| issue date = 03/31/2017
| issue date = 03/31/2017
| title = Independent Spent Fuel Storage Installation (ISFSI) - Transmittal of 10 CFR 50.59, 10 CFR 72.48, and Commitment Change Annual Reports and Notifications
| title = Independent Spent Fuel Storage Installation (ISFSI) - Transmittal of 10 CFR 50.59, 10 CFR 72.48, and Commitment Change Annual Reports and Notifications
| author name = Weber T N
| author name = Weber T
| author affiliation = Arizona Public Service Co
| author affiliation = Arizona Public Service Co
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:A member of the STARS Alliance LLC Callaway Diablo Canyon Palo Verde Wolf Creek Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393
{{#Wiki_filter:A member of the STARS Alliance LLC Callaway
-5764 10 CFR 50.59 / 10 CFR 72.48 102-07444 TNW/TMJ March 31, 2017 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555
* Diablo Canyon
-0001
* Palo Verde
* Wolf Creek Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-5764 10 CFR 50.59 / 10 CFR 72.48 102-07444 TNW/TMJ March 31, 2017 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  


==Dear Sirs:==
==Dear Sirs:==
==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, & 3 and Independent Spent Fuel Storage Installation (ISFSI) Docket No s. STN 50-528/529/530 and 72
Units 1, 2, & 3 and Independent Spent Fuel Storage Installation (ISFSI)
-44 10 CFR 50.59, 10 CFR 72.48, and Commitment Change Annual Reports and Notifications Enclosed please find the Arizona Public Service Company (APS) 10 CFR 50.59 and 10 CFR 72.48 report for January 1, 2016 , through December 31, 2016. In accordance with 10 CFR 50.59(d)(2), APS is providing a brief description and summary of the evaluations required by 10 CFR 50.59(d)(1) for each change completed during the period. The enclosure contains a report of the evaluations written during 2016, regardless of the implementation status of the evaluated action.
Docket Nos. STN 50-528/529/530 and 72-44 10 CFR 50.59, 10 CFR 72.48, and Commitment Change Annual Reports and Notifications Enclosed please find the Arizona Public Service Company (APS) 10 CFR 50.59 and 10 CFR 72.48 report for January 1, 2016, through December 31, 2016.
In accordance with 10 CFR 72.48(d)(2), APS is reporting that there was on e change completed during the period that was required to be reported pursuant to 10 CFR 72.48.
In accordance with 10 CFR 50.59(d)(2), APS is providing a brief description and summary of the evaluations required by 10 CFR 50.59(d)(1) for each change completed during the period. The enclosure contains a report of the evaluations written during 2016, regardless of the implementation status of the evaluated action.
In accordance wit h the APS commitment management program, APS is reporting that there were no NRC commitment change s during 2016 that were not previously reported
In accordance with 10 CFR 72.48(d)(2), APS is reporting that there was one change completed during the period that was required to be reported pursuant to 10 CFR 72.48.
. A separate commitment change was made during 2016 as reported in APS letter number 102-07204, dated February 25, 2016, Agencywide Documents Access and Management System (ADAMS) Accession No. ML 16056A5974
In accordance with the APS commitment management program, APS is reporting that there were no NRC commitment changes during 2016 that were not previously reported.
. No new commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Michael D. DiLorenzo, Nuclear Regulatory Affairs Section Leader at (623) 393
A separate commitment change was made during 2016 as reported in APS letter number 102-07204, dated February 25, 2016, Agencywide Documents Access and Management System (ADAMS) Accession No. ML16056A5974.
-3495. Sincerely, Thomas N. Weber Department Leader, Nuclear Regulatory Affairs TNW/TMJ/sma  
No new commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Michael D. DiLorenzo, Nuclear Regulatory Affairs Section Leader at (623) 393-3495.
Sincerely, Thomas N. Weber Department Leader, Nuclear Regulatory Affairs TNW/TMJ/sma  


