| issue date = 01/21/2009 | | issue date = 01/21/2009 | ||
| title = IR 05000219-08-007; 10/27/2008 - 12/23/2008; Exelon, LLC, Oyster Creek Generating Station; License Renewal Follow-up | | title = IR 05000219-08-007; 10/27/2008 - 12/23/2008; Exelon, LLC, Oyster Creek Generating Station; License Renewal Follow-up | ||
| author name = Roberts D | | author name = Roberts D | ||
| author affiliation = NRC/RGN-I/DRS | | author affiliation = NRC/RGN-I/DRS | ||
| addressee name = Pardee C | | addressee name = Pardee C | ||
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | ||
| docket = 05000219 | | docket = 05000219 | ||
| license number = DPR-016 | | license number = DPR-016 | ||
| contact person = Conte R | | contact person = Conte R | ||
| case reference number = FOIA/PA-2009-0070 | | case reference number = FOIA/PA-2009-0070 | ||
| document report number = IR-08-007 | | document report number = IR-08-007 | ||
| Line 16: | Line 16: | ||
| page count = 37 | | page count = 37 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000219/2008007]] | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I | {{#Wiki_filter:UNITED STATES | ||
475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 | NUCLEAR REGULATORY COMMISSION | ||
REGION I | |||
475 ALLENDALE ROAD | |||
KING OF PRUSSIA, PA 19406-1415 | |||
January 21, 2009 | |||
| Line 31: | Line 38: | ||
4300 Winfield Rd. | 4300 Winfield Rd. | ||
Warrenville, IL 60555 | Warrenville, IL 60555 | ||
SUBJECT: OYSTER CREEK GENERATING STATION - NRC LICENSE RENEWAL | SUBJECT: | ||
OYSTER CREEK GENERATING STATION - NRC LICENSE RENEWAL | |||
FOLLOW-UP INSPECTION REPORT 05000219/2008007 | |||
Dear Mr. Pardee: | Dear Mr. Pardee: | ||
On December 23, 2008, the U. S. Nuclear Regulatory Commission (NRC) completed an | On December 23, 2008, the U. S. Nuclear Regulatory Commission (NRC) completed an | ||
| Line 44: | Line 52: | ||
inspection results, which were discussed on December 23, 2008, with Mr. T. Rausch, Site Vice | inspection results, which were discussed on December 23, 2008, with Mr. T. Rausch, Site Vice | ||
President, Mr. M. Gallagher, Vice President License Renewal, and other members of your staff. | President, Mr. M. Gallagher, Vice President License Renewal, and other members of your staff. | ||
First, this inspection was conducted using the guidance of Inspection Procedure (IP) 71003 | First, this inspection was conducted using the guidance of Inspection Procedure (IP) 71003 | ||
"Post-Approval Site Inspection for License Renewal." Although IP 71003 is designated as a | "Post-Approval Site Inspection for License Renewal." Although IP 71003 is designated as a | ||
"post-approval" inspection procedure, the NRC conducted this inspection as a prudent measure absent a final NRC decision on license renewal. This inspection observed Oyster Creek license renewal activities during the last planned refueling outage prior to entering the period of | "post-approval" inspection procedure, the NRC conducted this inspection as a prudent measure | ||
absent a final NRC decision on license renewal. This inspection observed Oyster Creek license | |||
renewal activities during the last planned refueling outage prior to entering the period of | |||
extended operation. The license renewal application was the subject of a hearing and the | extended operation. The license renewal application was the subject of a hearing and the | ||
Atomic Safety and Licensing Board decision is being appealed to the Commission. Because a | Atomic Safety and Licensing Board decision is being appealed to the Commission. Because a | ||
| Line 55: | Line 64: | ||
Accordingly, as related to license renewal activities, the enclosed report records the inspector's | Accordingly, as related to license renewal activities, the enclosed report records the inspector's | ||
factual observations. | factual observations. | ||
Second, the inspection examined activities conducted under your current license as they relate | Second, the inspection examined activities conducted under your current license as they relate | ||
to safety and compliance with the | to safety and compliance with the Commissions rules and regulations. This portion of the | ||
inspection focused on the inservice inspection of the drywell containment. The inspectors | inspection focused on the inservice inspection of the drywell containment. The inspectors | ||
reviewed selected procedures and records, observed activities, and interviewed personnel. | reviewed selected procedures and records, observed activities, and interviewed personnel. | ||
Based on the results of the NRC's inspection, the NRC did not identify any safety significant | Based on the results of the NRC's inspection, the NRC did not identify any safety significant | ||
conditions affecting current operations. | conditions affecting current operations. | ||
C. Pardee | |||
2 | |||
C. Pardee 2 | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its | ||
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system | enclosure will be available electronically for public inspection in the NRC Public Document | ||
(ADAMS). ADAMS is accessible from the NRC Web-site at http://www.nrc.gov/reading-rm/adams.html | Room or from the Publicly Available Records (PARS) component of NRC's document system | ||
(ADAMS). ADAMS is accessible from the NRC Web-site at http://www.nrc.gov/reading- | |||
rm/adams.html (the Public Electronic Reading Room). | |||
We appreciate your cooperation. Please contact Richard Conte of my staff at (610) 337-5183 if | We appreciate your cooperation. Please contact Richard Conte of my staff at (610) 337-5183 if | ||
you have any questions regarding this letter. | you have any questions regarding this letter. | ||
Sincerely, | |||
/RA/ Original Signed By: | |||
/RA/ Original Signed By: | |||
Darrell J. Roberts, Director | Darrell J. Roberts, Director | ||
Division of Reactor Safety | Division of Reactor Safety | ||
Docket No. 50-219 | Docket No. | ||
License No. DPR-16 | 50-219 | ||
License No. | |||
DPR-16 | |||
Enclosure: | |||
Inspection Report No. 05000219/2008007 | |||
w/Attachment: Supplemental Information | |||
| Line 108: | Line 122: | ||
E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance | E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance | ||
P. Baldauf, Assistant Director, NJ Radiation Protection Programs | P. Baldauf, Assistant Director, NJ Radiation Protection Programs | ||
Congressman C. Smith | Congressman C. Smith | ||
C. Pardee 2 | |||
C. Pardee | |||
2 | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its | ||
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system | enclosure will be available electronically for public inspection in the NRC Public Document | ||
(ADAMS). ADAMS is accessible from the NRC Web-site at http://www.nrc.gov/reading-rm/adams.html | Room or from the Publicly Available Records (PARS) component of NRC's document system | ||
(ADAMS). ADAMS is accessible from the NRC Web-site at http://www.nrc.gov/reading- | |||
rm/adams.html (the Public Electronic Reading Room). | |||
We appreciate your cooperation. Please contact Richard Conte of my staff at (610) 337-5183 if | We appreciate your cooperation. Please contact Richard Conte of my staff at (610) 337-5183 if | ||
you have any questions regarding this letter. | you have any questions regarding this letter. | ||
Sincerely, | |||
/RA/ Original Signed By: | |||
/RA/ Original Signed By: | |||
Darrell J. Roberts, Director | Darrell J. Roberts, Director | ||
Division of Reactor Safety | Division of Reactor Safety | ||
Docket No. 50-219 | Docket No. | ||
License No. DPR-16 | 50-219 | ||
License No. | |||
DPR-16 | |||
Enclosure: | |||
Inspection Report No. 05000219/2008007 | |||
w/Attachment: Supplemental Information | |||
Distribution w/encl | Distribution w/encl: | ||
: S. Collins, RA | S. Collins, RA | ||
M. Dapas, DRA | M. Dapas, DRA | ||
D. Lew, DRP | D. Lew, DRP | ||
| Line 148: | Line 169: | ||
R. Nelson, NRR | R. Nelson, NRR | ||
G. Miller, PM, NRR | G. Miller, PM, NRR | ||
J. Hughey, NRR, Backup ROPreportsResource@nrc.gov (All IRs) Region I Docket Room (with concurrences) | J. Hughey, NRR, Backup | ||
SUNSI Review Complete: JER/RJC (Reviewer | ROPreportsResource@nrc.gov (All IRs) | ||
=s Initials) Adams Accession No. ML090210106 DOCUMENT NAME: G:\DRS\Engineering Branch 1\Richmond\OC 2008-07 LR\_Report\OC 2008-07 LRI_rev-14.doc After declaring this document "An Official Agency Record" it will be released to the Public. To receive a copy of this document, indicate in the box:"C" = Copy without attachment/enclosure E" = Copy with attachment/enclosure "N" = No copy | Region I Docket Room (with concurrences) | ||
OFFICE RI/DRS E RI/DRS | |||
SUNSI Review Complete: JER/RJC (Reviewer=s Initials) Adams Accession No. ML090210106 | |||
DOCUMENT NAME: G:\\DRS\\Engineering Branch 1\\Richmond\\OC 2008-07 LR\\_Report\\OC 2008-07 LRI_rev-14.doc | |||
After declaring this document "An Official Agency Record" it will be released to the Public. | |||
To receive a copy of this document, indicate in the box:"C" = Copy without attachment/enclosure E" = Copy with attachment/enclosure "N" = No copy | |||
OFFICE | |||
RI/DRS | |||
E | |||
RI/DRS | |||
RI/DRP | |||
RI/DRS | |||
NAME | |||
JRichmond/JER | |||
RConte/RJC | |||
RBellamy/RRB | |||
DRoberts/DJR | |||
DATE | |||
01/20/09 | |||
01/20/09 | |||
01/20/09 | |||
01/20/09 | |||
OFFICIAL RECORD COPY | |||
License No.: DPR-16 | |||
U. S. NUCLEAR REGULATORY COMMISSION | |||
REGION I | |||
Docket No.: | |||
50-219 | |||
License No.: | |||
DPR-16 | |||
Report No.: | |||
05000219/2008007 | |||
Licensee: | |||
Exelon Generation Company, LLC | |||
Facility: | |||
Oyster Creek Generating Station | |||
Location: | |||
Forked River, New Jersey | |||
Dates: | |||
October 27 to November 7, 2008 (on-site inspection activities) | |||
November 13, 15, and 17, 2008 (on-site inspection activities) | |||
November 10 to December 23, 2008 (in-office review) | |||
Inspectors: | |||
J. Richmond, Lead | |||
M. Modes, Senior Reactor Engineer | |||
G. Meyer, Senior Reactor Engineer | |||
T. O'Hara, Reactor Inspector | |||
J. Heinly, Reactor Engineer | |||
J. Kulp, Resident Inspector, Oyster Creek | |||
Approved by: | |||
Richard J. Conte, Chief | |||
Engineering Branch 1 | |||
Division of Reactor Safety | |||
Region I | |||
ii | |||
TABLE OF CONTENTS | |||
SUMMARY OF FINDINGS.........................................................................................................iii | |||
4. | |||
OTHER ACTIVITIES (OA)...................................................................................................1 | |||
4OA5 | |||
License Renewal Follow-up (IP 71003)....................................................................1 | |||
1. | |||
......................................................................................................... | Inspection Overview .....................................................................................................1 | ||
1.1 | |||
1.2 Sample Selection Process.....................................................................................1 2. Assessment of Current Licensing Basis Performance Issues.......................................2 2.1 ASME, Section XI, Subsection IWE Program........................................................2 | Purpose of Inspection............................................................................................1 | ||
2.2 Issues for Follow-up..............................................................................................2 3. Detailed Review of License Renewal Activities............................................................. | 1.2 | ||
Sample Selection Process.....................................................................................1 | |||
2. | |||
3.4 Drywell Sand Bed Region Drain Monitoring...........................................................5 3.5 Reactor Cavity Seal Leakage Action Plan for 1R22............................................... | Assessment of Current Licensing Basis Performance Issues.......................................2 | ||
2.1 | |||
3.7 Moisture Barrier Seal Inspection (inside | ASME, Section XI, Subsection IWE Program........................................................2 | ||
sand bed bays).......................................8 3.8 Drywell Shell Internal Coatings Inspection (inside drywell)....................................9 | 2.2 | ||
3.9 Drywell Shell External Coatings Inspection ( | Issues for Follow-up ..............................................................................................2 | ||
3. | |||
3.11 Drywell Shell Thickness Measurements..............................................................13 | Detailed Review of License Renewal Activities.............................................................4 | ||
3.1 | |||
Reactor Refuel Cavity Liner Strippable Coating.....................................................4 | |||
3.2 | |||
Reactor Refuel Cavity Seal Leakage Monitoring ...................................................4 | |||
3.3 | |||
Reactor Cavity Trough Drain Inspection for Blockage ...........................................5 | |||
3.4 | |||
Drywell Sand Bed Region Drain Monitoring...........................................................5 | |||
3.5 | |||
Reactor Cavity Seal Leakage Action Plan for 1R22...............................................6 | |||
3.6 | |||
Moisture Barrier Seal Inspection (inside drywell) ...................................................8 | |||
3.7 | |||
Moisture Barrier Seal Inspection (inside sand bed bays).......................................8 | |||
3.8 | |||
Drywell Shell Internal Coatings Inspection (inside drywell) ....................................9 | |||
3.9 | |||
Drywell Shell External Coatings Inspection (inside sand bed bays).....................10 | |||
3.10 Drywell Floor Trench Inspections ........................................................................12 | |||
3.11 Drywell Shell Thickness Measurements ..............................................................13 | |||
3.12 One Time Inspection Program.............................................................................15 | 3.12 One Time Inspection Program.............................................................................15 | ||
3.13 "B" Isolation Condenser Shell Inspection.............................................................15 3.14 Periodic Inspections............................................................................................16 | 3.13 "B" Isolation Condenser Shell Inspection.............................................................15 | ||
3.15 Circulating Water Intake Tunnel & Expansion | 3.14 Periodic Inspections ............................................................................................16 | ||
3.15 Circulating Water Intake Tunnel & Expansion Joint Inspection............................16 | |||
3.16 Buried Emergency Service Water Pipe Replacement..........................................17 | |||
3.17 Electrical Cable Inspection inside Drywell............................................................17 | 3.17 Electrical Cable Inspection inside Drywell............................................................17 | ||
3.18 Inaccessible Medium Voltage Cable Test............................................................18 3.19 Fatigue Monitoring Program................................................................................18 4. Proposed Conditions of License.................................................................................19 5. Commitment Management Program........................................................................... | 3.18 Inaccessible Medium Voltage Cable Test............................................................18 | ||
3.19 Fatigue Monitoring Program................................................................................18 | |||
4. | |||
IR 05000219/2008007; 10/27/2008 - 12/23/2008; Exelon, LLC, Oyster Creek | Proposed Conditions of License.................................................................................19 | ||
5. | |||
Commitment Management Program...........................................................................19 | |||
4OA6 | |||
Meetings, Including Exit Meeting.............................................................................20 | |||
SUPPLEMENTAL INFORMATION...........................................................................................21 | |||
iii | |||
SUMMARY OF FINDINGS | |||
IR 05000219/2008007; 10/27/2008 - 12/23/2008; Exelon, LLC, Oyster Creek | |||
Generating Station; License Renewal Follow-up. | Generating Station; License Renewal Follow-up. | ||
The report covers a multi-week inspection of license renewal follow-up items. The inspection | The report covers a multi-week inspection of license renewal follow-up items. The inspection | ||
| Line 238: | Line 384: | ||
Department of Environmental Protection, Bureau of Nuclear Engineering, observed portions of | Department of Environmental Protection, Bureau of Nuclear Engineering, observed portions of | ||
the NRC inspection activities. | the NRC inspection activities. | ||
A. NRC-Identified and Self-Revealing Findings | A. | ||
NRC-Identified and Self-Revealing Findings | |||
No findings of significance were identified. | |||
No findings of significance were identified. | |||
B. | |||
Licensee-Identified Violations | |||
None. | |||
REPORT DETAILS | |||
Summary of Plant Status | |||
The Oyster Creek Generating Station was in a scheduled refueling outage during the on-site | The Oyster Creek Generating Station was in a scheduled refueling outage during the on-site | ||
portions of this inspection. | portions of this inspection. | ||
At the time of the inspection, AmerGen Energy Company, LLC was the licensee for Oyster | At the time of the inspection, AmerGen Energy Company, LLC was the licensee for Oyster | ||
Creek Generating Station. As of January 8, 2009, the Oyster Creek license was transferred to | Creek Generating Station. As of January 8, 2009, the Oyster Creek license was transferred to | ||
Exelon Generating Company, LLC by license amendment No. 271 (ML083640373). | Exelon Generating Company, LLC by license amendment No. 271 (ML083640373). | ||
1. Inspection Overview | 4. | ||
OTHER ACTIVITIES (OA) | |||
1.1 Purpose of Inspection | |||
4OA5 License Renewal Follow-up (IP 71003) | |||
1. | |||
Inspection Overview | |||
1.1 | |||
Purpose of Inspection | |||
The NRC conducted this inspection using the guidance of Inspection Procedure (IP) | |||
71003 "Post-Approval Site Inspection for License Renewal." The license renewal | |||
application was the subject of a hearing and the Atomic Safety and Licensing Board | application was the subject of a hearing and the Atomic Safety and Licensing Board | ||
decision is being appealed to the Commission. Although IP 71003 is designated as a | decision is being appealed to the Commission. Although IP 71003 is designated as a | ||
"post-approval" inspection procedure, the NRC conducted this inspection as a prudent | "post-approval" inspection procedure, the NRC conducted this inspection as a prudent | ||
measure absent a final NRC decision on license renewal. This inspection observed Oyster Creek license renewal activities during the last refueling outage prior to entering | measure absent a final NRC decision on license renewal. This inspection observed | ||
Oyster Creek license renewal activities during the last refueling outage prior to entering | |||
the period of extended operation. | the period of extended operation. | ||
Inspection observations were made of license renewal commitments and license | |||
Inspection observations were made of license renewal commitments and license | |||
conditions selected from NUREG-1875, "Safety Evaluation Report (SER) Related to the | conditions selected from NUREG-1875, "Safety Evaluation Report (SER) Related to the | ||
License Renewal of Oyster Creek Generating Station" (ML071290023 & ML071310246). | License Renewal of Oyster Creek Generating Station" (ML071290023 & ML071310246). | ||
| Line 284: | Line 443: | ||
basis for the evaluation was the current licensing basis (CLB), and the license renewal | basis for the evaluation was the current licensing basis (CLB), and the license renewal | ||
enhancements were not considered in the evaluation. | enhancements were not considered in the evaluation. | ||
For license renewal activities, within the context of 10 CFR 54, the report only | |||
For license renewal activities, within the context of 10 CFR 54, the report only | |||
documents inspector observations, because the proposed license conditions and | documents inspector observations, because the proposed license conditions and | ||
associated regulatory commitments were not in effect at the time of this inspection. | associated regulatory commitments were not in effect at the time of this inspection. | ||
| Line 292: | Line 452: | ||
this report as "proposed" conditions and commitments. | this report as "proposed" conditions and commitments. | ||
1.2 Sample Selection Process | 1.2 | ||
Sample Selection Process | |||
on the risk significance using insights gained from sources such as the NRC's | |||
2 "Significance Determination Process Risk Informed Inspection Notebooks," the results of previous license renewal audits, and inspections of aging management programs. | The SER proposed commitments and proposed license conditions were selected based | ||
on the risk significance using insights gained from sources such as the NRC's | |||
2 | |||
"Significance Determination Process Risk Informed Inspection Notebooks," the results | |||
of previous license renewal audits, and inspections of aging management programs. | |||
The inspectors also reviewed selected corrective actions taken as a result of previous | The inspectors also reviewed selected corrective actions taken as a result of previous | ||
license renewal inspections. | license renewal inspections. | ||
2. Assessment of Current Licensing Basis Performance Issues | 2. | ||
Assessment of Current Licensing Basis Performance Issues | |||
2.1 ASME, Section XI, Subsection IWE Program | |||
2.1 | |||
ASME, Section XI, Subsection IWE Program | |||
Monitoring of the condition of the primary containment drywell is accomplished through | |||
Exelons ASME Section XI, Subsection IWE monitoring program. The inspectors | |||
determined Exelon provided an adequate basis to provide assurance that the drywell | determined Exelon provided an adequate basis to provide assurance that the drywell | ||
primary containment will remain operable throughout the period to the next scheduled | primary containment will remain operable throughout the period to the next scheduled | ||
| Line 315: | Line 484: | ||
the enhancements made as a result of license renewal activities were integrated into the | the enhancements made as a result of license renewal activities were integrated into the | ||
existing program for the drywell structural integrity. | existing program for the drywell structural integrity. | ||
The drywell shell epoxy coating and the moisture barrier seal, both in the sand bed | |||
The drywell shell epoxy coating and the moisture barrier seal, both in the sand bed | |||
region, are barriers used to protect the drywell from corrosion. The problems identified | region, are barriers used to protect the drywell from corrosion. The problems identified | ||
with these barriers (discussed in Sections 3.7 & 3.9) were corrected and had a minimal | with these barriers (discussed in Sections 3.7 & 3.9) were corrected and had a minimal | ||
| Line 329: | Line 499: | ||
and integrity of the drywell shell epoxy coating. | and integrity of the drywell shell epoxy coating. | ||
