| number = ML17311A832
| number = ML17311A832
| issue date = 04/27/1995
| issue date = 04/27/1995
| title = Forwards Response to NRC 950410 Ltr Re Violations Noted in Insp Repts 50-528/95-07-01,50-529/95-07-01 & 50-530/95-07-01 on 950306-10.Corrective Actions:Surveyed Area & Posted as High Contamination Area
| title = Forwards Response to NRC Re Violations Noted in Insp Repts 50-528/95-07-01,50-529/95-07-01 & 50-530/95-07-01 on 950306-10.Corrective Actions:Surveyed Area & Posted as High Contamination Area
| author name = STEWART W L
| author name = Stewart W
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee name =  
| addressee name =  
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 9505020298
| document report number = NUDOCS 9505020298
| title reference date = 04-10-1995
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 11
| page count = 11
}}
}}
See also: [[followed by::IR 05000528/1995007]]


=Text=
=Text=
{{#Wiki_filter:F a.roarWv (AC(.ELI'.RATED
{{#Wiki_filter:F a.roarWv (AC(.ELI'.RATEDI'll)(iI'l<OC:I:.SSli('3 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
I'll)(i I'l<OC:I:.SSli('3
CCESSION NBR:9505020298 DOC.DATE: 95/04/27 NOTARIZED: NO DOCKET N
REGULATORY
FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION F
INFORMATION
STEWART,W.L.
DISTRIBUTION
Arizona Public Service Co.
SYSTEM (RIDS)CCESSION NBR:9505020298
(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOC.DATE: 95/04/27 NOTARIZED:
F
NO DOCKET N FACIL:STN-50-528
 
Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529
==SUBJECT:==
Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530
Forwards response to NRC 950410 ltr re violations noted in insp repts 50-528/95-07-01,50-529/95-07-01
Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION
& 50-530/95-07-01 on 950306-10.Corrective actions:surveyed area
F STEWART,W.L.
& posted as high contamination area.
Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME
DISTRIBUTION CODE:
RECIPIENT AFFILIATION
IEOID COPIES RECEIVED:LTRI ENCL I
Document Control Branch (Document Control Desk)F SUBJECT: Forwards response to NRC 950410 ltr re violations
SIZE:
noted in insp repts 50-528/95-07-01,50-529/95-07-01
/
&50-530/95-07-01
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:STANDARDIZED PLANT Standardized plant.
on 950306-10.Corrective
Standardized plant.
actions:surveyed
05000528 I
area&posted as high contamination
05000529 05000530 RECIPIENT ID CODE/NAME PD4-2 PD TRAN,L ERNAL: ACRS AEOD/SPD/RAB AEOD/TTC gZM CENTER P NRR/DORS/OEAB'UDOCS-ABSTRACT OGC/HDS2 EXTERNAL: LITCO BRYCE,J H
area.DISTRIBUTION
NRC PDR COPIES LTTR ENCL 1
CODE: IEOID COPIES RECEIVED:LTR
1 1
I ENCL I SIZE:/TITLE: General (50 Dkt)-Insp Rept/Notice
1 2
of Violation Response NOTES:STANDARDIZED
2 1
PLANT Standardized
1 1
plant.Standardized
1 1
plant.05000528 I 05000529 05000530 RECIPIENT ID CODE/NAME PD4-2 PD TRAN,L ERNAL: ACRS AEOD/SPD/RAB
1 1
AEOD/TTC gZM CENTER P NRR/DORS/OEAB'UDOCS-ABSTRACT
1 1
OGC/HDS2 EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME HOLIAN, B THOMAS, C AEOD/DEIB AEOD/SPD/RRAB
1 1
DEDRO NRR/DIS P/PI PB NRR/DRCH/HHFB
1 1
OE DIR RGN4 FILE 01 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D U iO'I'I I 0 Al.l."Rl DS" Rl:.Cll'I I'.i'I'S PI.L:XSI: I II I.P I'S'I'0 ICFDL'CI:.(i';X&'I'I.!
1 1
CONT%(I" I'I II: DOC('),Ilii"I'OiTIZOI.
1 RECIPIENT ID CODE/NAME HOLIAN, B THOMAS, C AEOD/DEIB AEOD/SPD/RRAB DEDRO NRR/DISP/PI PB NRR/DRCH/HHFB OE DIR RGN4 FILE 01 NOAC COPIES LTTR ENCL 1
DESK.IZOOil I'I 37 (I".Xl: 5&4.'(h33 ('I'0 I:I.I!1lli:X'I'I'.
1 1
YOl'li X'Aill I'ROTI DIS'I'RI IIL" I'ION I.IS'I'S I'OR D()('.I'ill'.i'I'S
1 1
5 ()(')ON"I'l;I'.I)'
1 1
TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 22  
1 1
Arizona Public Service Companv 10CFR2.201
1 1
102-03335-WLS/AKK/R
1 1
JH April 27, 1995 U.S.Nuclear Regulatory
1 1
Commission
1 1
ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001
1 1
Dear Sirs: SubJect: Palo Verde Nuclear Generating
1 D
Station (PVNGS)Units 1, 2, and 3 Docket Nos.STN 50-528/529/530
U iO'I'I I 0 Al.l."RlDS" Rl:.Cll'II'.i'I'S PI.L:XSI: III I.P I'S 'I'0 ICFDL'CI:. (i';X&'I'I.!CONT%( I"I'III: DOC('),Ilii"I'OiTIZOI.
Reply to Notice of Violation 50-528/529/530/9&071
DESK. IZOOil I'I 37 (I".Xl:5&4.'(h33 ('I'0 I:I.I!1lli:X'I'I'.YOl'liX'Aill I'ROTI DIS'I'RIIIL"I'ION I.IS'I'S I'OR D()('.I'ill'.i'I'S5 ()( ')ON"I'l;I'.I)'
Arizona Public Service Company (APS)has reviewed NRC Inspection
TOTAL NUMBER OF COPIES REQUIRED:
Report 50-528/529/530/95-07
LTTR 22 ENCL 22
and the Notice of Violation (NOV)dated April 10, 1995.Pursuant to the provisions
 
