ML060960284: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML060960284
| number = ML060960284
| issue date = 04/06/2006
| issue date = 04/06/2006
| title = 04/12/06 Public Meeting, Susquehanna, Slides on Reactor Oversight Program - Cy 2005
| title = Public Meeting, Susquehanna, Slides on Reactor Oversight Program - Cy 2005
| author name =  
| author name =  
| author affiliation = NRC/RGN-I
| author affiliation = NRC/RGN-I
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Susquehanna Steam Electric Station Susquehanna Steam Electric Station Annual Assessment MeetingAnnual Assessment MeetingReactor Oversight Program Reactor Oversight Program  
{{#Wiki_filter:Susquehanna Steam Electric Station Susquehanna Steam Electric Station Annual Assessment Meeting Annual Assessment Meeting Reactor Oversight Program Reactor Oversight Program -- CY 2005 CY 2005 Nuclear Regulatory Commission Nuclear Regulatory Commission -- Region I Region I King of Prussia, Pennsylvania King of Prussia, Pennsylvania April 12, 2006 April 12, 2006
--CY 2005CY 2005Nuclear Regulatory Commission Nuclear Regulatory Commission  
 
--Region IRegion IKing of Prussia, PennsylvaniaKing of Prussia, PennsylvaniaApril 12, 2006April 12, 2006 Purpose of Today's MeetingPurpose of Today's MeetingA public forum for discussion of the licensee's A public forum for discussion of the licensee's performanceperformanceNRC will address the licensee performance identified NRC will address the licensee performance identified during the assessment periodduring the assessment periodPPL will respond to the information in the letter and PPL will respond to the information in the letter and inform the NRC of new or existing programs to inform the NRC of new or existing programs to maintain or improve their performance maintain or improve their performance AgendaAgendaIntroduction  Introduction Review of Reactor Oversight ProcessReview of Reactor Oversight ProcessNational Summary of Plant PerformanceNational Summary of Plant PerformanceDiscussion of Plant Performance ResultsDiscussion of Plant Performance ResultsLicensee Response and RemarksLicensee Response and RemarksNRC Closing RemarksNRC Closing RemarksBreakBreakNRC available to address public questionsNRC available to address public questions NRC RepresentativesNRC RepresentativesJames Trapp, Branch ChiefJames Trapp, Branch Chief
Purpose of Todays Meeting Purpose of Todays Meeting zz A public forum for discussion of the licensees A public forum for discussion of the licensees performance performance zz NRC will address the licensee performance identified NRC will address the licensee performance identified during the assessment period during the assessment period zz PPL will respond to the information in the letter and PPL will respond to the information in the letter and inform the NRC of new or existing programs to inform the NRC of new or existing programs to maintain or improve their performance maintain or improve their performance  
--(610) 337(610) 337--5186 5186 Alan Blamey, Senior Resident InspectorAlan Blamey, Senior Resident Inspector
 
