| issue date = 08/16/2012
| issue date = 08/16/2012
| title = IR 05000458-12-010, River Bend, Augmented Inspection Team Follow-Up Inspection Planning Letter
| title = IR 05000458-12-010, River Bend, Augmented Inspection Team Follow-Up Inspection Planning Letter
| author name = Gaddy V G
| author name = Gaddy V
| author affiliation = NRC/RGN-IV/DRP/RPB-C
| author affiliation = NRC/RGN-IV/DRP/RPB-C
| addressee name = Olson E W
| addressee name = Olson E
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
| docket = 05000458
| docket = 05000458
| license number = NPF-047
| license number = NPF-047
| contact person = Gaddy V G
| contact person = Gaddy V
| document report number = IR-12-010
| document report number = IR-12-010
| document type = Inspection Plan, Letter, Inspection Report
| document type = Inspection Plan, Letter, Inspection Report
| page count = 5
| page count = 5
}}
}}
See also: [[followed by::IR 05000458/2012010]]
See also: [[see also::IR 05000458/2012010]]


=Text=
=Text=
{{#Wiki_filter:August 16, 2012
{{#Wiki_filter:August 16, 2012  
   
  Mr. Eric W. Olson
Site Vice President
   
Entergy Operations, Inc.
River Bend Station
5485 U.S. Highway 61
Mr. Eric W. Olson  
St. Francisville, LA  70775
Site Vice President  
  SUBJECT: RIVER BEND STATION
Entergy Operations, Inc.  
- NRC AUGMENTED INSPECTION TEAM FOLLOW-UP INSPECTION PLANNING LETTER, INSPECTION REPORT 05000458/2012010
River Bend Station  
Dear Mr. Olson
5485 U.S. Highway 61  
: The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV staff will conduct  
St. Francisville, LA  70775  
an augmented inspection team follow
-up inspection at your River Bend Station.  The inspection will be comprised of resident inspectors and  
SUBJECT:  
a regional reactor inspector
RIVER BEND STATION - NRC AUGMENTED INSPECTION TEAM  
from the NRC Region
FOLLOW-UP INSPECTION PLANNING LETTER, INSPECTION REPORT  
IV office.  The inspection will be conducted in accordance with Inspection Procedure 93800 and multiple reactor oversight process
05000458/2012010  
baseline inspection procedures.
Dear Mr. Olson:
The schedule for the inspection is as follows:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV  
    In-office preparation
staff will conduct an augmented inspection team follow-up inspection at your River Bend  
: September 10 - 14, 2012  Onsite inspection
Station.  The inspection will be comprised of resident inspectors and a regional reactor inspector  
: September 17 - 21, 2012 This inspection is resource intensive both for the NRC inspectors and your staff.
from the NRC Region IV office.  The inspection will be conducted in accordance with Inspection  
  In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.  Please note that the documents
Procedure 93800 and multiple reactor oversight process baseline inspection procedures.  
are requested to be provided by September 4, 2012.  In addition, we request that appropriate
The schedule for the inspection is as follows:  
personnel knowledgeable
of each of the unresolved items documented in NRC Inspection Report 0500458/201200 9 be available to support the inspector s during the onsite inspection week. We have discussed
th is inspection activit
y with your staff.  If there are any questions about this inspection or the material requested, please contact the team lead , Brian Tindell
, at 254-897-1500 or by email
at brian.tindell@nrc.gov
.    U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V1600 EAST LAMAR BLVD
A R L I N G T O N , T E X A S 7 6 0 1 1-4511 
E. Olson - 2 -  This letter does
not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection
requirements were approved by the Office of Management and Budget, Control No. 3150 0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget
Control No. I n accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
  Sincerely,  /RA/  Vincent G. Gaddy, Chief Project Branch C Division of Reactor Projects 
Docket:  05000458 License:  NPF-4 7  Enclosure:  Augmented Inspection Team Follow
-up Inspection Document Request 
c c w/ encl:  Electronic Distribution
     
E. Olson - 3 -  Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Acting DRP Deputy Director (Alan.Howe@nrc.gov)
Acting DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Patrick.Louden@nrc.gov)
Senior Resident Inspector (Grant.Larkin@nrc.gov)
Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)
Resident Inspector (Andy.Barrett@nrc.gov)
RBS Administrative Assistant (Lisa.Day@nrc.gov)
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
RIV/ETA: OEDO
(Silas.Kennedy@nrc.gov)
DRS/TSB STA (Dale.Powers@nrc.gov)
   
