ML17324B346: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/16/2017
| issue date = 11/16/2017
| title = Notification of Licensed Operator Initial Examination 05000269/2018301, 05000270/2018301 and 05000287/2018301
| title = Notification of Licensed Operator Initial Examination 05000269/2018301, 05000270/2018301 and 05000287/2018301
| author name = McCoy G J
| author name = Mccoy G
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
| addressee name = Ray T D
| addressee name = Ray T
| addressee affiliation = Duke Energy Carolinas, LLC
| addressee affiliation = Duke Energy Carolinas, LLC
| docket = 05000269, 05000270, 05000287
| docket = 05000269, 05000270, 05000287
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION  
{{#Wiki_filter:UNITED STATES  
REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257
NUCLEAR REGULATORY COMMISSION  
  November 16, 2017  
REGION II  
  Thomas D. (Tom) Ray  
245 PEACHTREE CENTER AVENUE NE, SUITE 1200  
ATLANTA, GEORGIA  30303-1257  
November 16, 2017  
Thomas D. (Tom) Ray  
Vice President, Oconee Nuclear Station  
Vice President, Oconee Nuclear Station  
Duke Energy Carolinas, LLC  
Duke Energy Carolinas, LLC  
7800 Rochester Highway  
7800 Rochester Highway  
Seneca, SC  29672-0752  
Seneca, SC  29672-0752  
 
SUBJECT: OCONEE NUCLEAR STATION  - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000269/2018301, 05000270/2018301 AND  
 
SUBJECT:  
OCONEE NUCLEAR STATION  - NOTIFICATION OF LICENSED OPERATOR  
INITIAL EXAMINATION 05000269/2018301, 05000270/2018301 AND  
05000287/2018301  
05000287/2018301  
Dear Mr. Ray:
   
   
In a telephone conversation on November 6, 2017, between Mr. Scott Bowen, Operations Exam Writer, Mr. Sam Lark, NRC Exam Author and Mr. Phillip G. Capehart, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at the Oconee Nuclear Station.  The operating test is scheduled to be administered during the week of  
Dear Mr. Ray:
In a telephone conversation on November 6, 2017, between Mr. Scott Bowen, Operations Exam  
Writer, Mr. Sam Lark, NRC Exam Author and Mr. Phillip G. Capehart, Senior Operations  
Engineer, arrangements were made for the administration of licensing examinations at the  
Oconee Nuclear Station.  The operating test is scheduled to be administered during the week of  
June 4, 2018.  The written examination is scheduled to be administered the week of June 20,  
June 4, 2018.  The written examination is scheduled to be administered the week of June 20,  
2018.  The on-site preparatory week is scheduled for the week of April 30, 2018.  
2018.  The on-site preparatory week is scheduled for the week of April 30, 2018.  
   
   
As agreed during the telephone conversation, your staff will prepare both the operating test and written examinations based on the guidelines in Revision 11, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."  The U.S. Nuclear Regulatory  
As agreed during the telephone conversation, your staff will prepare both the operating test and  
Commission (NRC) regional office will discuss
written examinations based on the guidelines in Revision 11, of NUREG-1021, "Operator  
with your staff any changes that might be necessary before the examinations are administered.  Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.  
Licensing Examination Standards for Power Reactors."  The U.S. Nuclear Regulatory  
  To meet the above schedule, it will be necessary for your staff to furnish the operating test  
Commission (NRC) regional office will discuss with your staff any changes that might be  
 
necessary before the examinations are administered.  Your staff has also agreed to make  
outlines by January 5, 2018.  I provided written examination outlines to your staff in September 2017.  The written examinations, operating test and the supporting reference materials identified  
copies of all examination materials that are necessary for administering the examination.  
   
To meet the above schedule, it will be necessary for your staff to furnish the operating test  
outlines by January 5, 2018.  I provided written examination outlines to your staff in September  
2017.  The written examinations, operating test and the supporting reference materials identified  
in Attachment 3 to ES-201 will be due by March 21, 2018.  Pursuant to Title 10, Section  
in Attachment 3 to ES-201 will be due by March 21, 2018.  Pursuant to Title 10, Section  
55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the examinations, and test before they are submitted to the NRC for review and approval.  All materials shall be complete and ready-to-use.   
55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized  
representative of the facility licensee shall approve the examinations, and test before they are  
submitted to the NRC for review and approval.  All materials shall be complete and ready-to-
use.   
   
   
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.  Any delay in receiving the required examination and reference materials, or the submittal of inadequate or  
We request that any personal, proprietary, sensitive unclassified, or safeguards information in  
incomplete materials, may cause the examinations to be rescheduled
your response be contained in a separate enclosure and appropriately marked.  Any delay in  
T. Ray 2  In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and
receiving the required examination and reference materials, or the submittal of inadequate or  
to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.  
incomplete materials, may cause the examinations to be rescheduled.  