--(570) 542(570) 542--21342134Frederick Frederick JaxheimerJaxheimer, Resident Inspector, Resident Inspector
Agenda Agenda zz Introduction Introduction zz Review of Reactor Oversight Process Review of Reactor Oversight Process zz National Summary of Plant Performance National Summary of Plant Performance zz Discussion of Plant Performance Results Discussion of Plant Performance Results zz Licensee Response and Remarks Licensee Response and Remarks zz NRC Closing Remarks NRC Closing Remarks zz Break Break zz NRC available to address public questions NRC available to address public questions
--(570) 542(570) 542--21342134 Region I OrganizationRegion I OrganizationRegional SpecialistsMarsha K. GamberoniDeputy DirectorA. Randolph BloughDirector Division of Reactor SafetyFred BowerDaniel SchroederPeach BottomResident InspectorsSamuel HansellCarey BickettLimerickResident InspectorsAlan BlameyFrederick JaxheimerSusquehannaResident InspectorsCheryl KhanThomas SetzerProject EngineersBranch ChiefJames M. TrappDavid C. LewDeputy DirectorBrian E. HolianDirector Division of Reactor ProjectsDeputy Regional AdministratorSamuel J. CollinsRegional AdministratorMarc L. Dapas NRC Performance Goals NRC Performance Goals Safety Safety: Ensure protection of the public health and : Ensure protection of the public health and safety and the environmentsafety and the environmentSecuritySecurity: Ensure the secure use and management of : Ensure the secure use and management of radioactive materialsradioactive materialsOpennessOpenness: Ensure openness in our regulatory process: Ensure openness in our regulatory processEffectivenessEffectiveness: Ensure that NRC actions are effective, : Ensure that NRC actions are effective, efficient, realistic, and timelyefficient, realistic, and timelyManagementManagement: Ensure excellence in agency : Ensure excellence in agency management to carry out the NRC' strategic objectivemanagement to carry out the NRC' strategic objective Reactor Oversight ProcessReactor Oversight ProcessSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance AreasSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance Areas Examples of Baseline InspectionsExamples of Baseline InspectionsEquipment Alignment    Equipment Alignment   ~80 hrs/yr ~80 hrs/yr Triennial Fire Protection   Triennial Fire Protection   ~200 hrs every 3 yrs~200 hrs every 3 yrsOperator Response     Operator Response     ~125 hrs/yr~125 hrs/yrEmergency Preparedness Emergency Preparedness ~80 hrs/yr~80 hrs/yrRad Release Controls     Rad Release Controls     ~110 hrs every 2 yrs~110 hrs every 2 yrsWorker Radiation Protection Worker Radiation Protection ~90 hrs/yr~90 hrs/yrCorrective Action Program Corrective Action Program ~250 hrs every 2 yrs~250 hrs every 2 yrsCorrective Action Case Reviews   ~60 hrs/yrCorrective Action Case Reviews   ~60 hrs/yr Significance ThresholdSignificance ThresholdPerformance IndicatorsPerformance IndicatorsGreenGreen::Baseline InspectionBaseline Inspection White White::Increased NRC oversightIncreased NRC oversightYellowYellow::Requires more NRC oversightRequires more NRC oversight Red Red::Requires more NRC oversightRequires more NRC oversightInspection FindingsInspection FindingsGreenGreen::Very low safety issueVery low safety issue White White::Low to moderate safety issueLow to moderate safety issueYellowYellow::Substantial safety issueSubstantial safety issue Red Red::High safety issueHigh safety issue Action Matrix ConceptAction Matrix ConceptLicenseeResponseRegulatoryResponseDegradedCornerstoneMultiple/Rep.DegradedCornerstoneUnacceptablePerformanceIncreasing Safety SignificanceIncreasing Safety SignificanceIncreasing NRC Inspection EffortsIncreasing NRC Inspection EffortsIncreasing NRC/Licensee Management InvolvementIncreasing NRC/Licensee Management InvolvementIncreasing Regulatory ActionsIncreasing Regulatory Actions National Summary of Plant PerformanceNational Summary of Plant PerformanceStatus at End of CY 2005Status at End of CY 2005Licensee Response Licensee Response 84 84Regulatory Response   Regulatory Response 12 12Degraded Cornerstone   Degraded Cornerstone 4 4Multiple/Repetitive Degraded CornerstoneMultiple/Repetitive Degraded Cornerstone 3 3Unacceptable  Unacceptable 0 0TotalTotal 103 103 National Summary National SummaryPerformance Indicator Results (at end of CY Performance Indicator Results (at end of CY 2005)2005)GreenGreen18501850 White White 4 4YellowYellow 0 0 Red Red 0 0Total Inspection Findings (CY 2005)Total Inspection Findings (CY 2005)GreenGreen849849 White White 10 10YellowYellow 1 1 Red Red 0 0 Susquehanna Inspection ActivitiesSusquehanna Inspection Activities(Jan 1 (Jan 1 --Dec 31, 2005)
 
