Line 2: Line 2:
| number = ML18018B053
| number = ML18018B053
| issue date = 10/15/1999
| issue date = 10/15/1999
| title = Nine Mile Point Unit 1 - Third Inservice Inspection Interval - Ten-Year Inservice Inspection Plan and Schedule
| title = Third Inservice Inspection Interval - Ten-Year Inservice Inspection Plan and Schedule
| author name =  
| author name =  
| author affiliation = Niagara Mohawk Power Corp
| author affiliation = Niagara Mohawk Power Corp
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:V NIAGARA U MOHAWK Niagara Mohawk Power Corporation 300 Erie Boulevard West Syracuse, New York 13202 Nine Mile Point Nuclear Power Station THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Prepared For Nine Mile Point Nuclear Power Station P.O.Box 63 Lycoming, New York 13093 Commercial Service Date: NRC Docket Number: Document Number: Revision Number: 0 December 26, 1969 50-220 NMP1-ISI-003-1 0 Date: October 15, 1999 Prepared by: NMP1-ISI Program Manager Approved by':/O l~Approved by: Glenn R.erkins-Supervisor ASME Sectio XI Programs r/WIJ iam Yae er-Bra ch Manager, Engineerin Services OCR<<~woigl~g Ilgwu'is 5<iHi)i~Z I
{{#Wiki_filter:}}
N Y NIAGARA 4 MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 Table of Contents Record of Revision.Abstract.TABLE OF CONTENTS 1.0 Introduction
.1.1 Inspection Interval 1.2 Inspection Periods.1.3 Applicable Documents 1.4 Applicable Code Edition and Addenda 7..7..7..7 102.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 Class 1 Systems/Components Class 2 Systems/Components
.Class 3 Systems/Components
.Class 1, 2, 3 Component Supports Substitute Examinations Nondestructive Examinations Weld/Support Location Maps Ultrasonic Calibration Blocks..Weld Identification
 
==2.0 Development==
of Inspection Plan......~.......~...........
12 12 12 12 12 12 13 13 13 3..0 Records~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~1 6 3.1 3.2 3.3 General 3.1.1 Scheduled Examination Tables........
 
====3.1.1 Inspection====
Zones.3.1.3 Code Item Classification 3.1.4 Inspection/Examination Table Contents..Final Reports ISI Summary Report.16 16 16 16 16 17 17 File: NMP1ISIPL.wpd 0
hl V NIAGARA H U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 TABLE OF CONTENTS-Continued 4.0 Class 1 Tables.~..~19 00.0 01.0 31.0 32.0 33.0 36.0 37.0 38.0 39.0 40.0 42.1 44.1 Reactor Pressure Vessel Main Steam.Feedwater System.Reactor Recirculation System..Reactor Clean Up Reactor Instrumentation Reactor Drain 8 Vent..Reactor Shutdown Cooling Emergency Condenser System Reactor Core Spray System.Liquid Poison System Control Rod Drive System...........
1thru 83..........
84thru90........91 thru 97.98thru130.......131 thru 135.......136 thru 137........138 thru 143........144 thru 147........148 thru156.......157thru171
.....~..172 thru 173........174 thru 177 5.0 Class 2 Tables~..~~~~~~~~~~~~~20 02.0 Main Steam System.03.0 Main Steam System.39.0 Emergency Condenser System.44.2 Control Rod Drive System..80.0 Reactor Containment Spray System.81.0 Reactor Core Spray System 93.0 Reactor Containment Spray System.6.0 Class 3 Tables......177thru179
.....180 thru 181......182 thru 196......197 thru 198......199 thru 210 211 thru 222 223 thru 225 21 38.0 Shutdown Cooling Water System 39.0 Emergency Condenser System.54.0 Spent Fuel Pool Cooling System 57.0 Spent Fuel Pool Cooling System 70.0'eactor Building Closed Loop Cooling System 72.0 Emergency Service Water System 93.0 Reactor Containment Spray System APPENDICES 226 thru 226 227 thru 223 228 thru 235 236 thru 236 237 thru 242 243 thru 244 245 thru 248 A B C D E Acceptance Criteria Nondestructive Examination Procedure Listing Ultrasonic Calibration Blocks Class 1, 2, and 3 Weld/Support Location Maps ASME Code Cases..22 24 26 33 38 File: NMP1ISIPL.wpd 0
El 1 N1AGARA H U MOHAWK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-10 Rev.0 Date: October 15, 1999 TABLE OF CONTENTS-Continued LIST OF FIGURES 2-1 Tee Weld ID 2-2 Elbow weld ID 2-3 Reducer weld ID 3-1 Inservice Inspection Schedule.LIST OF TABLES 14 14 15 18 1-2 A-1 A-2 A-3 A-4 NMP1 Inservice Inspection Periods Class 1 Acceptance Standards Class 2 Acceptance Standards............
Class 3 Acceptance Standards Component Support Acceptance Standards.7 22....23 23 23 File: NMP1ISIPL.wpd I
N V NIAGARA 4 MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 REVISION No.DATE RECORD OF REVISION',":;,'FFECTED'PAGES 0 October 15, 1999 Entire Document Ten-Year Inservice Inspection Plan and Schedule for the 3" Ten Year Inservice Inspection Interval e File: NMP1ISIPL.wpd
 
N Y NIAGARA Lf MOHAWK NINE MILE POINT NUCLEAR POWER STATION N MP1-ISI-003-10 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 ABSTRACT This document provides the Third Interval Ten-Year Inservice Inspection Plan and Schedule for Nine Mile Point Nuclear Power Station, Unit 1.The Schedule identifies those components and/or systems (including supports)which are classified Quality Group A, B and C (ASME Code Class 1, 2, and 3, and have been selected for nondestructive examination, as set forth in the ASME Boiler and Pressure Vessel Code, Section XI, 1989 Edition, no Addenda, to the extent practical within the limitations of design, geometry and materials of construction of the components as stated in 10 CFR 50.55a (b)(2).Where an examination required by Section XI is determined to be impractical, the basis for this determination is included in the Nine Mile Point Insetvice Inspection Program, in the form of a Request for Relief.Tables for each system subject to examination are included within this document, and provides Code classification, Code examination category, Code item number, component identification and description, examination method, and where within the Third Ten-Year Inspection Interval and period the component is scheduled to be performed.
File: NMP1ISIPL.wpd
 
El Y NlAGARA H U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-10 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN>>YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999
 
==1.0 INTRODUCTION==
 
This document details the Third Interval, Ten-Year Inservice Inspection Plan and schedule for selected components, welds, supports, bolting, pump casings, valve bodies, and reactor pressure vessel internals for the Nine Mile Point Nuclear Power Station, Unit 1.Niagara Mohawk Power Corporation (NMPC), is the Owner of Record.The Commercial Service Date for the Nine Mile Point Nuclear Power Station, Unit 1 is December 26, 1969.1.1 Inspection Interval The Third Inservice Inspection Interval becomes effective on December 26, 1999 and is scheduled to end on December 25, 2009.1.2 Inspection Periods The Third lnservice Inspection Interval is divided into three successive inspection periods as determined by calendar years of plant service within the inspection interval.Identified below are the period dates for the third inspection interval as defined by Inspection Program NBN In accordance with IWB-2412(b) the inspection period specified below may be decreased or extended by as much as 1 year to enable inspection to coincide with NMP1's plant outages.TABLE 1-2 NMP1 INSERVICE INSPECTION PERIODS INSPECTION PERIODS PERIOD START DATES PERIOD END'DATES REFUEL OUTAGE REFUEL OUTAGE YEAR December 26, 1999 December 25, 2002 December 25, 2002 December 26, 2006 December 26, 2006 December 25, 2009 RFO-16 RFO-17 RFO-18 RFO-19 2001 2003 2005 2007*The plant operating license is currently scheduled to expire on August 22, 2009.1.3 Applicable Documents The Third Inservice Inspection Program for Quality Group A, B, and C (ASME Code Class 1, 2 and 3), systems and components (including their supports)was developed after giving due consideration to the following documents and subject to the limitations and modifications listed File: NMP1ISIPL.wpd
 
H V NIAGARA H V MOHAWK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-10 Rev.0 Date: October 15, 1999 in 10 CFR 50.55a(b), and to the extent practical within the limitations of design, geometry and materials of construction.
Specific areas within this document where these document are used in the preparation of this program are addressed within the area affected.Code of Federal Regulations 10 CFR 50.55(a)Code of Federal Regulations; Federal Register, Volume 64, Number 183, dated September 22, 1999, amendment to the regulation.
ASME Code Editions and Addenda ASME Boiler and Pressure Vessel Code, Sections V, 1989 Edition,"Nondestructive Examination"ASME Boiler and Pressure Vessel Code, Section XI, 1989 Edition,"Rules for Inservice Inspection of Nuclear Power Plant Components" ASME Boiler and Pressure Vessel Code, Section XI, 1992 Edition through the 1992 Addenda,"Rules for Inservice Inspection of Nuclear Power Plant Components", Subsections IWE and IWL.USNRC Regulatory Guides The following list of Regulatory Guides are applicable to the Nine Mile Point Nuclear Power Station Third Inservice Inspection Program: 1.26 Quality Group Classifications and Standards for Water-Steam, and Radioactive-Waste-Containing Components of Nuclear Power Plants, Revision 2, June 1975.1.65 Materials and Inspections for Reactor Vessel Closure Studs, dated October 1973, Regulatory Position C.4.b.1.84 Design and Fabrication Code Case Acceptability ASME Section III, Division 1, Latest Revision.1.85 Material Code Case Acceptability ASME Section III, Division 1, Latest Revision.1.147 Inservice Inspection Code Case Acceptability ASME Section XI, Division 1, Revision 12..NMP1 Specific Documents Nine Mile Point Unit 1 Updated Final Safety Analysis Report, Sections 1, 5, 7, 9, 12 File: NMP1ISIPL.wpd 0
N Y NIAGARA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-10 Rev.0 Date: October 15, 1999 and 16.Nine Mile Point Unit 1 Technical Specifications, USNRC Docket number 50-220, Sections 3.6 and 4.6.USNRC NUREGS/SRP's USNRC NUREG 0313, Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping, Revision 2.USNRC NUREG 0619, BWR Feedwater Nozzle and CRD Return Lines.USNRC Bulletins 82-03 Stress Corrosion Cracking in Thick-Wall, Large-Diameter, Stainless Steel, Recirculation System Piping at BWR Plants, Revision 1, October 28, 1982.USNRC Generic Letters 88-01 USNRC Position on IGSCC in BWR Austenitic Stainless Steel Piping, January 25, 1988.88-01 NRC Position on Intergranular Stress Corrosion Cracking (IGSCC)in BWR Austenitic Stainless Steel Piping, Supplement 1, February 4, 1992.81-11 Feedwater and Control Rod Drive Nozzle Cracking, 90-05 Guidance for Performing Temporary Non-Code Repairs to ASME (ISI)Code Class 1, 2 and 3 Piping and Components, June 15, 1990.90-09 Alternative Requirements for Snubber Visual Inspection Intervals and Corrective Actions, December 11, 1990.94-03 Intergranular Stress Corrosion Cracking (IGSCC)of Core Shroud in Boiling Water Reactors, February 1, 1995.98-05 Boiling Water Reactor Licensees Use of the BWRVIP 05 Report to Request Relief rom Augmented Examination Requirements on Reactor Pressure Vessel Circumferential Shell Welds, December 10, 1998.Additional References or Commitments Requirements of the complete BWRVIP implementation criteria for the Third Ten Year Inservice Inspection Interval is currently under development.
Upon completion of this process the applicable information will be incorporated within ISI Program.General Information pertaining to BWRVIPs implementation is contained in the ISI Program NMP1-ISI-003, Section 6.0 Titled Augmented Examinations.
File: NMP1ISIPL.wpd 0
N Y NIAGARA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-10 Rev.0 Date: October 15, 1999 USNRC Informational Notices 89-79 Degraded Coatings and Corrosion of Steel Containment Vessels, December 1, 1989.ASME Code Cases Code Cases approved through Regulatory Guide 1.147 may be proposed for revision to the inspection plan.Specific Code Cases used in the preparation of this document are identified below.N-460 N-491-1 N-509 N-524 Alternative Examination Coverage for Class 1 and Class 2 Welds, Section XI, Division 1.RG 1.147, Rev.12 Alternative Rules for Examination of Class 1, 2, 3 and MC Component Supports of Light Water Cooled Power Plants, Section XI, Division 1.RG 1.147, Rev.12.Alternative Rules for the Selection and Examination of Class 1, 2 and 3 Integrally Welded Attachments, Section XI, Division 1.RG 1.147, Rev.12.Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping Section XI, Division 1.RG 1.147, Rev.12.Note: See Appendix E"Code Cases" of the 10 Year Inspection Plan for a complete listing applicable Code Cases.1.4 Applicable Code Editions and Addenda 1.4.1 Third Inspection Interval Pursuant to Title 10, Part 50, Section 55a(g)(4), of the Code of Federal Regulations, the Inservice Inspection requirements applicable to nondestructive examination and system pressure testing for the Third Inservice Inspection Interval are based on the rules set forth in the 1989 Edition, no Addenda of Section XI, that was endorsed twelve months prior to the start of the Third Inspection Interval.1.4.2 Subsequent Code Editions and Addenda As permitted by 10 CFR 50.55a(g)(4)(iv), the NMPC may elect to meet the requirements set forth in subsequent Editions and Addenda of Section XI that are incorporated by reference into 10 CFR 50.55a(b)(2), subject to the applicable limitations and modification and subject to USNRC approval.File: NMP1ISIPL.wpd Ol El V NIAGARA Il U MOHAWK NINE MILE POINT NUCLEAR POWER STATION N MP1-ISI-003-10 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 Portions of Editions and Addenda may also be used provided that all related requirements to the respective Editions and Addenda are met.NMPC intends to continually evaluate and apply, as appropriate, changes in adopted Code Editions and Addenda which provide the continuing assurance of the quality and safety of pressure retaining components and systems.File: NMP1ISIPL.wpd 0
El Y NIAGARA a U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-Isl-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 2.0~DEVELOPMENT OF INSPECTION PLAN This document provides the component schedule for inservice nondestructive examinations to be performed over the Third Ten-Year Inservice Inspection Interval on Class 1, 2 and 3 components and their supports of the Niagara Mohawk Power Corporation (NMPC), Nine Mile Point Nuclear Power Station (NMP1).Component and/or system selected for nondestructive examination are scheduled in accordance with the requirements of Section XI, to the extent practical.
 
===2.1 CLASS===
1 SYSTEMS/COMPONENTS The Class 1 system boundaries subject to examination were developed based upon the requirements of 10 CFR 50.2(v)and NMPC NMP1-FSAR.
The Class 1 components and systems (including supports)selected for examination are identified in Section 4.0 of this document.2.2 CLASS 2 SYSTEMS/COMPONENTS The Class 2 system boundaries subject to examination were developed based upon the requirements of Regulatory Guide 1.26 and the NMPC NMP1-FSAR.
The Class 2 components and systems (including supports)selected for examination are identified in Section 5.0 of this document.2.3 CLASS 3 SYSTEMS/COMPONENTS The Class 3 system boundaries subject to examination were developed based upon the requirements of Regulatory Guide 1.26, and the NMPC NMP1-FSAR.
The Class 3 components and systems (including supports)selected for examination are identified in Section 6.0 of this document.2.4 CLASS 1, CLASS 2 AND CLASS 3 COMPONENT SUPPORTS-IWF Component supports selected for examination shall be the supports of those components that are required to be examined under IWB, IWC and IWD, and are included within Sections 4.0, 5.0 and 6.0 as applicable.
 
===2.5 SUBSTITUTE===
EXAMINATIONS NMPC may substitute components scheduled in this Document for others not previously scheduled when the original selection was part of the additional piping weld selection.
This substitution may be done due to such conditions as limited physical access, high radiation levels, inaccessibility etc.Such changes will be noted in the Summary Report Submittal.
Specific examinations that are required, and can not be completed within the periodfinterval will be identified within the Summary Report Submittal, and may be the subject of a request for relief.2.6 NONDESTRUCTIVE EXAMINATIONS Nondestructive examinations will be performed in accordance with established Niagara File: NMP1ISIPL.wpd
 
N Y NIAGARA kJ MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 Mohawk Power Corporation (NMPC)nondestructive examination procedures and/or NMPC approved vendor procedures which conform to the requirements of the NMPC Quality Assurance Program and the applicable sections of the ASME Boiler and Pressure Vessel Code.NMPC approved vendor NDE Procedures will be identified as required, (example, Automated UT of RPV).2.7 WELD/SUPPORT LOCATION MAPS Weld/Support location maps Listing indicating components, areas, weld locations, and other information pertinent to the performance of the inservice Nondestructive examinations are contained in Appendix C.2.8 ULTRASONIC CALIBRATION BLOCKS Ultrasonic calibration blocks for each component subject to volumetric examination are maintained at the plant site.A listing of applicable ultrasonic calibration blocks is included in Appendix B.2.9 WELD IDENTIFICATION Longitudinal welds in Class 2 piping and pipe fittings do not receive unique identification numbers from the spool fabricators.
All longitudinal pipe welds intersecting any of the selected circumferential welds will also be examined.As an alternate to Table IWB-2500-1, ASME Code Case N-524,"Alternative Examination Requirements for Longitudinal Welds in Class 1 Piping Section XI, Division 1", shall be used as defined below: (A)When only a surface examination is required, examination of longitudinal piping welds is not required beyond those portions of the welds within the examination boundaries of intersecting circumferential welds.(B)When both surface and volumetric examinations are required, examination of longitudinal piping welds is not required beyond those portions of the welds within the examination boundaries of intersecting circumferential welds providing the following requirements are met.(1)Where longitudinal welds are specified and locations are known, examination requirements shall be met for both transverse and parallel flaws at the intersection of the welds and for that length of longitudinal weld within the circumferential weld examination volume;(2)Where longitudinal welds are specified but locations are unknown, or the existence of longitudinal welds is uncertain, the examination requirements shall be met for both transverse and parallel flaws within the entire examination volume of intersecting circumferential welds.File: NMP1ISIPL.wpd
 
El Y NIAGARA H U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 Since Class 2 longitudinal welds are required to be examined from the intersecting circumferential weld, they were given unique identification numbers as denoted below.Fittings: Longitudinal welds in fittings are identified by adding letter A, B, or C, (1, 2, or 3), as applicable, to the I.D.for the reference weld.The reference weld is defined as the first circumferential weld encountered when entering the fitting on the direction of the flow.The following figure shows the convention for identifying which weld in a welded fitting receives a particular letter designation.
Tee Case 1: Three welds located as shown in Figure 2-1.Tee Case 2: If only one weld Figure 2-1 TEE weld ID exists it is identified by the letter A or 1.Figure 2-1 Tee Weld ID Elbow Case 1: Two welds located as shown in Figure 2-2, one located on the inside radius and the other on the outside radius.Elbow Case 2: If only one weld exists it is identified by the letter A or 1.Figure 2-2 Elbow weld ID File: NMP1ISIPL.wpd 0
N V NlAGARA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-1 0 Rev.0 Date: October 15, 1999 Elbow Case 3: If two welds exist in locations other than Case 1, Weld A or 1 is the first weld encountered when moving clockwise from the reference weld datum while looking in the direction of flow.The other weld is identified by B or 2.Reducer Case 1: If only one weld exists it is identified by the letter A or 1.Reducer Case 2: If two welds exist, weld A or 1 is the first weld encountered when moving clockwise from the reference weld datum while looking in the direction of flow.The other weld is identified by B or 2.See Figure 2-3.Figure 2-3 Reducer weld ID Piping: Longitudinal piping welds are not assigned a specific weld identification number.They are identified by reference to the intersecting circumferential weld first encountered when entering the seamed pipe in the direction of flow.File: NIVIP1ISIPL.wpd 0
N Y NlAGARA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 3.0 RECORDS 3.1 General Records and Reports of Inservice Inspection activities (such as Programs, Plans, Schedules, calibration, examination procedures, examination results, reports, equipment and personnel certifications, corrective actions taken or recommended will be developed and maintained in accordance with IWA-6000 of the ASME Boiler and Pressure Vessel Code, Section XI.3.1.1 SCHEDULED EXAMINATION TABLES The Scheduled Examination Tables for Inservice examinations of major components of Niagara Mohawk Power Corporation, Nine Mile Point Nuclear Power Station will be in a format similar to Figure 3-1.3.1.2 INSPECTION ZONES Areas subject to examination have been divided into systems.Each system is defined by a weld/support location map which identifies and locates all welds, supports, and other examination areas subject to and/or selected for examination within each system.3.1.3 CODE ITEM CLASSIFICATION For the sake of continuity and clarity, all items to which a Code Category and Code Item Number can be applied are identified.
3.1.4 INSPECTION/EXAMINATION TABLE CONTENTS The Inservice Inspection/Examination Tables provide the following information:
ASME SECTION XI ITEM NUMBER-Listed in this column is the appropriate item number from Table IWB-2500-1, IWC-2500-1, IWD-2500-1 or IWF-2500-1, as applicable, of the ASME Boiler 8.Pressure Vessel Code, Section XI.COMPONENT IDENTIFICATION
-The examination area identification is the unique component or weld identification number.This number also appears on the applicable ISI Weld/Support Location Map.COMPONENT DESCRIPTION
-The examination area description is a brief description of the component or, in the case of a weld, the parts being joined.CODE EXAMINATION CATEGORY-Listed in this column are the appropriate examination categories from Tables IWB-2500-1, IWC-2500-1, IWD-2500-1 or IWF-2500-1, as applicable, of the ASME Boiler 8 Pressure Vessel Code, Section XI.CODE EXAMINATION METHODS-Listed in this column are the appropriate nondestructive examination method(s)to be used for each component or item subject File: NMP1ISIPL.wpd 0
El Y NIAGARA H U MOHAlhlK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-10 Rev.0 Date: October 15, 1999 to examination, if applicable.
ISI INTERVAL-Identified in this column are numbers 1, 2, and 3.Each number signitying an inspection period.The current inspection interval relating to this Table is number 3.Within each column a system of codes are entered to define the status of each component or item.For the purpose of providing Tables of components or areas selected for examination during the interval an (X)will be placed on the applicable row.Each row is defined by period, depending on where the (X)is placed, will determine when that item is scheduled to be examined within the interval and period.Additional codes are used to provide a status of examinations conducted during a given period in time.Additional codes such as those identified in Figure 3-1 may also be used.REMARKS-This column identifies examination note(s)and/or instruction applicable to a particular item.3.2 FINAL REPORTS Following the completion of the Inservice Inspection Activity, NMPC shall prepare a Inservice Inspection Final Report.The Final Report will be tiled at the Nine Mile Point site Document Control Center.Final Examination Report Tables are included as part of the Final Report along with any additional records and reports in order to provide a documentation of the complete examination activity.This report shall be made available for review by the Enforcement and Regulatory Authority having jurisdiction at the plant side.3.3 INSERVICE INSPECTION
 
==SUMMARY==
REPORT Following the units return to service, NMPC shall prepare a Summary Report of the ISI activity.The Summary Report shall be filed with the Nuclear Regulatory Commission as required by Section XI and/or Code Case N-532.File: NMP1ISIPL.wpd
 
hl Y NlAGARA H U MOHAWK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-10 Rev.0 Date: October 15, 1999 DATE: (A)Rev.(8)System (D)Summary Examination Area Number Identiiicatlon ASME Sec.XI Categy Item No Nine Mlle Point Nuclear Plant unit 1 Inservlce Inspection Long Term Plan Class X Section XI Scheduled Components INSPECTION INTERVAI PLAN STATUS NDE First Second Third Meth Period Period Period-OUTAGE-1234 1234 1234 Page (C)Instructions
" Calibration Blocks-DRAWING NUM8ER: (E), LINE NO.(F)(G)(I)(J)(H)(K)(L)--.---------(K)(M)(A)(B)(C)(D)))6)(I)(J)(H)(K)(L)(M)Denotes the date of the inspection plan table Denotes the current revision number of the plan Identifies the page number of the table Identifies the System applicable to this table Denotes the applicable Drawing number for this table Identifies the applicable Line for this table Denotes the Summary Number Denotes the component or weld identification number Denotes the ASME Code Category Denotes the ASME Code Item Number Denotes the NDE Method to be used for the examination Shows when an item was examined or is scheduled to be examined.Any interval can be shown separately.
X-Scheduled P-Partial C-Completed E-Expanded Scope A-Augmented B-Baseline Denotes specific instruction applicable to the item FIGURE 3-1 lnservice Inspection Plan (also known as Long Term Plan)File: NMP1ISIPL.wpd
 
N Y NIAGARA kJ MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 4.0 CLASS 1 INSERVICE INSPECTION PLAN TABLES This section contains the Long Term Ten-Year Inservice Inspection Examination Tables for nondestructive examinations of selected systems and components for the Second Inservice Inspection Interval.00.0 01.0 31.0 32.0 33.0 36.0 37.0 38.0 39.0 40.0 42.1 44.1 Reactor Pressure Vessel Main Steam Feedwater System Reactor Recirculation System Reactor Clean Up Reactor Instrumentation
.Reactor Drain 8 Vent.Reactor Shutdown Cooling.Emergency Condenser System Reactor Core Spray System..Liquid Poison System.Control Rod Drive System.1 thru 83 84 thM 90.91 thru97....98thru130 131 thru 135 136 thru 137 138 thru 143 144 thru 147 148 thru 156 157 thru 171 172 thru 173 174 thru 177 File: NMP1 ISIPL.wpd
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 1 J Welds NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFZCATZON INSPECTION INTERVAL AS ME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
++CALIBRATION BLOCK*+Control Rod Drive Housings (REF.DWG.NO.28A)002610 DRV-44-XXXX(NC02)
NCTS UT CRDH Upper-J Weld&503783 Roll Area 3 X---X X--X Prior to and after each Roll Repair Drives to be determined later+*LATER**002620 DRV 44-XXXX(NC02)
NCTS UT CRDH to Upper-J Weld 503783 X---X X--X Examine (2)previously roll-repaired CRDH, only if made availablc thru norm drive maint., 1" above s below upper-J veld, Drives to bc dctermincd during each outage~+LATER*w 630 DRV-44-XXXX(NC02)
NCTS UT CRDH Roll Repair 503783 Region X---X X--X Examine (2)previously rolled areas to include volume of base material of 1" above C beld roll band, only if made availablc thru norm drive maint., Drives to bc determined during 1*LATER*4 0
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 2 ure Head Nuts NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
++CALIBRATION BLOCK**00.0 RPV (REF.DWG.NO.28A)002700 CH-01-N B-G-1 VT-1+AN/A**Closure Head Flange B6.10 Nuts X 002800 CH-02-N B-G-1 VT-1*~N/A+*Closure Head Flange B6.10 Nuts 3 X 002900 CH-03-N B-G-1*AN/A%1 Closure Head Flange B6.10 Nuts 3 X 003000 CH-04-N B-G-1 a 1N/Aa a Closure Head Flange B6.10 Nuts 3 X 003100 CH-05-N B-G-1 VT-1 Closure Head Flange B6.10 Nuts 3 X 003200 CH-06-N B-G-1 VT-1~~N/A~~Closure Head Flange B6.10 Nuts 3 X 003300 CH-07-N B-G-1 VT-1 aaN/Aaa Closure Head Flange B6.10 Nuts 3 X 003400 CH-08-N B-G-1 VT-1~+N/A**Closure Head Flange B6.10 Nuts 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 3 ura Head Nuts NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTZFZCATZON INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH PLAN STATUS FIRST PERIOD SECOND PERZOD THIRD PERIOD-OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
+*CALIBRATION BLOCK**003500 CH-09-N Closure Head Flange Nuts B-G-1 B6.10 3 X++N/A++003600 CH-10-N Closure Head Flange Nuts BG1 B6.10 3 X**N/A~~003700 CH-11-N Closure Head Flange Nuts B-G-1 B6.10 3 X**N/A**003800 CH-12-N Closuro Head Flange Nuts B G 1 B6.10 3 X**N/A*~003900 CH-13-N Closure Head Flange Nuts B-G-1 B6.10 X*AN/A1*004000 CH-14-N Closure Head Flange Nuts B" G-1 B6.10 3 X f f N/A*%004100 CH-15-N Closure Head Flange'uts B"G-1 B6.10 3 X*aN/Aas 004200 CH-16 N B-0" 1 VT 1**N/A++Closure Head Flange B6~10 Nuts 3 X
 
DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 4 ure Head Nuts NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS e iCALIBRATION BLOCK**004300 CH-17-N B-G-1 VT-1 Closure Head Flange B6.10 Nuts 3 X 004400 CH 18-N Closure Head Flange Nuts B G 1 B6.10 VT 1 3 X aeN/As*004500 CH-19-N I Closure Head Flange Nuts B-G-1 B6.10 3 X tkN/At 1 004600 CH-20-N Closure Head Flange Nuts B-G-1 B6.10 VT-1 3 X e*N/A*a 004700 CH-21-N Closure Head Flange Nuts B-G-1 B6.10 3 X eaN/A+a 004800 CH-22-N B-G-1 VT-1**N/A*%Closure Head Flange B6.10 Nuts 3 X 004900 CH 23-N Closure Head Flange Nuts B G-1 B6.10 3 X*~N/A~~005000 CH-24-N B-G-1 VT-1**N/A~~Closure Head Flange B6 F 10 Nuts 3 X
 
DATE: 10/15/99 REVISZON: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 5 ure Head Nuts NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS y yCALIBRATION BLOCKt a 005100 CH-25-N Closure Head Flange Nuts B-G-1 B6.10 VT-1 3 X**N/A4*005200 CH-26-N Closure Head Flange Nuts B-G-1 B6.10 VT 1 3 X 4 4N/Af*005300 CH-27-N Closure Head Flange Nuts B G 1 B6.10 3 X asN/AP+005400 CH-28-N Closure Head Flange Nuts B-G-1 B6.10 VT 1 3 X**N/A**005500 CH-29-N Closure Head Flange Nuts B-G-1 B6.10 VT-1 3 X aaN/Ass 005600 CH-30-N Closure Head Flange Nuts B-G-1 B6.10 3 X**N/As*005700 CH-31-N Closure Head Flange'uts B G-1 B6.10 VT-1 3 X 1*'N/A*0 005800 CH-32-N Closure Head Flange Nuts B-G-1 B6.10 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 6 urc Head Nuts NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTIFZCATION INSPECTION INTERVAZ ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
+~CALIBRATION BLOCK**005900 CH-33-N Closure Head Flange Nuts B-G-1 B6.10 VT-1 3 X**N/A~~006000 CH-34 N Closure Head Flange Nuts B-G-1 B6.10 3 X*~N/A~+006100 CH-35-N Closure Head Flange Nuts B-G"1 B6.10 3 X**N/A*I 006200 CH 36"N Closure Head Flange Nuts B-G-1 B6.10 3 X~~N/A~*006300 CH-37-N Closure Head Flange Nuts B-G-1 B6.10 3 X a*N/Aa*006400 CH-38-N Closure Head Flange Nuts B-G-1 B6.10 VT-1 X~~N/A~~006500 CH-39-N Closure Head Flange Nuts B-G" 1 B6.10 3 X*~N/A++006600 CH-40 N B G 1 VT-1**N/A*+Closure Head Flange B6.10 Nuts 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 7 ure Head Nuts l~NUMBER: 00.0
 
==SUMMARY==
EXAMINATZON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
**CALIBRATION BLOCK~*006700 CH-41"N Closure Head Flange Nuts B-G-1 B6.10 3 X ttN/Af*006800 CH-42-N Closure Head Flange Nuts B G-1 B6.10 3 X*iN/Af4 006900 CH-43-N Closure Head Flange Nuts B G 1 B6.10 3 X+sN/A@a 007000 CH-44-N Closure Head Flange Nuts B-G 1 B6.10 3 X**N/A*+007100 CH 45-N Closure Head Flange Nu ts B-G-1 B6.10 3 X**N/A*%007200 CH-46-N Closure Head Flange Nuts B-G-1 B6.10 3 X**N/A~*007300 CH-47-'N Closure Head Flange'uts B-G-1 B6.10 VT 1 3 X j*N/A1*007400 CH-48-N Closure Head Flange Nuts B-G-l B6.10 3 X%AN/A*1
 
DATE: 10/15/99 REVISION: 0 NZNE MILE POZNT NUCLEAR PIANT UNIT 1 I INSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 8 urc Head Nuts NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION ZNTERVAI ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1-2 3 4 PRESERVZCE YEAR INSTRUCTIONS
<<*CALIBRATION BLOCK**007500 CH"49-N Closure Head Flange Nuts B-G"1 B6.10 VT-1 3 X~~N/A~+007600 CH-50-N Closure Head Flango Nuts B-G-1 B6.10 3 X+*N/A+*007700 CH-51-N Closure Head Flange Nuts B-G-1 B6.10 3 X f iN/A*1 007800 CH-52-N Closure Head Flange Nuts B G-1 B6.10 VT 1 3 X*+N/A~~007900 CH-53-N Closure Head Flange Nuts B-G-1 B6.10 3 X f4N/A4*008000 CH-54-N Closure Head Flange Nuts B-G-1 B6.10 VT-1 3 X**N/A~~008100 CH-55-N Closure Head Flange Nuts B"G-1 B6.10 VT-1 3 X t*N/A**008200 CH-56-N B-G-1 VT 1++N/A~+Closure Head Flange B6.10 Nuts 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 9 ure Head Nuts NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
++CALIBRATION BLOCK*~008300 CH-57-N Closure Head Flange Nuts B-G-1 B6.10 VT 1 3 X++N/A++008400 CH-58-N Closure Head Flange Nuts B-G 1 B6.10 3 X 4*N/At 1 008500 CH-59-N Closure Head Flange Nuts B-G-1 B6.10 VT-1 3 X~1N/Al*008600 CH-60"N Closure Head Flange Nuts B-G-1 B6.10 3 X**N/A**008700 CH-61-N Closure Head Flange Nuts B-G-1 B6.10 3 X~*N/A**008800 CH-62 N Closure Head Flange Nuts B-G-1 B6.10 3 X 4%N/At 1 008900 CH-63-N Closure Head Flange'uts B-G-1 B6.10 3 X+*N/A~~009000 CH 64 N Closuro Head Flange Nuts B-G-1 B6.10 VT 1 3 X*IN/A**
 
DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 V INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 10 urc Head Studs NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTZON ZNTERVAL SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~+CALIBRATION BLOCK**00.0 RPV (REF.DWG.NO.28A)009100 CH" 01-B B-G-1 UT Closure Head Flange B6.20 MT Studs 3 X Rcg.Guide 1.65, Surface exam when removed~+6.25-RPV-STUD+*
009200 CH 02 B B-G 1 UT Closure Head Flange B6.20 MT 3 X Studs Rcg.Guide 1.65, Surface exam when removed**6.25-RPV-STUD**
009300 CH-03-B Closure Head Flange Studs B-G-1 UT B6.20 3 X Rcg.Guide 1.65, MT exam when removed~~6.25-RPV-STUD**
009400 CH-04 B B-G-1 Closure Head Flange B6.20 Studs MT 3 X Rcg.Guide 1.65,Surface exam when removed*+6.25-RPV-STUD*+
009500 CH-05-B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Rcg.Guide 1.65,Surface exam when removed~~6.25-RPV-STUD**
009600 CH 06 B B-G-1 UT Closure Head Flange B6 20 MT 3 X Studs Reg.Guide 1.65,Surface exam when removed~~6.25-RPV-STUD**
009700 CH"07-B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Rcg.Guide 1.65;Surface exam when removed**6.25 RPV-STUD+~
009800 CH-08-B Closure Head Flango Studs B-G-1 B6.20 3 X Rcg.Guide 1.65, MT when removed++6.25-RPV STUD++
 
DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PLAIiT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 11 ure Head Studs NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~*009900 CH-09"B B-G-1 UT Closure Head Flange B6~20 MT 3 X Studs Rcg.Guide 1.65, MT when removed~~6.25 RPV-STUD++
010000 CH-10-B Closure Head Flange Studs B G-1 B6.20 MT 3 X Rcg.Guide 1.65,MT when removed~+NMP-6.25-RPV-STUD**
010100 CH-11-B B-G-1 UT Closure Head Flange B6.20 MT Studs 3 X Rcg.Guide 1.65, MT when removed*~6.25 RPV-STUD+*
010200 CH-12-B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Reg.Guide 1.65,MT exam when removed**6.25 RPV STUD++010300 CH-13"B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Rcg.Guide 1.65,MT exam when rcmovcd*~6.25"RPV-STUD**
010400 CH-14-B Closure Head Flange Studs BG1 B6.20 MT 3 X Rcg.Guide 1.65, MT exam when removed~~6.25 RPV-STUD**
010500 CH-15-B Closure Head Flange Studs B"G-l UT B6.20 3 X Rcg.Guide 1.65, MTexam when rcmovcd++6.25"RPV-STUD*~
010600 CH-16-B Closure Head Flange Studs B-G"1 B6.20 MT 3 X Rcg.Guido 1.65, MT exam when removed*+6.25-RPV STUD*~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTZON TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 12 urc Head Studs NUMBER: 00.0
 
==SUMMARY==
EXAMZNATZON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~+CALIBRATION BLOCX>>~010700 CH-17-B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Rcg.Guide 1.65, MT eaxm when removed+*6.25-RPV STUD~~010800 CH-18-B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Rcg.Guide 1.65, MT exam when removed~~6.25-RPV-STUD~~
010900 CH-19-B Closure Head Flango Studs B-G-1 UT B6.20 MT Reg.Guide 1.65,MT exam when removed**NMP-6.25-RPV-STUD**
011000 CH-20-B Closure Head Flange Studs B-G 1 B6.20 MT 3 X Rcg.Guido 1.65,MT exam when removed**NMP 6.25 RPV-STUD++
011100 CH-21-B Closure Head Flange Studs B-G-1 UT B6.20 3 X Rcg.Guide 1.65, MT exam when removed~~NMP-6.25-RPV-STUD~*
011200 CH-22-B Closure Head Flange Studs B-G-1 UT B6.20 3 X Rcg.Guide 1.65, MT exam when removed+~6.25-RPV"STUD**
011300 CH-23-B Closure Head Flange'tuds B-G-1 UT B6.20 3 X Rcg.Guide 1.65,MT exam when removed**NMP 6.25-RPV-STUD+
+011400 CH-24-B Closuro Hoad Flange Studs B-G-1 UT B6.20 MT 3 X Reg.Guide 1.65, MT exam when removed+*NMP-6.25-RPV-STUD**
 
DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 13 ure Head Studs NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
~~CALIBRATION BLOCX**011500 CH-25-B B-G-1 UT Closure Head Flange B6.20 MT 3 X Studs Reg.Guide 1.65,MT exam when r~~~NMP-6.25-RPV-STVD**
011600 CH-26-B B-G 1 VT Closure Head Flange B6.20 MT 3 X Studs Rcg.Guide 1.65, MT when removed~+NMP-6.25-RPV-STUD~
+011700 CH-27-B Closure Head Flange Studs B-G-1 UT B6.20 MT 3'I Rcg.Guide 1.65, MT exam when rcmovcd~~NMP"6.25-RPV-STVD**
011800 CH" 28-B Closure Head Flango Studs B-G-1 B6.20 MT 3 X Rcg.Guide 1.65, MT exam when rcmovcd~~NMP-6.25-RPV-STUD~~
011900 CH-29-B Closuro Head Flange Studs BG1 VT B6.20 MT 3 Reg.Guide 1.65, MT exam when rcmovcd~+6.25-RPV-STUD~~
012000 CH-30-B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Rcg.Guido 1.65, MT exam when removed++6.25-RPV STUD~+012100 CH-31-B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Rcg.Guide 1.65, MT exam when removed~+6.25-RPV STUD~~012200 CH-32-B Closure Head Flange Studs B-G 1 VT B6.20 MT 3 X Rcg.Guido 1.65, MT exam when rcmovcd**6.25 RPV-STUD++
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN"YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 14 urc Head Studs NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~*012300 CH-33-B B-G 1 UT Closure Head Flange B6.20 3 X Studs Reg.Guide 1.65, MT exam when rcmovcd~~6.25"RPV-STUD*~
012400 CH-34-B B-G-1 UT Closure Head Flange B6~20 MT 3 X Studs Reg.Guide 1.65, MT exam when removed**6'5-RPV-STUD**
012500 CH-35-B Closure Head Flange Studs B-G-l UT B6.20 MT 3 X Reg.Guide 1.65, MT exam when removed~+6.25-RPV-STUD++
012600 CH 36-B Closure Head Flange Studs B-G-1 B6.20 3 X Rcg.Guide 1.65,MT exam when rcmovcd+*6.25 RPV STUD++012700 CH-37-B Closure Head Flange Studs B-G-1 B6.20 X Reg.Guide 1.65,MT exam when removed*~6.25 RPV-STUD~~
012800 CH-38-B B-G-1 UT Closure Head Flange B6.20 MT 3 X Studs Reg.Guide 1.65,MT exam when rcmovcd~~6.25-RPV-STUD~~
012900 CH-39-B Closure Head Flange Studs B" G-1 UT B6.20 MT 3 X Reg.Guide 1.65, MT exam when removed~*6.25-RPV-STUD**
013000 CH 40 B B-G-1 Closure Head Flange B6.20 Studs 3 X Rcg.Guide 1.65,MT exam when rcmovcd~+6.25-RPV STUD**
 
DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 15 ure Head Studs NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION ZNTERVAI ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
**CALIBRATION BLOCK**013100 CH-41-B Closure Head Flange Studs B-G-1 UT B6.20 3 X Reg.Guide 1.65, MT exam when removed a+6.25 RPV STUD*a 013200 CH-42-B B-G 1 UT Closure Head Flange B6.20 MT 3 X Studs Rcg.Guide 1.65, MT exam when removed~~6.25-RPV-STUD+~
013300 CH-43-B Closure Head Flange Studs B-G-1 B6.20 3 X Reg.Guide 1.65, MT exam when removed**6.25-RPV-STUD+*
013400 CH-44-B B-G-1 UT Closure Head Flange B6~20 MT Studs X Reg.Guide 1.65,MT exam when removed*+6~25-RPV-STUD*+
013500 CH-45-B B-G-1 UT Closure Head Flange B6.20 MT 3 Studs X Reg.Guide 1.65, MT exam when removed~~6.25-RPV-STUD**
013600 CH-46"B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Reg.Guide 1.65, MT exam when removed~*6.25-RPV-STUD**
013700 CH-47-B Closure Head Flange Studs B-G-1 B6.20 3 X Reg.Guide 1.65,MT exam when removed~~6.25-RPV-STUD**
013800 CH-48-B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Reg.Guide 1.65, MT exam when removed~~6.25-RPV-STUD**
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 16 ure Head Studs NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH'IRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~~013900 CH 49 B B-G-1 UT Closure Head Flange B6.20 MT 3 Studs X Reg.Guide 1.65, MT exam when removed++6.25 RPV-STUD++
014000 CH-50-B B"G" 1 UT Closure Head Flange B6~20 MT Studs 3 X Rcg.Guide 1.65, MT exam when removed++6.25 RPV-STUD++
014100 CH-51-B B-G-1 UT Closure Head Flange B6.20 MT 3 Studs Rcg.Guide 1.65, MT exam when removed~~6.25-RPV-STUD*~
014200 CH-52-B Closure Head Flange Studs B-G-1 B6.20 MT 3 Reg.Guide 1.65, MT exam when removed~~NMP-6.25-RPV-STUD~
~014300 CH-53-B Closure Head Flange Studs B-G 1 B6.20 MT 3 X Reg.Guide 1.65, MT exam when removed++NMP-6.25 RPV STUD*t 014400 CH-54-B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Rcg.Guide 1.65, MT exam when removed~~6.25 RPV-STUD~~
014500 CH-55-B B-G-1 UT Closure Head Flange'6~20 Studs 3 X Rcg.Guide 1.65, MT exam when removed~~NMP" 6.25-RPV-STUD+~
014600 CH"56-B B-G-1 UT Closure Head Flange B6~20 MT 3 Studs Rcg.Guide 1.65, MT exam when rcmovcd~~NMP-6.25-RPV-STUD*>>
 
DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 17 urc Head Studs NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTIFZCATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERZOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~~014700 CH-57-B BG1 UT Closure Head Flange B6 20 3 Studs Reg.Guide 1.65, MT exam when removed~~NMP-6.25-RPV-STUD~*
014800 CH-58-B Closure Head Flange Studs B G 1 UT B6.20 MT 3 X Rcg.Guide 1.65, MT exam when removed~~NMP-6.25-RPV-STUD~
~014900 CH-59-B B-G-1 UT Closure Head Flange B6.20 MT 3 Studs Reg.Guide 1.65, MT exam when removed+*6~25-RPV-STUD+*
015000 CH-60-B Closure Head Flange Studs B-G-l B6.20 3 Rcg.Guide 1.65, MT exam when removed~~NMP-6.25-RPV-STUD~*
015100 CH-61-B BG1 Closure Head Flange B6.20 Studs 3 X Rcg.Guide 1.65, MT exam when removed aaNMP-6.25-RPV STUDa~015200 CH-62-B B-G-1 UT Closure Head Flange B6.20 MT 3 Studs Rcg.Guide 1.65, MT exam when removed**NMP-6.25-RPV STUDY'015300 CH-63-B Closure Head Flange'tuds B-G-1 B6.20 3 Rcg.Guide 1.65, MT exam when removed~~NMP-6.25-RPV-STUD**
015400 CH-64-B Closure Head Flange Studs B-G-1 UT B6.20 MT 3 X Rcg.Guide 1.65, MT exam when removed~*6.25-RPV-STUD~~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 18 ure Head Studs NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTZPZCATZON INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
+'~CALIBRATION BLOCK++015500 CH-XX-B B-G-1 MT Closure Head Plangc B6.30 Studs 3 X---X X Per RG 1.65, a minimum of 4 studs vill be examLncd each period for a total of 12.**N/A*~
 
DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 19 ure Head Washcrs NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
**CALIBRATION BLOCK**00.0 RPV (REF.DWG.NO.28)015600 RV-01-TA B-G 1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X 015700 RV-01-TB BG-1VT1 Reactor Vcsscl Flange B6~50 Washer 3 X 015800 RV-02" TA B-G 1 VT 1 Reactor Vessel Flange B6 F 50 Washer 3 X 015900 RV-02"TB B-G-1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X 016000 RV-03-TA B-G-1 VT-1 Reactor Vcsscl Flange B6 F 50 Washer 3 X 016100 RV-03-TB B-G"1 Reactor Vcsscl Flange B6~50 Washer 3 X 016200 RV-04 TA B-G-1 VT-1 Reactor Vcsscl Flange B6~50 Washer 3 X 016300 RV-04 TB B-G-1 Reactor Vcsscl Flange B6.50 Washer 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PZANT UNIT 1 N.INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 20 ure Head Washers NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
**CALIBRATION BLOCK~~016400 RV-05-TA BG1VT1 Reactor Vessel Flange B6.50 Washer 3 X 016500 RV-05-TB B G-l VT-1 Reactor Vessel Flange B6~50 Washer 3 X 016600 RV-06-TA B-G-1 Reactor Vessel Flange B6.50 Washer 3 X 016700 RV-06-TB B-G-1 Reactor Vessel Flange B6~50 Washer 3 X 016800 RV-07-TA B G-1 VT-1 Reactor Vessel Flange B6~50 Washer 3 X 016900 RV-07-TB B-G-1 Reactor Vessel Flange B6.50 Washer 3 X 017000 RV-08-TA B-G 1 VT 1 Reactor Vessel Flange B6 50 Washer 3 X 017100 RV-08-TB B-G-1 VT-1 Reactor Vessel Flange B6~50 Washer X
 
DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 21 ure Head Washcrs NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH PLAN STATUS FIRST PERIOD THIRD PERIOD SECOND PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR ZNSTRUCTIONS
~~CALIBRATION BLOCK~~017200 RV-09-TA B-G 1 VT-1 Reactor Vcsscl Flange B6~50 Washer X 017300 RV-09-TB B G 1 VT 1 Reactor Vessel Flange Washer 3 X 017400 RV-10"TA B-G-1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X 017500 RV-10 TB B-G-1 Reactor Vessel Flange B6.50 washer VT 1 3 X 017600 RV-11-TA B"G 1 VT-1 Reactor Vcsscl Flange B6.50 Washer 3 X 017700 RV-11-TB B-G-1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X 017800 RV-12-TA B-G-1 Reactor Vessel Flange B6.50 Washer 3 X 017900 RV-12-TB B-G-1 VT 1 Reactor Vcsscl Flange B6.50 Washer 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 22 ure Head Washers NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION ZNTERVAZ ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PIJN STATUS SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
~*CALIBRATION BLOCK**018000 RV-13-TA B-G-1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X 018100 RV-13-TB BG1 Reactor Vessel Flange B6~50 Washer 3 X 018200 RV-14-TA B-G-1 Reactor Vessel Flange B6.50 Washer 3 X 018300 RV-14 TB B G-1 VT 1 Reactor Vessel Flange B6 F 50 Washer 3 X 018400 RV-15-TA B-G-1 VT-1 Reactor Vcsscl Flange B6.50 Washer 3 X 018500 RV-15 TB B-G-1 VT 1 Reactor Vessel Flange B6.50 washer 3 X 018600 RV-16-TA B-G-1 VT-1 Reactor Vcsscl Flange Washer 3 X 018700 RV-16-TB BG1VT1 Reactor Vessel Flange B6~50 Washer 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 23 ure Head Washers NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
++CALIBRATION BLOCK>>~018800 RV-17-TA B-G-l VT-1 Reactor Vessel Flange B6~50 Washer 3 X 018900 RV-17-TB B-G-1 Reactor Vessel Flange B6.50 Washer 3 X 019000 RV 18-TA B-G-1 Reactor Vessel Flange B6.50 Washer 3 X 019100 RV-18-TB B-G-1 Reactor Vessel Flange B6 F 50 Washer 3 X 019200 RV-19-TA B-G-1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X 019300 RV-19-TB B G 1 VT 1 Reactor Vessel Flange B6~50 Washer 3 X 019400 RV-20-TA B-G-l Reactor Vessel Flange B6.50 Washer 3 X 019500 RV-20-TB B-G-1 Reactor Vessel Flange B6~50 Washer 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MZLE POZNT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 24 ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR
 
==SUMMARY==
NUMBER EXAMINATION AREA IDENTIFICATION ASME SEC.XI CATEGY ITEM NO NDE METH FIRST PERIOD SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
~*CALIBRATION BLOCK+*019600 RV-21-TA B-G-1 VT-1 Reactor Vessel Flange B6~50 Washer 3 X 019700 RV-21-TB B-G-1 Reactor Vcsscl Flange B6 F 50 Washer 3 X 019800 RV-22-TA B"G-1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X 019900 RV-22-TB Reactor Vcsscl Flange Washer B-G-1 B6.50 3 X 020000 RV-23-TA Reactor Vessel Flange Washer B-G-1 B6.50 VT-1 3 X 020100 RV-23-TB B-G-1 Reactor Vessel Flange B6.50 Washer'3 X 020200 RV 24 TA B-G-1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X 020300 RV-24-TB B-G"1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MIIE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 25 ure Head Washers NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
~*CALIBRATION BLOCK*~020400 RV-25-TA B-G-1 VT-1 Reactor Vessel Flange B6 F 50 Washer 3 X 020500 RV-25-TB BG1 Reactor Vessel Flange B6.50 Washer 3 X 020600 RV-26-TA B-G-1 VT 1 Reactor Vessel Flange B6.50 Washer 3 X 020700 RV-26-TB B-G-1 Reactor Vessel Flange B6 F 50 Washer 3 X 020800 RV-27-TA Reactor Vessel Flange Washer B-G-1 VT 1 3 X 020900 RV-27-TB B-G-1 VT 1 Reactor Vcsscl Flange B6.50 Washer 3 X 021000 RV-28-TA B-G-1 Reactor Vcsscl Flange B6.50 Washer VT 1 3 X 021100 RV-28-TB B-G-1 Reactor Vessel Flange B6.50 Washer VT-1 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 26 urc Head Washcrs NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FZRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
*~CALIBRATION BLOCK**021200 RV-29-TA B-G-1 Reactor Vessel Flange B6.50 Washer 3 X 021300 RV-29-TB B"G-1 Reactor Vessel Flange B6.50 Washer 3 X 021400 RV-30-TA B-G-1 Roactor Vcsscl Flango B6.50 Washer 3 X 021500 RV-30-TB Reactor Vessel Flange Washer B-G-1 B6.50 3 X 021600 RV" 31-TA Reactor Vessel Flange Washer B-G-1 B6.50 3 X 021700 RV-31-TB B-G-1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X 021800 RV-32-TA B"G-1 Reactor Vessel Flange B6.50 Washer VT 1 3 X 021900 RV-32-TB B-G-1 Reactor Vessel Flange B6.50 Washer 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 27 urc Head Washers NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATE GY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
+*CALIBRATION BLOCK**022000 RV-33-TA B-G-1 Reactor Vessel Flange B6~50 Washer 3 X 022100 RV-33-TB B-G-1 VT 1 Reactor Vessel Flange B6.50 Washer 3 X 022200 RV-34-TA B G 1 Reactor Vessel Flange B6~50 Washer 3 X 022300 RV 34 TB B-G 1 Reactor Vessel Flange B6.50 Washer 3 X 022400 RV-35-TA Reactor Vessel Flange Washer B-G 1 B6.50 3 X 022500 RV-35-TB B-G-1 Reactor Vcsscl Flange B6.50 Washer 3 X 022600 RV-36-TA B-G-1 VT"1 Reactor Vcsscl Flange B6.50 Washer 3 X 022700 RV-36-TB B-G-1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS PAGE: 28 ure Head Washers NUMBER: 00.0 SUHHARY EXAHINATZON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY ITEH NO FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
~*CALIBRATION BLOCK~~022800 RV-37-TA B G 1 Reactor Vessel Flange B6.50 Washer 3 X 022900 RV-37-TB B-G-1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X 023000 RV-38-TA B-G-1 Reactor Vessel Flange B6.50 Washer VT-1 3 X 023100 RV-38-TB B"G-1 Reactor Vessel Flange B6.50 Washer 3 X 023200 RV 39 TA B-G-1 Reactor Vessel Flange B6.50 Washer 3 X 023300 RV-39-TB B-G-1 Reactor Vessel Flange B6~50 Washer 3 X 023400 RV-40-TA B G 1 Reactor Vcsscl Flange B6.50 Washer 3 X 023500 RV-40-TB B-G-1 Reactor Vessel Flange B6.50 Washer 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PIANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 29 ure Head Washers NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THZRD PERZOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~~023600 RV-41-TA BG1 VT-1 Reactor Vessel Flange B6.50 Washer X 023700 RV-41-TB B-G-1 Reactor Vcsscl Flange B6.50 Washer 3 X 023800 RV-42-TA B-G-1 Reactor Vessel Flange B6.50 Washer 3 X 023900 RV-42-TB B-G-1 Reactor Vcsscl Flange B6.50 Washer 3 X 024000 RV 43 TA B-G" 1 VT-1 Reactor Vessel Flange B6~50 Washor 3 X 024100 RV-43-TB B-G-1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X 024200 RV-44-TA B G 1 Reactor Vessel Flange B6 F 50 Washer 3 X 024300 RV-44-TB B-0" 1 VT-1 Reactor Vcssol Flange B6~50 Washer 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 30 urc Head Washcrs NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERZOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
~+CALIBRATION BLOCK*'~024400 RV 45 TA BG1 Reactor Vessel Flange B6~50 Washer 3 X 024500 RV-45-TB B-G-1 Reactor Vcsscl Flange B6.50 Washer 3 X 024600 RV-46-TA B-G-1 VT-1+*N/A++Reactor Vessel Flange B6~50 Washer 3 X 024700 RV-46-TB B G-1**N/A*+Reactor Vcsscl Flange B6~50 Washer 3 X 024800 RV-47-TA B-G-1 Reactor Vcsscl Flange B6 F 50 Washer 3 X 024900 RV-47-TB B-G-1 VT 1 Reactor Vcsscl Flange B6.50 Washer 3 X 025000 RV-48-TA B-G 1 Reactor Vessel Flangh B6.50 Washer 3 X 025100 RV-48-TB B-G-1 VT-1 Roactor Vcsscl Flange B6.50 Washer 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 31 ure Head Washers NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFZCATZON INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
++CALIBRATION BLOCK~~025200 RV-49"TA B-G-1 Reactor Vcsscl Flange B6.50 Washer 3 X 025300 RV-49-TB B-G-1 VT 1 Reactor Vessel Flange B6.50 Washer 3 025400 RV-50-TA B G-l Reactor Vcsscl Flange B6~50 Washer 3 X 025500 RV-50-TB B-G-l VT-1 Reactor Vessel Flange B6.50 Washer 3 X 025600 RV-51-TA B-G-1 VT 1+*N/A**Reactor Vessel Flange B6.50 Washer 3 X 025700 RV-51-TB B-G-1 VT-1*~N/A*~Reactor Vessel Flange B6.50 Washer 3 X 025800 RV-52-TA B-G"1 Reactor Vcsscl Flange B6.50 Washer 3 X**N/A%*025900 RV 52 TB B-G-1 Reactor Vessel Flange B6.50 Washer 3 X~*N/A**
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 32 ure Head Washers NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 026000 RV-53-TA INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH B-G-1 FIRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
*~CALIBRATION BLOCKi~eaN/Aaa Reactor Vessel Flange B6.50 Washer 3 X 026100 RV-53-TB B-G-l Reactor Vessel Flange B6.50 Washer VT-1 3 X++N/A*+026200 RV-54-TA B-G-1++N/PPa Reactor Vcsscl Flange B6.50 Washer 3 X 026300 RV-54-TB B G 1**N/A*~Reactor Vessel Flange B6~50 Washer 3 X 026400 RV-55-TA B"G"1 Reactor Vessel Flange B6.50 Washer 3 X ktN/Akk 026500 RV-55-TB BG1 VT-1~iN/A+*Reactor Vessel Flange B6.50 Washer 3 X 026600 RV-56-TA B-G-1 Reactor Vessel Flange B6.50 Washer 3 X*tN/Aft 026700 RV-56-TB B" G-1 Reactor Vessel Flange B6.50 Washer VT-1 3 X*ON/A**
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 33 ure Head Washcrs NUMBER: 00.0
 
==SUMMARY==
EXAMZNATZON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ZTEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRE SERVICE YEAR ZNSTRUCTIONS yqCALIBRATZON BLOCKte 026800 RV-57-TA B-G-1 VT-1~*N/A~*Reactor Vessel Flange B6~50 Washer 3 X 026900 RV-57-TB B-G-1 4kN/Ak*Reactor Vessel Flange B6.50 Washer 3 X 027000 RV-58"TA B-G-1 VT-1~+N/A~~Reactor Vessel Flange B6.50 Washer 3 X 027100 RV-58-TB B-G-1**N/A~~Reactor Vcsscl Flange B6.50 Washer 3 X 027200 RV-59-TA B-G-1*+N/A**Reactor Vessel Flange B6~50 Washer 3 X 027300 RV-59-TB B-G-1**N/A**Reactor Vessel Flange B6~50 Washer 3 X 027400 RV-60-TA B"G-1 VT-1 Reactor Vcsscl Flange B6.50 Washer 3 X**N/Aaa 027500 RV-60-TB B-G-1 VT 1**N/A**Reactor Vessel Flange B6.50 Washer 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 34 urc Head Washers NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTZFZCATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ZTEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
**CALIBRATION BLOCK~i 027600 RV-61-TA B G-1 Reactor Vessel Flange B6~50 Washer VT-1 3 X ION/A*f 027700 RV-61-TB B-G-1 VT-1**N/A+~Reactor Vcsscl Flange B6.50 Washer 3 X 027800 RV-62-TA B-G"1 VT-1**N/A*%Reactor Vessel Flange B6 F 50 Washer 3 X 027900 RV 62 TB B-G-1**N/A**Reactor Vessel Flange B6.50 Washer 3 X 028000 RV-63-TA B-G-1~~N/A~~Reactor Vcsscl Flange B6.50 Washer 3 X 028100 RV-63-TB B-G 1 VT-1 Reactor Vessel Flange B6.50 Washer 3 X*AN/A**028200 RV-64-TA BG-1 VT 1 Reactor Vessel Flange B6~50 Washer 3 X**N/Af*028300 RV-64 TB B-G-1 VT-1*AN/AOt Reactor Vcsscl Flange B6.50 Washer 3 X
 
DATE: 10/15/99 REVISION: 0 NZNE HIIE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN"YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS PAGE: 35 rol Rod Drive Housings NUMBER: 00.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAHINATZON AREA NUMBER IDENTIFICATION ASHE SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
+~CALIBRATION BLOCK**00.0 RPV (REF.DWG.NO.28A)041300 CRD XX-X Capscrcws (8)8 ()B-G 2 B7.80 X---X X--X Only when disassembled, To be identified as disassembled during each outage~~N/A+~041400 NCTS503783 1 AZZSRDH NOTS VT-2 CRDH Exterior e Rx 503783 Bottom Head 3 X---X X--X All CRD Housings, CRD pcn.leakage req'd during RFO a Maint 4 Mid-cycle shutdown when drywcll De-inerted.
0 1 N/A**041500 RV-CRD-Rl B" 0 Examine outer 180 CRD Housing-to-Flange B14.10 weld 3 degrccs of circufercnce pcr RR-ISZ-9**N/A*+041600 RV-CRD-RS B 0 Examine outer 180 CRD Housing-to-Flange B14.10 weld 3 X degrees of circumfcrencc pcr RR-ZSI-9 i~N/Ai+041700 RV-CRD-Sl B-0 Examine outcr 180 CRD Housing-to-Flange B14.10 weld 3 X degrees of circumfcrencc per RR-ZSI-9**N/A~~041800 RV" CRD-S3 B-0 Examine outer 180 CRD Housing-to-Flange B14.10 weld 3 X degrccs of circumference per RR-ISZ-9*~N/A**041900 RV-CRD-T3 B-0 Examine outer 180 CRD Housing-to-Flange B14.10 weld 3 dcgrccs of circumference pcr RR-ISZ-9~~N/A+~
 
DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 36 rol Rod Drive Housings NUMBER: 00.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATZON AREA NUMBER IDENTIFICATION 042000 RV-CRD-T7 ASME SEC.XZ CATEGY NDE ITEM NO METH B-0 FIRST PERIOD SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
~+CAIIBRATZON BLOCK**Examine outer 180 CRD Housing-to-Flange B14.10 weld degrees of circumfcrcncc pcr RR-ZSZ-9~~N/A~*042100 RV CRD U2 B-0 Examine outer 180 CRD Housing-to-Flange B14.10 weld 3 X dcgrecs of circumference pcr RR-ISI-9*~N/A~~042200 RV-CRD-U6 B-0 Examine outer 180 CRD Housing-to-Flange B14.10 weld 3 X dcgrecs of circumfcrcnce pcr RR-ZSZ-9*~N/A~~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 37 tor Vassal Flange NUMBER: 00.0
 
==SUMMARY==
EXAMZNATZON AREA NUMSER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ZTEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR ZNSTRUCTZONS
**CALIBRATION BLOCK**00.0 RPV (REF.DWG.NO.28)042300 RV-01-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
**Pl LF 1*a 042400 RV-01-T Reactor Vessel Bushings in Flange B"G-1 B6.50 VT-1 3 X Only when disassembled.
**N/A*~042500 RV 02-L B-G-1 Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
**Pl-LF-lai 042600 RV-02-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disassembled.
++N/A++042700 RV-03-L B-G-1 UT Reactor Vcsscl Threads B6.40 in Flange 3 X Only when disassembled.
**Pl LF 1++042800 RV-03-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disassembled.
44N/A4 l 042900 RV-04-L B-G-l UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
**Pl LF 1**043000 RV-04-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disasscmblcd.
F DATE: 10/15/99 REVISZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 38 tor Vessel Flange NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS a yCALIBRATION BLOCKt s 043100 RV-05-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
tfP]LF]1l 043200 RV 05 T Reactor Vessel Bushings in Flange B-G-1 B6.50 VT"1 3 X Only when disassembled.
~*N/A**043300 RV-06-L B-G-l UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
**Pl-LF-I~~
043400 RV-06-T Reactor Vessel Bushings in Flange B-G-l B6.50 VT-1 3 X Only when disassembled.
+~N/A~~043500 RV-07-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disasscmblcd.
+~Pl-LF-I++
043600 RV-07-T Reactor Vcsscl Bushings in Flange B-G-1 B6.50 3 X Only when disassembled.
**N/A**043700 RV-08-L B G 1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
*~Pl-LF-1**043800 RV-08 T Reactor Vessel Bushings in Flange B G-1 B6.50 3 X Only when disassembled.
*AN/AJ*
 
DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 39 tor Vessel Flange NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION ZNTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR ZNSTRUCTZONS w wCALZBRATION BLOCK*s 043900 RV-09-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
eePZ LF Zaa 044000 RV-09-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disassembled.
*1'N/A**044100 RV-10-L B-G-1 UT Reactor Vcsscl Threads B6.40 in Flange 3 X Only when disassembled.
*~Pl-LF-l~~
044200 RV-10-T Reactor Vessel Bushings in Flange B-G-l B6.50 VT-1 3 X Only when disassembled., 044300 RV-11-I B G-1 UT Reactor Vessel Threads B6 40 in Flange 3 X Only when disassembled.
+*Pl LF-I++044400 RV-11-T Reactor Vessel Bushings in Flange B-G-1 B6.50 VT 1 3 X Only when disassembled.
%AN/A%*044500 RV-12-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
<<*Pl-LF-I**
044600 RV-12-T Reactor Vessel Bushings in Flange B-G-1 B6.50 VT-1 3 X Only when disassembled.
*ON/A**
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 40 tor Vessel Flange NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFZCATZON ZNSPECTZON INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
*~CALIBRATION BLOCK**044700 RV-13-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
~~PI-LF-I~*
044800 RV-13-T Reactor Vessel Bushings in Flange B-G-1 B6.50 VT-1 3 X Only when disassembled.
'+N/A~+044900 RV-14-L B-G-l UT Reactor Vcsscl Threads B6.40 in Flange 3 X Only when disassembled.
~~Pl-LF-1+~045000 RV-14-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disasscmblcd.
~~N/A~~045100 RV-15-L B"G-1 UT Reactor Vcsscl Threads B6.40 in Flange 3 X Only when disassembled.
41P]IF 1*4 045200 RV-15 T Reactor Vessel Bushings in Flange B-G-1 B6.50 VT-1 3 X Only when disassembled.
ttN/A4*045300 RV-16-L B-G-1 UT Reactor Vcsscl Threads B6.40 in Flange 3 X Only when disassembled.
**Pl-Z,F-1**
045400 RV-16-T Reactor Vessel Bushings in Flange B G-1 B6.50 3 X Only when disassembled.
**N/A~~
a DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 41 tor Vessel Flange NUHBER: 00.0 SUHHARY EXAHZNATZON AREA NUHBER IDENTIFICATION INSPECTION ZNTERVAZ ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR ZNSTRUCTIONS
~~CALIBRATION BLOCX~~045500 RV-17-L B-G-1 Reactor Vcsscl Threads B6.40 in Flange X Only when disassembled.
++Pl-LF-1*~
045600 RV-17-T Reactor Vassal Bushings in Flange B-G 1 B6.50 3 X Only when disassembled.
*~N/A~~045700 RV 18 L B-G 1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
*~PI-LF-1*~
045800 RV-18-T Reactor Vessel Bushings in Flango B-G-1 B6.50 VT-1 3 X Only when disasscmblcd.
~*N/A**045900 RV 19 L B G-1 UT Reactor Vcsscl Threads B6.40 in Flange 3 X Only when disasscmblcd.
**Pl LF-1**046000 RV-19-T Reactor Vessel Bushings in Flange BG1 B6.50 3 X Only when disasscmblcd.
046100 RV-20-L B-G 1 UT Reactor Vessel Thrca'ds B6.40 in Flange 3 X Only when disassembled.
++Pl-LF-I++
046200 RV-20-T Reactor Vcsscl Bushings in Flango B-G-1 B6.50 VT"1 3 X Only when disasscmblcd.
 
DATE: 10/15/99 REVZSZON: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 42 tor Vessel Flange NUMBER: 00.0
 
==SUMMARY==
EXAMZNATZON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ZTEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
**CALIBRATION BLOCK**046300 RV-21-L B-G-1 Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
ttP]LF]tt 046400 RV-21-T Reactor Vcsscl Bushings in Flange B-G-1 B6.50 VT-1 3 X Only when disassembled.
046500 RV-22-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disasscmblcd.
~~Pl-LF-1*~
046600 RV-22-T Reactor Vessel Bushings in Flange BG1 B6.50 3 X Only when disasscmblcd.
**N/A~~046700 RV-23-L B G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
+*Pl-LF-1*~
046800 RV-23-T Reactor Vessel Bushings in Flange B-G" 1 B6.50 3 X Only when disassembled.
046900 RV 24-L B-G-1 UT Reactor Vcsscl Threads B6.40 in Flange 3 X Only when disasscmblcd.
**Pi-LF-1~*
047000 RV-24-T Reactor Vcsscl Bushings in Flange B G-1 B6.50 3 X Only when disassembled.
0 4'I DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 43 tor Vessel Flange NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTZFICATZON INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~~047100 RV-25-L B-G-1 Reactor Vessel Threads B6 40 in Flange 3 X Only when disassembled.
~+Pl-LF-I**
047200 RV-25 T Reactor Vessel Bushings in Flange B-G-l B6.50 3 X Only when disasscmblcd.
047300 RV-26-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
*~PI-LF-I+
~047400 RV 26 T Reactor Vessel Bushings in Flange B-G"1 B6.50 3 X Only when disassembled.
047500 RV-27-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
~*Pi-LF-I~+
047600 RV-27-T Reactor Vessel Bushings in Flange B-G 1 B6.50 3 X Only when disassembled.
047700 RV 28-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
**Pl-LF-I++
047800 RV-28-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disassembled.
lq DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 44 tor Vessel Flange NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERZOD THZRD PERIOD---OUTAGE--
1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR ZNSTRUCTZONS 1 rCALIBRATION BLOCK+~047900 RV-29-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
0IP]LF]**048000 RV 29 T Reactor Vessel Bushings in Flange B-G-1 VT-1 B6.50 3 X Only when disassembled.
~+N/A++048100 RV-30-L B-G-l UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disasscmblcd.
~~Pl-LF-1~~048200 RV-30-T Reactor Vcsscl Bushings in Flange B G-1 B6.50 3 X Only when disasscmblcd.
*'~N/A~*048300 RV-31-L B-G-l UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
~~Pl-LF-1~~
048400 RV-31-T Reactor Vessel Bushings in Flange B G"1 B6.50 3 X Only when disassembled.
1 O'/A1 0 048500 RV-32-L B-G-l UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
~~Pl-LF-I**
048600 RV-32-T Reactor Vessel Bushings in Flange B G-1 B6.50 3 X Only when disassembled.
*IN/A4*
 
DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE ZNSPECTZON TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 45 tor Vessel Flange NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK*~048700 RV-33-L B-G-1 UT Reactor Vcsscl Threads B6.40 in Flange 3 X Only when disassembled.
a+PI-LF-Iae 048800 RV"33-T Reactor Vessel Bushings in Flange B-G-l B6.50 3 X Only when disassembled.
4 1N/A**048900 RV-34-L B-G"1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disasscmblcd.
~+Pl-LF-1~+049000 RV 34 T Reactor Vcsscl Bushings in Flange B G'1 B6.50 3 X Only when disassembled.
**N/Af*049100 RV-35-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
*+Pl-LF-I++
049200 RV-35-T Reactor Vessel Bushings in Flange BG1 B6.50 3 X Only when disassembled.
l*N/A1 1 049300 RV-36-L BG1UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disasscmblcd.
aaPI LF 1**049400 RV-36-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disasscmblcd.
t 1N/Ak*
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PZAN CZASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 46 tor Vcsscl Flange NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTZFZCATZON ZNSPECTZON ZNTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
++CALIBRATION BLOCK++049500 RV-37-L B-G-l Reactor Vessel Threads B6.40 in Flange 3----X Only when disassembled.
~+Pl-LF-1~~049600 RV-37-T Reactor Vessel Bushings in Flange B-G-l B6.50 3 X Only when disassembled.
~kN/Af4 049700 RV-38-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange X Only when disassembled.
~~Pl-LF-l~~
049800 RV-38-T Reactor Vcsscl Bushings in Flange B-G-1 B6.50 3 X Only when disassembled
~~N/A+*049900 RV-39-L B-G-1 UT Reactor Vcsscl Threads B6.40 in Flange 3 X Only when disassembled.
~~Pl-LF-I**
050000 RV-39-T Reactor Vessel Bushings in Flange B-G-1 B6.50 VT-1 3 X Only when disassembled.
*+N/A+*050100 RV-40-L B G-l UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
**Pl-LF-1*~
050200 RV-40-T Reactor Vessel Bushings in Flange B G 1 B6.50 3 X Only when disassembled.
k4N/A*4
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 47 tor Vessel Flange NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ZTEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~~050300 RV-41-L B-G 1 Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
++Pl-LF-1~~
050400 RV-41-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disassembled.
+AN/A+a 050500 RV-42-L B-G-1 UT Reactor Vcsscl Threads B6.40 in Flange 3-"--X Only when disassembled.
**Pl-LF-1**
050600 RV 42 T Reactor Vessel Bushings in Flange B G-1 B6.50 3 X Only when disassembled.
t*N/A*4 050700 RV-43-I B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disasscmblcd.
++Pl-LF-1*~, 050800 RV 43 T Reactor Vessel Bushings in Flange B-G-1 B6.50 VT-1 3 X Only when disasscmblcd.
1 O'/A**050900 RV-44-L B G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
**Pl-I,F-1**
051000 RV-44-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disasscmblcd.
*~N/A~~
4 DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 48 tor Vessel Flange NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFZCATZON INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
*+CALIBRATION BLOCK~+051100 RV-45-L B-G-l Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
aaP1 IF 051200 RV-45-T Reactor Vessel Bushings in Flange B-G-l B6.50 VT-1 3 X Only when disassembled.
**N/A+i 051300 RV-46-L BG1UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
~+Pl-LF-1~~051400 RV-46-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disassembled.
~+N/A++051500 RV-47-L B-G-1 Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
*~PI-LF-l~~
051600 RV-47-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disassembled.
f 4N/Al t 051700 RV-48-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
**Pl-I F-1**051800 RV-48-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disasscmblcd.
~~N/Ai~
0~},
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PIAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 49 tor Vcsscl Flange NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERZOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
++CALIBRATION BLOCK+*051900 RV-49-L B-G-l UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
toPI LF Itf 052000 RV-49-T Reactor Vessel Bushings in Flango B-G-1 B6.50 3 X Only when disassembled.
**N/A*~052100 RV-50-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
**Pl-LF-1*~
052200 RV-50-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disassembled.
*iN/A*%052300 RV-51-L B-G-1 UT Reactor vcsscl Threads B6.40 in Flange 3 X Only when disassembled.
+*Pl-LF-1**
052400 RV-51-T Reactor Vcsscl Bushings in Flange B"G 1 B6.50 3 X Only when disassembled.
+*N/A*+052500 RV-52-L B" G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
**Pl-LF-1**
052600 RV-52-T Reactor Vessel Bushings in Flange B-G-1 86.50 3 X Only when disassembled.
**N/A**
 
DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1~INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 50 tor Vessel Flange NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTION ZNTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PZAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR I INSTRUCTIONS
~*CALIBRATION BLOCK**052700 RV-53-L B-G-1 Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
4%PI LF Ilt 052800 RV-53-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disassembled.
~~N/A++052900 RV-54-L B-G-1 UT Reactor Vcsscl Threads B6.40 in Flange 3 X Only when disassembled.
~~PI-LF-I++
053000 RV-54-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 Only when disassembled.
*ON/A*%053100 RV 55 L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disasscmblcd.
++Pl-LF-1~~
053200 RV-55-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disassembled.
++N/A++053300 RV-56-L B-G-l UT Reactor Vcsscl Threads B6 40 in Flange 3 X Only when disassembled.
**Pl-LF-1**
053400 RV 56 T Reactor Vessel Bushings in Flange B"G 1 B6.50 3 X Only when disassembled.
*ON/At 1
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 51 tor Vessel Flange NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTZON INTERVAL SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERZOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS t t CALIBRATION BLOCKt t 053500 RV-57-L BG1UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled."t Pl-IF-I t~053600 RV-57-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disasscmblcd.
*'tN/A't 053700 RV-58-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disasscmblcd.
t*Pl-LF-ltt 053800 RV 58 T Reactor Vcsscl Bushings in Flange B G-1 B6.50 3 X Only when disassembled.
*tN/A**053900 RV"59-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
t t Pl-LF-1 t t 054000 RV-59-T Reactor Vessel Bushings in Flange BG1 B6.50 VT 1 3 X Only when disassembled.
ttN/Att 054100 RV 60-L B-G-1 UT Reactor Vcsscl Threads B6.40 in Flange 3 X Only when disassembled.
ttpl-LF-ltt 054200 RV-60-T Reactor Vessel Bushings in Flange B-G-1 B6.50 VT 1 3 X Only when disasscmblcd.
t tN/At 1
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 52 tor Vcsscl Flange NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFZCATION ZNSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD PIAN STATUS SECOND PERZOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
++CALIBRATION BLOCK~'~054300 RV-61-L B-.G-1 Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
i*Pl-LF-1~~
054400 RV-61-T Reactor Vessel Bushings in Flange B-G 1 B6.50 3 X Only when disassembled.
*+N/A+*054500 RV-62-L B-G-1 UT Reactor Vcsscl Threads B6~40 in Flange 3 X Only when disassembled.
~~PI-LF-I~~
054600 RV-62-T Reactor Vessel Bushings in Flange B-G-1 B6.50 VT-1 3 X Only when disasscmblcd.
~~N/A~~'*W 054700 RV-63-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
++PI-LF-1*~
054800 RV-63-T Reactor Vcsscl Bushings in Flange B-G"1 B6.50 3 X Only when disassembled.
054900 RV 64-L B-G-1 UT Reactor Vessel Threads B6.40 in Flange 3 X Only when disassembled.
**PI-LF-I**
055000 RV-64-T Reactor Vessel Bushings in Flange B-G-1 B6.50 3 X Only when disassembled tAN/Atf
 
DATE: 10/15/99 REVZSION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 53 tor Vcsscl Interior NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTION INTERVAL SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
**CALIBRATION BLOCK**RPV (REF.DWG.NO.28A)056100 HS B-N-2 Shroud Support skirt B13.40 H8 Weld VT-3 3 X UT*USNRC GL94-03, USNRC SER 3/24/99 RFO16 scope to be defined, EVT1 top surface 6 Locations of prior indications; UT to be determined.
**LATER**056200 H9 B-N-2 EVT1 Shroud Support Skirt B13.40 H9 Weld Scope to be dcfincd, BWRVZP-38 Exam 0 to 180 degrees~~N/A~~056300 H9 B N 2 EVT1 Shroud Support Skirt B13.40 H9 Weld 3 X Scope to bc dcfincd, BWRVZP-38 Exam 180 to 360 dcgrccs~~N/A**056400 H9-166 B"N-2 Shroud Support Skirt B13.40 H9 Weld Repair Anch VT-3 3 X USNRC GL94-03, USNRC SER 3/24/99 RF016 scope to bc defined, EVT1 top surface of shroud support skirt to RPV H9 weld ad)accnt to TIEROD-RXVE-166.
for a min.26" ad)accnt to two togg~~N/A~~056500 H9-270 B-N-2 EVT1 Shroud Support Skirt B13.40 VT-3 H9 Wold Repair Anch USNRC GL94"03, USNRC SER 3/24/99 RFO16 scope to bc dcfincd, EVT1 top surface of shroud support skirt to RPV H9 weld ad)accnt to TIEROD-RXVE-270 foc a min.26" ad)accnt to two toggl~~N/A~~
 
DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 54 tor Vessel Interior NUMBER: 00.0
 
==SUMMARY==
EXAMZNATZON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD THIRD PERIOD-OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~+CALIBRATION BLOCK~+056600 H9-350 B-N-2 EVT1 Shroud Support Skirt B13.40 VT-3 H9 Weld Repair Anch USNRC GL94-03, USNRC SER 3/24/99 RF016 scope to be defined, EVT1 top surface of shroud support skirt to RPV H9 weld ad)accnt to TIEROD-RXVE-350 for 26" adjacent to two toggles..~~N/A*~056700 H9-90 B"N"2 EVT1 Shroud Support Skirt B13.40 VT-3 H9 Weld Repair Anch 3 X USNRC GL94"03, USNRC SER 3/24/99 RFO16 scopo to be defined, EVT1 of top surface of shroud support skirt to RPV H9 wold ad)accnt to TIEROD-RXVE-90 for a min.of 26" adjacent to two~~N/A~~056900 RV-01-Z Stcam Dryer Drain Cracking SZL 474 X---X---X Once every inspection period~~N/A~~057000 RV 01 I Stcam Dryer B" N-1 B13.10 3 X---X---X Once cvcry inspection period~~N/A~~057100 RV-02-I Stcam Separator B-N-1 VT-3 B13.10 3 X---X---X Once every inspection period~~N/A~~057200 RV-05-I Fccdwatcr Sparger NUREG 0619 VT 3 3 X Exam required cvcry four outages, commencing in RF08, (1981), Examine flow holes a welds in sparger arms 6 tees and FW nozzle~~N/AP~
 
DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PZANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 55 tor Vessel Interior NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERZOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
+*CALIBRATION BLOCK**057300 RV-06-I Core Spray Sparger BNRVI P VT-3 Examine pcr Memo 18 NMP1-M99-018.
++N/A+~3 X---X X--X 057400 RV-07-I Core Spray Lines BWRVZP VT 1 18 3 X---X X--X Examine per Memo NMP1-M99-018.
~*N/A~~057500 RV-08-Z B-N-2 VT-1 Dryer Support Brackets B13.20 (bcltlino) 3 X Examine once pcr interval*+N/A+*057600 RV-09-Z Feedvater Sparger Brackets (bcltline)
B-N-2 B13.20 VT 1 3 X Examine once pcr interval++N/A++00 RV-10-I Guide Rod Support Brackets (bcltlinc)
B-N-2 VT-1 B13.20 3 X Examine once per interval++N/A**057800 RV-11-I Upper Survicllancc Specimen Holder B-N-2 VT-1 B13.20 3 X hei tlinc, Examine once pcr interval*~N/A*+057900 RV-12-Z Lower Survicllancc Specimen Holder B-N-2 VT-1 B13.20 3 X bcltlinc, Examine once pcr interval+~N/A+~058000 RV-13-I Upper Ccrc Grid B-N-2 VT-3 B13.40 3 X Examine once pcr Znspection Interval*fN/A*0 058100 RV-13-I Upper Core Grid SZL 554 3 X RFO-16 scope to bc defined..+~N/A++
 
DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 56 tor Vessel Interior NUMBER: 00.0
 
==SUMMARY==
EXAMINATZON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
~+CALIBRATION BLOCK**058300 RV-14-I Core Shroud B-N-2 B13.40 VT 3 Examine accessible surface's each interval.X%*N/At 0 058400 RV-15-Z B-N-2 VT-3 Core Shroud Support B13.40 Ring 3 X Examine once pcr Inspection Interval aaN/A*t 059000 SZL409-ZDTC1245 SZL IRM Incorc Dry Tube 409R1 4 Assembly 3 X X EVT1 every other even numbcrcd outage++N/A~~059900 SZI 409-IDTC3645 SIL IRM Zncoro Dry Tube 409R1 Assembly EVT1 3 X X EVT1 cvcry other even numbcrcd outage++N/A++060100 Shroud Head Bolts B-N-2 VT-3 Shroud Head Bolts (36)B13.40 UT 3 X UT cxams to bc identified later pending final results of BWR Owner's Group.~~LATER~~060200 Skirt-166 Shroud Support Skirt Surface B-N-2 EVT1 B13.40 3 X USNRC GL94-03, USNRC SER 3/24/99, EVT1 top surface of inconel srd.sprt.skirt where accessible around intcrfacc of lower stablizcr sprt.pedestal to conical sprt.8 166 dcg ticrod~+N/A~~
 
DATE: 10/15/99 REVZ SION: 0 NINE HYLE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COHPONENTS PAGE: 57 tor Vessel Interior NUMBER: 00.0
 
==SUMMARY==
EXAHINATZON AREA NUHBER ZDENTZFZCATZON INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FZRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR ZNSTRUCTIONS
+~CALIBRATION BLOCK~~060300 Skirt-270 B-N-2 EVT1 Shroud Support Skirt B13.40 Surface 3 X USNRC GL94-03, USNRC SER 3/24/99, EVT1 top surface of inconcl srd.sprt.skirt whcrc accessible around interface of lower stablizer suppt pedestal to conical sprt 6 270 dcg ticrod~~N/A~~060400 Skirt-350 B-N-2 EVT1 Shroud Support Skirt B13.40 Surface 3 X USNRC GL94-03, USNRC SER 3/24/99, EVT1 top surface of inconcl srd.sprt.skirt where accessible around interface of lower stablizcr supt.pcdcstal to conical sprt 6 350 deg tierod<<~N/A**060500 Skirt-90 B-N-2 EVT1 Shroud Support Skirt B13.40 Surface 3 X USNRC GL94 03, USNRC SER 3/24/99, EVT1 top surface of inconcl srd sprt skirt when accessible around interface of lower stablizcr supt pedestal to conical sprt 6 90 dcg ticrod locat**N/A~~060600 Spaccr-RXVE-168 Shroud Stabilizer Assembly (Spacer)B-N-2 VT-3 B13.40 3 X USNRC GL94-03, USNRC SER 3/24/99, BWRVI P rcccommends exam of shroud assembly core plate clamp/spaccr assembly located bctwcen ZD of shroud 6 core support plate 8 168 dcg.11N/Alt
 
DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 58 tor Vessel Interior NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTZON INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERZOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
~+CALIBRATION BLOCK++060700 Spacer-RXVE-276 Shroud Stabilizer Assembly (Spacer)B-N-2 VT-3 B13.40 3 X USNRC GL94"03, USNRC SER 3/24/99, BWRVIP reccommends exam of shroud assembly coro plate clamp/spaccr assembly located bctwccn ZD of shroud support plate 8 276 deg.~~N/A~~060800 Spacer-RXVE-348 Shroud Stabilizer Assembly (Spaccr)B-N-2 VT-3 B13.40 3 X X USNRC GL94-03, USNRC SER 3/24/99, BWRVIP rcccommcnds exam of shroud assembly core plate clamp/spcccr assembly located between ID of shroud 6 core support plate 8 348 dcg.**N/At*060900 Spaccr-RXVE-96 Shroud Stabilizer Assembly (Spaccr)B-N-2 VT 3 B13.40 3 X---X USNRC GI 94-03, USNRC SER 3/24/99, BWRVIP rcccommcnds exam of shroud assembly core plate clamp/spaccr assembly located bctwccn ZD of shroud 4 core support plate 896 dcg.t4N/Att 061000 Tiorod-RXVE-166 Shroud Stabilizer Assembly (Tic Rod)B-N-2 VT-3 B13.40 3 X---X USNRC GL94-03'SNRC SER 3/24/99, BWRVZP rcccommcndcd
**N/A**061100 Ticrod-RXVE-270 Shroud Stabilizer Assembly (Tic Rod)B"N-2 VT-3 B13.40 3 X X USNRC GL94-03, USNRC SER 3/24/99, BWRVIP rcccommcndcd
**N/A**
 
DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 59 tor Vessel Interior NUHBER: 00.0
 
==SUMMARY==
EXAHZNATZON AREA NUMBER ZDENTZPZCATZON INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEH NO HETH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTZONS
**CALIBRATION BLOCK*n 061200 Tierod-RXVE-350 Shroud Stabilizer Assembly (Tic Rod)B-N-2 VT-3 B13.40 3 X X USNRC GL94-03, USNRC SER 3/24/99, BWRVIP reccommended n*N/A**061300 Tierod-RXVE-90 Shroud Stabilizer Assembly (Tic Rod)B-N 2 VT 3 B13.40 X---X USNRC GL94 03, USNRC SER 3/24/99, BWRVIP reccommcnded
*nN/A*i 061400 Vl CoreShroud Vertical Wclds B-N-2 EVT1 B13.40 UT 3 X X USNRC GL94-03, USNRC SER 3/24/99, BWRVZP rcccommondcd EVT1 of ZD/OD, 25%of total length, UT contgcncy only,**LATERnn 00 V10 B-N-2 EVT1 Core Shroud Vertical B13.40 UT Wclds 3 X X USNRC GL94-03, USNRC SER 3/24/99, EVT1 of ID/OD 25%of total length, UT contgy only, BWRVZP roccommendcd
*~LATER*i 061600 V11 B-N-2 EVT1 Core Shroud Vortical B13.40 UT 3 X---X Wclds USNRC GL94 03, USNRC SER 3/24/99, BWRVIP recommended EVT1 of ID/OD 25%of total length, UT contgy only.~~LATER~~061700 V12 B-N-2 EVT1 Core Shroud Vertical B13.40 UT 3 X X Wclds USNRC GL94-03, USNRC SER 3/24/99, BWRVZP roccommcndod EVTl of ID/OD 25%of total length, UT contgy only~+LATER+~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 60 tor Vessel Interior NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTZON INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
**CALIBRATION BLOCK~*061800 V13 B-N-2 EVT1 Core Shroud Vertical B13~40 UT Wclds 3 X---X USNRC GL94 03, USNRC SER 3/24/99, BWRVZP reccommcndcd EVT1 of ZD/OD 25%of total length, UT contgy only.*+LATER+*061900 V14 B-N-2 EVT1 Core Shroud Vertical B13.40 UT 3 X-------X Wclds USNRC GL94-03, USNRC SER 3/24/99, BWRVZP reccommcndcd EVT1 of ID/OD 25%of total length, UT contgy only.%*LATER**062000 V15 B-N-2 Core Shroud Vertical B13.40 Wclds UT 3 X X USNRC GL94-03, USNRC SER 3/24/99, BWRVIP reccommended, EVT11 of ZD/OD 25%of total length, UT contgy only.~~LATER**062100 V16 C B-N-2 EVT1 Core Shroud Vertical B13.40 UT Wclds 3 X X USNRC GL94-03, USNRC SER 3/24/99, BWRVIP reccommcnded, EVT1 of ZD/OD 25%of total length, UT contgy only.~~LATER**062200 V2 B-N-2 EVT1 Core Shroud Vertical B13.40 UT Welds X X USNRC GL94-03, USNRC SER 3/24/99 i BWRVI P reccommcndcd, EVT1 of ZD/OD 225%of total length, UT contgy only.**LATER**
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 61 tor Vessel Interior NUMBER: 00.0
 
==SUMMARY==
EXAMINATZON AREA NUMBER IDENTIFICATION INSPECTION ZNTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
**CALIBRATZON BLOCK~*062300 V3 B-N-2 EVT1 Core Shroud Vertical B13.40 UT Welds 3 X X USNRC GL94-03, USNRC SER 3/24/99, BWRVIP reccommcndcd EVT1 of ID/OD 25%of total length, UT contgy only.~~LATER~+062400 V4 B-N-2 EVT1 Core Shroud Vertical B13.40 UT Wclds 3 X X USNRC GL94-03, USNRC SER 3/24/99, BWRVIP reccommcndcd, EVT1 of ID/OD 25%of total length, UT contgy only.++LATER*+062500 V5 B-N-2 EVT1 Coro Shroud Vertical B13.40 Wclds-Ring Support 3 X X USNRC GL94-03, USNRC SER 3/24/99, BWRVZP rcccommended, EVT1 of ZD/OD 25%of total length,~~N/A~*062600 V6 B-N-2 EVT1 Core Shroud Vertical B13.40 Welds-Ring Support 3 X X USNRC GL94-03, USNRC SER 3/24/99, BWRVIP rcccommended, EVT1 of ZD/OD 25%of total length,~~N/A~~062700 V7 B-N-2 EVT1 Core Shroud Vertical B13.40 UT 3 X X Wclds USNRC GL94-03, USNRC SER 3/24/99, BWRVIP reccommended, EVT1 of ID/OD 25%of total length, UT contgy only.ssLATERei
 
DATE: 10/15/99 REVISION: 0 NINE HYLE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS PAGE: 62 tor Vessel Interior NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTZON INTERVAL SEC.XI CATEGY NDE ZTEH NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
~*CALIBRATION BLOCX**062800 VS B-N-2 EVT1 Core Shroud Vertical B13.40 UT 3 X Welds X USNRC GL94-03, USNRC SER 3/24/99, BWRVZP reccommcnded, EVT1 of ID/OD 25%of total length, UT contgy only.~~LATER~~062900 V9 B-N-2 EVT1 Core Shroud Vertical B13~40 UT 3 X Welds USNRC GL94-03, USNRC SER 3/24/99, BWRVIP reccommended, EVT1 of ID/OD 25%of total length, UT contgy only.t 1 LATER*4 0
DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PIANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 63 tor Vessel Nozzles NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTZFZCATZON INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERZOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~*Instrument Nozzles (REF.DWG.NO.14)063000 SIL571-N12 RPV N12 Instr Nozzle-to-Safe End SII VT-2 571 3 X---X X--X VT-2 after vessel flood-up (static prcssure, no hold time)at start of each RFO 4 during System Leakage each RFO.+iN/A~~Safety Valve Nozzles (REF.DWG.NO.28)063100 CH-576-07A-B Nozzle N7N Flange Bolting B"G-2 B7.10 3 X R33~*N/A*+063200 CH-576-07B-B Nozzle N7P Flange Bolting B"G-2 Bj.10 3 X R34~iN/Aii 063300 CH-576-07C-B Nozzle N7R Flange Bolting B-G-2 B7.10 3 X Group R35~*N/A**063400 CH-576-07D-B Nozzle N7S Flange Bolting B-G-2 B7.10 3 X Group R36*~N/A*+063500 CH-576-07E-B Nozzle N7T Flange Bolting B-G-2 VT 1 B7.10 3 X Group R37~~N/A~~063600 CH-576-07F-B Nozzle N7U Flange Bolting B-G-2 B7.10 3 X Group R38~~N/A~~
0 DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 ZNSERVZCE ZNSPECTZON TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 64 tor Vessel Nozzles NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
+*CALIBRATION BLOCK*~063700 CH-576-12A-B Nozzle N7A Flange Bolting B-G-2 B7.10 3 X Group R21+~N/A~~063800 CH-576-12B-B No zlc N7B Flange Bolting B-G-2 B7.10 3 X Group R22~*N/A~~063900 CH-576-12C-B Nozzle N7C Flange Bolting B-G-2 B7.10 3 X Group R23**N/A~*064000 CH-576-12D-B Nozzle N7D Flange Bolting B"G-2 B7.10 3 X Group R24**N/A**064100 CH-576-12E-B No zlc N7E Flange Bolting B G 2 B7.10 X Group R25~+N/A++064200 CH-576-12F-B Nozzle N7F Flange Bolting B-G-2 B7.10 3 X Group R26~~N/A~~064300 CH"576-12G-B B-G-2 VT-1 Group R27~~N/A~~Nozzle N7G Flange B7.10 Bolting 3 X 064400 CH-576-12H-B Nozzle N7H Flange Bolting B-G-2 B7.10 3 X Group R28**N/A~~
 
DATE: 10/15/99 REVZSZON: NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 65 tor Vcsscl Nozzlcs NUMBER: 00.0
 
==SUMMARY==
EXAMZNATZON AREA NUMBER ZDENTZFICATZON INSPECTION ZNTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD 0 U T AG E THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTZONS
~~CALIBRATION BLOCK~'~064500 CH-576-12 J-B Nozzle N7J Flange Bolting B-G-2 B7.10 3 X Group R29~~N/A**064600 CH-576-12K-B Nozzle N7K Flange Bolting B-G-2 B7.10 3 X Group R30+~N/A++064700 CH-576-12L-B Nozzle N7L Flange Bolting B-G-2 Bj.10 VT-1 3 X Group R31~~N/A~~064800 CH-576-12M-B B-G-2 VT-1 Group R32*+N/A**Nozzle N7M Flange B7.10 Bolting 3 X 064900 RV-WD 011 B-F UT Group R21**LATER**Nozzle N7A-to-Flange B5.10 PT 3 X 065000 RV-WD-Oll SZL Nozzle N7A-to-Flange 455R1S1 3 X Group R21, Inconcl 1S2 butter expansion from nozzle side of weld.**LATERI*065100 RV-WD-012 B-D Group R21,**LATER**Closure Head-to N7A B3.90 Nozzle 3 X 065200 RV-WD-012-IR N7A Nozzle Inner Radius Section B-D B3.100 3 X Group R21,**LATER~~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 66 tor Vessel Nozzles z NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PZAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS ttCALIBRATION BLOCK~'065300 RV WD 013 SIL Nozzle N7B-to-Flange 455R1S1 3 X Group R22, Znconel 182 butter expansion from nozzle side of weld.~~LATER~~065400 RV WD 013 B-F UT GrouP R22++ZATER~~Nozzle N7B-to-Flange B5~10 3 X 065500 RV-WD-014 B-D Group R22,~~IATER~~Closure Head-to-Nozzle B3~90 N7B 3 X 065600 RV"WD" 014-IR Nozzle N7B Znner Radius Section B-D B3.100 3 X Group R22,~~IATER~~065700 RV-WD-015 B-F UT Group R23,~~LATER~~Nozzle N7C-to-Flange B5~10 PT 3 X 065800 RV-WD-015 SZL Nozzle N7C-to-Flange 455R1S1 3 X Group R23, Inconel 182 butter expansion from nozzle side of weld**ZATER**065900 RV WD 016 B-D Group R23,+*ZATER**Closure Head-to-Nozzle B3.90 Njc 3 X 066000 RV-WD-016 ZR Nozzle N7C Inner Radius Section B-D UT B3.100 X Group R23,++LATER~+
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE ZNSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 67 tor Vessel Nozzles NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS ilCALIBRATZON BLOCK>>~066100 RV-WD-017 B-F UT Group R24~~LATER~~Nozzle N7D-to-Flange B5.10 PT 3 X 066200 RV-WD-017 SZL UT Nozzle N7D-to-Flange 455R1S1 3 X Group R24, Inconel 182 butter expansion from nozzle side of weld+~LATER~~066300 RV-WD-018 B"D UT Group R24,~~LATER'Closure Head-to-Nozzle B3~90 N7D 3 X 066400 RV-WD-018-ZR Nozzle N7D Inner Radius Section t 066500 RV-WD-019 B-D UT B3.100 B-F UT 3 X Group R24,**LATER~~Group R25,+~ZATER+~Nozzle N7E-to-Flange B5.10 PT 3 X 066600 RV-WD-019.SZL UT Nozzle N7E-to-Flange 455R1S1 3 X Group R25, Inconel 182 butter expansion from nozzle side of weld.**LATER~*066700 RV"WD-020 B-D Group R25,~~LATER~~Closure Head-to-Noz"lc B3.90 N7E 3 X 066800 RV"WD"020-ZR Nozzle N7E Inner Radius Section B-D B3.100 3 X Group R25,**LATER**n>
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 68 or Vessel Nozzles NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTZON ZNTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PZAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
>>>>CALIBRATION BLOCK>>>>066900 RV-WD-021 B-F UT Group R26>>>>LATER>>>>
Nozzle N7F-to-Flange B5.10 PT 3 X 067000 RV-WD-021 SIL UT Nozzle N7F-to-Flange 455R1S1 Group R26, Inconel 182 butter expansion from nozzle side of weld**IATER>>*067100 RV-WD-022 B-D UT Closure Head-to-Nozzle B3.90 3 X Group R26,>>>>ZATER*>>067200 RV-WD-022-ZR Nozzle N7F Inner Radius Section B-D UT B3.100 3 X Group R26,**ZATER>>*067300 RV-WD-023 Nozzle N7G-to-Flange B-F UT B5.10 PT 3 X Group R27**ZATER**067400 RV-WD-023 SZL UT Nozzle N7G-to-Flange 455R1S1 3 X Group R27, Inconcl 182 butter expansion from thc nozzle side of weld>>>>LATER>>>>067500 RV-WD-024 B D UT Group R27,**ZATER>>>>Closure Head-to-Nozzle B3.90 N7G 3 X 067600 RV-WD-024-ZR Nozzle N7G Inner Radius Section B-D UT B3.100 3 X Group R27,>>>>LATER>>>>
0 DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 69 tor Vessel Nozzlcs NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTZON INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~*CALIBRATION BLOCK~~067700 RV-WD"025 B F UT Group R28+~LATER**Nozzle N7H-to-Flange BS.10 PT 3 X 067800 RV-WD-025 SZL Nozzle N7H-to-Flange 455R1S1 3 X Group R28, Znconcl 182 butter expansion from nozzle side of weld**LATER**067900 RV-WD"026 B-D UT Group R28,~~LATER+~Closure Head-to-Nozzle B3.90 N7H 3 X 068000 RV-WD-026-ZR Nozzle N7H Inner Radius Section B-D UT B3.100 3 X Group R28,**LATER~*068100 RV-WD-027 Nozzle N7J-to-Flange B-F UT B5.10 PT 3 X Group R29**LATER++068200 RV-WD"027 SIL UT Nozzle N7J-to-Flange 455R1S1 3 X Group R29, Inconcl 182 butter expansion from nozzle side of weld.~~LATER**068300 RV-WD"028 B D UT Group R29,**LATER+~Closure Head-to-Nozzle B3~90 N7J 3 X 068400 RV-WD-028 IR Nozzle N7J Inner Radius Section B-D B3.100 3 X Group R29,*~LATER~~
 
DATE: 10/15/99 REVISZON: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 70 tor Vessel Nozzles z NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~~068500 RV-WD-029 B-F UT Group R30,~~LATER'*Nozzle N7K-to-Flange B5.10 PT 3 X 068600 RV-WD-029 SZL UT Nozzle N7K-to-Flange 455R1S1 3 X Group R30, Znconcl 182 butter expansion from nozzle siCk of weld.~~LATER++068700 RV-WD-030 B-D Group R30, iiZATER+~Closure Head-to-No zlc B3.90 N7K 3 X 068800 RV-WD-030-ZR Nozzle N7K Inner Radius Section B-D B3.100 3 X Group R30,**LATER~*068900 RV-WD-031 B-F UT Group R32++LATER~i Nozzle N7M-to-Flange B5 10 PT 3 X 069000 RV-WD"031 SIL Nozzle N7M-to-Flange 455R1S1 X Group R32, Znconcl butter expansion from the nozzle side of thc weld~~LATER~~069100 RV-WD-032 B-D Group R32,~PLATER*~Closure Head-to-Noz"lc B3.90 N7M 3 X 069200 RV-WD-032-IR Nozzle N7M Inner Radius Section B-D B3.100 3 X Group R32, i~LATER~~
 
DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 71 tor Vessel Nozzles NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERZOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
**CALIBRATION BLOCK~+069300 RV-WD-033 B-F UT Group R33+~LATER~+Nozzle N7N-to-Flange B5.10 PT 3 X 069400 RV-WD-033 SZL Nozzle N7N-to-Flange 455R1S1 3 X Group R33, Znconcl 182 butter expansion from nozzle side of weld.~~LATER~*069500 RV-WD-034 B-D UT Group R33,**LATER~~Closure Head-to-Nozzle B3.90 N7N 3 X 069600 RV"WD-034-ZR Nozzle N7N Inner Radius Section B-D UT B3.100 3 X Group R33,*~LATER~~069700 RV-WD-035 B-F UT Group R34*~IATER~~Nozzle N7P-to-Flange BED 10 PT 3 X 069800 RV-WD-035 SZI UT Nozzle N7P-to-Flango 455R1S1 3 R34 , Znconel 182 butter expansion from thc nozzle side of thc weld.+~LATER+*069900 RV-WD-036 B-D UT R34+~LATER~*Closure Head-to-Nozzle B3.90 N7P 3 X 070000 RV-WD-036-ZR Nozzle N7P Inner Radius Section B-D B3.100 3 X R34~~LATER~~
 
DATE: 10/15/99 REVZ S ZON: 0 NINE MILE POINT NUCLEAR PZANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 72 tor Vessel Nozzles NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
++CALIBRATION BLOCK~~070100 RV-WD-037 B-F UT Group R35,**LATER**Nozzle N7R-to-Flange B5.10 PT 3 X 070200 RV-WD-037 SZL Nozzle N7R-to-Flange 455R1S1 X Group R35, Inconcl 182 butter expansion from thc nozzlo sido of the weld.i*IATERi~070300 RV-WD-038 B-D GrouP R35, 44LATER4~Closure Head-to-Nozzle B3.90 N7R 3 X 070400 RV-WD-038-ZR Nozzlo N7R Inner Radius Section B-D B3.100 3 X Group R35,~iLATERi~070500 RV-WD-039 B-F UT Group R36**IATERii Nozzlo N7S-to-Flange B5.10 3 X 070600 RV-WD-039 SZL Nozzle N7S-to-Flange 455R1S1 3 X Group R36, Inconcl 182 butter expansion from the nozzle side of thc weld.**IATER~~070700 RV-WD-040 B-D Closure Head-to-Nozzle B3.90 N78 3 X Group R36,+~IATERi'70800 RV-WD-040-ZR Nozzle N7S Inner Radius Section B-D B3.100 3 X Group R36,<<~IATER~*
 
DATE: 10/15/99 REVISION: 0 NINE MZIE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 73 tor Vessel Nozzlcs NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFICATZON INSPECTION ZNTERVAL SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
++CALIBRATION BLOCK++070900 RV WD 041 B F UT Group R37**LATER~i Nozzle N7T-to-Flange B5~10 PT X 071000 RV-WD-041 SZL Nozzle N7T-to-Flange 455R1S1 3 X Group R37, Inconel N butter expansion from the noz le side of thc weld.**IATER**071100 RV WD-042 B-D Group R37,**LATER+*Closure Head-to-Nozzle B3.90 N7T 3 X 071200 RV-WD-042 ZR No zlc N7T Inner Radius Section B-D B3.100 3 X Group R37,~iLATERi~071300 RV WD 043 No" zle N7U-to-Flange B5.10 PT 3 X Group R38~~IATER*+071400 RV-WD-043 SIL Nozzle N7U-to-Flange 455R1S1 3 X Group R38, Inconcl 182 butter expansion from the nozzle side of the weld.~~IATER~~071500 RV-WD-044 B-D Group R38*PLATER~~Closure Head-to-Nozzle B3~90 N7U 3 X 071600 RV-WD-044-ZR Nozzle N7U Inner Radius Section B-D B3.100 3 X Group R38**LATER**
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 74 tor Vessel Nozzles NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASHE SEC.XI CATEGY NDE ITEH NO METH FIRST PERZOD PLAN SIATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~*6.0" Safety Relief Valve (REF.DWG.NO.28)071700 V-BK-01-119A B-M-2 VT-3 Safety Valve Zntcrior B12.50 Surface X V09, Examine when disassembled
+~N/A~~Control Rod Drive Nozzles (REF.DWG.NO.28A)073500 CRD NOEELES B" E VT-2 Partial Penetration B4~12 Wclds 129 CRD Nozzlcs, 25%or 32 required, included in system pressure test program**N/A**Instrumentation Nor zlcs (REF.DWG.NO.28A)073600 INST-NOEELES Incore Flux Honitors B4.13 VT"2 3 X 64 IFH's, 25%or 16 repaired, included in system pressure test program*~N/A**Instrument Worries (REF.DWG.NO.8)073900 SZL571-N13A SZL VT 2 VT-2 after vessel RPV N13A Instr 571 No ic-to-Safe End X---X X--X flood-up (static prcssure, no hold time)at start of each RFO f during System Lcakagc each RFO.~~N/A~*074000 SZL571-N13B SZL VT-2 RPV N13B Instr 571 Nozzle-to-Safe End X---X X--X VT-2 after vessel flood-up (static prcssure, no hold time)at start of each RFO 4 during System Leakage each RFO.**N/A~*
 
DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 75 tor Vessel Nozzlas NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION ZNTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FZRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
**CALIBRATION BLOCK+'~Znstrumcnt Nozzles (REF.DWG.NO.SA)074100 SZL571-N14A RPV N14A Instr Nozzle-to-Safe End SIL VT-2 571 3 X---X X--X VT-2 after vessel flood-up (static pressure, no hold time)at start of each RFO a during System Lcakagc each RFO.~~N/A~~074200 SIL571-N14B RPV N14B Znstr Nozzle-to-Safe End SZL VT" 2 571 X---X X--X VT-2 after vessel flood-up (static prcssure, no hold time)at start of each RFO a during System Leakage each RFO.~~N/A~+Instrument Nozzles (REF.DWG.NO.SB)00 SZL571-N15A SIL VT-2 RPV N15A Instr 571 Nozzle-to-Safe End X---X X--X VT-2 after vcsscl flood-up (static prcssure, no hold time)at start of each RFO a during System Leakage each RFO.**N/A*~074400 SIL571 N15B RPV N15B Znstr Nozzle-to-Safe End SIL VT-2 571 3 X---X X--X VT-2 after vessel flood-up (static pressure, no hold time)at start of each RFO 6 during System Leakage each RFO.~+N/A~~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PZANT UNIT 1 INSERVZCE INSPECTION TEN YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 76 tor Vessel Nozzles NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS atCALIBRATZON BLOCK+a Instrument Nozzles (REF.DWG.NO.BC)074500 SZL571 N16A RPV N16A Instr Nozzle-to-Safe End SZL VT-2 571 3 X---X X--X VT-2 after vessel flood-up (static pressure, no hold tine)at start of each RFO 6 during System Leakage each RFO.~~N/A~~074600 SZL571-N168 RPV N16B Instr Nozzle-to-Safe End SIL VT 2 571 3 X---X X--X VT-2 after vessel flood-up (static pressure, no hold tine)at start of each RFO a during System Lcakagc each RFO.~*N/A*+Instrument No zlcs (REF.DWG.NO.SD)00 SZL571-N17A SZL VT-2 RPV N17A Instr 571 Nozzle-to-Safe End X---X X--X VT-2 after vessel flood-up (static pressure, no hold time)at start of each RFO C during System Leakage each RFO.**N/A+~074800 SIL571-N17B RPV N17B Instr Nozzle-to-Safe End SZL 571 VT 2 3 X---X X--X VT-2 after vessel flood-up (static prcssure, no hold time)at start of each RFO 6 during System Leakage each RFO.**N/A~~
 
'ATE: 10/15/99 REVI SION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 77 tor Vessel Supports NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS THIRD PERIOD SECOND PERIOD--OUTAGE--
1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS 4 lCALIBRATION BLOCK~~Stabilizers (REF.DWG.NO.28)074900 RV-SB-1A F-A VT 3 RPV Stabilizer Strut F1.40 3 X Code Case N-491-1~+N/A+~075000 RV SB-1B RPV Stabilizer Strut F1.40 3 X Code Case N-491-1*AN/Alt 075100 RV SB-2A RPV Stabilizer Strut F1.40 3 Coda Case N-491-1++N/A~+075200 RV-SB-2B F-A VT-3 RPV Stabilizer Strut F1.40 3 X Code Case N 491 1+*N/A+*00 RV-SB-3A F-A VT 3 RPV stabilizer Strut F1.40 3 X Code Case N-491-1~~N/A~*075400 RV-SB-3B RPV Stabilizer Strut Fl~40 VT 3 3 X Code Case N-491-1 aeN/Aee 075500 RV-SB-4A F-A VT" 3 RPV Stabilizer Strut F1.40 3 X Code Case N-491-1+~N/A++075600 RV-SB-4B F-A VT-3 RPV Stabilizer Strut F1.40 3 X Code Casa N-491-1 i*N/A%*Integral Attachments (REF.DWG.NO.2S)075700 RV-SB1-ZA-371/372 B-K MT Stabilizer Integral B10.10 Woldcd Lug 8 22.5 3 X WRA 50%, Examine accessible length of attachment weld., Coda Caso N-509.~*N/A*~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 78 tor Vessel Supports NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
+*CALIBRATION BLOCK~~075800 RV-SB2-ZA-373/374 B-K MT Stabilircr Integral B10.10 Welded Lug 8 112.5 3 X WRA 50%, Examine accessible length of welded attachment, Code Casa N-509.~~N/A~~Zntcgral Attachments (REF.DWG.NO.28A)076200 RV"WD"356-OD B-K PT SuPport Skirt Integral B10.10 Attachment Weld 100%of attachment weld length, Code Case N-509 3 X aaN/Aaa Support Skirt (REFT DWG.NO.N/A)076300 RPV-NR02 SKT/BLT F-A VT-3 Support Skirt F1.40 3 X+*N/A*+
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PZAN.I CLASS 1 SECTZON XI SCHEDULED COMPONENTS PAGE: 79 tor Vessel Welds NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFICATZON INSPECTION ZNTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR ZNSTRUCTZONS
~~CALIBRATION BLOCK**076500 RV-WD-001 B-A UT Closure Head-to-Flange Bl.40 MT Wold Closure Head Wclds (REF.DWG.NO.28)X---X---X Examine 100%of weld length, 1/3 each inspection period**IATER**076600 RV-WD"002 Closure Hcad-Circumferential Weld B-A UT Bl.21 3 X Removable steal insulation platform, 50%CRV achieved, Dollar Plate)+~IATERi i 076700 RV-WD-003 Closure Hcad-Mcridional Weld B-A UT Bl.22 3 X Examine accessible length of weld.**IATER**00 RV-WD-004 Closure Head-Mcridional Weld B-A UT B1.22 3 X Examine accessible length of wold.~~IATER~*076900 RV-WD-005 Closure Head-Mcridional Weld B-A UT B1.22 3 X Examine accessible length of weld~~IATER~~077000 RV-WD-006 Closure Hcad-Meridional Weld B-A UT B1.22 3 Examine accessible length of wold.**LATER~~077100 RV-WD-007 Closure Head-Mcridional Weld B-A UT Bl.22 3 X Examine accessible length of weld.**ZATER~+
 
DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNZT 1 ZNSERVZCE ZNSPECTZON TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 80 tor Vessel Welds NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
**CALIBRATION BLOCK**077200 RV-WD-008 Closure Head-Meridional Weld B A UT B1.22 3 X Examine accessible length of weld*~IATER~~077300 RV-WD-009 Closure Head-Mcridional Weld B-A UT B1.22 Examine accessible length of weld.3 X+~LATER~~077400 RV-WD-010 Closure Head-Mcridional Weld B"A UT B1.22 3 X Examine accessible length of weld~~LATER~~Shell Wclds (REF.DWG.NO.28)RV-WD-099 B-A AUT Shell-to-Flange weld B1.30 3 X 100%of weld length from thc shell side*~LATER**077600 RV-WD-099 Shell-to-Flange weld Bl~30 3 X 100%of wold length from the seal surface**LATER*+077900 RV-WD-130 B-A AUT Upper Shell Long Weld B1.12 15 3 100%of weld length, and intersection of circumferential weld RV-WD 100*+LATER+*078000 RV-WD 131 B-A Upper Shell Long Weld B1.12 8 135 3 X 100%of weld length and intersection of RV WD 100.+*LATER*+078100 RV-WD-132 B-A AUT Upper Shell Long Weld B1.12 8 255 3 X 100%of weld length and intersecting circumfcrcntial weld RV-WD-100.
~~LATER~~
 
DATE: 10/15/99 REVISION: 0 NINE MZZE POINT NUCLEAR PLANT UNZT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 81 tor Vassal Welds NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTZON ZNTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR ZNSTRUCTZONS
++CALIBRATION BLOCK>>~078200 RV-WD-133 B-A Upper Intermediate B1.12 Shell Long Weld 8 90 3 X 100%of weld length and intersecting circumferential weld RV-WD-100 C RV-WD-101.
++IATER~+078300 RV-WD-134 B-A Upper Intermedi ate Bl.12 Shell Long Weld 8 210 3 X 100%of weld length and intcrsccting circumferential weld RV-WD-100 C RV-WD-101.
**LATER+~078400 RV-WD-135 B-A Upper Intermediate Bl.12 Shell Long Weld 8 330 3 X 100%of weld length and intcrsccting circumferential weld Rv wD 100 a Rv-wD 101.~+LATER**078700 RV-WD-139 B-A Lower Intcrmediatc B1.12 Shell Long Weld 8 105 3 X 100%of weld length and intersecting circumfcrcntial weld RV-WD-101 4 RV-WD-137.
+~IATER~+078800 RV-WD 140 B-A Lower Zntcrmcdiatc B1.12 Shell Long Weld 8 225 3 100%of weld length and intersecting circumferential weld RV-WD-101 6 RV-WD-137.
**LATER**078900 RV-WD-141 B A Lower Intermediate Bl.12 Shell Long Weld 8 345 X 100%of weld length and intersecting circumferential weld RV-WD-101 S RV-WD-137.
**LATER**
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 INSERVICE INSPECTION TEN-YEAR PLAN lI CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 82 tor Vessel Wclds NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTZON INTERVAL SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE-THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~+079000 RV-WD-142 B-A AUT Lower Shell Long Weld B1.12 8 18 3 X 100%of weld length and intersecting circumf crential weld RV-WD-101 6 RV-WD-137.
*+LATER'~'
079100 RV-WD-143 B-A AUT Lower Shell Long Weld B1.12 138 3 X 100%of weld length and intersecting circumferential weld RV-WD-137 6 RV-WD-138.
*+LATER*+079200 RV-WD-144 B-A AUT Lower Shell Long Weld B1.12 e 258 3 X 100%of weld length and intersecting circumforontial wclds RV-WD 137 6 RV"WD-138.
+iLATER+*Bottom Head Wclds (REF.DWG.NO.28A)079300 RV-WD-147 B A UT Bottom Head Dollar B1.21 Plate Circ.Weld 3 Accessible length of weld**LATER*~079400 RV-WD-148 B-A UT Bottom Head Meridional B1.22 Weld 3 X Accessible length of wold+*LATER~~079500 RV-WD-149 B A Bottom Head Meridional B1.22 Weld 3 X Accessible length of weld**LATER'~079600 RV-WD-150 B-A Bottom Head Meridional B1.22 Weld 3 X Acccssiblc length of weld~~LATER**
 
DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 83 tor Vessel Wclds NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTIPICATZON INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 XRESERVZCE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK+~079700 RV-WD-151 B A Bottom Head Meridional B1.22 Weld 3 X Accessible length of weld**LATER+a 079800 RV-WD-152 B-A UT Bottom Head Meridional B1.22 Weld 3 X Accessible length of weld**LATER*~079900 RV-WD-153 B A UT Bottom Head Meridional B1.22 Weld 3 X Acccssiblc length of weld+PLATER**080000 RV-WD-154 B-A UT Bottom Head Meridional B1.22 Weld 3 X Accessible length of weld~~LATER++080100 RV-WD-155 B-A UT Bottom Head Meridional B1.22 Weld 3 X Accessible length of weld~*LATER'*080200 RV-WD-156 Bottom Head Meridional B1.22 Weld 3 X Accessible length of weld**LATER*~080300 RV-WD-157 Bottom Head Meridional B1.22 Weld 3 X Accessible length of weld**LATER~~080400 RV WD-158 Bottom Head Meridional B1.22 Weld 3 X Acccssiblc length of weld~*LATER**
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 84 tor Vessel Welds~NUMBER: 00.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~~080500 RV-WD-159 B-A Bottom Head Meridional Bl.22 Weld 3 X Accessible length of weld~~LATER~~080600 RV-WD-160 B-A UT Bottom Head Meridional Bl.22 Weld 3 X Acccssiblc length of weld~~LATER~+080700 RV-WD-161 B-A UT Bottom Head Meridional B1.22 Weld 3 X Accessible length of weld++LATER**080800 RV-WD-162 Bottom Head Circumf crcntial Weld B A UT Bl.21 3 X Accessible length of weld~~LATER~~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 85 Steam System NUMBER: 01.0
 
==SUMMARY==
EXAHZNATZON AREA NUHBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEH NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
+*CALIBRATION BLOCK+*24.0" HSB (REF.DWG.NO.2)080900 01-01-VB Globe Valve 01-01 Bolting B-G-2 B7.70 V01, Limited to valve selected under B-M-2 SAN/At+081000 01-01-VBY Globe Valve 01-01 Interior Surface B-M-2 B12.50 3 X V01, Only when disassembled, onc valve in a group of valves.%*N/A+*6.0" HSB Relief (REF.DWG.NO.2)081900 01-07-VB Gate Valve 01-07 Bolting B-G-2 B7.70 3 V02, Limited to valve selected under B-M-2 X 14N/At%000 01-07-VBY Gate Valve 01-07 Interior Surface B-M-2 VT-3 B12.50 X V02, Only when disassembled, one valve in a group of valves.**N/A**6.0" MSB (REF.DWG.NO.2)082700 01-102-A-SVB Relief SV 01-102A Bolting B-G-2 B7,70 3 X V03, 12 Bolts, Limited to valve selected under B-H-2~*N/A**~082800 01-102-A-SVBY B"M-2 Rclicf SV 01-102A B12.50 Interior Surface 3 X V03, Only when disassembled, one valve in a group of valves%*N/A%4 082900 01-102-A-WD-001 Relief SV 01 102A Valve Body Weld B"M-1 UT B12.40 3 X V03, Limited to one valve in a group of valves.~~LATER*~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCZEAR PIANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 86 Steam System NUMBER: 01.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATOS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
*~CALIBRATION BLOCK**2.0" MSA Vent Line (REF.DWG.NO.2)084900 01-120-VB B-G-2 VT-1 Valve 01-120 Bolting B7.70 3 X 2 Bolts~*N/A~*24.0" MSA (REF.DWG.NO.2)086600 01 MSH 21 WD 001 B-K Integral Attachment B10.20 Lug 1 3 X Code Case N-509, Welded on 3 sides~~N/A~~086700 01-MSH-21-WD-002 B-K Integral Attachment B10.20 Lug 2 3 X Code Case N-509, Welded on 3 sides**N/A~*6800 01-MSH-21 WD 003 B-K PT Integral Attachment B10.20 Lug 3 3 X Code Case N-509, Welded on 3 sides~~N/Ai*086900 01 MSH-21-WD-004 B-K Integral Attachment B10.20 Lug 4 3 X Code Case N-509, Welded on 3 sides~*N/A~~087000 01-MSH-21A Spring Hanger F-A F1.10 VT-3 3 Code Case N-491-1, 4 Integrally Welded Lugs**N/Af 4 087100 01-MSH 21B Spring Hanger Fl.10 VT-3 3 X Code Casa N-491-1++N/A~~
0 DATE: 10/15/99 REVISION: 0 NZNE MZLE POINT NUCLEAR PIANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 87 Stcam System NUMBER: 01.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH PIAN STATUS SECOND PERIOD THIRD PERIOD FIRST PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK**24.0" MSB (REF.DWG.NO.2)087600 01-MSH-22A F-A Spring Hanger Fl.10 VT-3 3 X Code Case N-491-1.~~N/A~~24.0" MSA (REF.DWG.NO.2)087800 01-MSH-23 Pipe Stanchion F A Fl.10 VT-3 3 X Code Case N-491-1 saN/A+a 32.0" MSA (REF.DWG.NO.2)088200 01-WD-001 B-D Nozzle N3A-to-Vessel B3.90 3 X Group Rll, 87%CRV, Limitation due to ad)accnt nozzle and Bioshicld.
~~IATER++z 00 01-WD 001 IR Nozzle N3A Inner Radius Section B D UT B3.100 3 X Group Rll, 54%CRV, Limitation duc to ad)accnt nozzle and Bioshicld.
~~LATER~~24.0" MSA (REF.DWG.NO.2)088400 01-WD-002 B-J Group Rll,*~LATER~~Nozzle N3A-to-Safe B9.11 End 3 X 088500 01-WD 003 Nozzle N3A Safe End-to-Elbow B-J UT B9.11 MT 3 X Terminal End, Examine 100%of weld length~~NMPI-24-080-CS~~
088700 01-WD-006 Branch Connection (24"x2" WOL)B-J MT B9.32 3 X To Vent Line, Examine 100%of weld length a sN/AP a
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE ZNSPECTZON TEN YEAR PZAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 88 Steam System NE NUMBER: 01.0 SUHMARY EXAHINATZON AREA NUMBER IDENTZFZCATZON INSPECTION INTERVAL ASHE SEC.XI CATEGY NDE ITEM NO HETH PZAN STATUS THIRD PERIOD SECOND PERIOD FIRST PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
**CALIBRATION BLOCK**089800 01-WD-016 Branch Connection (24"X6" WOL)B-J UT B9.31 HT 3 X Examine 100%of weld length i~NHP1-24-080-CS, NMP1 6-80**090400 01-WD-019 B-J UT Pipo-to-Valvo 01-02 B9.11 HT 3 X Terminal End, High Stross Wold, Examine 100%of weld length+~NMPI-24-080"CS**
090500 01-WD-020 B-J UT Valve 01-02-to-Pipe B9.11 HT 3 X Terminal End, High Stress Weld, Examine 100%of weld length.**NMPI-24-080-CS~*
32.0" HSB (REF.DWG.NO.2)0800 01"WD-033 B-D Nozzle N3B-to-Vessel B3.90 3 X Group R12, 91%CRV Limitation duc to ad)acent nozzle and Bioshicld~*LATER+*090900 01-WD-033-ZR Nozzle N3B Inner Radius Section B-D B3.100 3 X Group R12, 78%CRV Limitation due to ad)accnt nozzlo and Bioshi old**LATER~~24.0" HSB (REF.DWG.NO.2)091000 01 WD-034 B-J MT Nozzle N3B-to-Safe End B9.11 3 X Group R12,*ePIR-l.475-1++091100 01-WD-035 Nozzlo N3B Safe End-to-Elbow B-J UT B9.11 3 X Tarnd.nal End, Examine 100%of wold length.**NHP1-24-080-CSs*
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 89 Steam System E NUMBER: 01.0 SUMHARY EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASHE SEC.XZ CATEGY NDE ZTEH NO HETH FIRST PERIOD PZAN STATUS SECOND PERZOD OUTAGE THZRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE 1'EAR INSTRUCTIONS
~*CALIBRATION BLOCK*+2.5" MSB (REP.DWG.NO.2)091600 01-WD-042 Reducer (2.5" x2.0")-to-Pipe B-J HT B9.21 3 X Cont.on sht.2A, Examine 100%of weld length**N/A+a 6.0" HSB (REF.DWG.NO.2)092100 01-WD-046-A Branch Connection-to-Valve 01-08 B-J UT B9.11 HT 3 X Terminal End, High Stress Weld, Examine 100%of weld length.+~NMPZ-6-80-CS~~
24.0" MSB (REP.DWG.NO.2)092600 01"WD-048 B-J HT Examine 100%of weld Branch Connection B9.31 UT{24"x6" WOL)length+~PZR-1.219-1, X 94-6007+*6.0" MSB (REF.DWG.NO.2)092700 01-WD"048-A Branch Connection-to-Valve 01-12 B-J UT B9.11 HT 3 X Terminal End, High Stress Weld, Examine 100%of weld length+*NHPZ-6-80-CS~+
092800 01-WD-048-B B-J UT Valve 01-12-Plangc B9.11 MT 3 01-102E X Terminal End, High Stress Weld, Examine 100%of wold length**NMP1-6"80-CS~~
24.0" MSB (REP.DWG.NO.2)092900 01-WD-050 B"J UT Pipe-to-Valve 01-01 B9.11 3 X Terminal End, High Stress Weld, Examine 100%of weld length**NMP1-24-080-CS~
~
 
DATE: 10/15/99 REVISZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 90 Steam System NUMBER: 01.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PZAN STATUS SECOND PERIOD OUTAGE THZRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
**CALIBRATION BLOCK~~093000 01-WD-051 B-J UT Valve 01-01-to-Pipe B9.11 MT 3 X Terminal End, High Stress Weld, Examine 100%of weld length.+*NMP1-24-080-CS(P1R-1.219-~~093300 01-WD-448 B-J PT Sock-0-Lct-to-Pipe B9.21 2.0" MSA Vent Linc (REF.DWG.NO.2)3 X Examino 100%of weld length++N/A+*093500 01-WD-450 Elbow-to-Pipe B J B9.21 3 X Examino 100%of weld length~*N/A~~800 01-WD-453 Pipe-to-Valve 01-120 B-J B9.21 3 X Examine 100%of weld length.*~N/A~~2.0" MSA Valve By-Pass Line (REF.DWG.NO.2B)094300 01-WD-454 Pipe-to-Coupling B-J MT B9.40 3 X Examino 100%of weld length.~~N/A++
 
DATE: 10/26/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 91 water System NUMBER: 31.0
 