          R:\_REACTORS\_RB\2012\RBS 20120 10 Inspection Planning Ltr.doc SUNSI Rev Compl.  Yes  No ADAMS  Yes  No Reviewer Initials
VGG Publicly Avail
  Yes  No Sensitive  Yes  No Sens. Type Initials
VGG RI:DRP/A BC:DR P/C    BTindell VGGaddy    /RA via Email /RA/    08/16/2012 08/16/2012    OFFICIAL RECORD COPY
    T=Telephone          E=E
-mail        F=Fax
    
    
   - 1 - Enclosure  Augmented Inspection Team Follow
In-office preparation: September 10 - 14, 2012
-up Inspection Document Request
  Inspection Dates:
Onsite inspection:
  In-office preparation:  September 10  
September 17 - 21, 2012
- 14, 2012     Onsite:  September 17  
This inspection is resource intensive both for the NRC inspectors and your staff.  In order to
- 21, 2012  Inspection Procedures:
minimize the impact to your onsite resources and to ensure a productive inspection, we have
IP 93800 , Augmented Inspection Team
enclosed a request for documents needed for this inspection.  Please note that the documents
Various Reactor Oversight Process
are requested to be provided by September 4, 2012.  In addition, we request that appropriate
Baseline Inspection Procedures
personnel knowledgeable of each of the unresolved items documented in NRC Inspection
  Team Lead:   Brian Tindell, Resident Inspector, Comanche Peak NPP
Report 0500458/2012009 be available to support the inspectors during the onsite inspection
      The following information should be sent to the Region IV office in hard copy or electronic format in care of Brian Tindell
week.
, by September 4, 2012.  Please provide requested documentation electronically if possible.  Also, we request that you categorize the documents with the numbered list below.  
We have discussed this inspection activity with your staff.  If there are any questions about this
  If you are unable to send the requested information, please inform the inspector s and provide the documentation during the first day of the onsite inspection.  The inspector s will request additional documents during the
inspection or the material requested, please contact the team lead, Brian Tindell, at
preparation and
254-897-1500 or by email at brian.tindell@nrc.gov.    
onsite inspection week s.  If you have any questions regarding this information request, please contact
the team lead. For the following items from Augmented Inspection Team Inspection
Report 050004 58/201200 9 , please provide current copies, as applicable, of related condition reports, work orders, root cause analysis and/or apparent cause evaluations , system design criteria
UNITED STATES
, vendor manuals, UFSAR descriptions, technical specification requirements, technical requirements manual requirements, fire protection report
NUCLEAR REGULATORY COMMISSION
descriptions, procedures, drawings, plant safety index records, fire incident report
REGION IV
s , scram reports, industry operating experience screening s , and post-event risk analysis
1600 EAST LAMAR BLVD
: 1. Main Control Room Annunciator Control and Conduct of Operations
ARLINGTON, TEXAS 76011-4511
2. Past Operability of the Reactor Core Isolation Cooling System
3. Implementation of the Procedure for Infrequently Performed Tests or Evolutions
4. Corrective Action Program Implementation for Prior Lockout Relay Failure in  
 
February 2011 5. Implementation of Vendor and Industry Recommended Relay Testing and Maintenance
E. Olson
6. Implementation of the Station Cable Reliability Program
- 2 -
7. Onsite Safety Review Committee Implementation
8. Ability to Promptly Staff the Fire Brigade at All Times During Plant Operation
This letter does not contain new or amended information collection requirements subject to the
   
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection
  - 2 - Enclosure Inspector Contact Information:
requirements were approved by the Office of Management and Budget, Control No. 3150 0011. 
Brian Tindell
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for
Resident Inspector 254-897-1500 brian.tindell@nrc.gov
information or an information collection requirement unless the requesting document displays a
  Mailing Address:
currently valid Office of Management and Budget Control No.
US NRC Region
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and
IV Attn: Brian Tindell
its enclosure will be available electronically for public inspection in the NRC Public
1600 East Lamar Blvd.
Document Room or from the Publicly Available Records (PARS) component of NRC's
Arlington, TX 76011
document system (ADAMS).  ADAMS is accessible from the NRC Web site at
-4511
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Project Branch C
Division of Reactor Projects
Docket:  05000458
License:  NPF-47
Enclosure:  Augmented Inspection Team Follow-up Inspection Document Request
cc w/ encl:  Electronic Distribution
 