2.2 Issues for Follow-up | 2.2 | ||
Issues for Follow-up | |||
Introduction | |||
Introduction | |||
The inspectors and Exelon identified a number of issues during the inspection with | |||
potential implications on the current licensing basis (CLB). More information is required | potential implications on the current licensing basis (CLB). More information is required | ||
in order to determine whether these issues are acceptable or are CLB performance | in order to determine whether these issues are acceptable or are CLB performance | ||
deficiencies. | deficiencies. | ||
3 | |||
3 | |||
Description | |||
As noted in the detailed observations of this report, a number of issues were observed | |||
which Exelon placed into its corrective action program. The specific issues for further | which Exelon placed into its corrective action program. The specific issues for further | ||
review include: | review include: | ||
(1) Exelon applied a strippable coating to the refuel cavity liner to prevent water | |||
(1) Exelon applied a strippable coating to the refuel cavity liner to prevent water | |||
intrusion into the gap between the drywell steel shell and the concrete shield | intrusion into the gap between the drywell steel shell and the concrete shield | ||
wall. The strippable coating unexpectedly de-laminated, resulting in increased | wall. The strippable coating unexpectedly de-laminated, resulting in increased | ||
| Line 348: | Line 527: | ||
higher than the actual leakage rate at which water intrusion into the gap | higher than the actual leakage rate at which water intrusion into the gap | ||
occurred. (Sections 3.1 & 3.5) | occurred. (Sections 3.1 & 3.5) | ||
(2) While the reactor cavity was being filled, Exelon frequently monitored the | |||
(2) While the reactor cavity was being filled, Exelon frequently monitored the | |||
cavity seal leakage by observing flow in the cavity trough drain line. | cavity seal leakage by observing flow in the cavity trough drain line. | ||
Subsequently, Exelon determined that the trough drain line had been left isolated | Subsequently, Exelon determined that the trough drain line had been left isolated | ||
during a previous maintenance activity. As a result, cavity seal leakage had not | during a previous maintenance activity. As a result, cavity seal leakage had not | ||
been monitored as intended. (Section 3.2) | been monitored as intended. (Section 3.2) | ||
(3) During the refueling outage, Exelon monitored for water leakage from the | |||
(3) During the refueling outage, Exelon monitored for water leakage from the | |||
sand bed bay drains by checking poly bottles connected via tygon tubing and | sand bed bay drains by checking poly bottles connected via tygon tubing and | ||
funnels to the sand bed drain lines. Exelon subsequently discovered that the | funnels to the sand bed drain lines. Exelon subsequently discovered that the | ||
poly bottle tubing was not connected to the drain lines for two sand bed bays. | poly bottle tubing was not connected to the drain lines for two sand bed bays. | ||
(Section 3.4) | (Section 3.4) | ||
(4) Exelon identified four blisters on the epoxy coating in one sand bed bay. | |||
(4) Exelon identified four blisters on the epoxy coating in one sand bed bay. | |||
Exelon's evaluation to determine the cause of the blisters was still in-progress at | Exelon's evaluation to determine the cause of the blisters was still in-progress at | ||
the time this inspection was completed. In addition, a video recording from 2006 | the time this inspection was completed. In addition, a video recording from 2006 | ||
appeared to indicate that one of the blisters existed at that time, but was not | appeared to indicate that one of the blisters existed at that time, but was not | ||
identified during Exelon's 2006 visual inspection. (Section 3.9) | identified during Exelon's 2006 visual inspection. (Section 3.9) | ||
The inspectors will review these issues in a future inspection to determine whether the | |||
The inspectors will review these issues in a future inspection to determine whether the | |||
individual issues are acceptable or constitute a CLB performance deficiency. The | individual issues are acceptable or constitute a CLB performance deficiency. The | ||
inspectors' assessment will, in part, determine whether these items are consistent with | inspectors' assessment will, in part, determine whether these items are consistent with | ||
design specifications and requirements, the conduct of operations, and whether appropriate administrative controls were utilized. (URI 05000219/2008007-01: Drywell Sand Bed Water Intrusion, Drain Monitoring, and Coating Deficiency) | design specifications and requirements, the conduct of operations, and whether | ||
4 3. Detailed Review of License Renewal Activities | appropriate administrative controls were utilized. (URI 05000219/2008007-01: Drywell | ||
Sand Bed Water Intrusion, Drain Monitoring, and Coating Deficiency) | |||
3.1 Reactor Refuel Cavity Liner Strippable Coating | |||
4 | |||
a. Scope of Inspection | |||
3. | |||
Detailed Review of License Renewal Activities | |||
3.1 | |||
Reactor Refuel Cavity Liner Strippable Coating | |||
a. | |||
Scope of Inspection | |||
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancement | |||
(2), stated, in part: | (2), stated, in part: | ||
A strippable coating will be applied to the reactor cavity liner to | |||
A strippable coating will be applied to the reactor cavity liner to | |||
prevent water intrusion into the gap between the drywell shield | prevent water intrusion into the gap between the drywell shield | ||
wall and the drywell shell during periods when the reactor cavity is | wall and the drywell shell during periods when the reactor cavity is | ||
flooded. Prior to filling the reactor cavity with water. | flooded. Prior to filling the reactor cavity with water. | ||
The inspectors reviewed work order (WO) R2098682-06, "Coating Application to Cavity | |||
Walls and Floors." | The inspectors reviewed work order (WO) R2098682-06, "Coating Application to Cavity | ||
b. Observations | Walls and Floors." | ||
b. | |||
Observations | |||
The strippable coating is applied to the reactor cavity liner before the cavity is filled with | |||
water to minimize the likelihood of cavity seal leakage into the cavity concrete trough. | water to minimize the likelihood of cavity seal leakage into the cavity concrete trough. | ||
This action is taken to prevent water intrusion into the gap (Figure A-3) between the | This action is taken to prevent water intrusion into the gap (Figure A-3) between the | ||
drywell steel shell and the concrete shield wall. (see Figure A-1 for general | drywell steel shell and the concrete shield wall. (see Figure A-1 for general | ||
arrangement) | arrangement) | ||
From Oct. 29 to Nov. 6, the cavity liner strippable coating limited cavity seal leakage into | |||
From Oct. 29 to Nov. 6, the cavity liner strippable coating limited cavity seal leakage into | |||
the cavity trough drain to less than 1 gallon per minute (gpm). On Nov. 6, in one | the cavity trough drain to less than 1 gallon per minute (gpm). On Nov. 6, in one | ||
localized area of the refuel cavity, the liner strippable coating started to de-laminate. | localized area of the refuel cavity, the liner strippable coating started to de-laminate. | ||
| Line 394: | Line 592: | ||
common cause evaluation as part of IR 845297. Exelon's initial evaluations identified | common cause evaluation as part of IR 845297. Exelon's initial evaluations identified | ||
several likely or contributing causes, including: | several likely or contributing causes, including: | ||
* A portable submerged water filtration unit was improperly placed in the reactor cavity, which resulted in flow discharged directly on the strippable coating. | |||
* A portable submerged water filtration unit was improperly placed in the reactor | |||
cavity, which resulted in flow discharged directly on the strippable coating. | |||
* A small oil spill into the cavity may have affected the coating integrity. | * A small oil spill into the cavity may have affected the coating integrity. | ||
* No post installation inspection of the coating had been performed. | * No post installation inspection of the coating had been performed. | ||
3.2 Reactor Refuel Cavity Seal Leakage Monitoring | 3.2 | ||
Reactor Refuel Cavity Seal Leakage Monitoring | |||
a. Scope of Inspection | |||
a. | |||
Scope of Inspection | |||
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancement | |||
(3), stated, in part: | (3), stated, in part: | ||
The reactor cavity seal leakage trough drains and the drywell | |||
sand bed region drains will be monitored for leakage, periodically. | The reactor cavity seal leakage trough drains and the drywell | ||
5 The inspectors directly observed Exelon's cavity seal leakage monitoring activities, performed under WO R2095857. The inspectors independently checked the cavity | sand bed region drains will be monitored for leakage, periodically. | ||
5 | |||
The inspectors directly observed Exelon's cavity seal leakage monitoring activities, | |||
performed under WO R2095857. The inspectors independently checked the cavity | |||
trough drain flow immediately after the reactor cavity was filled, and several times | trough drain flow immediately after the reactor cavity was filled, and several times | ||
throughout the outage. The inspectors also reviewed the written monitoring logs. | throughout the outage. The inspectors also reviewed the written monitoring logs. | ||
b. Observations | b. | ||
Observations | |||
Exelon monitored reactor refuel cavity seal leakage by checking and recording the flow | |||
in a two inch drain line from the cavity concrete trough to a plant radwaste system drain | in a two inch drain line from the cavity concrete trough to a plant radwaste system drain | ||
funnel which, in turn, drained to the reactor building equipment drain tank. (See Figures | funnel which, in turn, drained to the reactor building equipment drain tank. (See Figures | ||
A-1 thru A-3) | A-1 thru A-3) | ||
On Oct. 27, Exelon isolated the cavity trough drain line to install a tygon hose to allow | |||
On Oct. 27, Exelon isolated the cavity trough drain line to install a tygon hose to allow | |||
drain flow to be monitored. On Oct. 28, the reactor cavity was filled. Drain line flow was | drain flow to be monitored. On Oct. 28, the reactor cavity was filled. Drain line flow was | ||
monitored frequently during cavity flood-up, and daily thereafter. On Oct. 29, a | monitored frequently during cavity flood-up, and daily thereafter. On Oct. 29, a | ||
| Line 422: | Line 633: | ||
This issue was entered into the corrective action program as IR 837647. | This issue was entered into the corrective action program as IR 837647. | ||
3.3 Reactor Cavity Trough Drain Inspection for Blockage | 3.3 | ||
Reactor Cavity Trough Drain Inspection for Blockage | |||
a. Scope of Inspection | |||
a. | |||
Scope of Inspection | |||
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancement | |||
(13), stated, in part: | (13), stated, in part: | ||
The reactor cavity concrete trough drain will be verified to be clear | |||
The reactor cavity concrete trough drain will be verified to be clear | |||
from blockage once per refueling cycle. Any identified issues will | from blockage once per refueling cycle. Any identified issues will | ||
be addressed via the corrective action process. | be addressed via the corrective action process. | ||
The inspectors reviewed a video recording of a boroscope inspection of the cavity | |||
The inspectors reviewed a video recording of a boroscope inspection of the cavity | |||
trough drain line, performed under WO R2102695. | trough drain line, performed under WO R2102695. | ||
b. Observations | b. | ||
Observations | |||
See observations in Section 3.2 above. | |||
See observations in Section 3.2 above. | |||
3.4 | |||
Drywell Sand Bed Region Drain Monitoring | |||
a. | |||
Scope of Inspection | |||
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancement | |||
(3), stated, in part: | (3), stated, in part: | ||
The sand bed region drains will be monitored daily during | |||
The sand bed region drains will be monitored daily during | |||
refueling outages. | refueling outages. | ||
The inspectors directly observed Exelon's activities to monitor sand bed drains, | |||
6 performed under WO R2095857. The inspectors independently checked drain line poly bottles and accompanied Exelon personnel during routine daily checks. The inspectors | The inspectors directly observed Exelon's activities to monitor sand bed drains, | ||
6 | |||
performed under WO R2095857. The inspectors independently checked drain line poly | |||
bottles and accompanied Exelon personnel during routine daily checks. The inspectors | |||
also reviewed the written monitoring logs. | also reviewed the written monitoring logs. | ||
b. Observations | b. | ||
Observations | |||
There is one sand bed drain line for every two sand bed bays (i.e., total of five drains for | |||
10 bays). Exelon remotely monitored the sand bed drains by checking for the existence | 10 bays). Exelon remotely monitored the sand bed drains by checking for the existence | ||
of water in poly bottles attached via tygon tubing (approximately 50 foot long) to a funnel | of water in poly bottles attached via tygon tubing (approximately 50 foot long) to a funnel | ||
| Line 456: | Line 684: | ||
tubing were not directly observable from the outer area of the torus room, where the | tubing were not directly observable from the outer area of the torus room, where the | ||
poly bottles were located. (see Figures A-1, A-4, & A-5) | poly bottles were located. (see Figures A-1, A-4, & A-5) | ||
On Nov. 10, Exelon found two of the five tygon tubes disconnected from their funnels | |||
On Nov. 10, Exelon found two of the five tygon tubes disconnected from their funnels | |||
and laying on the floor (bays 3 and 7). Exelon personnel could not determine when the | and laying on the floor (bays 3 and 7). Exelon personnel could not determine when the | ||
tubing was last verified to be connected to the funnel. The inspectors directly observed | tubing was last verified to be connected to the funnel. The inspectors directly observed | ||
| Line 467: | Line 696: | ||
were subsequently reconnected. This issue was entered into the corrective action | were subsequently reconnected. This issue was entered into the corrective action | ||
program as IR 843209. | program as IR 843209. | ||
On Nov. 15, during a daily check of the sand bed bay 11 drain poly bottle, Exelon found | |||
On Nov. 15, during a daily check of the sand bed bay 11 drain poly bottle, Exelon found | |||
the poly bottle nearly full. Chemistry collected about 4.3 gallons out of the poly bottle | the poly bottle nearly full. Chemistry collected about 4.3 gallons out of the poly bottle | ||
and tubing. The inspectors noted that Exelon had found the poly bottle empty during | and tubing. The inspectors noted that Exelon had found the poly bottle empty during | ||
| Line 480: | Line 710: | ||
evaluation IR 845297. | evaluation IR 845297. | ||
3.5 Reactor Cavity Seal Leakage Action Plan for 1R22 | 3.5 | ||
Reactor Cavity Seal Leakage Action Plan for 1R22 | |||
a. Scope of Inspection | |||
a. | |||
Scope of Inspection | |||
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancement | |||
(3), stated, in part: | (3), stated, in part: | ||
If leakage is detected [out of a sand bed drain], procedures will be | |||
If leakage is detected [out of a sand bed drain], procedures will be | |||
in place to determine the source of leakage and investigate and | in place to determine the source of leakage and investigate and | ||
address the impact of leakage on the drywell shell. | address the impact of leakage on the drywell shell. | ||
7 | |||
7 | |||
b. Observations | The inspectors reviewed Exelon's cavity seal leakage action plan. | ||
b. | |||
Observations | |||
For the reactor cavity seal leakage, Exelon established an administrative limit of 12 gpm | |||
flow in the cavity trough drain, based on a calculation which indicated that cavity trough | flow in the cavity trough drain, based on a calculation which indicated that cavity trough | ||
drain flow of less than 60 gpm would not result in trough overflow into the gap between | drain flow of less than 60 gpm would not result in trough overflow into the gap between | ||
the drywell concrete shield wall and the drywell steel shell. (see Figures A-1 thru A-5) | the drywell concrete shield wall and the drywell steel shell. (see Figures A-1 thru A-5) | ||
The inspectors noted that Exelon's action plan, in part, directed the following actions to | |||
The inspectors noted that Exelon's action plan, in part, directed the following actions to | |||
be taken: | be taken: | ||
* If the cavity trough drain flow exceeded 5 gpm, then increase monitoring of the cavity drain flow from daily to every 8 hours. | |||
* If the cavity trough drain flow exceeded 12 gpm, then increase monitoring of the sand bed poly bottles from daily to every 4 hours. | * If the cavity trough drain flow exceeded 5 gpm, then increase monitoring of the | ||
* If the cavity trough drain flow exceeded 12 gpm and any water is found in a sand bed poly bottle, then enter and inspect the sand bed bays. | cavity drain flow from daily to every 8 hours. | ||
On Nov. 6, the reactor cavity liner strippable coating started to de-laminate (see Section | * If the cavity trough drain flow exceeded 12 gpm, then increase monitoring of | ||
the sand bed poly bottles from daily to every 4 hours. | |||
* If the cavity trough drain flow exceeded 12 gpm and any water is found in a | |||
sand bed poly bottle, then enter and inspect the sand bed bays. | |||
On Nov. 6, the reactor cavity liner strippable coating started to de-laminate (see Section | |||
3.1 above). The cavity trough drain flow took a step change from less than 1 gpm to | 3.1 above). The cavity trough drain flow took a step change from less than 1 gpm to | ||
approximately 4 to 6 gpm. Exelon increased monitoring of the trough drain to every 2 | approximately 4 to 6 gpm. Exelon increased monitoring of the trough drain to every 2 | ||
| Line 506: | Line 751: | ||
drain flow remained at about 4 to 6 gpm until the cavity was drained on Nov. 12, when | drain flow remained at about 4 to 6 gpm until the cavity was drained on Nov. 12, when | ||
the drain flow subsided to zero. | the drain flow subsided to zero. | ||
On Nov. 8, personnel working in sand bed bay 11 identified dripping water. Water | |||
On Nov. 8, personnel working in sand bed bay 11 identified dripping water. Water | |||
puddles were subsequently identified in sand bed bays 11, 13, 15, and 17. These | puddles were subsequently identified in sand bed bays 11, 13, 15, and 17. These | ||
issues were entered into the corrective action program as IR 842333. In addition, these | issues were entered into the corrective action program as IR 842333. In addition, these | ||
items were included in a common cause evaluation as part of IR 845297. | items were included in a common cause evaluation as part of IR 845297. | ||
On Nov. 12, the cavity was drained. All sand bed bays were dried and inspected by | |||
On Nov. 12, the cavity was drained. All sand bed bays were dried and inspected by | |||
Exelon for any water or moisture damage; no issues were identified. Exelon stated | Exelon for any water or moisture damage; no issues were identified. Exelon stated | ||
follow-up ultrasonic test (UT) examinations will be performed during the next refuel | follow-up ultrasonic test (UT) examinations will be performed during the next refuel | ||
outage to evaluate the upper drywell shell for corrosion as a result of the water intrusion | outage to evaluate the upper drywell shell for corrosion as a result of the water intrusion | ||
into the sand bed bays. | into the sand bed bays. | ||
On Nov. 15, water was found in sand bed bay 11 poly bottle (see Section 3.4 above). | |||
The inspectors observed that | On Nov. 15, water was found in sand bed bay 11 poly bottle (see Section 3.4 above). | ||
The inspectors observed that Exelons action plan was inconsistent with the actions | |||
taken in response to increased cavity seal leakage. The inspectors observed that the | taken in response to increased cavity seal leakage. The inspectors observed that the | ||
actual actions taken were in response to visual indication that the strippable coating was | actual actions taken were in response to visual indication that the strippable coating was | ||
| Line 525: | Line 774: | ||
closed out by Nov. 2, as originally scheduled (before a coating problem was identified, | closed out by Nov. 2, as originally scheduled (before a coating problem was identified, | ||
see Section 3.9), then Exelon personnel would not have been inside of bay 11 on Nov. | see Section 3.9), then Exelon personnel would not have been inside of bay 11 on Nov. | ||
8, and therefore, would not have visually identified the water intrusion into bay 11. | 8, and therefore, would not have visually identified the water intrusion into bay 11. | ||
8 The inspectors also noted that water had entered the gap between the drywell shield wall and the drywell shell at a much lower value of cavity seal leakage than Exelon had | |||
8 | |||
The inspectors also noted that water had entered the gap between the drywell shield | |||
wall and the drywell shell at a much lower value of cavity seal leakage than Exelon had | |||
calculated and, as a result, water intrusion into the sand bed region occurred at a value | calculated and, as a result, water intrusion into the sand bed region occurred at a value | ||
below the threshold established in the action plan. | below the threshold established in the action plan. | ||
3.6 Moisture Barrier Seal Inspection (inside drywell) | 3.6 | ||
Moisture Barrier Seal Inspection (inside drywell) | |||
a. Scope of Inspection | |||
a. | |||
Scope of Inspection | |||
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancement | |||
(17), stated, in part: | (17), stated, in part: | ||
Perform visual inspection of the moisture barrier seal between the | |||
Perform visual inspection of the moisture barrier seal between the | |||
drywell shell and the concrete floor curb, installed inside the | drywell shell and the concrete floor curb, installed inside the | ||
drywell during the October 2006 refueling outage. | drywell during the October 2006 refueling outage. | ||
The inspectors reviewed structural inspection reports 187-001 and 187-002, performed | |||
The inspectors reviewed structural inspection reports 187-001 and 187-002, performed | |||
under WO R2097321-01 on Nov. 1 and Oct. 29, respectively. The reports documented | under WO R2097321-01 on Nov. 1 and Oct. 29, respectively. The reports documented | ||
visual inspections of the perimeter seal between the concrete floor curb and the drywell | visual inspections of the perimeter seal between the concrete floor curb and the drywell | ||
| Line 545: | Line 803: | ||
barrier seal. | barrier seal. | ||
b. Observations | b. | ||
Observations | |||
The inspectors performed a general visual observation of the moisture barrier seal | |||
inside the drywell on multiple occasions during the outage. For the areas directly | inside the drywell on multiple occasions during the outage. For the areas directly | ||
observed, the inspectors did not identify any significant problems or concerns. | observed, the inspectors did not identify any significant problems or concerns. | ||
3.7 Moisture Barrier Seal Inspection (inside sand bed bays) | 3.7 | ||
