ML18024B194: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[05000296/LER-1979-021]]
| number = ML18024B194
| issue date = 12/21/1979
| title = Forwards LER 79-021/01T-0
| author name = CALHOUN J R
| author affiliation = TENNESSEE VALLEY AUTHORITY
| addressee name = OREILLY J P
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| docket = 05000296
| license number =
| contact person =
| document report number = NUDOCS 7912280503
| package number = ML18024B195
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 4
}}
 
=Text=
{{#Wiki_filter:'ecember 21, 1979 ENNESSEE VALLEY AUTHOR Y CHATTANOOGA.
TENNESSEE ST401 716 Edney Building Mr.James.O'Reilly, Director U.S.Hucl egul tory Commission Office of Inspecti n and Enforcement Region IX 101 Marietta St et, Suite 3100 Atlanta, Georgia 30303 Dear Mr OtReilly I TENNESSEE VALLEY AUTHORITY-BROMNS PERRY NUCLEAR PLANT UNIT 3-DOCKET HO.50-296-PACILIXY OPERATING LICENSE DPB;68-REPORTABLE OCCURMrNCE REPORT BPRO-50-296/7921
/The enclosed report provides details concerning the differentia1 pressure between the dryvell and pressure suppression chamber which could not be maintained at greater than 1.3 psig trith unit 3 at 200 Kfe following unit return to service follo1rlng refueling outage.This report iS submitted in accordance with Brogans Perry unit 3 Technical Specification 6.7.2.a.3.
Very'ruly yours, TENNESSEE VALLEY AUTHORITY J.R.Calhoun Director of Nuclear Power Enclosure (3)cc (Enclosure):
Director (3)p Office of Management Infoxmation and Program Control U.S.Nuclear Regulatory Commissi n washington, DC 20555 Mrectox (40)Office of Inspection and Enforcement U.S.Nuclear Regulatory Commission llashington, DC 20555 R.P.Sullivan, NRC Inspector, Brogans Perry/co>i/i An Equal Opportunity Employer es~saso 90
~'~l>>Cg',>>4 i>>It r, 4't r>>e.>>I>>L~''V cl~I Ct 4 4-~l>>~+tt'f'I~I>>" I>>I Il r~'I J', ll P December 21, 1979~~TENNESSEE VAL.LEY AUTHGR/TY CHATTANOOGA.
TENNESSEE 37AQs.716 Edney Building Hr.James.O'Reilly, Director U.S.Nucle egul tory Commission Office of Inspecti n and Enforcement Region IX 101 Marietta St et, Suite 3100 Atlanta, Georgia 30303
 
==Dear 1fr.O'Reilly:==
TEN1KSSEE VALLEY AUTHORITY-BROWNS FERRY NUCLEAR PLANT UNIT 3-DOCKET NO.50-296-FACILITY OPERATING LICENSE DPR-68-REPORTABLE OCCURRIBiCE REPORT BFRO-50-296/7921 The enclosed report provides details concerning the differential pressure between the drywell and pressure suppression chamber which could not be maintained at greater than 1.3 psig with unit 3 at 200 Mfe following unit return to service following refueling outage.This report.is submitted in accordance with Browns Ferry unit 3 Technical Specification 6.7.2.a.3.
Very truly yours, TENNESSEE VALLEY AUTHORITY J.R.Calhoun Director of Nuclear Power Enclosure (3)cc (Enclosure):
Director (3)Office of i~fanagement Information and Program Control U.S.Nuclear Regulatory Commissi n Washington, DC 20555 Director (40)Office of Inspection and Enforcement U.S.Nuclear Regulatory Commission Washington, DC 20555 R.F.Sullivan, NRC Inspector, Browns Ferry QQbk S i!(}}

Latest revision as of 04:20, 7 January 2025