ML073390630: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML073390630 | | number = ML073390630 | ||
| issue date = 12/05/2007 | | issue date = 12/05/2007 | ||
| title = | | title = Notice of Withdrawal of Andrea Silvia and Hearing File Update Supplement 17 | ||
| author name = Sexton K | | author name = Sexton K, Silvia A | ||
| author affiliation = NRC/OGC | | author affiliation = NRC/OGC | ||
| addressee name = Abramson P | | addressee name = Abramson P, Cole R, Young M | ||
| addressee affiliation = NRC/ASLBP | | addressee affiliation = NRC/ASLBP | ||
| docket = 05000293 | | docket = 05000293 | ||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:December 5, | {{#Wiki_filter:December 5, 2007 Administrative Judge Administrative Judge Richard F. Cole Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. | ||
(Pilgrim Nuclear Power Station) | |||
Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board | |||
Atomic Safety and Licensing Board Panel | |||
Mail Stop: T-3 F23 | |||
U.S. Nuclear Regulatory Commission | |||
Washington, DC 20555-0001 In the Matter of Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.(Pilgrim Nuclear Power Station) | |||
Docket No. 50-293-LR; ASLBP No. 06-848-02-LR | Docket No. 50-293-LR; ASLBP No. 06-848-02-LR | ||
==Dear Administrative Judges:== | ==Dear Administrative Judges:== | ||
The NRC Staff hereby provides its notice that it has updated the hearing file for this proceeding pursuant to 10 C.F.R. § 2.336(d) as modified by the Board's Order Regarding Schedule for Proceeding and Related Matters (November 29, 2006). An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1. The Staff has no updates to its privilege log required by 10 C.F.R. § 2.336(b)(5) at this time; however, the Staff is continuing to preserve and maintain all privileged documents during the pendency of this proceeding. Also attached | |||
R. Cole P. Abramson A. Young are the Affidavit of Perry Buckberg, as required by 10 C.F.R. § 2.336(c). | |||
Sincerely, | |||
/RA/ | |||
Kimberly A. Sexton Counsel for the NRC Staff | |||
==Enclosures:== | |||
Hearing File Index Affidavit of Perry Buckberg cc: | |||
Attached Service List | |||
ATTACHMENT 1: | |||
PILGRIM LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplement 17-December 5, 2007 Accession Number Document Date Title/Description: | |||
17-01 ML073241016 11/30/2007 NUREG-1891, Safety Evaluation Report Related to the License Renewal of Pilgrim Nuclear Power Station. | |||
December 5, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of | |||
) | |||
) | |||
ENTERGY NUCLEAR GENERATION | |||
) | |||
Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR | |||
) | |||
OPERATIONS, INC. | |||
December 5, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING | ) | ||
)ENTERGY NUCLEAR GENERATION )Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR) | ASLBP No. 06-848-02-LR | ||
OPERATIONS, INC.)ASLBP No. 06-848-02-LR | ) | ||
)(Pilgrim Nuclear Power Station)) | (Pilgrim Nuclear Power Station) | ||
) | |||
AFFIDAVIT OF PERRY BUCKBERG CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(c) | AFFIDAVIT OF PERRY BUCKBERG CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(c) | ||
I, Perry Buckberg, do hereby state as follows:1.I am employed as a Project Manager in the Division of License Renewal in | I, Perry Buckberg, do hereby state as follows: | ||
1. | |||
project manager for the Pilgrim Nuclear Power | I am employed as a Project Manager in the Division of License Renewal in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I serve as a project manager for the Pilgrim Nuclear Power Stations license renewal application (LRA). | ||
2. | |||
I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of the date of this certification. | |||
3. | |||
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief. | |||
/Original Signed By/ | |||
Perry Buckberg Executed in Rockville, MD this 5th day of December, 2007 | |||
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of | |||
) | |||
) | |||
)ENTERGY NUCLEAR OPERATIONS, INC. | ENTERGY NUCLEAR OPERATIONS, INC. ) | ||