==SUMMARY==
EXAMINATION AREA NUHBER ZDENTIFZCATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEH NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
**CALIBRATION BLOCK++18.0" FWA (REF.DWG.NO.5)095900 31-01R-FLG Check Valve 31-01R Flange Surface B-G-1 VT-1 B6.220 3 X V04, Limited to valve selected under B-M-2*IN/Ak l 096000 31-01R-VB Check Valve 31-01 Studs (18)BG1 UT B6.210 Limited to valve selected under B-M-2 3 X+*LATER**096100 31-01R-VBY Check Valve 31-01R Interior Surface B-M-2 B12.50 3 X V04, Only when disassembled, one valve among group of valves%IN/A%1 0 31 01R-VNW B-G-1 VT-1 Check Valve 31-01R B6.230 Nuts and Washers V04, Limited to valve selected under B-M-2**N/A*~096700 31-07-VB Gate Valve 31-07 Bolting B-G-2 B7.70 3 X V05, Limited to valve selected under B-M-2.096800 31-07 VBY Gate Valve 31-07 Interior Surface B-H-2 VT-3 B12.50 3 X V05, Only when disassembled, Limited onc valve among group of valves.**N/A**18.0" FWD (REF.DWG.NO.5)098000 31-A2 Anchor F-A Fl.10 VT 3 3 X Code Case N-491-1**N/A~*
 
DATE: 10/26/99 REVISZON: 0 NZNE MILE POINT NUCLEAR PIANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 92 ater System ZONE NUMBER: 31.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS t tCALZBRATION BLOCKt t 10.0" FWC{REF.DWG.NO.5)099900 31-HS-A Spring Hanger F-A F1.10 VT 3 3 4 Lugs welded 3 sides, Code Case N-491-1.X**N/Att 100000 31-HS-B Spring Hanger F-A Fl.10 VT 3 3 4 lugs, woldcd 3 sides, Codo Case N-491-1 X**N/At*100100 31-H5-WD-001 B"K MT Zntcgral Attachment B10.20 3 X CRA 90%, Code Case N-509 ttN/A**31-HS-WD-002 B-K MT Integral Attachment B10.20 3 X CRA 90%, Code Case N-509 ttN/At*100300 31"HS-WD-003 B-K MT Integral Attachment B10.20 3 X CRA 90%, 4 Lugs, pipe clamp contacts one side of lug.Code Case N-509*t'N/Att 100400 31-H5 WD-004 B-K MT Integral Attachment B10.20 3 CRA 90%, 4 Lugs, pipe clamp contacts ono side of lug, Codo Case N-509*t'N/A**10 0" FWD{REF.DWG.NO, 5)100500 31-H6 F-A VT 3 Spring Support F1.10 Stanchion 3 X Code Case N 491-1 ttN/A*i
 
DATE: 10/26/99 REVISION: 0 NINE HILE POINT NUCLEAR PIANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS PAGE: 93 water System E NUMBER: 31.0
 
==SUMMARY==
EXAHINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAI ASHE SEC.XI CATEGY NDE ITEH NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
**CALIBRATION BLOCK*~18.0" FWA (REF.DWG.NO.5)101300 31-HS F-A Spring Support F1.10 w/welded stanchion X Code Case N-491-1*AN/A*4 18.0" FWB (REF.DWG.NO.5)101900 31-WD-001 B-J HT Valve 31-02R-to-Valve B9.11 UT Extension 3 X Terminal End, High Stress Weld, Examine 100%of weld length.~~P1R-1.156-1*'~102500 31-WD-015 Pipe-to-Tee B-J UT B9.11 HT 3----X Examine 100%of weld length.~~PIR-1.156-1**
10.0" FWB (REF.DWG.NO.5)103000 31-WD-019 Pipe-to-Nozzle N4B Safe End B-J UT B9.11 HT 3 X Terminal End, Examine 100$of weld length~~PIR-1.156-1*~103100 31-WD-020 B-J UT Group R14,~~LATER~~Safe End-to Nozzle N4B B9.11 HT 3 103300.31-WD-021 B-D Nozzle N4B-to-Vcsscl B3.90 3 X Group R14, 78%CRV Limitation duc to ad)accnt nozzle and Bioshield~~LATER~~103400 31-WD-021 NUREG UT Group R14, Auto UT Nozzle N4B Bore (Zone 0619 3)Gene-Gcris 2000 system~~LATER+~
 
DATE: 10/26/99 REVISION: 0 NZNE MILE POINT NUCLEAR PIANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 94 water System NUMBER: 31.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
NUMBER EXAMINATION AREA IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD THIRD PERZOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
++CALIBRATION BLOCK*+103500 31-WD-021-ZR B D UT Noz.N4B Inner Radius B3 100 Section (zone 1/2)3 , X Group Rli, Auto UT Gene-Gcris 2000 system, Frequency per NUREG 0619, 47%CRV Limitation due to ad)acent nozzle and ioshield.~~LATER~+10.0" FWA (REF.DWG.NO.5)104300 31-WD-028 Pipe" to"Nozzle N4A Safe End B-J UT B9~11 MT 3 X Terminal End*~LATER**104400 31 WD-029 B J UT Safe End-to-Nozzle N4A B9.11 PT 3 X Group R13, 99%CRV Limitation duc to thermocouplc lugs++LATER'~~
104600 31"WD-030 B D UT N4A Nozzle-to-Vessel B3.90 3 X Group R13, 94%CRV Limitation due to ad)acent nozzle and Bioshicld,~~IATER~~104700 31-WD-030 NUREG UT N4A Nozzle Bore (Zone 0619 3)3 Group R13, Auto UT Gene-Geris 2000 system**LATER**104800 31-WD-030-ZR B"D N4A Noz.Inner Radius B3.100 Section(zone 1/2)3 X Group R13, 82%CRV, Limitation duc to ad)acent nozzle and Bioshield, Auto UT Gene-Gcris 2000 system , Frequency by NUREG 0619**LATER**
 
DATE: 10/26/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PIAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 95 water System NUMBER: 31.0 SUHMARY EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASHE SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
++CALIBRATION BLOCK~~18.0" FWA (REF.DWG.NO.5)10490031-WD-031 B"J MT Valve 31-01-to-Valve B9.11 UT 31-07 Extension Torminal End, High Stress Weld, Examine 100%of weld length.**P1R-1.156-1**18.0" FWB (REF.DWG.NO.5)105500 31-WD"045 Pipe-to-Tcc B-J UT B9.11 3 X Examine 100%of weld length+*PZR-1.156-1~~
10.0" FWC (REF.DWG.NO.5)106000 31-WD-049 Pipo-to-Nozzle N4C Safe End B J HT B9.11 3 Torad.nal End, Examine 100%of weld length.++PZR-.75-2++106100 31 WD-050 B-J UT N4C Nozzlo-to-Safe End B9.11 HT 3 X Group R15, 86%CRV, 99%for UT~*PIR-1.156-1*~
106300 31-WD-051 B D UT N4C Nozzle-to-Vessel B3~90 3 X Group R15, 84%CRV.Limitation duc to ad)acent nozzle and Bioshicld~~ZATERi~106400 31 WD 051 NUREG UT N4C Nozzle Bore (Zone 0619 3)3 X Group R15, Frequency pcr NUREG-0619
**LATER+a 106500 31-WD-051-ZR B-D N4C Noz.Inner Radius B3.100 Section (Zones 1/2 3 X Group R15, (Zone 1 4 2)Frequency per NUREG-0619, 86%CRV, Limitation duc to ad)acent nozzle and Bioshield.
~~LATER~~
 
DATE: 10/26/99 REVISZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PIAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 96 water System ZONE NUMBER: 31.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~*CALIBRATION BLOCK~~10.0" FWD (REF.DWG.NO.5)107300 31 WD-058 Pipe-to-Nozzle N4D Safe End B-J B9.11 X Terminal End~*FIR-.75-2~*
107400 31-WD-059 B J UT Group R16,~*LATER++N4D Safe End-to-Nozzle B9.11 3 X 107600 31"WD-060 B-D N4D Nozzle-to-Vessel B3.90 3 X Group R16, 82%CRV Limitation due to Bioshield**IATER*~107700 31-WD-060 N4D Nozzle Bore (Zone 0619 3)3 X Group R16, Frequency per NUREG-0619
**N/A~+107800 31-WD" 060-ZR B D N4D Noz.Inner radius B3.100 Section (zones 1/2 3 X Group R16, Zone 1 4 2, 59%CRV Limitation duc to Bioshield, Frcqucncy by NUREG-0619
~~LATER~~
 
Page 97 Left Blank Intentionally
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 98 tor Recirculation E NUMBER: 32.0 Discharge INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
~~CALIBRATION BLOCK~*28.0" Discharge 12D (REF.DWG.NO.7)109200 32-12-H4A F-A VT-3 Spring Hanger Fl.10 3 X Removed verify, Code Case N-491-1*~N/A~~109300 32-12-H4B Spring Hanger Fl.10 3 X Removed verify, Code Caso N-491-1~~N/A~+109600 32-13-H4 WD 001 B K PT Integral Attachment B10.20 Lug 28.0" Discharge 13D (REF.DWG.NO.7)3 X (32-13-H-4-A), Code Case N-509**N/A**109700 32-13"H4"WD-002 B-K Integral Attachment B10.20 Lug X (32-13-H-4-A), Code Case N-509**N/A**109800 32-13-H4-WD-003 B K Zntcgral Attachment B10.20 Lug X (32-13-H-4-B), Code Case N-509~*N/A~*109900 32-13-H4-WD-004 B-K Integral Attachment B10.20 Lug 3 X (32-13-H-4-B), Code Case N-509~*N/A~*110000 32-13-H4A Spring Hanger Fl.10 3 X Code Case N-491-1++N/A+*110100 32-13-H4B Spring Hanger Fl.10 3----X Code Case N-491-1**N/A**
 
DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 99 tor Recirculation Discharge ZONE NUMBER: 32.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH PLAN STATUS THIRD PERIOD SECOND PERIOD FIRST PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~*28.0" Discharge 15D (REF.DWG.NO.7)112000 32-15-H4A F-A VT-3 Spring Hanger Fl.10 3 X Code Case N-491-1*~N/A~*112100 32-15"H4B Spring Hanger F-A Pl.10 3 X Code Case N-491-1+*N/A++113900 32-385-VB B-G-2 VT-1 Valve 32-385 Bolting B'7.70 2.0" Discharge 11D (REF.DWG.NO.7)3 X 2.0" Valve By-pass Linc**N/At 1 2.0" Discharge 12D (REP.DWG.NO.7)000 32-386-VB B-G-2 VT-1 Valve 32-386 Bolting B7.70 3 X 2.0" Valve by-pass linc 2.0" Discharge 13D (REF.DWG.NO.7)114100 32"387 VB B-G-2 VT" 1 Valve 32-387 Bolting B7.70 3 X 2.0" Valve by-pass linc~*N/A*+2.0" Discharge 14D (REP.DWG.NO.7)114200 32-388-VB B-G 2 VT-1 Valve 32-388 Bolting B7.70 3 X 2.0" Valve by-pass line**N/A+~114300 32-389 VB B-G 2 VT 1 Valve 32-389 Bolting B7.70 2.0" Discharge 15D (REF.DWG.NO.7)3 X 2.0" Valve by-pass line%AN/A*t
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTZON TEN-YEAR PLAN CZASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 100 or Recirculation Discharge NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
++CALIBRATION BLOCK**28.0" Discharge 13D (REF.DWG.NO.7)115000 32-SB-6A Sway Brace F-A Fl.10 3 X Code Case N-491-1*+N/A**115100 32-SB-6B Sway Brace Fl.10 3 X Code Case N-491"1 eaN/Ate 28.0" Discharge 11D (REF.DWG.NO.7)115400 32-WD"017 Pump 11 Discharge-to-Elbow B-J UT B9.11 3 X Terminal End, High Stress Wold, Examine 100%of weld length.~~PSR-Z.2*~
00 32-WD"017-Dl Elbow-Long Scam OR B-J UT B9.12 PT 3 X Code Case N-524~*PSR-Z.2~~
115700 32"WD-017-D2 Elbow-Long Seam ZR B-J UT B9.12 PT 3 X Code Casa N-524 e t PER-1.2*a 3.0" Dischargo 11D (REF.DWG.NO.7)115900 32-WD-020 Branch Connection-Dccon B-J PT B9.32 3 X**N/A~*116000 32-WD"020-FB 11D Dccon Flango Bolting B-G-2 B7.50 VT"1 3 X Examine in place, when removed or disasscmblcd.
*+N/A**
 
DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PIANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDUZED COMPONENTS PAGE: 101 or Recirculation NUMBER: 32.0 Discharge INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
~~CALIBRATION BLOCK~~28.0" Discharge llD (REF.DWG.NO.7)116600 32"WD-022 Pipe-to-Gate Valve 32-380 B-J UT B9.11 PT 3 X Terminal End, High Stress Weld, Examine 100%of weld length.*+PSR-1.2+*116700 32-WD-022 Pipe-to-Gate Valve 32"380 GL A 88-01 3 X+*PSR-1.109-l~~116800 32-WD-022-U Pipe-Long Seam B-J B9.12 3----X Code Case N-524<<~PSR-1.2**2.0" Discharge 11D (REF.DWG.NO.7)32-WD-023 Coupling-to-Pipe B"J PT B9.40 H 3 X**N/A**118000 32-WD-034 Pipe-to-Coupling B J PT B9.40 3 X 4*N/A*1 28.0" Discharge 11D (REF.DWG.NO.7)118100 32-WD-035 Gate Valve 32-380-to-Pipe B-J UT B9.11 PT**PSR-1.2*~118200 32-WD-035 Gate Valve 32-380-to-Pipe GL-A UT 88 01 3 X~*PSR-I.109-1*~119300 32-WD-040 Elhow-to-Pipe GL-A UT 88-01 3 X**PSR-1.109-1)
PSR-1.260**
 
DATE: 10/15/99 REVISZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 102 or Recirculation Discharge NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTZFZCATZON ASME SEC.XI CATE GY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
+~CALIBRATION BLOCK+~119800 32-WD-041 Pipe-to-Nozzle N2A Safe End B-J PT B9.11 UT 3----X Examine 100%of weld length.~~PSR-l.655/1.150-1,PSR-119900 32-WD-041 Pipe-to-Nozzle N2A Safo End GL-A UT 88-01 3 X+*PSR-1.655/1.150**120000 32-WD-041-U Pipe-Long Seam B-J B9.12 3 X Code Case N-524~~PSR-l.2~~120100 32-WD-042 GL A UT Group R06~~LATER~~N2A Nozzle-to-Safe End 88-01 X 120200 32-WD-042 B-F UT Group R06,~~IATER~~NPA Nozzle-to-Safe End B5.10 PT 3 X 120300 32-WD-042 SZL N2A Nozzle-to-Safe End 455R1S1 3 X Group R06, Incolal 182 butter expansion from nozzle side of weld*+ZATER+*120400 32-WD-043 B-D AUT N2A No" zle-to-Vessel B3.90 3 X Group R06, 75%CRV Limitation due to bottom head taper of shell thickness+~N/A**120500 32"WD-043-ZR N2A Nozzle Inner Radius Section B-D AUT B3.100 3 X Group R06, 60%CRV Limitation due to bottom head taper of shell thickness*~N/A+~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 103 or Recirculation NUMBER: 32.0 Discharge INSPECTION INTERVAI PLAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATZON AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FZRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCTIONS
**CALIBRATION BLOCK~*28.0" Discharge 12D (REF.DWG.NO.7)120600 32-WD"057 B J PT Pump 12 B9~11 UT Discharge-to-Elbow 3 Terminal End, High Stress Weld, Examine 100%of weld length.**PSR-1.260a m 120800 32-WD-057"Dl Elbow-Long Seam OR B-J PT B9.12 UT 3 X Code Case N-524++PSR-1.260**
120900 32-WD-057-D2 B-J PT Elbow-Long Seam ZR B9~12 UT 3 X Code Case N-524**PSR-1.260**
3.0" Discharge 12D (REF.DWG.NO.7)00 32 WD 060-FB BG2 Dccon Flange Bolting B7.50 VT-1 3 X Examine in place, when removed or when disasscmblcd.
~*N/A~~2S.O" Discharge 12D (REF.DWG.NO.7)121300 32-WD-061 Elbow-to-Pipe GL-A UT 88"01 3 X~~PER" 1.109-1+~121400 32-WD-061 Elbow-to-Pipe B-J UT B9.11 PT 3 X~~PSR-1.2**121900 32-WD"062 Pipe-to-Gate Valve 32-381 GL-A UT 88-01 3 X~~PSR-1.109-1*+
 
DATE: 10/15/99 REVISZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN'ZASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 104 r Recirculation l NUMBER: 32.0 Discharge INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCTZONS
++CALIBRATION BLOCX**2.0" Discharge 12D (REF.DWG.NO.7)122100 32-WD-063 Coupling-to-Pipe B-J PT B9.403 X Examine 100%of weld length.~~N/A~*123200 32-WD-074 Pipo-to-Coupling B-J B9.40 3 X Examino 100%of weld length.~~N/A*~28.0" Discharge 12D (REF.DWG.NO.7)123300 32-WD-075 Gate Valve 32-381-to-Pipe B-J UT B9.11 PT 3 X Examine 100%of weld length.*~PBR-1.109-1**
32-WD-075-D Pipe-Long Scam B J B9.12 3 X Code Case N-524.**PBR-1.109-1~~
124000 , 32-WD-079 Pipe-to-Elbow GL A UT 88-01 3 X~~PBR-1.260/PSR-1.
109-1*124800 32"WD-081 Pipe-to-Nozzle N2B Safe End B-J UT B9.11 PT 3 X Examine 100%of weld length+~PBR-1.109-1+~
125000 32-WD-081-U Pipe-Long Weld B-J UT B9.12 FT 3 X Code Case N-524**PBR-1.109-1**
125100 32-WD-082 SIL UT N2B Safe End-to-Nozzle 455R1S1 3 X Group R07, Znconel 182 buttor oxpansion from nozzle sido of weld t1LATERf t
 
DATE: 10/15/99 REVISION: 0 NINE MZIE POINT NUCLEAR PIANT UNZT 1 INSERVICE ZNSPECTZON TEN-YEAR PIAN CZASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 105 tor Recirculation Discharge NUMBER: 32.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
*~CALIBRATION BLOCK~~125200 32-WD-082 B-F Group R07*~LATER~~N2B Safe End-to-Nozzle B5.10 3 X 125300 32-WD-082 GL-A Group R07+*LATER~~N2B Safe End-to-Nozzle SS-01 3 X 125400 32-WD-083 B-D AUT N2B Nozzle-to<<Vcsscl B3~90 3 X Group R07, 75.4%CRV Limitation duc to bottom head taper of shell weld.**LATER**125500 32-WD-083-IR N2B Nozzle Inner radius Section B-D B3.100 3 X Group R07, 608 CRV Limitation duc to bottom head taper of shell weld.+*LATER~*28.0" Discharge 13D (REF.DWG.NO.7)125600 32"WD-097 B-J UT Pump 13 B9.11 PT Discharge-to-Elbow 3 X Terminal End, High Stress Wold, Examine 100%of weld length**PSR-1.109-1*+125800 32-WD-097-Dl Elbow-Long Scam OR B-J UT B9.12 PT 3 X Formerly LW-032-A, Code Case N-524*~PSR-1.109-1~~
125900 32"WD-097-D2 B-J UT Elbow-Long Seam ZR B9.12 PT 3 X Formerly LW-032-B, Code Caso N-524 saPSR 1.109 la*
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 106 tor Recirculation Discharge NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFZCATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
**CALIBRATION BLOCK~~2.5" Dischargo 13D (REF.DWG.NO.7)126000 32-WD"099 B-J PT Branch B9.32 Connection-Thermowcll 3 X Examine 1008 of weld length+~N/AP~3.0" Discharge 13D (REF.DWG.NO.7)126200 32-WD-100-FB B-G-2 VT-1 Decon Flange Bolting B7.50 3 X Examine in place, when removed or when disassembled.
~~N/A~+28.0" Discharge 13D (REF.DWG.NO.7)126300 32-WD-101 Pipe-to-Pipe GL-A UT 88-01 X**PBR-1.109-1, PBR-1.260*126800 32-WD-102 Pipe-to-Gate Valve 32-382 GL-A UT 88 01 3 X~~PBR-1.109-1+*
126900 32-WD-102 Pipe-to-Gate Valve 32-382 B-J B9.11 3 X Terminal End, High Stress Weld, Limitation 588 CRV, Examine 1008 of wold length~~PBR-1.109-1**127000 32-WD-102-U Pipe-Long Seam B-J B9.12 3 X Code Case N-524+*PBR-I.109-1+*
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 107 tor Recirculation Discharge NUMBER: 32.0 INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
>>>>CALIBRATION BLOCK>>>>2.0" Discharge 13D (REF.DWG.NO.7)127200 32-WD-104 B-J PT Pipe-to-Coupling B9.40 3 X Examine 100$of weld length>>>>N/A>>>>127400 32-WD-106 Pipe-to-Elbow B J PT B9.21 3 X Examine 100%of weld length>>>>N/A>>*127900 32-WD-111 Elbow-to-Pipe B-J PT B9.21 3 X Examine 100%of weld length**N/A**128200 32-WD-114 Pipe-to-Coupling B-J PT B9.40 3 X Examine 100%of weld length**N/A**28.0" Discharge 13D (REF.DWG.NO.7)128400 32-WD-115 Gate Valve 32-382-to-Pipe B"J UT B9.11 PT 3 X Terminal End, High Stross Wold, Examine 100%of weld length>>>>PSR-1.109-1*>>128500 32-WD-115-D Pipo-Long Scam B-J UT B9.12 PT 3 X Formerly LW-034, Codo Caso N-524*>>PSR-1.109-1*>>129000 32-WD-119 Pipe-to-Elbow B J B9.11 3 X<<<<P8R-1.109-1*>>129100 32-WD-119 Pipe-to-Elbow GL-A UT 88-01 3 X>>>>P8R-1.109-1)PSR-1.260<<>>129600 32-WD-120 Elbow-to-Pipo GL-A UT 88 01 3 X>>>>PSR-1.109-1, PSR-1.260>>*
 
DATE: 10/15/99 REVI S ZON: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 108 tor Recirculation Discharge ZONE NUMBER: 32.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PZAN STATUS SECOND PERZOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
<<<<CAI,ZBRAT ION BLOCK>>>>130000 32-WD-121 B-J UT Pipe-to-Nozzle N2C B9~11 PT X Safe End Examine 100%of weld length>>*PBR-1.109-1**
130100 32-WD-121 Pipe-to"Nozzle N2C Safe End GL-A UT 88-01 3 X>><<PBR-1.109-1>>>>130200 32-WD"121-U Pipe-Long Soam B-J B9.12 3 X Code Case N-524<<*PER-1.109-1*>>
130300 32-WD-122 B F UT Group ROB,<<>>LATER>>>>N2C Safo End-to-Nozzlo B5~10 3 X 30400 32-WD"122 SIL N2C Safe End-to-Nozzle 455R1S1 3 X Group ROB, Inconcl 182 butter expansion from nozzle side of weld,<<<<LATER>>*130500 32 WD-122 GL-A UT N2C Safe End-to-Nozzle 88-01 X GrouP ROB**ZATER>>>>130600 32-WD-123 B D N2C Nozzle-to-Vessel B3.90 3 X Group ROB, 75.4%CRV**ZATER>>>>130700 32-WD"123-IR N2C Nozzle Innor Radius Section B D B3.100 3 X Group ROB, 82%CRV<<>>LATER*>>
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 109 tor Recirculation E NUMBER: 32.0 Discharge INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
+*CALIBRATION BLOCK++3.0" Discharge 14D (REF.DWG.NO.7)131400 32-WD-142-FB 14D Dccon Flange Bolting B-G-2 B7.50 VT-1 3 X Examine in place, when removed or when disassembled
*~N/A+~2.0" Discharge 14D (REF.DWG.NO.7)132300 32-WD-145 Coupling-to-Pipe B-J PT B9.40 3 X Examine 100%of weld length~~N/A~+133400 32-WD-156 Pipe-to-Coupling B-J B9.40 3 X Examine 1008 of weld length~~N/A+~28.0" Discharge 14D (REF.DWG.NO.7)00 32-WD-157 GL A UT Valve 32-383-to-Pipe 88-01 3 X~'~PSR-1.109-1*+134900 32-WD-163 Pipe-to-Nozzle N2D Safe End B J UT B9.11 PT 3 X Examine 100%of weld length~~PSR-1.109-1**
135100 32-WD-163-U Pipe-Long Seam B J UT B9.12 PT 3 X Code Case N-524++PER-1.109-1++
135200 32-WD-164 B F UT Group R09~+LATER'+N2D Safe End-to-Nozzle B5.10 X 135300 32-WD-164 SIL N2D Safe End-to-Nozzle 455R1S1 3 X Group R09, Inconcl 182 butter expansion from nozzle side of weld~~LATER~~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 110 or Recirculation Discharge NUMBER: 32.0 ZNSPECTION INTERVAI PZAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMZNATZON AREA NUMBER ZDENTZFICATION ASME SEC.XZ CATEGY NDE ZTEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
~+CALIBRATION BLOCK**135400 32-WD-164 GL-A Group R09,~+LATER~~N2D Safe End-to-Nozzle 88-01 3 X 135500 32-WD-165 B-D N2D Nozzle-to-Vessel B3.90 3 X Group R09, 75.4%CRV Limitation due to bottom" head taper of shell thickness**LATER**135600 32-WD-165-ZR N2D Nozzle Inner Radius Section B-D B3.100 3 X Group R09, 82%CRV Limitation duc to bottom head taper of shell thickness*~LATER*~28.0" Discharge 15D (REF.DWG.NO.7)0 32-WD-181 B-J UT Pump 15 B9.11 PT Discharge-to-Elbow 3 Terminal End, High Stress Weld, Examine 100%of weld length stPSR-1.109 lao 135900 32-WD-181-Dl Elbow-Long Scam B-J B9.12 3 X Formerly LW-OSS-A, Code Case N-524*aPSR 1.109 Zest 136000 32-WD-181-D2 Elbow-Long Scam ZR B-J UT B9.12 PT 3 Formerly LW-058-B, Code Case N-524**P8R-1.109-1*~3.0" Discharge 15D (REF.DWG.NO.7)136300 32-WD-184-FB 15D Decon Flange Bolting B"G-2 B7.50 VT 1 3 X Examine in place, when rcmcnrcd, or when disassembled
**N/A*~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 111 or Recirculation NUMBER: 32.0 Discharge INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCTZONS
*+CALIBRATION BLOCK**28.0" Discharge 15D (REF.DWG.NO.7)136700 32"WD-186 B-J UT PiPc-to-Valve 32-384 B9.11 PT 3 Terminal End, High Stress Weld, Examine 100%of weld length~~PER-1.109-1~~
136900 32"WD-186-U Pipe-Long Seam B-J B9.12 3 X Code Case N-524~~PSR-1.109-1~~2.0" Discharge 15D (REF.DWG.NO.7)137000 32-WD-187 B-J PT Coupling-to-Pipe B9.'40 3 X Examine 100%of weld length**N/A~*00 32-WD-193 B-J Valve 32-389-to-Pipe B9.21 3 X Examine 100%of weld length+*N/A+~137700 32-WD-194 Pipe-to-Elbow B-J B9.21 3 X Examine 100%of weld length*~N/A~~137800 32-WD-195 Elbow-to-Pipe B-J B9.21 3 X Examine 100%of weld length**N/A**14.0" Discharge 15D (REF.DWG.NO.7)139700 32-WD-204-MT ZNPO UT Mixing Tcc-Base Metal 5-85 3 X---X X--X 100%of base material, each RFO.~*PSR-2.055-1++
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 112 tor Recirculation Discharge ZONE NUMBER: 32.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH PIRST PERIOD PLAN STATUS SECOND PERZOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~*CALIBRATION BLOCK+~28.0" Discharge 15D (REF.DWG.NO.7)141400 32-WD-207 Pipo-to-Nozzle N2E Safe End B-J B9.11 3 X Examine 100%of weld length+*P8R-1.655/1.150-1**141500 32-WD-207"U Pipe-Long Weld B-J B9.12 3 X former LW-064, Code Case N-524~~PSR-I.I09-1+~
141600 32-WD-208 B-F UT N2E Safe End-to-Nozzle B5.10 PT 3 Group R10++LATER~+141700 32-WD"208 SIL t N2E Safe End-to-Nozzle 455R1S1 3 Group R10, Znconel 182 buttor expansion from nozzle sido of weld*+LATER**141800 32 WD-208 N2E Safe End-to-Nozzle 88-01 3 X Group R10,~*LATER~~141900 32-WD 209 B"D N2E Nozzlo-to-Vessel B3.90 3 X Group R10, 74.5%CRV Limitation duc to bottom head taper of shell thickness.
*+IATER**142000 32-WD-209-IR N2E Nozzle Inner Radius Section B-D B3.100 3 X Group R10, 82%CRV Limitation due to bottom head taper of shell thickness.
*+LATER~*
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 113 tor Recirculation Pump NUMBER: 32.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
**CALIBRATION BLOCK e 32-187 (REF.DWG.NO.7A)142900 32-187 F-A VT 3 Pump 11 Support Fl.40 3 X Code Case N-491-1*~N/A~~143000 32-187-PBB B-G-l VT-1 Pump 11 Busihings (1 B6.200 thru 16)3 X One pump in a group of pumps, only when disassembled.
~~N/A~~143100 32-187-PBN B G-l VT-1 Pump 11 Nuts, (1 thru B6~200 16)3 X Liad.tcd to pump selected under B-L-2, One pump in a group of pumps++N/A++143200 32-187-PBS B-G-1 UT Pump 11 Flange Studs B6.180 (1 thru 16)3 X Limited to pump selected under B-L-2, Onc pump in a group of pumps.++NMP1 2.75-RCP-STUD**
143300 32-187-PBW Pump 11 Washcrs (1 thru 16)B-G-1 B6.200 3 X Limited to pump sclcctcd under B-L-2, One pump among a group of pumps k*N/A%4 143400 32-187-PBY Pump 11 Interior Surface B-L-2 B12.20 VT 3 3 X When disasscmblcd, one pump among a group of pumps~*N/A~*143500 32-187-PFS B-G-1 VT-1 Pump 11 Flange Surface B6.190 3 X Limited to pump selected under B-L-2, Examine 1 in.annular surface oi flange surrounding each stud~*N/A+~
 
DATE: 10/15/99 REVI S ZON: 0 NINE MZLE POINT NUCLEAR PZANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 114 tor Recirculation Pump NUMBER: 32.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH PIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
**CALIBRATION BLOCK~+143700 32-187-SHB B-G-2 VT-1 Pump 11 Seal Housing B7.60 Bolting (I thru 16)P01, Limited to pump selected under B-L-2, one pump among group of pumps.~~N/A*~
 
DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 115 tor Recirculation Pump 15 NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD THIRD PERIOD SECOND PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
*iCALIBRATION BLOCK+32-191 (REF.DWG.NO.7)148900 32-15-H1 Spring Hanger F A F1.40 3 X Code Case N-491-1**N/A*i
 
DATE: 10/15/99 REVISZON: 0 NINE MILE POINT NUCLEAR PIANT UNZT 1 INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 116 or Recirculation NUMBER: 32.0 Suction INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS i~CALIBRATION BLOCK~~28.0" Suction 11S (REF.DWG.NO.7)151000 32-11-H3A Spring Hanger F-A Fl.10 VT-3 3 X Code Case N-491-1*AN/A**151100 32-11-H3B Spring Hanger F A F1.10 VT-3 3 X Code Case N-491-1 eaN/A*a 28.0" Suction 12S (REF.DWG.NO.7)151300 32-12-H3-WD-001 B-K PT Integral Welded Lug B10.20 3 X (32-12-H-3-A), Code Case N"509*~N/A~~151400 32-12-H3-WD-002 B-K PT Integral Welded Lug B10.20 3 X (32-12-H-3-A), Code Case N-509**N/A~*1 1500 32-12-H3-WD-003 B"K Integral Welded Lug B10.20 3 X (32-12-H-3-B), Code Case N-509**N/A~*151600 32-12-H3-WD-004 B-K Integral Wcldcd Lug B10.20 3 X (32-12-H-3-B), Code Case N-509~+N/A~*28.0" Suction 14S (REF.DWG.NO.7)153100 32-14-H3A Spring Hanger F A F1.10 3 X Code Case N-491-1 1 O'/A1 t 153200 32-14-H3B Spring Hanger F-A Fl.10 3 X Code Case N-491-1**'N/A**
 
DATE: 10/15/99 REVISION: 0 NINE HILE POZNT NUCLEAR PIANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 117 tor Recirculation Suction ZONE NUHBER: 32.0 SUHHARY EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASHE SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
>>*CAZ,IBRATZON BLOCK>>>>28.0" Suction 11S (REF.DWG.NO.7)155600 32-375-VB Gate Valve 32-375 Bolting B-G-2 B7.70 3 V06, Limited to valve selected under B-M-2 X>>>>N/A>>*155700 32-375-VBY Gate Valve 32-375 Interior Surface B"H-2 VT-3 B12.50 3 X V06,Only whe'n disassembled, one valvo among group of valves>>*N/A>>>>28.0" Suction 12S (REP.DWG.NO.7)156800 32-SB"3A Sway Brace P-A F1.10 VT-3 3-------X Code Case N-491-1*>>N/A>>>>6900 32-SB-3B Sway Brace F-A F1.10 3 Code Case N-491-1>>>>N/A*>>28.0" Suction 13S (REF.DWG.NO.7)157000 32-SB-5A sway Brace F-A Fl.10 VT-3 3 X Code Case N-491"1>>>>N/A>>*157100 32-SB-5B Sway Brace P-A Fl.10 VT 3 3 X Code Case N-491-1*>>N/A>>>>28.0" Suction 11S (REP.DWG.NO.7)157600 32-WD-001 B D AUT N1A Nozzle-to-Vessel B3.90 3 X Group R01, 65%CRV Limitation duc to lug, ad)acent nozzle and Bioshicld>>>>LATER>>>>
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 118 tor Recirculation Suction NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THZRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
**CALIBRATION BLOCK*~157700 32-WD-001-IR N1A Nozzle Inner Radius Section B-D B3.100 3 X Group R01, 73%CRV Limitation due to lug, ad)accnt nozzle and Bioshield~iLATER~i 157800 32-WD-002 GL-A UT Group R01+*LATER*~N1A Nozzle-to-Safe End 88-01 3 X 157900 32-WD-002 SIL N1A Nozzle-to-Safe End 455R1S1 X Group R01, Inconcl 182 butter expansion from nozzle side of weld**LATER~*158000 32-WD"002 N1A Nozzle-to-Safe End B5.10 3 X Group R01**LATER~~158200 32 WD-003 Nozzle N1A Safe End-to-Elbow B J B9.11 3 X++PSR 1.2++158300 32-WD-003-Dl Elbow-OR Long Scam B9.12 PT 3 X formerly LW-001-A, Coda Case N-524**PSR-1.2~~
158400 32-WD-003-D2 B-J UT Elbow-IR Long Scam B9.12 PT 3 X formerly LW-001-B, Code Case N-524**PSR 1.2++159400 32 WD 004A-MT ZNPO UT Mixing Tee-Base Metal 5-85 Exams 12.0" Suction 11S (REF.DWG.NO.7)3 X---X X--X UT Only, every rcfucling outage, 100%asc Material+~PSR-2.055-1**
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 119 tor Recirculation NUMBER: 32.0 Suction INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERZOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCTIONS
+~CALIBRATION BLOCK~~28.0" Suction 11S (REF.DWG.NO.7)160800 32-WD-007 Branch Connection B-J UT B9.31 PT 3 X Examine 100%of weld length.~~PSR-1.2~~
161800 32-WD-009 Pipe-Valve 32-375 B J B9.11 PT 3 X Terminal End, High Stress Weld, Examine 100%of weld length.*+LATER**161900 32-WD-009-U Pipe-Long Seam B-J UT B9.12 PT 3 X Formerly LW-004, Code Case N-524*~LATER**3.0" Suction 11S (REF.DWG.NO.7)00 32-WD-011-FB B-G 2 11S Decon Flange B7.50 Bolting X Examine in place, when removed, or disassembled.
~+N/A++28.0" Suction 11S (REF.DWG.NO.7)162500 32-WD-012 Pipe-to-Elbow B-J UT B9.11 PT 3 X Examine 100%of weld length.+~P8R-1.2**
162700 32-WD-012"Dl Elbow-Long Scam OR B9.12 PT 3 X Code Case N-524~~PSR-I.2~~
162800 32-WD-012-D2 Elbow-Long Seam IR B9.12 PT 3 X Code Case N-524~+PSR-1.2~~
162900 32-WD-012-U Pipe-Long Seam B-J UT B9.12 PT 3 X Code Case N-524**PSR-1.2**
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 120 tor Recirculation Suction NUHBER: 32.0 INSPECTZON INTERVAL PLAN STATUS PRESERVZCE YEAR SUHHARY EXAMINATION AREA NUHBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
~~CALIBRATION BLOCK~~163100 32-WD-015 Elbow-to-Elbow B-J B9.11 3 X Examine 100%of weld length.+~PSR-1.2**
163500 32-WD-015-Ul B-J UT Elbow>>Long Seam OR B9.12 PT 3 X Formally LW-006-A, Code Casa N-524.~*PSR-1.2~*
163600 32-WD-015-U2 Elbow-Long Scam IR B-J UT B9.12 PT 3 X Formally LW-006-B, Coda Case N-524~+PSR-1.2~*
28.0" Suction 12S (REF.DWG.NO.7)163700 32-WD-044 B-D UT N1B Nozzle-to-Vessel B3.90 3 X Group R02, 65%CRV Limitation duc to Bioshield~+LATER**00 32-WD"044-ZR N1B Nozzle Inner Radius Section B D B3.100 3 X Group R02, 73%CRV Limitation duo to Bioshield**NHP1-GE-7875~~
163900 32-WD-045 SZL N1B Nozzle-to-Safe End 455R1S1 3 X Group R02, Inconcl 1S2 butter expansion from nozzle side i*LATER*~164000 32-WD-045 N1B Nozzle-to-Safe End B5.10 PT 3 X Group R02, i+LATER++164100 32"WD-045 GL-A UT Group R02,**LATER~*N1B Nozzle-to-Safe End 88-01 3 X 164200 32"WD-046 Nozzle N1B Safe End-to-Elbow B-J B9.11 3 X Examine 100%of weld length,**PSR-1.2~*
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 121 tor Recirculation E NUMBER: 32.0 Suction INSPECTION ZNTERVAL PLAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTIFZCATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
~+CALIBRATION BLOCK++164300 32-WD-046 Nozzle N1B Safe End-to-Elbow N/A N/A 3 X---X---X IWB-2420 (b)Exaad.nc flaw growth area next 3 periods.~*PSR-1.2+~
164400 32-WD-046 Nozzle N1B Safe End-to-Elbow GL F UT 88-01 3 X---X X--X Examine each refueling outage flaw growth.**P8R-1.260++164500 32-WD-046-Dl B-J UT Elbow-Long Seam OR B9.12 3 X Code Case N-524++PSR-1.260*~
164600 32-WD-046-D2 B-J UT Elbow-Long Scam ZR B9.12 PT 3 Coda Case N-524**PSR-1.260+*
00 32-WD-049 B-J UT Pipe-to-Gate Valve.B9.11 PT 3 32-376 X Terminal End, High Stress Weld, Examine 100%of weld length*+PSR-1.2+~
165700 32-WD-049-U Pipe-Long Scam B J UT B9.12 PT 3 X Code Case N-524++PSR-1.2++
165800 32-WD-050 Gate Valve 32-376-to-Pipe B-J B9.11 3 X Tarad.nal End, Limitation 58%CRV,~~PSR-1.2~~
165900 32-WD-050 Gate Valve 32-376-to-Pipe N/A N/A 3 X---X---X Re-cxaminc pcr IWB-2420 (b)Flaw growth area next 3 periods, acceptable USNRC TAC No.MA5696..++PSR 1.2*+
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 INSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 122 tor Recirculation Suction INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTZFZCATION ASME SEC.XZ CATEGY NDE ZTEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
**CALIBRATION BLOCK~~166100 32-WD-050"D Pipe-Long Seam B-J B9.12 3 X Code Case N-524+*PSR-1.2**166200 32-WD-051 Branch Connection-Decon B-J PT B9.32 3 X Examine 100&of weld length.+*N/A**3.0" Suction 12S (REF.DWG.NO.7)166300 32-WD-051-FB Dccon Flange Bolting B-G-2 B7.50 3 X Examine in place, when removed or disassembled.
~~N/A+~2.5" Suction 12S (REF.DWG.NO.7)00 32-WD-053 Thcrmowel 1 B-J PT B9.21 3 X Examine 100%of weld length*~N/A~*28.0" Suction 13S (REF.DWG.NO.7)167400 32-WD-084 B-D UT N1C Nozzle-to-Vessel B3.90 3 X Group R03, 65%CRV Limitation due to lug, ad)accnt nozzle and bioshicld**LATER~>>167500 32-WD-084-IR N1C Nozzle Inner Radius Section B-D B3.100 3 X Group R03, 73%CRV Limitation duc to lug, ad)acent nozzle and bioshicld~~NMP1-GE-7875+~
167600 32-WD"085 B-F UT Group R03,~~LATER~*N1C No"zlc-to-Safe End B5.10 PT 3 X
 
DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 123 tor Recirculation Suction NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD THZRD PERIOD------OUTAGE------
1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
**CALIBRATZON BLOCK*+167700 32-WD-085 SZL N1C Nozzle-to-Safo End 455R1Sl 3 X Group R03, Inconel 182 butter expansion from nozzle side of weld,*+ZATER**167800 32-WD-085 GL A UT N1C Nozzle-to-Safe End 88-01 3 X Group R03**IATER*~167900 32-WD-086 Nozzle N1C Safe End-to-Elbow B-8 B9.11 3 X Examine 100%of weld length,~~PSR-1.109-1*~
168000 32-WD-086 Nozzle N1C Safe End-to-Elbow N/A N/A 3 X IWB-2420 (b)Examine flaw growth area next 3 periods.~*PSR-1.109-1**
168100 32-WD-086 Nozzle N1C Safe End-to-Elbow GL-F UT 88-01 3 X---X X--X Examine each refueling outage flaw growth.++PSR-1.260, PSR-l.655/1.150-~~168200 32-WD-086-Dl B a7 UT Elbow-Long Seam OR B9.12 PT 3 X Formerly LW-026-A, Code Case N-524**PSR-1.260~~
168300 32-WD-086-D2 B-J UT Elbow-Long Seam IR B9.12 3 X Formerly LW-026-A, Code Case N-524**PSR-1.260~*
169300 32-WD-089 Pipe-to-Valve 32-377 B9.11 PT 3 X Terminal End, High Stress Weld, Examine 100%of weld length~~PSR-1.109-1**
 
DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 124 tor Recirculation Suction ZNSPFCTION INTERVAL PZAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS yyCALIBRATION BLOCKa~169500 32-WD-089-U Pipe-Long Scam B-J B9.12 3 X Formerly I.W-028, Code Case N-524**PSR-1.109-1**169600 32-WD-090 B-J UT Valve 32-377-to-Pipe B9.11 PT 3 X Terminal End, High Stress Weld, Limitation duc to configuration 58%CRV, Examine 100%of weld length.+*PSR-I.109-1**169800 32-WD-090-D Pipe-Long Seam B-J B9.12 X Formally LW-029, Code Case N-524**P8R-1.109-1*~3.0" Suction 13S (REF.DWG.NO.7)170000 32-WD-091-FB 13S Dccon Flange Bolting~B-G-2 B7.50 X Examine in place, when removed or when disassembled.
<<*N/A~*28.0" Suction 13S (REF.DWG.NO.7)170100 32-WD-092 Pipe-to-Elbow B-J UT B9.11 3 X**PSR-1..109-1**170200 32-WD-092 Pipe-to-Elbow GL-A UT 88-01 3 X++PSR 1.109-1)PSR-1.260~
 
DATE: 10/15/99 REVISION: 0 NINE MZIE POZNT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 125 tor Recirculation Suction NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
~~CALIBRATION BLOCK~~28.0" Suction 14S (REF.DWG.NO.7)171300 32-WD-124 B D UT Group R04, 65%CRV N1D Nozzle-to-Vessel B3.90 Limitation duc to Bioshield+<<LATER~>>171400 32-WD-124-IR N1D Nozzle Znner radius Section B D B3.100 3 X Group R04, 73&CRV Limitation duc to Bioshield*+NMP1-GE-7875~+
171500 32-WD-125 SII N1D Nozzle-to-Safe End 455R1S1 3 Group R04, Znconel 182 butter expansion from nozzle side of weld~~LATER~*00 32-WD-125 B-F UT Group R04+~LATER~+N1D Nozzle-to-Safe End B5.10 PT 3 X 171700 32-WD-125 GL A UT N1D Nozzle<<to-Safe End 88-01 3 X Group R04~*LATER~~171800 32-WD-126 Nozzle N1D Safe End-to-Elbow B-J B9.11 3 X Examine 100%of weld length,+~PSR-I 109-1~*171900 32-WD-126 Nozzle N1D Safe End-to-Elbow N/A UT N/A 3 X X IWB-2420 (b)Examine flaw growth area next 3 periods.~~P8R-1.109-1*~
172000 32-WD-126 Nozzle N1D Safe End-to-Elbow GL-F UT 88-01 3 X Examine each rcfucling outage flaw growth.**PSR-1.655/1.150"1~~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 126 tor Recirculation Suction INSPECTION ZNTERVAL PLAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
**CALIBRATZON BLOCK*+172100 32-WD-126-Dl B-J UT Elbow-Long Seam OR B9.12 PT 3 X Code Case N-524**PSR-1.109-1+*172200 32"WD-126-D2 Elbow-Long Scam ZR B-J UT B9.12 PT 3 X Code Case N-524~~PSR-1.109-1**14.0" Suction 14S (REF.DWG.NO.7)173200 32-WD-128A Pipe-to-Gate Valve 38-01 GL A UT 88-01 3 X Removablc pipe clamp**PSR-.935-1**
173300 32-WD-128A Pipe-to-Gate Valve 38-01 B J B9.11 X Terminal End, High Stress Wold, Removablc pipe clamp, Examine 100%of weld length.~+PSR-l.109-l~~173400 32-WD-128A-U Pipe-Long Seam B-J UT B9.12 PT 3 X Code Case N-524~~PSR-1.109-1~~
28.0" Suction 14S (REF.DWG.NO.7)174300 32-WD-131 B-J UT PiPe-to-Valve 32-378 B9.11 PT 3 X Terminal End, High Stress Weld, Examine 100%of weld length e*PSR 1.109-1*a 174500 32-WD-131-U Pipe-Long Seam B-J B9.12 3 X Rcmovablc pipe clamp, Coda Case N-524*~PSR" 1.109-1**
 
DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PIANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 127 or Recirculation Suction NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
++CALIBRATION BLOCK**175000 32-WD-133-FB B G-2 Decon Flange Bolting B7.50 3.0" Suction 14S (REF.DWG.NO.7)3 X Examine in place, when removed or when disassembled.
~~N/A~~2.5" Suction 14S (REF.DWG.NO.7)175600 32"WD-135 Branch Connection-Thcrmowell B-J PT B9.32 3 X Examine 100%of weld length+~N/A~~28.0" Suction 15S (REF.DWG.NO.7)176300 32-WD-166 N1E Nozzle-to-Vessel B-D AUT B3.90 3 X Group R05, 33.8%CRV Limitation duc to lug, thermocouple and bioshicld*~LATER*~176400 32-WD-166-IR N1E Nozzle Znncr Radius Section B-D B3.100 3 X Group R05, 73%CRV Limitation due to lug, thermocouplc and bioshicld~~ZATER~~176500 32-WD-167 B-F UT N1E Nozzle-to-Safe End B5.10 PT 3 X GrouP R05++LATER~~176600 32-WD-167 SII N1E Nozzle-to-Safe End 455R1S1 3 X Group R05, Znconcl 182 butter expansion from nozzle side of weld*+LATER+~176700 32-WD-167 GL-A UT Group R05~~LATER*~N1E Nozzle-to-Safe End 88-01 3 X
 
DATE: 10/15/99 REVI S ZON: 0 NINE MILE POINT NUCLEAR PIANT UNZT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 128 tor Recirculation NUMBER: 32.0 Suction INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ZTEM NO METH FIRST PERIOD SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCTIONS
~~CALIBRATION BLOCK**176800 32-WD-168 Nozzle N1E Safe End-to-Elbow B-J B9.11 3 X Examine 100%of weld length,++PSR-1.260~~
176900 32-WD-168 Nozzle N1E Safe End-to-Elbow N/A N/A 3 X X---X WB-2420 (b)Examine flaw growth area next 3 periods.**PSR-1.260~*177000 32"WD-168 Nozzle N1E Safe End-to-Elbow GL" F UT 88"01 3 X-X X-X Examine each rcfucling outage flaw growth.stPSR-1.260,PSR-1.655/1.
150-~*177100 32-WD-168"Dl B-J Elbow-Long Seam OR B9.12 3 X Formerly LW-051-A, Code Case N-524~*P8R-1.260*~
177200 32-WD-168-D2 Elbow-Long Seam ZR B9.12 PT 3 X Formerly IW-051-B, Coda Case N-524++P8R-1.260*~
178600 32-WD-171-MT ZNPO UT Mixing Tee Base Metal 5-85 X---X X Base metal scans required each Refueling Outage**PSR-1.109-1*~
178SOO 32-WD-171A Reducer-to-Pipe B-J B9.11 3 X Examine 100%of weld length++PSR-1.109-1~*
179000 32 WD-171A-D Pipe-Long Seam B-J UT B9.12 PT 3 X Code Case N-524~+PSR-I.109-1**
 
DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 ZNSERVZCE ZNSPECTZON TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 129 tor Recirculation Suction ZONE NUMBER: 32.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
+*CALIBRATION BLOCK*~10.0" Suction 15S (REF.DWG.NO.7)179200 32-WD" 171BR GL A UT~*NMP-10-XX1-SS**
Valve 39-01-to-Reducer 88>>01 3 X 179300 32-WD-171BR B-J Valve 39-01-to-Reducer B9.11 3 X Tcrnd.nal End, High Stress Weld~iNMP-10"XXI-SSi~
28.0" Suction 15S (REF.DWG.NO.7)179400 32-WD-172 Limitation duc to Tee-to-Pipo B9.11 3 X fitting configuration, and material 58%CRV.Examine 100%of weld length.~~PSR-1.109-1~~
179700 32"WD-172-D Pipe-Long Scam B-J B9.12 3 X (CW172, 173), Code Case N-524**P8R-1.109 1**179800 32-WD-172-U Tee-Long Seam B-J UT B9.12 PT 3 X Coda Case N-524*+PSR-l.109-1*+180200 32-WD-174 B-J UT Valve 32-379-to-Pipe B9.11 PT 3 Terminal End, High Stress Weld, Examine 100%of weld length++PSR 1.109 I+*180400 32-WD-174-D Pipe Long Scam B"J B9.12 3 X Code Case N-524+*PER-1.109 1~~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 130 tor Recirculation Suction NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEOY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD THIRD PERIOD-OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
**CALIBRATION BLOCK*~3.0" Suction 15S (REF.DWO.NO.7)150600 32-WD-175-FB B-6-2 Decon Flange Bolting BI~50 VT-1 3 X Examine in place, when removed or when disassembled.
*~N/A**
 
DATE: 10/15/99 REVISZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTZON XZ SCHEDULED COMPONENTS PAGE 131 r Clean Up NUMBER: 33.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
NUMBER EXAMINATION AREA IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD THIRD PERIOD SECOND PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCTIONS
*~CALIBRATION BLOCK**6.0" Line (REF.DWG.NO.20)181900 33 01R VBY B-M-2 VT"3 Valve 33-01R Znterior B12.50 Suriace X V07, Onlc when disassenbled, one valve among group of valves.~~N/A~~182300 33-03-VB Valvo 33-03 Bolting B-G-2 B7.70 3 X V13, Limited to valve sclcctcd under B-M-2.<<*N/A~~182400 33"03-VBY Valve 33-03 Interior Surface B-M"2 VT-3 B12.50 X V13, Only when disassembled, onc valve among group of valves.eaN/Aea 00 33"03-WD-001 B-K PT Valve 33-03 Integral~B10.40 Attachment X Code Case N-509, Examine 100%of wold length+~N/A*+183700 33-WD" 001 Branch Connection B"J PT B9.32 3 X Examine 100%of weld length.**N/A~*183800 33-WD-002 B J UT Pipe-to-Valve 33-02 B9.11 PT 3 Terminal End, High Stress Weld, Limitation duo to fitting configuration 62%CRV, Examine 100%of weld length.**LATER**184000 33-WD-003 Valve 33-02R-to-Pipe B9.11 PT3 Terminal End, High Stress Weld, Limitation duc to fitting configuration 62%CRV, Examine 100%of wold length.*~LATER*~
 
DATE: 10/15/99 REVZSION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 132 or Clean Up NUMBER: 33.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH PIRST PERZOD PZAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~*CALIBRATION BLOCK*~184300 33-WD-004 Pipe-to-Pipe Bend GL-D 88-01 3 X X 184900 33-WD-014 Pipe-to-Pipe GL-G 88-01 VT-2 X---X X--X Inaccessible, inside Pen X"9, Visual VT-2 each outage for evidence of leakage.+~N/A++185100 33-WD" 015 Pipe-to-Valve 33"04 GL-A 88-01 3 X---X X"-X Znaccossible inside Pen X-9.Visual VT-2 each outage for cvidcnce of leakage.i~N/A~i 185500 33-WD-035 Valvo 33-03-to-Pipe 88-01 VT-2 X---X X--X Znaccossible located inside pen X-154, VT-2 Each Rcfucling Outage for evidence of leakage~*N/A~~185700 33"WD-036 Pipe-to-Elbow GL-G 88-01 X---X X--X Inaccessible located inside pcn X-154, VT-2 Each Rcfucling Outage for evidcncc of leakage~~N/A*+185900 33"WD-046 Pipe-to-Pipe B-J B9.11 3 X Bimettalic weld, Examine 100%of weld length.++IATER+*186000 33"WD-046 Pipe-to-Pipe GL-D UT 88-01 3 X X Bimettalic weld~~LATER~+186300 33-WD-047C1 B-J Pipe-to-Valve 33-01R1 B9.11 3 X Examine 100%of weld length*~PER-.432-2~~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 133 or Clean Up NUMBER: 33.0
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTIFZ CAT ION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
++CALIBRATION BLOCK*+186700 33-WD-048C1 B J UT~*PSR-.432-2~*
Valve 33"01R to Pipe B9.11 PT 3 186900 33-WD"049 Pipe-to-Elbow B-J B9.11 3 X BiMattalic weld, Limited duc to pcrmn't hanger attach.90%CRV, 90%CRA.Exam 100%of weld length.**IATER**1S7000 33-WD-049 Pipe-to-Elbow GL D UT 88 01 3 X X+~LATER~+187500 33-WD-054 Pipe-to-Tcc B J UT B9.11 3 X Examine 100%of weld length+*LATER**187600 33-WD-055 Tee-to-Reducer B-J B9.11 3 X Examine 100%of weld length**LATER**4.0" Line (REF.DWG.NO.20)187700 33-WD-056 Reducer-to-Pipe B J UT B9.11 PT 3 X Examine 100%of weld length.**LATER~~6.0" Line (REF.DWG.NO.20)188200 33-WD-061 Tcc-to-Reducer B-J UT B9.11 PT 3 X Examine 100%of weld length~+IATER~~4.0" Linc (REF.DWG.NO.20)188700 33-WD"066 Pipe-to-Reducer B-J UT B9.11 PT 3----X Examino 100%of weld length'~LATER~~
 
DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PIANT UNIT 1 INSERVZCE ZNSPECTZON TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 134 or Clean Up NUMBER: 33.0
 
==SUMMARY==
EXAMINATION AREA IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH PIAN STATUS THIRD PERZOD SECOND PERIOD FIRST PERZOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
++CALIBRATION BLOCK~~6.0" Lino (REF.DWG.NO.20)189900 33.2-6-R5 Seismic Restraint F-A F1.10 3 X Code Case N 491 1, 4 Lugs**N/A~+190000 33.2-6-R5-WD-001 B K PT Integral Attachment B10~20 X Code Case N-509, Examine 100%of wold length*ON/A4*190100 33.2-6"R5-WD-004 B-K Integral Attachment B10.20 3 X Code Caso N-509, Examine 100%of wold length**N/A~*6.0" Line Outside CZV (REF.DWG.NO.C26852-1)00 33-FW-22 GL-E UT Pipe-to-SS Nozzle 88-01 3 X---X Outside CIV, 10%each refueling, weld overlay/Examine once cvcry 2 RFO's.~~SK"JAF-88-006**
190300 33-FW-22"R GL-G UT Pipe-to-SS Nozzle 88-01 3 X X Outside CZV, 10%each rcfucling, weld overlay~~8K-JAF-88-006+*
190800 33-FW-35 Elbow-to-Nozzle GL S UT 88 01 3 X---X X Terminal End, Outside CIV, 10%each refueling~~PSR-.432"2**
190900 33-FW-36 Nozzle" to-Elbow GL-8 UT 88 01 X---X X--X Terminal End, Outside CIV, 10%each rcfucling~~PSR-.432-2*~
191000 33-FW" 37 Elbow-to-Nozzle GL-S UT 88"01 3 X---X X Terminal End, Outside CZV, 10%each refueling~~PSR-.432-2'~*
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 135 tor Clean Up NUMBER: 33.2
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFZCATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~~6.0" Line (REF.DWG.NO.20)195100 33-32 F-A VT 3 Pipe Stanchion F1.10 3 X Code Case N-491++N/A+~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 136 or Instrumentation NUMBER: 36.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTZFZCATZON INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
>><<CALIBRATION BLOCK>><<2.0" Linc (REF.DWG.NO.28)195200 36-WD-1073 N7L Closure Head-to-Nozzle B-D UT B3.90 3 X Group R31,*>>ZATER>>*195300 36-WD-1073-IR N7L Closure Head Nozzle Inner Radiu B-D UT B3.100 3 X Group R31,**ZATER*>>195400 36-WD-1074 N7L Closure Head Nozzle-to-Flange B"F UT B5.10 PT 3 X Group R31>>*LATER*>>
500 36"WD"1074 N7L Closure Head Nozzle'-to-Flange SZL UT 455R1S1 3 X Group R31, Znconel 182 butter expansion from nozzlo side of weld.>><<LATER>>'>>2.0" Linc (REF.DWG.NO.8)195800 36-R12-A F-A VT-3 Spring Hanger Fl.10 3 X Code Case N-491-1>>*N/A>>>>196000 36-WD 003 Nozzle N13A-to-Safe End B-F B5.20 3 Group R42, Examine 100%of weld length.*<<N/A<<>>196050 36-WD-003 Nozzle N13A-to-Safe End SIL PT 571 3 X Group R42, Examine 100%of weld length.<<>>N/A>>>>196100 36 WD 004 B J Safe End-to-Coupling B9.21 3 X Terminal End, Examine 100%of weld length.**N/A**
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 INSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 137 or Instrumentation NUMBER: 36.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
++CALIBRATION BLOCK++2.0" Linc (REF.DWG.NO.SC)196500 36-WD-924 N16A Nozzle-to-Safe BS.20 End X Group R43, iiN/A++196600 36-WD-924 SZL N16A Nozzle-to-Safe 571 End PT 3 X Group R43, Determine if Aug.Sur/Vol on nozzle and safe cnd is required, SIL 571?s*N/Aaa 196700 36-WD-925 B-J Terminal End Nozzle Safe End-to-Coupling B9.21 3 N16A, Examine 100%of weld length+~N/Ai*00 36-WD-932 B-J Elbow-to<<Coupling
" B9.40 3 X Examine 100%of weld length**N/A**
 
DATE: 10/15/99 REVISION: NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 138 or Drain NUMBER: 37.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~+CALIBRATION BLOCK~*2.0" Line (REF.DWG.NO.9)197600 37-WD-030 Pipe-to-Elbow B-J PT B9.21 3--X Examine 100%of weld length++N/A+~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 139 or Head Vent NUMBER: 37.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION ZNTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK**2.0" Line (REF.DWG.NO.9)197800 37-01-VB B-G-2 VT-1 Valve 37-01 Bolting B7.70 3 X~~N/A~~197900 37-02-VB B G-2 4 l N/A**Valve 37-02 Bolting B7.70 3 X 198000 37-06-VB Valve 37-06 Bolting B G-2 B7.70 VT 1 3 X t tN/At 1 198200 37-R11 Spring Hanger F-A Fl.10 3 X Code Case N"491-1**N/A+*0 37-R12 Spring Hanger F A Fl.10 VT-3 3 X Code Case N-491-1 ktN/Atf 4.0" Zine (REF.DWG.NO.9)199100 37-WD-001 B D UT Group R39,~*LATER~~NS Nozzle-to-Head B3.90 3 X 199200 37-WD-001-ZR B-D UT N8 Nozzle Znner Radius Section 3 X Group R39,~+LATER**199300 37-WD-002 B-F UT Nozzle N8-to-Flange BS.10 PT 3 X Group R39, Examine 100%of weld length++IATER++199400 37-WD-002 SZL UT Nozzle NS-to-Flango 455R1S1 3 Inconel 182 Butter Expansion from Nozzle side.~~IATER~+
 
DATE: 10/15/99 REVISZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN YEAR PIAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 140 or Head Vent NUMBER: 37.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERZOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
>>>>CALIBRATION BLOCK<<>>199500 37-WD-002-FB Flange Bolting B-G-2 B7.50 3 X Examine in place, when removed, or when disassembled.
>>*N/A*>>199700 37-WD-003 Flange-to-Rcduccr GL-D UT 88-01 3 X X<<>>4-A396-.337>>>>
199710 37-WD-003 N/A Flange-to-Rcduccr N/A 3 X-"-X X--X VT-2 each outage for cvidcncc of leakage>>>>4-A396-.337>>>>
2.0" Linc (REF.DWG.NO.9)199800 37-WD-004 Rcduccr to Pipe B-J B9.40 3 X Examine 100%of weld length<<<<N/A<<>>200000 37-WD-006 Elbow-to-Pipe B-J B9.21 3 X Examino 100%of weld length>>>>N/A>>>>200100 37-WD-007 Pipe-to-Flange B-J B9.40 3 X Examine 100%of weld length>>*N/A**200200 37-WD-007-FB B-G-2 VT-1 Refueling Platform B7.50 Flange Bolting 3 X Examine in place, when removed, or when disassembled
>>>>N/A>>>>200500 37-WD-010 Tcc to Pipo B-J B9.21 3 X Examine 100%of weld length**N/A*>>201000 37-WD-015 Pipe-to-Valvo 37-01B-J B9.40 3 X Terminal End, High Stress Weld, Examine 100%of weld length**N/A**
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 141 tor Head Vent E NUMBER: 37.0
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTIPZCATION 201300 37-WD-018 Tee-to-Pipe INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE, ITEM NO METH B"J B9.21 FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD X 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
**CALIBRATION BLOCK~*Examine 100%oi'eld length.~+N/A~+201700 37-WD-022 Elbow-to-Pipe B J B9.21 3 X Examine 100%of weld length*~N/A*~202200 37-WD-027 Pipe-to-Valve 37-02 B J B9.40 X Terminal End, High Stress Wclds, Examine 100%of wold length arN/Aaa
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNZT 1 INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 142 or Drain NUMBER: 37.1
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFICATZON INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THZRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~~2.0" Linc (REF.DWG.NO.9)202700 37-Hl F-A VT-3 Spring Hanger Fl.10 3 X Code Case N-491-1++N/A+*203100 37-SC-2 Box Restraint Fl.10 3 X Code Casa N-491-1**N/A**203300 37.1"07R-VB B-G-2 VT-1 Valve 37-07R Bolting X Examine in place, when disassembled or when removed.+*N/A~+203400 37.1-37-08R-VB B G 2 Valve 37-08R Bolting B7~70 3 Examine in place, when removed, or when disassembled.
++N/A~~203500 37.1-37-10-VB Valve 37-10 Bolting B-G-2 B7.70 VT 1 3 X Examine in place, when removed, or when disassembled
+*N/A**203600 37.1-37-11-VB B-G-2 VT-1 Valve 37-11 Bolting B7.70 3 X Examine in place, when removed or when disassembled.
**N/A*+203900 37.1-WD-003 Pipe-to-Valve 37-10 B J B9.40 3 X Terminal End, High Stress Weld, Examine 100%of weld length~*N/A**204500 37.1-WD-009 B J PiPc to-Valve 37 07R B9.40 3 X Terminal End, High Stress Weld, Examine 100%of wold length~~N/A~~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 143 or Drain NUMBER: 37.1
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERZOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~'iCALIBRATION BLOCK~~204900 37.1-WD-013 Pipe-to-Coupling B-J B9.40 3 X Examine 100%of weld length+iN/Aii 205100 37.1-WD-015 B-J Pipe-to-Valve 37-11 B9.40 X Terminal End, High Stress Weld, Examine 100%of wold length.~~N/A~~205300 37.1-WD-017 B-J Pipe-to-Valve 37-OSR B9.40 3 X Terminal End, High Stress Weld, Examine 100%of wold length.ikN/A%0
 
DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 144 or Shutdown Cooling NUMBER: 38.0
 
==SUMMARY==
EXAHI NATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO HETH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERV ICE YEAR INSTRUCTIONS
**CALIBRATION BLOCK~~14.0" SDC Line (REF.DWG.NO.10)205600 38-01-VB B G-2 VT-1 Valve 38-01 Bolting B7.70 3 V07, Limited to valve selcctcd under B-M-2++N/A++205700 38-01-VBY B"H-2 VT-3 Valve 38-01 Interior B12.50 Surf aco 3 X V07, Only when disassembled, One valve among a group of valves.~~N/A~~1 206100 38-12-FLG B-G-1 VT 1 Valve 38-12 Flange B6.220 Surface X Vlo, When connection is disasscmblcd, Examine 1.0" annular surface of flange surrounding each stud.~~N/A~~206200 38-12-NBW Valve 38-12 Nuts, Bushing, Washers B G-1 B6.230 VT 1 3 X V10 (~<<N/A>>~206300 38-12-VB Valve 38-12 Bolting B-G-1 UT B6.210 3 X V10, 16 studs, Examine inplacc, when disasscmblcd, or when removed.+~NM1-2.50-Bl 6-1~+206400 38"12-VBY B-H-2 VT-3 Valve 38-12 Zntcrior B12.50 Surface X V10, Only when disassembled, Onc valve among a group of valves tfN/At*206500 38-12-WD-003 B K Code Case N-509~~N/A~+Valve 38-12 Integral B10.40 Attachment 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 145 or Shutdown Cooling NUMBER: 38.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTZON INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCX~~207300 38-H1 Spring Hanger F-A Fl.10 3--------X Code Case N-491-1 1 fN/Af i 208100 38-WD-001 Valve 38-01-to-Pipe GL-D UT 88-01 3----X---X Requires 38-H-1 Clamp to be removed.~~PSR-.760~~
208200 38-WD-001 B-J UT Valve 38-01-to-Pipe B9.11 PT 3 X Support 38-Hl support clamp is required to bc removed prior to pcrformanco.
~*LATER**208300 38"WD-002 Pipe-to-Elbow B-J UT B9.11 PT 3 X Examine 100%of weld length~*LATER~+00 38-WD-002 Pipe" to-Elbow GL D UT 88-01 3 X X**LATER**208500 38-WD-002-Dl B-J UT Elbow-hong Seams OR B9.12 3 X Code Case N-524~~LATER++208600 38-WD-002-D2 B-J UT Elbow-Long Seams IR B9~12 PT Code Case N-524**IATER++208800 38-WD-003 Elbow-to-Elbow GL D UT 88-01 3 X X*~LATER~~209400 38-WD"004 Elbow-to-Pipe GL-D UT 88-01 3 X X+~IATER~+209900 38-WD-005 Pipe-to-Elbow GL D UT 88"01 X X**PSR-.760**
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 146 r Shutdown Cooling NUMBER: 38.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
*<<CALIBRATION BLOCK<<<<210400 38-WD-006 Elbow-to-Pipe GL-D UT 88-01 3 X X*<<PSR-.760<<<<
210900 38-WD-007 Pipe-to-Pipe GL-G 88 01 3 X---X X--X Inaccessible inside pen.X-S, Examine area each outage for evidence of leakage.**N/A**211200 38-WD-008 GL-G VT-2 Inaccessible inside Pipe-to-Valve 38-02 88-01 3 X---X X--X pcnctration X-8, Examine each outage for evidence of leakage.**N/A*<<211400 38-WD-087 GL-G Valve 38-12-to-Pipe 88-01 X-"-X X--X Inaccessible inside pen.X-7.Examine area each outage for cvidcncc of leakage.<<<<N/A**211500 38 WD-088 Pipe-to-Pipe GL G 88-01 X---X X--X Inaccessible inside pen.X-7.Examine area each outage for evidence of leakage.<<*N/A<<<<211700 38-WD-089 Pipe-to-Elbow B J B9.11 3 X Examine 100%of weld length*<<LATER<<<<211800 38-WD-089 Pipe-to-Elbow
'GL-D UT 88-01 3 X X<<<<LATER<<<<212200 38-WD-090 Elbow-to" Pipe GL D UT 88-01 X X'*LATER<<<<
 
DATE: 10/15/99 REVISION: 0 NINE HILE POZNT NUCLEAR PLANT UNIT 1 ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 147 or Shutdown Cooling NUMBER: 38.0 SUMHARY EXAHI NATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATE GY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~+CALIBRATION BLOCK~~212700 38"WD-091 Pipe-to-Pipe GL-D UT 88-01 3 X~~PBR-.760~*
212800 38-WD-092 Pipe-to-Pipe GL"D UT 88-01 3 X X+*P8R-.760~*
213100 38-WD-093 Pi pe-to-Elbow GL-D UT 88-01 3 X X**LATER**213500 38-WD-094 GL-D UT+*PBR.760+*Elbow-to-Valve 38-13 88-01 3 X X
 
DATE: 10/15/99 REVISION: 0 NINE HZLE POINT NUCLEAR PZANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COHPONENTS PAGE: 148 cncy Condenser Return INSPECTION INTERVAL HUHBER: 39.0 PLAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASHE SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCTIONS
*+CALIBRATION BLOCK*10.0" ECC I ine (REF.DWG.NO.11A)213800 39-01R-VB Valve 39-01 Bolting B G-2 B7.70 V15, Limited to valve selected under B-M-2 X~~N/A+~213900 39-01R-VBY BH2 Valve 39-01 Interior B12.50 Surface 3 X V15, Only when disassembled, One valve among a group of valves.1tN/Af*214200 39-03-VB B-G-2 VT-1 Valve 39-03 Bolting B7.70 3 X V12, Limited to valve selected under B-H-2.++N/A**0 39-03-VBY B-H-2 VT-3 Valve 39-03 Interior B12.50 Surface 3 X V12, Only when di.assembled,, One valve among a group of valves.**N/A0f 214600 39-05"VB B-G-2 VT-1 Valve 39-05 Bolting B7.70 3 X V09, Limited to valvo selected under B-M-2%*N/A**214700 39-05-VBY Valve 39-05 Interior Surface B-M-2 VT 3 B12.50 3 X V09, Only when disassembled, Onc valve among a group of valves.esN/Aaa 215200 39-A2 Anchor F-A Fl.10 3 X Code Case N-491-1 tiN/Aft
 
DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 149 ency Condenser Return NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFZCATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
~+CALIBRATION BLOCK**215300 39-A2-WD-001 Anchor Integral Attachment B-K B10.20 3 X Code Case N-509**N/Ai~215400 39-A2-WD-002 Anchor Integral Attachment B-K PT B10.20 3 X Code Case N-509+*N/A**215900 39-H16 Spring Hanger Fl.10 VT-3 3 X Code Case N-491-1.*AN/Af*217200 39-H9 Spring Hanger Fl.10 VT-3 3 X Code Case N-4 91-1.e*N/A+a 0 39-WD-194 GL-G Valvo 39-05-to-Pipe
.88-01 X---X X Examine each outage for evidence of leakage.*~N/A~~218000 39-WD-194A Pipe-to-Pipe GL-G 88-01 3 X---X X--X Inaccessible inside penetration X-5B, Examine each outage for evidence of leakage*0 N/Al*218400 39-WD-195 Pipe-to-Elbow GL-D UT 88 01 3 X X+*NMP-10 XX1 SS*+218800 39-WD-196 Elbow-to-Pipe GL-D UT 88-01 3 X--X Removal of pipe support clamp 39-HS-12 6 16 required.++NMP 10 XX1-SS**
 
DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PZANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 150 eney Condenser Return NUMBER: 39.0 INSPECTION ZNTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
+~CALIBRATION BLOCK+~219200 39-WD-197 Pipe-to-Elbow GL D 88-01 3 X X Remove Clamps on 39-HS-12 6 16.~~NMP-10-XXI-SS**
219600 39-WD-198 Elbow-to-Pipe GL-D UT 88"01 3----X X~~NMP-10-XX1-SS**
220000 39-WD-199 Pipe-to-Elbow GL-D UT 88-01 3 X X**NMP-10-XX1 SS**220400 39-WD-200 Elbow-to-Pipe GL-D UT 88-01<<3 X X UT exams every 2 RFO's.*+NMP 10-XX1-SS++
0 39-WD-201 Pipe-to-Elbow GL-D UT 88-01 3 X X UT cxams cvcry 2 RFQ'.221100 39-WD"202 Elbow-to-Pipe GL-D UT 88 01 X----X UT cxams cvry 2 RFO'+*LATER++221600 39"WD-203R Pipe-to-Elbow GL-D UT 88 01 3 X X++NMP-10 XX1-SS**222000 39-WD-204A Pipe-to-Pipe GL-D UT 88-01 3 X---X Sensitized, UT exams cvcry 2 RFO's,~<<NMP-10-XXI-SS>>
~222400 39-WD-204R Elbow-to-Pipe GL-D UT 88-01 3 Sensitized, UT cxams every 2 RFO's X X~+NMP-10-XXI-SS"
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 151 cncy Condenser Return NUMBER: 39.0 ZNSPECTZON ZNTERVAL PZAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASHE SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERZOD THIRD PERIOD------OUTAGE------
1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
+~CALIBRATION BLOCK**223200 39-WD-226 Valve 39-06-to-Pipe GL G 88 01 3 X VT-2 exam each RFO for evidence of leakage 4 1N/At*223400 39-WD-226A Pipe-to-Pipe GL-G 88-01 3 X---X X--X Inaccessible inside pen.X-SA, VT-2 exam each RFO for evidence of leakage.++N/A+*223900 39-WD-226B Pipe-to-Pipe GL-D UT 88-01 3 X----X UT exam every 2 RFO's*+LATER**224300 39-WD-227 Pipe-to-Elbow GL D UT 88-01 3 X X UT exam every 2 RFO's**NMP-10-XX1-SS**
224500 39-WD-228 Pipe-to-Elbow GL-D UT 88 01 3 X X UT exam cvcry 2 RFO's++ZATER*+225000 39-WD-229 Pipe-to-Elbow GL-D UT 88 01 3 X X UT exam every 2 RFO's, Rcmove clamps on support 39-H9, HS-9 and 10.**NMP-10-XX1-SS**
225300 39-WD-230 Elbow-to-Pipo GL-D UT 88-01 3 X UT exam every 2 RFO's**NHP-10-XX1-SS**
225800 39-WD-231 Pipe-to-Pipe GL D UT 88-01 3 X X UT exam every 2 RFO's I f LATER*t 226200 39-WD"232 Pipe-to-Elbow GL-D UT 88-01 3 X X UT exam every 2 RFO's+*NHP-10-XX1-SS+*
 
DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 152 cney Condenser Return NUMBER: 39.0
 
==SUMMARY==
EXAHZNATZON AREA NUMBER ZDENTZFZCATION INSPECTION ZNTERVAL ASHE SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
++CALIBRATION BLOCX++226500 39-WD-233 Elbow-to-Pipe GL D UT 88-01 3 X UT cx~every 2 RFO's**NHP-10-XXZ-SS~~
226900 39-WD-233A Pipe-to-Elbow GL-D UT 88 01 3 X X Sensitized, UT exalts every 2 RFO's**NHP-10-XX1-SS**
227300 39-WD-234A Pipe-to-Elbow GL-D UT 88" 01 3 X Sensitized
+'~NHP 10 XX1 SS++227800 39-WD-235R Elbow-to-Pipe GL D 88-01 3 X X Sensitized
~+NMP-10-XX1-SS**
 
DATE: 10/15/99 REVISZON: 0 NINE HYLE POINT NUCLEAR PIANT UNIT 1 ZNSERVZCE INSPECTZON TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 153 cncy Condenser Supply NUMBER: 39.0
 
==SUMMARY==
EXAMINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
**CALIBRATION BLOCK>>t 229800 39-07R-VB B-G-2 Valve 39-07R Bolting B7.70 10.0" ECC Line (REF.DWG.NO.11)VT 1 3 V16, Limited to valve selected under B-H-2 t*N/A**229900 39-07R-VBY B-M-2 VT 3 Valve 39-07R Interior B12.50 Surface 3 X V16, Only when disassembled, one valve among a group of valves.**N/Att 230500 39-09R-WD-001 Valve 39-09R Body-to-Extension Weld GL-G 88-01 VT-2 VT-2 exam each RFO for cvidcncc of leakage 3 X---X X--X~>>N/Att 0 39"10R-WD-001 Valve 39-10R Body-to-Extension GL-G 88-01 VT 2 3 X---X X VT-2 exam each RFO for cvidcnce of leakage t>>N/A>>*18.0" ECC Nozzlcs (REF.DWG.NO.11)231000 39-WD-001 B-D UT N5A Nozzle-to-Vessel B3.90 3 X Group R17, 65%CRV Limitation duc to ad)accnt nozzle and bioshield t>>LATER**231100 39-WD-001-ZR B D UT NSA Nozzle Incr Radius B3.100 Section 3 X Group R17, 55%CRV limitation due to ad)accnt nozzle and bioshicld**ZATER>>t 231200 39-WD-002 GL-A UT Group R17, t*ZATER>>>>NSA Nozzle-to-Safe End 88-01 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 154 ency Condenser Supply NUMBER: 39.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTZON INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PZAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS 4*CALIBRATION BLOCK~~10.0" ECC Nozzlcs (REF.DWG.NO.11)231300 39-WD-002 B-F PT Group R17,+~LATER~~N5A Nozzle-to-Safe End B5.10 UT 3 X 231400 39-WD-002 SZL UT NSA Nozzle-to-Safe End 455R1S1 Znconel 182 Butter Expansion from nozzle side of weld.++IATER++10.0" ECC Line (REF.DWG.NO.11)231500 39-WD-003 Nozzle N5A Safe End-to-Pipe B J UT B9.11 PT 3 X Terminal End, High Stress Weld+~LATER~~00 39-WD-003 Nozzle NSA Safe End-to-Pipe GL-A UT 88-01 3 X+*LATER**231900 39-WD-006 Pipe-to-Pipe
~~GL-A UT 88-01 3 X~*ZATER*~232700 39-WD-008 Pipe-to-Pipe GL-A UT 88 01 3 X~~LATER~*233100 39 WD-009 GL-A VT-2 Inaccessible inside Pipe-to-Valve 39-09R 88-01 3 X---X X--X penetration X-3A, VT-2 exam each RFO for evidence of leakage,**N/A**233500.39-WD-011 Valve 39-07R-to-Reducer B J UT B9.11 PT 3 X Terminal End, High Stress Weld, Examine 100%of weld length**ZATER**
 
DATE: 10/15/99 REVISION:=0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 155 cncy Condenser Supply NUMBER: 39.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATE GY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 ZRESERVICE YEAR INSTRUCTIONS
<<<<CALIBRATION BLOCK**233800 39-WD-089 B-D UT NSB Nozzle-to-Vessel B3.90 18.0" ECC Nozzles (REF.DWG.NO.11)Group R18, 73%CRV Limitation due to ad)acent nozzle and bioshield**LATER*<<233900 39-WD-089-IR N5B Nozzle Inner Radius Section B-D B3.100 3 X Group R18, 75%CRV Limitation duc to ad)accnt nozzle and bioshield*<<ZATER**234000 39-WD-090 B F UT NSB Nozzle-to-Safe End B5.10 PT 10.0" ECC Nozzles (REF.DWG.NO.11)3 X Group R18, 91.02%CRV*<<LATER<<<<2 4100 39-WD-090 GL-D UT NSB Nozzle-to-Safe End 88-01 3----X---X Group R18, 91.02%CRV<<<<LATER<<<<234200 39-WD-090 SIL NSB Nozzle-to-Safe End 455R1S1 3 X Group R18, Znconcl 182 Butter Expansion from nozzle side of weld<<<<LATER<<<<10.0" ECC Linc (REF.DWG.NO.11)234300 39-WD"091 Nozzle N5B Safe End-to-Pipe B-J UT B9.11 PT 3 X Terminal End, High Stress Weld, Examine 100%of weld length<<*LATER<<<<235500 39-WD-096 Elbow-to-Pipe B-J B9.11 3 X Examine 100%of weld length*<<ZATER<<*
 
DATE: 10/15/99 REVISZON: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 156 ency Condenser Supply NUMBER: 39.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
**CALIBRATION BLOCK**235900 39-WD-097 GL-A VT-2 exam each RFO for PiPe-to-Valve 39-10R 88-01 evidence of leakage X---X X--X iiN/At 1 236300 39-WD-099 Valve 39-OSR-to-Reducer B-J B9.11 3 X Terminal End, High Stress Weld, Examine 100%of weld length**LATER*~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 157 or Core Spray NUMBER: 40.0
 
==SUMMARY==
EXAMZNATZON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD-~OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 IRESERVZCE YEAR INSTRUCTIONS t tCAI.IBRATION BLOCKt t 12.0" CSA (REF.DWG.NO.12)236700 40-01"VB B-G-2 VT-1 Valve 40-01 Bolting B7.70 3 X V14, Limited to valve sclectcd under B-M-2*tN/A**236SOO 40-01-VBY B-M"2 VT-3 Valvo 40-01 Interior B12.50 Surface 3 X V14, Only when disasscmblcd, onc valve among group of valves t*N/Att 237100 40-03-FLG Valve 40-03 Flange Surface B-G-1 VT" 1 B6.220 3 X Vll, Examine 1.0" annular surface of flange surrounding each stud**N/At*00 40 03 NBB B-G-1 VT-1 Valve 40-03 Bushings~B6.230 3 X Vll, Only when disassembled t*N/A**237300 40-03-NBN Valve 40-03 Nuts B G 1 VT 1 B6.230 3 X Vl1, Examine inplacc, when removed or disassembled
**N/A**237400 40-03-NBW Valve 40-03 Washers B-G-l VT-1 B6.230 3 X Vll, Examino inplaco, when rcmovcd or disassembled ttN/A*t 237500 40-03-VB B-G-1 UT Valve 40-03 Bolting B6.210 Vll, Limited to valve sclcctcd under B-M-2 3 X ttLATERtt
 
DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNZT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 158 or Core Spray NUMBER: 40.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTZON INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
*+CALIBRATION BLOCK~*237600 40-03-VBY B-M-2 Valve 40-03 Interior B12.50 3 X Surface Vll, Only when disassembled, one valve among group of valves+*N/A*+2.0" CSB (REF.DWG.NO.12)239500 40"20-VB Valve 40-20 Bolting B-G-2 B7.70 X Examine in place, when removed or when disassembled.
**N/A~~12.0" CSA (REF.DWG.NO.12)239600 40-Al F-A Anchor Fl.10 VT-3 3 X Code Case N-491-1++N/A++12.0" CSB (REF.DWG.NO.12)240200 40-H17 Spring Hanger F-A Fl.10 3 X Code Case N-491-1~~N/Ai~240600 40-H21-A F-A VT-3 Constant Spring Hanger F1.10 3 X Code Case N-491-1**N/A~~240700 40"H21-A-WD-001 Integral Attachment B"K B10.20 3 X Code Case N-509++N/A~~240800 40-H21-A-WD-004 Integral Attachment B10.20 PT 3 X Code Case N-509**N/A**240900 40-H21-A-WD-007 B-K PT Integral Attachment B10.20 3 X Code Case N-509+~N/A+a
 
DATE: 10/15/99 REVZSION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 159 J or Cora Spray E NUMBER: 40.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION ZNTERVAL ASME SEC.XI CATE GY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
++CALIBRATION BLOCK**241000 40"H21-A-WD-010 Integral Attachment B K PT B10.20 3 Code Case N-509**N/A*~241100 40-H21-B F A Constant Spring Hangar F1.10 VT 3 3 X Code Case N-491-1 N/Af f 12.0" CSA (REF.DWG.NO.12)241700 40-H54 F-A Spring Support Fl.10 VT 3 3 X Code Case N-491-1**N/At%243100 40-H57-B F-A Constant Weight hanger F1.10 X Code Case N-491-1**N/A+~00 40-WD-001 GL-D UT Valve 40-03-to-Pipe 88-01 3 X UT exams every 2 RFO'*~NMP-12-XXI-SS~
~2.0" CSA (REF.DWG.NO.12)245900 40-WD 002 B-J Branch Connection B9.32 3 X Examine 100%of weld length*~N/A~*6.0" CSA (REF.DWG.NO.12)246100 40-WD-003 Branch Connection GL D UT 88-01 3----X UT exams every 2 RFO's.**PSR-1.5-2~~246300 40-WD-004 Pi pc-to-Elbow GL" D UT 88-01 3 X X UT exams cvcry 2 RFO's.**PSR-.42-2~~
246500 40-WD-005 Elbow-to-Pipe GL-D UT 88-01 3 X X UT exams cvcry 2 RFO's to the extent practical**PSR".432-2i~
 
DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 160 or Core Spray NUMBER: 40.0
 