Dec 31, 2005)5267 hours of inspection related activities5267 hours of inspection related activities2 resident inspectors assigned to the site2 resident inspectors assigned to the site~15 regional inspector visits~15 regional inspector visits
NRC Representatives NRC Representatives zz James Trapp, Branch Chief James Trapp, Branch Chief
--Included two team inspections (SSDI, Fire Included two team inspections (SSDI, Fire Protection Inspection)Protection Inspection)Unit 2 refueling outageUnit 2 refueling outage
-- (610) 337 (610) 337--5186 5186 zz Alan Blamey, Senior Resident Inspector Alan Blamey, Senior Resident Inspector
**February February --March 2005March 2005 Susquehanna Unit 1 Assessment ResultsSusquehanna Unit 1 Assessment ResultsOperated safely throughout the Assessment PeriodOperated safely throughout the Assessment PeriodLicensee response column of the Action Matrix for Licensee response column of the Action Matrix for all of 2005 (cornerstone objectives fully met)all of 2005 (cornerstone objectives fully met)Inspection FindingsInspection Findings
-- (570) 542 (570) 542--2134 2134 zz Frederick Frederick Jaxheimer Jaxheimer, Resident Inspector
--4 findings of very low safety significance (4 findings of very low safety significance (GreenGreen))--All 4 findings were common to both unitsAll 4 findings were common to both unitsNRC will conduct baseline inspections during the NRC will conduct baseline inspections during the remainder of the cycleremainder of the cycle (Jan 1 (Jan 1 --Dec 31, 2005)Dec 31, 2005)
, Resident Inspector
Susquehanna Unit 2 Assessment ResultsSusquehanna Unit 2 Assessment ResultsOperated safely throughout the Assessment PeriodOperated safely throughout the Assessment PeriodLicensee response column of the Action Matrix for Licensee response column of the Action Matrix for all of 2005 (cornerstone objectives fully met)all of 2005 (cornerstone objectives fully met)Inspection FindingsInspection Findings
-- (570) 542 (570) 542--2134 2134
--7 findings of very low safety significance (7 findings of very low safety significance (GreenGreen) ) --4 of the 7 findings were common to both units4 of the 7 findings were common to both units
 
--4 human performance cross4 human performance cross
Region I Organization Region I Organization Regional Specialists Marsha K. Gamberoni Deputy Director A. Randolph Blough Director Division of Reactor Safety Fred Bower Daniel Schroeder Peach Bottom Resident Inspectors Samuel Hansell Carey Bickett Limerick Resident Inspectors Alan Blamey Frederick Jaxheimer Susquehanna Resident Inspectors Cheryl Khan Thomas Setzer Project Engineers Branch Chief James M. Trapp David C. Lew Deputy Director Brian E. Holian Director Division of Reactor Projects Deputy Regional Administrator Samuel J. Collins Regional Administrator Marc L. Dapas
--cutting issues identified at end cutting issues identified at end of assessment period. However, there is no common of assessment period. However, there is no common subcategory and a substantive crosssubcategory and a substantive cross
 
--cutting issue was not cutting issue was not proposed.proposed.NRC will conduct baseline inspections during NRC will conduct baseline inspections during remainder of the cycleremainder of the cycle (Jan 1 (Jan 1 --Dec 31, 2005)Dec 31, 2005)
NRC Performance Goals NRC Performance Goals zz Safety Safety: Ensure protection of the public health and
Unit 1 Unit 1 --4Q Performance Indicators4Q Performance Indicatorswww.NRC.GOV/NRR/oversight/assess/index.htmlwww.NRC.GOV/NRR/oversight/assess/index.html
: Ensure protection of the public health and safety and the environment safety and the environment zz Security Security: Ensure the secure use and management of
--click on plant name on left side of pageclick on plant name on left side of page Unit 2 Unit 2 --4Q Performance Indicators4Q Performance Indicatorswww.NRC.GOV/NRR/oversight/assess/index.htmlwww.NRC.GOV/NRR/oversight/assess/index.html
: Ensure the secure use and management of radioactive materials radioactive materials zz Openness Openness: Ensure openness in our regulatory process
--click on plant name on left side of pageclick on plant name on left side of page Performance Indicator (PI) ExamplePerformance Indicator (PI) Examplewww.NRC.GOV/NRR/oversight/assess/index.htmlwww.NRC.GOV/NRR/oversight/assess/index.htmlclick on plant name on left side of page, then on PIclick on plant name on left side of page, then on PI Unit 1 Unit 1 --Inspection ResultsInspection Resultswww.NRC.GOV/NRR/oversight/assess/index.htmlwww.NRC.GOV/NRR/oversight/assess/index.html
: Ensure openness in our regulatory process zz Effectiveness Effectiveness: Ensure that NRC actions are effective,
--click on plant name on left side of pageclick on plant name on left side of page Unit 2 Unit 2 --Inspection ResultsInspection Resultswww.NRC.GOV/NRR/oversight/assess/index.htmlwww.NRC.GOV/NRR/oversight/assess/index.html
: Ensure that NRC actions are effective, efficient, realistic, and timely efficient, realistic, and timely zz Management Management: Ensure excellence in agency
--click on plant name on left side of pageclick on plant name on left side of page Susquehanna Susquehanna Annual Assessment SummaryAnnual Assessment SummaryJanuary 1 January 1  
: Ensure excellence in agency management to carry out the NRC strategic objective management to carry out the NRC strategic objective
--December 31, 2005December 31, 2005PPL operated Susquehanna Units 1 & 2 in a PPL operated Susquehanna Units 1 & 2 in a manner that protected public health and safetymanner that protected public health and safetyLicensee response column of the Action Matrix Licensee response column of the Action Matrix (All cornerstone objectives were fully met)(All cornerstone objectives were fully met)NRC plans baseline inspections at Susquehanna NRC plans baseline inspections at Susquehanna for the remainder of the 2006 assessment periodfor the remainder of the 2006 assessment period Licensee Response and RemarksLicensee Response and Remarks Contacting the NRCContacting the NRCReport an emergencyReport an emergency
 
