ML070590625: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 5: Line 5:
| author name = Haney C
| author name = Haney C
| author affiliation = NRC/NRR/ADRO/DORL
| author affiliation = NRC/NRR/ADRO/DORL
| addressee name = Hinnant C S
| addressee name = Hinnant C
| addressee affiliation = Progress Energy Co
| addressee affiliation = Progress Energy Co
| docket = 05000261, 05000302, 05000324, 05000325, 05000400
| docket = 05000261, 05000302, 05000324, 05000325, 05000400
| license number =  
| license number =  
| contact person = Dinh T Q, NRR/DRA, 415-2149
| contact person = Dinh T, NRR/DRA, 415-2149
| document type = Letter
| document type = Letter
| page count = 6
| page count = 6
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:April 29, 2007Mr. C. S. HinnantSenior Vice President and Chief Nuclear Officer Progress Energy P.O. Box 1551 Raleigh, NC 27602
{{#Wiki_filter:April 29, 2007 Mr. C. S. Hinnant Senior Vice President and Chief Nuclear Officer Progress Energy P.O. Box 1551 Raleigh, NC 27602


==SUBJECT:==
==SUBJECT:==
PERIOD OF ENFORCEMENT DISCRETION DURING IMPLEMENTATION OFNATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805, SHEARON HARRIS UNIT 1, H. B. ROBINSON UNIT 2, BRUNSWICK UNITS 1 AND 2, AND CRYSTAL RIVER UNIT 3
PERIOD OF ENFORCEMENT DISCRETION DURING IMPLEMENTATION OF NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805, SHEARON HARRIS UNIT 1, H. B. ROBINSON UNIT 2, BRUNSWICK UNITS 1 AND 2, AND CRYSTAL RIVER UNIT 3


==Dear Mr. Hinnant:==
==Dear Mr. Hinnant:==
In a {{letter dated|date=September 19, 2005|text=letter dated September 19, 2005}} (Agencywide Documents Access and Management System (ADAMS) Accession No. ML052140391), the U.S. Nuclear Regulatory Commission (NRC) acknowledged your letter of June 10, 2005 (ADAMS No. ML051720404), in which you stated that Progress Energy intends to adopt National Fire Protection Association (NFPA)
Standard 805, NFPA 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Electric Generating Plants, 2001 Edition, pursuant to Title 10 of the Code of Federal Regulations, Section 50.48(c), for Shearon Harris Unit 1, H. B. Robinson Unit 2, Brunswick Units 1 and 2, and Crystal River Unit 3 nuclear power plants.
In your letter, you requested enforcement discretion for a period of 3 years for existing identified incidents of noncompliances in accordance with the NRCs Interim Enforcement Policy for each of the above power plants. In our {{letter dated|date=September 19, 2005|text=September 19, 2005, letter}}, the NRC granted a 2-year enforcement discretion period for Shearon Harris. For the other sites, the 2-year discretion period for noncompliances identified during the transition will begin when the NRC receives the additional plant-specific letters of intent (LOI). However, we also noted that the NRC is considering your request for extended discretion and would contact you when we have reached a decision.
On the basis of a revision to the Enforcement Policy (71 FR 19905), I am now informing you that your request for a 3-year enforcement discretion period for Shearon Harris is granted.
Therefore, the discretion period for Shearon Harris, which began on June 10, 2005, will expire on June 10, 2008. For the other sites, the 3-year enforcement discretion period begins when the NRC receives the plant-specific LOI for transitioning to NFPA 805.
As you are aware, in order to receive enforcement discretion, you must: (a) evaluate the risk significance of all noncompliances to assure that they do not constitute Red (or a Severity Level I) findings under the reactor oversight program, (b) enter them into your corrective action program, and (c) implement and maintain appropriate compensatory measures until you