==SUMMARY==
EXAHINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO HETH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
**CALIBRATION BLOCK'>>~246510 40-WD-005 Elbow-to-Pipe N/A N/A VT 2 3 X X X--X VT-2 each outage, for evidence of leakage**PSR-.432-2i~
246700 40-WD-006 Pipe-to-Pipe GL-D UT 88-01 3 X X UT cxams every 2 RFO's.**LATER++246710 40-WD-006 Pipo-to-Pipe N/A N/A VT-2 3 X---X X VT-2 exam each outage for evidence of leakage 246900 40-WD-007 GI-D UT Pipe-to-Valve 40-05 88-01 3 X X UT cxams every 2 RFO's.*~PSR-.432-2**
12.0" CSA (REF.DWG.NO.12)247100 40 WD-008 Pipe-to-Elbow GL-D UT 88-01 3 X X UT exams every 2 RFO's.+*NMP-12-XX1-SS**
247300 40-WD-009 GL"D UT Elbow-to-Valve 40-02 88-01 3 X X UT exams cvcry 2 RFO's**NMP-12-XXI-SS++
247700 40-WD-010A GL-G VT 2 Valve 40-02-to-Pipe 88-01 X-X X Inaccessible inside pen.X-13A, VT-2 exam each RFO for evidence of leakage.**N/A~i 248000 40-WD-011 Pipe-to-Elbow GL-D UT 88-01 3 X X UT exams cvcry 2 RFO's.*~NHP-12-XX1-SS**
248010 40-WD-011 Pipe-to-Elbow N/A N/A 3 X---X X X VT-2 each outage for evidence of leakage~~NHP-12-XX1-SS~
~
 
DATE: 10/15/99 REVISION: 0 NINE HYLE POINT NUCLEAR PIANT UNIT 1 INSERVICE INSPECTION TEN-.YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 161 tor Core Spray E NUMBER: 40.0 SUHMARY EXAMINATION AREA NUMBER IDENTIFICATION INSPECTZON INTERVAL ASHE SEC.XZ CATEGY NDE ITEM NO HETH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
*+CALIBRATION BLOCK~~248300 40-WD-012 Elbow-to-Pipe GL-D 88-01 3----X UT cxams every 2 RFO's.++NHP-12 XX1-SS**248600 40"WD"013 Pipe-to-Pipe GL D UT 88"01 3----X UT exam every 2 RFO's.**NMP-12-XXI-SS'~
+249000 40-WD-014 Pipe-to-Pipe GL D UT 88-01 3----X X UT exams every 2 RFO's.++NMP-12 XX1 SS**249400 40 WD-015 Pipe-to-Elbow GL-D UT 88-01 3 X X UT cxams every 2 RFO's.'~~NMP-12-XX1-SS~
~9700 40-WD-016 Elbow-to-Pipe GL-D 88-01 X UT cxams every 2 RFO's.**NMP-12-XXI-SS+~
249900 40-WD-017 Pipe-to-Elbow GL-D UT 88-01 X---X UT exams every 2 RFO's.+*NMP-12-XX1-SS**
250000 40-WD-018 Elbow-to-Pipo GL D UT 88-01 3----X X UT exam every 2 RFO's.~~NMP-12-XXI-SS~
~250400 40-WD-020 Pipe to Tcc GL D UT 88-01 3 X X UT exams every 2 RFO's.++NMP-12-XX1-SS*+
250600 40 WD-021 Tcc-to-Pipe GL-D UT 88-01 X---X UT exam every 2 RFO~s.**NHP-12-XXZ-SS**
250900 40-WD-022 Pipe-to-Elbow GL D UT 88 01 X UT cxams every 2 RFO's.*+NMP 12 XX1 SS+*
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 162 tor Core Spray NUMBER: 40.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTION INTERVAZ SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~" 251200 40-WD-023 Elbow-to-Pipe GL-D 88-01 3 X X UT exams every 2 RFO's.++NMP 12 XXZ-SS+*251500 40-WD-024 Pipe-to-Valve 40-09 GL-D UT 88-01 3 X UT exams every 2 RFO's.~~NMP-12-XXl-SS~*
251800 40-WD"025 GL D UT Valve 40-09-to-Elbow 88-01 X X UT exams cvcry 2 RFO's.~~NMP"12-XX1-SS**
252000 40-WD-026 Elbow-to-Pipe GL-D UT 88 01 3 X X UT exams every 2 RFO'st~+NMP-12-XXI-SS**
2 2200 40-WD-027 Pipe-to-Tee GL-D UT 88-01 3 X X UT every 2 RFO's~~NMP-12-XX1-SS~~
252500 40-WD-028 GL D UT Tcc-to-Valve 40-01 88-01 3 X X UT exams cvcry 2 RFO's.**NMP-12-XXI-SS~
~252800 40-WD-029 GL"D UT Valve 40-01-to-Pipe 88-01 3 X X UT cxams cvcry 2 RFO's.~~NMP-12-XXZ-SS**
253100 40-WD-030 Pipe-to-Tec GL-D UT 88 01 3 X X UT exams every 2 RFO's.~~NMP-12-XX1-SS*~
253400 40-WD-031 Tec-to-Pipe GL-D UT 88"01 3 X UT exams every 2 RFO's.**NMP-12-XX1-SS*~
253800 40-WD-032 Pipe-to-Elbow GL-D UT 88-01 3 X X UT cvcry 2 RFO's~~NMP-12-XX1-SS**
 
DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 163 or Core Spray NUMBER: 40.0 SUHHARY EXAHINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR ZNSTRUCTZONS
++CALIBRATION BLOCK*~254100 40-WD-033 Elbow-to-Elbow GL D 88-01 3 X X UT exams every 2 RFO's.~~NHP-12-XXZ-SS~~
254300 40"WD"034 Pipe-to-Elbow GL-D UT 88 01 3 X X UT cxams avery 2 RFO's.**NMP-12-XX1-SS~~
254400 40-WD"035 Elbow-to-Reducer GL-D UT 88-01 3 X X UT exams cvcry 2 RFO's.*~NHP-12-XX1-SS~
~6.0" CSA (REF.DWG.NO.12)254600 40-WD"036 Reducer-to-Pipe B-J UT B9.11 PT 3 X Examine 100%of weld length~*LATER*~0 40-WD-036 Rcducor-to-Pipo GL-D UT 88-01 3 X X UT exams every 2 RFO',**PSR-.432-2*~
254800 40-WD-038 GL-D UT Nozzle N6A Outcr Safe 88-01 End-to-Elbow 3 X UT exam every, 2 RFO's**PSR-.75-3~*
254900 40-WD-038 B J PT Nozzlo N6A Outcr Safe B9.11 UT End-to-Elbow 3 X Terminal End,**PSR-.75-3**
255000 40-WD-038A B"J UT Nozzle N6A Znnor Safe B9.11 PT End-to-Outcr Safe 3 X Examine 100%of weld length~*IATER**255100 40-WD-038A GL-D UT Nozzle N6A, Inner Safe 88-01 End-to-Outcr Safe 3 X X UT cxams evory 2 RFO's.~~LATER*~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 164 or Core Spray NUMBER: 40.0
 
==SUMMARY==
EXAMINATION AREA NVMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~+CALIBRATION BLOCK*~255200 40-WD-039 Nozzle N6A-to-Inner Safe End B F BS.10 3 X Group R19, UT 28.4%CRV**LATER**255300 40-WD-039 Nozzle N6A-to-Inner Safe End SZL UT 455R181 Znconel 182 Butter Expansion from nozzle side of weld~~N/A+~255400 40-WD-039 Nozzle N6A-to-Inner Safe End GL D UT 88-01 3----X X UT exams every 2 RFO's.etN/Aee 255500 40-WD-040 B-D VT N6A Nozzle-to-Vessel B3.90 X Group R19, 66%CRV ,Limitation duc to ad)accnt nozzle and bioshiold**IATER+s 255600 40-WD-040-ZR N6A Nozzle Inner Radius Section B-D UT B3.100 3 X Group R19, 66%CRV ,Limitation duc to ad)accnt nozzle and bioshicld~~LATER~~12.0" CSB (REF.DWG.NO.12)255800 40-WD-041 GL-D VT Valve 40-13-to-Pipe 88-01 3 X----X UT exams every 2 RFO's~+LATER~~6.0" CSB (REF.DWG.NO.12)256200 40-WD"043 Branch Connection GL-D UT 88-01 3 X X UT exam every 2 RFO's.~+LATER~~256400 40-WD-043A GL D UT Pipe-to-BR Stub Nozzle 88-01 X--X UT exam cvcry 2 RFO's++LATER*+
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTZON XI SCHEDULED COMPONENTS PAGE: 165 or Core Spray NUMBER: 40.0
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFZCATION INSPECTION ZNTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
>>>>CALIBRATION BLOCK>>>>256600 40-WD-044 Pipe-to-Elbow GL-D 88 01 3 X X UT cxams every 2 RFO's.**LATER>>>>256800 40 WD 045 Elbow-to-Pipe GL-D UT 88-01 3 X X UT cxams every 2 RFO's.>>>>LATER>>*12.0" CSB (REF.DWG.NO.12)257100 40-WD-047 GL D UT Pipe-to-Valve 40-06 88-01 X----X UT cxams every 2 RFO's.>>>>LATER>>>>257300 40-WD-048 Pipe-to-Elbow GL-D UT 88 01 3 X X UT cxams every 2 RFO's**LATER**0 40-WD-049 GL D UT Elbow-to-Valve 40-12 88-01 3 X X UT cxams every 2 RFO's>>>>LATER>>>>257900 40-WD-050A GL G VT-2 VT-2 exam each RFO for Valve 40-12-to-Pipe 88-01 cvidcnco of leakage.X---X X--X>>>>N/A>>~258100 40-WD-051 Pipe-to-Elbow GL-D UT 88-01 X X UT cxams cvcry 2 RFO's>>>>LATER>>>>258110 40-WD-051 Pipe-to-Elbow N/A VT-2 N/A 3 X---X X--X VT-2 each outage for evidence of leakage>>>>IATER>>>>258500 40 WD 052 Elbow-to-Pipe GL-D UT 88-01 3 X X UT cxams every 2 RFO's.**LATER>>>>
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 166 or Core Spray NVMBER: 40.0
 
==SUMMARY==
EXAMZ NATION AREA NVMBER IDENTIFICATION INSPECTZON INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
*>>CALIBRATION BLOCK>>t 258800 40-WD-053 Pipe-to-Elbow GL-D 88-01 3 X--X UT cxams every 2 RFO's.**LATER**259100 40-WD-054 Elbow-to-Pipe GL-D UT 88-01 X X UT exams every 2 RFO's.t>>LATER>>t 259300 40-WD-055 Pipe-to-Elbow GL D VT 88-01 3 X X UT exam every 2 RFO's t*ZATER**259700 40-WD-056 Elbow-to-Pipe GL-D UT 88-01 3 X X UT cxams every 2 RFO's.<<*LATER>>>>2 200 40-WD-058 Pipe-to-Tcc GL-D UT 88-01 3 X X UT exams every 2 RFO'.t t LATER>>t 260500 40-WD-059 GL-D VT Tcc-to-Valve 40-10 88-01 X X UT cxams every 2 RFO's.t>>IATER>>t 260900 40-WD-060 Valve 40-10-to-Pipe GL-D UT 88-01 3 X X UT exams every 2 RFO's.t>>LATER>>t 261200 40-WD-061 Pipe-to-Elbow GL-D UT 88-01 X X UT cvcry 2 RFO's.t>>LATER>>t 261400 40-WD-062 Elbow-to-Pipe GL" D VT 88-01 X X VT every 2 RFO's.t<<LATER>>t 261800 40-WD-063 Pipe-to-Elbow GL-D VT 88-01 3 X X UT exams cvcry 2 RFO's.**LATER>>t
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNZT 1 INSERVZCE ZNSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 167 or Core Spray E NUMBER: 40.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PZAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~~262200 40-WD-064 Elbow-to-Pipe GL-D 88 01 3 X X UT exams every 2 RFO's.~'~IATER~~262500 40-WD-065 Pipe-to-Elbow GL D UT 88-01 3 X X UT exams every 2 RFO's.**ZATER**263000 40-WD-066 Elbow-to-Pipe GL-D UT 88-01 X X UT cxams every 2 RFO's.~~LATER~~263400 40-WD-067 Pipe-to-Tce GL-D UT 88"01 3 X X UT cvcry 2 RFO's~*LATER**600 40-WD 068 Tce to-Pipe GL-D UT 88-01 3 X X UT exams every 2 RFO's.**IATER1*264000 40-WD-069 GL-D UT Pipe-to-Valve 40-11 88-01 X----X UT exams every 2 RFO's.~~LATER**264300 40-WD-070 GL-D UT Valve 40-11-to-Pipe 88-01 3 X X UT exams every 2 RFO>s.~~ZATER~~264600 40-WD"072 Elbow-to-Pipe GL-D UT 88-01 3 X X UT exams every 2 RFO's.~+IATER++265000 40"WD-073 Pipe-to-Tcc GL-D UT 88-01 X----X UT cxams every 2 RFO's.**IATER**265400 40-WD"074 Tec-to-Pipe GL-D UT 88-01 3 X X UT every 2 RFO's.~~ZATER~~
 
DATE: 10/15/99 REVISION: 0 NINE MZI E POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COHPONENTS PAGE: 168 or Core Spray NUHBER: 40.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEH NO HETH FIRST PERZOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
+~CALIBRATION BLOCK*+265800 40"WD-075 Pipe-to-Pipe GL-D 88 01 3 X----X UT exams every 2 RFO's.~~LATER*~266100 40-WD-076 Pipe-to-Reducer (12'x6")GL-D VT 88-01 3 X---" X UT axams every 2 RFO's.**LATER++266400 40-WD-077 Reducer (12" x6")to Pipe GL D UT 88-01 3 X----X UT exams every 2 RFO's.~+ZATER++266500 40-WD-077 Reducer (12" x6")-to-Pipe B"J VT B9.11 PT 3 X Examine 100%of weld length~+LATER~~6.0" CSB (REF.DWG.NO.12)266600 40-WD-079 B-J UT Terminal End~*LATER~+Nozzle N6B Outer Safe B9.11 PT End-to-Elbow 3 X 266700 40-WD-079 GL-D VT Nozzle N6B Outcr Safe 88-01 End-to-Elbow 3 X----X Terminal End, UT exam every 2 RFO's.~*LATER~*266800 40-WD-079A GL-D UT Nozzle N6B Inner Safe 88-01 End-to-Outcr Safe 3 X X UT exam every 2 RFO's~~IATER+*266900 40-WD"079A B-J VT Nozzle N6B Znncr Safe B9.11 End-to-Outer Safe 3 X Examine 100%of weld length**ZATER~~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 169 or Core Spray NUMBER: 40.0
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERZOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
**CALIBRATION BLOCK+*267000 40-WD-080 Nozzle N6B-to-Inner Safe End B-F B5.10 X Group R20, Examine 100%of weld length**LATER**267100 40-WD-080 SIL No" zlc N6B-to-Inner 455R1S1 Safe End 3 X 182 Butter Expansion from nozzle sido of weld.aaLATER+a 267200 40-WD-080 Nozzle N6B-to-Inner Safe End GL-D 88-01 3 X X UT exams cvcry 2 RFO's**LATER+*267300 40-WD-081 B-D N6B Nozzle-to-Vcsscl B3.90 3 X Group R20, 56%CRV ,Limitation due to ad)acent nozzle and bioshield~~NMPI-GE-7.875~~
267400 40-WD-081-ZR N6B Nozzle Znner Radius Section B-D B3.100 3 X Group R20, 54%CRV ,Limitation duc to ad)accnt nozzle and bioshicld+*NMP1 GE 7.875++2.0" CSS (REF.DWG.NO.12)267500 40-23"VB Valve 40-23 Bolting B-G-2 B7.70 3 X Examine in place, when removed or when disasscmblcd
*~N/A~*267600 40-24-VB Valve 40-24 Bolting B-G-2 B7.70 X Examine in place, when removed or when disassembled
~~N/A~*
 
DATE: 10/15/99 REVISION: 0 NZNE MZLE POINT NUCLEAR PIANT UNIT 1 ZNSERVZCE ZNSPECTION TEN YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 170 or Core Spray NUMBER: 40.1
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATE GY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
++CALIBRATION BLOCK**267700 40.1-25-VB Valve 40-25 B-G-2 B7.70 Removed Crom schedule as Class 2, and less than 2.0~diameter.*~N/A~*267800 40.1-WD-001 B J*AN/Al 0 Sock-0-let-to-Pipe B9.21 3 X 267900 40.1-WD-002 Pipe-to-Valve 40-19 B-J B9.21 X Terminal End,+*N/A++268600 40.1-WD"009 B-J Terminal End<<*N/A*>>Valve 40-22-to-Pipe B9.21 3 X 0 40.1-WD-011 Tce-to-Pipe B-J B9.21 3 X~+N/A~*268900 40.1-WD-012 B-J Terminal End iiN/A++Pipe-to-Valve 40-23 B9.21 3 X 270300 40.1-WD-026 Tec-to-Pipe B-J B9.21 3 X f*N/A%1 270400 40.1-WD-027 Pipe<<to-Elbov B-J B9.21 3 X+*N/A**271200 40.1-WD-035 Pipe-to-Valve 40-20 B-J B9.21 3 X Tcrmnal End**N/A~~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 171 or Core Spray NUMBER: 40.1
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
**CALIBRATION BLOCK**1.0" CSS (REF.DWG.NO.12)271400 40.1 WD 037 B-J PT Terminal End*~N/A~~Pipe-to-Valve 40-24 B9.21 3 271500 40.1-WD-038 B-J PT Terminal End~~N/Ai~Valve 40-24-to-Pipe B9.21 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 172 d Poison NUMBER: 42.1
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTZON INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
>>*CALIBRATION BLOCK>>>>1.5" Liquid Poison Line (REF.DWG.NO.14)271700 42.1-02-VB B-G-2 VT-1 Valve 42.1-02 Bolting B7.70 3 X>>>>N/A>>>>271800 42.1-03-VB B-G-2 VT-1 Valve 42.1-02 Bolting B7.70 3 X**'N/A>>*271900 42.1-R1-A Spring Hanger Fl.10 VT 3 3 X Code Caso N-491-1>>>>N/A>>>>272800 42.1-WD-005 Pipe-to-Elbow B-J B9.21 3 X Examine 100%of weld length**N/A**0 42.1-WD-006 Elbow-to-Pipe B"J PT B9.21 3 X Examine 100%of wold length**N/A>>>>273500 42.1-WD-017 Valve 42.1-02-to-Reducer B-J PT B9.21 3 X Terminal End>>>>N/A>>>>273800 42.1-WD-026 B-J PT Valve 42.1-01-to-Pipe B9.21 3 X Terminal End, Examine 100%of weld length>>>>N/A>>>>274100 42.1-WD-029 Pipe-to-Elbow B-J PT B9.21 3 X Examino 100%of weld length>>>>N/A>>>>274600 42.1-WD-034 SZL Safe End-to-Nozzle N12 571 3 X Augmcnetd UT and PT to dotermincd>>>>IATER>>>>
 
DATE: 10/15/99 REVZSZON: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN YEAR PLAN I CLASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 173 d Poison NUMBER: 42.1
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
++CALIBRATION BLOCK~~274700 42.I-WD-034 B-F Safe End-to-Nozzle N12 B5.20 3 X Group R41, Terminal End Examine 100%of weld length~~N/A**274800 X-131 Penetration F-A VT-3 System Anchor Point F1.10 3 X Code Casa N-491-1 1 tN/A1*
 
DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PIANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PZAN CZASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 174 ol Rod Drive NUMBER: 44.1 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
NUMBER EXAMINATION AREA IDENTIFICATION ASME SEC.XI CATEGY NDE ZTEM NO METH THIRD PERIOD FIRST PERIOD SECOND PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCTZONS
**CALIBRATION BLOCK**3.0" Control Rod Drive Line (REF.DWG.NO.18)275000 44.1-H1 F-A VT-3 Spring Hanger Fl.10 3 X Code Case N-491-1+*N/A+*275300 44.1-SC-1 Pipe Clamp F-A F1.10 VT-3 3 X Code Casa N-491-1 1tN/Ait 275500 44.1-WD-001 B"J Valve 44-189-to-Pipe B9~21 3 X Terminal End, Examine 100%of wold length**N/A+*275600 44.1-WD-002 Pipe-to-Elbow B-J PT B9.21 3 X Examine 100%of weld length~*N/A**Elbow-to-Pipe B9.21 00 44.1-WD-003 B-J 3 X Examine 100%of weld length.~~N/A**275900 44.1-WD-005 Elbow-to-Pipe B-J B9.21 3 X Examino 100%of wold length.**N/A**276900 44.1-WD-015 Pipe-to-Elbow B-J B9.21 3 X Examine 100%of weld length~+N/A*~277000 44.1-WD-016 B-J PT Terminal End++N/A++Elbow-to-Safe End (N9)B9.21 X 277100 44.1-WD-017 B-F PT N9 Safe End-to-Nozrlc B5~20 3 X Group R40, Examine 100%of weld length~*N/A**277200 44.1-WD-017 N9 Safe End-to-No""lc 0619 3 X Group R40~+ZATER*~
 
DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS PAGE: 175 ol Rod Drive NUMBER: 44.1
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH PIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
+~CALIBRATION BLOCK*~277300 44.1-WD-017 SZL N9 Safe End-to-Noz lc 455R1S1 3 X Group R40, Inconel 182 Butter Expansion from nozzle side of weld.**LATER**277400 44.1-WD-018 N9 Nozzle-to-Vcssol B-D UT B3.90 3 X Group R40, 63%CRV Limitation duc to bioshicld~+LATER*~277500 44.1"WD-018-IR NUREG UT N9 Nozzle-to-Vessel 0619 RUT X Group R40,~iIATERii 277600 44.1-WD-018-ZR B-D N9 Nozzle Inner Radius B3.100 Section 3 X Group R40, 48%CRV, I imitation due to bioshicld~iLATERi+3.0" Control Rod Drive Line (REF.DWG.NO.19)277800 44.3-12-VB B-G-2 Valvo 44-3-12 Bolting B7.70 VT 1 10 Studs 20 Nuts, Examine in place, when removed or when disassembled
**N/A**277900 44.3-13-VB B-G-2 VT-1 Valve 44-3-13 Bolting B7.70 3 X Examine in place, when removed or when disasscmblcd.
~*N/A~~278000 44.3-189-VB B G-2 VT-1 Valve 44-189 Bolting B7.70 3 X Examine 10 studs and 20 nuts, in place, when removed or when disassembled
~~N/A++278100 44.3-WD-093 B-J Terminal End~~N/Ai~Pipe-to-Valve 44-3-12 B9~21 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS PAGE: 176 ol Rod Drive NUMBER: 44.3
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTIFICATZON INSPECTION ZNTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR ZNSTRUCTIONS
~~CALIBRATION BLOCK~*278200 44.3-WD"094 B-K PT Valve 44.3-12 Integral B10~40 AttachrN:nt 3 X Code Case N-509~~N/A'~278500 44.3-WD-111 B J Valve 44.3-13-to-Pipe B9.21 X Examfne 100%of weld length~~N/A~+
 
N Y NIAGARA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-10 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 5.0 CLASS 2 INSERVICE INSPECTION PLAN TABLES This section contains the Long Term Ten-Year Inservice Inspection Examination Tables for nondestructive examinations of selected systems and components for the Second Inservice Inspection Interval.02.0 03.0 39.0 44.2 80.0 81.0 93.0 Main Steam System Main Steam System Emergency Condenser System Control Rod Drive System Reactor Containment Spray System Reactor Core Spray System~Reactor Containment Spray System 177 thru 179..180thru181
..182 thru 196..197 thru198..199 thru 210 211 thru 222 223 thru 225 File: NMP1ISIPL.wpd f,
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 177 Steam System NUMBER: 02.0
 
==SUMMARY==
EXAMZNATZON AREA NUMBER ZDENTZFZCATZON INSPECTION INTERVAL ASME SEC.XZ CATE GY NDE ZTEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS 4*CALIBRATION BLOCK~*18.0" MSA (REF.DWG.NO.3)284000 02-MS-H10 F-A VT-3 Spring Hanger Fl.20 3 X Code Case N-491-1++N/A~*284100 02-MS-Hll Spring Hanger Fl.20 VT 3 3 X Code Case N-491-1 41N/AI4 24.0" MSB (REF.DWG.NO.3)286400 02-SR-1A Seismic Restraint F-A Fl.20 VT-3 3 X Code Case N-491-1~~N/A~*286500 02"SR-1A-WD-001.
1 C C Integral Attachment C3.20 3 X 1-1/4"x 14xl'-4" Lug , Code Case N-509**N/A**286600 02-SR-1A-WD-001.
11 C-C Integral Attachment C3.20 3 X Code Case N-509**N/A**286700 02-SR-1A-WD-001
.13 C-C Integral Attachment C3.20 3 X Code Case N-509+AN/Aee 286800 02-SR-1A-WD-001.15 C-C MT Integral Attachment C3.20 3 X Code case N-509~~N/A~~286900 02-SR-1A-WD-001.3 C C MT Integral Attachment C3.20 3 X Code Case N-509+~N/A~~287000 02-SR-1A-WD-001.5 C-C MT Integral Attachment C3.20 3 X Code Case N-509~+N/A++
 
DATE: 10/15/99 REVISION: 0 NINE HZLE POZNT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 178 Steam System NUHBER: 02.0
 
==SUMMARY==
EXAMINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL ASHE SEC.XZ CATEGY NDE ZTEH NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS 4 4CALZBRATION BLOCK~~287100 02-SR-1A-WD-001.
7 C-C HT Integral Attachment C3.20 3 X Code Case N-509++N/Ai+287200 02-SR-1A-WD-001.
9 C C MT Zntegral Attachment C3.20 3 X Code Case N-509**N/A**24.0" HSA (REF.DWG.NO.3)290800 02"WD-041 Branch Connection (24"x18" Header)C-F-2 PT C5.81 3 X**N/A%*24.0" HSB (REF.DWG.NO.3)02-WD-073 Tcc-to-Pipe C-F-2 UT C5.51 HT 3 X**NMP1-24-080-CS*~
293400 02"WD-078 Pipe-to-Elbow C-F-2 UT C5.51 3 X~'~NMP1-24-080-CS~*
18.0" MSA (REF.DWG.NO.3)294000 02-WD-182 Rct-to-Pipe C" F-2 UT C5.51 3 X~~NMPI-18-.
937-CS-106*~
294100 02-WD-190 C-F-2 UT++NHP1-18-.937-CS-106**
Pipe-to-180 dcg Ret C5.51 HT 3 294500 02-WD-329 CF2UT Pipe-to-Turbine Stop C5~51 PT 3 X Valve Terminal End~+NHP1-18-.937-CS-106**
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 179 Steam System NUMBER: 02'.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRE SERVICE YEAR INSTRUCTIONS
**CALIBRATION BLOCK*'~294600 02-WD-330 Pipe-to-Turbine Stop Valve C-F-2 C5.51 3 X Terminal End~~NMP1-18".
937-CS-106**
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 180 Stcam NUMBER: 03.0
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
++CALIBRATION BLOCK~*16.0" MSS (REF.DWG.NO.4)294900 03-H1 Pipe Anchor Fl.20 VT 3 3 X Code Case N-491-1*+N/A+'295000 03-Hl-WD-001.
1 Integrally Welded Attachment C-C C3.20 3 X Code Case N-509*~N/A+*295100 03-Hl WD-001.2 C C Code Caso N-509~~N/A~~Integrally Welded C3.20 Attachment 3 X 295200 03-H1-WD-001.3 C C Code Case N-509~~N/A~~Integrally Welded C3.20 Attachment 3 X 295300 03-Hl-WD-001.
4 C-C Integrally Welded C3.20 Attachment 3 X Coda Case N-509++N/A++295700 03-H3 Rod Hanger F-A F1.20 3 X Coda Case N-491-1 ftN/Att 297800 03-WD-001 Tec-to-Pipe CF2UT C5.51 MT 3 X Examine 100%of weld length~*PZR-I.24-1~~299400 03-WD-020 Pipe-to-Elbow C-F-2 UT C5.51 MT 3 X Examine 100%of weld length*~PZR-1.24-1**
 
DATE: 10/15/99 REVISION: 0 NINE HZLE POINT NUCLEAR PIANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 181 Steam NUMBER: 03.0
 
==SUMMARY==
EXAHINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASHE SEC.XZ CATEGY NDE ZTEH NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD THIRD PERIOD------OUTAGE------
1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR ZNSTRUCTIONS
++CALIBRATION BLOCK*~299700 03-ND-023 C-F-2 MT Tee-to-Valve Hanifold C5~51 UT 3 X Terminal End, Examine 100%of weld length**NMP ISW 1020 CSiPIR-1.24-1**300800 Valve Manifold 03-1 F-A VT-3 Valve Hanifold 03-1 F1.40 X Tuxbine By-Pass Hanifold, Code Case N-491-1~~N/A~i
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN"YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 182 ency Condenser NUMBER: 39.0 Heat Exchanger 122 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
++CALIBRATION BLOCK*~EC Heat Exchanger 60-42 (REF.DWG.NO.11)303300 60-42-WD-001 N/A UT Hx 60-42 N/A PT Nozzle-to-Inlet Head This weld was replaced by 60-42-WD-001
**LATER**303400 60-42-WD-001C1 Hx 60-42 Nozzle-to-Inlet Head C-B C2.21 3 X**IATER**303600 60"42"WD-002C1 Hx 60-42 Inlet Head-to Tube Shcct C-A C1.30 3 X~~LATER~~800 60-42-WD-005C1 Hx 60-42 Tube Sheet-to-Outlet Head C-A C1.30 X 303900 60-42-WD-006C1 Hx 60-42 Outlet Head-Nozzle C-B UT C2.21 PT 3 X~~LATER~~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 183 cncy Condenser Return NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD-OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTZONS
++CALIBRATION BLOCK++10.0" ECC Line (REF.DWG.NO.11A)305500 39"H2 F A VT-3 Spring Support Fl.20 3 X Code Case N-491-1 i 0 N/Al 0 305600 39-H2-WD"001C1 C-C Integral Attachment C3.20 3 X Code Case N-509**N/A~~305700 39-H2-WD-003C1 C C Code Case N-509~*N/A*~Integral Attachment C3.20 3 X 305800 39-H2"WD-005C1 C-C Integral Attachment C3.20 3 X Code Case N-509+*N/A++0 39-H2-WD-007C1 C C Integral Attachment C3.20 3 X Code Case N-509.~*N/A~i 306000 39-H27 Spring Hanger F A F1.20 VT-3 3 X Code Case N-491-1++N/A+*307300 39-H4 Spring Hanger F1.20 3 X Code Case N-491-1~~N/A~~307400 39-H4-WD-001C1 C-C Code Case N-509+~N/Ai~Integral Attachment C3.20 3 X 307500 39-H4-WD-004C1 C"C Integral Attachment C3.20 3 X Code Case N-509++N/A++307600 39-H4-WD-007C1 C C PT Code Case N-509**N/A**Integral Attachment C3.20 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 184 ancy Condenser Return NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS FRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NVMBER IDENTIFICATION ASME SEC.XI CATEOY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD THZRD PERIOD------OUTAOE------
1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
~+CALIBRATION BLOCK~*307700 39-H4-WD-010C1 Integral Attachment C-C C3.20 3 X Code Case N-509~*N/A~*313500 39-WD-178-D Pipe-Long Seam C-F-1 C5.12 3 X Code Casa N-524**ZATER*~313600 39-WD-178C1 Hx 60-46 Outlet Nozzle-to-Pipe C-F-1 UT C5.11 pT 3 X Examine 100%of weld length~~ZATER~+313800 39"WD-179-D C-F 1 VT Elbow-Long Scam (60 C5.12 pT dcg.LR)3 X Code Casa N-524+~ZATER*~0 39-WD-179-U CF1 Pipe-Long Seam C5.12 3 X Code Casa N-524~*LATER~+314000 39-WD-179C1 Pipe-to-Elbow C-F 1 C5.11 3 X+~LATER*~314500 39-WD-181 Pipe-to-Tcc C-F-1 VT C5.11 PT 3 X Examine 100%of weld length~~ZATER~~314600 39-WD-181-D Pipe>>Long Seam C-F-1 C5.12 3 X Coda Case N-524**IATER**314700 39-WD-181-U Teo-Long Seam C-F-1 VT C5.12 pT 3 X Code Case N-524*+LATER+'~
315200 39-WD-183-D Pipe-Long Seam C-F-1 UT C5.12 pT 3 X Code Case N-524*~LATER~~
0 DATE: 10/15/99 REVISION: 0 NINE MII E POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 185 gency Condenser Return E NUMBER: 39.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFZCATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
++CALIBRATION BLOCK*+315300 39-WD-183-U C-F-1 Elbow-Long Seam (60 C5.12 deg LR)X Code Case N-524*~LATER~*315400 39-WD-183C1 Elbow-to-Pipe C-F" 1 UT CS.11 PT 3----X Examine 100%of weld length+~LATER+~315700 39-WD-184-D C-F-1 Elbow-Long Seam (60deg CS.12 LR)3 X Code Case N-524 1 t LATER'315800 39-WD-184-U Pipe-Long Seam C-F-1 UT CS.12 PT 3 X Code Case N-524**IATER~~900 39-WD-184C1 Pipe-to-Elbow C-F-1 CS.11 3 X Examine 100%of weld length~~ZOSTER~*
316100 39-WD 185 D Pipe-Long Weld C F 1 C5.12 3 X Code Caso N-524**LATER**316200 39-WD-185C1 Hx 60-45 Nozrlc Outlet-to-Pipe C-F-1 UT C5.11 PT 3 X Examine 100%of weld length**LATER**319300 39-WD-211C1 GL-A UT Pipe-to-Elbow (60dcg 88-01 LR)X Examined 100%of weld length~~LATER**319900 39-WD-213 Pipe-to-Tec C-F-1 UT CS.11 PT 3 X Examine 100%of weld length*~LATER~*
 
DATE: 10/15/99 REVZSZON: 0 NINE MZLE POINT NUCLEAR PIANT UNZT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 186 cncy Condcnscr Return INSPECTION INTERVAL PIAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
++CALIBRATION BLOCK~+320000 39-WD-213-D Tcc-Long Seam C F1 C5.12 3 X Coda Casa N-524~+IATER++320100 39-WD-213-U Pipe-Long Scam CF1 C5.12 3 X Code Casa N-524 111ATERA*321400 39-WD-217-D Pipe-Long Scam C-F-1 UT C5.12 PT 3 X Codo Casa N-524~~LATER**321500 39-WD-217C1 Hx 60-42 No@tie Outlet-to-Pipe C-F-1 C5.11 3 X Examine 100%of weld length~+IATERi~0 39-WD-224-D Pipe-Long Seam C-F-1 UT C5.12 PT 3 X Code Case N-524**LATER**323600 39-WD-224-U Pipe-Long Seam C-F 1 C5.12 3 X Code Case N-524*~LATER~~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 INSERVZCE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 187 cncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SVMMARY EXAMINATION AREA NUMBER IDENTZFICATZON ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
*~CALIBRATION BLOCK~~12.0" ECC Linc (REF.DWG.NO.11)323900 39-WD-012 Reducer-to-Pipe CF1UT CS.11 PT 3 X Examine 100%of weld length**IATER**324400 39-WD-014 Pipe-to-Pipe GL-D VT 88-01 3 X----X**IATER~*324700 39"WD-016 Pipe-to-Pipe GL-D VT 88 01 3 X X<<~IATER**325100 39-WD-017 Pipe-to-Pipe GL-D UT 88-01 X X UT exam every 2 RFO's.i~ZATER~~0 39 WD-020 Pipe-to-Pipe GL D UT 88-01 3 X X UT exam cvcry 2 RFOis.+~IATER*~325900 39-WD-021 Pipe-to-Tee C-F 1 VT C5.11 PT 3 X Examine 100%of weld length~~LATER*~326000 39-WD-021 Pipe-to-Tee GL-D UT 88-01 3 X X UT exam avery 2 RFO's~*NMP-12-XXI-SS**
326100 39-WD-021-D Tcc-Long Scam C-F-1 UT C5.12 3 X Code Case N-524++IATER~~326200 39-WD-021-U Pipe-Long Seam C-F-1 VT C5.12 PT 3 X Code Case N-524**IATER**326300 39-WD-022 Tcc-to-Pipe C-F-1 CS.11 Examine 100%of wold PT length**IATER**3 X 0
DATE: 10/15/99 REVZSZON: 0 NINE MIZE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 188 gcncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCTIONS
**CALIBRATION BLOCK**326400 39-WD-022 Tcc-to-Pipe GL-D 88-01 X X UT exam every 2 RFO's++LATER++326500 39-WD-022-D Pipe-Long Seam C-F-1 UT C5.12 PT 3 X Code Case N-524**LATER*l 326600 39-WD-022-U Tcc-Long Seam C-F-1 C5.12 3 X Code Case N-524**IATER++326700 39-WD-024 Tcc-to-Pipe C-F-1 C5.11 3 X Examine 100%of weld length~~LATER~~326800 39-WD-024 Tcc-to-Pipe GL-D UT 88-01 3 X X UT exam every 2 RFO's**LATER**326900 39-WD-024-U Tcc-Long Seam C-F-1 C5.12 3 X Code Case N-524**ZATER**327000 39"WD-025 Elbow-to-Pipe GL-D UT 88-01 3 X---X UT exam every 2 RFO~s~~LATER~~327100 39-WD-025 Elbow-to-Pipe C-F-1 C5.11 3 X Examine 100%of weld length~+ZATER~~327200 39-WD-025-D Pipe-Long Seam C-F-1 C5.12 3 X Code Case N-524**LATER**327400 39-WD-026 Pipe-to-Pipe GL-D UT 88-01 3 X X UT exam every 2 RFO's++LATER~+
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 189 cncy Condenser Supply INSPECTION ZNTERVAL E NUMBER: 39.0 PZAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THZRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCTZONS
~*CALIBRATION BLOCK**327800 39-WD-027 Pipe-to-Pipe GL D UT 88-01 3 X X UT exam cvcry 2 RFO's+~LATER~~328300 39-WD"029-D Elbow-Long Seam C-F-1 UT C5.12 PT 3 X Code Case N-524~*LATER**328400 39-WD-029-U Pipe-Long Seam C-F-1 C5.12 3 X Code Case N-524++LATER*+328500 39-WD-029C1 Pipe-to-Elbow C F1 C5.11 3 X Examine 100%of weld length~~LATER~*800 39-WD-030 Elbow-to-Pipe GL-D UT 88-01 3 X X UT exam every 2 RFO's**LATER*~329200 39-WD-033 N/A Pipe-to 60-46 EC Hx N/A Nozzle Znlct 3 X X UT every 2 RFO's, This weld no longer exists, Thcrcforc ZGSCC Category D no longer applicable.
*+LATER**329700 39-WD-034 Pipe-to-Pipe GL-D UT 88 01 3 X X Examine cvcry 2 RFO's~~ZATER~~330000 39-WD-035 Pipe-to-Pipe GI-D UT 88-01 3 X X UT exam every 2 RFO's+~LATER+*330500 39"WD-037 Pipe-to-Elbow N/A N/A 3 X----X UT exam cvcry 2 RFO's, This weld no longer exists*~LATER**
 
DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 190 cncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
**CALIBRATION BLOCK>>>>330600 39-WD-037-D Elbow-Long Seam C-F-1 CS.12 3 X Code Case N-524>>>>LATER>>>>330700 39-WD-037-U Pipe-Long Scam C-F 1 UT C5.12 PT 3 X Coda Case N-524>>*LATER>>>>330800 39-WD-037C1 Pipe-to-Elbow CF1UT C5.11 3 X Examine 100%of weld length>>*IATER*>>330900 39-WD-037C1 Pipe-to-Elbow GL-A UT 88-01 3 X**LATER>>>>3 000 39-WD-038 Elbow-to-Pipe C-F-1 UT C5.11 PT 3 X Examine 100%of weld length>>>>LATER>>>>331100 39-WD-038 Elbow-to-Pipe GL-D UT 88-01 3 X----X UT exam every 2 RFO's>>*LATER**331300 39-WD-038-U Elbow-Long Scam C" F-1 UT C5.12 PT 3 X Code Case N-524>>>>LATER>>>>331400 39-WD-041 Pipe-to-Hx 60-45 Nozzle Inlet N/A N/A 3 X X UT exam cvcry 2 RFO's, This weld was cut out, ZGSCC Cat.D no longer applies**LATER>>>>331500 39-WD-041 Pipe-to-Hx 60 45 Nozzle Inlet N/A N/A 3 X This weld was cut out, Replaced by 39-WD-041C1
*>>LATER>>>>
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 191 ency Condenser Supply E NUMBER: 39.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD------OUTAGE------
1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
>><<CALIBRATION BLOCK>>>>331700 39-WD-041C1 Pipe-to-Hx 60-45 Nozzle Inlet C F-1 CS.11 3 X Examine 100%of weld length>>*LATER**331800 39-WD-041C1 Pipe-to-Hx 60-45 Nozzle Inlet GL-A UT 88-01 3 X**LATER>><<331900 39-WD-100 Reducer to-Pipe C-F-1 C5.11 3 X Examine 100%of weld length>>>>ZATER>>>>332000 39-WD-100 Reducer-to-Pipe GL A UT 88-01 3 X**LATER>>>>00 39-WD-102 Pipe-to-Pipe GL-D UT 88-01 3 X X VT exam every 2 RFO's>>*LATER**332800 39-WD" 104 Pipe-to-Pipe GL D VT 88-01 3 X X VT cvcry 2 RFO's>>>>LATER>><<333200 39-WD-105 Pipe-to-Pipe GL-D UT 88-01 3 X X UT exam every 2 RFO's**LATER**333600 39"WD-108 Pipe-to-Pipe GL-D UT 88-01 3 X X UT exam cvcry 2 RFO's**LATER>>>>334000 39-WD-109 Pipe-to-Tec GL-D UT 88-01 3 X X VT exam every 2 RFO's>>>>LATER>><<334300 39"WD-110 Tce-to-Pipe C-F-1 C5.11 3 X Examine 100%of weld length>>>>LATER>>>>
 
DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 192 cncy Condenser Supply ZNSPECTION INTERVAL E NUMBER: 39.0 PZAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFZCATZON ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCI'ZONS
~*CALIBRATION BLOCK~~334400 39-WD-110 Tcc-to-Pipe GL-D UT 88"01 3 X X UT exam every 2 RFO's~+LATER~+334500 39-WD-110-D Pipe-Long Seam C-F-1 C5.12 3 X Coda Case N-524~~ZATER~~334600 39-WD-110-U Tco-Long Scam C-F-1 C5.12 3 X Code Case N-524 4*IATERt*334800 39"WD"112 Tec-to-Elbow GL D UT 88-01 3 X X UT exam cvcry 2 RFO's*OIATER**100 39-WD-113 Elbow-to-Pipe C-F-1 C5.11 X Examine 100%of weld length~~LATER**335200 39-WD-113 Elbow-to-Pipe GL-D UT 88-01 3 X X UT exam every 2 RFO's~~ZATER~~335300 39-WD-113-D Pipe-Long Scam C F-1 C5.12 3 X Code Case N-524**ZATER*~335400 39-WD-113-U Elbow-Long Scam C F-1 C5.12 3 X Code Case N-524~~LATER~~335600 39-WD-114 Pipe-to-Pipe GL-D UT 88-01 3 X X UT exam every 2 RFO's**ZATER*+336000 39-WD-115 Pipe-to-Elbow GL-D UT 88-01 3 X X UT exam cvcry 2 RFO's**LATER+*
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PZANT UNIT 1 ZNSERVICE ZNSPECTION TEN YEAR PLAN CIASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 193 ency Condcnscr Supply NUMBER: 39.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL SEC.XZ, CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
+~CALIBRATION BLOCK+~336300 39-WD-117 Pipe"to-Elbow N/A N/A 3 X This weld was cut out, Replaced by 39-WD-117C1
**ZATER**336400 39-WD-117 Pipe-to-Elbow N/A N/A 3 X X VT exam every 2 RFO's.This weld no longer exists, ZGSCC Cat.D no longer applies**LATER~*336500 39-WD-117-D Elbow-Long Scam C-F-1 UT C5.12 PT 3 X Code Case N-524~~LATER*i 336600 39-WD-117-U Pipe-Long Seam CF1 C5.12 3 X Code Case N-524~+IATER++336700 39-WD-117C1 Pipe-to-Elbow C F-1 C5.11 3 X++LATER+*336800 39-WD-117C1 Pipo-to-Elbow GL-A VT 88-01 3 X~*LATER**337000 39-WD-118 Elbow-to-Pipe GL"D VT 88-01 3 X----X VT every 2 RFO's 4 PLATER**337500 39-WD-121-U Pipe-Long Seam C-F"1 UT C5.12 3 Coda Case N-524*+IATER**337600 39-WD-121C1 Pipe-to Hx 60-42 Nozzle Inlet C F-1 VT C5.11 PT 3 X Examine 100%of weld length i+LATER~i
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 INSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 194 cncy Condensor Supply NUMBER: 39.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTZONS
*~CALIBRATION BLOCK~~337700 39-WD-121C1 Pipo-to-Hx 60-42 Nozzle Inlet GL-A 88-01 3 X~+LATER*~337800 39-WD-122 Pipe-to-Elbow C-F-1 UT C5.11 PT 3--------X Examine 100%of weld length+'~LATER+*
337900 39-WD-122 Pipe-to-Elbow GL-D UT 88-01 3 X X UT exam every 2 RFO's~~LATER**338300 39-WD" 123 Pipe-to-Pipe GL-D UT 88-01 3 X----X UT exam every 2 RFO's**LATER~+0 39-WD-124 Pipe-to-Elbow GL-D UT 88-01 3 X X UT exams every 2 RFO's~~IATER*+339000 39-WD-125 Elbow-to-Pipe C-F-1 C5.11 3 X Examine 100%of weld length~+LATER~+339100 39-WD-125 Elbow-to" Pipe GL-D UT 88 01 PT 3----X X UT every 2 RFO's~~NMP-12-XX1-SS**
339200 39-WD 125-D Pipe-Long Seam C-F-1 C5.12 3 X Coda Case N-524~~LATER~~339300 39-WD-125"U Elbow-hong Scam CF1 CS.12 3 X Codo Case N-524~~LATER*+339600 39-WD-127-D Elbow-Long Scam C-F-1 C5.12 3 X Code Case N-524~~IATER~~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 1 95 gcncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL PZAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBFR IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
**CALIBRATION BLOCK~*339700 39-WD" 127-U Elbow-Long Seam C-F"1 C5.12 X Coda Case N-524*~LATER*~339800 39-WD-127C1 Pipe-to-Elbow C-F 1 CS.11 3 X Examine 100%of weld length~~ZATER~~340100 39-WD-128 Elbow-to-Pipe GL-D UT 88"01 3 X X UT cvcry 2 RFO's+*IATER++340500 39-WD-129 Pipe-to-Pipe GL-D UT 88-01 3 X X UT exam every 2 RFO's**LATER*4 12.0" ECC Linc (REF.DWG.NO.11A)0 39-H21 F-A VT-3 Spring Hanger Pl.20 3 X Codo Case N-491-1*AN/A4*341800 39"H22 Spring Hanger F-A F1.20 VT-3 3 X Coda Case N-491-1, 4 Lugs~~N/A~*341900 39-H22-WD-001 C-C Code Case N-509+~N/A**Integral Attachment C3.20 3 X 342000 39-H22-WD-004 Integral Attachment C-C C3.20 3 X Coda Casa N-509**N/A**342100 39-H22-WD-007 C C Code Case N-509++N/A**Integral Attachment C3.20 3 X 342200 39-H22-WD-010 C-C Integral Attachment C3.20 3 X Code Case N-509**N/A~~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 196 ency Condenser Supply NUMBER: 39.0 INSPECTZON INTERVAL PLAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTZFZCATZON SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERZOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 ZNSTRUCTIONS e eCALIBRATION BLOCK*a 342300 39-H25 Spring Hanger F A F1.20 VT 3 3 X Code Case N 491 1 l 4N/A1*
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 197 ol Rod Drive NUMBER: 44.2
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
++CALIBRATION BLOCK~*10.0" CRD Line (REF.DWG.NO.17)346400 44.2-H2 F-A VT-3 Sway Brace Fl.20 3 X Code Case N-491-1*ON/A**347000 44.2-H9 Spring Hanger Fl~20 3 X Code case N-491-1 t 1N/A1 t 350200 44.2-SB-1 Sway Brace F1.20 3 X Code Case N-491-1**N/A*+350700 44.2-SB-6 Sway Brace F-A Fl.20 3 X Code Casa N 491-1*+N/A+~6.0" CRD Line (REF.DWG.NO.17)352500 44.2-WD-045 Pipe-to<<Cap C-F-2 UT C5.51 PT 3 X Examine 100%of weld length**IATER~~10.0" CRD Zinc (REF.DWG.NO.17)353000 44.2-WD-085 Elbow-to-Reducer C-F-2 MT C5.51 UT 3 Examine 100%of weld length**NMP 1SW-1020-CS, P1R-.6 00-1~~353100 44.2-WD-086 Pipe-to-Elbow C-F-2 UT C5.51 PT 3 X Examine 100%of weld length**LATER~~353600 44.2-WD-092 Pipe-to-Tcc C-F-2 MT CS.51 UT 3 Examine 100%of weld length~+NMP-1SW 1020 CS, P1R-.6 00-1~*
 
DATE: 10/15/99 REVISION: 0 NINE HZLE POINT NUCLEAR PIANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 198 ol Rod Drive NUHBER: 44.2 SUHHARY EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD------OUTAGE------
1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR ZNSTRUCTIONS
*+CALIBRATION BLOCK~+8.0" CRD Line (REF.DWG.NO.17)353900 44.2-WD-096 Reducer-to-Elbow C-F-2 UT C5.51 PT 3 X Examine 100%of weld length**LATER**8.0" CRD Line (REF.DWG.NO.17A)357500 44.2-WD"432 C-F-2 UT Pipe-to-Elbow C5.51 PT 3 X Examine 100%of weld length~~LATER~~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNZT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 199 or Containment Spray NUMBER: 80.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
NUMBER EXAMINATION AREA IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH THZRD PERIOD FIRST PERZOD SECOND PERZOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
+*CALIBRATION BLOCK++16.0" RCS Line (REF.DWG.NO.15)358000 80-09 ZEB VT-3 CTMT.Spray Suction 96-03 Strainer 3 X---X X Examine strainer for debris every outage.*+N/A+*12.0" RCS Line (REF.DWG.NO.15)358600 80-H12 F A VT-3 Seismic Restraint Fl.20 3 X Code Case N-491-1*+N/A++358700 80-H12-WD-001 C-C MT Integral Attachment C3.20 3 X Code Case N-509~*N/A**80-H12-WD-004 Integral Attachment C C MT C3.20 3 X Code Case N-509~~N/A~~358900 80-H12-WD-007 Integral Attachment C-C MT C3.20 3 X Code Case N-509**N/A~~359000 80-H12-WD-010 C-C Code Case N-509~~N/A~~Integral Attachment C3~20 3 X 359100 80-H14 Spring Hanger F-A F1.20 3 X 4 Lugs, Code Casa N-491-1*+N/A+~359200 80-H14-WD-001 C-C Code Case N-509~~N/A+~Integral Attachment C3.20 3 X 359300 80-H14-WD"004 C-C Zntegral Attachment C3.20 3 X Code Case N-509~*N/A~*
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 200 tor Containment Spray NUMBER: 80.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 359400 80-H14-WD-007 ZNSPECTZON INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH C-C MT FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK**Code Case N-509+~N/Aii Integral Attachment C3.20 3 X 359500 80-H14-WD-010 C-C Code Case N-509~*N/A+*Integral Attachment C3.20 3 X 359900 80-H20 Rod Hanger F A F1.20 3 X Code Case N-491-1 f%N/A**360500 80-H46 Rod Hanger F-A Fl.20 3 X Code Case N-491-1++N/A+~360600 80-H46-WD-001 C-C Code Case N-509**N/A**Integral Attachment C3.20 3 X 362800 80-SC-14 Seismic Restraint F1.20 VT-3 3 X Code Case N-491-1 1*N/A*4 362900 80-SC-14-WD-001 C-C Code Case N-509~~N/A~~Integrally Welded Lug C3~20 3 X 363000 80-SC-14-WD-002 C-C Integrally Wcldcd Lug C3.20 3 X Code Case N-509~~N/A~~363100 80-SC-14-WD-003 C-C Integrally Welded Lug C3.20 3 X Code Case N-509~~N/A*~363200 80-SC-14-WD-004 C-C Code Case N-509~~N/A**Integrally Welded Lug C3.20 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 201 tor Containment Spray NUMBER: 80.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
++CALIBRATION BLOCK*~363300 80-SC-14-WD-005 C-C Code Case N-509~~N/A~~Integrally Welded Lug C3.20 3 X 363400 80-SC-14-WD-006 C-C Integrally Welded Lug C3.20 3 X Code Case N-509~iN/A++363500 80-SC-14-WD-007 C-C Code Case N-509*+N/A*+Integrally Welded Lug C3.20 3 X 363600 80-SC-14-WD-008 C C Code Case N-509++N/A+<Integrally Welded Lug C3.20 3 X 80 SR 47 Seismic Pipe Restraint F1.20 3 X Code Case N-491-1 0 1M/A1 1 367100 80-88-1 Sway Strut F1.20 VT-3 3 X Code Case N-491-1~~N/A~~367200 80-SS-2 Sway Strut F1.20 VT-3 3 X Code Case N-491-1 t*N/A*I 367800 80-WD-008 Flange-to-Pipe C-F"2 C5.51 3 X Examine 100%of weld length~*LATER~~368300 80-WD-017 Pipe-to-Elhow C-F 2 UT C5.51 MT 3 X Examine 100%of weld length~~LATER~~368400 80-WD-019 Pipe-to-Flange C-F-2 C5.51 3 X Examine 100%of weld length~~IATER~*
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 202 tor Containment Spray NUMBER: 80.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 369000 80-WD-026 Pipe-to-Elbow INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH C-F-2 C5.51 FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 3 X 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~'~Examine 100%of weld length**LATER**370800 80-WD-046 FE-to-Pipe C-F-2 C5.51 3 X Examine 100%of weld length+~ZATER~~372200 80-WD-062 C-F-2 UT Reducer-to-Nozrle C5.51 MT 3 X Examine 100%of weld length~~LATER~~373700 80-WD-082 Pipe-to-Elbow C-F-2 C5.51 3 X Examine 100%of weld length 1tLATERt1 oo 16.0" RCS Linc (REF.DWG.NO.15A)II 80-30 VT-3 IEB 96-03 CTMT.Spray Suction Strainer 3 X---X X--X Examine strainer each outage for debris t*N/A*4 12.0" RCS Linc (REF.DWG.NO.15A)374900 80-H30 Spring Support Fl.20 3 X Code Case N-491-1**N/A*~375000 80-H30-WD-001 C-C Code Case N-509+~N/A~*Integral Attachment C3.20 3 X 375100 80 H30 WD-004 C-C Code Case N-509+iN/A+i Integral Attachment C3.20 3 X 375200 80-H30-WD-007 C-C Integral Attachment C3.20 3 X Code Case N-509+AN/Ate
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 203 tor Containmcnt Spray NUMBER: 80.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK'~~375300 80-H30-WD-010 C-C MT Code Case N-509+~N/Aii Integral Attachment C3.20 X 375600 80-H34 Spring Hanger F1.20 3 X Code Case N 491 1*~N/A+*375700 80-H34-WD-001 C-C MT Integral Attachment C3.20 3 X Code Case N-509*~N/A~*375800 80-H34-WD-004 C-C MT Code Case N-509**N/A*t Integral Attachment C3.20 3 X 80-H34-WD-007 C-C MT Code Case N-509*wN/A+~Integral Attachment C3.20 3 X 376000 80-H34-WD-010 C-C MT Integral Attachment C3.20 3 X Code Case N-509~+N/A~~376100 80-H36 Spring Hanger F A F1.20 3 X Code Case N 491 1 ktN/A4t 376200 80-H36-WD-001 C-C Code Case N-509*~N/A*~Integral Attachment C3.20 (West Side)3 X 376300 80-H36-WD-002 C-C Code Case N-509~~N/A~~Zntegral Attachment C3.20 (East Side)3 X 376800 80-H59 Spring Hanger F-A Fl.20 VT 3 3 X Code Case N-491-1 1*N/A1*
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 204 tor Containment Spray NUMBER: 80.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
NUMBER EXAMINATION AREA IDENTZFZCATZON ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
~~CALIBRATION BLOCK++376900 80-H59-WD-001 C C MT Code Case N-509+~N/A~~Integral Attachment C3.20 3 X 377000 80-H60 Spring Hanger F-A Fl.20 VT 3 3 X Code Case N-491-1~~N/A~~377100 80-H60-WD-001 C C Code Case N-509**N/A**Integral Attachment C3.20 3 X 388900 80-WD-144 Pipe-to-Rcduccr C-F-2 UT C5.51 MT 3 X Examine 100%of weld length**P1R-.375-2' 391100 80-WD-169 Valve 80-31-to-Reducer C-F"2 C5.51 3 Terminal End, Examine 100%of weld length~~NMP-ISW-1020-CS
)PIR-.375-ae 391300 80-WD-171 C-F-2 MT No""le-to-Reducer C5.51 UT 3 X Terminal End, located inside floor grating, Examine 100%of weld length"~NMP-ISW-1020-CS,NMP2-2 0 5%*391400 80-WD-172 C-F-2 UT located inside floor Reducer-to-Pipe C5.51 MT X grating Examine 100%of weld length~~PZR-.375-2++
391800 80-WD-176 Pipe-to-Tcc C-F-2 C5.51 3 X Examine 100%of weld length~~NMP-ZSW-1020-CS)
P1R.375-~i
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PIANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COHPONENTS PAGE: 205 tor Containmcnt Spray NUMBER: 80.0
 
==SUMMARY==
EXAHZNATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
+*CALIBRATION BLOCK*'~392000 80-WD-178 Pipe-to-Elbow C-F 2 C5.51 Examine 100%of weld MT length~~PZR-.375-2, NHP-ZSW-1020-C~~
393100 80-WD-194 Elbow-to-Pipe C-F-2 C5.51 3 X Examine 100%of weld length~~PZR-.375-2~~
16.0" RCS Linc (REF.DWG.NO.15B)393300 80-10 ZEB VT-3 CTHT.Spray Suction 96-03 Strainer Examine strainer each outage for debris 3 X---X X--X r*N/A+a 12.0" RCS Linc (REF.DWG.NO.15B)00 SO-SC-20 F-A VT-3 Seismic Box Restraint Fl~20 3 X 2 Lugs , Coda Case N-491-1~+N/A~~400200 80-SC-20-WD-001 C C Code Case N-509~~N/A+*Integral Attachment, C3.20 3 X 400300 80-SC-20-WD-004 C"C Coda Caso N-509~~N/A~~Integral Attachment C3.20 3 X 400400 80-SC-20-WD-007 C-C MT Integral Attachment C3.20 3 X Coda Caso N-509~~N/A~i 400500 80 SC-20-WD-011 C C MT Integral Attachment C3.20 3 X Code Case N-509~~N/Ai~400600 80-SC"20-WD-015 C-C MT Code Case N-509*~N/A*+Integral Attachment C3.20 3 X
 
DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLZAR PLANT UNIT 1 ZNSERVZCE ZNSPECTION TEN YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COHPONENTS PAGE: 206 tor Containment Spray NUMBER: 80.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTZON INTERVAL AS ME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERI OD PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~~405200 80-SR-50 F-A VT-3 Seismic Pipe Restraint F1.20 X Code Case N-491-1 a aN/PP t 406500 80-WD-233 Elbow-to-Pipe C-F-2 C5.51 3 X Examine 100%of weld length~~PIR-.375-2~*
407500 80-WD-245 Elbow-to-Pipe C-F-2 UT C5.51 HT 3 X Examine 100%of weld length~~PIR-.375-2~~
408100 80-WD-251 Pipe-to-Reducer C-F-2 C5.51 3 X Examine 100%of weld length~~PIR-.375-2~~
80-WD-281 Pipe-to-Tce C-F-2 UT C5.51 HT X Examine 100%of weld length~~PIR-.375-2~~
411400 80-WD-287 Tcc-to-Pipe C-F 2 C5.51 3 X Examine 100%of weld length++PIR-.375-2++
6.0" RCS Linc (REF.DWG.NO.15B)411500 80"WD-290-A C F-2 MT 6.0~Branch Connection C5.81 3 X Examine 100%of wold length~~N/A~~16.0" RCS Linc (REF.DWG.NO.15C)'412700 80-29 CTMT.Spray Suction Strainer IEB 96-03 Examine strainer Each outage for debris X---X X--X eeN/Aea
 
DATE: 10/15/99 REVISION: 0 NINE HYLE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 207 tor Containment Spray NUMBER: 80.0 SUHHARY EXAHZNATZON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASHE SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCKi i 12.0" RCS Line (REF.DWG.NO.15C)413200 80-H28 Spring Support Fl.20 VT-3 3 X 4 Lugs, Code Case N-491-1++N/A**413300 80-H28-WD-001 C-C Code Case N-509~~N/A~*Integral Attachment C3.20 3 X 413400 80-H28-WD-004 C-C Code Case N-509+~N/Ai+Integral Attachment C3.20 3 X 413500 80-H28-WD-007 C-C MT Code Case N-509~*N/A~i Integral Attachment C3.20 3 X 00 80-H28-WD-010 C-C MT Integral Attachment C3.20 3 X Code Case N-509 i~N/A~~419400 80 SS 3 Sway Strut F-A Fl.20 VT"3 3 X Code Case N-491-1 t*N/Atf 419900 80 WD"338 Pipe-to-Flange C-F-2 C5.51 3 X A Examine 100%of wold length~~PIR-.375-2**
422100 8()-WD-363 Pipe-to-Elbow C-F-2 C5.51 3 X Examine 100%of weld length**PZR-.375-2*i 12.0" RCS Line (REF.DWG.NO.15D)427600 80-H88 Spring Support F A Fl.20 VT 3 3 X Code Caso N-491-1*+N/A++
 
DATE: 10/15/99 REVISION: NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COHPONENTS PAGE: 208 tor Containmcnt Spray NUMBER: 80.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ZTEH NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
'~+CALIBRATION BLOCK*'~6.0" RCS Line (REF.DWG.NO.15D)433400 80-SS-15 Sway Strut F-A F1.20 3 X Code Case N-491-1+*N/A**433600 80-88-6 Sway Strut F1.20 3 X Code Case N-491-1 lkN/Aft 433700 80-88-7 Sway Strut F1.20 3 X Code Case N-491-1 eeN/Aea
 
DATE: 10/15/99 REVZSION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTZON XZ SCHEDULED COMPONENTS PAGE: 209 tor Containment Spray Heat Exchanger 122~NUMBER: 80.0 INSPECTION ZNTERVAL PLAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
*4CALIBRATION BLOCK**RCSHE 80-13 (REF.DWG.NO.15A)438500 80-13 F A VT 3 Hx Support F1.40 3 X Coda Casa N-491-1*+N/A++438600 80-13-WD-001 Hx 80-13 Nozzle-to-Vessel C-B MT C2.11 3 H02++N/A++438700 80-13-WD"002 C-C MT Hx 80-13 Integral C3.10 Attachment Inlet 3 X H02, Coda Casa N-509+*N/A*+80-13-WD-004 Hx 80-13 Vessel-to-Noz le C-B MT C2.11 3 X H02 s+N/A+a 439000 80-13-WD-005 Hx 80-13 Tubcshcct-to-Shell Inlet C-A UT C1.30 3 X H02**NMP2-24-.500-CS*i 439100 80-13-WD-006 Hx 80-13 Tubcshcct-to-Shell Outlet C-A UT C1.30 3 X H02~~NMP2-24-.500"CS~+
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 210 tor Containment Spray Pump 121 NUMBER: 80.0 INSPECTION ZNTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
~~CALIBRATION BLOCK~~RCSP 80-03 (REF.DWG.NO.15)442600 80-03 F-A VT-3 Pump Support F1.40 3 X Code Case N-491-1 1tN/At%442900 80-03-WD-003 Pipe-to-Casing C-F-2 MT CS.81 3 X Terminal End~~N/A~~443100 80-03-WD-005 C-G PT 0 lN/A**Upper Head-to-Shaft C6.10 Channel 3 X 443200 80-03-WD-006 Shaf t Channel-to-Shaf t C6.10 Guide 3 X**N/A*t 443300 80-03-WD-007 C"G P03~*N/A~~Upper Casing-to-Head C6.10 X 443400 80-03-WD-008 C-G P03+~N/A**Upper Casing-to-Flange C6.10 3 X 443900 80-03-WD-013 C-G P03 atN/Aas Upper Casing Long Weld C6.10 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COHPONENTS PAGE: 211 tor Core Spray NUMBER: 81.0 SUMHARY EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL'SME SEC.XZ CATEGY NDE ITEH NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD------OUTAGE------
1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
+~CALIBRATION BLOCK**12.0" CS Line (REF.DWG.NO.13)446000 58-SC-1 Pipe Restraint F A Fl.20 3 X Code Case N-491-1 aaN/Ant 446100 58-SC-1-WD-001 C C MT Code Case N-509~~N/Ai~Integral Attachment C3.20 3 X 446200 58-SC-1-WD-002 C-C MT Integral Attachment C3.20 3 X Code Case N-509~~N/A~~446300 58 SC-1-WD-003 C C MT Integral Attachment C3.20 3 X Code Case N-509~~N/A+*00 58-SC-1-WD-004 C-C Integral Attachment C3.20 3 X Code Case N-509~~N/A~+16.0" CS Line (REF.DWG.NO.13)447000 81-05 Suction Strainer IEB 96-03 VT-3 Examine strainer each outage for debris X X X X i IN/AI i 447100 81-06 Suction Strainer ZEB 96-03 VT-3 X---X X--X Examine strainer each outage for debris 1 0'N/AP+447200 81"24 Suction Strainer ZEB 96-03 VT 3 X---X X X Examine strainer each outage for debris++N/A++447300 81-25 Suction Strainer IEB 96-03 VT-3 3 X---X X--X Examine strainer each outage for debris i~N/A~~
 
DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PIANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 212 tor Core Spray NUMBER: 81.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERZOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR ZNSTRUCTZONS
*>>CALIBRATION BLOCK>>>>12.0" CS Li.nc (REF.DWG.NO.13)453900 81-H10 F-A VT-3 Spring Hanger Fl.20 3 X Coda Case N-491-1*>>N/A**454000 81-H10-WD-001 C-C MT Spring Hanger Integral C3.20 Attachment 3 X Coda Case N-509>>>>N/A>>>>454300 81-H12 Pipe Stanchion F-A F1.20 3 X Code Case N-491-1**N/A**454400 81-H12-WD-001 Pipe Stanchion C-C C3.20 3 X Coda Casa N-509>>>>N/A>>>>00 81 H14 Rod Hanger F1.20 3 X Code Case N 491-1**N/A>>>>454800 81-H15 Rod Hanger Fl.20 VT 3 3 X Code Caso N-491-1**N/A*>>455000 81-H15-WD-001 Rod Hangar Integral Attachment C-C C3.20 3 X Coda Case N-509>>>>N/A>>>>455100 81-H15"WD-002 Rod Hanger Zntcgral Attachment C-C C3.20 3 X Code Case N-509>>>>N/A>>>>455200 81-H15-WD-003 Rod Hanger Integral Attachment C-C C3.20 3 X Code Case N-509>>>>N/A>>>>
 
DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 213 tor Cora Spray NUMBER: 81.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 455300 81-H15-WD-004 Rod Hanger Integral Attachment ASME SEC.XI CATEGY NDE ITEM NO METH C-C MT C3.20 FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 3 X 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
>>>>CALIBRATION BLOCK>>>>Code Case N-509>>>>N/A**455400 81-H15-WD 005 C-C MT Rod Hanger Integral C3.20 Attachment 3 X Code Case N-509>>>>N/A*>>455500 81-H15-WD-006 C C MT Rod Hanger Zntegral C3.20 Attachment 3 X Code Case N-509>>>>N/A>>~456200 81-H34 Pipe Stanchion F"A F1.20 3 X Code Case N-491-1>>*N/A**456700 81-H34-WD-001 Pipe Stanchion C-C MT C3.20 3 X Code Case N-509>>>>N/A>>>>458700 81"H37 Spring Hanger Fl.20 VT-3 3 X Code Case N-491-1>>>>N/A>>>>458800 81-H37-WD-001 C-C Integral Attachment C3.20 3 X Code Case N-509>>>>N/A>>>>458900 81-H38 Spring Hanger F A Fl.20 3 X CoCk Case N-491-1>>>>'N/A>>>>459000 81-H38-WD-001 C-C Code Case N-509>>>>N/A>>>>Integral Attachment C3.20 3 X
 
DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 214 tor Core Spray NUMBER: 81.0
 
==SUMMARY==
EXAMINATION AREA NUMBER ZDENTZFZCATION INSPECTION INTERVAL SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
+*CALIBRATION BLOCK++460100 81-H5 Pipe Stanchion F-A Fl.20 3 X Code Case N-491-1~~N/A~~460600 81-H5-WD-001 Pipe Stanchion C-C MT C3.20 3 X Code Case N-509+iN/A+~6.0" CS I.ine (REF.DWG.NO.13)460700 81-H50 F"A VT-3 Rod Hanger F1.20 3 X Code Case N-491-1**N/A*~12.0" CS Line (REF.DWG.NO.13)461600 81-Hj F-A VT-3 Spring Hanger Fl.20 3 X Code Case N-491-1+AN/Ass 1700 81-H7-WD-001 C-C Code Case N-509+*N/A~+Spring Hanger Integral C3.20 Attachment 3 X 461800 81-H7-WD-002 C-C Coda Case N-509~~N/A++Spring Hanger Integral C3.20 Attachment 3 X 461900 81-H7-WD-003 C-C Code Case N-509~*N/A**Spring Hanger Integral C3.20 Attachment 3 X 462000 81-H7-WD-004 C C Code Case N-509++N/A++Spring Hanger Zntegral C3.20 Attachment 3 X
 
DATE: 10/15/99 REVISZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 215 tor Core Spray NUMBER: 81.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
+~CALIBRATION BLOCK~~462100 81-H7-WD-005 C-C MT Code Case N-509**N/A~*Spring Hanger Integral C3.20 Attachment 3 X 462200 81 H7-WD-006 C-C Code Case N-509~~N/A~~Spring Hanger Integral C3.20 Attachment 3 X 462300 81-H7-WD-007 C-C MT Spring Hanger Integral C3.20 Attachment 3 X Code Case N-509~~N/A++462500 81-HB Spring Hanger Fl.20 VT"3 3 X Code Case N-491-1**N/Ak*462600 81-HB-WD-001 C-C MT Code Case N-509~+N/A~i Zntegral Attachment C3.20 3 X 471300 81"SC-21 S~ay Brace F1.20 VT-3 3 X Code Case N-491-1~*N/A~~6.0" CS Line (REF.DWG.NO.13)483200 81-SC-45 Seismic Restraint F-A F1.20 VT 3 3 X Code Case N-491-1 esN/Aas 483300 81-SC-46 Seismic Restraint F1.20 3 X Code Case N-491-1**N/A+*483400 81-SC-47 Seismic Restraint F-A F1.20 VT 3 3 X Code Casa N-491-1 l4N/Af 4
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 216 tor Core Spray NUMBER: 81.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATZON INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
**CALIBRATION BLOCK~~12.0" CS Linc (REF.DWG.NO.13)484700 81 SC-51 Seismic Restraint F-A F1.20 3 X Code Case N-491-1**N/A~~6.0" CS Linc (REF.DWG.NO.13)486100 81-SR-4 Seismic Restraint F1.20 3 X Code Case N-491-1**N/A++14.0" CS Line (REF.DWG.NO.13)487300 81-88-1 Sway Strut F-A F1.20 3 X Code Case N-491-1 saN/Ate 487400 81-SS-1-WD-001 C C Code Case N-509 aeN/Ass Sway Strut Integral C3.20 Attachment 3 X 487700 81-88-11 Sway Strut F1.20 3 X Code Case N-491-1 1*N/A4*6.0" CS Lino (REF.DWG.NO.13)487900 81"88-13 F-A Sway Strut F1.20 VT 3 3 X Code Case N-491-1 f 1N/A*t 14.0" CS Linc (REF.DWG.NO.13)490400 81-SS 8 Sway Strut F-A F1.20 3 X Code Case N-491-1 tf N/A*%490500 81-SS-8"WD-001 Sway Strut Integral Attachment C-C C3.20 3 X Code Case N-509~~N/A~*
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 A ZNSERVZCE INSPECTION TEN YEAR PIAN CIASS 2 SECTION XI SCHEDUZED COMPONENTS PAGE: 217 tor Core Spray NUMBER: 81.0
 
==SUMMARY==
EXAHZNATZON AREA NUMBER ZDENTIFZCATION ZNSPECTZON INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~~4 91300 81-WD-006 C-F-2 UT Valve 81-01-to-Pipe C5.51 HT 3 X Terminal End, Examine 100%of weld length+~NHP-1 SW-1 020-CS~~492000 81-WD-013 Pipe-to-Elbow C-F 2 C5.51 3 X Examine 100%of weld length~*NMP-1 SW-1020-CS~
~492200 81-WD-016 Pipe-to-Rcduccr (14x12")C-F-2 C5.51 HT 3 X Examine 100%of wold length~*NMP-1SW-1020-CS**
12.0~CS Linc (REF.DWG.NO.13)493000 81-WD-024 C-F" 2 UT Examine 100%of weld Elbow-to-Pipe C5.51 length**NMP-1SW 1020"CS**16.0" CS I inc (REF.DWG.NO.13)493300 81-WD-028 81-05 STRT-to-Reducer(12"x16 C-F-2 UT C5.51 HT 3 X Examine 100%of weld length+*NMP-ISW-1020-CS+~
12.0" CS Linc (REF.DWG.NO.13)494000 81 WD 035 C-F-2 UT Examine 100%of weld Pipe-to-Reducer C5.51 MT (12" x10")X length~~NMP-1SW-1020-CS*~
494500 81-WD-040 Pipe-to-Rcduccr (12" x14")C-F-2 UT C5.51 HT Examine 100%of weld length**NMP-1SW-1020-CS*+
 
DATE: 10/15/99 REVISION: 0 NZNE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 218.tor Core Spray NUMBER: 81.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
~~CALZBRATION BLOCK*~14.0" CS Linc (REF.DWG.NO.13)494900 81 WD 044 C-F-2 UT Pipe-to-Elbow C5.51 MT 3 X Examine 100%of weld length~+NMP-ISW-1020"CS~~12.0" CS Linc (REF.DWG.NO.13)4 96200 81-WD-058 Pipe-to-Valve 81-37 C-F-2 UT C5.51 3 X Terminal End, Examine 100%of weld length**NMP-ISW-1020-CS*~
496600 81-WD-065 Tcc-to-Flange C-F-2 C5.51 Examine 100%of weld MT length eeNMP 1SW 1020 CS*e 00 81-WD-125 Reducer-to-Flange (14'x12")C-F-2 CS.51 3 X Examine 100%of weld length**NMP-1SW-1020-CS~~
501200 81-WD-136 Pipe-to-Reducer (12"x16~)C-F-2 UT C5.51 3 X Examine 100%of weld length~~NMP-1SW-1020-CS~*
502400 81-WD-149 Pipe-to-Elbow CF2 C5.51 3 X Examine 100%of weld length**NMP-1SW 1020 CS++502600 81 WD 151 C-F-2 UT Reducer-to-Pump 81-50 C5.51 MT 3 X Terminal End, Examine 100%of weld length~~NMP-ISW-1020-CS**
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE ZNSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 219 tor Core Spray NUMBER: 81.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATZON INSPECTION INTERVAL ASHE SEC.XI CATEGY NDE ITEH NO METH FIRST PERZOD PIAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK*>>14.0" CS Zine (REF.DWG.NO.13)504200 81-WD-167 Elbow-to-Pipe C-F-2 UT CS.51 HT 3----X Examine 100%of weld length~~NMP 1SW 1020-CS~~12.0" CS Linc (REF.DWG.NO.13)504600 81 WD 172 Tee-to-Pipe C-F-2 UT CS.51 HT 3 X Examine 100%of weld length~~NMP-ISW-1020-CS~*
506000 81 WD-189 Pipe-to-Reducer C-F-2 UT C5.51 3 Examine 100%of weld length~~NMP-1 SW-1020-CS**
 
DATE: 10/15/99 REVISION: 0 NINE MZLE POINT NUCLEAR PLANT UNIT 1 L INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 220 tor Core Spray Pump 121 NUMBER: 81.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD THZRD PERIOD SECOND PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
++CALIBRATION BLOCK~~CSP 81-03 (REF.DWG.NO.13)511200 81-03-WD-005 Upper Head-to-Shaf t Channel C-G C6.10 3 X P03**N/A**511300 81-03-WD-006 C-G P03**N/A**Shaft Channel-to-Shaf t C6.10 Guide 3 X 511500 81 03 WD"008 C-G P03~*N/A+~Upper Casing-to-Flange C6.10 3 X 512000 81-03-WD-013 C-G Lower Casing Long Weld C6.10 P03+'~N/A++
 
DATE: 10/15/99~REVISION: NINE MILE POZNT NUCLEAR PIANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 221 tor Core Spray Topping Pump 111 INSPECTION INTERVAL NUMBER: 81.0 PLAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
*+CALIBRATION BLOCK+~CSTP 81-50 (REF.DNG.NO.13)514100 81-50 Purap Support F-A F1.40 3 X Code Case N-491-1+AN/Ant
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 222 tor Core Spray NUMBER: 81.1
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL AS ME SEC.XZ CATEGY NDE ITEH NO HETH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRE SERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK*~12.0" CS Linc (REF.DWG.NO.13)516200 81.1-WD-023 C-F-2 UT Pipe-to-Flange C5.51 HT 3 Examine 100$of weld length**NHP 1SW-1020-CS++
517000 81.1-WD-031 Elbow-to Pipe C F-2 C5.51 3 X Examine 100$of weld length*~NHP-1 SW-1020-CS
~i 518400 81.1-WD-047 Tee-to-Valve 81-30 C-F-2 MT C5.51 UT X Terminal End, Examine 100$of weld length~~NHP-1SW-1020-CS**
519400 81.1 WD-059 Pipe-to-Tcc C-F 2 CS.51 3 X Examine 100$of weld length*~NHP-ISW-1020-CS~~
0 0 DATE: 10/15/99 REVISION: 0 NINE MIZE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN YEAR PZAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 223 tor Containment Spray NUMBER: 93.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
**CALIBRATION BLOCK++12.0" Raw Water Line (REF.DWG.NO.16)521400 93-R23-A Rod Hanger Fl.20 VT-3 X Code Case N-491-1~~N/A~+521800 93-R23-E Rod Hanger F-A Fl.20 3 X Code Case N 491-1**N/A**522000 93-R24-A Anchor F-A Fl.20 VT 3 3 X Code Case N-491-1 eaN/A@a 529600 93"R27"F F-A Dead Weight Support F1.20 3 X Code Case N-491-1~~N/A**00 93"R30 Rod Hanger Fl.20 X Code Case N-491-1 t 1N/A1k 533400 93-SCR-9E F A Seismic Box Restraint Fl~20 3 X Code Case N-491-1++N/A++533500 93-SCR-9E-WD-001 C-C Integral Attachment C3.20 3 X Coda Case N-509+iN/A~+533600 93-SCR-9E-WD-002 C C Code Case N-509+*N/A++Integral Attachment C3.20 3 X 533700 93-SCR-9E-WD-003 C-C Code Case N-509*~N/A*t Integral Attachment C3.20 3 X 533800 93-SCR-9E-WD-004 C-C MT Integral Attachment C3.20 3 X Coda Case N-509**N/A~*
0 0 DATE: 10/15/99 REVISION: 0 NINE HII E POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS PAGE: 224 tor Containment Spray NUMBER: 93.0 INSPECTION ZNTERVAL PIAN STATUS PRESERVZCE YEAR SUHMARY NUMBER EXAHINATZON AREA ZDENTIFZCATION ASHE SEC.XI CATEGY NDE ITEH NO METH SECOND PERIOD THIRD PERIOD FIRST PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
~+CALIBRATION BLOCK'~533900 93-SCR-9E-WD-005 C-C HT Integral Attachment C3.20 3 X Code Case N-509**N/A~*534000 93-SCR-9E-WD"006 C C HT Code Case N-509*~N/A~*Integral Attachment C3.20 3 X 534100 93-SCR-9E-WD-007 C-C HT Code Case N-509<<N/A4~Integral Attachment C3.20 3 X 534200 93"SCR"9E-WD-008 C-C Integral Attachment C3.20 3 X Code Case N-509~+N/Art 535200 93-SCR-9G Seismic Box Restraint F1.20 VT 3 3 X Code Case N-491-1 a+N/Ate 535300 93-SCR-9G-WD-001 C-C Code Case N-509*~N/A~~Integral Attachment C3.20 3 X 535400 93-SCR-9G-WD-002 C-C Code case N-509++N/A%a Integral Attachment C3.20 3 X 535500 93-SCR-9G-WD-003 C-C Code Case N-509~~N/A~*Integral Attachment C3.20 3 X 535600 93 SCR 9G-WD-004 C-C Code Case N-509<<~N/A**Integral Attachment C3.20 3 X 535700 93-SCR-9G"WD-005 Integral Attachment C-C C3.20 3 X Code Case N-509~~N/A~*
 
DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PIANT UNZT 1 INSERVICE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XI SCHEDULED COMPONENTS PAGE: 225 tor Containmcnt Spray NUMBER: 93.0 SUMHARY EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~~535800 93-SCR-9G-WD-006 C-C MT Integral Attachment C3.20 3 X Code Case N-509*~N/A~~535900 93-SCR-9G-WD"007 C C MT Code Case N-509~*N/A~i Integral Attachment C3.20 3 X 536000 93-SCR-9G-WD"008 C-C Code Case N-509~*N/A~*Integral Attachment C3.20 3 X 542200 93-WD-055 Valve 93-72-to-Pipe C-F-2 UT C5.51 HT 3 X Examine 100%of weld length**NHP 1SW 1020-CS++~00 93.1-WD-005 Elbow-to-Pipe C-F-2 CS.51 3 ExamLnc 100%of weld length i~PZRP.375-2**
543900 93.1-WD-012 Pipe-to-Elbow C-F-2 UT C5.51 MT 3 Examine 100%of weld length+~NMP-ISW-1020-CS*~
544700 93.1-WD-020 Pipe-to-Elbow C-F-2 C5.51 3 X Examine 100%of weld length~*PZR-.375-2, 94-6007+~544900 93.1-WD-022 Elbow-to-Valve 93-52 C-F-2 HT CS.51 3 X Pipe restraint interfercncc, scan in both directions to achieve 100%CRV.*~94-6007iPZR-.375-2~*
545200 93.1-WD-028 CF2UT Pipe-to-Valve 93-71 C5.51 HT 3 X Examine 100%of weld length*~PZR-.375-2*~
 
EI T NIAGARA H kJ MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-10 THIRD INSERVICEINSPECTIONINTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 6.0 CLASS 3 INSERVICE INSPECTION PLAN TABLES This section contains the Long Term Ten-Year Inservice Inspection Examination Tables for nondestructive examinations of selected systems and components for the Second Inservice Inspection Interval.38.0 39.0 54.0 57.0 70.0 72.0 93.0 Shutdown Cooling Water System Emergency Condenser System Spent Fuel Pool Cooling System Spent Fuel Pool Cooling System Reactor Building Closed Loop Cooling System Emergency Service Water System Reactor Containment Spray System 226 thru 226 227 thru 227 228 thru 235 236 thru 236 237 thru 242 243 thru 244 245 thru 248 File: NMP1ISIPL.wpd 0
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNZT 1 INSERVICE INSPECTION TEN YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS PAGE: 226 down Cooling Water Heat Exchanger 11 NUMBER: 38.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
++CALIBRATION BLOCK'~+SDCW HX 38-129 (REF.DWG.NO.C-26855-C7) 548000 38-129-WD-001 D-A VT-1 SDC Hx Front Support D1.10 3 Code Case N-509, Examine 100%of weld length X~~N/A+~548100 38-129-WD-002 SDC Hx Roar Support D-A D1.10 X Code case N<<509, Examine 100%of weld'ength ttN/Ail SDCW HX 38-135 (REF.DWG.NO.C-26855-C7) 548200 38-SDC-HX-11 SDC Heat Exchanger F1.40 Support 3 X Code Case N-491-1+~N/A~~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS PAGE: 227 gency Condenser Heat Exchanger 122 NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH THIRD PERIOD FIRST PERIOD SECOND PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS i*CALIBRATION BLOCK**ECHE 60-42 (REF.DWG.NO.11A)550100 60-42-WD-007 North Saddle-to-Shell Dl.10 Weld VT 1 3 X Code Case N-509~~N/A~~550200 60-42-WD-008 D-A Code Case N-509~~N/A+*Center Saddle-to-Shell D1.10 Weld 3 X 550300 60-42-WD-009 D-A VT-1 Code Case N-509**N/A**South Saddle-to-Shell Dl.10 Weld 3 X 550400 HX-60-42 Heat Exchanger Support Fl~40 X Code Case N-491"1**N/A*~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS PAGE: 228 t Fuel Pool Cooling NUMBER: 54.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~~6.0" Spent Fuel Pool Cooling Line (REF.DWG.NO.C-27171-C) 551200 54-R1-B Rod Hanger F A F1.30 3 X Code Case N-491-1 iON/Afk 551600 54-R1"D Rod Hanger F-A F1.30 VT 3 3 X Code Case N-491-1+~N/A++552000 54-R1-H Rod Hanger F A Fl.30 VT-3 3 X Code Case N-491-1*AN/A*~552900 54-Rll-A Pipe Stanchion F-A Fl.30 Includes U-Bolt and protection saddle, Code Case N-491-1~~N/A+~00 54 R13-A Spring Hanger F1.30 3 X Code Case N-491-1~~N/A~+555000 54-R2-BA Rod Hanger F-A F1.30 VT-3 3 X Code Case N-491-1%AN/A**55S100 54-SCR-1E Seismic Box Restraint F1.30 VT-3 3 X Code Case N-491-1~~N/A~+558200 54-SCR" 1E"WD-001 D-A Code Case N-509**N/A**Integrally Welded Lug Dl~20 1 3 X 55S300 54-SCR-1E-WD-002 Integrally Welded Lug D1.20 2 3 X Code Case N-509**N/A~~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS PAGE: 229 t Fuel Pool Cooling NUMBER: 54.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~*558400 54 SCR 1E-WD-003 D-A Code Case N-509~*N/A*~Zntdgrally Welded Lug D1.20 3 3 X 558500 54-SCR-1E-WD-004 D-A VT-1 Integrally Wcldcd Lug Dl.20 3 X Code Case N-509**N/A~*8.0" Spent Fuel Pool Cooling Line (REF.DWG.NO.C-27171-C) 563700 54-SCR-1N Seismic Box Restraint Fl~30 3 X Code Case N-491-1 eaN/Ass 563800 54-SCR-1N-WD-001 D-A Code Case N 509~+N/A++Integrally Welded I.ug D1.20 1 3 X 563900 54-SCR-1N-WD-002 D-A VT-1 Code Case N-509+iN/Aii Integrally Welded Lug D1.20 2 3 X 564000 54"SCR-1N-WD-003 D-A Code Casa N-509~~N/Ai~Integrally Welded Lug D1.20 3 3 X 564100 54"SCR-1N-WD-004 D-A VT-1 Integrally Welded Lug Dl~20 4 3 X Code Case N-509~~N/Ai~
 
