| title = Operating Corporation - Notification of Inspection (NRC Inspection Report 05000482-12-005 and Request for Information
| title = Operating Corporation - Notification of Inspection (NRC Inspection Report 05000482-12-005 and Request for Information
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Sunseri M W
| addressee name = Sunseri M
| addressee affiliation = Wolf Creek Nuclear Operating Corp
| addressee affiliation = Wolf Creek Nuclear Operating Corp
| docket = 05000482
| docket = 05000482
| license number = NPF-042
| license number = NPF-042
| contact person = Osterholtz C C /vlm
| contact person = Osterholtz C /vlm
| document report number = IR-12-005
| document report number = IR-12-005
| document type = Letter
| document type = Letter
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:August 16, 2012  
{{#Wiki_filter:August 16, 2012  
 
  Matthew W. Sunseri, President and  Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS   
Matthew W. Sunseri, President and  
   Chief Executive Officer  
Wolf Creek Nuclear Operating Corporation  
P.O. Box 411  
Burlington, KS   
SUBJECT:  WOLF CREEK NUCLEAR OPERATING CORPORATION - NOTIFICATION OF
INSPECTION (NRC INSPECTION REPORT 05000482/2012005 AND REQUEST
FOR INFORMATION)
Dear Mr. Sunseri:
From October 1, 2012 to October 5, 2012, inspectors from the Nuclear Regulatory
Commissions (NRC) Region IV office will perform the baseline biennial requalification
inspection at Wolf Creek Nuclear Operating Corporation, using NRC Inspection
Procedure 71111.11B, Licensed Operator Requalification Program.  Experience has shown
that this inspection is a resource intensive inspection both for the NRC inspectors and your staff. 
In order to minimize the impact to your onsite resources and to ensure a productive inspection,
we have enclosed a request for documents needed for this inspection.  These documents have
been divided into three groups.  The first group (Section A of the enclosure) identifies
information to be provided prior to the inspection to ensure that the inspectors are adequately
prepared.  The second group (Section B of the enclosure) identifies the information the
inspectors will need upon arrival at the site.  The third group (Section C of this enclosure)
identifies the items which are necessary to close out the inspection and are usually sent a few
weeks after the team has left the site.  It is important that all of these documents are up to date
and complete in order to minimize the number of additional documents requested during the
preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. J. Knapp of your operations training
organization.  Our inspection dates are subject to change based on your updated schedule of
examination activities. 
UNITED STATES
NUCLEAR REGULATORY COMMISSION
RE GIO N I V
1600 EAST LAMAR BLVD
ARLINGTON, TEXAS 76011-4511


  SUBJECT:  WOLF CREEK NUCLEAR OPERATING CORPORATION - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000482/2012005 AND REQUEST FOR INFORMATION)
Mr. Sunseri  
  Dear Mr. Sunseri:
- 2 -  
From October 1, 2012 to October 5, 2012, inspectors from the Nuclear Regulatory
   
Commission's (NRC) Region IV office will perform the baseline biennial requalification inspection at Wolf Creek Nuclear Operating Corporation, using NRC Inspection Procedure 71111.11B, "Licensed Operator Requalification Program."  Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff.  In order to minimize the impact to your onsite resources and to ensure a productive inspection,
If there are any questions about this inspection or the material requested, please contact the  
we have enclosed a request for documents needed for this inspection.  These documents have been divided into three groups.  The first group (Section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared.  The second group (Section B of the enclosure) identifies the information the inspectors will need upon arrival at the site.  The third group (Section C of this enclosure)
lead inspector Mr. C. Osterholtz at (817)-200-1269 (Clyde.Osterholtz@nrc.gov) or   
identifies the items which are necessary to close out the inspection and are usually sent a few weeks after the team has left the site.  It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
Ms. T. Buchanan at (817)-200-1503 (Theresa.Buchanan@nrc.gov).  
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. J. Knapp of your operations training organization.  Our inspection dates are subject to change based on your updated schedule of examination activities.  UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
   