Moisture Barrier Seal Inspection (inside sand bed bays) | |||
a. Scope of Inspection | |||
a. | |||
Scope of Inspection | |||
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancements | |||
(12 & 21), stated, in part: | (12 & 21), stated, in part: | ||
Inspect the [moisture barrier] seal at the junction between the | |||
Inspect the [moisture barrier] seal at the junction between the | |||
sand bed region concrete [sand bed floor] and the embedded | sand bed region concrete [sand bed floor] and the embedded | ||
drywell shell. During the 2008 refueling outage and every other | drywell shell. During the 2008 refueling outage and every other | ||
refueling outage thereafter. | refueling outage thereafter. | ||
The inspectors directly observed portions of Exelon's activities to perform a 100% visual | |||
The inspectors directly observed portions of Exelon's activities to perform a 100% visual | |||
test (VT) inspection of the seal in the sand bed region (total of 10 bays). The inspectors | test (VT) inspection of the seal in the sand bed region (total of 10 bays). The inspectors | ||
performed independent field walkdowns to determine the as-found conditions in portions | performed independent field walkdowns to determine the as-found conditions in portions | ||
| Line 565: | Line 830: | ||
general visual observations inside the sand bed bays to independently identify flaking, | general visual observations inside the sand bed bays to independently identify flaking, | ||
peeling, blistering, cracking, de-lamination, discoloration, corrosion, or mechanical | peeling, blistering, cracking, de-lamination, discoloration, corrosion, or mechanical | ||
damage. | damage. | ||
9 The inspectors reviewed VT inspection records for each sand bed bay, and compared their direct observations to the recorded VT inspection results. The inspectors reviewed | |||
9 | |||
The inspectors reviewed VT inspection records for each sand bed bay, and compared | |||
their direct observations to the recorded VT inspection results. The inspectors reviewed | |||
Exelon VT inspection procedures, interviewed non-destructive examination (NDE) | Exelon VT inspection procedures, interviewed non-destructive examination (NDE) | ||
supervisors and technicians, and directly observed field collection, recording, and | supervisors and technicians, and directly observed field collection, recording, and | ||
reporting of VT inspection data. The inspectors also reviewed a sample of NDE | reporting of VT inspection data. The inspectors also reviewed a sample of NDE | ||
technician visual testing qualifications. | technician visual testing qualifications. | ||
The inspectors reviewed Exelon's activities to evaluate and repair the moisture barrier | |||
The inspectors reviewed Exelon's activities to evaluate and repair the moisture barrier | |||
seal in sand bed bay 3. | seal in sand bed bay 3. | ||
b. Observations | b. | ||
Observations | |||
The purpose of the moisture barrier seal is to prevent water from entering a gap below | |||
the concrete floor in the sand bed region. The inspectors observed that NDE visual | the concrete floor in the sand bed region. The inspectors observed that NDE visual | ||
inspection activities were conducted in accordance with approved procedures. The | inspection activities were conducted in accordance with approved procedures. The | ||
| Line 581: | Line 853: | ||
moisture barrier seal which required repair, completed the seal repairs in accordance | moisture barrier seal which required repair, completed the seal repairs in accordance | ||
with engineering procedures, and conducted appropriate re-inspection of repaired | with engineering procedures, and conducted appropriate re-inspection of repaired | ||
areas. The VT inspections identified moisture barrier seal problems in 7 of the 10 sand bed | areas. | ||
The VT inspections identified moisture barrier seal problems in 7 of the 10 sand bed | |||
bays, including small surface cracks and partial separation of the seal from the steel | bays, including small surface cracks and partial separation of the seal from the steel | ||
shell or concrete floor. Exelon determined the as-found moisture barrier function was | shell or concrete floor. Exelon determined the as-found moisture barrier function was | ||
| Line 588: | Line 862: | ||
(IRs are listed in the Attachment). In addition, these items were included in a common | (IRs are listed in the Attachment). In addition, these items were included in a common | ||
cause evaluation as part of IR 845297. | cause evaluation as part of IR 845297. | ||
The VT inspection for sand bed bay 3 identified a seal crack and surface rust stains | |||
The VT inspection for sand bed bay 3 identified a seal crack and surface rust stains | |||
below the crack. When the seal was excavated, some drywell shell surface corrosion | below the crack. When the seal was excavated, some drywell shell surface corrosion | ||
was identified. Exelon's laboratory analysis of removed seal material determined the | was identified. Exelon's laboratory analysis of removed seal material determined the | ||
| Line 594: | Line 869: | ||
installation issue. The seal crack and drywell shell surface were repaired. This issue | installation issue. The seal crack and drywell shell surface were repaired. This issue | ||
was entered into the corrective action program as IRs 839194, 841957, and 844288. | was entered into the corrective action program as IRs 839194, 841957, and 844288. | ||
The inspectors compared the 2008 VT results to the 2006 results and noted that, in | |||
The inspectors compared the 2008 VT results to the 2006 results and noted that, in | |||
2006, no moisture barrier seal problems were identified in any sand bed bay. | 2006, no moisture barrier seal problems were identified in any sand bed bay. | ||
3.8 Drywell Shell Internal Coatings Inspection (inside drywell) | 3.8 | ||
Drywell Shell Internal Coatings Inspection (inside drywell) | |||
a. Scope of Inspection | |||
a. | |||
Scope of Inspection | |||
Proposed SER Appendix-A Item 33, Protective Coating Monitoring and Maintenance | |||
Program, stated, in part: | Program, stated, in part: | ||
The program provides for aging management of Service Level I | |||
The program provides for aging management of Service Level I | |||
coatings inside the primary containment. | coatings inside the primary containment. | ||
The inspectors reviewed a vendor memorandum which summarized the vendor | |||
10 inspection findings for a coating inspection of the as-found condition of the ASME Service Level I coating of the drywell shell inner surface. The final detailed report, with | The inspectors reviewed a vendor memorandum which summarized the vendor | ||
10 | |||
inspection findings for a coating inspection of the as-found condition of the ASME | |||
Service Level I coating of the drywell shell inner surface. The final detailed report, with | |||
specific elevation notes and photographs, was not available during the on-site portion of | specific elevation notes and photographs, was not available during the on-site portion of | ||
this inspection. The inspectors reviewed selected photographs taken during the coating | this inspection. The inspectors reviewed selected photographs taken during the coating | ||
| Line 612: | Line 897: | ||
was conducted on Oct. 30, by a qualified ANSI Level III coating inspector. | was conducted on Oct. 30, by a qualified ANSI Level III coating inspector. | ||
b. Observations | b. | ||
Observations | |||
The inspectors performed a general visual observation of the drywell shell coating on | |||
multiple occasions during the outage. The inspectors noted that Exelon's documented | multiple occasions during the outage. The inspectors noted that Exelon's documented | ||
inspection results were consistent with the conditions directly observed by the | inspection results were consistent with the conditions directly observed by the | ||
| Line 619: | Line 906: | ||
Exelon's inspection activities. | Exelon's inspection activities. | ||
3.9 Drywell Shell External Coatings Inspection (inside sand bed bays) | 3.9 | ||
Drywell Shell External Coatings Inspection (inside sand bed bays) | |||
a. Scope of Inspection | |||
a. | |||
Scope of Inspection | |||
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancements | |||
(4 & 21), stated, in part: | (4 & 21), stated, in part: | ||
Perform visual inspections of the drywell external shell epoxy | |||
Perform visual inspections of the drywell external shell epoxy | |||
coating in all 10 sand bed bays. During the 2008 refueling outage | coating in all 10 sand bed bays. During the 2008 refueling outage | ||
and every other refueling outage thereafter. | and every other refueling outage thereafter. | ||
The inspectors directly observed portions of Exelon's activities to perform a 100% visual | |||
The inspectors directly observed portions of Exelon's activities to perform a 100% visual | |||
inspection of the epoxy coating in the sand bed region (total of 10 bays). The inspectors | inspection of the epoxy coating in the sand bed region (total of 10 bays). The inspectors | ||
performed independent field walkdowns to determine the as-found conditions of the | performed independent field walkdowns to determine the as-found conditions of the | ||
| Line 634: | Line 926: | ||
sand bed bays to independently identify flaking, peeling, blistering, de-lamination, | sand bed bays to independently identify flaking, peeling, blistering, de-lamination, | ||
cracking, discoloration, corrosion, or mechanical damage. | cracking, discoloration, corrosion, or mechanical damage. | ||
The inspectors reviewed VT inspection records for each sand bed bay and compared | |||
The inspectors reviewed VT inspection records for each sand bed bay and compared | |||
their direct observations to the recorded VT inspection results. The inspectors reviewed | their direct observations to the recorded VT inspection results. The inspectors reviewed | ||
Exelon VT inspection procedures, interviewed NDE supervisors and technicians, and | Exelon VT inspection procedures, interviewed NDE supervisors and technicians, and | ||
directly observed field collection, recording, and reporting of VT inspection data. The | directly observed field collection, recording, and reporting of VT inspection data. The | ||
inspectors also reviewed a sample of NDE technician visual testing qualifications. | inspectors also reviewed a sample of NDE technician visual testing qualifications. | ||
The inspectors directly observed Exelon's activities to evaluate and repair the epoxy | |||
The inspectors directly observed Exelon's activities to evaluate and repair the epoxy | |||
coating in sand bed bay 11. In addition, the inspectors reviewed Technical Evaluation | coating in sand bed bay 11. In addition, the inspectors reviewed Technical Evaluation | ||
330592.27.46, "Coating Degradation in Sand Bed bay 11." | 330592.27.46, "Coating Degradation in Sand Bed bay 11." | ||
b. Observations | |||
b. | |||
accordance with approved procedures. The inspectors noted that Exelon completed the | Observations | ||
11 inspections, identified condition(s) in the exterior coating which required repair, completed the coating repairs in accordance with engineering procedures, and | |||
The inspectors observed that NDE visual inspection activities were conducted in | |||
accordance with approved procedures. The inspectors noted that Exelon completed the | |||
11 | |||
inspections, identified condition(s) in the exterior coating which required repair, | |||
completed the coating repairs in accordance with engineering procedures, and | |||
conducted appropriate re-inspection of repaired areas. | conducted appropriate re-inspection of repaired areas. | ||
In sand bed bay 11, the NDE inspection identified one small broken blister, about 1/4 | |||
In sand bed bay 11, the NDE inspection identified one small broken blister, about 1/4 | |||
inch in diameter, with a 6-inch surface rust stain, dry to the touch, trailing down from the | inch in diameter, with a 6-inch surface rust stain, dry to the touch, trailing down from the | ||
blister. During the initial investigation, three additional smaller surface irregularities | blister. During the initial investigation, three additional smaller surface irregularities | ||
| Line 655: | Line 957: | ||
838833 and 839053. In addition, this item was included in a common cause evaluation | 838833 and 839053. In addition, this item was included in a common cause evaluation | ||
as part of IR 845297. All four blisters were evaluated and repaired. | as part of IR 845297. All four blisters were evaluated and repaired. | ||
On Nov. 13, the inspectors conducted a general visual observation of the repaired area | On Nov. 13, the inspectors conducted a general visual observation of the repaired area | ||
| Line 661: | Line 962: | ||
inspectors noted that Exelon's inspection data reports were consistent with the | inspectors noted that Exelon's inspection data reports were consistent with the | ||
conditions directly observed by the inspectors. | conditions directly observed by the inspectors. | ||
All sand bed bays had been inspected by the same NDE technician. To confirm the | |||
All sand bed bays had been inspected by the same NDE technician. To confirm the | |||
adequacy of the coating inspection, Exelon re-inspected 4 sand bed bays (bays 3, 7, 15, | adequacy of the coating inspection, Exelon re-inspected 4 sand bed bays (bays 3, 7, 15, | ||
and 19) with a different NDE technician. No additional concerns or problems were | and 19) with a different NDE technician. No additional concerns or problems were | ||
| Line 678: | Line 980: | ||
9. The inspectors observed that Exelon's inspection data reports adequately described | 9. The inspectors observed that Exelon's inspection data reports adequately described | ||
the conditions directly observed by the inspectors. | the conditions directly observed by the inspectors. | ||
In follow-up, Exelon reviewed a 2006 video of the sand beds, which had been made as | |||
In follow-up, Exelon reviewed a 2006 video of the sand beds, which had been made as | |||
a general aid, not as part of an NDE inspection. The 2006 video showed the same | a general aid, not as part of an NDE inspection. The 2006 video showed the same | ||
6-inch rust stain in bay 11. The inspectors compared the 2008 VT results to the 2006 | 6-inch rust stain in bay 11. The inspectors compared the 2008 VT results to the 2006 | ||
| Line 684: | Line 987: | ||
This inconsistency, between the results of the 2006 coating inspection and the 2007 | This inconsistency, between the results of the 2006 coating inspection and the 2007 | ||
inspection, was entered into the corrective action program as IR 839053. | inspection, was entered into the corrective action program as IR 839053. | ||
During the final closeout of bays 3, 5, and 7, minor chipping in the epoxy coating was | |||
identified, which Exelon described as incidental mechanical damage from personnel entry for inspection or repair activities. All identified problems were entered into the | During the final closeout of bays 3, 5, and 7, minor chipping in the epoxy coating was | ||
corrective action program and subsequently repaired (IRs are listed in the Attachment). | identified, which Exelon described as incidental mechanical damage from personnel | ||
12 During the final closeout of bay 9, an area approximately 8 inches by 8 inches was identified where the color of the epoxy coating appeared different than the surrounding | entry for inspection or repair activities. All identified problems were entered into the | ||
corrective action program and subsequently repaired (IRs are listed in the Attachment). | |||
12 | |||
During the final closeout of bay 9, an area approximately 8 inches by 8 inches was | |||
identified where the color of the epoxy coating appeared different than the surrounding | |||
area. Because each of the 3 layers of the epoxy coating is a different color, Exelon | area. Because each of the 3 layers of the epoxy coating is a different color, Exelon | ||
questioned whether the color difference could have been indicative of an original | questioned whether the color difference could have been indicative of an original | ||
| Line 693: | Line 1,002: | ||
844815, and the identified area was re-coated with epoxy. | 844815, and the identified area was re-coated with epoxy. | ||
3.10 Drywell Floor Trench Inspections | 3.10 | ||
Drywell Floor Trench Inspections | |||
a. Scope of Inspection | |||
a. | |||
Scope of Inspection | |||
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancements | |||
(5, 16, & 20), stated, in part: | (5, 16, & 20), stated, in part: | ||
Perform visual test (VT) and ultrasonic test (UT) examinations of | |||
Perform visual test (VT) and ultrasonic test (UT) examinations of | |||
the drywell shell inside the drywell floor inspection trenches in bay | the drywell shell inside the drywell floor inspection trenches in bay | ||
5 and bay 17 during the 2008 refueling outage, at the same | 5 and bay 17 during the 2008 refueling outage, at the same | ||
locations that were examined in 2006. In addition, monitor the | locations that were examined in 2006. In addition, monitor the | ||
trenches for the presence of water during refueling outages. | trenches for the presence of water during refueling outages. | ||
The inspectors directly observed NDE activities and reviewed UT examination records. | |||
The inspectors directly observed NDE activities and reviewed UT examination records. | |||
The inspectors independently performed field walkdowns to determine the conditions in | The inspectors independently performed field walkdowns to determine the conditions in | ||
the trenches on multiple occasions during the outage. The inspectors compared UT | the trenches on multiple occasions during the outage. The inspectors compared UT | ||
| Line 712: | Line 1,026: | ||
1994, 1996, and 2006," and C-1302-187-5320-024, revision 2, "Drywell External UT | 1994, 1996, and 2006," and C-1302-187-5320-024, revision 2, "Drywell External UT | ||
Evaluation in the Sand Bed." In addition, the inspectors reviewed Technical Evaluation | Evaluation in the Sand Bed." In addition, the inspectors reviewed Technical Evaluation | ||
330592.27.43, "2008 UT Data of the Sand Bed Trenches." The inspectors reviewed Exelon UT examination procedures, interviewed NDE | 330592.27.43, "2008 UT Data of the Sand Bed Trenches." | ||
The inspectors reviewed Exelon UT examination procedures, interviewed NDE | |||
supervisors and technicians, and reviewed a sample of NDE technician UT | supervisors and technicians, and reviewed a sample of NDE technician UT | ||
qualifications. The inspectors also reviewed records of trench inspections performed | qualifications. The inspectors also reviewed records of trench inspections performed | ||
during two non-refueling plant outages during the last operating cycle. | during two non-refueling plant outages during the last operating cycle. | ||
b. Observations | b. | ||
Observations | |||
In Technical Evaluation 330592.27.43, Exelon determined the UT thickness values | |||
satisfied the general uniform minimum wall thickness criteria (e.g., average thickness of | satisfied the general uniform minimum wall thickness criteria (e.g., average thickness of | ||
an area) and the locally thinned minimum wall thickness criteria (e.g., areas 2-inches or | an area) and the locally thinned minimum wall thickness criteria (e.g., areas 2-inches or | ||
| Line 727: | Line 1,045: | ||
same locations, and concluded there were no significant differences in measured | same locations, and concluded there were no significant differences in measured | ||
thicknesses and no observable on-going corrosion. The inspectors independently | thicknesses and no observable on-going corrosion. The inspectors independently | ||
verified that the UT thickness values satisfied applicable acceptance criteria. | verified that the UT thickness values satisfied applicable acceptance criteria. | ||
13 During two non-refueling plant outages during the last operating cycle, both trenches were inspected for the presence of water and found dry by Exelon's staff and by NRC | |||
13 | |||
During two non-refueling plant outages during the last operating cycle, both trenches | |||
were inspected for the presence of water and found dry by Exelon's staff and by NRC | |||
inspectors (NRC Inspection Reports 05000219/2007003, 05000219/2007004, and | inspectors (NRC Inspection Reports 05000219/2007003, 05000219/2007004, and | ||
memorandum ML071240008). | memorandum ML071240008). | ||
During the initial drywell entry on Oct. 25, the inspectors observed that both floor | |||
During the initial drywell entry on Oct. 25, the inspectors observed that both floor | |||
trenches were dry. On subsequent drywell entries for routine inspection activities, the | trenches were dry. On subsequent drywell entries for routine inspection activities, the | ||
inspectors observed the trenches to be dry. On one occasion, Exelon observed a small | inspectors observed the trenches to be dry. On one occasion, Exelon observed a small | ||
| Line 738: | Line 1,061: | ||
program as IR 843190. On Nov. 17, during the final drywell closeout inspection, the | program as IR 843190. On Nov. 17, during the final drywell closeout inspection, the | ||
inspectors observed the following: | inspectors observed the following: | ||
* Bay 17 trench was dry and had newly installed sealant on the trench edge where concrete meets shell, and on the floor curb near the trench. | |||
* Bay 5 trench had a few ounces of water in it. The inspectors noted that within the last day there had been several system flushes conducted in the | * Bay 17 trench was dry and had newly installed sealant on the trench edge | ||
where concrete meets shell, and on the floor curb near the trench. | |||
* Bay 5 trench had a few ounces of water in it. The inspectors noted that within | |||
the last day there had been several system flushes conducted in the | |||
immediate area. Exelon stated the trench would be dried prior to final drywell | immediate area. Exelon stated the trench would be dried prior to final drywell | ||
closeout. This issue was entered into the corrective action program as IR | closeout. This issue was entered into the corrective action program as IR | ||
846209 and IR 846240. | 846209 and IR 846240. | ||
* Bay 5 trench had the lower 6-inches of grout re-installed and had newly installed sealant on the trench edge where concrete meets shell, and on the | |||
* Bay 5 trench had the lower 6-inches of grout re-installed and had newly | |||
installed sealant on the trench edge where concrete meets shell, and on the | |||
floor curb near the trench. | floor curb near the trench. | ||
3.11 Drywell Shell Thickness Measurements | 3.11 | ||
Drywell Shell Thickness Measurements | |||
a. Scope of Inspection | |||
a. | |||
Scope of Inspection | |||
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancements | |||
(1, 9, 14, & 21), stated, in part: | (1, 9, 14, & 21), stated, in part: | ||
Perform full-scope drywell inspections [in the sand bed region], | |||
Perform full-scope drywell inspections [in the sand bed region], | |||
including UT thickness measurements of the drywell shell, from | including UT thickness measurements of the drywell shell, from | ||
inside and outside the drywell. During the 2008 refueling outage | inside and outside the drywell. During the 2008 refueling outage | ||
and every other refueling outage thereafter. | and every other refueling outage thereafter. | ||
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancements | |||