In a letter dated September 19, 2005 (Agencywide Documents Access and ManagementSystem (ADAMS) Accession No. ML052140391), the U.S. Nuclear Regulatory Commission (NRC) acknowledged your letter of June 10, 2005 (ADAMS No. ML051720404), in which youstated that Progress Energy intends to adopt National Fire Protection Association (NFPA)
C. Hinnant complete your corrective actions, or until the NRC staff approves your license amendment request and issues its safety evaluation. You should refer to NRC Regulatory Issue Summary 2005-07, Compensatory Measures to Satisfy the Fire Protection Program Requirements, for additional NRC staff guidance on appropriate compensatory measures.
Standard 805, "NFPA 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Electric Generating Plants," 2001 Edition, pursuant to Title 10 of the Code of FederalRegulations, Section 50.48(c), for Shearon Harris Unit 1, H. B. Robinson Unit 2, BrunswickUnits 1 and 2, and Crystal River Unit 3 nuclear power plants.In your letter, you requested enforcement discretion for a period of 3 years for existing identifiedincidents of noncompliances in accordance with the NRC's Interim Enforcement Policy for each of the above power plants. In our September 19, 2005, letter, the NRC granted a 2-year enforcement discretion period for Shearon Harris. For the other sites, the 2-year discretion period for noncompliances identified during the transition will begin when the NRC receives the additional plant-specific letters of intent (LOI). However, we also noted that the NRC is considering your request for extended discretion and would contact you when we have reached
If you have any questions regarding this matter, please contact Chandu Patel, Project Manager, at 301-415-3025 or CCP@nrc.gov.
Sincerely,
/RA/
Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-400, 50-261, 50-325, 50-324 and 50-302 cc: See Attached List


a decision.On the basis of a revision to the Enforcement Policy (71 FR 19905), I am now informing youthat your request for a 3-year enforcement discretion period for Shearon Harris is granted.
ML070590625 Office LPL2-2:PM LPL2-2:LA LPL2-2:BC DRA/FPB:BC DRIS/IRIB:BC Name CPatel BClayton SWeerakkody JIsom Date 03/14/07 03/14/07 03/14/07 03/16/07 03/19/07 Office OE R-II/DRS/EB2:BC NRR/DRA:D DORL:D Name DSolorio CPayne CHolden CHaney Date 03/23/07 03/19/07 03/29/07 04/29/07
Therefore, the discretion period for Shearon Harris, which began on June 10, 2005, will expire on June 10, 2008. For the other sites, the 3-year enforcement discretion period begins when the NRC receives the plant-specific LOI for transitioning to NFPA 805.As you are aware, in order to receive enforcement discretion, you must: (a) evaluate the risksignificance of all noncompliances to assure that they do not constitute "Red" (or a Severity Level I) findings under the reactor oversight program, (b) enter them into your corrective action program, and (c) implement and maintain appropriate compensatory measures until you C. Hinnant  complete your corrective actions, or until the NRC staff approves your license amendment request and issues its safety evaluation. You should refer to NRC Regulatory Issue Summary 2005-07, "Compensatory Measures to Satisfy the Fire Protection Program Requirements," for additional NRC staff guidance on appropriate compensatory measures.If you have any questions regarding this matter, please contact Chandu Patel, Project Manager,at 301-415-3025 or CCP@nrc.gov.Sincerely,/RA/   Catherine Haney, DirectorDivision of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos.: 50-400, 50-261, 50-325,          50-324 and 50-302cc: See Attached List