Mr. Sunseri - 2 -  
This letter does not contain new or amended information collection requirements subject to the  
  If there are any questions about this inspection or the material requested, please contact the lead inspector Mr. C. Osterholtz at (817)-200-1269 (Clyde.Osterholtz@nrc.gov) or  Ms. T. Buchanan at (817)-200-1503 (Theresa.Buchanan@nrc.gov
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection  
).  This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection  
requirements were approved by the Office of Management and Budget, control number 3150-
requirements were approved by the Office of Management and Budget, control number 3150-0018.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.   
0018.  The NRC may not conduct or sponsor, and a person is not required to respond to, a  
request for information or an information collection requirement unless the requesting document  
displays a currently valid Office of Management and Budget control number.   
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document
system (ADAMS).  ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
                                                                                    /RA/ C. Osterholtz for
Mark S. Haire, Chief
   
   
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Operations Branch  
  Sincerely,
                                                                                      /RA/ C. Osterholtz for
Division of Reactor Safety  
 
   
Mark S. Haire, Chief  Operations Branch  Division of Reactor Safety  
Docket:  50-482  
  Docket:  50-482  
License:  NPF-42  
License:  NPF-42  50-313 License:  DPDR-51  
  50-313  
  Enclosure:  
License:  DPDR-51  
   
Enclosure:  
Inservice Inspection Document Request  
Inservice Inspection Document Request  
  Electronic Distribution for Wolf Creek Nuclear Operating Corporation
   
Electronic Distribution for Wolf Creek Nuclear Operating Corporation  
 


   ML12229A537 ADAMS:   No      # Yes # SUNSI Review Complete Reviewer Initials:    CCO  
   ML12229A537  
  #  Publicly Available  
ADAMS:   No      # Yes  
# SUNSI Review Complete  
Reviewer Initials:    CCO  
   
#  Publicly Available  
# Non-Sensitive  
# Non-Sensitive  
  Non-publicly Available   Sensitive RIV/DRS/OPS  
  DRS/OPS/Chief C. Osterholtz   M. Haire /RA/   /RA/COsterholtz for  8/16/2012   8/16/2012
  Non-publicly Available  
  Sensitive  
RIV/DRS/OPS  
DRS/OPS/Chief  
C. Osterholtz  
M. Haire  
/RA/  
/RA/COsterholtz for  
  8/16/2012  
8/16/2012  
 
Attachment 2 BRQ Info Request Template (remove this text before use)  
Attachment 2 BRQ Info Request Template (remove this text before use)  
  - 1 - Enclosure  
  BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST  
  From: C. Osterholtz Senior Operations Engineer, NRC RIV 817-200-1269  
  To: J. Knapp Licensed Supervising Instructor/simulator, Wolf Creek Nuclear Operating Corporation  
- 1 -  
Enclosure  
   
BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST  
   
From: C. Osterholtz  
Senior Operations Engineer, NRC RIV  
817-200-1269  
   
To:  
J. Knapp  
Licensed Supervising Instructor/simulator, Wolf Creek Nuclear Operating Corporation  
620-364-8831  
620-364-8831  
Subj: Information Request to Support October 1-5, 2012, Licensed Operator Requalification Program Inspection (IP 71111.11B)
   
   
A. The following information is requested in order to support inspection preparation activities.  These items are listed by section as they appear in the inspection module  
Subj: Information Request to Support October 1-5, 2012, Licensed Operator Requalification
(ie 2.02, 2.04, etc). Requested materials should be sent either electronically or hardcopy in order to arrive at the Region IV office no later than September 21, 2012.  
Program Inspection (IP 71111.11B)
  * Electronically To:  e-mail address  (Clyde.Osterholtz@nrc.gov) Cc: email address (Theresa.Buchanan@nrc.gov)  
  * Hardcopy to: US Nuclear Regulatory Commission, Region IV 1600 E. Lamar Blvd Arlington, TX 76011  
A. The following information is requested in order to support inspection preparation  
activities.  These items are listed by section as they appear in the inspection module  
(ie 2.02, 2.04, etc). Requested materials should be sent either electronically or  
hardcopy in order to arrive at the Region IV office no later than September 21, 2012.  
   