E. Olson
- 3 -
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Acting DRP Deputy Director (Alan.Howe@nrc.gov)
Acting DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Patrick.Louden@nrc.gov)
Senior Resident Inspector (Grant.Larkin@nrc.gov)
Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)
Resident Inspector (Andy.Barrett@nrc.gov)
RBS Administrative Assistant (Lisa.Day@nrc.gov)
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
RIV/ETA: OEDO (Silas.Kennedy@nrc.gov)
DRS/TSB STA (Dale.Powers@nrc.gov)
R:\\_REACTORS\\_RB\\2012\\RBS2012010 Inspection Planning Ltr.doc
SUNSI Rev
Compl.
Yes  No
ADAMS
Yes  No
Reviewer Initials
VGG
Publicly Avail
Yes  No
Sensitive
Yes  No
Sens. Type Initials VGG
RI:DRP/A
BC:DRP/C
BTindell
VGGaddy
/RA via Email
/RA/
08/16/2012
08/16/2012
OFFICIAL RECORD COPY 
T=Telephone          E=E-mail        F=Fax
ML 12229A511
 
- 1 -  
Enclosure  
   
Augmented Inspection Team Follow-up Inspection Document Request  
Inspection Dates:  
In-office preparation:  September 10 - 14, 2012  
Onsite:  September 17 - 21, 2012  
   
Inspection Procedures:  
IP 93800, Augmented Inspection Team  
Various Reactor Oversight Process Baseline Inspection  
Procedures  
Team Lead:  
Brian Tindell, Resident Inspector, Comanche Peak NPP  
The following information should be sent to the Region IV office in hard copy or electronic  
format in care of Brian Tindell, by September 4, 2012.  Please provide requested documentation  
electronically if possible.  Also, we request that you categorize the documents with the  
numbered list below.  If you are unable to send the requested information, please inform the  
inspectors and provide the documentation during the first day of the onsite inspection.  The  
inspectors will request additional documents during the preparation and onsite inspection  
weeks.  If you have any questions regarding this information request, please contact the team  
lead.  
For the following items from Augmented Inspection Team Inspection Report
05000458/2012009, please provide current copies, as applicable, of related condition reports,  
work orders, root cause analysis and/or apparent cause evaluations, system design criteria,
vendor manuals, UFSAR descriptions, technical specification requirements, technical  
requirements manual requirements, fire protection report descriptions, procedures, drawings,  
plant safety index records, fire incident reports, scram reports, industry operating experience  
screenings, and post-event risk analysis:
1. Main Control Room Annunciator Control and Conduct of Operations  
2. Past Operability of the Reactor Core Isolation Cooling System  
3. Implementation of the Procedure for Infrequently Performed Tests or Evolutions  
4. Corrective Action Program Implementation for Prior Lockout Relay Failure in  
February 2011  
5. Implementation of Vendor and Industry Recommended Relay Testing and Maintenance  
6. Implementation of the Station Cable Reliability Program  
7. Onsite Safety Review Committee Implementation  
8. Ability to Promptly Staff the Fire Brigade at All Times During Plant Operation  
 
- 2 -  
Enclosure  
Inspector Contact Information:  
Brian Tindell  
Resident Inspector  
254-897-1500  
brian.tindell@nrc.gov  
Mailing Address:  
US NRC Region IV
Attn: Brian Tindell  
1600 East Lamar Blvd.  
Arlington, TX 76011-4511
}}
}}

Latest revision as of 22:55, 11 January 2025

IR 05000458-12-010, River Bend, Augmented Inspection Team Follow-Up Inspection Planning Letter
ML12229A511
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/16/2012
From: Vincent Gaddy
NRC/RGN-IV/DRP/RPB-C
To: Olson E
Entergy Operations
Gaddy V
References
IR-12-010
Download: ML12229A511 (5)


See also: IR 05000458/2012010

Text

August 16, 2012

Mr. Eric W. Olson

Site Vice President

Entergy Operations, Inc.

River Bend Station

5485 U.S. Highway 61

St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION - NRC AUGMENTED INSPECTION TEAM

FOLLOW-UP INSPECTION PLANNING LETTER, INSPECTION REPORT

05000458/2012010

Dear Mr. Olson:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV

staff will conduct an augmented inspection team follow-up inspection at your River Bend

Station. The inspection will be comprised of resident inspectors and a regional reactor inspector

from the NRC Region IV office. The inspection will be conducted in accordance with Inspection

Procedure 93800 and multiple reactor oversight process baseline inspection procedures.