--(301) 816(301) 816--5100 (call collect)5100 (call collect)Report a safety concern:   Report a safety concern:  
Reactor Oversight Process Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas
--(800) 695(800) 695--74037403--Allegation@nrc.govAllegation@nrc.govGeneral information or questionsGeneral information or questions
 
--www.nrc.govwww.nrc.gov
Examples of Baseline Inspections Examples of Baseline Inspections zz Equipment Alignment Equipment Alignment
--Select "What We Do" for Public AffairsSelect "What We Do" for Public Affairs Reference SourcesReference SourcesReactor Oversight ProcessReactor Oversight Process
~80 hrs/yr  
--http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.htmlhttp://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.htmlPublic Electronic Reading RoomPublic Electronic Reading Room
~80 hrs/yr zz Triennial Fire Protection Triennial Fire Protection  
--http://www.nrc.gov/readinghttp://www.nrc.gov/reading
~200 hrs every 3 yrs
--rm.htmlrm.htmlPublic Document RoomPublic Document Room
~200 hrs every 3 yrs zz Operator Response Operator Response  
--1 1--800 800--397 397--4209 (Toll Free)4209 (Toll Free)}}
~125 hrs/yr
~125 hrs/yr zz Emergency Preparedness Emergency Preparedness  
~80 hrs/yr
~80 hrs/yr zz Rad Release Controls Rad Release Controls  
~110 hrs every 2 yrs
~110 hrs every 2 yrs zz Worker Radiation Protection Worker Radiation Protection ~90 hrs/yr
~90 hrs/yr zz Corrective Action Program Corrective Action Program  
~250 hrs every 2 yrs
~250 hrs every 2 yrs zz Corrective Action Case Reviews ~60 hrs/yr Corrective Action Case Reviews ~60 hrs/yr
 
Significance Threshold Significance Threshold Performance Indicators Performance Indicators Green Green::
Baseline Inspection Baseline Inspection White White::
Increased NRC oversight Increased NRC oversight Yellow Yellow::
Requires more NRC oversight Requires more NRC oversight Red Red::
Requires more NRC oversight Requires more NRC oversight Inspection Findings Inspection Findings Green Green::
Very low safety issue Very low safety issue White White::
Low to moderate safety issue Low to moderate safety issue Yellow Yellow::
Substantial safety issue Substantial safety issue Red Red::
High safety issue High safety issue
 
Action Matrix Concept Action Matrix Concept Licensee
 
===Response===
Regulatory
 
===Response===
Degraded Cornerstone Multiple/Rep.
Degraded Cornerstone Unacceptable Performance Increasing Safety Significance Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions Increasing Regulatory Actions
 
National Summary of Plant Performance National Summary of Plant Performance Status at End of CY 2005 Status at End of CY 2005 Licensee Response Licensee Response 84 84 Regulatory Response Regulatory Response 12 12 Degraded Cornerstone Degraded Cornerstone 44 Multiple/Repetitive Degraded Cornerstone Multiple/Repetitive Degraded Cornerstone 33 Unacceptable Unacceptable 00 Total Total 103 103
 