*  
Electronically To:  e-mail address  (Clyde.Osterholtz@nrc.gov) Cc: email address  
(Theresa.Buchanan@nrc.gov)  
   
*  
Hardcopy to: US Nuclear Regulatory Commission, Region IV  
1600 E. Lamar Blvd  
Arlington, TX 76011  
ATTN:  C. Osterholtz  
ATTN:  C. Osterholtz  
  General Requests:
   
* List of licensed operators (SRO & RO) by crew (operating & staff)  
General Requests:  
* Training and Operations Department organization charts (with qualified LOR evaluators identified)  
*  
* Procedures that identify process for revising and maintaining LO continuing training program up to date  
List of licensed operators (SRO & RO) by crew (operating & staff)  
* List of outstanding LOR program changes  
*  
* List of plant events and industry operating experience incorporated into LOR program since last BRQ  
Training and Operations Department organization charts (with qualified LOR  
* Audits and/or self-assessment reports addressing the licensed operator requalification training program  
evaluators identified)  
* Last two years of simulator review committee (or equivalent) meeting minutes  
*  
* Last two years of CRC (or equivalent) meeting minutes  
Procedures that identify process for revising and maintaining LO continuing training  
  02.03:  Biennial Requalification Written Examination Quality
program up to date  
* The current and approved biennial written examination schedule   
*  
* The current requalification cycle written examination results for both SRO & RO that have already been administered up to the week prior to the inspection team arrival onsite.
List of outstanding LOR program changes  
*  
List of plant events and industry operating experience incorporated into LOR  
program since last BRQ  
*  
Audits and/or self-assessment reports addressing the licensed operator  
requalification training program  
*  
Last two years of simulator review committee (or equivalent) meeting minutes  
*  
Last two years of CRC (or equivalent) meeting minutes  
   
02.03:  Biennial Requalification Written Examination Quality  
*  
The current and approved biennial written examination schedule   
*  
The current requalification cycle written examination results for both SRO & RO that  
have already been administered up to the week prior to the inspection team arrival  
onsite.  
 
Attachment 2 BRQ Info Request Template (remove this text before use)  
Attachment 2 BRQ Info Request Template (remove this text before use)  
  - 2 - Enclosure  
* All written examinations that have been approved for administration up to and including the week before the inspection team is onsite.  This will need to have  
adequate password protection if e-mailed or double envelope protection if mailed via regular mail per NUREG-1021.   
* The current requalification cycle examination methodology (sample plan)  
- 2 -  
  02.04:  Annual Requalification Operating Test Quality
Enclosure  
* The schedule for the operating tests (JPMs & scenarios) to be given the week of  October 1, 2012 (week team is onsite)  
*  
* The operating tests (JPMs & scenarios) (password protected and provide separately via telephone at later date) to be given the week of October 1, 2012 (week team is onsite) * Current requalification cycle operating tests (SRO & RO) and results up to the week prior to the inspection team arrival onsite.  
All written examinations that have been approved for administration up to and  
* All of the previous year's NRC required annual operating tests.   
including the week before the inspection team is onsite.  This will need to have  
* Current requalification cycle operating test methodology (sample plan)  
adequate password protection if e-mailed or double envelope protection if mailed via  
* All portions of the UFSAR that identify operator response times for time critical operator actions  
regular mail per NUREG-1021.   
  02.05:  Licensee Admin of Requal Exams
*  
* All procedures used to administer the annual operating test  
The current requalification cycle examination methodology (sample plan)  
* All procedures used to assess operator performance  
   
* All procedures that describe conduct of simulator training  
02.04:  Annual Requalification Operating Test Quality  
* All Procedures used to test, operate, and maintain the simulator  
*  
  02.06:  Requalification Examination Security
The schedule for the operating tests (JPMs & scenarios) to be given the week of   
* Submit any tracking tools that you use as a means to prevent excessive overlap on the written examinations and also meet the intent of sampling all required topics on a periodic basis.   
October 1, 2012 (week team is onsite)  
* Submit any tracking tools that you use as a means to prevent excessive overlap on the operating tests and also meet the intent of sampling all required malfunctions (including major events, instrument/component malfunctions, TS calls, etc) on a  
*  
The operating tests (JPMs & scenarios) (password protected and provide separately  
via telephone at later date) to be given the week of October 1, 2012 (week team is  
onsite)  
*  
Current requalification cycle operating tests (SRO & RO) and results up to the week  
prior to the inspection team arrival onsite.  
*  
All of the previous years NRC required annual operating tests.   
*  
Current requalification cycle operating test methodology (sample plan)  
*  
All portions of the UFSAR that identify operator response times for time critical  
operator actions  
   