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancements | |||
(7, 10, & 11) stated, in part: | (7, 10, & 11) stated, in part: | ||
Conduct UT thickness measurements in the upper regions of the | |||
Conduct UT thickness measurements in the upper regions of the | |||
drywell shell. Prior to the period of extended operation and two | drywell shell. Prior to the period of extended operation and two | ||
refueling outages later. | refueling outages later. | ||
The inspectors directly observed NDE activities and independently performed field | |||
The inspectors directly observed NDE activities and independently performed field | |||
walkdowns to determine the condition of the drywell shell both inside the drywell, | walkdowns to determine the condition of the drywell shell both inside the drywell, | ||
including the floor trenches, and in the sand bed bays (drywell external shell). The | including the floor trenches, and in the sand bed bays (drywell external shell). The | ||
inspectors reviewed UT examination records and compared UT data results to licensee | inspectors reviewed UT examination records and compared UT data results to licensee | ||
14 established acceptance criteria in Specification IS-328227-004, revision 14, "Functional Requirements for Drywell Containment Vessel Thickness Examinations," and to design | |||
14 | |||
established acceptance criteria in Specification IS-328227-004, revision 14, "Functional | |||
Requirements for Drywell Containment Vessel Thickness Examinations," and to design | |||
analysis values for minimum wall thickness in calculations C-1302-187-E310-041, | analysis values for minimum wall thickness in calculations C-1302-187-E310-041, | ||
revision 0, "Statistical Analysis of Drywell Vessel Sand Bed Thickness Data 1992, 1994, | revision 0, "Statistical Analysis of Drywell Vessel Sand Bed Thickness Data 1992, 1994, | ||
| Line 770: | Line 1,110: | ||
in the Sand Bed." In addition, the inspectors reviewed the Technical Evaluations (TEs) | in the Sand Bed." In addition, the inspectors reviewed the Technical Evaluations (TEs) | ||
associated with the UT data, as follows: | associated with the UT data, as follows: | ||
The inspectors reviewed UT examination records for the following: | |||
* TE 330592.27.42, "2008 Sand Bed UT data - External" | |||
* TE 330592.27.45, "2008 Drywell UT Data at Elevations 23-foot & 71-foot" | |||
* Transition weld from 2.625-inch plate to 0.640-inch plate (knuckle area), inside the drywell | |||
The inspectors reviewed Exelon UT examination procedures, interviewed NDE | |||
* TE 330592.27.88, "2008 Drywell Sand Bed UT Data - Internal Grids" | |||
The inspectors reviewed UT examination records for the following: | |||
* Sand bed region elevation, inside the drywell | |||
* All 10 sand bed bays, drywell external | |||
* Various drywell elevations between the 50-foot and 87-foot elevations | |||
* Transition weld from bottom to middle spherical plates, inside the drywell | |||
* Transition weld from 2.625-inch plate to 0.640-inch plate (knuckle area), inside | |||
the drywell | |||
The inspectors reviewed Exelon UT examination procedures, interviewed NDE | |||
supervisors and technicians, and directly observed field collection, recording, and | supervisors and technicians, and directly observed field collection, recording, and | ||
reporting of UT data. The inspectors also reviewed a sample of NDE technician UT | reporting of UT data. The inspectors also reviewed a sample of NDE technician UT | ||
qualifications. | qualifications. | ||
b. Observations | b. | ||
Observations | |||
The inspectors observed that NDE UT examination activities were conducted in | |||
accordance with approved procedures. In addition, the inspectors performed a general | accordance with approved procedures. In addition, the inspectors performed a general | ||
visual observation of the drywell shell general conditions on multiple occasions during | visual observation of the drywell shell general conditions on multiple occasions during | ||
the outage. | the outage. | ||
In Technical Evaluations 330592.27.42, 330592.27.45, and 330592.27.88, Exelon | |||
In Technical Evaluations 330592.27.42, 330592.27.45, and 330592.27.88, Exelon | |||
determined the UT thickness values satisfied the general uniform minimum wall | determined the UT thickness values satisfied the general uniform minimum wall | ||
thickness criteria (e.g., average thickness of an area) and the locally thinned minimum | thickness criteria (e.g., average thickness of an area) and the locally thinned minimum | ||
| Line 798: | Line 1,162: | ||
no significant differences in measured thicknesses and no observable on-going | no significant differences in measured thicknesses and no observable on-going | ||
corrosion. The inspectors independently verified that the UT thickness values satisfied | corrosion. The inspectors independently verified that the UT thickness values satisfied | ||
applicable acceptance criteria. | applicable acceptance criteria. | ||
15 3.12 One Time Inspection Program | |||
15 | |||
a. Scope of Inspection | |||
3.12 | |||
The One-Time Inspection program will provide reasonable | One Time Inspection Program | ||
a. | |||
Scope of Inspection | |||
Proposed SER Appendix-A Item 24, One Time Inspection Program, stated, in part: | |||
The One-Time Inspection program will provide reasonable | |||
assurance that an aging effect is not occurring, or that the aging | assurance that an aging effect is not occurring, or that the aging | ||
effect is occurring slowly enough to not affect the component or | effect is occurring slowly enough to not affect the component or | ||
| Line 809: | Line 1,180: | ||
operation, and therefore will not require additional aging | operation, and therefore will not require additional aging | ||
management. Perform prior to the period of extended operation. | management. Perform prior to the period of extended operation. | ||
The inspectors reviewed the program's sampling basis and sample plan. Also, the | |||
The inspectors reviewed the program's sampling basis and sample plan. Also, the | |||
inspectors reviewed UT results from approximately 24 selected piping sample locations | inspectors reviewed UT results from approximately 24 selected piping sample locations | ||
in the main steam, spent fuel pool cooling, domestic water, and demineralized water | in the main steam, spent fuel pool cooling, domestic water, and demineralized water | ||
systems. | systems. | ||
b. Observations | |||
b. | |||
Observations | |||
The inspectors noted that for two UT sample locations, the measured piping thickness | |||
did not satisfy the acceptance criteria, and the results were evaluated within the | did not satisfy the acceptance criteria, and the results were evaluated within the | ||
corrective action program. The inspectors did not identify any significant problems or | corrective action program. The inspectors did not identify any significant problems or | ||
concerns with Exelon's inspection activities. | concerns with Exelon's inspection activities. | ||
3.13 "B" Isolation Condenser Shell Inspection | 3.13 | ||
"B" Isolation Condenser Shell Inspection | |||
a. Scope of Inspection | |||
a. | |||
part: To confirm the effectiveness of the Water Chemistry program to | Scope of Inspection | ||
Proposed SER Appendix-A Item 24, One Time Inspection Program Item (2), stated, in | |||
part: | |||
To confirm the effectiveness of the Water Chemistry program to | |||
manage the loss of material and crack initiation and growth aging | manage the loss of material and crack initiation and growth aging | ||
effects. A one-time UT inspection of the "B" Isolation Condenser | effects. A one-time UT inspection of the "B" Isolation Condenser | ||
shell below the waterline will be conducted looking for pitting | shell below the waterline will be conducted looking for pitting | ||
corrosion. Perform prior to the period of extended operation. | corrosion. Perform prior to the period of extended operation. | ||
The inspectors directly observed NDE examinations of the "B" isolation condenser shell | |||
The inspectors directly observed NDE examinations of the "B" isolation condenser shell | |||
performed under WO C2017561-11. The NDE examinations included a visual | performed under WO C2017561-11. The NDE examinations included a visual | ||
inspection of the shell interior, UT thickness measurements in two locations that were | inspection of the shell interior, UT thickness measurements in two locations that were | ||
| Line 835: | Line 1,216: | ||
the UT data records, and compared the UT data results to the established minimum wall | the UT data records, and compared the UT data results to the established minimum wall | ||
thickness criteria for the isolation condenser shell, and compared the UT data results | thickness criteria for the isolation condenser shell, and compared the UT data results | ||
with previously UT data measurements from 1996 and 2002. | with previously UT data measurements from 1996 and 2002. | ||
16 | |||
16 | |||
b. | |||
Observations | |||
The inspectors noted that the UT results satisfied the acceptance criteria for minimum | |||
wall thickness. The inspectors did not identify any significant problems or concerns with | wall thickness. The inspectors did not identify any significant problems or concerns with | ||
Exelon's inspection activities. | Exelon's inspection activities. | ||
3.14 Periodic Inspections | 3.14 | ||
Periodic Inspections | |||
a. Scope of Inspection | |||
a. | |||
Activities consist of a periodic inspection of selected structures, | Scope of Inspection | ||
Proposed SER Appendix-A Item 41, Periodic Inspection Program, stated, in part: | |||
Activities consist of a periodic inspection of selected structures, | |||
systems, and components to verify integrity and confirm the | systems, and components to verify integrity and confirm the | ||
absence of identified aging effects. Perform prior to the period of | absence of identified aging effects. Perform prior to the period of | ||
extended operation. | extended operation. | ||
b. Observations | The inspectors directly observed the following field activities: | ||
* Condensate expansion joints Y-2-11 and Y-2-12 inspection (WO R2083515) | |||
* 4160 V Bus 1C switchgear fire barrier penetration inspection (WO R2093471) | |||
b. | |||
Observations | |||
The inspectors noted that Exelon's documented inspection results were consistent with | |||
the conditions directly observed by the inspectors. The inspectors did not identify any | the conditions directly observed by the inspectors. The inspectors did not identify any | ||
significant problems or concerns. | significant problems or concerns. | ||
3.15 Circulating Water Intake Tunnel & Expansion Joint Inspection | 3.15 | ||
Circulating Water Intake Tunnel & Expansion Joint Inspection | |||
a. Scope of Inspection | |||
a. | |||
Scope of Inspection | |||
Proposed SER Appendix-A Item 31, Structures Monitoring Program Enhancement (1), | |||
stated, in part: | stated, in part: | ||
Buildings, structural components and commodities that are not in | |||
Buildings, structural components and commodities that are not in | |||
scope of maintenance rule but have been determined to be in the | scope of maintenance rule but have been determined to be in the | ||
scope of license renewal. Perform prior to the period of extended | scope of license renewal. Perform prior to the period of extended | ||
operation. | operation. | ||
On Oct. 29, the inspector directly observed the conduct of a structural engineering | |||
On Oct. 29, the inspector directly observed the conduct of a structural engineering | |||
inspection of the circulating water intake tunnel, including reinforced concrete wall and | inspection of the circulating water intake tunnel, including reinforced concrete wall and | ||
floor slabs, steel liners, embedded steel pipe sleeves, butterfly isolation valves, and tunnel expansion joints. The inspection was conducted by a qualified Exelon structural | floor slabs, steel liners, embedded steel pipe sleeves, butterfly isolation valves, and | ||
tunnel expansion joints. The inspection was conducted by a qualified Exelon structural | |||
engineer. After the inspection was completed, the inspectors compared his direct | engineer. After the inspection was completed, the inspectors compared his direct | ||
observations with the documented visual inspection results. | observations with the documented visual inspection results. | ||
17 | |||
17 | |||
b. | |||
Observations | |||
The inspectors noted that Exelon's documented inspection results were consistent with | |||
the conditions directly observed by the inspectors. The inspectors did not identify any | the conditions directly observed by the inspectors. The inspectors did not identify any | ||
significant problems or concerns with Exelon's inspection activities. | significant problems or concerns with Exelon's inspection activities. | ||
3.16 Buried Emergency Service Water Pipe Replacement | 3.16 | ||
Buried Emergency Service Water Pipe Replacement | |||
a. Scope of Inspection | |||
a. | |||
Replace the previously un-replaced, buried safety-related | Scope of Inspection | ||
Proposed SER Appendix-A Item 63, Buried Piping, stated, in part: | |||
Replace the previously un-replaced, buried safety-related | |||
emergency service water piping prior to the period of extended | emergency service water piping prior to the period of extended | ||
operation. Perform prior to the period of extended operation. | operation. Perform prior to the period of extended operation. | ||
The inspectors directly observed the following activities, performed under WO | |||
The inspectors directly observed the following activities, performed under WO | |||
C2017279: | C2017279: | ||
3.17 Electrical Cable Inspection inside Drywell | |||
* Field work to remove old pipe and install new pipe | |||
a. Scope of Inspection | |||
A representative sample of accessible cables and connections | * Foreign material exclusion (FME) controls | ||
* External protective pipe coating, and controls to ensure the pipe installation | |||
activities would not result in damage to the pipe coating | |||
b. | |||
Observations | |||
The inspectors did not identify any significant problems or concerns. | |||
3.17 | |||
Electrical Cable Inspection inside Drywell | |||
a. | |||
Scope of Inspection | |||
Proposed SER Appendix-A Item 34, Electrical Cables and Connections, stated, in part: | |||
A representative sample of accessible cables and connections | |||
located in adverse localized environments will be visually | located in adverse localized environments will be visually | ||
inspected at least once every 10 years for indications of | inspected at least once every 10 years for indications of | ||
accelerated insulation aging. Perform prior to the period of | accelerated insulation aging. Perform prior to the period of | ||
extended operation. | extended operation. | ||
The inspector accompanied electrical technicians and an electrical design engineer during a visual inspection of selected electrical cables in the drywell. The inspector directly observed the pre-job brief which discussed inspection techniques and | |||
The inspector accompanied electrical technicians and an electrical design engineer | |||
during a visual inspection of selected electrical cables in the drywell. The inspector | |||
directly observed the pre-job brief which discussed inspection techniques and | |||
acceptance criteria. The inspector directly observed the visual inspection activities, | acceptance criteria. The inspector directly observed the visual inspection activities, | ||
which included cables in raceways, as well as cables and connections inside junction boxes. After the inspection was completed, the inspector compared his direct | which included cables in raceways, as well as cables and connections inside junction | ||
observations with the documented visual inspection results. | boxes. After the inspection was completed, the inspector compared his direct | ||
18 | observations with the documented visual inspection results. | ||
18 | |||
b. | |||
Observations | |||
The inspectors noted that Exelon's documented inspection results were consistent with | |||
the conditions directly observed by the inspectors. The inspectors did not identify any | the conditions directly observed by the inspectors. The inspectors did not identify any | ||
significant problems or concerns with Exelon's inspection activities. | significant problems or concerns with Exelon's inspection activities. | ||
3.18 Inaccessible Medium Voltage Cable Test | 3.18 | ||
Inaccessible Medium Voltage Cable Test | |||
a. Scope of Inspection | |||
a. | |||
part: Cable circuits will be tested using a proven test for detecting | Scope of Inspection | ||
Proposed SER Appendix-A Item 36, Inaccessible Medium Voltage Cables, stated, in | |||
part: | |||
Cable circuits will be tested using a proven test for detecting | |||
deterioration of the insulation system due to wetting, such as | deterioration of the insulation system due to wetting, such as | ||
power factor or partial discharge. Perform prior to the period of | power factor or partial discharge. Perform prior to the period of | ||
extended operation. | extended operation. | ||
The inspectors directly observed field testing activities for the 4 kilovolts feeder cable | |||
The inspectors directly observed field testing activities for the 4 kilovolts feeder cable | |||
from the auxiliary transformer secondary to Bank 4 switchgear and independently | from the auxiliary transformer secondary to Bank 4 switchgear and independently | ||
reviewed the test results. A Doble and power factor test of the transformer, with the | reviewed the test results. A Doble and power factor test of the transformer, with the | ||
| Line 929: | Line 1,367: | ||
electrical engineering and maintenance personnel. | electrical engineering and maintenance personnel. | ||
b. Observations | b. | ||
Observations | |||
The inspectors noted that the cable test results satisfied the acceptance criteria. The | |||
inspectors did not identify any significant problems or concerns with Exelon's test | inspectors did not identify any significant problems or concerns with Exelon's test | ||
activities. | activities. | ||
3.19 Fatigue Monitoring Program | 3.19 | ||
Fatigue Monitoring Program | |||
a. Scope of Inspection | |||
a. | |||
Scope of Inspection | |||
Proposed SER Appendix-A Item 44, Metal Fatigue of Reactor Coolant Pressure | |||
Boundary, stated, in part: | Boundary, stated, in part: | ||
The program will be enhanced to use the EPRI-licensed | |||
The program will be enhanced to use the EPRI-licensed | |||
FatiguePro cycle counting and fatigue usage factor tracking | FatiguePro cycle counting and fatigue usage factor tracking | ||
computer program. | computer program. | ||
The inspectors reviewed Exelon's proposed usage of the FatiguePro software program, | |||
The inspectors reviewed Exelon's proposed usage of the FatiguePro software program, | |||
reviewed the list of high cumulative usage factor components, and interviewed the | reviewed the list of high cumulative usage factor components, and interviewed the | ||
fatigue program manager. | fatigue program manager. | ||
19 | |||
19 | |||
b. | |||
Observations | |||
The inspectors noted that the FatiguePro program, although in place and ready to go, | |||
had not been implemented. Exelon stated the FatiguePro program will be implemented | had not been implemented. Exelon stated the FatiguePro program will be implemented | ||
after final industry resolution of a concern regarding a mathematical summation | after final industry resolution of a concern regarding a mathematical summation | ||
technique used in FatiguePro. | technique used in FatiguePro. | ||
4. Proposed Conditions of License | 4. | ||
Proposed Conditions of License | |||
a. Scope of Inspection | |||
a. | |||
The fourth license condition requires the applicant to perform | Scope of Inspection | ||
SER Section 1.7 contained two outage-related proposed conditions of license: | |||
The fourth license condition requires the applicant to perform | |||
full-scope inspections of the drywell sand bed region every other | full-scope inspections of the drywell sand bed region every other | ||
refueling outage. | refueling outage. | ||
The fifth license condition requires the applicant to monitor drywell | |||
The fifth license condition requires the applicant to monitor drywell | |||
trenches every refueling outage to identify and eliminate the | trenches every refueling outage to identify and eliminate the | ||
sources of water and receive NRC approval prior to restoring the | sources of water and receive NRC approval prior to restoring the | ||
trenches to their original design configuration. | trenches to their original design configuration. | ||
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancements | |||
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancements | |||
(1, 4, 9, 12, 14, & 21) implement the proposed license condition associated with a | (1, 4, 9, 12, 14, & 21) implement the proposed license condition associated with a | ||
full-scope drywell sand bed region inspection. | full-scope drywell sand bed region inspection. | ||
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancements | |||
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancements | |||
(5, 16, & 20) implement the proposed license condition associated with the drywell | (5, 16, & 20) implement the proposed license condition associated with the drywell | ||
trenches. | trenches. | ||
b. Observations | b. | ||
Observations | |||
For observations, see the applicable sections above for the specific ASME Section XI, | |||
Subsection IWE Enhancements (Sections 3.7, 3.9, 3.10, & 3.11). | Subsection IWE Enhancements (Sections 3.7, 3.9, 3.10, & 3.11). | ||
5. Commitment Management Program | 5. | ||
Commitment Management Program | |||
a. Scope of Inspection | |||
a. | |||
Scope of Inspection | |||
The inspectors evaluated current licensing basis procedures used to manage and revise | |||
regulatory commitments to determine whether they were consistent with the | regulatory commitments to determine whether they were consistent with the | ||
requirements of 10 CFR 50.59, NRC Regulatory Issue Summary 2000-17, "Managing | requirements of 10 CFR 50.59, NRC Regulatory Issue Summary 2000-17, "Managing | ||
| Line 983: | Line 1,445: | ||
reviewed the procedures to assess whether adequate administrative controls were in- | reviewed the procedures to assess whether adequate administrative controls were in- | ||
place to ensure commitment revisions or the elimination of commitments altogether | place to ensure commitment revisions or the elimination of commitments altogether | ||
would be properly evaluated, approved, and annually reported to the NRC. | would be properly evaluated, approved, and annually reported to the NRC. | ||
20 The inspectors also reviewed Exelon's current licensing basis commitment tracking program to evaluate its effectiveness. In addition, the following commitment change | |||
20 | |||
The inspectors also reviewed Exelon's current licensing basis commitment tracking | |||
program to evaluate its effectiveness. In addition, the following commitment change | |||
evaluation packages were reviewed: | evaluation packages were reviewed: | ||
b. Observations | |||
* Commitment Change 08-003, OC Bolting Integrity Program | |||
* Commitment Change 08-004, RPV Axial Weld Examination Relief | |||
b. | |||
Observations | |||
The inspectors observed that the commitment change activities were conducted in | |||
