IR 05000266/2018412: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:October 4, 2018 | ||
, | ==SUBJECT:== | ||
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000266/2018412 AND 05000301/2018412 | |||
==Dear Mr. Craven,== | |||
On September 20, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a material control and accounting inspection at your Point Beach Nuclear Plant and discussed the inspection results with Mr. J. Helfenberger, Supervisor - Nuclear Engineering, of your staff. The results of this inspection are documented in the enclosed report. | |||
Based on the results of this inspection, no findings or violations were identified. | |||
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. | |||
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related InformationWithhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). | |||
Sincerely, | |||
/RA Karla Stoedter Acting for/ | |||
Jamnes Cameron, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-266; 50-301; 72-005 License Nos. DPR-24 and DPR-27 | |||
Nonpublic Enclosure: | |||
IR 05000266/2018412; 05000301/2018412 | |||
cc: B. Beltz, Security Manager B. Woyak, Licensing Manager M. Nazar, Executive Vice President, Nuclear Division and Chief Nuclear Officer | |||
cc w/o encl: Distribution via LISTSERV | |||
}} | }} | ||
Latest revision as of 12:40, 5 January 2025
| ML18277A353 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 10/04/2018 |
| From: | Jamnes Cameron Reactor Projects Region 3 Branch 4 |
| To: | Craven R Point Beach |
| References | |
| IR 2018412 | |
| Download: ML18277A353 (3) | |
Text
October 4, 2018
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000266/2018412 AND 05000301/2018412
Dear Mr. Craven,
On September 20, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a material control and accounting inspection at your Point Beach Nuclear Plant and discussed the inspection results with Mr. J. Helfenberger, Supervisor - Nuclear Engineering, of your staff. The results of this inspection are documented in the enclosed report.
Based on the results of this inspection, no findings or violations were identified.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related InformationWithhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA Karla Stoedter Acting for/
Jamnes Cameron, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-266; 50-301;72-005 License Nos. DPR-24 and DPR-27
Nonpublic Enclosure:
IR 05000266/2018412; 05000301/2018412
cc: B. Beltz, Security Manager B. Woyak, Licensing Manager M. Nazar, Executive Vice President, Nuclear Division and Chief Nuclear Officer
cc w/o encl: Distribution via LISTSERV