National Summary National Summary zz Performance Indicator Results (at end of CY Performance Indicator Results (at end of CY 2005) 2005)
 
Green Green 1850 1850
 
White White 44
 
Yellow Yellow 00
 
Red Red 00 zz Total Inspection Findings (CY 2005)
Total Inspection Findings (CY 2005)
 
Green Green 849 849
 
White White 10 10
 
Yellow Yellow 11
 
Red Red 00
 
Susquehanna Inspection Activities Susquehanna Inspection Activities (Jan 1 (Jan 1 -- Dec 31, 2005)
Dec 31, 2005) zz 5267 hours of inspection related activities 5267 hours of inspection related activities zz 2 resident inspectors assigned to the site 2 resident inspectors assigned to the site zz ~15 regional inspector visits
~15 regional inspector visits
-- Included two team inspections (SSDI, Fire Included two team inspections (SSDI, Fire Protection Inspection)
Protection Inspection) zz Unit 2 refueling outage Unit 2 refueling outage
** February February -- March 2005 March 2005
 
Susquehanna Unit 1 Assessment Results Susquehanna Unit 1 Assessment Results zz Operated safely throughout the Assessment Period Operated safely throughout the Assessment Period zz Licensee response column of the Action Matrix for Licensee response column of the Action Matrix for all of 2005 (cornerstone objectives fully met) all of 2005 (cornerstone objectives fully met) zz Inspection Findings Inspection Findings
-- 4 findings of very low safety significance (
4 findings of very low safety significance (Green Green))
-- All 4 findings were common to both units All 4 findings were common to both units zz NRC will conduct baseline inspections during the NRC will conduct baseline inspections during the remainder of the cycle remainder of the cycle (Jan 1 (Jan 1 -- Dec 31, 2005)
Dec 31, 2005)
 
Susquehanna Unit 2 Assessment Results Susquehanna Unit 2 Assessment Results zz Operated safely throughout the Assessment Period Operated safely throughout the Assessment Period zz Licensee response column of the Action Matrix for Licensee response column of the Action Matrix for all of 2005 (cornerstone objectives fully met) all of 2005 (cornerstone objectives fully met) zz Inspection Findings Inspection Findings
-- 7 findings of very low safety significance (
7 findings of very low safety significance (Green Green) )  
-- 4 of the 7 findings were common to both units 4 of the 7 findings were common to both units
-- 4 human performance cross 4 human performance cross--cutting issues identified at end cutting issues identified at end of assessment period. However, there is no common of assessment period. However, there is no common subcategory and a substantive cross subcategory and a substantive cross--cutting issue was not cutting issue was not proposed.
proposed.
zz NRC will conduct baseline inspections during NRC will conduct baseline inspections during remainder of the cycle remainder of the cycle (Jan 1 (Jan 1 -- Dec 31, 2005)
Dec 31, 2005)
 
Unit 1 Unit 1 -- 4Q Performance Indicators 4Q Performance Indicators zz www.NRC.GOV/NRR/oversight/assess/index.html www.NRC.GOV/NRR/oversight/assess/index.html
-- click on plant name on left side of page click on plant name on left side of page
 
Unit 2 Unit 2 -- 4Q Performance Indicators 4Q Performance Indicators zz www.NRC.GOV/NRR/oversight/assess/index.html www.NRC.GOV/NRR/oversight/assess/index.html
-- click on plant name on left side of page click on plant name on left side of page
 
Performance Indicator (PI) Example Performance Indicator (PI) Example www.NRC.GOV/NRR/oversight/assess/index.html www.NRC.GOV/NRR/oversight/assess/index.html click on plant name on left side of page, then on PI click on plant name on left side of page, then on PI
 
Unit 1 Unit 1 -- Inspection Results Inspection Results zz www.NRC.GOV/NRR/oversight/assess/index.html www.NRC.GOV/NRR/oversight/assess/index.html
--click on plant name on left side of page click on plant name on left side of page
 
Unit 2 Unit 2 -- Inspection Results Inspection Results zz www.NRC.GOV/NRR/oversight/assess/index.html www.NRC.GOV/NRR/oversight/assess/index.html
--click on plant name on left side of page click on plant name on left side of page
 