accordance with approved procedures, which required an annual update to the NRC | accordance with approved procedures, which required an annual update to the NRC | ||
with a summary of each change. | with a summary of each change. | ||
4OA6 Meetings, Including Exit Meeting | 4OA6 Meetings, Including Exit Meeting | ||
Exit Meeting Summary | |||
The inspectors presented the results of this inspection to Mr. T. Rausch, Site Vice President, Mr. M. Gallagher, Vice President License Renewal, and other members of | |||
The inspectors presented the results of this inspection to Mr. T. Rausch, Site Vice | |||
President, Mr. M. Gallagher, Vice President License Renewal, and other members of | |||
Exelon's staff on December 23, 2008. | Exelon's staff on December 23, 2008. | ||
No proprietary information is present in this inspection report. | |||
A-1 | No proprietary information is present in this inspection report. | ||
A-1 | |||
ATTACHMENT | |||
SUPPLEMENTAL INFORMATION | |||
KEY POINTS OF CONTACT | |||
Licensee Personnel | |||
C. Albert, Site License Renewal | C. Albert, Site License Renewal | ||
J. Cavallo, Corrosion Control Consultants & labs, Inc. | J. Cavallo, Corrosion Control Consultants & labs, Inc. | ||
| Line 1,020: | Line 1,501: | ||
P. Tamburro, Site License Renewal Lead | P. Tamburro, Site License Renewal Lead | ||
C. Taylor, Regulatory Affairs | C. Taylor, Regulatory Affairs | ||
NRC Personnel | NRC Personnel | ||
S. Pindale, Acting Senior Resident Inspector, Oyster Creek | S. Pindale, Acting Senior Resident Inspector, Oyster Creek | ||
J. Kulp, Resident Inspector, Oyster Creek | J. Kulp, Resident Inspector, Oyster Creek | ||
| Line 1,030: | Line 1,510: | ||
M. Baty, Counsel for NRC Staff | M. Baty, Counsel for NRC Staff | ||
J. Davis, Senior Materials Engineer, NRR | J. Davis, Senior Materials Engineer, NRR | ||
Observers | Observers | ||
R. Pinney, New Jersey State Department of Environmental Protection | R. Pinney, New Jersey State Department of Environmental Protection | ||
R. Zak, New Jersey State Department of Environmental Protection | R. Zak, New Jersey State Department of Environmental Protection | ||
M. Fallin, Constellation License Renewal Manager | M. Fallin, Constellation License Renewal Manager | ||
R. Leski, Nine Mile Point License Renewal Manager | R. Leski, Nine Mile Point License Renewal Manager | ||
A-2 | |||
A-2 | |||
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED | |||
Opened/Closed | |||
None. | None. | ||
Opened | Opened | ||
05000219/2008007-01 URI Drywell Sand Bed Water Intrusion, Drain | |||
05000219/2008007-01 | |||
URI | |||
Drywell Sand Bed Water Intrusion, Drain | |||
Monitoring, and Coating Deficiency (Section 2.2) | |||
Closed | |||
None. | None. | ||
LIST OF ACRONYMS | |||
ANSI American National Standards Institute | LIST OF ACRONYMS | ||
ASME American Society of Mechanical Engineers | |||
CLB Current Licensing Basis | ANSI | ||
EPRI Electric Power Research Institute | American National Standards Institute | ||
FME Foreign Material Exclusion | ASME | ||
IP [NRC] Inspection Procedure | American Society of Mechanical Engineers | ||
IR [Exelon] Issue Report | CLB | ||
gpm Gallons per Minute | |||
NDE Non-destructive Examination | Current Licensing Basis | ||
NEI Nuclear Energy Institute | EPRI | ||
NRC U. S. Nuclear Regulatory Commission | Electric Power Research Institute | ||
NRR Office of Nuclear Reactor Regulation | FME | ||
OC Oyster Creek | |||
SER [NRC] Safety Evaluation Report | Foreign Material Exclusion | ||
SSC Structures, Systems, and Components | IP | ||
SDP Significance Determination Process | |||
TE Technical Evaluation | [NRC] Inspection Procedure | ||
UFSAR Updated Final Safety Analysis Report | IR | ||
URI [NRC] Unresolved Item | |||
UT Ultrasonic Test | [Exelon] Issue Report | ||
VT Visual Testing | gpm | ||
WO Work Order | |||
Gallons per Minute | |||
NDE | |||
Non-destructive Examination | |||
NEI | |||
Nuclear Energy Institute | |||
NRC | |||
U. S. Nuclear Regulatory Commission | |||
NRR | |||
Office of Nuclear Reactor Regulation | |||
OC | |||
Oyster Creek | |||
SER | |||
[NRC] Safety Evaluation Report | |||
SSC | |||
Structures, Systems, and Components | |||
SDP | |||
Significance Determination Process | |||
TE | |||
Technical Evaluation | |||
UFSAR | |||
Updated Final Safety Analysis Report | |||
URI | |||
[NRC] Unresolved Item | |||
UT | |||
Ultrasonic Test | |||
VT | |||
Visual Testing | |||
WO | |||
Work Order | |||
A-3 | |||
LIST OF DOCUMENTS REVIEWED | |||
License Renewal Program Documents | |||
2130-06-20364 Letter from AmerGen to the NRC, 10 CFR 54.21(b) Annual Amendment to OC | |||
License Renewal Application (TAC No. MC7624), dated July 18, 2006 | |||
2130-07-20502 Letter from AmerGen to the NRC, 10 CFR 54.21(b) Annual Amendment to OC | |||
License Renewal Application (TAC No. MC7624), dated July 9, 2007 | |||
PP-09, Inspection Sample Basis for the One-Time Inspection AMP, Rev. 0 | |||
Plant Procedures and Specifications | Plant Procedures and Specifications | ||
645.6.017, Fire Barrier Penetration Surveillance, Rev 13 | |||
ER-AA-330-008, Service Level I & Safety-Related Service Level III Protective Coatings, Rev. 6 | ER-AA-330-008, Service Level I & Safety-Related Service Level III Protective Coatings, Rev. 6 | ||
ER-AA-335-004, Manual UT of Material Thickness & Interfering Conditions, Rev. 2 | ER-AA-335-004, Manual UT of Material Thickness & Interfering Conditions, Rev. 2 | ||
ER-AA-335-018, Detailed, General, VT-1, VT-1C, VT-3 and VT-3C Visual Examination of ASME Class MC and CC Containment Surfaces and Components, Rev. 5 ER-OC-450, Structures Monitoring Program, Rev. 1 | ER-AA-335-018, Detailed, General, VT-1, VT-1C, VT-3 and VT-3C Visual Examination of | ||
ASME Class MC and CC Containment Surfaces and Components, Rev. 5 | |||
ER-OC-450, Structures Monitoring Program, Rev. 1 | |||
LS-AA-104-1002, 50.59 Applicability Review, Rev 3 | LS-AA-104-1002, 50.59 Applicability Review, Rev 3 | ||
LS-AA-110, Commitment Change management, Rev 6 | LS-AA-110, Commitment Change management, Rev 6 | ||
MA-AA-723-500, Inspection of Non EQ Cables and Connections for Managing Adverse Localized Environments, Rev 2 RP-OC-6006, Reactor Cavity and Equipment Pit Leak Mitigation and Decontamination, Rev. 0 | MA-AA-723-500, Inspection of Non EQ Cables and Connections for Managing Adverse | ||
Specification SP 1302-32-035, Inspection and Minor Repair of Coating on Concrete & Drywell Shell Surfaces in the Sand Bed Region, dated 2/24/93 | Localized Environments, Rev 2 | ||
RP-OC-6006, Reactor Cavity and Equipment Pit Leak Mitigation and Decontamination, Rev. 0 | |||
Specification SP 1302-32-035, Inspection and Minor Repair of Coating on Concrete & Drywell | |||
Shell Surfaces in the Sand Bed Region, dated 2/24/93 | |||
Incident Reports (IRs) | Incident Reports (IRs) | ||
* = IRs written as a result of the NRC inspection | |||
330592 | 330592 | ||
546915 | 546915 | ||
| Line 1,098: | Line 1,646: | ||
557180 | 557180 | ||
557898 | 557898 | ||
804754 836362* 836367* 836395 836802 836814 | 804754 | ||
836362* | |||
836367* | |||
836395 | |||
836802 | |||
836814 | |||
836994 | 836994 | ||
837188 | 837188 | ||
| Line 1,106: | Line 1,659: | ||
837647 | 837647 | ||
837765 | 837765 | ||
838148 838402 838509 838523* 838833 839028 | 838148 | ||
838402 | |||
838509 | |||
838523* | |||
838833 | |||
839028 | |||
839033 | 839033 | ||
839053 | 839053 | ||
839182 | 839182 | ||
839185 | 839185 | ||
839188 839192 839194 | 839188 | ||
839192 | |||
839194 | |||
839204 | 839204 | ||
839211 | 839211 | ||
| Line 1,119: | Line 1,679: | ||
841957 | 841957 | ||
841957 | 841957 | ||
842010 842323 842325 | 842010 | ||
842323 | |||
842325 | |||
842333 | 842333 | ||
842355 | 842355 | ||
| Line 1,127: | Line 1,689: | ||
842566 | 842566 | ||
843190 | 843190 | ||
843209 843380 843608 | 843209 | ||
843380 | |||
843608 | |||
844815 | 844815 | ||
845297 | 845297 | ||
846240 | 846240 | ||
939194 Work Orders (WOs) | 939194 | ||
Work Orders (WOs) | |||
WO C20117279 | |||
WO C2017279 | WO C2017279 | ||
WO C2017561-11 | WO C2017561-11 | ||
| Line 1,142: | Line 1,708: | ||
WO R2095468 | WO R2095468 | ||
WO R2095469 | WO R2095469 | ||
WO R2095471 WO R2095857 WO R209585708 | WO R2095471 | ||
WO R2095857 | |||
WO R209585708 | |||
WO R2097321-01 | WO R2097321-01 | ||
WO R2098682-06 | WO R2098682-06 | ||
| Line 1,151: | Line 1,719: | ||
WO R2105479 | WO R2105479 | ||
WO R2105515 | WO R2105515 | ||
WO R2105516 WO R2117387 WO R21173870 | WO R2105516 | ||
A-4 Ultrasonic Test Non-destructive Examination Records | WO R2117387 | ||
WO R21173870 | |||
1R21LR-002, 50 | |||
1R21LR-026, 87 | A-4 | ||
1R21LR-028, 87 | |||
1R21LR-029, 23 | Ultrasonic Test Non-destructive Examination Records | ||
1R21LR-030, 23 | 1R21LR-001, 11 3 elevation, October 18, 2006 | ||
1R21LR-033, 71 | 1R21LR-002, 50 2 elevation, October 18, 2006 | ||
1R21LR-034, 71 | 1R21LR-026, 87 5 elevation, October 23, 2006 | ||
1R22-LRA-019, 23' 6 | 1R21LR-028, 87 5 elevation, October 23, 2006 | ||
1R21LR-029, 23 6 elevation, October 23, 2006 | |||
1R21LR-030, 23 6 elevation, October 24, 2006 | |||
1R21LR-033, 71 6 elevation, October 26, 2006 | |||
1R21LR-034, 71 6 elevation, October 26, 2006 | |||
1R22-LRA-019, 23' 6 elevation, November 5, 2008 | |||
1R22-LRA-020, 51' elevation, October 29, 2008 | 1R22-LRA-020, 51' elevation, October 29, 2008 | ||
1R22-LRA-021, 50' 2 | 1R22-LRA-021, 50' 2 elevation, October 29, 2008 | ||
1R22-LRA-022, 50' 2 | 1R22-LRA-022, 50' 2 elevation, October 29, 2008 | ||
1R22-LRA-023, 51' elevation, October 30, 2008 | 1R22-LRA-023, 51' elevation, October 30, 2008 | ||
1R22-LRA-024, 51' 10 | 1R22-LRA-024, 51' 10 elevation, October 29, 2008 | ||
1R22-LRA-030, 11' 3 | 1R22-LRA-030, 11' 3 elevation, October 30, 2008 | ||
1R22-LRA-039, 10' 3 | 1R22-LRA-039, 10' 3 elevation, November 3, 2008 | ||
1R22-LRA-040, 10' 3 | 1R22-LRA-040, 10' 3 elevation, November 3, 2008 | ||
1R22-LRA-050, 87' 5 | 1R22-LRA-050, 87' 5 elevation, November 4, 2008 | ||
1R22-LRA-057, 87' 5 | 1R22-LRA-057, 87' 5 elevation, November 4, 2008 | ||
1R22-LRA-058, 87' 5 | 1R22-LRA-058, 87' 5 elevation, November 4, 2008 | ||
1R22-LRA-061, 23' 6 | 1R22-LRA-061, 23' 6 elevation, November 5, 2008 | ||
1R22-LRA-064, 11' 3 | 1R22-LRA-064, 11' 3 elevation, November 3, 2008 | ||
1R22-LRA-065, 11' 3 | 1R22-LRA-065, 11' 3 elevation, November 3, 2008 | ||
1R22-LRA-067, 11' 3 | 1R22-LRA-067, 11' 3 elevation, November 4, 2008 | ||
1R22-LRA-068, 11' 3 | 1R22-LRA-068, 11' 3 elevation, November 4, 2008 | ||
1R22-LRA-071, 71' 6 | 1R22-LRA-071, 71' 6 elevation, November 3, 2008 | ||
1R22-LRA-073, 11' 3 | 1R22-LRA-073, 11' 3 elevation, November 5, 2008 | ||
1R22-LRA-074, 71' 6 | 1R22-LRA-074, 71' 6 elevation, November 5, 2008 | ||
1R22-LRA-077, 60' elevation, November 6, 2008 | 1R22-LRA-077, 60' elevation, November 6, 2008 | ||
1R22-LRA-078, 11' 6 | 1R22-LRA-078, 11' 6 elevation, November 7, 2008 | ||
1R22-LRA-079, 71' 6 | 1R22-LRA-079, 71' 6 elevation, November 5, 2008 | ||
1R22-LRA-088, 23' 6 | 1R22-LRA-088, 23' 6 elevation, November 11, 2008 | ||
NDE Data Report 2008-007-017 | NDE Data Report 2008-007-017 | ||
NDE Data Report 2008-007-030 | NDE Data Report 2008-007-030 | ||
NDE Data Report 2008-007-031 | NDE Data Report 2008-007-031 | ||
UT Data Sheet 21R056 | UT Data Sheet 21R056 | ||
Visual Test Inspection Non-destructive Examination Records | Visual Test Inspection Non-destructive Examination Records | ||
1R21LR-024 , Bay 5, October 21, 2006 | |||
1R21LR-025, Bay 17, October 21, 2006 | 1R21LR-025, Bay 17, October 21, 2006 | ||
1R21LR-032, Bay 5, October 26, 2006 | 1R21LR-032, Bay 5, October 26, 2006 | ||
| Line 1,202: | Line 1,774: | ||
1R22-LRA-031, Bay 9, October 29, 2008 | 1R22-LRA-031, Bay 9, October 29, 2008 | ||
1R22-LRA-032, Bay 5, October 29, 2008 | 1R22-LRA-032, Bay 5, October 29, 2008 | ||
1R22-LRA-035, Bay 13, October 30, 2008 | 1R22-LRA-035, Bay 13, October 30, 2008 | ||
A-5 1R22-LRA-036, Bay 1, October 30, 2008 1R22-LRA-037, Bay 13, October 30, 2008 | |||
A-5 | |||
1R22-LRA-036, Bay 1, October 30, 2008 | |||
1R22-LRA-037, Bay 13, October 30, 2008 | |||
1R22-LRA-038, Bay 17, October 30, 2008 | 1R22-LRA-038, Bay 17, October 30, 2008 | ||
1R22-LRA-046, Bay 11, October 31, 2008 | 1R22-LRA-046, Bay 11, October 31, 2008 | ||
| Line 1,219: | Line 1,795: | ||
1R22-LRA-084, Bay 19, November 8, 2008 | 1R22-LRA-084, Bay 19, November 8, 2008 | ||
1R22-LRA-091, Bay 19, November 8, 2008 | 1R22-LRA-091, Bay 19, November 8, 2008 | ||
NDE Certification Records | NDE Certification Records | ||
NDE Certification #0977 for Richard L. Alger, dated 10/29/08 | |||
NDE Certification #1421 for M. Kent Waddell, dated 10/29/08 | NDE Certification #1421 for M. Kent Waddell, dated 10/29/08 | ||
Calculations | Calculations | ||
C-1301-187-E310-037, Drywell Corrosion, Rev 1 | |||
C-1302-187-5320-024, O. C. Drywell Ext. UT Evaluation in Sand Bed, Rev 2 | C-1302-187-5320-024, O. C. Drywell Ext. UT Evaluation in Sand Bed, Rev 2 | ||
C-1302-187-E310-037, Drywell Corrosion, Rev. 2 | C-1302-187-E310-037, Drywell Corrosion, Rev. 2 | ||
C-1302-187-E310-041, Statistical Analysis of Drywell Vessel Sand Bed Thickness Data 1992, 1994, 1996, and 2006, Rev. 0 | C-1302-187-E310-041, Statistical Analysis of Drywell Vessel Sand Bed Thickness Data 1992, | ||
1994, 1996, and 2006, Rev. 0 | |||
Technical Evaluations | Technical Evaluations | ||
Tech Eval 00330592.27.42, 2008 Drywell Sand Bed UT Data - External Data | |||
Tech Eval 00330592.27.43, 2008 UT Data of the Sand Bed Trenches | Tech Eval 00330592.27.43, 2008 UT Data of the Sand Bed Trenches | ||
Tech Eval 00330592.27.45, 2008 Drywell UT Data at Elevations 23 and 71 foot | Tech Eval 00330592.27.45, 2008 Drywell UT Data at Elevations 23 and 71 foot | ||
Tech Eval 00330592.27.46, 2008 Degradation Coating Found in Sand Bed Bay 11 | Tech Eval 00330592.27.46, 2008 Degradation Coating Found in Sand Bed Bay 11 | ||
Tech Eval 00330592.27.88, 2008 Sand Bed UT Data - Internal Grids | Tech Eval 00330592.27.88, 2008 Sand Bed UT Data - Internal Grids | ||
Miscellaneous Documents | Miscellaneous Documents | ||
00553792-02, Drywell Structural Integrity Basis from 1R21 Inspections | |||
00725855-03, Oyster Creek License Renewal Commitment Implementation 2008 FASA | 00725855-03, Oyster Creek License Renewal Commitment Implementation 2008 FASA | ||
08-003, OC Bolting Integrity Program Commitment Change Evaluation, February 28, 2008 | 08-003, OC Bolting Integrity Program Commitment Change Evaluation, February 28, 2008 | ||
08-004, Oyster Creek LR Commitment Change for RPV Axial Weld Examination Relief for 60-years of Operation, March 28, 2008 168-002 (R2114262), Structures and Components Monitoring Report, Intake Tunnel and Expansion Joints, October 29, 2008 168-003 (R2120584-05), Structures and Components Monitoring Report, SW/ESW Piping at Intake Structure Underdeck (North Side), November 3, 2008 | 08-004, Oyster Creek LR Commitment Change for RPV Axial Weld Examination Relief for 60- | ||
A-6 187-001 (R2097321-01), Structures and Components Monitoring Report, Drywell Internal Structures, Above El. 23' - 0 | years of Operation, March 28, 2008 | ||
168-002 (R2114262), Structures and Components Monitoring Report, Intake Tunnel and | |||
Expansion Joints, October 29, 2008 | |||
168-003 (R2120584-05), Structures and Components Monitoring Report, SW/ESW Piping at | |||
Intake Structure Underdeck (North Side), November 3, 2008 | |||
A-6 | |||
187-001 (R2097321-01), Structures and Components Monitoring Report, Drywell Internal | |||
Structures, Above El. 23' - 0, November 1, 2008 | |||
1R22 Startup PORC, License Renwal Commitments and Inspection Status, Undated | |||
Assessment of Oyster Creek's response to condition document IR 00842333, Undated | Assessment of Oyster Creek's response to condition document IR 00842333, Undated | ||
Chemistry Data for Sandbed Bay 17 Water, Reactor Water, Fuel Pool, RBCCW, TBCCW, and Condensate Transfer, November 10 and 11, 2008 IS-328227-004, Functional Requirements for Drywell Containment Vessel Thickness Examinations, Rev. 13 IS-328227-004, Specification for OC Functional Requirements for Drywell Containment Vessel Thickness Examinations, Rev. 14 Letter from Williams Industrial Services to Oyster Creek Generating Station, Re: Brovo Iso Condenser, Internal Coating Assessment, November 2, 2008 Letter from Williams Specialty Services to Mr. Pete Tamburro, Oyster Creek Generating Station, Inspection of Safety Related Coating Systems Inner Surface of the Drywell Shell Elevations | Chemistry Data for Sandbed Bay 17 Water, Reactor Water, Fuel Pool, RBCCW, TBCCW, and | ||
23 | Condensate Transfer, November 10 and 11, 2008 | ||
OYS-20872, Letter from R. John Diletto, Exelon Power Labs to Tom Quintenz, Oyster Creek, Material Analysis of Samples Removed from Oyster Creek Sand Bed Bay Nos. 11 & 3 in | IS-328227-004, Functional Requirements for Drywell Containment Vessel Thickness | ||
Examinations, Rev. 13 | |||
IS-328227-004, Specification for OC Functional Requirements for Drywell Containment Vessel | |||
Thickness Examinations, Rev. 14 | |||
Letter from Williams Industrial Services to Oyster Creek Generating Station, Re: Brovo Iso | |||
Condenser, Internal Coating Assessment, November 2, 2008 | |||
Letter from Williams Specialty Services to Mr. Pete Tamburro, Oyster Creek Generating Station, | |||
Inspection of Safety Related Coating Systems Inner Surface of the Drywell Shell Elevations | |||
23-6 and 46, November, 3, 2008 | |||
ML-DCS-104, The Instacote Application System, Rev. 8 | |||
OYS-20872, Letter from R. John Diletto, Exelon Power Labs to Tom Quintenz, Oyster Creek, | |||
Material Analysis of Samples Removed from Oyster Creek Sand Bed Bay Nos. 11 & 3 in | |||
Support of Drywell Exterior Liner Inspection Outage Activities, Oyster Creek, Dated | Support of Drywell Exterior Liner Inspection Outage Activities, Oyster Creek, Dated | ||
November 11, 2008 OYS-20872, Letter from R. John Diletto, Exelon Power Labs to Tom Quintenz, Oyster Creek, Material Analysis of Samples Removed from Sand Bed Bay Nos. 11 & 3 in Support of Drywell | November 11, 2008 | ||
Exterior Liner Inspection Outage Activities, Oyster Creek, Dated November 7, 2008 OC Drywell Coating Status Update Report, Power Point Presentation, November 9, 2008 | OYS-20872, Letter from R. John Diletto, Exelon Power Labs to Tom Quintenz, Oyster Creek, | ||
Material Analysis of Samples Removed from Sand Bed Bay Nos. 11 & 3 in Support of Drywell | |||
Exterior Liner Inspection Outage Activities, Oyster Creek, Dated November 7, 2008 | |||
OC Drywell Coating Status Update Report, Power Point Presentation, November 9, 2008 | |||
Oyster Creek Nuclear Generating UFSAR, Section 3.8.2.8, Drywell Corrosion, Rev. 15 | Oyster Creek Nuclear Generating UFSAR, Section 3.8.2.8, Drywell Corrosion, Rev. 15 | ||
PORC Meeting (08-16) Report, November 15, 2008 | PORC Meeting (08-16) Report, November 15, 2008 | ||
Reactor Cavity Leakage Action Plan for 1R22 | Reactor Cavity Leakage Action Plan for 1R22 | ||
SP 1302-32-035, Specification for Inspection and Minor Repair of Coating on Concrete & Drywell Shell Surfaces in the Sandbed Region, Rev 0 Timeline of Documents Associated with the Strippable Coating on the Rx Cavity and Water Leakage Monitoring Through the Drains, undated Transformer Inspection and Test Results, Bank #4 Aux, November 3, 2008 | SP 1302-32-035, Specification for Inspection and Minor Repair of Coating on Concrete & Drywell | ||
Shell Surfaces in the Sandbed Region, Rev 0 | |||
Timeline of Documents Associated with the Strippable Coating on the Rx Cavity and Water | |||
Leakage Monitoring Through the Drains, undated | |||
Transformer Inspection and Test Results, Bank #4 Aux, November 3, 2008 | |||
White Paper on Water Leakage onto the Exterior Surface of the Drywell Shell, undated | White Paper on Water Leakage onto the Exterior Surface of the Drywell Shell, undated | ||
NRC Documents | |||
Generic Letter 87-05, Request for Additional Information Assessment of Licensee Measures to | |||
Mitigate and/or Identify Potential Degradation of Mark I Drywells | |||
Information Notice No. 86-99, Degradation of Steel Containments | |||
RIS 2000-17, Managing Regulatory Commitments Made by Licensees to the NRC Staff, | |||
September 21, 2000 | |||
Safety Evaluation Report, Related to the License Renewal of OC, March 2007 | |||
Safety Evaluation Report, Related to the License Renewal of OC Supplement 1, September 2008 | |||
Industry Documents | |||
NEI 99-04, Guidelines for Managing NRC Commitments, Rev. 0 | |||
A-7 | |||
Figure A-1, Cross Section of the Oyster Creek Drywell | |||
Source: Oyster Creek September 2007 Evidentiary Hearing - Applicant Exhibit 40, AmerGen's | Source: Oyster Creek September 2007 Evidentiary Hearing - Applicant Exhibit 40, AmerGen's | ||
Oyster Creek Generating Station License Renewal ACRS Presentation, ML072820416 | Oyster Creek Generating Station License Renewal ACRS Presentation, ML072820416 | ||
A-8 | |||
A-8 | |||
| Line 1,306: | Line 1,921: | ||
Figure A-2, Oyster Creek Reactor Cavity Seal Detail | |||
Figure A-2, Oyster Creek Reactor Cavity Seal Detail | |||
Source: Oyster Creek September 2007 Evidentiary Hearing - Applicant Exhibit 40, AmerGen's | Source: Oyster Creek September 2007 Evidentiary Hearing - Applicant Exhibit 40, AmerGen's | ||
Oyster Creek Generating Station License Renewal ACRS Presentation, ML072820416 | Oyster Creek Generating Station License Renewal ACRS Presentation, ML072820416 | ||
A-9 | |||
A-9 | |||
| Line 1,351: | Line 1,973: | ||
Figure A-3, Reactor Cavity Trough Drain Detail | |||
Source: Oyster Creek September 2007 Evidentiary Hearing - Applicant Exhibit 40, AmerGen's | Source: Oyster Creek September 2007 Evidentiary Hearing - Applicant Exhibit 40, AmerGen's | ||
Oyster Creek Generating Station License Renewal ACRS Presentation, | Oyster Creek Generating Station License Renewal ACRS Presentation, ML072820416 | ||
A-10 | Gap Between Drywell Steel | ||
Shell and Concrete Shield Wall | |||
A-10 | |||
Figure A-4, Oyster Creek Sandbed Region Detail Showing the Sandbed Drain Line | |||
Figure A-4, Oyster Creek Sandbed Region Detail Showing the Sandbed Drain Line | |||
Source: Oyster Creek September 2007 Evidentiary Hearing - Applicant Exhibit 40, AmerGen's | Source: Oyster Creek September 2007 Evidentiary Hearing - Applicant Exhibit 40, AmerGen's | ||
Oyster Creek Generating Station License Renewal ACRS Presentation, ML072820416 | Oyster Creek Generating Station License Renewal ACRS Presentation, ML072820416 | ||
A-11 | |||
A-11 | |||
| Line 1,391: | Line 2,027: | ||
Figure A-5, Oyster Creek Drywell Arrangement Showing the Sandbed Drain Monitoring Using | |||
Remote Poly Bottles | |||
Latest revision as of 13:40, 14 January 2025
| ML090210106 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 01/21/2009 |
| From: | Darrell Roberts Division of Reactor Safety I |
| To: | Pardee C Exelon Generation Co, Exelon Nuclear |
| Conte R | |
| Shared Package | |
| ML090120714 | List: |
| References | |
| FOIA/PA-2009-0070 IR-08-007 | |
| Download: ML090210106 (37) | |
See also: IR 05000219/2008007
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
475 ALLENDALE ROAD
KING OF PRUSSIA, PA 19406-1415
January 21, 2009
Mr. Charles G. Pardee
Chief Nuclear Officer (CNO) and Senior Vice President
Exelon Nuclear
4300 Winfield Rd.
Warrenville, IL 60555
SUBJECT:
OYSTER CREEK GENERATING STATION - NRC LICENSE RENEWAL
FOLLOW-UP INSPECTION REPORT 05000219/2008007
Dear Mr. Pardee:
On December 23, 2008, the U. S. Nuclear Regulatory Commission (NRC) completed an
inspection at your Oyster Creek Generating Station. The enclosed report documents the
inspection results, which were discussed on December 23, 2008, with Mr. T. Rausch, Site Vice
President, Mr. M. Gallagher, Vice President License Renewal, and other members of your staff.