02.05:  Licensee Admin of Requal Exams  
*  
All procedures used to administer the annual operating test  
*  
All procedures used to assess operator performance  
*  
All procedures that describe conduct of simulator training  
*  
All Procedures used to test, operate, and maintain the simulator  
   
02.06:  Requalification Examination Security  
*  
Submit any tracking tools that you use as a means to prevent excessive overlap on  
the written examinations and also meet the intent of sampling all required topics on a  
periodic basis.   
*  
Submit any tracking tools that you use as a means to prevent excessive overlap on  
the operating tests and also meet the intent of sampling all required malfunctions  
(including major events, instrument/component malfunctions, TS calls, etc) on a  
periodic basis.  
periodic basis.  
* All Procedures that describe examination security, including procedures used to develop the examinations that include guidelines on overlap between examinations in current exam cycle tests and prior year examinations.  
*  
* List of all Condition Reports since the last biennial requal inspection related to examination security and overlap.  
All Procedures that describe examination security, including procedures used to  
  02.07:  Licensee Remedial Training Program
develop the examinations that include guidelines on overlap between examinations  
* List of remedial training conducted or planned since last requal exams (includes training provided to operators to enable passing requal exams and training provided to correct generic or individual weaknesses observed during previous requal exam  
in current exam cycle tests and prior year examinations.  
cycle). * Remediation plans (lesson plans, reference materials, and attendance documentation)
*  
List of all Condition Reports since the last biennial requal inspection related to  
examination security and overlap.  
   
02.07:  Licensee Remedial Training Program  
*  
List of remedial training conducted or planned since last requal exams (includes  
training provided to operators to enable passing requal exams and training provided  
to correct generic or individual weaknesses observed during previous requal exam  
cycle).  
*  
Remediation plans (lesson plans, reference materials, and attendance  
documentation)  
 
Attachment 2 BRQ Info Request Template (remove this text before use)  
Attachment 2 BRQ Info Request Template (remove this text before use)  
  - 3 - Enclosure  
  02.08:  Conformance with Operator License Conditions
* All Procedures and Program documentation for maintaining active operator licenses, tracking training attendance, and ensuring medical fitness of licensed operators  
* All Procedures and associated documentation that supports reactivation of any SRO/RO license (operating or staff crew) since the last biennial inspection  
- 3 -  
  02.09:  Simulator Performance
Enclosure  
* For the following cases, send the most recent transient test packages, which may be electronic or in paper single test packages and shall be complete with test procedures for each test, the acceptance criteria, and results.  For each transient test, the reference chart should be included or an equivalent subject matter expert review versus the simulator results with a write-up for any differences beyond the ANSI 3.5 standard requirements:  
 
02.08:  Conformance with Operator License Conditions  
*  
All Procedures and Program documentation for maintaining active operator licenses,  
tracking training attendance, and ensuring medical fitness of licensed operators  
*  
All Procedures and associated documentation that supports reactivation of any  
SRO/RO license (operating or staff crew) since the last biennial inspection  
   
02.09:  Simulator Performance  
*  
For the following cases, send the most recent transient test packages, which may be  
electronic or in paper single test packages and shall be complete with test  
procedures for each test, the acceptance criteria, and results.  For each transient  
test, the reference chart should be included or an equivalent subject matter expert  
review versus the simulator results with a write-up for any differences beyond the  
ANSI 3.5 standard requirements:  
o Transient test 9, Maximum size unisolable steam line rupture  
o Transient test 9, Maximum size unisolable steam line rupture  
o Transient test 10, Stuck open PORV  
o Transient test 10, Stuck open PORV  
o Transient test 11, Maximum design load rejection  
o Transient test 11, Maximum design load rejection  
o Steady state tests for low power levels  
o Steady state tests for low power levels  
* All Simulator Management and Configuration Procedures if not already provided for section 02.05 above.  
*  
* Simulator Discrepancy Report summary list for all open DR's. For closed DR's, summary list for those items closed between September 2010 and September 2012.   
All Simulator Management and Configuration Procedures if not already provided for  
* Malfunction Test Package   
section 02.05 above.  
* Primary parameters tested in order to verify core physics parameters (such as MTC, IRW). The applicable reference graphs from the Plant physics data book (electronic or other means as available) should also be included as well as the test procedures used and the acceptance criteria with results.  
*  
  02.10:  Problem Identification and Resolution
Simulator Discrepancy Report summary list for all open DRs. For closed DRs,  
* A summary report of all condition reports related to operator actions/errors in the control room  
summary list for those items closed between September 2010 and September 2012.   
* Any revised requalification training that was based on licensed operator performance  
*  
issues   
Malfunction Test Package   
B. The following information is requested in order to support the onsite inspection activities.  Requested materials should be available to the inspection team, either  
*  
Primary parameters tested in order to verify core physics parameters (such as MTC,  
IRW). The applicable reference graphs from the Plant physics data book (electronic  
or other means as available) should also be included as well as the test procedures  
used and the acceptance criteria with results.  
   
