ML11350A233: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 12/13/2011 | | issue date = 12/13/2011 | ||
| title = Commitment Summary Report for January 1, 2010, Through June 30, 2011 | | title = Commitment Summary Report for January 1, 2010, Through June 30, 2011 | ||
| author name = Shea J | | author name = Shea J | ||
| author affiliation = Tennessee Valley Authority | | author affiliation = Tennessee Valley Authority | ||
| addressee name = | | addressee name = | ||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 December 13, 2011 10 CFR 50.4 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 | {{#Wiki_filter:Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 December 13, 2011 10 CFR 50.4 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 | ||
==Subject:== | ==Subject:== | ||
Commitment Summary Report The purpose of this letter is to provide the Sequoyah Nuclear Plant (SQN), Units 1 and 2, Commitment Summary Report for January 1, 2010, through June 30, 2011. This report, which summarizes docketed commitments the Tennessee Valley Authority (TVA) has evaluated and revised, using administrative controls during this time period, is provided in accordance with the Nuclear Energy Institute's "Guidelines for Managing NRC Commitment Changes," as endorsed in Nuclear Regulatory Commission Regulatory Issue Summary 2000-17. The enclosed commitment changes were inadvertently omitted from the commitment reporting period which ended in 2008 and are being reported in this summary report.Please direct any questions concerning this report to Geoff M. Cook at (423) 843-7170.fRes c ully, J. | Commitment Summary Report The purpose of this letter is to provide the Sequoyah Nuclear Plant (SQN), Units 1 and 2, Commitment Summary Report for January 1, 2010, through June 30, 2011. This report, which summarizes docketed commitments the Tennessee Valley Authority (TVA) has evaluated and revised, using administrative controls during this time period, is provided in accordance with the Nuclear Energy Institute's "Guidelines for Managing NRC Commitment Changes," as endorsed in Nuclear Regulatory Commission Regulatory Issue Summary 2000-17. The enclosed commitment changes were inadvertently omitted from the commitment reporting period which ended in 2008 and are being reported in this summary report. | ||
Please direct any questions concerning this report to Geoff M. Cook at (423) 843-7170. | |||
fRes c ully, J. | |||
Shea M*ager, Corporate Nuclear Licensing | |||
==Enclosure:== | ==Enclosure:== | ||
Commitment Summary Report cc: See page 2 Printed on recycled paper 0WL | |||
U.S. Nuclear Regulatory Commission Page 2 December 13, 2011 cc (Enclosure): | |||
NRC Regional Administrator | NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant | ||
-Region II NRC Senior Resident Inspector | |||
-Sequoyah Nuclear Plant ENCLOSURE TENNESSEE VALLEY AUTHORITY (TVA)SEQUOYAH NUCLEAR PLANT (SQN)UNITS 1 AND 2 COMMITMENT | ENCLOSURE TENNESSEE VALLEY AUTHORITY (TVA) | ||
SEQUOYAH NUCLEAR PLANT (SQN) | |||
UNITS 1 AND 2 COMMITMENT | |||
==SUMMARY== | ==SUMMARY== | ||
REPORT E-1}} | REPORT E-1}} | ||
Latest revision as of 21:32, 12 January 2025
| ML11350A233 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 12/13/2011 |
| From: | James Shea Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML11350A233 (3) | |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 December 13, 2011 10 CFR 50.4 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328
Subject:
Commitment Summary Report The purpose of this letter is to provide the Sequoyah Nuclear Plant (SQN), Units 1 and 2, Commitment Summary Report for January 1, 2010, through June 30, 2011. This report, which summarizes docketed commitments the Tennessee Valley Authority (TVA) has evaluated and revised, using administrative controls during this time period, is provided in accordance with the Nuclear Energy Institute's "Guidelines for Managing NRC Commitment Changes," as endorsed in Nuclear Regulatory Commission Regulatory Issue Summary 2000-17. The enclosed commitment changes were inadvertently omitted from the commitment reporting period which ended in 2008 and are being reported in this summary report.
Please direct any questions concerning this report to Geoff M. Cook at (423) 843-7170.
fRes c ully, J.
Shea M*ager, Corporate Nuclear Licensing
Enclosure:
Commitment Summary Report cc: See page 2 Printed on recycled paper 0WL
U.S. Nuclear Regulatory Commission Page 2 December 13, 2011 cc (Enclosure):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant
ENCLOSURE TENNESSEE VALLEY AUTHORITY (TVA)
SEQUOYAH NUCLEAR PLANT (SQN)
UNITS 1 AND 2 COMMITMENT
SUMMARY
REPORT E-1