ML070590625OfficeLPL2-2:PMLPL2-2:LALPL2-2:BCDRA/FPB:BCDRIS/IRIB:BCNameCPatelBClaytonSWeerakkodyJIsom Date03/14/07 03/14/07    03/14/07    03/16/0703/19/07 OfficeOER-II/DRS/EB2:BCNRR/DRA:DDORL:D NameDSolorioCPayneCHoldenCHaney Date03/23/0703/19/0703/29/0704/29/07 Page 1 of 3Mr. C. S. HinnantCarolina Power & Light Company
Page 1 of 3 Mr. C. S. Hinnant Carolina Power & Light Company cc:
David T. Conley, Associate General Counsel II - Legal Department Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551 Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 U. S. Nuclear Regulatory Commission Resident Inspector's Office H. B. Robinson Steam Electric Plant 2112 Old Camden Road Hartsville, SC 29550 Mr. William G. Noll Director of Site Operations H. B. Robinson Steam Electric Plant Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Ms. Beverly Hall, Section Chief N. C. Department of Environment and Natural Resources Division of Radiation Protection 3825 Barrett Dr.
Raleigh, North Carolina 27609-7721 Mr. Robert P. Gruber, Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, North Carolina 27699-4326 Resident Inspector U. S. Nuclear Regulatory Commission Brunswick Steam Electric Plant 8470 River Road Southport, North Carolina 28461 Mr. John H. ONeill, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW.
Washington, DC 20037-1128 Mr. Thomas D. Walt, Vice President H. B. Robinson Steam Electric Plant Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Mr. Henry H. Porter, Assistant Director Division of Radioactive Waste Management South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29201 Mr. J. Paul Fulford, Manager Performance Evaluation and Regulatory Affairs, PEB 7 Progress Energy Post Office Box 1551 Raleigh, North Carolina 27602-1551 Resident Inspector/Harris NPS U.S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, North Carolina 27562-9998 Mr. Robert J. Duncan II, Vice President Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165 New Hill, North Carolina 27562-0165 Mr. James Scarola, Vice President Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461-0429 Mr. David R. Sandifer, Chairperson Brunswick County Board of Commissioners Post Office Box 249 Bolivia, North Carolina 28422 Mr. Chris L. Burton, Director Site Operations Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165


cc:David T. Conley, Associate General Counsel II - Legal Department Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina  27602-1551Ms. Margaret A. ForceAssistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina  27602U. S. Nuclear Regulatory CommissionResident Inspector's Office H. B. Robinson Steam Electric Plant 2112 Old Camden Road Hartsville, SC 29550Mr. William G. NollDirector of Site Operations H. B. Robinson Steam Electric Plant Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina  29550Ms. Beverly Hall, Section ChiefN. C. Department of Environment and Natural Resources Division of Radiation Protection 3825 Barrett Dr.
Page 2 of 3 Mr. C. S. Hinnant Carolina Power & Light Company cc:
Raleigh, North Carolina  27609-7721Mr. Robert P. Gruber, Executive DirectorPublic Staff - NCUC 4326 Mail Service Center Raleigh, North Carolina  27699-4326Resident InspectorU. S. Nuclear Regulatory Commission Brunswick Steam Electric Plant 8470 River Road Southport, North Carolina  28461Mr. John H. O'Neill, Jr.Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW.
Director, Site Operations Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461-0429 Mr. Ben Waldrep Plant General Manager Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461-0429 Mr. Norman R. Holden, Mayor City of Southport 201 East Moore Street Southport, North Carolina 28461 Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, South Carolina 29211 Mr. Warren Lee Emergency Management Director New Hanover County Department of Emergency Management Post Office Box 1525 Wilmington, North Carolina 28402-1525 Chairman of the North Carolina Utilities Commission Post Office Box 29510 Raleigh, North Carolina 27626-0510 Mr. C. T. Baucom Supervisor, Licensing/Regulatory Programs H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Mr. Herb Council, Chair Board of County Commissioners of Wake County P.O. Box 550 Raleigh, North Carolina 27602 Mr. Randy C. Ivey, Manager Support Services Brunswick Steam Electric Plant Carolina Power & Light Company P.O. Box 10429 Southport, North Carolina 28461 J. F. Lucas, Manager Support Services - Nuclear H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Mr. Thomas J. Natale, Manager Support Services Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 Mr. David H. Corlett, Supervisor Licensing/Regulatory Programs Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 Mr. Ernest J. Kapopoulos, Jr.
Washington, DC  20037-1128Mr. Thomas D. Walt, Vice PresidentH. B. Robinson Steam Electric Plant Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina  29550Mr. Henry H. Porter, Assistant Director Division of Radioactive Waste Management South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina  29201Mr. J. Paul Fulford, Manager Performance Evaluation and Regulatory Affairs, PEB 7 Progress Energy Post Office Box 1551 Raleigh, North Carolina  27602-1551Resident Inspector/Harris NPSU.S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, North Carolina  27562-9998Mr. Robert J. Duncan II, Vice PresidentShearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165 New Hill, North Carolina  27562-0165Mr. James Scarola, Vice President Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina  28461-0429Mr. David R. Sandifer, ChairpersonBrunswick County Board of Commissioners Post Office Box 249 Bolivia, North Carolina  28422Mr. Chris L. Burton, Director  Site Operations Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Zone 1 New Hill, North Carolina  27562-0165 Page 2 of 3Mr. C. S. HinnantCarolina Power & Light Company
Plant General Manager H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Mr. Tommy Emerson, Chair Board of County Commissioners of Chatham County Post Office Box 87 Pittsboro, North Carolina 27312 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)
 