02.10:  Problem Identification and Resolution  
*  
A summary report of all condition reports related to operator actions/errors in the  
control room  
*  
Any revised requalification training that was based on licensed operator performance  
issues  
   
B. The following information is requested in order to support the onsite inspection  
activities.  Requested materials should be available to the inspection team, either  
electronically or hardcopy, upon site arrival on October 1, 2012.  
electronically or hardcopy, upon site arrival on October 1, 2012.  
  02.02:  Exam Results  /  02.03 and 02.04:  Written Exam and Op Test Quality
   
* All Operating tests (JPMs & scenarios) to be given in all subsequent weeks after onsite week  
02.02:  Exam Results  /  02.03 and 02.04:  Written Exam and Op Test Quality  
* All results up to the day the team leaves the site.   
*  
 
All Operating tests (JPMs & scenarios) to be given in all subsequent weeks after  
onsite week  
*  
All results up to the day the team leaves the site.   
 
Attachment 2 BRQ Info Request Template (remove this text before use)  
Attachment 2 BRQ Info Request Template (remove this text before use)  
  - 4 - Enclosure 02.08:  Conformance with Operator License Conditions
* Access to licensed operators' records (operating and staff crews)  
* Access to licensed operators' training attendance records  
* Access to licensed operators' medical records  
- 4 -  
  02.09:  Simulator Performance
Enclosure  
* Simulator discrepancies (DR's) from September 2010 to September 2012.  This should include all open DR's and DR's that have been closed, including the documentation/justification for closure.   
02.08:  Conformance with Operator License Conditions  
* Acceptance test documentation, including hardware and software model revisions at the time of acceptance (as available).  
*  
* Documentation that validates current models, including the thermal-hydraulics and neutronics models, to the actual plant.   
Access to licensed operators records (operating and staff crews)  
* All current model deficiencies, including FSAR vs Design differences in the simulator (any documentation on this)  
*  
* Summary list of modifications from September 2010 to September 2012.  
Access to licensed operators training attendance records  
* Plant Modifications (both hardware and software) completed on the Simulator by due date from September 2010 to September 2012.  
*  
* Simulator Differences Lesson plan used in training (current to October 1, 2012).  
Access to licensed operators medical records  
* The complete book of all Simulator annual performance test packages (usually in a single book, but may be electronic or in single test packages), complete with all transient tests, steady state tests, and malfunction tests.  This should also include the test procedures for each test, the acceptance criteria, and results.  For each transient test, the reference chart should be included or an equivalent subject matter expert review versus the simulator results with a write-up for any differences beyond the ANSI standard requirements.  
   