Docket No. 50-293-LR | |||
(Pilgrim Nuclear Power Station) )ASLBP No. 06-848-02-LR | ) | ||
) | (Pilgrim Nuclear Power Station) | ||
) | |||
ASLBP No. 06-848-02-LR | |||
) | |||
CERTIFICATE OF SERVICE I hereby certify that copies of the NOTICE OF WITHDRAWAL and letter notifying the administrative judges and the parties that the hearing file and affidavit in the above-captioned proceeding have been served on the following by electronic mail and deposit in the U.S. Mail Service or by deposit in the U.S. Nuclear Regulatory Commissions internal mail system as indicated by a single asterisk(*), or by deposit in the U.S. mail system, as indicated by a double asterisk (**) this 5th day of December, 2007. | |||
Administrative Judge* | Administrative Judge* | ||
Richard F. Cole | Richard F. Cole Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: rfc1@nrc.gov Administrative Judge* | ||
Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: amy@nrc.gov Sheila Slocum Hollis** | |||
Duane Morris LLP 1667 K Street, NW, Suite 700 Washington, DC 20006 E-mail: sshollis@duanemorris.com Administrative Judge* | |||
Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: pba@nrc.gov Office of Commission Appellate | |||
* Adjudication Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: OCAAMail@nrc.gov Office of the Secretary* | |||
Attn: Rulemaking and Adjudications Staff Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: hearingdocket@nrc.gov | |||
Atomic Safety and Licensing Board* | |||
Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Mary Lampert** | |||
Pilgrim Watch 148 Washington Street Duxbury, MA 02332 E-mail: mary.lampert@comcast.net Chief Kevin M. Nord** | |||
Fire Chief & Director Duxbury Emergency Management Agency 668 Tremont Street Duxbury, MA 02332 E-mail: nord@town.duxbury.ma.us Fax: 781-934-6530 Terence A. Burke, Esq.** | |||
Entergy Nuclear 1340 Echelon Parkway Mail Stop: M-ECH-62 Jackson, MS 39213 David R. Lewis, Esq.** | |||
Mail Stop: T-3 F23 | |||
U.S. Nuclear Regulatory Commission | |||
Washington, DC 20555-0001 Mary Lampert** | |||
Pilgrim Watch | |||
148 Washington Street | |||
Duxbury, MA 02332 | |||
E-mail: mary.lampert@comcast.net Chief Kevin M. Nord** | |||
Fire Chief & Director Duxbury Emergency | |||
Management Agency | |||
668 Tremont Street | |||
Duxbury, MA 02332 | |||
E-mail: nord@town.duxbury.ma.us Fax: 781-934-6530 Terence A. Burke, Esq.** | |||
Entergy Nuclear | |||
1340 Echelon Parkway | |||
Mail Stop: M-ECH-62 | |||
Jackson, MS 39213 David R. Lewis, Esq.** | |||
Paul A. Gaukler, Esq. | Paul A. Gaukler, Esq. | ||
Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N Street, NW Washington, DC 20037-1137 E-mail: david.lewis@pillsburylaw.com paul.gaukler@pillsburylaw.com Town Manager** | |||
Town of Plymouth 11 Lincoln St. | |||
Plymouth, MA 02360 E-mail: msylvia@townhall.plymouth.ma.us | |||
/RA/ | |||
Kimberly A. Sexton Counsel for the NRC Staff | |||
December 5, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of | |||
) | |||
) | |||
ENTERGY NUCLEAR OPERATIONS, INC. | |||
) | |||
Docket No. 50-293-LR | |||
) | |||
(Pilgrim Nuclear Power Station) | |||
) | |||
NOTICE OF WITHDRAWAL Notice is hereby given that, effective December 5, 2007, the undersigned counsel withdraws her appearance in the captioned proceeding. All mail and service lists in this proceeding should be amended appropriately. | |||
Respectfully submitted, | |||
/RA/ | /RA/ | ||
Andrea L. Silvia Counsel for the NRC Staff Dated at Rockville, Maryland this 5th day of December, 2007}} | |||
Dated at Rockville, Maryland this | |||
Latest revision as of 19:41, 14 January 2025
| ML073390630 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 12/05/2007 |
| From: | Sexton K, Andrea Silvia NRC/OGC |
| To: | Abramson P, Cole R, Matt Young Atomic Safety and Licensing Board Panel |
| SECY RAS | |
| References | |
| 50-293-LR, ASLBP 06-848-02-LR, RAS 14747 | |
| Download: ML073390630 (7) | |
Text
December 5, 2007 Administrative Judge Administrative Judge Richard F. Cole Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.