cc:Director, Site Operations Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461-0429Mr. Ben WaldrepPlant General Manager Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461-0429Mr. Norman R. Holden, MayorCity of Southport 201 East Moore Street Southport, North Carolina 28461Public Service CommissionState of South Carolina Post Office Drawer 11649 Columbia, South Carolina 29211Mr. Warren LeeEmergency Management Director New Hanover County Department of Emergency Management Post Office Box 1525 Wilmington, North Carolina 28402-1525Chairman of the North Carolina   Utilities Commission Post Office Box 29510 Raleigh, North Carolina 27626-0510Mr. C. T. BaucomSupervisor, Licensing/Regulatory Programs H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550Mr. Herb Council, ChairBoard of County Commissioners of Wake County P.O. Box 550 Raleigh, North Carolina 27602Mr. Randy C. Ivey, Manager   Support Services Brunswick Steam Electric Plant Carolina Power & Light Company P.O. Box 10429 Southport, North Carolina 28461J. F. Lucas, Manager   Support Services - Nuclear H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550Mr. Thomas J. Natale, Manager   Support Services Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165Mr. David H. Corlett, SupervisorLicensing/Regulatory Programs Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165Mr. Ernest J. Kapopoulos, Jr.Plant General Manager H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550Mr. Tommy Emerson, ChairBoard of County Commissioners of Chatham County Post Office Box 87 Pittsboro, North Carolina 27312Mr. Dale E. Young, Vice PresidentCrystal River Nuclear Plant (NA1B)
ATTN: Supervisor, Licensing  
ATTN: Supervisor, Licensing  
    & Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708 Page 3 of 3Mr. C. S. HinnantCarolina Power & Light Company
& Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708


cc:Mr. R. Alexander Glenn Associate General Counsel (MAC-BT15A)
Page 3 of 3 Mr. C. S. Hinnant Carolina Power & Light Company cc:
Florida Power Corporation P.O. Box 14042 St. Petersburg, Florida 33733-4042Mr. Jon A. FrankePlant General Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708Mr. Jim MallayFramatome ANP 1911 North Ft. Myer Drive, Suite 705 Rosslyn, Virginia 22209Mr. William A. Passetti, ChiefDepartment of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Attorney GeneralDepartment of Legal Affairs The Capitol Tallahassee, Florida 32304Mr. Craig Fugate, Director         Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100Chairman        Board of County Commissioners Citrus County 110 North Apopka Avenue Inverness, Florida 34450-4245   Mr. Michael J. AnnaconeEngineering Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708Mr. Daniel L. RoderickDirector Site Operations Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708Senior Resident InspectorCrystal River Unit 3 U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road Crystal River, Florida 34428Mr. Terry D. HobbsManager, Nuclear Assessment Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708}}
Mr. R. Alexander Glenn Associate General Counsel (MAC-BT15A)
Florida Power Corporation P.O. Box 14042 St. Petersburg, Florida 33733-4042 Mr. Jon A. Franke Plant General Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Jim Mallay Framatome ANP 1911 North Ft. Myer Drive, Suite 705 Rosslyn, Virginia 22209 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue Inverness, Florida 34450-4245 Mr. Michael J. Annacone Engineering Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Daniel L. Roderick Director Site Operations Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Senior Resident Inspector Crystal River Unit 3 U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road Crystal River, Florida 34428 Mr. Terry D. Hobbs Manager, Nuclear Assessment Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708}}