* All test packages used to verify core physics parameters (such as MTC, IRW).  The applicable reference graphs from the Plant physics data book (electronic or other means as available) should also be included as well as the test procedures used and the acceptance criteria with results.  
02.09:  Simulator Performance  
* All Simulator test, configuration management, and related documents available in the room for inspectors to review.  This includes training needs analysis packages, simulator review committee meeting minutes, etc.  
*  
* Current copy of ANSI 3.5 standard you are committed to for Simulator testing.  
Simulator discrepancies (DRs) from September 2010 to September 2012.  This  
  02.10:  Problem Identification and Resolution
should include all open DRs and DRs that have been closed, including the  
* All condition reports related to operator actions/errors in the control room  
documentation/justification for closure.   
  C. Wolf Creek Nuclear Operating Corporation is required to send the final results summary and any remaining exams and operating tests that have not been reviewed to the regional office lead inspector for this inspection for final review and comparison against the Significance Determination Tools in order to communicate the exit results for the inspection.
*  
Acceptance test documentation, including hardware and software model revisions at  
the time of acceptance (as available).  
*  
Documentation that validates current models, including the thermal-hydraulics and  
neutronics models, to the actual plant.   
*  
All current model deficiencies, including FSAR vs Design differences in the simulator  
(any documentation on this)  
*  
Summary list of modifications from September 2010 to September 2012.  
*  
Plant Modifications (both hardware and software) completed on the Simulator by due  
date from September 2010 to September 2012.  
*  
Simulator Differences Lesson plan used in training (current to October 1, 2012).  
*  
The complete book of all Simulator annual performance test packages (usually in a  
single book, but may be electronic or in single test packages), complete with all  
transient tests, steady state tests, and malfunction tests.  This should also include  
the test procedures for each test, the acceptance criteria, and results.  For each  
transient test, the reference chart should be included or an equivalent subject matter  
expert review versus the simulator results with a write-up for any differences beyond  
the ANSI standard requirements.  
*  
All test packages used to verify core physics parameters (such as MTC, IRW).  The  
applicable reference graphs from the Plant physics data book (electronic or other  
means as available) should also be included as well as the test procedures used and  
the acceptance criteria with results.  
*  
All Simulator test, configuration management, and related documents available in the  
room for inspectors to review.  This includes training needs analysis packages,  
simulator review committee meeting minutes, etc.  
*  
Current copy of ANSI 3.5 standard you are committed to for Simulator testing.  
   
02.10:  Problem Identification and Resolution  
*  
All condition reports related to operator actions/errors in the control room  
   
C. Wolf Creek Nuclear Operating Corporation is required to send the final results  
summary and any remaining exams and operating tests that have not been reviewed  
to the regional office lead inspector for this inspection for final review and  
comparison against the Significance Determination Tools in order to communicate  
the exit results for the inspection.
}}
}}

Latest revision as of 22:55, 11 January 2025

Operating Corporation - Notification of Inspection (NRC Inspection Report 05000482-12-005 and Request for Information
ML12229A537
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 08/16/2012
From: Mark Haire
Operations Branch IV
To: Matthew Sunseri
Wolf Creek
Osterholtz C /vlm
References
IR-12-005
Download: ML12229A537 (7)


See also: IR 05000482/2012005

Text

August 16, 2012

Matthew W. Sunseri, President and

Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS

SUBJECT: WOLF CREEK NUCLEAR OPERATING CORPORATION - NOTIFICATION OF

INSPECTION (NRC INSPECTION REPORT 05000482/2012005 AND REQUEST

FOR INFORMATION)

Dear Mr. Sunseri:

From October 1, 2012 to October 5, 2012, inspectors from the Nuclear Regulatory

Commissions (NRC) Region IV office will perform the baseline biennial requalification

inspection at Wolf Creek Nuclear Operating Corporation, using NRC Inspection

Procedure 71111.11B, Licensed Operator Requalification Program. Experience has shown

that this inspection is a resource intensive inspection both for the NRC inspectors and your staff.

In order to minimize the impact to your onsite resources and to ensure a productive inspection,

we have enclosed a request for documents needed for this inspection. These documents have

been divided into three groups. The first group (Section A of the enclosure) identifies

information to be provided prior to the inspection to ensure that the inspectors are adequately

prepared. The second group (Section B of the enclosure) identifies the information the

inspectors will need upon arrival at the site. The third group (Section C of this enclosure)

identifies the items which are necessary to close out the inspection and are usually sent a few

weeks after the team has left the site. It is important that all of these documents are up to date

and complete in order to minimize the number of additional documents requested during the

preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. J. Knapp of your operations training

organization. Our inspection dates are subject to change based on your updated schedule of

examination activities.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

RE GIO N I V

1600 EAST LAMAR BLVD

ARLINGTON, TEXAS 76011-4511

Mr. Sunseri

- 2 -

If there are any questions about this inspection or the material requested, please contact the

lead inspector Mr. C. Osterholtz at (817)-200-1269 (Clyde.Osterholtz@nrc.gov) or

Ms. T. Buchanan at (817)-200-1503 (Theresa.Buchanan@nrc.gov).