First, this inspection was conducted using the guidance of Inspection Procedure (IP) 71003
"Post-Approval Site Inspection for License Renewal." Although IP 71003 is designated as a
"post-approval" inspection procedure, the NRC conducted this inspection as a prudent measure
absent a final NRC decision on license renewal. This inspection observed Oyster Creek license
renewal activities during the last planned refueling outage prior to entering the period of
extended operation. The license renewal application was the subject of a hearing and the
Atomic Safety and Licensing Board decision is being appealed to the Commission. Because a
renewed license has not been issued, the proposed license conditions and associated
regulatory commitments, made as a part of the license renewal application, are not in effect.
Accordingly, as related to license renewal activities, the enclosed report records the inspector's
factual observations.
Second, the inspection examined activities conducted under your current license as they relate
to safety and compliance with the Commissions rules and regulations. This portion of the
inspection focused on the inservice inspection of the drywell containment. The inspectors
reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of the NRC's inspection, the NRC did not identify any safety significant
conditions affecting current operations.
C. Pardee
2
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web-site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
We appreciate your cooperation. Please contact Richard Conte of my staff at (610) 337-5183 if
you have any questions regarding this letter.
Sincerely,
/RA/ Original Signed By:
Darrell J. Roberts, Director
Division of Reactor Safety
Docket No.
50-219
License No.
Enclosure:
Inspection Report No. 05000219/2008007
w/Attachment: Supplemental Information
C. Crane, President and Chief Operating Officer, Exelon Corporation
M. Gallagher, Vice President License Renewal
M. Pacilio, Chief Operating Officer, Exelon Nuclear
T. Rausch, Site Vice President, Oyster Creek Nuclear Generating Station
P. Orphanos, Plant Manager, Oyster Creek Generating Station
J. Kandasamy, Regulatory Assurance Manager, Oyster Creek
R. DeGregorio, Senior Vice President, Mid-Atlantic Operations
K. Jury,Vice President, Licensing and Regulatory Affairs
P. Cowan, Director, Licensing
B. Fewell, Associate General Counsel, Exelon
Correspondence Control Desk, Exelon
Mayor of Lacey Township
P. Mulligan, Chief, NJ Dept of Environmental Protection
R. Shadis, New England Coalition Staff
E. Gbur, Chairwoman - Jersey Shore Nuclear Watch
E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance
P. Baldauf, Assistant Director, NJ Radiation Protection Programs
Congressman C. Smith
C. Pardee
2
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web-site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
We appreciate your cooperation. Please contact Richard Conte of my staff at (610) 337-5183 if
you have any questions regarding this letter.
Sincerely,
/RA/ Original Signed By:
Darrell J. Roberts, Director
Division of Reactor Safety
Docket No.
50-219
License No.
Enclosure:
Inspection Report No. 05000219/2008007
w/Attachment: Supplemental Information
Distribution w/encl:
S. Collins, RA
M. Dapas, DRA
D. Lew, DRP
J. Clifford, DRP
R. Bellamy, DRP
S. Barber, DRP
C. Newport, DRP
M. Ferdas, DRP, Senior Resident Inspector
J. Kulp, DRP, Resident Inspector
J. DeVries, DRP, Resident OA
S. Williams, RI OEDO
H. Chernoff, NRR
R. Nelson, NRR
J. Hughey, NRR, Backup
ROPreportsResource@nrc.gov (All IRs)
Region I Docket Room (with concurrences)
SUNSI Review Complete: JER/RJC (Reviewer=s Initials) Adams Accession No. ML090210106
DOCUMENT NAME: G:\\DRS\\Engineering Branch 1\\Richmond\\OC 2008-07 LR\\_Report\\OC 2008-07 LRI_rev-14.doc
After declaring this document "An Official Agency Record" it will be released to the Public.
To receive a copy of this document, indicate in the box:"C" = Copy without attachment/enclosure E" = Copy with attachment/enclosure "N" = No copy
OFFICE
RI/DRS
E
RI/DRS
RI/DRP
RI/DRS
NAME
JRichmond/JER
RConte/RJC
RBellamy/RRB
DRoberts/DJR
DATE
01/20/09
01/20/09
01/20/09
01/20/09
OFFICIAL RECORD COPY
U. S. NUCLEAR REGULATORY COMMISSION
REGION I
Docket No.:
50-219
License No.:
Report No.:
Licensee:
Exelon Generation Company, LLC
Facility:
Oyster Creek Generating Station
Location:
Forked River, New Jersey
Dates:
October 27 to November 7, 2008 (on-site inspection activities)
November 13, 15, and 17, 2008 (on-site inspection activities)
November 10 to December 23, 2008 (in-office review)
Inspectors:
J. Richmond, Lead
M. Modes, Senior Reactor Engineer
G. Meyer, Senior Reactor Engineer
T. O'Hara, Reactor Inspector
J. Heinly, Reactor Engineer
J. Kulp, Resident Inspector, Oyster Creek
Approved by:
Richard J. Conte, Chief
Engineering Branch 1
Division of Reactor Safety
Region I
ii
TABLE OF CONTENTS
SUMMARY OF FINDINGS.........................................................................................................iii
4.
OTHER ACTIVITIES (OA)...................................................................................................1
4OA5
License Renewal Follow-up (IP 71003)....................................................................1
1.
Inspection Overview .....................................................................................................1
1.1
Purpose of Inspection............................................................................................1
1.2
Sample Selection Process.....................................................................................1
2.
Assessment of Current Licensing Basis Performance Issues.......................................2
2.1
ASME,Section XI, Subsection IWE Program........................................................2
2.2
Issues for Follow-up ..............................................................................................2
3.
Detailed Review of License Renewal Activities.............................................................4
3.1
Reactor Refuel Cavity Liner Strippable Coating.....................................................4
3.2
Reactor Refuel Cavity Seal Leakage Monitoring ...................................................4
3.3
Reactor Cavity Trough Drain Inspection for Blockage ...........................................5
3.4
Drywell Sand Bed Region Drain Monitoring...........................................................5
3.5
Reactor Cavity Seal Leakage Action Plan for 1R22...............................................6
3.6
Moisture Barrier Seal Inspection (inside drywell) ...................................................8
3.7
Moisture Barrier Seal Inspection (inside sand bed bays).......................................8
3.8
Drywell Shell Internal Coatings Inspection (inside drywell) ....................................9
3.9
Drywell Shell External Coatings Inspection (inside sand bed bays).....................10
3.10 Drywell Floor Trench Inspections ........................................................................12
3.11 Drywell Shell Thickness Measurements ..............................................................13
3.12 One Time Inspection Program.............................................................................15
3.13 "B" Isolation Condenser Shell Inspection.............................................................15
3.14 Periodic Inspections ............................................................................................16
3.15 Circulating Water Intake Tunnel & Expansion Joint Inspection............................16
3.16 Buried Emergency Service Water Pipe Replacement..........................................17
3.17 Electrical Cable Inspection inside Drywell............................................................17
3.18 Inaccessible Medium Voltage Cable Test............................................................18
3.19 Fatigue Monitoring Program................................................................................18
4.
Proposed Conditions of License.................................................................................19
5.
Commitment Management Program...........................................................................19
4OA6
Meetings, Including Exit Meeting.............................................................................20
SUPPLEMENTAL INFORMATION...........................................................................................21
iii
SUMMARY OF FINDINGS
IR 05000219/2008007; 10/27/2008 - 12/23/2008; Exelon, LLC, Oyster Creek
Generating Station; License Renewal Follow-up.
The report covers a multi-week inspection of license renewal follow-up items. The inspection
was conducted by five region based engineering inspectors and with assistance from the
Oyster Creek resident inspector. The inspection was conducted using Inspection Procedure
(IP) 71003 "Post-Approval Site Inspection for License Renewal." In accordance with the NRC's
memorandum of understanding with the State of New Jersey, state engineers from the
Department of Environmental Protection, Bureau of Nuclear Engineering, observed portions of
the NRC inspection activities.
A.
NRC-Identified and Self-Revealing Findings
No findings of significance were identified.
B.
Licensee-Identified Violations
None.
REPORT DETAILS
Summary of Plant Status
The Oyster Creek Generating Station was in a scheduled refueling outage during the on-site
portions of this inspection.
At the time of the inspection, AmerGen Energy Company, LLC was the licensee for Oyster
Creek Generating Station. As of January 8, 2009, the Oyster Creek license was transferred to
Exelon Generating Company, LLC by license amendment No. 271 (ML083640373).
4.
OTHER ACTIVITIES (OA)
4OA5 License Renewal Follow-up (IP 71003)
1.
Inspection Overview
1.1
Purpose of Inspection
The NRC conducted this inspection using the guidance of Inspection Procedure (IP)
71003 "Post-Approval Site Inspection for License Renewal." The license renewal
application was the subject of a hearing and the Atomic Safety and Licensing Board
decision is being appealed to the Commission. Although IP 71003 is designated as a
"post-approval" inspection procedure, the NRC conducted this inspection as a prudent
measure absent a final NRC decision on license renewal. This inspection observed
Oyster Creek license renewal activities during the last refueling outage prior to entering
the period of extended operation.
Inspection observations were made of license renewal commitments and license
conditions selected from NUREG-1875, "Safety Evaluation Report (SER) Related to the
License Renewal of Oyster Creek Generating Station" (ML071290023 & ML071310246).
The inspection included observations of a number of license renewal commitments
which were enhancements to exiting programs implemented under the current license.
When the performance of an existing program was evaluated by the inspectors, the
basis for the evaluation was the current licensing basis (CLB), and the license renewal
enhancements were not considered in the evaluation.
For license renewal activities, within the context of 10 CFR 54, the report only
documents inspector observations, because the proposed license conditions and
associated regulatory commitments were not in effect at the time of this inspection.
These proposed conditions and commitments were not in effect because the application
for a renewed license remains under Commission review for final decision, and a
renewed license has not been approved for Oyster Creek. Thus they are referred to in
this report as "proposed" conditions and commitments.
1.2
Sample Selection Process
The SER proposed commitments and proposed license conditions were selected based
on the risk significance using insights gained from sources such as the NRC's
2
"Significance Determination Process Risk Informed Inspection Notebooks," the results
of previous license renewal audits, and inspections of aging management programs.
The inspectors also reviewed selected corrective actions taken as a result of previous
license renewal inspections.
2.
Assessment of Current Licensing Basis Performance Issues
2.1
ASME,Section XI, Subsection IWE Program
Monitoring of the condition of the primary containment drywell is accomplished through
Exelons ASME Section XI, Subsection IWE monitoring program. The inspectors
determined Exelon provided an adequate basis to provide assurance that the drywell
primary containment will remain operable throughout the period to the next scheduled
examination (2012 refueling outage). This determination was based on the inspectors'
evaluation of the drywell shell ultrasonic test (UT) thickness measurements (Sections
3.10 & 3.11), direct observation of drywell shell conditions both inside the drywell
(Sections 3.6, 3.8, & 3.11), including the floor trenches (Section 3.10), and outside the
drywell in the sand bed regions (Sections 3.7 & 3.9), condition and integrity of the
drywell shell epoxy coating (Section 3.9), and condition of the drywell shell moisture
barrier seals (Sections 3.6 & 3.7). On a sampling basis, the inspectors observed that
the enhancements made as a result of license renewal activities were integrated into the
existing program for the drywell structural integrity.
The drywell shell epoxy coating and the moisture barrier seal, both in the sand bed
region, are barriers used to protect the drywell from corrosion. The problems identified
with these barriers (discussed in Sections 3.7 & 3.9) were corrected and had a minimal
impact on the drywell steel shell. The drywell shell corrosion rate remains very small, as
confirmed by the inspectors' review of Exelon's technical evaluations of the 2008 UT
data. The inspectors determined Exelon provided an adequate basis to conclude the
likelihood of additional blisters or moisture barrier seal issues will not impact the
containment safety function during the period before the next scheduled examination
(2012 refueling outage). This is based on the inspectors' direct observations of four
coating blisters and a number of moisture barrier seal issues, review of Exelon's repairs,
and direct observation of the general conditions of the drywell shell, both inside the
drywell and outside the drywell, in the sand bed regions, as well as the overall condition
and integrity of the drywell shell epoxy coating.
2.2
Issues for Follow-up
Introduction
The inspectors and Exelon identified a number of issues during the inspection with
potential implications on the current licensing basis (CLB). More information is required
in order to determine whether these issues are acceptable or are CLB performance
deficiencies.
3
Description
As noted in the detailed observations of this report, a number of issues were observed
which Exelon placed into its corrective action program. The specific issues for further
review include:
(1) Exelon applied a strippable coating to the refuel cavity liner to prevent water
intrusion into the gap between the drywell steel shell and the concrete shield
wall. The strippable coating unexpectedly de-laminated, resulting in increased
refuel cavity seal leakage. As a result, water entered the gap and subsequently
flowed down the outside of the shell and into four sand bed bays. In addition,
Exelon had established an administrative limit for cavity seal leakage that was
higher than the actual leakage rate at which water intrusion into the gap
occurred. (Sections 3.1 & 3.5)
(2) While the reactor cavity was being filled, Exelon frequently monitored the
cavity seal leakage by observing flow in the cavity trough drain line.
Subsequently, Exelon determined that the trough drain line had been left isolated
during a previous maintenance activity. As a result, cavity seal leakage had not
been monitored as intended. (Section 3.2)
(3) During the refueling outage, Exelon monitored for water leakage from the
sand bed bay drains by checking poly bottles connected via tygon tubing and
funnels to the sand bed drain lines. Exelon subsequently discovered that the
poly bottle tubing was not connected to the drain lines for two sand bed bays.
(Section 3.4)
(4) Exelon identified four blisters on the epoxy coating in one sand bed bay.
Exelon's evaluation to determine the cause of the blisters was still in-progress at
the time this inspection was completed. In addition, a video recording from 2006
appeared to indicate that one of the blisters existed at that time, but was not
identified during Exelon's 2006 visual inspection. (Section 3.9)
The inspectors will review these issues in a future inspection to determine whether the
individual issues are acceptable or constitute a CLB performance deficiency. The
inspectors' assessment will, in part, determine whether these items are consistent with
design specifications and requirements, the conduct of operations, and whether
appropriate administrative controls were utilized. (URI 05000219/2008007-01: Drywell
Sand Bed Water Intrusion, Drain Monitoring, and Coating Deficiency)
4
3.
Detailed Review of License Renewal Activities
3.1
Reactor Refuel Cavity Liner Strippable Coating
a.
Scope of Inspection
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancement
(2), stated, in part:
A strippable coating will be applied to the reactor cavity liner to
prevent water intrusion into the gap between the drywell shield
wall and the drywell shell during periods when the reactor cavity is
flooded. Prior to filling the reactor cavity with water.
The inspectors reviewed work order (WO) R2098682-06, "Coating Application to Cavity
Walls and Floors."
b.
Observations
The strippable coating is applied to the reactor cavity liner before the cavity is filled with
water to minimize the likelihood of cavity seal leakage into the cavity concrete trough.
This action is taken to prevent water intrusion into the gap (Figure A-3) between the
drywell steel shell and the concrete shield wall. (see Figure A-1 for general
arrangement)
From Oct. 29 to Nov. 6, the cavity liner strippable coating limited cavity seal leakage into
the cavity trough drain to less than 1 gallon per minute (gpm). On Nov. 6, in one
localized area of the refuel cavity, the liner strippable coating started to de-laminate.
Water puddles were subsequently identified in sand bed bays 11, 13, 15, and 17 (see
Section 3.5 below for additional details). This issue was entered into the corrective
action program as Issue Report (IR) 841543. In addition, this item was included in a
common cause evaluation as part of IR 845297. Exelon's initial evaluations identified
several likely or contributing causes, including:
- A portable submerged water filtration unit was improperly placed in the reactor
cavity, which resulted in flow discharged directly on the strippable coating.
- A small oil spill into the cavity may have affected the coating integrity.
- No post installation inspection of the coating had been performed.
3.2
Reactor Refuel Cavity Seal Leakage Monitoring
a.
Scope of Inspection
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancement
(3), stated, in part:
The reactor cavity seal leakage trough drains and the drywell
sand bed region drains will be monitored for leakage, periodically.
5
The inspectors directly observed Exelon's cavity seal leakage monitoring activities,
performed under WO R2095857. The inspectors independently checked the cavity
trough drain flow immediately after the reactor cavity was filled, and several times
throughout the outage. The inspectors also reviewed the written monitoring logs.
b.
Observations
Exelon monitored reactor refuel cavity seal leakage by checking and recording the flow
in a two inch drain line from the cavity concrete trough to a plant radwaste system drain
funnel which, in turn, drained to the reactor building equipment drain tank. (See Figures
A-1 thru A-3)
On Oct. 27, Exelon isolated the cavity trough drain line to install a tygon hose to allow
drain flow to be monitored. On Oct. 28, the reactor cavity was filled. Drain line flow was
monitored frequently during cavity flood-up, and daily thereafter. On Oct. 29, a
boroscope examination of the drain line identified that the isolation valve had been left
closed. When the drain line isolation valve was opened, about 3 gallons of water
drained out. The drain flow then subsided to about a 1/8-inch stream (less than 1 gpm).
This issue was entered into the corrective action program as IR 837647.
3.3
Reactor Cavity Trough Drain Inspection for Blockage
a.
Scope of Inspection
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancement
(13), stated, in part:
The reactor cavity concrete trough drain will be verified to be clear
from blockage once per refueling cycle. Any identified issues will
be addressed via the corrective action process.
The inspectors reviewed a video recording of a boroscope inspection of the cavity
trough drain line, performed under WO R2102695.
b.
Observations
See observations in Section 3.2 above.
3.4
Drywell Sand Bed Region Drain Monitoring
a.
Scope of Inspection
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancement
(3), stated, in part:
The sand bed region drains will be monitored daily during
refueling outages.
The inspectors directly observed Exelon's activities to monitor sand bed drains,
6
performed under WO R2095857. The inspectors independently checked drain line poly
bottles and accompanied Exelon personnel during routine daily checks. The inspectors
also reviewed the written monitoring logs.
b.
Observations
There is one sand bed drain line for every two sand bed bays (i.e., total of five drains for
10 bays). Exelon remotely monitored the sand bed drains by checking for the existence
of water in poly bottles attached via tygon tubing (approximately 50 foot long) to a funnel
hung below each drain line. The sand bed drains, funnels, and a majority of the tygon
tubing were not directly observable from the outer area of the torus room, where the
poly bottles were located. (see Figures A-1, A-4, & A-5)
On Nov. 10, Exelon found two of the five tygon tubes disconnected from their funnels
and laying on the floor (bays 3 and 7). Exelon personnel could not determine when the
tubing was last verified to be connected to the funnel. The inspectors directly observed
that the torus room floor had standing water for most of the outage, due to other
identified system leaks. The inspectors noted that the standing water would have
prevented Exelon personnel from determining whether any water had drained directly
onto the floor from a sand bed drain during the time period that the tygon tubing was
disconnected. The inspectors also noted that bays 3 and 7 remained dry throughout the
outage, with no identified water intrusion (see observations in Section 3.5). Both tubes
were subsequently reconnected. This issue was entered into the corrective action
program as IR 843209.