T. Ray
2
   
   
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.  
  To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management  
In order to conduct the requested written examinations and operating tests, it will be necessary
and Budget (OMB) approval number 3150-0090), at least 60 days before the first examination date (if possible).  Contact Mr. Capehart to determine the method for submission of waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024)  
for your staff to provide adequate space and accommodations in accordance with ES-402, and
should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary. Final signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before  
to make the simulation facility available on the dates noted above.  In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in  
effect while the written examinations and operating tests are being administered.  
   
To permit timely NRC review and evaluation, your staff should submit preliminary reactor  
operator and senior reactor operator waiver or excusal requests (if any) (Office of Management  
and Budget (OMB) approval number 3150-0090), at least 60 days before the first examination  
date (if possible).  Contact Mr. Capehart to determine the method for submission of waiver or  
excusal requests. Preliminary reactor operator and senior reactor operator license applications  
(OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024)  
should be submitted at least 30 days before the first examination date. If the preliminary  
applications are not received at least 30 days before the examination date, a postponement  
may be necessary. Final signed applications certifying that all training has been completed and  
requesting any waivers or excusals, as applicable, should be submitted at least 14 days before  
the first examination date.  
the first examination date.  
   
   
Although the guideline for receiving waiver or excusal requests calls for at least 30 days before  
Although the guideline for receiving waiver or excusal requests calls for at least 30 days before  
 
the first examination date (preliminary) and 14 days before the first examination date (final), the  
the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline  
requests should be submitted as early as possible in the process (see the 60-day guideline  
above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.  Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form  
above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.   
398, "Personal Qualifications Statement - Li
Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form  
censee," or as directed by Mr. Capehart when contacting him to determine the method for submission). The NRC will document its final  
398, Personal Qualifications Statement - Licensee, or as directed by Mr. Capehart when  
decision on whether to grant a waiver or excusal on the final (not preliminary) NRC form 398 submitted for the applicant. The NRC will not provide its decision until the final application is  
contacting him to determine the method for submission). The NRC will document its final  
decision on whether to grant a waiver or excusal on the final (not preliminary) NRC form 398  
submitted for the applicant. The NRC will not provide its decision until the final application is  
submitted to the agency.  
submitted to the agency.  
 
Paperwork Reduction Act Statement  
Paperwork Reduction Act Statement  
  This letter contains information collections that are subject to the  
   
Paperwork Reduction Act of  
This letter contains information collections that are subject to the Paperwork Reduction Act of  
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018.  
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of  
 
Management and Budget (OMB) under approval number 3150-0018.  
   
   
The burden to the public for these voluntary information collections is estimated to average  
The burden to the public for these voluntary information collections is estimated to average  
2,250 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. You may submit comments on any aspect of the information collections,  
2,250 hours per response, including the time for reviewing instructions, searching existing data  
sources, gathering and maintaining the data needed, and completing and reviewing the  
information collections. You may submit comments on any aspect of the information collections,  
including suggestions for reducing the burden, to FOIA, Privacy and Information Collections  
including suggestions for reducing the burden, to FOIA, Privacy and Information Collections  
Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by  
Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by  
electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.  
electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information  
   
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,  
T. Ray 3   Public Protection Notification  
Washington, DC 20503.  
  The NRC may neither conduct nor sponsor, and a person is not required to respond to, an  
 
T. Ray  
3  
Public Protection Notification  
   
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an  
information collection, unless it displays a currently valid OMB control number.  
information collection, unless it displays a currently valid OMB control number.  
   
   
In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding,"
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,  
of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available  
of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available  
electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).  
electronically for public inspection in the NRC Public Document Room or from the Publicly  
  Thank you for your cooperation in this matter.  Mr. Scott Bowen has been advised of the policies  
Available Records (PARS) component of the NRCs Agencywide Documents Access and  
and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Phillip G. Capehart at (404) 997-4483, (Internet E-
Management System (ADAMS).  ADAMS is accessible from the NRC Website at  
mail: Phillip.Capehart@nrc.gov
http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).  
), or me at (404) 997-4551, (Internet E-mail:  
   
Gerald.McCoy@nrc.gov)  Sincerely,       /RA/  Gerald J. McCoy, Chief       Operations Branch 1  
Thank you for your cooperation in this matter.  Mr. Scott Bowen has been advised of the policies  
      Division of Reactor Safety  
and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination  
  Docket Nos.: 50-269, 50-270, 50-287  
procedures and guidelines, please contact Mr. Phillip G. Capehart at (404) 997-4483, (Internet E-
mail: Phillip.Capehart@nrc.gov), or me at (404) 997-4551, (Internet E-mail:  
Gerald.McCoy@nrc.gov)  
   
Sincerely,  
/RA/  
   
Gerald J. McCoy, Chief  
Operations Branch 1  
Division of Reactor Safety  
   
Docket Nos.: 50-269, 50-270, 50-287  
License Nos.: DPR-38, DPR-47, DPR-55  
License Nos.: DPR-38, DPR-47, DPR-55  
cc: Distribution via Listserv