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/ C. Osterholtz for

Mark S. Haire, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-482

License: NPF-42

50-313

License: DPDR-51

Enclosure:

Inservice Inspection Document Request

Electronic Distribution for Wolf Creek Nuclear Operating Corporation

ML12229A537

ADAMS: No # Yes

  1. SUNSI Review Complete

Reviewer Initials: CCO

  1. Publicly Available
  1. Non-Sensitive

Non-publicly Available

Sensitive

RIV/DRS/OPS

DRS/OPS/Chief

C. Osterholtz

M. Haire

/RA/

/RA/COsterholtz for

8/16/2012

8/16/2012

Attachment 2 BRQ Info Request Template (remove this text before use)

- 1 -

Enclosure

BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST

From: C. Osterholtz

Senior Operations Engineer, NRC RIV

817-200-1269

To:

J. Knapp

Licensed Supervising Instructor/simulator, Wolf Creek Nuclear Operating Corporation

620-364-8831

Subj: Information Request to Support October 1-5, 2012, Licensed Operator Requalification

Program Inspection (IP 71111.11B)

A. The following information is requested in order to support inspection preparation

activities. These items are listed by section as they appear in the inspection module

(ie 2.02, 2.04, etc). Requested materials should be sent either electronically or

hardcopy in order to arrive at the Region IV office no later than September 21, 2012.

Electronically To: e-mail address (Clyde.Osterholtz@nrc.gov) Cc: email address

(Theresa.Buchanan@nrc.gov)

Hardcopy to: US Nuclear Regulatory Commission, Region IV

1600 E. Lamar Blvd

Arlington, TX 76011

ATTN: C. Osterholtz

General Requests:

List of licensed operators (SRO & RO) by crew (operating & staff)

Training and Operations Department organization charts (with qualified LOR

evaluators identified)

Procedures that identify process for revising and maintaining LO continuing training

program up to date

List of outstanding LOR program changes

List of plant events and industry operating experience incorporated into LOR

program since last BRQ

Audits and/or self-assessment reports addressing the licensed operator

requalification training program

Last two years of simulator review committee (or equivalent) meeting minutes

Last two years of CRC (or equivalent) meeting minutes

02.03: Biennial Requalification Written Examination Quality

The current and approved biennial written examination schedule

The current requalification cycle written examination results for both SRO & RO that

have already been administered up to the week prior to the inspection team arrival

onsite.

Attachment 2 BRQ Info Request Template (remove this text before use)

- 2 -

Enclosure

All written examinations that have been approved for administration up to and

including the week before the inspection team is onsite. This will need to have

adequate password protection if e-mailed or double envelope protection if mailed via

regular mail per NUREG-1021.

The current requalification cycle examination methodology (sample plan)

02.04: Annual Requalification Operating Test Quality

The schedule for the operating tests (JPMs & scenarios) to be given the week of

October 1, 2012 (week team is onsite)

The operating tests (JPMs & scenarios) (password protected and provide separately

via telephone at later date) to be given the week of October 1, 2012 (week team is

onsite)

Current requalification cycle operating tests (SRO & RO) and results up to the week

prior to the inspection team arrival onsite.

All of the previous years NRC required annual operating tests.

Current requalification cycle operating test methodology (sample plan)

All portions of the UFSAR that identify operator response times for time critical

operator actions

02.05: Licensee Admin of Requal Exams

All procedures used to administer the annual operating test

All procedures used to assess operator performance

All procedures that describe conduct of simulator training

All Procedures used to test, operate, and maintain the simulator

02.06: Requalification Examination Security

Submit any tracking tools that you use as a means to prevent excessive overlap on

the written examinations and also meet the intent of sampling all required topics on a

periodic basis.

Submit any tracking tools that you use as a means to prevent excessive overlap on

the operating tests and also meet the intent of sampling all required malfunctions

(including major events, instrument/component malfunctions, TS calls, etc) on a

periodic basis.

All Procedures that describe examination security, including procedures used to

develop the examinations that include guidelines on overlap between examinations

in current exam cycle tests and prior year examinations.

List of all Condition Reports since the last biennial requal inspection related to

examination security and overlap.