On Nov. 15, during a daily check of the sand bed bay 11 drain poly bottle, Exelon found
the poly bottle nearly full. Chemistry collected about 4.3 gallons out of the poly bottle
and tubing. The inspectors noted that Exelon had found the poly bottle empty during
each check throughout the outage until Nov. 15, and had only noted water in the poly
bottle three days after the reactor refuel cavity had been drained. In addition, the
inspectors noted that the poly bottle had a capacity of about 5 gallons and the funnel
had a capacity of about 6 gallons, which suggested that the funnel had not overflowed.
Finally, the inspectors noted that Exelon entered bay 11 within a few hours of identifying
the water, visually inspected the bay, and found it dry. Exelon sampled the water, but
could not positively determine the source based on radiolytic or chemical analysis. This
issue was entered into the corrective action program as part of the common cause
evaluation IR 845297.
3.5
Reactor Cavity Seal Leakage Action Plan for 1R22
a.
Scope of Inspection
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancement
(3), stated, in part:
If leakage is detected [out of a sand bed drain], procedures will be
in place to determine the source of leakage and investigate and
address the impact of leakage on the drywell shell.
7
The inspectors reviewed Exelon's cavity seal leakage action plan.
b.
Observations
For the reactor cavity seal leakage, Exelon established an administrative limit of 12 gpm
flow in the cavity trough drain, based on a calculation which indicated that cavity trough
drain flow of less than 60 gpm would not result in trough overflow into the gap between
the drywell concrete shield wall and the drywell steel shell. (see Figures A-1 thru A-5)
The inspectors noted that Exelon's action plan, in part, directed the following actions to
be taken:
- If the cavity trough drain flow exceeded 5 gpm, then increase monitoring of the
cavity drain flow from daily to every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
- If the cavity trough drain flow exceeded 12 gpm, then increase monitoring of
the sand bed poly bottles from daily to every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
- If the cavity trough drain flow exceeded 12 gpm and any water is found in a
sand bed poly bottle, then enter and inspect the sand bed bays.
On Nov. 6, the reactor cavity liner strippable coating started to de-laminate (see Section
3.1 above). The cavity trough drain flow took a step change from less than 1 gpm to
approximately 4 to 6 gpm. Exelon increased monitoring of the trough drain to every 2
hours and monitoring of the sand bed poly bottles to every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. The cavity trough
drain flow remained at about 4 to 6 gpm until the cavity was drained on Nov. 12, when
the drain flow subsided to zero.
On Nov. 8, personnel working in sand bed bay 11 identified dripping water. Water
puddles were subsequently identified in sand bed bays 11, 13, 15, and 17. These
issues were entered into the corrective action program as IR 842333. In addition, these
items were included in a common cause evaluation as part of IR 845297.
On Nov. 12, the cavity was drained. All sand bed bays were dried and inspected by
Exelon for any water or moisture damage; no issues were identified. Exelon stated
follow-up ultrasonic test (UT) examinations will be performed during the next refuel
outage to evaluate the upper drywell shell for corrosion as a result of the water intrusion
into the sand bed bays.
On Nov. 15, water was found in sand bed bay 11 poly bottle (see Section 3.4 above).
The inspectors observed that Exelons action plan was inconsistent with the actions
taken in response to increased cavity seal leakage. The inspectors observed that the
actual actions taken were in response to visual indication that the strippable coating was
de-laminating, and later, in response to visual indication of water intrusion into a sand
bed bay. The inspectors noted that the action plan, as written, did not direct a sand bed
entry or sand bed internal inspection, because the cavity trough drain flow never
exceeded 12 gpm. The inspectors also noted that, if the sand bed bays had been
closed out by Nov. 2, as originally scheduled (before a coating problem was identified,
see Section 3.9), then Exelon personnel would not have been inside of bay 11 on Nov.
8, and therefore, would not have visually identified the water intrusion into bay 11.
8
The inspectors also noted that water had entered the gap between the drywell shield
wall and the drywell shell at a much lower value of cavity seal leakage than Exelon had
calculated and, as a result, water intrusion into the sand bed region occurred at a value
below the threshold established in the action plan.
3.6
Moisture Barrier Seal Inspection (inside drywell)
a.
Scope of Inspection
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancement
(17), stated, in part:
Perform visual inspection of the moisture barrier seal between the
drywell shell and the concrete floor curb, installed inside the
drywell during the October 2006 refueling outage.
The inspectors reviewed structural inspection reports 187-001 and 187-002, performed
under WO R2097321-01 on Nov. 1 and Oct. 29, respectively. The reports documented
visual inspections of the perimeter seal between the concrete floor curb and the drywell
steel shell, at the 10-foot elevation. In addition, the inspectors reviewed selected
photographs taken during the inspection, and directly observed portions of the moisture
barrier seal.
b.
Observations
The inspectors performed a general visual observation of the moisture barrier seal
inside the drywell on multiple occasions during the outage. For the areas directly
observed, the inspectors did not identify any significant problems or concerns.
3.7
Moisture Barrier Seal Inspection (inside sand bed bays)
a.
Scope of Inspection
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancements
(12 & 21), stated, in part:
Inspect the [moisture barrier] seal at the junction between the
sand bed region concrete [sand bed floor] and the embedded
drywell shell. During the 2008 refueling outage and every other
refueling outage thereafter.
The inspectors directly observed portions of Exelon's activities to perform a 100% visual
test (VT) inspection of the seal in the sand bed region (total of 10 bays). The inspectors
performed independent field walkdowns to determine the as-found conditions in portions
of 6 sand bed bays, and as-left conditions in 4 sand bed bays. The inspectors made
general visual observations inside the sand bed bays to independently identify flaking,
peeling, blistering, cracking, de-lamination, discoloration, corrosion, or mechanical
damage.
9
The inspectors reviewed VT inspection records for each sand bed bay, and compared
their direct observations to the recorded VT inspection results. The inspectors reviewed
Exelon VT inspection procedures, interviewed non-destructive examination (NDE)
supervisors and technicians, and directly observed field collection, recording, and
reporting of VT inspection data. The inspectors also reviewed a sample of NDE
technician visual testing qualifications.
The inspectors reviewed Exelon's activities to evaluate and repair the moisture barrier
seal in sand bed bay 3.
b.
Observations
The purpose of the moisture barrier seal is to prevent water from entering a gap below
the concrete floor in the sand bed region. The inspectors observed that NDE visual
inspection activities were conducted in accordance with approved procedures. The
inspectors noted that Exelon completed the inspections, identified condition(s) in the
moisture barrier seal which required repair, completed the seal repairs in accordance
with engineering procedures, and conducted appropriate re-inspection of repaired
areas.
The VT inspections identified moisture barrier seal problems in 7 of the 10 sand bed
bays, including small surface cracks and partial separation of the seal from the steel
shell or concrete floor. Exelon determined the as-found moisture barrier function was
not impaired, because no cracks or separation fully penetrated the seal. All identified
problems were entered into the corrective action program and subsequently repaired
(IRs are listed in the Attachment). In addition, these items were included in a common
cause evaluation as part of IR 845297.
The VT inspection for sand bed bay 3 identified a seal crack and surface rust stains
below the crack. When the seal was excavated, some drywell shell surface corrosion
was identified. Exelon's laboratory analysis of removed seal material determined the
epoxy seal material had not adequately cured, and concluded it was an original 1992
installation issue. The seal crack and drywell shell surface were repaired. This issue
was entered into the corrective action program as IRs 839194, 841957, and 844288.
The inspectors compared the 2008 VT results to the 2006 results and noted that, in
2006, no moisture barrier seal problems were identified in any sand bed bay.
3.8
Drywell Shell Internal Coatings Inspection (inside drywell)
a.
Scope of Inspection
Proposed SER Appendix-A Item 33, Protective Coating Monitoring and Maintenance
Program, stated, in part:
The program provides for aging management of Service Level I
coatings inside the primary containment.
The inspectors reviewed a vendor memorandum which summarized the vendor
10
inspection findings for a coating inspection of the as-found condition of the ASME
Service Level I coating of the drywell shell inner surface. The final detailed report, with
specific elevation notes and photographs, was not available during the on-site portion of
this inspection. The inspectors reviewed selected photographs taken during the coating
inspection and the initial assessment and disposition of identified coating deficiencies.
The inspectors also interviewed the vendor coating inspector. The coating inspection
was conducted on Oct. 30, by a qualified ANSI Level III coating inspector.
b.
Observations
The inspectors performed a general visual observation of the drywell shell coating on
multiple occasions during the outage. The inspectors noted that Exelon's documented
inspection results were consistent with the conditions directly observed by the
inspectors. The inspectors did not identify any significant problems or concerns with
Exelon's inspection activities.
3.9
Drywell Shell External Coatings Inspection (inside sand bed bays)
a.
Scope of Inspection
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancements
(4 & 21), stated, in part:
Perform visual inspections of the drywell external shell epoxy
coating in all 10 sand bed bays. During the 2008 refueling outage
and every other refueling outage thereafter.
The inspectors directly observed portions of Exelon's activities to perform a 100% visual
inspection of the epoxy coating in the sand bed region (total of 10 bays). The inspectors
performed independent field walkdowns to determine the as-found conditions of the
epoxy coating in portions of 6 sand bed bays, and the as-left conditions in sand bed bay
11 after coating repairs. The inspectors made general visual observations inside the
sand bed bays to independently identify flaking, peeling, blistering, de-lamination,
cracking, discoloration, corrosion, or mechanical damage.
The inspectors reviewed VT inspection records for each sand bed bay and compared
their direct observations to the recorded VT inspection results. The inspectors reviewed
Exelon VT inspection procedures, interviewed NDE supervisors and technicians, and
directly observed field collection, recording, and reporting of VT inspection data. The
inspectors also reviewed a sample of NDE technician visual testing qualifications.
The inspectors directly observed Exelon's activities to evaluate and repair the epoxy
coating in sand bed bay 11. In addition, the inspectors reviewed Technical Evaluation
330592.27.46, "Coating Degradation in Sand Bed bay 11."
b.
Observations
The inspectors observed that NDE visual inspection activities were conducted in
accordance with approved procedures. The inspectors noted that Exelon completed the
11
inspections, identified condition(s) in the exterior coating which required repair,
completed the coating repairs in accordance with engineering procedures, and
conducted appropriate re-inspection of repaired areas.
In sand bed bay 11, the NDE inspection identified one small broken blister, about 1/4
inch in diameter, with a 6-inch surface rust stain, dry to the touch, trailing down from the
blister. During the initial investigation, three additional smaller surface irregularities
(initially described as surface bumps) were identified within a 1 to 2 square inch area
near the broken blister. The three additional bumps were subsequently determined to
be unbroken blisters. This issue was entered into the corrective action program as IRs
838833 and 839053. In addition, this item was included in a common cause evaluation
as part of IR 845297. All four blisters were evaluated and repaired.
On Nov. 13, the inspectors conducted a general visual observation of the repaired area
and the general condition of the epoxy coating and moisture barrier seal in bay 11. The
inspectors noted that Exelon's inspection data reports were consistent with the
conditions directly observed by the inspectors.
All sand bed bays had been inspected by the same NDE technician. To confirm the
adequacy of the coating inspection, Exelon re-inspected 4 sand bed bays (bays 3, 7, 15,
and 19) with a different NDE technician. No additional concerns or problems were
identified. In Technical Evaluation 330592.27.46, Exelon determined, by laboratory
analysis using energy dispersive X-ray spectroscopy, that the removed blister material
contained trace amounts of chlorine. Exelon also determined that the presence of
chlorine, in a soluble salt as chloride on the surface of the drywell shell prior to the initial
application of the epoxy coating, can result in osmosis of moisture through the epoxy
coating. The analysis also concluded there were no pinholes in the blister samples. In
addition, the analysis determined approximately 0.003 inches of surface corrosion had
occurred directly under the broken blister. Exelon concluded that the corrosion had
taken place over an approximately 16-year period. In addition, UT dynamic scan
thickness measurements under the four blisters, from inside the drywell, confirmed the
drywell shell had no significant degradation as a result of the corrosion. On Nov. 13, the
inspectors conducted a general visual observation of the general conditions in bay 5 and
9. The inspectors observed that Exelon's inspection data reports adequately described
the conditions directly observed by the inspectors.
In follow-up, Exelon reviewed a 2006 video of the sand beds, which had been made as
a general aid, not as part of an NDE inspection. The 2006 video showed the same
6-inch rust stain in bay 11. The inspectors compared the 2008 VT results to the 2006
results and noted that in 2006 no coating problems were identified in any sand bed bay.
This inconsistency, between the results of the 2006 coating inspection and the 2007
inspection, was entered into the corrective action program as IR 839053.
During the final closeout of bays 3, 5, and 7, minor chipping in the epoxy coating was
identified, which Exelon described as incidental mechanical damage from personnel
entry for inspection or repair activities. All identified problems were entered into the
corrective action program and subsequently repaired (IRs are listed in the Attachment).
12
During the final closeout of bay 9, an area approximately 8 inches by 8 inches was
identified where the color of the epoxy coating appeared different than the surrounding
area. Because each of the 3 layers of the epoxy coating is a different color, Exelon
questioned whether the color difference could have been indicative of an original
installation deficiency. This issue was entered into the corrective action program as IR
844815, and the identified area was re-coated with epoxy.
3.10
Drywell Floor Trench Inspections
a.
Scope of Inspection
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancements
(5, 16, & 20), stated, in part:
Perform visual test (VT) and ultrasonic test (UT) examinations of
the drywell shell inside the drywell floor inspection trenches in bay
5 and bay 17 during the 2008 refueling outage, at the same
locations that were examined in 2006. In addition, monitor the
trenches for the presence of water during refueling outages.
The inspectors directly observed NDE activities and reviewed UT examination records.
The inspectors independently performed field walkdowns to determine the conditions in
the trenches on multiple occasions during the outage. The inspectors compared UT
data to licensee established acceptance criteria in Specification IS-328227-004, revision
14, "Functional Requirements for Drywell Containment Vessel Thickness Examinations,"
and to design analysis values for minimum wall thickness in calculations C-1302-187-
E310-041, revision 0, "Statistical Analysis of Drywell Sand Bed Thickness Data 1992,
1994, 1996, and 2006," and C-1302-187-5320-024, revision 2, "Drywell External UT
Evaluation in the Sand Bed." In addition, the inspectors reviewed Technical Evaluation
330592.27.43, "2008 UT Data of the Sand Bed Trenches."
The inspectors reviewed Exelon UT examination procedures, interviewed NDE
supervisors and technicians, and reviewed a sample of NDE technician UT
qualifications. The inspectors also reviewed records of trench inspections performed
during two non-refueling plant outages during the last operating cycle.
b.
Observations
In Technical Evaluation 330592.27.43, Exelon determined the UT thickness values
satisfied the general uniform minimum wall thickness criteria (e.g., average thickness of
an area) and the locally thinned minimum wall thickness criteria (e.g., areas 2-inches or
less in diameter) for the drywell shell, as applicable. For UT data sets, such as 7x7
arrays, the Technical Evaluation calculated statistical parameters and determined the
data set distributions were acceptable. The Technical Evaluation also compared the
data values to the corresponding values recorded by the 2006 UT examinations in the
same locations, and concluded there were no significant differences in measured
thicknesses and no observable on-going corrosion. The inspectors independently
verified that the UT thickness values satisfied applicable acceptance criteria.
13
During two non-refueling plant outages during the last operating cycle, both trenches
were inspected for the presence of water and found dry by Exelon's staff and by NRC
inspectors (NRC Inspection Reports 05000219/2007003, 05000219/2007004, and
memorandum ML071240008).
During the initial drywell entry on Oct. 25, the inspectors observed that both floor
trenches were dry. On subsequent drywell entries for routine inspection activities, the
inspectors observed the trenches to be dry. On one occasion, Exelon observed a small
amount of water in the bay 5 trench, which Exelon attributed to water spilled nearby on
the drywell floor; the trench was dried and the issue entered into the corrective action
program as IR 843190. On Nov. 17, during the final drywell closeout inspection, the
inspectors observed the following:
- Bay 17 trench was dry and had newly installed sealant on the trench edge
where concrete meets shell, and on the floor curb near the trench.
- Bay 5 trench had a few ounces of water in it. The inspectors noted that within
the last day there had been several system flushes conducted in the
immediate area. Exelon stated the trench would be dried prior to final drywell
closeout. This issue was entered into the corrective action program as IR
846209 and IR 846240.
- Bay 5 trench had the lower 6-inches of grout re-installed and had newly
installed sealant on the trench edge where concrete meets shell, and on the
floor curb near the trench.
3.11
Drywell Shell Thickness Measurements
a.
Scope of Inspection
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancements
(1, 9, 14, & 21), stated, in part:
Perform full-scope drywell inspections [in the sand bed region],
including UT thickness measurements of the drywell shell, from
inside and outside the drywell. During the 2008 refueling outage
and every other refueling outage thereafter.
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancements
(7, 10, & 11) stated, in part:
Conduct UT thickness measurements in the upper regions of the
drywell shell. Prior to the period of extended operation and two
refueling outages later.
The inspectors directly observed NDE activities and independently performed field
walkdowns to determine the condition of the drywell shell both inside the drywell,
including the floor trenches, and in the sand bed bays (drywell external shell). The
inspectors reviewed UT examination records and compared UT data results to licensee
14
established acceptance criteria in Specification IS-328227-004, revision 14, "Functional
Requirements for Drywell Containment Vessel Thickness Examinations," and to design
analysis values for minimum wall thickness in calculations C-1302-187-E310-041,
revision 0, "Statistical Analysis of Drywell Vessel Sand Bed Thickness Data 1992, 1994,
1996, and 2006," and C-1302-187-5320-024, revision 2, "Drywell External UT Evaluation
in the Sand Bed." In addition, the inspectors reviewed the Technical Evaluations (TEs)
associated with the UT data, as follows:
The inspectors reviewed UT examination records for the following:
- Sand bed region elevation, inside the drywell
- All 10 sand bed bays, drywell external
- Various drywell elevations between the 50-foot and 87-foot elevations
- Transition weld from bottom to middle spherical plates, inside the drywell
- Transition weld from 2.625-inch plate to 0.640-inch plate (knuckle area), inside
the drywell
The inspectors reviewed Exelon UT examination procedures, interviewed NDE
supervisors and technicians, and directly observed field collection, recording, and
reporting of UT data. The inspectors also reviewed a sample of NDE technician UT
qualifications.
b.
Observations
The inspectors observed that NDE UT examination activities were conducted in
accordance with approved procedures. In addition, the inspectors performed a general
visual observation of the drywell shell general conditions on multiple occasions during
the outage.
In Technical Evaluations 330592.27.42, 330592.27.45, and 330592.27.88, Exelon
determined the UT thickness values satisfied the general uniform minimum wall
thickness criteria (e.g., average thickness of an area) and the locally thinned minimum
wall thickness criteria (e.g., areas 2-inches or less in diameter) for the drywell shell, as
applicable. For UT data sets, such as 7x7 arrays, the Technical Evaluations calculated
statistical parameters and determined the data set distributions were acceptable. The
Technical Evaluations also compared the data values to the corresponding values
recorded by the 2006 UT examinations in the same locations, and concluded there were
no significant differences in measured thicknesses and no observable on-going
corrosion. The inspectors independently verified that the UT thickness values satisfied
applicable acceptance criteria.
15
3.12
One Time Inspection Program
a.
Scope of Inspection
Proposed SER Appendix-A Item 24, One Time Inspection Program, stated, in part:
The One-Time Inspection program will provide reasonable
assurance that an aging effect is not occurring, or that the aging
effect is occurring slowly enough to not affect the component or
structure intended function during the period of extended
operation, and therefore will not require additional aging
management. Perform prior to the period of extended operation.
The inspectors reviewed the program's sampling basis and sample plan. Also, the
inspectors reviewed UT results from approximately 24 selected piping sample locations
in the main steam, spent fuel pool cooling, domestic water, and demineralized water
systems.
b.
Observations
The inspectors noted that for two UT sample locations, the measured piping thickness
did not satisfy the acceptance criteria, and the results were evaluated within the
corrective action program. The inspectors did not identify any significant problems or
concerns with Exelon's inspection activities.
3.13
"B" Isolation Condenser Shell Inspection
a.
Scope of Inspection
Proposed SER Appendix-A Item 24, One Time Inspection Program Item (2), stated, in
part:
To confirm the effectiveness of the Water Chemistry program to
manage the loss of material and crack initiation and growth aging
effects. A one-time UT inspection of the "B" Isolation Condenser
shell below the waterline will be conducted looking for pitting
corrosion. Perform prior to the period of extended operation.
The inspectors directly observed NDE examinations of the "B" isolation condenser shell
performed under WO C2017561-11. The NDE examinations included a visual
inspection of the shell interior, UT thickness measurements in two locations that were
previously tested in 1996 and 2002, additional UT tests in areas of identified pitting and
corrosion, and spark testing of the final interior shell coating. The inspectors reviewed
the UT data records, and compared the UT data results to the established minimum wall
thickness criteria for the isolation condenser shell, and compared the UT data results
with previously UT data measurements from 1996 and 2002.
16
b.
Observations
The inspectors noted that the UT results satisfied the acceptance criteria for minimum
wall thickness. The inspectors did not identify any significant problems or concerns with
Exelon's inspection activities.
3.14
Periodic Inspections
a.