Susquehanna Susquehanna Annual Assessment Summary Annual Assessment Summary January 1 January 1 -- December 31, 2005 December 31, 2005 zz PPL operated Susquehanna Units 1 & 2 in a PPL operated Susquehanna Units 1 & 2 in a manner that protected public health and safety manner that protected public health and safety zz Licensee response column of the Action Matrix Licensee response column of the Action Matrix (All cornerstone objectives were fully met)
(All cornerstone objectives were fully met) zz NRC plans baseline inspections at Susquehanna NRC plans baseline inspections at Susquehanna for the remainder of the 2006 assessment period for the remainder of the 2006 assessment period
 
Licensee Response and Remarks Licensee Response and Remarks
 
Contacting the NRC Contacting the NRC zz Report an emergency Report an emergency
-- (301) 816 (301) 816--5100 (call collect) 5100 (call collect) zz Report a safety concern:
Report a safety concern:  
-- (800) 695 (800) 695--7403 7403
-- Allegation@nrc.gov Allegation@nrc.gov zz General information or questions General information or questions
-- www.nrc.gov www.nrc.gov
-- Select What We Do for Public Affairs Select What We Do for Public Affairs
 
Reference Sources Reference Sources zz Reactor Oversight Process Reactor Oversight Process
-- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html zz Public Electronic Reading Room Public Electronic Reading Room
-- http://www.nrc.gov/reading http://www.nrc.gov/reading--rm.html rm.html zz Public Document Room Public Document Room
-- 11--800 800--397 397--4209 (Toll Free) 4209 (Toll Free)}}

Latest revision as of 10:14, 15 January 2025

Public Meeting, Susquehanna, Slides on Reactor Oversight Program - Cy 2005
ML060960284
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/06/2006
From:
NRC Region 1
To:
References
Download: ML060960284 (24)


Text

Susquehanna Steam Electric Station Susquehanna Steam Electric Station Annual Assessment Meeting Annual Assessment Meeting Reactor Oversight Program Reactor Oversight Program -- CY 2005 CY 2005 Nuclear Regulatory Commission Nuclear Regulatory Commission -- Region I Region I King of Prussia, Pennsylvania King of Prussia, Pennsylvania April 12, 2006 April 12, 2006

Purpose of Todays Meeting Purpose of Todays Meeting zz A public forum for discussion of the licensees A public forum for discussion of the licensees performance performance zz NRC will address the licensee performance identified NRC will address the licensee performance identified during the assessment period during the assessment period zz PPL will respond to the information in the letter and PPL will respond to the information in the letter and inform the NRC of new or existing programs to inform the NRC of new or existing programs to maintain or improve their performance maintain or improve their performance

Agenda Agenda zz Introduction Introduction zz Review of Reactor Oversight Process Review of Reactor Oversight Process zz National Summary of Plant Performance National Summary of Plant Performance zz Discussion of Plant Performance Results Discussion of Plant Performance Results zz Licensee Response and Remarks Licensee Response and Remarks zz NRC Closing Remarks NRC Closing Remarks zz Break Break zz NRC available to address public questions NRC available to address public questions

NRC Representatives NRC Representatives zz James Trapp, Branch Chief James Trapp, Branch Chief

-- (610) 337 (610) 337--5186 5186 zz Alan Blamey, Senior Resident Inspector Alan Blamey, Senior Resident Inspector

-- (570) 542 (570) 542--2134 2134 zz Frederick Frederick Jaxheimer Jaxheimer, Resident Inspector

, Resident Inspector

-- (570) 542 (570) 542--2134 2134

Region I Organization Region I Organization Regional Specialists Marsha K. Gamberoni Deputy Director A. Randolph Blough Director Division of Reactor Safety Fred Bower Daniel Schroeder Peach Bottom Resident Inspectors Samuel Hansell Carey Bickett Limerick Resident Inspectors Alan Blamey Frederick Jaxheimer Susquehanna Resident Inspectors Cheryl Khan Thomas Setzer Project Engineers Branch Chief James M. Trapp David C. Lew Deputy Director Brian E. Holian Director Division of Reactor Projects Deputy Regional Administrator Samuel J. Collins Regional Administrator Marc L. Dapas

NRC Performance Goals NRC Performance Goals zz Safety Safety: Ensure protection of the public health and