of 10 CFR 2.201, APS'esponse
Arizona Public Service Companv 10CFR2.201 102-03335-WLS/AKK/RJH April 27, 1995 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001
is enclosed.Enclosure 1 to this letter is a restatement
 
of the NOV.APS'esponse
==Dear Sirs:==
is provided in Enclosure 2.This NRC inspection
SubJect:
focused on radiation protection
Palo Verde Nuclear Generating Station (PVNGS)
activities
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Reply to Notice of Violation 50-528/529/530/9&071 Arizona Public Service Company (APS) has reviewed NRC Inspection Report 50-528/529/530/95-07 and the Notice of Violation (NOV) dated April 10, 1995.
associated
Pursuant to the provisions of 10 CFR 2.201, APS'esponse is enclosed.
with the Unit 2 Refueling Outage.The NRC inspectors
Enclosure 1 to this letter is a restatement of the NOV. APS'esponse is provided in Enclosure 2.
noted that the APS Radiation Protection
This NRC inspection focused on radiation protection activities associated with the Unit 2 Refueling Outage. The NRC inspectors noted that the APS Radiation Protection program was satisfactory overall to support outage related activities and noted improvements in establishment of more challenging ALARA goals and more detailed pre-job briefings.
program was satisfactory
: However, a
overall to support outage related activities
need exists for additional improvement in radioactive material and contamination control.
and noted improvements
As stated by the NRC, although general housekeeping was adequate, improvements are necessary in staging and control of outage equipment and tools. Minor problems were observed in the control of trash and extra protective clothing items. The inspectors concluded that this area of the program needs additional attention and that Radiation Protection Technicians should be more aggressive in their efforts to identify problems.
in establishment
ln an effort to improve radioactive material control, Radiation Protection and Maintenance Management are forming a group to address contaminated tool issues.
of more challenging
The current guidelines are under evaluation to include necessary enhancements identified by the Palo Verde corrective action program.
ALARA goals and more detailed pre-job briefings.
Radiation Protection Management has increased monitoring of this area to ensure improvements are effective.
However, a need exists for additional
t 9505020298 950427 PDR ADOCK 05000528 9
improvement
PDR
in radioactive
 
material and contamination
U. S. Nuclear Regulatory Commission
control.As stated by the NRC, although general housekeeping
~
was adequate, improvements
~
are necessary in staging and control of outage equipment and tools.Minor problems were observed in the control of trash and extra protective
ATlN: Document Control Desk Reply to NOV 50-528/95-07-01 Page 3 bcc:
clothing items.The inspectors
J. M. Levine (7602)
concluded that this area of the program needs additional
M. D. Shea (7297)
attention and that Radiation Protection
J. B. Steward (7902)
Technicians
J. P. Gaffney (7397)
should be more aggressive
A. K. Krainik (7636)
in their efforts to identify problems.ln an effort to improve radioactive
B. A. Grabo (7636)
material control, Radiation Protection
G. R. Overbeck (7602)
and Maintenance
J. C. Velotta (6156)
Management
C. K. Seaman (7992)
are forming a group to address contaminated
C. E. Williams (7992)
tool issues.The current guidelines
J. A. Scott (7295)
are under evaluation
J. H. Thompson (7602)
to include necessary enhancements
R. E. Younger (7997)
identified
T. R. Bradish (7962)
by the Palo Verde corrective
N. E. Meador (7636)
action program.Radiation Protection
P. M. Myers (7636)
Management
Source Document Library (7747)
has increased monitoring
 