==Enclosure:==
==Enclosure:==
PVNGS 10 CFR 50.59 and 10 CFR 72.48 Report January 2016 - December 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Annual 10 CFR 50.59, 10 CFR 72.48 and Commitment Change Report Page 2   cc: K. M. Kennedy NRC Region IV Regional Administrator S. P. Lingam NRC NRR Project Manager for PVNGS M. M. Watford NRC NRR Project Manager C. A. Peabody NRC Senior Resident Inspector for PVNGS
PVNGS 10 CFR 50.59 and 10 CFR 72.48 Report January 2016 - December 2016 Weber, Thomas N(Z00499)
Digitally signed by Weber, Thomas N(Z00499)
DN: cn=Weber, Thomas N(Z00499)
Reason: I am approving this document Date: 2017.03.31 09:31:57 -07'00'
 
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Annual 10 CFR 50.59, 10 CFR 72.48 and Commitment Change Report Page 2 cc:
K. M. Kennedy NRC Region IV Regional Administrator S. P. Lingam NRC NRR Project Manager for PVNGS M. M. Watford NRC NRR Project Manager C. A. Peabody NRC Senior Resident Inspector for PVNGS  
 
ENCLOSURE Palo Verde Nuclear Generating Station 10 CFR 50.59 and 10 CFR 72.48 Report January 2016 - December 2016


ENCLOSURE  Palo Verde Nuclear Generating Station 10 CFR 50.59 and 10 CFR 72.48 Report  January 2016 - December 2016 PVNGS 10 CFR 50.59 and 10 CFR 72.48 Report (January 20 16 through December 20 16) Enclosure Page 1 of 2 Log Doc Type Doc Number Description Summary E-14-0002 Rev. 001 DMWO 3232547 Replace the inverters of the Class 1E Vital Instrument AC power system, E-PNA-N11, E-PNB-N12, E-PNC-N13 and E-PND-N14. In addition, to improve the system availability and reliability, new swing inverters E-PNE-N15 and E-PNE-N16 along with a swing line-up switch are added to each of three units.
PVNGS 10 CFR 50.59 and 10 CFR 72.48 Report (January 2016 through December 2016)
Enclosure Page 1 of 2 Log Doc Type Doc Number Description Summary E-14-0002 Rev. 001 DMWO 3232547 Replace the inverters of the Class 1E Vital Instrument AC power system, E-PNA-N11, E-PNB-N12, E-PNC-N13 and E-PND-N14. In addition, to improve the system availability and reliability, new swing inverters E-PNE-N15 and E-PNE-N16 along with a swing line-up switch are added to each of three units.
This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).
E-14-0002 Rev. 002 DMWO 3232547 Replace the inverters of the Class 1E vital instrument AC power system, E-PNA-N11, E-PNB-N12, E-PNC-N13 and E-PND-N14. In addition, to improve the system availability and reliability, new swing inverters E-PNE-N15 and E-PNE-N16 along with a swing line-up switch are added to each of the three units.
This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).
This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).
E-14-0002  Rev. 002 DMWO 3232547 Replace the inverters of the Class 1E vital instrument AC power system, E-PNA-N11, E-PNB-N12, E-PNC-N13 and E-PND-N14. In addition, to improve the system availability and reliability
E-15-0002 Rev. 001 DMWO 4096894 Add a digital asset protection system which is a centralized monitoring and cyber security response architecture for process systems at the Palo Verde Nuclear Generating Station (PVNGS) facilities.
, new swing inverters E-PNE-N15 and E-PNE-N16 along with a swing line-up switch are added to each of the three units.
This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1). E-15-0002 Rev. 001 DMWO 4096894 Add a digital asset protection system which is a centralized monitoring and cyber security response architecture for process systems at the Palo Verde Nuclear Generating Station (PVNGS) facilities.
This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).
This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).
E-16-0001 Rev. 000 STDY 13-MS-A151 Justify connecting the refueling water tank to the spent fuel p ool cleanup system during any mode of operation.
E-16-0001 Rev. 000 STDY 13-MS-A151 Justify connecting the refueling water tank to the spent fuel pool cleanup system during any mode of operation.
This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).
This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).
E-16-0002 Rev. 000 DMWO 3426436 N ew 525 KV Delaney transmission line is added to PVNGS switchyard.
E-16-0002 Rev. 000 DMWO 3426436 New 525 KV Delaney transmission line is added to PVNGS switchyard.
This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).
This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).
E-16-0003 Rev. 000 CALC 13-JC-HP-0200 Widen containment hydrogen monitoring indication tolerances.
E-16-0003 Rev. 000 CALC 13-JC-HP-0200 Widen containment hydrogen monitoring indication tolerances.
This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).
PVNGS 10 CFR 50.59 and 10 CFR 72.48 Report (January 2016 through December 2016)
Enclosure Page 2 of 2 Log Doc Type Doc Number Description Summary E-16-0005 Rev. 000 SEP 28079-001-001 Implement vendor procedure to test various sizes of NETCO-SNAP-IN non-borated test inserts to provide a basis for determining the appropriate size of the wing width that will allow a successful installation of inserts into most spent fuel pool cell locations.
This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).
This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).
 