02.07: Licensee Remedial Training Program

List of remedial training conducted or planned since last requal exams (includes

training provided to operators to enable passing requal exams and training provided

to correct generic or individual weaknesses observed during previous requal exam

cycle).

Remediation plans (lesson plans, reference materials, and attendance

documentation)

Attachment 2 BRQ Info Request Template (remove this text before use)

- 3 -

Enclosure

02.08: Conformance with Operator License Conditions

All Procedures and Program documentation for maintaining active operator licenses,

tracking training attendance, and ensuring medical fitness of licensed operators

All Procedures and associated documentation that supports reactivation of any

SRO/RO license (operating or staff crew) since the last biennial inspection

02.09: Simulator Performance

For the following cases, send the most recent transient test packages, which may be

electronic or in paper single test packages and shall be complete with test

procedures for each test, the acceptance criteria, and results. For each transient

test, the reference chart should be included or an equivalent subject matter expert

review versus the simulator results with a write-up for any differences beyond the

ANSI 3.5 standard requirements:

o Transient test 9, Maximum size unisolable steam line rupture

o Transient test 10, Stuck open PORV

o Transient test 11, Maximum design load rejection

o Steady state tests for low power levels

All Simulator Management and Configuration Procedures if not already provided for

section 02.05 above.

Simulator Discrepancy Report summary list for all open DRs. For closed DRs,

summary list for those items closed between September 2010 and September 2012.

Malfunction Test Package

Primary parameters tested in order to verify core physics parameters (such as MTC,

IRW). The applicable reference graphs from the Plant physics data book (electronic

or other means as available) should also be included as well as the test procedures

used and the acceptance criteria with results.

02.10: Problem Identification and Resolution

A summary report of all condition reports related to operator actions/errors in the

control room

Any revised requalification training that was based on licensed operator performance

issues

B. The following information is requested in order to support the onsite inspection

activities. Requested materials should be available to the inspection team, either

electronically or hardcopy, upon site arrival on October 1, 2012.

02.02: Exam Results / 02.03 and 02.04: Written Exam and Op Test Quality

All Operating tests (JPMs & scenarios) to be given in all subsequent weeks after

onsite week

All results up to the day the team leaves the site.

Attachment 2 BRQ Info Request Template (remove this text before use)

- 4 -

Enclosure

02.08: Conformance with Operator License Conditions

Access to licensed operators records (operating and staff crews)

Access to licensed operators training attendance records

Access to licensed operators medical records

02.09: Simulator Performance

Simulator discrepancies (DRs) from September 2010 to September 2012. This

should include all open DRs and DRs that have been closed, including the

documentation/justification for closure.

Acceptance test documentation, including hardware and software model revisions at

the time of acceptance (as available).

Documentation that validates current models, including the thermal-hydraulics and

neutronics models, to the actual plant.

All current model deficiencies, including FSAR vs Design differences in the simulator

(any documentation on this)

Summary list of modifications from September 2010 to September 2012.

Plant Modifications (both hardware and software) completed on the Simulator by due

date from September 2010 to September 2012.

Simulator Differences Lesson plan used in training (current to October 1, 2012).

The complete book of all Simulator annual performance test packages (usually in a

single book, but may be electronic or in single test packages), complete with all

transient tests, steady state tests, and malfunction tests. This should also include

the test procedures for each test, the acceptance criteria, and results. For each

transient test, the reference chart should be included or an equivalent subject matter

expert review versus the simulator results with a write-up for any differences beyond

the ANSI standard requirements.

All test packages used to verify core physics parameters (such as MTC, IRW). The

applicable reference graphs from the Plant physics data book (electronic or other

means as available) should also be included as well as the test procedures used and

the acceptance criteria with results.

All Simulator test, configuration management, and related documents available in the

room for inspectors to review. This includes training needs analysis packages,

simulator review committee meeting minutes, etc.

Current copy of ANSI 3.5 standard you are committed to for Simulator testing.

02.10: Problem Identification and Resolution

All condition reports related to operator actions/errors in the control room

C. Wolf Creek Nuclear Operating Corporation is required to send the final results

summary and any remaining exams and operating tests that have not been reviewed

to the regional office lead inspector for this inspection for final review and

comparison against the Significance Determination Tools in order to communicate

the exit results for the inspection.