ML16257A098: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML16257A098 | | number = ML16257A098 | ||
| issue date = 08/25/2016 | | issue date = 08/25/2016 | ||
| title = | | title = 09 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.6 | ||
| author name = | | author name = | ||
| author affiliation = Entergy Operations, Inc | | author affiliation = Entergy Operations, Inc | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:WSES-FSAR-UNIT-3 | {{#Wiki_filter:WSES-FSAR-UNIT-3 13.6-1 Revision 308 (11/14) | ||
(LBDCR 13-015, R308) 13.6 PLANT SECURITY The program for ensuring the physical security of the Waterford 3 station has been reviewed by the NRC and found acceptable. The fully implemented security plan provides the protection needed to meet the general performance requirements of 10 CFR 73.55(a) and the objectives of the specific requirements of 10 CFR 73.55, paragraphs (b) through (r), without impairing the ability to operate the plant safely. The approved plant security program, titled Waterford 3, Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI, is addressed in the facility operating license. The approved security plan documents and the NRC Security Plan Evaluation Report have been withheld from public disclosure pursuant to 10 CFR 2.790(d). | |||
13.6-1 Revision 308 (11/14) | (LBDCR 13-015, R308)}} | ||
The program for ensuring the physical security of the Waterford 3 station has been reviewed by the NRC and found acceptable. The fully implemented security plan provides the protection needed to meet the general performance requirements of 10 CFR 73.55(a) and the objectives of the specific requirements of 10 CFR 73.55, paragraphs (b) through (r), without | |||
Latest revision as of 20:20, 9 January 2025
| ML16257A098 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 08/25/2016 |
| From: | Entergy Operations |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16256A115 | List:
|
| References | |
| W3F1-2016-0053 | |
| Download: ML16257A098 (1) | |
Text
WSES-FSAR-UNIT-3 13.6-1 Revision 308 (11/14)
(LBDCR 13-015, R308) 13.6 PLANT SECURITY The program for ensuring the physical security of the Waterford 3 station has been reviewed by the NRC and found acceptable. The fully implemented security plan provides the protection needed to meet the general performance requirements of 10 CFR 73.55(a) and the objectives of the specific requirements of 10 CFR 73.55, paragraphs (b) through (r), without impairing the ability to operate the plant safely. The approved plant security program, titled Waterford 3, Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI, is addressed in the facility operating license. The approved security plan documents and the NRC Security Plan Evaluation Report have been withheld from public disclosure pursuant to 10 CFR 2.790(d).
(LBDCR 13-015, R308)