The schedule for the inspection is as follows:

In-office preparation: September 10 - 14, 2012

Onsite inspection:

September 17 - 21, 2012

This inspection is resource intensive both for the NRC inspectors and your staff. In order to

minimize the impact to your onsite resources and to ensure a productive inspection, we have

enclosed a request for documents needed for this inspection. Please note that the documents

are requested to be provided by September 4, 2012. In addition, we request that appropriate

personnel knowledgeable of each of the unresolved items documented in NRC Inspection

Report 0500458/2012009 be available to support the inspectors during the onsite inspection

week.

We have discussed this inspection activity with your staff. If there are any questions about this

inspection or the material requested, please contact the team lead, Brian Tindell, at

254-897-1500 or by email at brian.tindell@nrc.gov.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 EAST LAMAR BLVD

ARLINGTON, TEXAS 76011-4511

E. Olson

- 2 -

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control No. 3150 0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for

information or an information collection requirement unless the requesting document displays a

currently valid Office of Management and Budget Control No.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Project Branch C

Division of Reactor Projects

Docket: 05000458

License: NPF-47

Enclosure: Augmented Inspection Team Follow-up Inspection Document Request

cc w/ encl: Electronic Distribution

E. Olson

- 3 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

Acting DRP Deputy Director (Alan.Howe@nrc.gov)

Acting DRS Director (Tom.Blount@nrc.gov)

Acting DRS Deputy Director (Patrick.Louden@nrc.gov)

Senior Resident Inspector (Grant.Larkin@nrc.gov)

Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)

Resident Inspector (Andy.Barrett@nrc.gov)

RBS Administrative Assistant (Lisa.Day@nrc.gov)

Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)

Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

RIV/ETA: OEDO (Silas.Kennedy@nrc.gov)

DRS/TSB STA (Dale.Powers@nrc.gov)

R:\\_REACTORS\\_RB\\2012\\RBS2012010 Inspection Planning Ltr.doc

SUNSI Rev

Compl.

Yes No

ADAMS

Yes No

Reviewer Initials

VGG

Publicly Avail

Yes No

Sensitive

Yes No

Sens. Type Initials VGG

RI:DRP/A

BC:DRP/C

BTindell

VGGaddy

/RA via Email

/RA/

08/16/2012

08/16/2012

OFFICIAL RECORD COPY

T=Telephone E=E-mail F=Fax

ML 12229A511

- 1 -

Enclosure

Augmented Inspection Team Follow-up Inspection Document Request

Inspection Dates:

In-office preparation: September 10 - 14, 2012

Onsite: September 17 - 21, 2012

Inspection Procedures:

IP 93800, Augmented Inspection Team

Various Reactor Oversight Process Baseline Inspection

Procedures

Team Lead:

Brian Tindell, Resident Inspector, Comanche Peak NPP

The following information should be sent to the Region IV office in hard copy or electronic

format in care of Brian Tindell, by September 4, 2012. Please provide requested documentation

electronically if possible. Also, we request that you categorize the documents with the

numbered list below. If you are unable to send the requested information, please inform the

inspectors and provide the documentation during the first day of the onsite inspection. The

inspectors will request additional documents during the preparation and onsite inspection

weeks. If you have any questions regarding this information request, please contact the team

lead.

For the following items from Augmented Inspection Team Inspection Report 05000458/2012009, please provide current copies, as applicable, of related condition reports,

work orders, root cause analysis and/or apparent cause evaluations, system design criteria,

vendor manuals, UFSAR descriptions, technical specification requirements, technical

requirements manual requirements, fire protection report descriptions, procedures, drawings,

plant safety index records, fire incident reports, scram reports, industry operating experience

screenings, and post-event risk analysis:

1. Main Control Room Annunciator Control and Conduct of Operations

2. Past Operability of the Reactor Core Isolation Cooling System

3. Implementation of the Procedure for Infrequently Performed Tests or Evolutions

4. Corrective Action Program Implementation for Prior Lockout Relay Failure in

February 2011

5. Implementation of Vendor and Industry Recommended Relay Testing and Maintenance

6. Implementation of the Station Cable Reliability Program

7. Onsite Safety Review Committee Implementation

8. Ability to Promptly Staff the Fire Brigade at All Times During Plant Operation

- 2 -

Enclosure

Inspector Contact Information:

Brian Tindell

Resident Inspector

254-897-1500

brian.tindell@nrc.gov

Mailing Address:

US NRC Region IV

Attn: Brian Tindell

1600 East Lamar Blvd.