Latest revision as of 03:04, 15 January 2025

Period of Enforcement Discretion During Implementation of National Fire Protection Association Standard 805, Shearon Harris Unit 1, H. B. Robinson Unit 2, Brunswick Units 1 and 2, and Crystal River Unit 3
ML070590625
Person / Time
Site: Harris, Brunswick, Crystal River, Robinson  Duke Energy icon.png
Issue date: 04/29/2007
From: Catherine Haney
Plant Licensing Branch III-2
To: Hinnant C
Progress Energy Co
Dinh T, NRR/DRA, 415-2149
References
Download: ML070590625 (6)


Text

April 29, 2007 Mr. C. S. Hinnant Senior Vice President and Chief Nuclear Officer Progress Energy P.O. Box 1551 Raleigh, NC 27602

SUBJECT:

PERIOD OF ENFORCEMENT DISCRETION DURING IMPLEMENTATION OF NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805, SHEARON HARRIS UNIT 1, H. B. ROBINSON UNIT 2, BRUNSWICK UNITS 1 AND 2, AND CRYSTAL RIVER UNIT 3

Dear Mr. Hinnant:

In a letter dated September 19, 2005 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML052140391), the U.S. Nuclear Regulatory Commission (NRC) acknowledged your letter of June 10, 2005 (ADAMS No. ML051720404), in which you stated that Progress Energy intends to adopt National Fire Protection Association (NFPA)

Standard 805, NFPA 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Electric Generating Plants, 2001 Edition, pursuant to Title 10 of the Code of Federal Regulations, Section 50.48(c), for Shearon Harris Unit 1, H. B. Robinson Unit 2, Brunswick Units 1 and 2, and Crystal River Unit 3 nuclear power plants.

In your letter, you requested enforcement discretion for a period of 3 years for existing identified incidents of noncompliances in accordance with the NRCs Interim Enforcement Policy for each of the above power plants. In our September 19, 2005, letter, the NRC granted a 2-year enforcement discretion period for Shearon Harris. For the other sites, the 2-year discretion period for noncompliances identified during the transition will begin when the NRC receives the additional plant-specific letters of intent (LOI). However, we also noted that the NRC is considering your request for extended discretion and would contact you when we have reached a decision.

On the basis of a revision to the Enforcement Policy (71 FR 19905), I am now informing you that your request for a 3-year enforcement discretion period for Shearon Harris is granted.

Therefore, the discretion period for Shearon Harris, which began on June 10, 2005, will expire on June 10, 2008. For the other sites, the 3-year enforcement discretion period begins when the NRC receives the plant-specific LOI for transitioning to NFPA 805.

As you are aware, in order to receive enforcement discretion, you must: (a) evaluate the risk significance of all noncompliances to assure that they do not constitute Red (or a Severity Level I) findings under the reactor oversight program, (b) enter them into your corrective action program, and (c) implement and maintain appropriate compensatory measures until you

C. Hinnant complete your corrective actions, or until the NRC staff approves your license amendment request and issues its safety evaluation. You should refer to NRC Regulatory Issue Summary 2005-07, Compensatory Measures to Satisfy the Fire Protection Program Requirements, for additional NRC staff guidance on appropriate compensatory measures.

If you have any questions regarding this matter, please contact Chandu Patel, Project Manager, at 301-415-3025 or CCP@nrc.gov.

