ML041070051: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 01/06/2004
| issue date = 01/06/2004
| title = Initial Admin RO JPM 013.01
| title = Initial Admin RO JPM 013.01
| author name = Delaney T, Pickley T, Ryan P K
| author name = Delaney T, Pickley T, Ryan P
| author affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| author affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:CLINTON POWER STATIONJob Performance MeasureDetermine the effects of a Failed RelayJPM Number:
{{#Wiki_filter:CLINTON POWER STATION Job Performance Measure Determine the effects of a Failed Relay JPM Number: 013.01 Revision Number: 00 Date: 8/21/03 Developed By:
013.01Revision Number: 00 Date: 8/21/03Developed By:     T. Pickley                         8/21/03   InstructorDateValidated By:     T. Delaney                       10/16/03SME or InstructorDateReview By:     P. Ryan                         _10/16/03Operations RepresentativeDate Page 2 of 8JOB PERFORMANCE MEASURE VALIDATION CHECKLISTNOTE:All steps of this checklist should be performed upon initial validation. Prior to JPMusage, revalidate JPM using steps 8 through 11 below.________1. Task description and number, JPM description and number are identified.________2. Knowledge and Abilities (K/A) references are included.
T. Pickley 8/21/03 Instructor Date Validated By:
________3. Performance location specified. (in-plant, control room, or simulator)
T. Delaney 10/16/03 SME or Instructor Date Review By:
________4. Initial setup conditions are identified.
P. Ryan
________5. Initiating and terminating cues are properly identified.________6. Task standards identified and verified by SME review.________7. Critical steps meet the criteria for critical steps and are identified with anasterisk (*).________8. Verify the procedure referenced by this JPM matches the most currentrevision of that procedure:
_10/16/03 Operations Representative Date
Procedure Rev. _____ Date _____________________9. Pilot test the JPM:a. verify cues both verbal and visual are free of conflict, and
 
: b. ensure performance time is accurate.________10. If the JPM cannot be performed as written with proper responses, then revisethe JPM.________11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
Page 2 of 8 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:
SME/InstructorDate SME/InstructorDate SME/InstructorDate CLINTON POWER STATIONSYSTEM JPMJPM NUMBER: 013.01                                                                                                         REVISION: 00Page 3 of 8Revision Record (Summary)
All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
: 1. Revision 00,This is a new JPM CLINTON POWER STATIONSYSTEM JPMJPM NUMBER: 013.01                                                                                                         REVISION: 00Page 4 of 8Operator's Name:                                                                 SSN:
: 1. Task description and number, JPM description and number are identified.
Job Title:     NLO     RO     SRO     STA     SRO CertJPM Title/Number: Determine the effect of Relay 1UAY-CC516H1 coil failureTask Number and Title: 0.13 Read mechanical and electrical printsSuggested Testing Environment:Any     Actual Testing Environment:     Simulator     Plant     Control RoomTesting Method:PerformFaulted:NoAlternate Path:NoTime Critical:NoEstimated Time to Complete:   20   _minutesActual Time Used:
: 2. Knowledge and Abilities (K/A) references are included.
: 3. Performance location specified. (in-plant, control room, or simulator)
: 4. Initial setup conditions are identified.
: 5. Initiating and terminating cues are properly identified.
: 6. Task standards identified and verified by SME review.
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. _____ Date _____________
: 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
: 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor Date SME/Instructor Date SME/Instructor Date
 
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 013.01 REVISION: 00 Page 3 of 8 Revision Record (Summary)
: 1. Revision 00, This is a new JPM
 
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 013.01 REVISION: 00 Page 4 of 8 Operators Name:
SSN:
Job
 
==Title:==
NLO RO SRO STA SRO Cert JPM Title/Number: Determine the effect of Relay 1UAY-CC516H1 coil failure Task Number and
 
==Title:==
0.13 Read mechanical and electrical prints Suggested Testing Environment:
Any Actual Testing Environment: I Simulator Plant Control Room Testing Method:
 
Perform Faulted:
 
No I
Alternate Path:
 
No Time Critical:
 
No Estimated Time to Complete: 20 _minutes Actual Time Used:
minutes
minutes


Line 33: Line 69:


==SUMMARY==
==SUMMARY==
:Were all the Critical Elements performed satisfactorily?YesNoThe operator's performance was evaluated against the standards contained in this JPM, and has beendetermined to be:SatisfactoryUnsatisfactoryComments:                                                                                                                    
Were all the Critical Elements performed satisfactorily?
 