DATE: 10/15/99 REVISION: 0 NINE HYLE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COHPONENTS PAGE: 230 t Fuel Pool Cooling NUMBER: 54.0 SUHHARY EXAHZNATZON AREA NUMBER IDENTIFICATION INSPECTION ZNTERVAL ASME SEC.XZ CATEGY NDE ITEH NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~~567100 54-SCR-3BA F-A Seismic Box Restraint F1.30 3 X 6.0" Spent Fuel Pool Cooling Line (REF.DWG.NO.C-27171-C)
Code Case N-491-1 ktN/A%4 567200 54-SCR-3BA-WD-001 Integrally Welded Lug D1.20 1 3 X Code Case N-509++N/A~~567300 54-SCR-3BA-WD-002 Integrally Welded I.ug Dl.20 2 VT 1 3 X Code Case N-509+*N/A**567400 54-SCR" 3BA-WD-003 D A Integrally Welded Lug D1.20 3 3 X Code Case N 509*+N/A++567500 54-SCR-3BA WD 004 D-A Code Case N-509**N/A~*Integrally Woldcd Lug D1.20 4 3 X 567600 54-SCR-3BA-WD-005 D-A VT-1 Code Case N-509*~N/A~~Integrally Welded Lug D1.20 5 3 X 567700 54"SCR-3BA-WD-006 D-A Integrally Welded Lug D1.20 6 VT" 1 3 X Code Case N-509++N/A++567800 54-SCR-3BA-WD-007 Integrally Welded Lug D1.20 7 VT 1 3 X Code Case N-509++N/Ai+
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS PAGE: 231 t Fuel Pool Cooling NUMBER: 54.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERV ICE YEAR INSTRUCTIONS
+~CALIBRATION BLOCK~~567900 54-SCR-3BA-WD-008 D-A Integrally Welded Lug Dl.20 8 3 X Code Case N-509<<*N/A~~571500 54-SCR-5F F"A Seismic Box Restraint F1.30 3 X 8.0" Spent Fuel Pool Cooling Line (REF.DWG.NO.C-27171-C)
Code Case N-491-1**N/A**571600 54-SCR-5F-WD-001 D-A Code Case N-509~~N/A~~Integrally Welded Lug D1.20 1 3 X 571700 54-SCR-5F-WD-002 D-A Code Case N-509~~N/A~~Integrally Wcldcd Lug D1.20 2 X 571800 54-SCR-5F-WD-003 D-A Code Case N-509~*N/A~i Integrally welded Lug D1.20 3 3 X 571900 54-SCR-5F-WD-004 D-A Code Case N-509~~N/A*~Integrally Welded Lug D1.20 4 3 X
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS PAGE: 232 t Fuel Pool Cooling Filter 11 NUMBER: 54.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
~~CALIBRATION BLOCK~>SFPCF 54-03 (REF.DWG.NO.C-27171-C) 574800 FP-54-03 F A VT-3 FP Filter 11 Support F1.40 3 X Coda Case N-491-1+~N/A~~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS PAGE: 233 t Fuel Pool Cooling Heat Exchanger 12 NUMBER: 54.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS t+CALIBRATION BLOCK**SFPCHE 54-04 (REF.DWG.NO.C-27171-C) 575300 FP 54-04 FP Hx 12 Support Fl.40 3 X Code Case N-491-1 e*N/Ase 575400 FP-54-04-WD-001 FP Hx 12 Front Integral Attachment D A D1.10 3 X Code Case N-509**N/A~*575500 FP-54-04-WD-002 FP Hx 12 Roar Integral D1.10 Attachment 3 X Code Case N-509**N/A*~
E DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS PAGE: 234 t Fuel Pool Cooling Pump 11 NUMBER: 54.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
~~CALIBRATZON BLOCK**SFPCCP 54-01 (REF.DWG.NO.C-27171-C) 575600 FP-54-01 Pump Support F1.40 3 X Code Case N-491-1~+N/A~~
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS PAGE: 235 t Fuel Pool Cooling Surge Tank NUMBER: 54.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERZOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
+*CALIBRATION BLOCK**SFPCST 54 68 (REF.DWG.NO.C-27171 C)575800 TK-54-68 Surge TK Support F1.40 VT 3 3 X Code Casa N-491-1 aaN/Awe
 
DATE: 10/15/99 REVISION: NINE MILE POINT NUCLEAR PZANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS PAGE: 236 t Fuel Pool Cooling System NUMBER: 57.0 INSPECTION INTERVAL PIAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATZON AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ZTEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
**CALIBRATION BLOCK~*Spent Fuel Pool Cooling Linc (REF.DWG.NO.C-27172-C) 576000 57-R3-C Pipe Stanchion Fl.30 VT 3 X U Bolt, Code Case N 491 1~~N/A++
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS PAGE: 237 tor Building Closed Loop Cooling NUMBER: 70.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS 11CALZBRATZON BLOCK11 RBCLC Line (REF.DWG.NO.C-26855-C) 582900 70-R17-D Rod Hanger F-A F1.30 VT-3 3 X Code Case N-491-1 11N/A11 583200 70-R17-I Rod Hanger Fl.30 VT-3 3 X Code Case N-491-1**N/A1*583700 70-Rl 7-N Rod Hanger F-A Fl.30 VT-3 3 X Code Case N-491-1 11N/A11 584000 70-R19-A Pipe Stanchion F-A Fl.30 3 X Code Case N-491-1 1 1N/A1 1 00 70-R19-B Pipe Stanchion F-A F1.30 3 X Code Case N-491-1*1N/A*1 584200 70-R19-C Pipe Stanchion F-A F1.30 3 X Code Case N-491-1 11N/A11 588400 70 R7 G Rod Hanger F-A Fl.30 3 X Code Case N-491-1 11N/A1 1 588500 70-Rj-H Rod Hanger F-A Fl.30 3 X Code Case N-491-1 11'N/A1*588600 70-R7-I Rod Hanger Fl.30 3 X Code Case N-491-1 11N/A11 590700 70 R9 A Pipe Stanchion F-A F1.30 3 X Code Case N-491-1 1 1N/A1 1
 
DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS PAGE: 238 tor Buf.lding Closed Loop Cooling NUMBER: 70.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATZON AREA NUMBER ZDENTZFZCATZON ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
~~CALIBRATION BLOCK**590800 70 R9 A WD 001 Pipe Stanchion D A D1.20 VT-1 3 X Code Case N 509++N/A~~591700 70-R9-F Pipe Stanchion F-A F1.30 VT-3 3 X Code Case N-491-1++N/A++591800 70-R9-F-WD-001 Pipe Stanchion D-A D1.20 VT-1 3 X Code Case N-509 a*N/Ass 592300 70-83 Pipe Stanchion F"A Fl.30 3 X Code Case N-491-1 ssN/A*a70"S3-WD-001 Pipe Stanchion Dl.20 VT" 1 3 X Code Case N-509+~N/A~+594500 70-SC-3 Seismic Box Restraint F1.30 VT 3 3 X Code Case N-491-1 aaN/Att 597200 70-SC-8 F A Seismic Box Restraint F1.30 3 X Code Case N-491-1~~N/A**597300 70-SC-9 F-A Code Case N-491-1 Seismic Pipe Restraint F1.30 3 X aaN/Aea 599900 70 SCR-SA Box Restraint F A F1.30 3 X Code Case N-491-1**N/A**600000 70 SCR SA WD 001 Integral Attachment D-A D1.20 3 X Code Case N-509+~N/A++
 
DATE: 10/15/99 REVISION: 0 NINE HZLE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COHPONENTS PAGE: 239 tor Building Closed Loop Cooling NUMBER: 70.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR SUHMARY EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERZOD SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4'1 2 3 4 1 2 3 4 INSTRUCTIONS
~~CALIBRATION BLOCK~*600100 70-SCR-BA-WD-002 Integral Attachment D-A D1.20 VT 1 3 X Code Case N-509++N/A++600200 70-SCR-BA-WD-003 Integral Attachment D A D1.20 3 X Code Case N-509 i~N/A~~600300 70-SCR-BA-WD-004 Integral Attachment D-A Dl.20 3 X Coda Case N-509*~N/A*~601800 70-SR-23 Seismic Box Restraint F1.30 3 X A~Code Case N-491-1*I'N/At*70-SR-24 Seismic Box Restraint F1.30 VT-3 3 Code Case N-491-1+AN/Ate 602200 70-SR-27 Seismic Box Restraint F1.30 VT 3 3 X Codo Case N-491-1/AP a
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 3 SECTION XI SCHEDULED COMPONENTS PAGE: 240 tor Building Closed Loop Cooling Heat Exchange NUMBER: 70.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
*+CALIBRATION BLOCK~~RBCLCHE 70-13R (REF.DWG.NO.C-26855-C) 603400 70-13R F-A VT-3 RBCLCHE Support Fl.40 3 X Code Case N-491-1~~N/A~~603500 70 13R-WD-001 D-A Code Case N-509~~N/A~~RBCLCHE Front Integral D1.10 Attachment 3 X 603600 70-13R-WD-002 RBCLCHE Rear Integral D1.10 Attachment 3 X Code Case N-509++N/A~~
 
DATE: 10/15/99 REVISZON: 0 NINE MILE POZNT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS PAGE: 241 tor Building Closed Loop Cooling MU Tank NUMBER: 70.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
~~CALIBRATION BLOCK*~RBCLC M.U.Tank 71-126 (REF.DNG.NO.C-26855-C) 604300 71-126 F-A VT-3 CLC M.U.Tank Fi.40 3 X Code Case N-491-1 1 4N/A1 4
 
DATE: 10/15/99 REVZSZON: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS PAGE: 242 tor Building Closed Loop Cooling Pump NUMBER: 70.0 INSPECTION INTERVAL PLAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
'~~CALIBRATION BLOCK*+RBCLCP 70-01 (REF.DWG.NO.C-26855-C) 604400 70-01 RBCLC Pump Support F1.40 3 X Coda Case N-491-1 eeN/Ate
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS PAGE: 243 gency Service Water NUMBER: 72.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ZNSPECTION ZNTERVAL ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTIONS
~~CALIBRATION BLOCK~~ESW Line (REF.DWG.NO.F-45235-C) 604700 72-Al Pipe Stanchion F-A F1.30 3 X Code Case N-491-1++N/A++604800 72-Al-WD-001 Pipe Stanchion D-A D1.20 3 Code Case N-509**N/A**604900 72-A2 Pipe Stanchion F-A F1.30 3 X Code Case N-491-1++N/A++605000 72-A2-WD-001 Pipe Stanchion D-A D1.20 VT 1 3 X Code Case N-509~~N/A++00 72-H159 Rod Hanger F1.30 VT-3 3 X Code Case N-491-1@AN/Aea 607600 72-H162 Rod Hanger F1.30 VT-3 3 X Code Case N-491-1+~N/A++607700 72-H163 Rod Hanger Fl.30 3 X Code Case N-491-1*~N/A~*608700 72-SC-4 Seismic Restraint F-A F1.30 3 X Code Case N-491-1 i*N/Af f
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS PAGE: 244 gcncy Service Water Pump 11 INSPECTION ZNTERVAI PLAN STATUS PRESERVZCE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
+~CALIBRATION BLOCK~~ESWP 72-04 (REF.DWG.NO.F-45235-C) 613300 72-04 Pump Support F1.40 3 Code Casa N-491-1%AN/APk 1
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS PAGE: 245 tor Containment Spray NUMBER: 93.0
 
==SUMMARY==
EXAMZNATZON AREA NUMBER IDENTIFICATION INSPECTION ZNTERVAL ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVZCE YEAR INSTRUCTZONS
>>>>CALIBRATION BLOCK>>>>12.0" Raw Water Linc (REF.DWG.NO.16)613700 93-H3 F A VT-3 Gravity Support Fl.30 I 3 X Code Case N-491-1*>>N/A>>>>613900 93-HS Gravity Support F A F1.30 VT 3 3 X Code Case N-491-1**N/A>>*614100 93-H7 Gravity Support F1.30 3 X Code Case N-491-1**N/A*>>615100 93-R10-A Rod Hanger Fl.30 VT 3 3 X Code Case N-491-1**N/A>>*00 93 Rll A2 Rod Hanger F1.30 VT-3 3 X Code Case N-491-1>>>>N/A>>>>616400 93-R13-B Rod Hanger F-A VT 3 F1.30 3 X Code Case N-491-1>>>>N/A>>>>617500 93-R16-A Pipe Stanchion F-A Fl.30 3 X Code Case N-491-1>>>>N/A>>>>617600 93-R16-A-WD-001 Pipe Stanchion D-A Dl.20 VT-1 3 X Code Case N-509**N/A>>>>617700 93-R16-B Pipe Stanchion F-A F1.30 3 X Code Case N-491-1>>>>'N/A>>>>617900 93-R16-C Pipe Stanchion F-A F1.30 VT-3 3 X Code Case N-491-1**N/A**
 
DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS PAGE: 246 tor Containment Spray NUMBER: 93.0
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION ZNTERVAZ SEC.XI CATE GY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD OUTAGE THIRD PERIOD 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR INSTRUCTIONS saCALIBRATION BLOCK+t 618000 93 R16-C-WD-001 Pipe Stanchion D-A Dl.20 3 X Code Case N-509~*N/A*~621000 93-R2-C Spring Hanger F-A F1.30 3 X Code Case N-491-1 4 f N/A4 1 621100 93-R2-C"WD-001 Integral Attachment D-A Dl.20 3 X Code Case N-509~~N/A~~628300 93-SCR-10A Seismic Restraint F-A F1.30 3 X Code Case N-491-1*~N/A~~93-SCR 10B Seismic Restraint F-A F1.30 3 X Code Case N-491-1**N/A**637000 93-SCR-4A F"A Seismic Box Restraint F1.30 VT-3 3 X Code Case N-491-1**N/Af f 637100 93-SCR-4A-WD-001 Integral Attachment D-A D1.20 VT-1 3 X Code Case N-509~*N/A~~637200 93-SCR-4A-WD-002 Integral Attachment D1.20 3 X Code Case N-509+~N/A~~637300 93-SCR-4A-WD-003 D-A VT-1 Code Case N-509~*N/A~*Zntcgral Attachment D1.20 3 X 637400 93-SCR-4A-WD-004 D-A VT 1 Code Case N-509+*N/A~~Zntegral Attachment D1.20 3 X
 
DATE: 10/15/99 REVISION: 0 NINE HII E POINT NUCLEAR PLANT UNIT 1 INSERVICE ZNSPECTION TEN YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS PAGE: 247 tor Containment Spray NUHBER: 93.0 SUHHARY EXAHI NATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAI ASME SEC.XI CATEGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD OUTAGE 1 2 3 4 1 2 3 4 1 2 3 4 PRESERVICE YEAR ZNSTRUCTZONS
+*CALIBRATION BLOCK+*642000 93-SCR-7A1 F A Seismic Box Restraint F1.30 VT-3 3 X Code Case N-491-1+*N/A*~642100 93-SCR-7A1-WD-001 Integral Attachment Dl.20 3 X Code Case N 509*+N/A*+642200 93-SCR-7A1-WD-002 Integral Attachment D-A D1.20 3 X Code Case N-509++N/A++642300 93 SCR 7A1-WD-003 Integral Attachment D1.20 VT 1 3 X Code Case N-509~~N/A~~93-SCR-7A1"WD-004 D A VT-1 Code Case N-509 4wN/Aiw Integral Attachment D1.20 3 X 648000 93-SCR-9A Seismic Box Restraint F1.30 3 X Code Case N-491-1~+N/A+~648100 93-SCR-9A-WD-001 D-A Integral Attachment Dl.20 3 X Code Case N-509~~N/A~+648200 93-SCR-9A"WD-002 Integral Attachment D1.20 VT-1 3 X Code Case N-509+~N/A++648300 93-SCR-9A-WD-003 D-A Code Case N-509~*N/A**Integral Attachment D1.20 3 X 648400 93 SCR-9A-WD-004 Integral Attachment D1.20 VT-1 3 X Code Case N-509++N/A~+
4 DATE: 10/15/99 REVISION: 0 NINE MILE POINT NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION TEN-YEAR PZAN CZASS 3 SECTION XZ SCHEDULED COMPONENTS PAGE: 248 tor Containment Spray Raw Water Pump 111 INSPECTION INTERVAL NUMBER: 93.0 PLAN STATUS PRESERVICE YEAR
 
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.XZ CATEGY NDE ITEM NO METH FIRST PERIOD SECOND PERIOD OUTAGE THIRD PERZOD 1 2 3 4 1 2 3 4 1 2 3 4 INSTRUCTIONS
~*CALIBRATION BLOCK~~RCSRWP 111 (REF.DWG.NO.16)649500 RWP-111 F-A VT-3 Pump Support F1.40 X Code Case N-491-1~~N/A~+
 
N V NlAGARA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 APPENDIXA ACCEPTANCE CRITERIA Indications detected by inservice examinations, shall be compared against the acceptance criteria of Section XI as defined in Tables A-1 through A-4.).'ABLE A-1 CLASS::1:ACCEPTANCE STANDARDS EXAMINATION:
CATEGORY" 8-A B-B 8-D 8-E B-F, 84 8-G-1 8-G-2 B-H, 8-K-1 B-L-1, 8-M-1 B-L-2, 8-M-2 8-N-1 8-N-2 8-N4 B-O 8-P 8-0 ,, COMPONENT;.,OR PART EXAMINED",-,,-:,j-;gg Welds In Reactor Vessels Welds in Other Vessels Vessel Nozzle Wolds Partial Penetration welds In Vessels Dissimilar and Similar Metal Welds In Pl!n Boltln>2" dia.Boltin<2" dla.Into ralAttachmentsforPI in, Valves Pum s&Vessels Welds In Pum s&Valves Pum Casln s&Valvo Bodies Interior Surfaces&Internal Components of Reactor Vessels Control Rod Drive Housln Welds Pressure Rotainin Bounda Steam Generator Tubln'"ACCEPTANCE STANDARD IW 84510 IW84510 IW 84512 IW 84522 IW 84514 IW 8451 5/3517 IW 84517 IW84516 IW 84518 IW 8<519 IW 84520.1 IW 84520.2 IW84523 IW 84522 IW 84521 File: NMP1ISIPL.wpd
 
N V NIAGARA UmomwK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 TABLE A-2 CLASS 2 ACCEPTANCE STANDARDS EXAMINATION CATEGORY C-A C-B C-C C-D C-F-1, C-F-2 C-H COMPONENT OR PART EXAMINED Welds In Pressure Vessels Nozzle Welds In Vessels Inte raIAttachmentsfor Vessels Pi In Pum sand Valves Boltln Weids in Pi in Welds In Pum s and Valves Pressure Retainln Com onents ACCEPTANCE STANDARD IWC4510 IWC4511 IWC4512 IWC4513 IWC4514 IWC4515 IWC4516 TABLE AN CLASS 3 ACCEPTANCE STANDARDS EXAMINATION CATEGORY D-A D-B D-C COMPONENT OR PART EXAMINED Pressure Boundary (VT-2)Inte ral Attachments VTQ Pressure Boundary (VT-2)Inte ralAttachments VTQ Pressure Boundary (VT-2)Into ral Attachments VTN ACCEPTANCE STANDARD"No Leakage'Mfg.Code&llcablo Standards"No Leakage'Mfg.Codo&llcablo Standards IWA-5250'Mfg.Code&A Ilcablo Standards ASME Section XI Acceptanco Standard in course of preparation.
Defined as no leakago from the pressure boundary, in excess of that which is expected and determined to bo within acceptablo limits, l.e., at valve packing, bolted connections, pump seals, etc.EXAMINATION CATEGORY F-A TABLE A-4 COMPONENT SUPPORT ACCEPTANCE STANDARDS COMPONENT OR PART EXAMINED Su rts ACCEPTANCE
, STANDARD IWF-3410 File: NMP1ISIPL.wpd
 
El Y NIAGARA H kl MOHAWK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-1 0 Rev.0 Date: October 15, 1999 APPENDIX B NONDESTRUCTIVE EXAMINATION PROCEDURE LISTING NDEP REVISION TITLE VT 2.01 PT 3.00 MT 4.00 RT 5.00 UT 6.01 UT 6.04 UT 6.05 UT 6.06 UT 6.07 UT 6.09 UT 6.10 UT 6.13 UT 6.15 UT 6.16 UT 6.19 UT 6.20 UT 6.21 UT 6.23 UT 6.24 UT 6.25 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1"ASME XI Visual Examination Procedure""Li uid Penetrant Examination Procedure""Ma netic Particle Examination Procedure""Radio ra hic Examination""Ultrasonic Linearit Verification""Ultrasonic Examination of Bolts, Studs, Nuts and Cylindrical Com onents""Ultrasonic Thickness Measurement""Ultrasonic IGSCC Sizin Procedure" Manual"Ultrasonic Examination of Nozzle Inner Radii""Ultrasonic Examination Procedure for RPV Flange Weld and Stud Hole Threads in the RPV Flan e""S stem Performance Checks""Ultrasonic Examination of Bi-Metallic Pi in Welds""Ultrasonic Examination to Determine Water Level""Ultrasonic Thickness Measurement Utilizin Di ital E ui ment""Freeze Seal Ultrasonic Examination Procedure for Ferritic Pipe and Fittin s""Ultrasonic Examination of Reactor CRD Housin s""Ultrasonic Examination Procedure for Vessel Welds 2" Thick or Less and Associated Nozzle Inner Radius Areas""Ultrasonic Examination of Ferritic Pi e Welds""Ultrasonic Examination of Austenitic Pi e Welds""Strai ht Beam Ultrasonic Examination of Bolts and Studs" File: NMP1ISIPL.wpd
 
LI V NIAGARA a U MOHAWK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-10 Rev.0 Date: October 15, 1999.."';,",',:AP.P...END)X-:B
;;;:::.';-.".';
': NONDESTRUCTIV.E'.EXAMlNATlON;PROCEDU,RE L'ISTING REVlSfON'P 7.00 SP 7.01 SP 7.02 SP 7.03 SP 7.04 SP 7.05 ET 8.00 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1 Note 1"Standard Method for Etchin Metals and Allo s""Hardness Testin of Metals""Visual Examination of Weldin 0 erations""Visual Examination of Brazed Joints""Measurin Coatin Thickness b Use of Edd Current""Weld Detection b Use of Edd Currents""Eddy Current Examination of Nonferromagnetic Heat Exchange Tubing" See controlled copy of NDE Procedures for latest approved revision.File: NMP1ISIPL.wpd
 
hl Y NIAGARA H U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-10 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999-APPENDIX C'.'-'': 'ULTRASONIC.'CALIBRATION BL'GCKS':,'.
'.";;,''ITEMNUMBER,.:,-,*;"'.", BL'OCK.;':::"'.""'::
':-";-".THICKNESS:
1-2 1-3 1-4 1-6 1-7 1-8 1-12 1-13 1-14 1-16 1-17 1-21 1-22 1-23 1-25 1-28 1-29 1-30 1-32 1-33 1-36 1-37 1-38 NMP1-29-SE-1 NMP1-28-2.00-SS NMP-28-1.200-SS NMP1-24-SE-1 NMP1-24-080-CS NMP.1-20-1.500-CS NMP1-18-1.375-CS NMP1-18-1.156-CS NMP1-18-.937-CS-106 NMP-18-120-CS NMP-18-100-CS NMP1-16-120-CS NMP-16-100-CS NMP1-16-.375-CS-106 NMP1-14-120-CS NMP1-14-XX2-SS NMP-14-XX1-SS NMP-14-STD-CS NMP1-12-1.44-CS-105 NMP1-12-.688-SS NMP1-12-XX2-SS NMP-12-XX1-SS NMP-12-STD-CS 1.655/1.1501.151.11 2.055 1.109 1.475 1.219 1.63 1.375 1.156.937 1.375 1.156 1.24 1.031.375 1.219.935.760.375 1.44.688.855.720.375 File: NMP1ISIPL.wpd
 
El Y NIAGARA H U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999'PPENDIX C"-'UL''FRASONIC:CALIBRATION BLot:-KS-:
"-'-'-.''---:-:--: ITEM NUMBER"'-40 1-42 1-43 1-44 1-47 1-49 1-50 1-51 1-52 1-55 1-56 1-61 1-62 1-64 1-65 1-66 1-68 1-69 1-70 1-77 1-81 1-82 1-83 1-84 v B L O Q Kg<~~<i<c~,.NMP1-10-.594-CS NMP1-10-.522-SS-F2 NMP1-10-.500-SS-403 NMP1-10-160-SS NMP1-10-100-CS NMP1-10-80-CS NMP-10-XX1-SS NMP1-10-XX1-SS-358 NMP1-1 0-SE-1 NMP1-8-120-CS NMP1-8-80-CS NMP1-6.25-RPV-STUD NMP1-6-.596-SS NMP1-6-160-CS NMP1-6-80-SS NMP-6-080-CS NMP1-6-80-SS-312 NMP1-6-SE-2 NMP1-6-SE-1 NMP1-4-80-CS NMP1-2.75-RCP-STUD NM1-2.50-B16-1 NM1-2.50-B16-2 NM1-2.25-B16
.700~522.500 1.141.75.600.727.591.900.720.495 2.72.596.720.432.432.432 1.5.75.337 File: NMP1ISIPL.wpd
 
Y NIAGARA kL MOHAWK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-10 Rev.0 Date: October 15, 1999 APPENDIX C Uk.TRASONlt CALIBRATION BLOCKS ITEM NUMBER 1-92 1-94 1-96 1-97 1-98 1-99 1-1 00 1-108 1-113 1-114 1-128 1-130 1-133 1-137 1-138 1-140 1-143 1-146 1-158 1-159 1-165 1-166 2-1 BLOCK NMP1-FW-1.50-CS-516 FWMU-N1-P3-8.1-RV NMP1-IR-9 NMP1-IR-7.5 NMP1-IR-5.5 NMP1-IR-3.3 NMP1-IR-1.7 NMP-80XI-N278-ALT-BL1 NMP1-SW-1020-CS NMP1-SW-304-SS NMP1-SW-600-IN P8R-1.260 P8R-.75-1 P8R-.3-1 PIS-6.25 PIS-2.5 P IR-1.5-1 PIN-6.25 PIF-1.5C NMP1-RPV-4 NMP1-RPV-1 NMP-EPRI-CS NMP-EPRI-SS NMP2-48-3.50-CS THICKNESS.
1.7 10.75.1-3.00.1-3.00.1-1.0 1.260.75 2.72 16.7 1.5 1.62 1.5 27.0 4.60 3.50 File: NMP1ISIPL.wpd
 
V NIAGARA 4 MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 APPENDlX C ULTRASONlC CAL1BRATION BLOCKS lTEM NUMBER 2-2 2-3 2-4 2-5 2-6 2-7 2-8 2-9 2-10 2-11 2-12 2-13 2-14 2-15 2-16 2-17 2-18 2-19 2-20 2-21 2-22 2-23 2-24 2-25 BLOCK NMP2-30-2.90-CS NMP2-28-2.60-CS NMP2-28-1.34-CS NMP2-27-1.57-CS NMP2-26-1.26-CS NMP2-25-1.84-NOZ NMP2-24-2.469-CS NMP2-24-2.06-CS NMP2-24-1.317-SS NMP2-24-1.234-SS NMP2-24-1.219-CS NMP2-24-1.002-SS NMP2-24-.500-SS NMP2-24-.500-CS NMP2-24-.375-CS NMP2-20-1.031-SS NMP2-20-1.031-CS NMP2-20-.84-SS NMP2-20-.812-CS NMP2-20-.594-CS NMP2-20-.500-CS NMP2-20-.375-CS NMP2-20-.375-SS NMP2-18-.938-CS THlCKNESS 2.90 2.60 1.34 1.57 1.26 1.84 2.469 2.06 1.317 1.234 1.219 1.002.500.500.375 1.031 1.031.84.812.594.500.375.375.938 File: NMP1ISIPL.wpd
 
V NIAGARA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999-APPEND)X C ULTRASONlC CALlBRATlQN BLOCKS 1TEM NUMBER 2-26 2-27 2-28 2-29 2-30 2-31 2-32 2-33 2-34 2-35 2-36 2-37 2-38 2-39 2-40 2-41 2-42 2-43 2-44 2-45 2-46 2-47 2-48 2-49 BLOCK NMP2-18-.500-CS NMP2-18-.375-CS NMP2-18-.375-SS NMP2-16-1.031-CS NMP2-16-.822-SS NMP2-16-.500-CS NMP2-16-.375-SS NMP2-16-.375-CS NMP2-14-.375-CS NMP2-12-1.00-SS NMP2-12-.844-SS NMP2-12-.844-CS NMP2-12-.688-CS NMP2-12-.688-SS NMP2-12-.657-SS NMP2-12-.375-SS NMP2-12-.375-CS NMP2-11.625-1.125-CS NMP2-10-1.00-CS NMP2-10-.719-CS NMP2-10-.594-CS NMP2-1 0-.365-CS NMP2-9.3-1.77-CS NMP2-8-.906-CS THlCKNESS.500.375.375 1.031.822.500.375.375.375 1.00.844.844.688.688.657.375.375 1.125 1.00.719.594.365 1.77.906 File: NMP1ISIPL.wpd
 
V NIAGARA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 PENDIX Q'"'>>','>>'w'w'*", ,',',ULTR'A'SONIC CAL'IBRATION'BLOCKS.
':".'-,.'"'TEM NUMBER.';-'.","..'"".'-".""'":BLOCK 2-50 2-51 2-52 2-53 2-54 2-55 2-57 2-58 2-59 2-60 2-61 2-62 2-63 2-64 2-65 2-66 2-67 2-68 2-69 2-70 2-71 2-72 2-73 2-74 NMP2-8-.718-CS NMP2-8-.594-CS NMP2-8-.500-CS NMP2-8-.322-SS NMP2-8-.322-CS NMP2-6.3-1.24-CS NMP2-6-.432-CS NMP2-6-.280-CS NMP2-5.8-.365-SS NMP2-5.25-.69-NOZ NMP2-5-.78-CS NMP2-4-.337-SS NMP2-4-.337-SS-182 NMP2-4-.337-CS NMP2-4-.250-CS NMP2-4-.250-SS NMP2-3.25-23.5-STUD NMP2-2.25-10-STUD NMP2-IR-9-CS NMP2-IR-7.5-CS NMP2-IR-4-CS NMP2-RHS-.75-CS NMP2-RHS-IR-3.75-CS NMP2-FLG-RPV
.718.594.500.322.322.562.432.280.365.69.78.337.337.337.250.250 23.5 10.0 9.0 7.5 4.0.75 3.75 38.0 File: NMP1ISIPL.wpd
 
N Y NIAGARA@MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICEINSPECTIONINTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999',""APPENDIX:
C;:;';',";,"',:~~,"-;:."."''...""".-.':,,'ULTRASONIC CALIBRATION BLOCKS;::,'::
':: 2-75 2-76 2-77 2-78 2-79 2-80 2-81 2-82 2-900 2-84 1-95': ":i;BLOCK."".NMP2-RPV-STUD-1 NMP2-RPV-NUT-1 NMP2-128-1-RPV NMP2-127-1-RPV NMP2-126-1-RPV NMP2-1 25-1-RPV NMP2-124-1-RPV NMP2-123-1-RPV GE795E254G3 NMP2-2.24-15.88-STUD H JT-6-13-A".",THICKNESS,'.69 7.125 5.25 3.18 7.90 6.80 6.68 8.11 15.88.55 File: NMP1ISIPL.wpd
 
hl Y NIAGARA H V MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-10 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 ,,APPENDIX D CL'ASS 1, 2 and 3 WELDlSUPPORT LOCATION QAPS-DRAWING NUMBER SYSTEM TITLE C-26830-C C-26831-C C-26832-C C-27165-C C-27165-C C-27165-C C-26839-C C-26846-C C-26852-C C-26852-C C-26839-C C-26839-C C-26851-C F-45028-C C-26852-C C-45060-C C-26852-C C-26847-C C-26843-C C-26844-C C-35682-C C-27168-C C-27168-C 01 02 03 05 05.1 05.2 31 32 33 33.1 33.2 33.3 34 36 37 37 37.1 38 39 40 40.1 41 42 Main Steam Main Steam Main Steam Emergency Condenser Vent Emergency Condenser Vent Emergency Condenser Vent High Pressure Reactor Feedwater Reactor Recirculation Reactor Clean UP Reactor Clean UP Reactor Clean UP Reactor Clean UP Reactor Head Spray Reactor Instrumentation Reactor Drain Reactor Head Vent Reactor Drain Reactor Shutdown Cooling Emergency Condenser Reactor Core Spray Reactor Core Spray Liquid Poison Liquid Poison File: NMP1ISIPL.wpd 0
El Y NIAGARA H 4 MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-10 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 APPENDIX D CLASS 1, 2 and 3 VlELNSUPPORT LOCATION MAPS DRAY/ING NUMBER SYSTEM TITLE C-27168-C C-26849-C C-34124-C C-27171-C C-27178-C C-26855-C C-39816-C C-27179-C F-45236-C C-26848-C C-27181-C C-26845-C C-26845-C C-27183-C 2A 2B 3A 5A 42.1 44.1 44.2 54 66 70 70 72 72 80 80.1 81 81.1 93 N/A 01 01 01 02 02 03 31 34 Liquid Poison Control Rod Drive Hydraulic Control Rod Drive Hydraulic Fuel Pool Cooling Main Steam Line Reactor Building Closed Loop Cooling Closed Loop Cooling Service Water System Service Water System Reactor Containment Spray Reactor Containment Spray Reactor Core Spray Reactor Core Spray Containment Spray Cooling Raw Water Weld Map Index Main Steam Main Steam Main Steam Main Steam Main Steam Main Steam Turbine By Pass to Condenser Reactor Feedwater Reactor Feedwater Reactor Head Spray File: NMP1ISIPL.wpd
 
hl Y NIAGARA H U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-10 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999:-'-CLASS 1, 2 an'd,3 WELD/SUPPORT,L'OCATfON IIIIAPS;:-;J F.DRAW!NG":NUMBER
,-7A 7B 7C 7D 8A 8B 8C 8D 8E 8F 8G 8H 8J 10 10A 11A 11B 12 12A 13;SY'TEM'=,"",''-,.", 32 32 32 32 36 36 36 36 36 36 36 36 36 36 36 37, 37.1 38 38 39 39 39 40, 40.1 40,40.1 80,80.1 Reactor Recirculation Reactor Recirculation Reactor Recirculation Pump Discharge Instrumentation Reactor Recirculation Pump Instrumentation Reactor Recirculation Pump Seal Cavity Instrumentation Reactor Instrumentation Level Protection System Reactor Instrumentation Level Control Range Reactor Instrumentation Level Control Range Reactor Instrumentation Level Protection System Reactor Instrumentation Wide Range Level Reactor Instrumentation Seal Leak Detection Reactor Instrumentation Level Triple Low Reactor Instrumentation Level Triple Low Reactor Instrumentation Emergency Condenser Steam Reactor Instrumentation Emergency Condenser Steam Reactor Head Vent and Drain Reactor Shutdown Cooling Reactor Shutdown Cooling Emergency Condenser Steam Supply Emergency Condenser Steam Return Emergency Condenser Drain and Overflow Lines Reactor Core Spray Reactor Core Spray Reactor Core Spray File: NMP1ISIPL.wpd
 
N V NlAGARA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999'""-:"":;=';"""CLASS"1"2 and 3 WELDtSUPPQRT,.:LOCATION MAPS""-"""'"':," DRAWING NUMBER, 13A 13B 13C 14 15 15A 15B 15C 15D 16 16A 16B 16C 17 17A 18 19 20 21 22 22A 23 24 24A SYSTEM'-'0,80.1 80,80.1 80,80.1 42.1 80 80 80 80 80 93,93.1 93,93.1 93,93.1 93,93.1 44.2 44.2 44.1 44.3 33332333 27 05,05.1,05.2 05,05.1,05.2 23 66 66 Reactor Core Spray Reactor Core Spray Reactor Core Spray Liquid Poison Reactor Containment Spray Reactor Containment Spray Reactor Containment Spray Reactor Containment Spray Reactor Containment Spray Reactor Containment Spray Reactor Containment Spray Reactor Containment Spray Reactor Containment Spray Control Rod Drive Control Rod Drive Control Rod Drive Control Rod Drive Reactor Clean Up Reactor Head Spray Emergency Condenser Vent Emergency Condenser Vent Main Steam Line Drain Main Steam Power Operated Relief Valve Discharge Main Steam Power Operated Relief Valve Discharge File: NMP1ISIPL.wpd
 
Y NIAGARA 4 MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999.':~';",-"'::,-":-CLASSi1'2 and'3'-"~VfFL'DISUPPORT LQCATjON'',MAPS:.:::,';
-";"':;i":
':::':--':,9!-"::.
'DRAWING NUMBER'SYSTEM,.'',".;r",,%w
-Tl TL'E:,'"';,',','i'i', z'<'P'ill'qg~P~;,"'j;"l'P,",.;,i i,".i'~!.'""s',~;>j;",'"~',';',.'...r.':~":,.;"".".', 25 25A 26 28 28A 80.1 80.1 41,42 00.0 00.0 Reactor Containment Spray Reactor Containment Spray Liquid Poison Reactor Vessel Reactor Vessel File: NMP1ISIPL.wpd
 
N Y NIAGARA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-1 0 Rev.0 Date: October 15, 1999 APPENDIX E ASME CODE CASES The following ASME Code Cases have been reviewed for possible use during the Third Inservice Inspection Interval.Code Cases used during the inspection interval shall be identified with the specific component within the Inspection/
Examination Tables.CODE CASE NUMBER TITLE ASME CODE CASE LISTING RG 1.147 Revision IMPLEMENTED IN PROGRAM N-236-1 N-355 N-389-1 N-416-1 N-432 N-457 N-458-1 N-460 N-461 N-472 N-485-1 N-490-1 Repair and Replacement of Class MC Vessels, Section XI, Division 1.Calibration Block for Angle Beam Ultrasonic Examination of Large Fittings in accordance with Appendix III-3410, Section XI, Division 1.Alternative Rules for Repairs, Replacements, or Modifications, Section XI, Division 1 Alternative Pressure Test Requirement for Welded Repairs or Installation of Replacement Items by Welding, Class 1, 2 and 3, Section XI, Division 1.Repair Welding Using Automatic or Machine Gas Tungsten-Arc Welding (GTAW)Temper Bead Technique, Section XI, Division 1.Qualification Specimen Notch Location for Ultrasonic Examination of Bolts and Studs, Section XI, Division 1.Magnetic Particle Examination of Coated Materials, Section XI, Division 1.Alternative Examination Coverage for Class 1 and Class 2 Welds, Section XI, Division 1 Alternative Rules For Piping Calibration Block Thickness, Section XI, Division 1 Use of Digital Readout and Digital Measurement Devises for performing Pump Vibration Testing, Section XI, Division 1.Eddy Current Examination of Coated Ferritic Surfaces as an alternative to Surface Examination, Section XI, Division 1.Alternative Vision Test Requirements for Nondestructive E, S t'I Division 1 Rev.12 Rev.12 Rev.12 Rev.12 Rev.12 Rev.12 None Rev.12 Rev.12 Rev.12 Rev.12 Rev.12 No No Yes No No Yes No No No No File: NMP1ISIPL.wpd
 
V NlAGARA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE NMP1-ISI-003-10 Rev.0 Date: October 15, 1999 CODE CASE TITLE NUMBER ASME CODE CASE LISTING N-491-1 Alternative Rules for Examination of Class 1, 2, 3, and MC Component Supports, Section XI, Division RG 1.147 Revision Rev.12 IMPLEMENTED IN PROGRAM Yes N-496-1 N-498-1 N-504-1 N-509 N-516 N-523 N-524 N-526 N-532 N-534 Helical Coil Threaded Inserts, Section XI, Division 1 Alternative Rules for 10-Year System Hydrostatic Testing for Class 1, 2 and 3 Systems, Section XI, Division 1 Alternative Rules for Repair of Class 1, 2 and 3 Austenitic Stainless Steel Piping, Section XI, Division 1 Alternative Rules for the Selection and Examination of Class 1, 2 and 3 Integrally Welded Attachments, Section XI, Division 1 Underwater Welding, Section XI, Division 1 Pressure Testing of Containment Penetration Piping, Section XI, Division 1 Mechanical Clamping Devices for Class 2 and 3 piping, Section XI, Division 1.Alternative Examination Requirements for Longitudinal Welds in Class 1 and Class 2 Piping, Section XI, Division 1 Alternative Requirements for Successive Inspection of Class 1 and 2 Vessels, Section XI, Division 1 Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as required by IWA-4000 and IWA-6000, Section XI, Division 1.Alternative Requirements for Pneumatic Pressure Testing, Section XI, Division 1 Rev.12 Rev.12 Rev.12 Rev.12 Rev.12 None Rev.12 None None None No Yes No No Yes Yes Yes No N-537 Location of Ultrasonic Depth Sizing Flaws, Section XI, Division 1.Rev.12 No N-554 N-573 Alternative Requirements for Reconciliation of Replacement Items, Section XI, Division 1.Transfer of Procedure Qualification Records Between Owners, Section XI, Division 1.None None No Yes File: NMP1ISIPL.wpd
 
V NIAG'AHA U MOHAWK NINE MILE POINT NUCLEAR POWER STATION NMP1-ISI-003-1 0 THIRD INSERVICE INSPECTION INTERVAL Rev.0 TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Date: October 15, 1999 END OF DOCUMENTFile: NMP1ISIPL.wpd W1lh''tigl~0 i k'I}}

Latest revision as of 05:20, 7 January 2025

Third Inservice Inspection Interval - Ten-Year Inservice Inspection Plan and Schedule
ML18018B053
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 10/15/1999
From:
Niagara Mohawk Power Corp
To:
Office of Nuclear Reactor Regulation
References
Download: ML18018B053 (576)


Text