___ _____________________
SUNSI REVIEW COMPLETE
FORM 665 ATTACHED
OFFICE
RII:DRS
RII:DRS
   
   
cc: Distribution via Listserv  
   
 
___ _____________________ SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE PGC1 EMAIL GJM1     NAME PCAPEHART GMCCOY     DATE 11/ 16/2017 11/ 16 /2017     E-MAIL COPY?    YES NO       YES NO    YES NO       YES NO      YES NO       YES NO       YES NO
   
SIGNATURE  
PGC1 EMAIL  
GJM1  
NAME  
PCAPEHART  
GMCCOY  
DATE  
11/ 16/2017  
11/ 16 /2017
E-MAIL COPY?  
     YES  
NO    
  YES  
NO    YES  
NO    
  YES  
NO      YES  
NO    
  YES  
NO    
  YES  
NO
}}
}}

Latest revision as of 15:58, 7 January 2025

Notification of Licensed Operator Initial Examination 05000269/2018301, 05000270/2018301 and 05000287/2018301
ML17324B346
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/16/2017
From: Gerald Mccoy
Division of Reactor Safety II
To: Teresa Ray
Duke Energy Carolinas
References
50-269/18-301, 50-270/18-301, 50-287/18-301
Download: ML17324B346 (4)


See also: IR 05000269/2018301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

November 16, 2017

Thomas D. (Tom) Ray

Vice President, Oconee Nuclear Station

Duke Energy Carolinas, LLC

7800 Rochester Highway

Seneca, SC 29672-0752

SUBJECT:

OCONEE NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR

INITIAL EXAMINATION 05000269/2018301, 05000270/2018301 AND

05000287/2018301

Dear Mr. Ray:

In a telephone conversation on November 6, 2017, between Mr. Scott Bowen, Operations Exam

Writer, Mr. Sam Lark, NRC Exam Author and Mr. Phillip G. Capehart, Senior Operations

Engineer, arrangements were made for the administration of licensing examinations at the

Oconee Nuclear Station. The operating test is scheduled to be administered during the week of

June 4, 2018. The written examination is scheduled to be administered the week of June 20,

2018. The on-site preparatory week is scheduled for the week of April 30, 2018.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examinations based on the guidelines in Revision 11, of NUREG-1021, "Operator

Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outlines by January 5, 2018. I provided written examination outlines to your staff in September

2017. The written examinations, operating test and the supporting reference materials identified

in Attachment 3 to ES-201 will be due by March 21, 2018. Pursuant to Title 10, Section

55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the examinations, and test before they are

submitted to the NRC for review and approval. All materials shall be complete and ready-to-

use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

T. Ray

2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator waiver or excusal requests (if any) (Office of Management

and Budget (OMB) approval number 3150-0090), at least 60 days before the first examination

date (if possible). Contact Mr. Capehart to determine the method for submission of waiver or

excusal requests. Preliminary reactor operator and senior reactor operator license applications

(OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024)

should be submitted at least 30 days before the first examination date. If the preliminary

applications are not received at least 30 days before the examination date, a postponement

may be necessary. Final signed applications certifying that all training has been completed and

requesting any waivers or excusals, as applicable, should be submitted at least 14 days before

the first examination date.

Although the guideline for receiving waiver or excusal requests calls for at least 30 days before

the first examination date (preliminary) and 14 days before the first examination date (final), the

requests should be submitted as early as possible in the process (see the 60-day guideline

above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.

Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form

398, Personal Qualifications Statement - Licensee, or as directed by Mr. Capehart when

contacting him to determine the method for submission). The NRC will document its final

decision on whether to grant a waiver or excusal on the final (not preliminary) NRC form 398

submitted for the applicant. The NRC will not provide its decision until the final application is

submitted to the agency.

Paperwork Reduction Act Statement

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget (OMB) under approval number 3150-0018.

The burden to the public for these voluntary information collections is estimated to average

2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per response, including the time for reviewing instructions, searching existing data

sources, gathering and maintaining the data needed, and completing and reviewing the

information collections. You may submit comments on any aspect of the information collections,

including suggestions for reducing the burden, to FOIA, Privacy and Information Collections

Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by

electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information

and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

T. Ray

3

Public Protection Notification

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available

electronically for public inspection in the NRC Public Document Room or from the Publicly

Available Records (PARS) component of the NRCs Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRC Website at

http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Scott Bowen has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Mr. Phillip G. Capehart at (404) 997-4483, (Internet E-

mail: Phillip.Capehart@nrc.gov), or me at (404) 997-4551, (Internet E-mail:

Gerald.McCoy@nrc.gov)

Sincerely,

/RA/

Gerald J. McCoy, Chief

Operations Branch 1

Division of Reactor Safety

Docket Nos.: 50-269, 50-270, 50-287

License Nos.: DPR-38, DPR-47, DPR-55

cc: Distribution via Listserv

___ _____________________

SUNSI REVIEW COMPLETE

FORM 665 ATTACHED

OFFICE

RII:DRS

RII:DRS

SIGNATURE

PGC1 EMAIL

GJM1

NAME

PCAPEHART

GMCCOY

DATE

11/ 16/2017

11/ 16 /2017

E-MAIL COPY?

YES

NO

YES

NO YES

NO

YES

NO YES

NO

YES

NO

YES

NO