

Simulate

References:

EOP-4.0, Loss Of Coolant Recovery EOP Supplement 40, Charging Pump Suction Alignment Validation Time: 5 minutes Time Critical:

NO Candidate: ___________________________________________________

Time Start: ________

Time Finish:

Performance Time:

________ minutes Performance Rating:

SAT______

UNSAT ______

Comments:

Examiner: _______________________________

Date:

Signature

JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 3 of 8 JULY 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

EOP Supplement 40, Charging Pump Suction Alignment, Rev. 5 Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • A Loss of Coolant Accident has occurred.
  • SIS and CHR have occurred.
  • PCS boron concentration has been verified greater than the required concentration per EOP Supplement 35, Determination of Emergency Boration Requirements.

INITIATING CUES:

  • During performance of EOP-4.0, Loss of Coolant Accident Recovery, Step 22, the Control Room Supervisor directs you to secure Emergency Boration per EOP Supplement 40 aligning Charging Pump suction to the SIRWT with all Charging Pumps left operating.

JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 4 of 8 JULY 2008 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Locate EOP Supplement 40, Charging Pump Suction Alignment EOP Supplement 40 located.

S U Comment:

Evaluator hands operator a Working Copy.

Proc. Step TASK ELEMENT 2 STANDARD Grade 2.01 Open Charging Pumps Suction From SIRWT Valve, MO-2160 MO-2160 handswitch taken to the open position (valve opens).

S U Comment:

Note: MO-2160 will take a little time to stroke open.

CRITICAL STEP Proc. Step TASK ELEMENT 3 STANDARD Grade 2.02 Stop the Boric Acid Pumps.

P-56A P-56B P-56A AND P-56B handswitches to the trip position (Pumps off).

S U Comment:

CRITICAL STEP

JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 5 of 8 JULY 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade 2.03 Close the following valves:

Boric Acid Pump Feed Valve, MO-2140 Gravity Feed Valves MO-2169 MO-2170 MO-2140, MO-2169, and MO-2170 handswitches taken to the closed position (valves close)

S U Comment:

Note: MO-2140, MO-2169, and MO-2170 will take a little time to stroke closed.

CRITICAL STEP Proc. Step TASK ELEMENT 5 STANDARD Grade 2.04 Ensure closed Charging Pumps Suction VCT Outlet Valve, MO-2087.

MO-2087 verified closed.

S U Comment:

Proc. Step TASK ELEMENT 6 STANDARD Grade 2.05 Operate each Charging Pump for at least five minutes.

Determines that all Charging pumps will be left in-service (given in initial conditions).

S U Comment:

JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 6 of 8 JULY 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade 2.06 WHEN each pump has been operated at least five minutes,.

Determines that all Charging pumps will be left in-service (given in initial conditions).

S U Comment:

Evaluator Cue: Inform Operator that another Operator will perform this step.

Proc. Step TASK ELEMENT 8 STANDARD Grade n/a EOP Supplement 40 is Signed, Dated/Timed EOP Supplement 40 Signed, Dated/Timed S U Comment:

Proc. Step TASK ELEMENT 9 STANDARD Grade n/a Notify CRS of the completion of EOP Supplement 40 CRS notified that EOP Supplement 40 complete S U Comment:

END OF TASK

JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 7 of 8 JULY 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • A Loss of Coolant Accident has occurred.
  • SIS and CHR have occurred.
  • PCS boron concentration has been verified greater than the required concentration per EOP Supplement 35, Determination of Emergency Boration Requirements.

INITIATING CUES:

  • During performance of EOP-4.0, Loss of Coolant Accident Recovery, Step 22, the Control Room Supervisor directs you to secure Emergency Boration per EOP Supplement 40 aligning Charging Pump suction to the SIRWT with all Charging Pumps left operating.

JPM-RO SYSTEM a PALISADES NUCLEAR PLANT Page 8 of 8 JULY 2008 SIMULATOR OPERATOR INSTRUCTIONS USE IC-79