Ensure protection of the public health and safety and the environment safety and the environment zz Security Security: Ensure the secure use and management of
Ensure the secure use and management of radioactive materials radioactive materials zz Openness Openness: Ensure openness in our regulatory process
Ensure openness in our regulatory process zz Effectiveness Effectiveness: Ensure that NRC actions are effective,
Ensure that NRC actions are effective, efficient, realistic, and timely efficient, realistic, and timely zz Management Management: Ensure excellence in agency
Ensure excellence in agency management to carry out the NRC strategic objective management to carry out the NRC strategic objective

Reactor Oversight Process Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas

Examples of Baseline Inspections Examples of Baseline Inspections zz Equipment Alignment Equipment Alignment

~80 hrs/yr

~80 hrs/yr zz Triennial Fire Protection Triennial Fire Protection

~200 hrs every 3 yrs

~200 hrs every 3 yrs zz Operator Response Operator Response

~125 hrs/yr

~125 hrs/yr zz Emergency Preparedness Emergency Preparedness

~80 hrs/yr

~80 hrs/yr zz Rad Release Controls Rad Release Controls

~110 hrs every 2 yrs

~110 hrs every 2 yrs zz Worker Radiation Protection Worker Radiation Protection ~90 hrs/yr

~90 hrs/yr zz Corrective Action Program Corrective Action Program

~250 hrs every 2 yrs

~250 hrs every 2 yrs zz Corrective Action Case Reviews ~60 hrs/yr Corrective Action Case Reviews ~60 hrs/yr

Significance Threshold Significance Threshold Performance Indicators Performance Indicators Green Green::

Baseline Inspection Baseline Inspection White White::

Increased NRC oversight Increased NRC oversight Yellow Yellow::

Requires more NRC oversight Requires more NRC oversight Red Red::

Requires more NRC oversight Requires more NRC oversight Inspection Findings Inspection Findings Green Green::

Very low safety issue Very low safety issue White White::

Low to moderate safety issue Low to moderate safety issue Yellow Yellow::

Substantial safety issue Substantial safety issue Red Red::

High safety issue High safety issue

Action Matrix Concept Action Matrix Concept Licensee

Response

Regulatory

Response

Degraded Cornerstone Multiple/Rep.

Degraded Cornerstone Unacceptable Performance Increasing Safety Significance Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions Increasing Regulatory Actions

National Summary of Plant Performance National Summary of Plant Performance Status at End of CY 2005 Status at End of CY 2005 Licensee Response Licensee Response 84 84 Regulatory Response Regulatory Response 12 12 Degraded Cornerstone Degraded Cornerstone 44 Multiple/Repetitive Degraded Cornerstone Multiple/Repetitive Degraded Cornerstone 33 Unacceptable Unacceptable 00 Total Total 103 103

National Summary National Summary zz Performance Indicator Results (at end of CY Performance Indicator Results (at end of CY 2005) 2005)

Green Green 1850 1850

White White 44

Yellow Yellow 00

Red Red 00 zz Total Inspection Findings (CY 2005)

Total Inspection Findings (CY 2005)

Green Green 849 849

White White 10 10

Yellow Yellow 11

Red Red 00

Susquehanna Inspection Activities Susquehanna Inspection Activities (Jan 1 (Jan 1 -- Dec 31, 2005)

Dec 31, 2005) zz 5267 hours0.061 days <br />1.463 hours <br />0.00871 weeks <br />0.002 months <br /> of inspection related activities 5267 hours0.061 days <br />1.463 hours <br />0.00871 weeks <br />0.002 months <br /> of inspection related activities zz 2 resident inspectors assigned to the site 2 resident inspectors assigned to the site zz ~15 regional inspector visits

~15 regional inspector visits

-- Included two team inspections (SSDI, Fire Included two team inspections (SSDI, Fire Protection Inspection)

Protection Inspection) zz Unit 2 refueling outage Unit 2 refueling outage

    • February February -- March 2005 March 2005

Susquehanna Unit 1 Assessment Results Susquehanna Unit 1 Assessment Results zz Operated safely throughout the Assessment Period Operated safely throughout the Assessment Period zz Licensee response column of the Action Matrix for Licensee response column of the Action Matrix for all of 2005 (cornerstone objectives fully met) all of 2005 (cornerstone objectives fully met) zz Inspection Findings Inspection Findings