Yes
 
No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
 
Satisfactory
 
Unsatisfactory Comments:
Evaluators Name: __________________________
Evaluators Signature:
Date:
 
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 300601.06 REVISION: 00 Page 5 of 8 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
SIMULATOR SET-UP CONDITIONS:
Not Applicable TASK STANDARDS:
Determines that 1IA005 and 1IA008 will not close on a Level 1 signal.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
None PROCEDURAL/
 
==REFERENCES:==
E02-1CC99 Sh 16 E02-1IA99 Sh 5 EVALUATOR INSTRUCTIONS:
Amplifying cues are provided within the JPM steps.
INITIAL CONDITIONS AND INITIATING CUE:
The plant was operating at rated power in the middle of the operating cycle, when relay 1UAY-CC516H1 relay coil opens.
Determine the affect(s) of this component failure on system operation during normal and accident conditions.
START TIME:
 
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 300601.06 REVISION: 00 Page 6 of 8
 
==========================================================================
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.


Evaluator's Name:  __________________________Evaluator's Signature:                                                                                      Date:             
==========================================================================
PERFORMANCE STEPS
*1 Candidate determines the effect of the loss of relay 1UAY-CC516H1 on plant operation.
Standard Candidate states that that 1IA005 and 1IA008 will not close on a Level 1 signal.
CUE Comments SAT UNSAT Comment Number 2
Candidate determines system impact.
StandardCandidate states that there is no impact on system operation.
CUE Comments SAT UNSAT Comment Number


CLINTON POWER STATIONSYSTEM JPMJPM NUMBER:     300601.06                                   REVISION: 00Page 5 of 8READ TO THE OPERATORI will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complet ethe task successfully, the objective of this Job Performance Measure will be satisfied.SIMULATOR SET-UP CONDITIONS
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 300601.06 REVISION: 00 Page 7 of 8 STOP TIME:_____________
:Not ApplicableTASK STANDARDS
TERMINATING CUES:
:Determines that 1IA005 and 1IA008 will not close on a Level 1 signal.TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS
Candidate determines impact of failed relay.
:NonePROCEDURAL/REFERENCES
K/A REFERENCE NUMBERS Importance Rating K/A SYSTEM NUMBER K/A NUMBER RO SRO 2.1.24 2.8 3.1
:E02-1CC99 Sh 16E02-1IA99 Sh 5EVALUATOR INSTRUCTIONS
:Amplifying cues are provided within the JPM steps.INITIAL CONDITIONS AND INITIATING CUE
:The plant was operating at rated power in the middle of the operating cycle, when relay 1UAY-CC516H1 relay coil opens.Determine the affect(s) of this component failure on system operation during normal and accident conditions.START TIME:
CLINTON POWER STATIONSYSTEM JPMJPM NUMBER:    300601.06                                    REVISION: 00Page 6 of 8
==========================================================================PERFORMANCE INFORMATIONCritical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meetthe standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.


==========================================================================PERFORMANCE STEPS*1Candidate determines the effect of the loss of relay 1UAY-CC516H1 on plant operation.StandardCandidate states that that 1IA005 and 1IA008 will not close on a Level 1 signal.
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 300601.06 REVISION: 00 Page 8 of 8 INITIATING CUE The plant was operating at rated power in the middle of the operating cycle, when relay 1UAY-CC516H1 relay coil opens.
CUECommentsSAT        UNSAT      Comment Number2Candidate determines system impact.StandardCandidate states that there is no impact on system operation.
Determine the affect(s) of this component failure on system operation during normal and accident conditions.}}
CUECommentsSAT        UNSAT      Comment Number CLINTON POWER STATIONSYSTEM JPMJPM NUMBER:    300601.06                                    REVISION: 00Page 7 of 8STOP TIME:_____________TERMINATING CUES:Candidate determines impact of failed relay.K/A REFERENCE NUMBERS                Importance RatingK/A SYSTEM NUMBERK/A NUMBER RO SRO2.1.242.83.1 CLINTON POWER STATIONSYSTEM JPMJPM NUMBER:     300601.06                                   REVISION: 00Page 8 of 8INITIATING CUEThe plant was operating at rated power in the middle of the operating cycle, when relay 1UAY-CC516H1 relay coil opens.Determine the affect(s) of this component failure on system operation during normal and accident conditions.}}