Sincerely,

/RA/

Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-400, 50-261, 50-325, 50-324 and 50-302 cc: See Attached List

ML070590625 Office LPL2-2:PM LPL2-2:LA LPL2-2:BC DRA/FPB:BC DRIS/IRIB:BC Name CPatel BClayton SWeerakkody JIsom Date 03/14/07 03/14/07 03/14/07 03/16/07 03/19/07 Office OE R-II/DRS/EB2:BC NRR/DRA:D DORL:D Name DSolorio CPayne CHolden CHaney Date 03/23/07 03/19/07 03/29/07 04/29/07

Page 1 of 3 Mr. C. S. Hinnant Carolina Power & Light Company cc:

David T. Conley, Associate General Counsel II - Legal Department Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551 Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 U. S. Nuclear Regulatory Commission Resident Inspector's Office H. B. Robinson Steam Electric Plant 2112 Old Camden Road Hartsville, SC 29550 Mr. William G. Noll Director of Site Operations H. B. Robinson Steam Electric Plant Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Ms. Beverly Hall, Section Chief N. C. Department of Environment and Natural Resources Division of Radiation Protection 3825 Barrett Dr.

Raleigh, North Carolina 27609-7721 Mr. Robert P. Gruber, Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, North Carolina 27699-4326 Resident Inspector U. S. Nuclear Regulatory Commission Brunswick Steam Electric Plant 8470 River Road Southport, North Carolina 28461 Mr. John H. ONeill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW.

Washington, DC 20037-1128 Mr. Thomas D. Walt, Vice President H. B. Robinson Steam Electric Plant Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Mr. Henry H. Porter, Assistant Director Division of Radioactive Waste Management South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29201 Mr. J. Paul Fulford, Manager Performance Evaluation and Regulatory Affairs, PEB 7 Progress Energy Post Office Box 1551 Raleigh, North Carolina 27602-1551 Resident Inspector/Harris NPS U.S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, North Carolina 27562-9998 Mr. Robert J. Duncan II, Vice President Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165 New Hill, North Carolina 27562-0165 Mr. James Scarola, Vice President Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461-0429 Mr. David R. Sandifer, Chairperson Brunswick County Board of Commissioners Post Office Box 249 Bolivia, North Carolina 28422 Mr. Chris L. Burton, Director Site Operations Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165

Page 2 of 3 Mr. C. S. Hinnant Carolina Power & Light Company cc:

Director, Site Operations Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461-0429 Mr. Ben Waldrep Plant General Manager Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461-0429 Mr. Norman R. Holden, Mayor City of Southport 201 East Moore Street Southport, North Carolina 28461 Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, South Carolina 29211 Mr. Warren Lee Emergency Management Director New Hanover County Department of Emergency Management Post Office Box 1525 Wilmington, North Carolina 28402-1525 Chairman of the North Carolina Utilities Commission Post Office Box 29510 Raleigh, North Carolina 27626-0510 Mr. C. T. Baucom Supervisor, Licensing/Regulatory Programs H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Mr. Herb Council, Chair Board of County Commissioners of Wake County P.O. Box 550 Raleigh, North Carolina 27602 Mr. Randy C. Ivey, Manager Support Services Brunswick Steam Electric Plant Carolina Power & Light Company P.O. Box 10429 Southport, North Carolina 28461 J. F. Lucas, Manager Support Services - Nuclear H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Mr. Thomas J. Natale, Manager Support Services Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 Mr. David H. Corlett, Supervisor Licensing/Regulatory Programs Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 Mr. Ernest J. Kapopoulos, Jr.

Plant General Manager H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Mr. Tommy Emerson, Chair Board of County Commissioners of Chatham County Post Office Box 87 Pittsboro, North Carolina 27312 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)

ATTN: Supervisor, Licensing

& Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708

Page 3 of 3 Mr. C. S. Hinnant Carolina Power & Light Company cc:

Mr. R. Alexander Glenn Associate General Counsel (MAC-BT15A)

Florida Power Corporation P.O. Box 14042 St. Petersburg, Florida 33733-4042 Mr. Jon A. Franke Plant General Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Jim Mallay Framatome ANP 1911 North Ft. Myer Drive, Suite 705 Rosslyn, Virginia 22209 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue Inverness, Florida 34450-4245 Mr. Michael J. Annacone Engineering Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Daniel L. Roderick Director Site Operations Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Senior Resident Inspector Crystal River Unit 3 U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road Crystal River, Florida 34428 Mr. Terry D. Hobbs Manager, Nuclear Assessment Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708