-- 4 findings of very low safety significance (

4 findings of very low safety significance (Green Green))

-- All 4 findings were common to both units All 4 findings were common to both units zz NRC will conduct baseline inspections during the NRC will conduct baseline inspections during the remainder of the cycle remainder of the cycle (Jan 1 (Jan 1 -- Dec 31, 2005)

Dec 31, 2005)

Susquehanna Unit 2 Assessment Results Susquehanna Unit 2 Assessment Results zz Operated safely throughout the Assessment Period Operated safely throughout the Assessment Period zz Licensee response column of the Action Matrix for Licensee response column of the Action Matrix for all of 2005 (cornerstone objectives fully met) all of 2005 (cornerstone objectives fully met) zz Inspection Findings Inspection Findings

-- 7 findings of very low safety significance (

7 findings of very low safety significance (Green Green) )

-- 4 of the 7 findings were common to both units 4 of the 7 findings were common to both units

-- 4 human performance cross 4 human performance cross--cutting issues identified at end cutting issues identified at end of assessment period. However, there is no common of assessment period. However, there is no common subcategory and a substantive cross subcategory and a substantive cross--cutting issue was not cutting issue was not proposed.

proposed.

zz NRC will conduct baseline inspections during NRC will conduct baseline inspections during remainder of the cycle remainder of the cycle (Jan 1 (Jan 1 -- Dec 31, 2005)

Dec 31, 2005)

Unit 1 Unit 1 -- 4Q Performance Indicators 4Q Performance Indicators zz www.NRC.GOV/NRR/oversight/assess/index.html www.NRC.GOV/NRR/oversight/assess/index.html

-- click on plant name on left side of page click on plant name on left side of page

Unit 2 Unit 2 -- 4Q Performance Indicators 4Q Performance Indicators zz www.NRC.GOV/NRR/oversight/assess/index.html www.NRC.GOV/NRR/oversight/assess/index.html

-- click on plant name on left side of page click on plant name on left side of page

Performance Indicator (PI) Example Performance Indicator (PI) Example www.NRC.GOV/NRR/oversight/assess/index.html www.NRC.GOV/NRR/oversight/assess/index.html click on plant name on left side of page, then on PI click on plant name on left side of page, then on PI

Unit 1 Unit 1 -- Inspection Results Inspection Results zz www.NRC.GOV/NRR/oversight/assess/index.html www.NRC.GOV/NRR/oversight/assess/index.html

--click on plant name on left side of page click on plant name on left side of page

Unit 2 Unit 2 -- Inspection Results Inspection Results zz www.NRC.GOV/NRR/oversight/assess/index.html www.NRC.GOV/NRR/oversight/assess/index.html

--click on plant name on left side of page click on plant name on left side of page

Susquehanna Susquehanna Annual Assessment Summary Annual Assessment Summary January 1 January 1 -- December 31, 2005 December 31, 2005 zz PPL operated Susquehanna Units 1 & 2 in a PPL operated Susquehanna Units 1 & 2 in a manner that protected public health and safety manner that protected public health and safety zz Licensee response column of the Action Matrix Licensee response column of the Action Matrix (All cornerstone objectives were fully met)

(All cornerstone objectives were fully met) zz NRC plans baseline inspections at Susquehanna NRC plans baseline inspections at Susquehanna for the remainder of the 2006 assessment period for the remainder of the 2006 assessment period

Licensee Response and Remarks Licensee Response and Remarks

Contacting the NRC Contacting the NRC zz Report an emergency Report an emergency

-- (301) 816 (301) 816--5100 (call collect) 5100 (call collect) zz Report a safety concern:

Report a safety concern:

-- (800) 695 (800) 695--7403 7403

-- Allegation@nrc.gov Allegation@nrc.gov zz General information or questions General information or questions

-- www.nrc.gov www.nrc.gov

-- Select What We Do for Public Affairs Select What We Do for Public Affairs

Reference Sources Reference Sources zz Reactor Oversight Process Reactor Oversight Process

-- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html zz Public Electronic Reading Room Public Electronic Reading Room

-- http://www.nrc.gov/reading http://www.nrc.gov/reading--rm.html rm.html zz Public Document Room Public Document Room

-- 11--800 800--397 397--4209 (Toll Free) 4209 (Toll Free)