E-16-0006 Rev. 000 STDY 13-MS-A154 Summarize the design and licensing basis for components important to safety that are exposed to tornado-generated missiles.
PVNGS 10 CFR 50.59 and 10 CFR 72.48 Report (January 20 16 through December 20 16) Enclosure Page 2 of 2 Log Doc  Type  Doc Number Description Summary  E-16-0005 Rev. 000 SEP 28079-001-001 Implement vendor procedure to test various sizes of NETCO-SNAP-IN non-borated test inserts to provide a basis for determining the appropriate size of the wing width that will allow a successful installation of inserts into most spent fuel pool cell locations.
This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).
This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).
E-16-0006 Rev. 000 STDY 13-MS-A154 Summarize the design and licensing basis for components important to safety that are exposed to tornado
72.48 E-16-001 Rev. 000 EDC 2016-00369 Reduce the minimum required transportable storage canister shield lid weld size from 3/8 to 5/16.
-generated missiles.
This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).
This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).
72.48  E-16-001 Rev. 000 EDC 2016-00369 Reduce the minimum required transportable storage canister shield lid weld size from 3/8" to 5/16". This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).
Acronymn/Abbreviation List CALC - Calculation DMWO - Design Modification Work Order EDC  
Acronymn/Abbreviation List CALC - Calculation DMWO - Design Modification Work Order EDC - Engineering Document Change LDCR - Licensing Document Change Request PROC - Procedure SEP - Special Engineering (Vendor) Procedure STDY - Study TMWO - Temporary Modification Work Order}}
- Engineering Document Change LDCR - Licensing Document Change Request PROC - Procedure SEP  
- Special Engineering (Vendor) Procedure STDY - Study TMWO - Temporary Modification Work Order}}

Latest revision as of 10:43, 9 January 2025

Independent Spent Fuel Storage Installation (ISFSI) - Transmittal of 10 CFR 50.59, 10 CFR 72.48, and Commitment Change Annual Reports and Notifications
ML17090A529
Person / Time
Site: Palo Verde, Summer, Yankee Rowe, Plum Brook  South Carolina Electric & Gas Company icon.png
Issue date: 03/31/2017
From: Weber T
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
102-07444 TNW/TMJ
Download: ML17090A529 (5)


Text

A member of the STARS Alliance LLC Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-5764 10 CFR 50.59 / 10 CFR 72.48 102-07444 TNW/TMJ March 31, 2017 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, & 3 and Independent Spent Fuel Storage Installation (ISFSI)

Docket Nos. STN 50-528/529/530 and 72-44 10 CFR 50.59, 10 CFR 72.48, and Commitment Change Annual Reports and Notifications Enclosed please find the Arizona Public Service Company (APS) 10 CFR 50.59 and 10 CFR 72.48 report for January 1, 2016, through December 31, 2016.

In accordance with 10 CFR 50.59(d)(2), APS is providing a brief description and summary of the evaluations required by 10 CFR 50.59(d)(1) for each change completed during the period. The enclosure contains a report of the evaluations written during 2016, regardless of the implementation status of the evaluated action.

In accordance with 10 CFR 72.48(d)(2), APS is reporting that there was one change completed during the period that was required to be reported pursuant to 10 CFR 72.48.