(Pilgrim Nuclear Power Station)
Docket No. 50-293-LR; ASLBP No. 06-848-02-LR
Dear Administrative Judges:
The NRC Staff hereby provides its notice that it has updated the hearing file for this proceeding pursuant to 10 C.F.R. § 2.336(d) as modified by the Board's Order Regarding Schedule for Proceeding and Related Matters (November 29, 2006). An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1. The Staff has no updates to its privilege log required by 10 C.F.R. § 2.336(b)(5) at this time; however, the Staff is continuing to preserve and maintain all privileged documents during the pendency of this proceeding. Also attached
R. Cole P. Abramson A. Young are the Affidavit of Perry Buckberg, as required by 10 C.F.R. § 2.336(c).
Sincerely,
/RA/
Kimberly A. Sexton Counsel for the NRC Staff
Enclosures:
Hearing File Index Affidavit of Perry Buckberg cc:
Attached Service List
ATTACHMENT 1:
PILGRIM LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplement 17-December 5, 2007 Accession Number Document Date Title/Description:
17-01 ML073241016 11/30/2007 NUREG-1891, Safety Evaluation Report Related to the License Renewal of Pilgrim Nuclear Power Station.
December 5, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
ENTERGY NUCLEAR GENERATION
)
Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR
)
OPERATIONS, INC.
)
ASLBP No. 06-848-02-LR
)
(Pilgrim Nuclear Power Station)
)
AFFIDAVIT OF PERRY BUCKBERG CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(c)
I, Perry Buckberg, do hereby state as follows:
1.
I am employed as a Project Manager in the Division of License Renewal in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I serve as a project manager for the Pilgrim Nuclear Power Stations license renewal application (LRA).
2.
I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of the date of this certification.
3.
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
/Original Signed By/
Perry Buckberg Executed in Rockville, MD this 5th day of December, 2007
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
ENTERGY NUCLEAR OPERATIONS, INC. )
Docket No. 50-293-LR
)
(Pilgrim Nuclear Power Station)
)
ASLBP No. 06-848-02-LR
)
CERTIFICATE OF SERVICE I hereby certify that copies of the NOTICE OF WITHDRAWAL and letter notifying the administrative judges and the parties that the hearing file and affidavit in the above-captioned proceeding have been served on the following by electronic mail and deposit in the U.S. Mail Service or by deposit in the U.S. Nuclear Regulatory Commissions internal mail system as indicated by a single asterisk(*), or by deposit in the U.S. mail system, as indicated by a double asterisk (**) this 5th day of December, 2007.
Administrative Judge*
Richard F. Cole Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: rfc1@nrc.gov Administrative Judge*
Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: amy@nrc.gov Sheila Slocum Hollis**
Duane Morris LLP 1667 K Street, NW, Suite 700 Washington, DC 20006 E-mail: sshollis@duanemorris.com Administrative Judge*
Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: pba@nrc.gov Office of Commission Appellate
- Adjudication Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: OCAAMail@nrc.gov Office of the Secretary*
Attn: Rulemaking and Adjudications Staff Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: hearingdocket@nrc.gov
Atomic Safety and Licensing Board*
Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Mary Lampert**
Pilgrim Watch 148 Washington Street Duxbury, MA 02332 E-mail: mary.lampert@comcast.net Chief Kevin M. Nord**
Fire Chief & Director Duxbury Emergency Management Agency 668 Tremont Street Duxbury, MA 02332 E-mail: nord@town.duxbury.ma.us Fax: 781-934-6530 Terence A. Burke, Esq.**
Entergy Nuclear 1340 Echelon Parkway Mail Stop: M-ECH-62 Jackson, MS 39213 David R. Lewis, Esq.**
Paul A. Gaukler, Esq.
Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N Street, NW Washington, DC 20037-1137 E-mail: david.lewis@pillsburylaw.com paul.gaukler@pillsburylaw.com Town Manager**
Town of Plymouth 11 Lincoln St.
Plymouth, MA 02360 E-mail: msylvia@townhall.plymouth.ma.us
/RA/
Kimberly A. Sexton Counsel for the NRC Staff
December 5, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
ENTERGY NUCLEAR OPERATIONS, INC.
)
Docket No. 50-293-LR
)
(Pilgrim Nuclear Power Station)
)
NOTICE OF WITHDRAWAL Notice is hereby given that, effective December 5, 2007, the undersigned counsel withdraws her appearance in the captioned proceeding. All mail and service lists in this proceeding should be amended appropriately.
Respectfully submitted,
/RA/
Andrea L. Silvia Counsel for the NRC Staff Dated at Rockville, Maryland this 5th day of December, 2007