Scope of Inspection
Proposed SER Appendix-A Item 41, Periodic Inspection Program, stated, in part:
Activities consist of a periodic inspection of selected structures,
systems, and components to verify integrity and confirm the
absence of identified aging effects. Perform prior to the period of
extended operation.
The inspectors directly observed the following field activities:
- Condensate expansion joints Y-2-11 and Y-2-12 inspection (WO R2083515)
- 4160 V Bus 1C switchgear fire barrier penetration inspection (WO R2093471)
b.
Observations
The inspectors noted that Exelon's documented inspection results were consistent with
the conditions directly observed by the inspectors. The inspectors did not identify any
significant problems or concerns.
3.15
Circulating Water Intake Tunnel & Expansion Joint Inspection
a.
Scope of Inspection
Proposed SER Appendix-A Item 31, Structures Monitoring Program Enhancement (1),
stated, in part:
Buildings, structural components and commodities that are not in
scope of maintenance rule but have been determined to be in the
scope of license renewal. Perform prior to the period of extended
operation.
On Oct. 29, the inspector directly observed the conduct of a structural engineering
inspection of the circulating water intake tunnel, including reinforced concrete wall and
floor slabs, steel liners, embedded steel pipe sleeves, butterfly isolation valves, and
tunnel expansion joints. The inspection was conducted by a qualified Exelon structural
engineer. After the inspection was completed, the inspectors compared his direct
observations with the documented visual inspection results.
17
b.
Observations
The inspectors noted that Exelon's documented inspection results were consistent with
the conditions directly observed by the inspectors. The inspectors did not identify any
significant problems or concerns with Exelon's inspection activities.
3.16
Buried Emergency Service Water Pipe Replacement
a.
Scope of Inspection
Proposed SER Appendix-A Item 63, Buried Piping, stated, in part:
Replace the previously un-replaced, buried safety-related
emergency service water piping prior to the period of extended
operation. Perform prior to the period of extended operation.
The inspectors directly observed the following activities, performed under WO
C2017279:
- Field work to remove old pipe and install new pipe
- Foreign material exclusion (FME) controls
- External protective pipe coating, and controls to ensure the pipe installation
activities would not result in damage to the pipe coating
b.
Observations
The inspectors did not identify any significant problems or concerns.
3.17
Electrical Cable Inspection inside Drywell
a.
Scope of Inspection
Proposed SER Appendix-A Item 34, Electrical Cables and Connections, stated, in part:
A representative sample of accessible cables and connections
located in adverse localized environments will be visually
inspected at least once every 10 years for indications of
accelerated insulation aging. Perform prior to the period of
extended operation.
The inspector accompanied electrical technicians and an electrical design engineer
during a visual inspection of selected electrical cables in the drywell. The inspector
directly observed the pre-job brief which discussed inspection techniques and
acceptance criteria. The inspector directly observed the visual inspection activities,
which included cables in raceways, as well as cables and connections inside junction
boxes. After the inspection was completed, the inspector compared his direct
observations with the documented visual inspection results.
18
b.
Observations
The inspectors noted that Exelon's documented inspection results were consistent with
the conditions directly observed by the inspectors. The inspectors did not identify any
significant problems or concerns with Exelon's inspection activities.
3.18
Inaccessible Medium Voltage Cable Test
a.
Scope of Inspection
Proposed SER Appendix-A Item 36, Inaccessible Medium Voltage Cables, stated, in
part:
Cable circuits will be tested using a proven test for detecting
deterioration of the insulation system due to wetting, such as
power factor or partial discharge. Perform prior to the period of
extended operation.
The inspectors directly observed field testing activities for the 4 kilovolts feeder cable
from the auxiliary transformer secondary to Bank 4 switchgear and independently
reviewed the test results. A Doble and power factor test of the transformer, with the
cable connected to the transformer secondary, was performed, in part, to detect
deterioration of the cable insulation. The inspectors also compared the current test
results to previous test results from 2002. In addition, the inspectors interviewed plant
electrical engineering and maintenance personnel.
b.
Observations
The inspectors noted that the cable test results satisfied the acceptance criteria. The
inspectors did not identify any significant problems or concerns with Exelon's test
activities.
3.19
Fatigue Monitoring Program
a.
Scope of Inspection
Proposed SER Appendix-A Item 44, Metal Fatigue of Reactor Coolant Pressure
Boundary, stated, in part:
The program will be enhanced to use the EPRI-licensed
FatiguePro cycle counting and fatigue usage factor tracking
computer program.
The inspectors reviewed Exelon's proposed usage of the FatiguePro software program,
reviewed the list of high cumulative usage factor components, and interviewed the
fatigue program manager.
19
b.
Observations
The inspectors noted that the FatiguePro program, although in place and ready to go,
had not been implemented. Exelon stated the FatiguePro program will be implemented
after final industry resolution of a concern regarding a mathematical summation
technique used in FatiguePro.
4.
Proposed Conditions of License
a.
Scope of Inspection
SER Section 1.7 contained two outage-related proposed conditions of license:
The fourth license condition requires the applicant to perform
full-scope inspections of the drywell sand bed region every other
refueling outage.
The fifth license condition requires the applicant to monitor drywell
trenches every refueling outage to identify and eliminate the
sources of water and receive NRC approval prior to restoring the
trenches to their original design configuration.
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancements
(1, 4, 9, 12, 14, & 21) implement the proposed license condition associated with a
full-scope drywell sand bed region inspection.
Proposed SER Appendix-A Item 27, ASME Section XI, Subsection IWE Enhancements
(5, 16, & 20) implement the proposed license condition associated with the drywell
trenches.
b.
Observations
For observations, see the applicable sections above for the specific ASME Section XI,
Subsection IWE Enhancements (Sections 3.7, 3.9, 3.10, & 3.11).
5.
Commitment Management Program
a.
Scope of Inspection
The inspectors evaluated current licensing basis procedures used to manage and revise
regulatory commitments to determine whether they were consistent with the
requirements of 10 CFR 50.59, NRC Regulatory Issue Summary 2000-17, "Managing
Regulatory Commitments," and the guidance in Nuclear Energy Institute (NEI) 99-04,
"Guidelines for Managing NRC Commitment Changes." In addition, the inspectors
reviewed the procedures to assess whether adequate administrative controls were in-
place to ensure commitment revisions or the elimination of commitments altogether
would be properly evaluated, approved, and annually reported to the NRC.
20
The inspectors also reviewed Exelon's current licensing basis commitment tracking
program to evaluate its effectiveness. In addition, the following commitment change
evaluation packages were reviewed:
- Commitment Change 08-003, OC Bolting Integrity Program
b.
Observations
The inspectors observed that the commitment change activities were conducted in
accordance with approved procedures, which required an annual update to the NRC
with a summary of each change.
4OA6 Meetings, Including Exit Meeting
Exit Meeting Summary
The inspectors presented the results of this inspection to Mr. T. Rausch, Site Vice
President, Mr. M. Gallagher, Vice President License Renewal, and other members of
Exelon's staff on December 23, 2008.
No proprietary information is present in this inspection report.
A-1
ATTACHMENT
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
C. Albert, Site License Renewal
J. Cavallo, Corrosion Control Consultants & labs, Inc.
M. Gallagher, Vice President License Renewal
C. Hawkins, NDE Level III Technician
J. Hufnagel, Exelon License Renewal
J. Kandasamy, Manager Regulatory Affairs
S. Kim, Structural Engineer
M. McDermott, NDE Supervisor
R. McGee, Site License Renewal
D. Olszewski, System Engineer
F. Polaski, Exelon License Renewal
R. Pruthi, Electrical Design Engineer
S. Schwartz, System Engineer
P. Tamburro, Site License Renewal Lead
C. Taylor, Regulatory Affairs
NRC Personnel
S. Pindale, Acting Senior Resident Inspector, Oyster Creek
J. Kulp, Resident Inspector, Oyster Creek
L. Regner, License Renewal Project Manager, NRR
D. Pelton, Chief - License Renewal Projects Branch 1, NRR
M. Baty, Counsel for NRC Staff
J. Davis, Senior Materials Engineer, NRR
Observers
R. Pinney, New Jersey State Department of Environmental Protection
R. Zak, New Jersey State Department of Environmental Protection
M. Fallin, Constellation License Renewal Manager
R. Leski, Nine Mile Point License Renewal Manager
A-2
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened/Closed
None.
Opened 05000219/2008007-01
Drywell Sand Bed Water Intrusion, Drain
Monitoring, and Coating Deficiency (Section 2.2)
Closed
None.
LIST OF ACRONYMS
ANSI
American National Standards Institute
American Society of Mechanical Engineers
Current Licensing Basis
Electric Power Research Institute
IP
[NRC] Inspection Procedure
IR
[Exelon] Issue Report
gpm
Gallons per Minute
NEI
Nuclear Energy Institute
NRC
U. S. Nuclear Regulatory Commission
Office of Nuclear Reactor Regulation
OC
Oyster Creek
[NRC] Safety Evaluation Report
Structures, Systems, and Components
Significance Determination Process
Technical Evaluation
Updated Final Safety Analysis Report
[NRC] Unresolved Item
Ultrasonic Test
Visual Testing
Work Order
A-3
LIST OF DOCUMENTS REVIEWED
License Renewal Program Documents
2130-06-20364 Letter from AmerGen to the NRC, 10 CFR 54.21(b) Annual Amendment to OC
License Renewal Application (TAC No. MC7624), dated July 18, 2006
2130-07-20502 Letter from AmerGen to the NRC, 10 CFR 54.21(b) Annual Amendment to OC
License Renewal Application (TAC No. MC7624), dated July 9, 2007
PP-09, Inspection Sample Basis for the One-Time Inspection AMP, Rev. 0
Plant Procedures and Specifications
645.6.017, Fire Barrier Penetration Surveillance, Rev 13
ER-AA-330-008, Service Level I & Safety-Related Service Level III Protective Coatings, Rev. 6
ER-AA-335-004, Manual UT of Material Thickness & Interfering Conditions, Rev. 2
ER-AA-335-018, Detailed, General, VT-1, VT-1C, VT-3 and VT-3C Visual Examination of
ASME Class MC and CC Containment Surfaces and Components, Rev. 5
ER-OC-450, Structures Monitoring Program, Rev. 1
LS-AA-104-1002, 50.59 Applicability Review, Rev 3
LS-AA-110, Commitment Change management, Rev 6
MA-AA-723-500, Inspection of Non EQ Cables and Connections for Managing Adverse
Localized Environments, Rev 2
RP-OC-6006, Reactor Cavity and Equipment Pit Leak Mitigation and Decontamination, Rev. 0
Specification SP 1302-32-035, Inspection and Minor Repair of Coating on Concrete & Drywell
Shell Surfaces in the Sand Bed Region, dated 2/24/93
Incident Reports (IRs)
- = IRs written as a result of the NRC inspection
330592
546915
547236
549432
557180
557898
804754
836362*
836367*
836395
836802
836814
836994
837188
837554
837613
837628
837647
837765
838148
838402
838509
838523*
838833
839028
839033
839053
839182
839185
839188
839192
839194
839204
839211
839214
839848
841543
841957
841957
842010
842323
842325
842333
842355
842357
842359
842360
842566
843190
843209
843380
843608
844815
845297
846240
939194
Work Orders (WOs)
WO C20117279
WO C2017279
WO C2017561-11
WO R2083515
WO R2088180-07
WO R2093471
WO R2094623
WO R2095467
WO R2095468
WO R2095469
WO R2095471
WO R2095857
WO R209585708
WO R2097321-01
WO R2098682-06
WO R2098683
WO R2102695
WO R2105179
WO R2105477
WO R2105479
WO R2105515
WO R2105516
WO R2117387
WO R21173870
A-4
Ultrasonic Test Non-destructive Examination Records
1R21LR-001, 11 3 elevation, October 18, 2006
1R21LR-002, 50 2 elevation, October 18, 2006
1R21LR-026, 87 5 elevation, October 23, 2006
1R21LR-028, 87 5 elevation, October 23, 2006
1R21LR-029, 23 6 elevation, October 23, 2006
1R21LR-030, 23 6 elevation, October 24, 2006
1R21LR-033, 71 6 elevation, October 26, 2006
1R21LR-034, 71 6 elevation, October 26, 2006
1R22-LRA-019, 23' 6 elevation, November 5, 2008
1R22-LRA-020, 51' elevation, October 29, 2008
1R22-LRA-021, 50' 2 elevation, October 29, 2008
1R22-LRA-022, 50' 2 elevation, October 29, 2008
1R22-LRA-023, 51' elevation, October 30, 2008
1R22-LRA-024, 51' 10 elevation, October 29, 2008
1R22-LRA-030, 11' 3 elevation, October 30, 2008
1R22-LRA-039, 10' 3 elevation, November 3, 2008
1R22-LRA-040, 10' 3 elevation, November 3, 2008
1R22-LRA-050, 87' 5 elevation, November 4, 2008
1R22-LRA-057, 87' 5 elevation, November 4, 2008
1R22-LRA-058, 87' 5 elevation, November 4, 2008
1R22-LRA-061, 23' 6 elevation, November 5, 2008
1R22-LRA-064, 11' 3 elevation, November 3, 2008
1R22-LRA-065, 11' 3 elevation, November 3, 2008
1R22-LRA-067, 11' 3 elevation, November 4, 2008
1R22-LRA-068, 11' 3 elevation, November 4, 2008
1R22-LRA-071, 71' 6 elevation, November 3, 2008
1R22-LRA-073, 11' 3 elevation, November 5, 2008
1R22-LRA-074, 71' 6 elevation, November 5, 2008
1R22-LRA-077, 60' elevation, November 6, 2008
1R22-LRA-078, 11' 6 elevation, November 7, 2008
1R22-LRA-079, 71' 6 elevation, November 5, 2008
1R22-LRA-088, 23' 6 elevation, November 11, 2008
NDE Data Report 2008-007-017
NDE Data Report 2008-007-030
NDE Data Report 2008-007-031
UT Data Sheet 21R056
Visual Test Inspection Non-destructive Examination Records
1R21LR-024 , Bay 5, October 21, 2006
1R21LR-025, Bay 17, October 21, 2006
1R21LR-032, Bay 5, October 26, 2006
1R22-LRA-026, Bay 1, October 30, 2008
1R22-LRA-027, Bay 5, October 29, 2008
1R22-LRA-028, Bay 9, October 29, 2008
1R22-LRA-029, Bay 17, October 30, 2008
1R22-LRA-031, Bay 9, October 29, 2008
1R22-LRA-032, Bay 5, October 29, 2008
1R22-LRA-035, Bay 13, October 30, 2008
A-5
1R22-LRA-036, Bay 1, October 30, 2008
1R22-LRA-037, Bay 13, October 30, 2008
1R22-LRA-038, Bay 17, October 30, 2008
1R22-LRA-046, Bay 11, October 31, 2008
1R22-LRA-047, Bay 11, October 31, 2008
1R22-LRA-048, Bay 15, October 31, 2008
1R22-LRA-049, Bay 15, October 31, 2008
1R22-LRA-050, Bay 19, October 31, 2008
1R22-LRA-051, Bay 19, October 31, 2008
1R22-LRA-052, Bay 3, October 31, 2008
1R22-LRA-053, Bay 3, October 31, 2008
1R22-LRA-054, Bay 7, October 31, 2008
1R22-LRA-055, Bay 7, October 31, 2008
1R22-LRA-082, Bay 5, November 7, 2008
1R22-LRA-083, Bay 15, November 8, 2008
1R22-LRA-084, Bay 19, November 8, 2008
1R22-LRA-091, Bay 19, November 8, 2008
NDE Certification Records
NDE Certification #0977 for Richard L. Alger, dated 10/29/08
NDE Certification #1421 for M. Kent Waddell, dated 10/29/08
Calculations
C-1301-187-E310-037, Drywell Corrosion, Rev 1
C-1302-187-5320-024, O. C. Drywell Ext. UT Evaluation in Sand Bed, Rev 2
C-1302-187-E310-037, Drywell Corrosion, Rev. 2
C-1302-187-E310-041, Statistical Analysis of Drywell Vessel Sand Bed Thickness Data 1992,
1994, 1996, and 2006, Rev. 0
Technical Evaluations
Tech Eval 00330592.27.42, 2008 Drywell Sand Bed UT Data - External Data
Tech Eval 00330592.27.43, 2008 UT Data of the Sand Bed Trenches
Tech Eval 00330592.27.45, 2008 Drywell UT Data at Elevations 23 and 71 foot
Tech Eval 00330592.27.46, 2008 Degradation Coating Found in Sand Bed Bay 11
Tech Eval 00330592.27.88, 2008 Sand Bed UT Data - Internal Grids
Miscellaneous Documents
00553792-02, Drywell Structural Integrity Basis from 1R21 Inspections
00725855-03, Oyster Creek License Renewal Commitment Implementation 2008 FASA 08-003, OC Bolting Integrity Program Commitment Change Evaluation, February 28, 2008 08-004, Oyster Creek LR Commitment Change for RPV Axial Weld Examination Relief for 60-
years of Operation, March 28, 2008
168-002 (R2114262), Structures and Components Monitoring Report, Intake Tunnel and
Expansion Joints, October 29, 2008
168-003 (R2120584-05), Structures and Components Monitoring Report, SW/ESW Piping at
Intake Structure Underdeck (North Side), November 3, 2008
A-6
187-001 (R2097321-01), Structures and Components Monitoring Report, Drywell Internal
Structures, Above El. 23' - 0, November 1, 2008
1R22 Startup PORC, License Renwal Commitments and Inspection Status, Undated
Assessment of Oyster Creek's response to condition document IR 00842333, Undated
Chemistry Data for Sandbed Bay 17 Water, Reactor Water, Fuel Pool, RBCCW, TBCCW, and
Condensate Transfer, November 10 and 11, 2008
IS-328227-004, Functional Requirements for Drywell Containment Vessel Thickness
Examinations, Rev. 13
IS-328227-004, Specification for OC Functional Requirements for Drywell Containment Vessel
Thickness Examinations, Rev. 14
Letter from Williams Industrial Services to Oyster Creek Generating Station, Re: Brovo Iso
Condenser, Internal Coating Assessment, November 2, 2008
Letter from Williams Specialty Services to Mr. Pete Tamburro, Oyster Creek Generating Station,
Inspection of Safety Related Coating Systems Inner Surface of the Drywell Shell Elevations
23-6 and 46, November, 3, 2008
ML-DCS-104, The Instacote Application System, Rev. 8
OYS-20872, Letter from R. John Diletto, Exelon Power Labs to Tom Quintenz, Oyster Creek,
Material Analysis of Samples Removed from Oyster Creek Sand Bed Bay Nos. 11 & 3 in
Support of Drywell Exterior Liner Inspection Outage Activities, Oyster Creek, Dated
November 11, 2008
OYS-20872, Letter from R. John Diletto, Exelon Power Labs to Tom Quintenz, Oyster Creek,
Material Analysis of Samples Removed from Sand Bed Bay Nos. 11 & 3 in Support of Drywell
Exterior Liner Inspection Outage Activities, Oyster Creek, Dated November 7, 2008
OC Drywell Coating Status Update Report, Power Point Presentation, November 9, 2008
Oyster Creek Nuclear Generating UFSAR, Section 3.8.2.8, Drywell Corrosion, Rev. 15
PORC Meeting (08-16) Report, November 15, 2008
Reactor Cavity Leakage Action Plan for 1R22
SP 1302-32-035, Specification for Inspection and Minor Repair of Coating on Concrete & Drywell
Shell Surfaces in the Sandbed Region, Rev 0
Timeline of Documents Associated with the Strippable Coating on the Rx Cavity and Water
Leakage Monitoring Through the Drains, undated
Transformer Inspection and Test Results, Bank #4 Aux, November 3, 2008
White Paper on Water Leakage onto the Exterior Surface of the Drywell Shell, undated
NRC Documents
Generic Letter 87-05, Request for Additional Information Assessment of Licensee Measures to
Mitigate and/or Identify Potential Degradation of Mark I Drywells
Information Notice No. 86-99, Degradation of Steel Containments
RIS 2000-17, Managing Regulatory Commitments Made by Licensees to the NRC Staff,
September 21, 2000
Safety Evaluation Report, Related to the License Renewal of OC, March 2007
Safety Evaluation Report, Related to the License Renewal of OC Supplement 1, September 2008
Industry Documents
NEI 99-04, Guidelines for Managing NRC Commitments, Rev. 0
A-7
Figure A-1, Cross Section of the Oyster Creek Drywell
Source: Oyster Creek September 2007 Evidentiary Hearing - Applicant Exhibit 40, AmerGen's
Oyster Creek Generating Station License Renewal ACRS Presentation, ML072820416
A-8
Figure A-2, Oyster Creek Reactor Cavity Seal Detail
Source: Oyster Creek September 2007 Evidentiary Hearing - Applicant Exhibit 40, AmerGen's
Oyster Creek Generating Station License Renewal ACRS Presentation, ML072820416
A-9
Figure A-3, Reactor Cavity Trough Drain Detail
Source: Oyster Creek September 2007 Evidentiary Hearing - Applicant Exhibit 40, AmerGen's
Oyster Creek Generating Station License Renewal ACRS Presentation, ML072820416
Gap Between Drywell Steel
Shell and Concrete Shield Wall
A-10
Figure A-4, Oyster Creek Sandbed Region Detail Showing the Sandbed Drain Line
Source: Oyster Creek September 2007 Evidentiary Hearing - Applicant Exhibit 40, AmerGen's
Oyster Creek Generating Station License Renewal ACRS Presentation, ML072820416
A-11
Figure A-5, Oyster Creek Drywell Arrangement Showing the Sandbed Drain Monitoring Using
Remote Poly Bottles
Source: Oyster Creek September 2007 Evidentiary Hearing - Applicant Exhibit 40, AmerGen's
Oyster Creek Generating Station License Renewal ACRS Presentation, ML072820416