Latest revision as of 03:34, 16 January 2025

Initial Admin RO JPM 013.01
ML041070051
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/06/2004
From: Delaney T, Pickley T, Ryan P
Exelon Generation Co, Exelon Nuclear
To:
Office of Nuclear Reactor Regulation
References
-RFPFR, 50-461/04-301, JPM 013.01, Rev 00 50-461/04-301
Download: ML041070051 (8)


Text

CLINTON POWER STATION Job Performance Measure Determine the effects of a Failed Relay JPM Number: 013.01 Revision Number: 00 Date: 8/21/03 Developed By:

T. Pickley 8/21/03 Instructor Date Validated By:

T. Delaney 10/16/03 SME or Instructor Date Review By:

P. Ryan

_10/16/03 Operations Representative Date

Page 2 of 8 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:

All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. _____ Date _____________

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.
10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 013.01 REVISION: 00 Page 3 of 8 Revision Record (Summary)

1. Revision 00, This is a new JPM

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 013.01 REVISION: 00 Page 4 of 8 Operators Name:

SSN:

Job

Title:

NLO RO SRO STA SRO Cert JPM Title/Number: Determine the effect of Relay 1UAY-CC516H1 coil failure Task Number and

Title:

0.13 Read mechanical and electrical prints Suggested Testing Environment:

Any Actual Testing Environment: I Simulator Plant Control Room Testing Method:

Perform Faulted:

No I

Alternate Path:

No Time Critical:

No Estimated Time to Complete: 20 _minutes Actual Time Used:

minutes

References:

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes

No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory

Unsatisfactory Comments:

Evaluators Name: __________________________

Evaluators Signature:

Date:

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 300601.06 REVISION: 00 Page 5 of 8 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

SIMULATOR SET-UP CONDITIONS:

Not Applicable TASK STANDARDS:

Determines that 1IA005 and 1IA008 will not close on a Level 1 signal.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

None PROCEDURAL/

REFERENCES:

E02-1CC99 Sh 16 E02-1IA99 Sh 5 EVALUATOR INSTRUCTIONS:

Amplifying cues are provided within the JPM steps.

INITIAL CONDITIONS AND INITIATING CUE:

The plant was operating at rated power in the middle of the operating cycle, when relay 1UAY-CC516H1 relay coil opens.

Determine the affect(s) of this component failure on system operation during normal and accident conditions.

START TIME:

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 300601.06 REVISION: 00 Page 6 of 8

==============================================================

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

==============================================================

PERFORMANCE STEPS

  • 1 Candidate determines the effect of the loss of relay 1UAY-CC516H1 on plant operation.

Standard Candidate states that that 1IA005 and 1IA008 will not close on a Level 1 signal.

CUE Comments SAT UNSAT Comment Number 2

Candidate determines system impact.

StandardCandidate states that there is no impact on system operation.

CUE Comments SAT UNSAT Comment Number

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 300601.06 REVISION: 00 Page 7 of 8 STOP TIME:_____________

TERMINATING CUES:

Candidate determines impact of failed relay.

K/A REFERENCE NUMBERS Importance Rating K/A SYSTEM NUMBER K/A NUMBER RO SRO 2.1.24 2.8 3.1

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 300601.06 REVISION: 00 Page 8 of 8 INITIATING CUE The plant was operating at rated power in the middle of the operating cycle, when relay 1UAY-CC516H1 relay coil opens.

Determine the affect(s) of this component failure on system operation during normal and accident conditions.