ML17331B140: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 7: Line 7:
| issue date = 12/15/1993
| issue date = 12/15/1993
| title = Forwards Analysis for TS Change to Allow Unit 1 SG Tube Interim Plugging Criteria of 1.0 Volt for Cycle 14,per NRC Request That Portions of Draft NUREG-1477 Be Incorporated in 930310 Lar.Affected TS Pages & Westinghouse Rept Also Encl
| title = Forwards Analysis for TS Change to Allow Unit 1 SG Tube Interim Plugging Criteria of 1.0 Volt for Cycle 14,per NRC Request That Portions of Draft NUREG-1477 Be Incorporated in 930310 Lar.Affected TS Pages & Westinghouse Rept Also Encl
| author name = FITZPATRICK E
| author name = Fitzpatrick E
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name = MURLEY T E
| addressee name = MURLEY T E
Line 22: Line 22:
| number = ML17331B141
| number = ML17331B141
| issue date = 12/09/1993
| issue date = 12/09/1993
| title = Forwards Analysis for TS Change to Allow Unit 1 SG Tube Interim Plugging Criteria of 1.0 Volt for Cycle 14,per NRC Request That Portions of Draft NUREG-1477 Be Incorporated in 930310 Lar.Affected TS Pages & Westinghouse Rept Also Encl
| title = Suppl Info for DC Cook Unit 1 Ipc.
| author name = PITTERLE T A
| author name = Pitterle T
| author affiliation = WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
| author affiliation = WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
| addressee name =  
| addressee name =  
Line 37: Line 37:
| number = ML17331B139
| number = ML17331B139
| issue date = 12/15/1993
| issue date = 12/15/1993
| title = Forwards Analysis for TS Change to Allow Unit 1 SG Tube Interim Plugging Criteria of 1.0 Volt for Cycle 14,per NRC Request That Portions of Draft NUREG-1477 Be Incorporated in 930310 Lar.Affected TS Pages & Westinghouse Rept Also Encl
| title = Proposed Tech Specs to Allow Unit 1 SG Tube Interim Plugging Criteria of 1.0 Volt for Cycle 14
| author name =  
| author name =  
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG

Latest revision as of 02:30, 7 March 2020

Forwards Analysis for TS Change to Allow Unit 1 SG Tube Interim Plugging Criteria of 1.0 Volt for Cycle 14,per NRC Request That Portions of Draft NUREG-1477 Be Incorporated in 930310 Lar.Affected TS Pages & Westinghouse Rept Also Encl
Date released: 05/31/2018 Download: ML17331B140


Forwards Analysis for TS Change to Allow Unit 1 SG Tube Interim Plugging Criteria of 1.0 Volt for Cycle 14,per NRC Request That Portions of Draft NUREG-1477 Be Incorporated in 930310 Lar.Affected TS Pages & Westinghouse Rept Also Encl
ML17334B496
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/15/1993
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: MURLEY T E
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-1477
Download: ML17334B496 (122)
Suppl Info for DC Cook Unit 1 Ipc.
ML17331B141
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/09/1993
From: Pitterle T
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To:
References
Download: ML17331B141 (4)
Proposed Tech Specs to Allow Unit 1 SG Tube Interim Plugging Criteria of 1.0 Volt for Cycle 14
ML17331B139
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/15/1993
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
Download: ML17331B139 (7)