In accordance with the APS commitment management program, APS is reporting that there were no NRC commitment changes during 2016 that were not previously reported.

A separate commitment change was made during 2016 as reported in APS letter number 102-07204, dated February 25, 2016, Agencywide Documents Access and Management System (ADAMS) Accession No. ML16056A5974.

No new commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Michael D. DiLorenzo, Nuclear Regulatory Affairs Section Leader at (623) 393-3495.

Sincerely, Thomas N. Weber Department Leader, Nuclear Regulatory Affairs TNW/TMJ/sma

Enclosure:

PVNGS 10 CFR 50.59 and 10 CFR 72.48 Report January 2016 - December 2016 Weber, Thomas N(Z00499)

Digitally signed by Weber, Thomas N(Z00499)

DN: cn=Weber, Thomas N(Z00499)

Reason: I am approving this document Date: 2017.03.31 09:31:57 -07'00'

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Annual 10 CFR 50.59, 10 CFR 72.48 and Commitment Change Report Page 2 cc:

K. M. Kennedy NRC Region IV Regional Administrator S. P. Lingam NRC NRR Project Manager for PVNGS M. M. Watford NRC NRR Project Manager C. A. Peabody NRC Senior Resident Inspector for PVNGS

ENCLOSURE Palo Verde Nuclear Generating Station 10 CFR 50.59 and 10 CFR 72.48 Report January 2016 - December 2016

PVNGS 10 CFR 50.59 and 10 CFR 72.48 Report (January 2016 through December 2016)

Enclosure Page 1 of 2 Log Doc Type Doc Number Description Summary E-14-0002 Rev. 001 DMWO 3232547 Replace the inverters of the Class 1E Vital Instrument AC power system, E-PNA-N11, E-PNB-N12, E-PNC-N13 and E-PND-N14. In addition, to improve the system availability and reliability, new swing inverters E-PNE-N15 and E-PNE-N16 along with a swing line-up switch are added to each of three units.

This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).

E-14-0002 Rev. 002 DMWO 3232547 Replace the inverters of the Class 1E vital instrument AC power system, E-PNA-N11, E-PNB-N12, E-PNC-N13 and E-PND-N14. In addition, to improve the system availability and reliability, new swing inverters E-PNE-N15 and E-PNE-N16 along with a swing line-up switch are added to each of the three units.

This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).

E-15-0002 Rev. 001 DMWO 4096894 Add a digital asset protection system which is a centralized monitoring and cyber security response architecture for process systems at the Palo Verde Nuclear Generating Station (PVNGS) facilities.

This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).

E-16-0001 Rev. 000 STDY 13-MS-A151 Justify connecting the refueling water tank to the spent fuel pool cleanup system during any mode of operation.

This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).

E-16-0002 Rev. 000 DMWO 3426436 New 525 KV Delaney transmission line is added to PVNGS switchyard.

This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).

E-16-0003 Rev. 000 CALC 13-JC-HP-0200 Widen containment hydrogen monitoring indication tolerances.

This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).

PVNGS 10 CFR 50.59 and 10 CFR 72.48 Report (January 2016 through December 2016)

Enclosure Page 2 of 2 Log Doc Type Doc Number Description Summary E-16-0005 Rev. 000 SEP 28079-001-001 Implement vendor procedure to test various sizes of NETCO-SNAP-IN non-borated test inserts to provide a basis for determining the appropriate size of the wing width that will allow a successful installation of inserts into most spent fuel pool cell locations.

This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).

E-16-0006 Rev. 000 STDY 13-MS-A154 Summarize the design and licensing basis for components important to safety that are exposed to tornado-generated missiles.

This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).

72.48 E-16-001 Rev. 000 EDC 2016-00369 Reduce the minimum required transportable storage canister shield lid weld size from 3/8 to 5/16.

This change does not require prior NRC approval in accordance with 10 CFR 50.59(C)(1).

Acronymn/Abbreviation List CALC - Calculation DMWO - Design Modification Work Order EDC

- Engineering Document Change LDCR - Licensing Document Change Request PROC - Procedure SEP

- Special Engineering (Vendor) Procedure STDY - Study TMWO - Temporary Modification Work Order