of this area to ensure improvements
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Reply to NOV 50-528/95-07-01 Page 2 Should you have any questions, please contact Angela Krainik at (602) 393-5421.
are effective.
Sincerely,
t 9505020298
/I'/~
950427 PDR ADOCK 05000528 9 PDR  
RI5 WLS/AKK/RJH/pv
U.S.Nuclear Regulatory
 
Commission
==Enclosures:==
~~ATlN: Document Control Desk Reply to NOV 50-528/95-07-01
Restatement of Notice of Violation 2.
Page 3 bcc: J.M.Levine (7602)M.D.Shea (7297)J.B.Steward (7902)J.P.Gaffney (7397)A.K.Krainik (7636)B.A.Grabo (7636)G.R.Overbeck (7602)J.C.Velotta (6156)C.K.Seaman (7992)C.E.Williams (7992)J.A.Scott (7295)J.H.Thompson (7602)R.E.Younger (7997)T.R.Bradish (7962)N.E.Meador (7636)P.M.Myers (7636)Source Document Library (7747)  
Reply to Notice of Violation CC:
U.S.Nuclear Regulatory
L. J. Callan K. E. Perkins B. E. Holian K. E, Johnston
Commission
 
ATTN: Document Control Desk Reply to NOV 50-528/95-07-01
ENCLOSURE 1 RESTATEMENT OF NOTICE OF VIOLATION50-529/95%71 NRC INSPECTION CONDUCTED MARCH 6 THROUGH MARCH 10, 1995 INSPECTION REPORT NOs. 50-528/529/530/957
Page 2 Should you have any questions, please contact Angela Krainik at (602)393-5421.Sincerely,/I'/~RI5 WLS/AKK/R JH/pv Enclosures:
 
Restatement
Restatement of Notice of Violation 50-529 9&47%1 During an NRC inspection conducted on March 6 through March 10, 1995, one vio'lation of NRC requirements was identwed.
of Notice of Violation 2.Reply to Notice of Violation CC: L.J.Callan K.E.Perkins B.E.Holian K.E, Johnston  
ln accordance with the "General Statement of Policy and Procedures for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, the violation is listed below:
ENCLOSURE 1 RESTATEMENT
Section 6.8.1 of the Palo Verde, Unit 2, Technical Specifications states in part, that written procedures shall be established, implemented, and maintained covering the activities referenced in Regulatory Guide 1.33, Revision 2,
OF NOTICE OF VIOLATION 50-529/95%71
February 1978.
NRC INSPECTION
Appendix A, Section 7.e.(4) of Regulatory Guide 1.33 references contamination control.
CONDUCTED MARCH 6 THROUGH MARCH 10, 1995 INSPECTION
Palo Verde Radiation Protection procedure 75RP-ORP01, "Radiological Posting,"
REPORT NOs.50-528/529/530/957  
Revision 7, Section 3.5, requires that areas identified as having contamination levels greater than 100,000 disintegrations per minute per 100 square centimeters be posted with radiation warning sign(s) bearing the words: "Caution or Danger, High Contamination Area." Where practical, radiological hazard tape should be used to further define area boundaries.
Restatement
Contrary to the above, on March 8, 1995, the inspectors identified an unposted area on the 80-foot elevation of the Unit 2 containment building where contamination levels were as high as 150,000 disintegrations per minute per 100 square centimeters, This is a Severity Level IV violation, applicable to Unit 2 (Supplement IV)
of Notice of Violation 50-529 9&47%1 During an NRC inspection
(529/95-07-01).
conducted on March 6 through March 10, 1995, one vio'lation
Page1 of1
of NRC requirements
 
was identwed.ln accordance
ENCLOSURE 2 REPLY TO NOTICE OF VIOLATION50-529/95%7%1 NRC INSPECTION CONDUCTED MARCH 6 THROUGH MARCH 10, 4995 INSPECTION REPORT NOs. 50-528/529/530/95%7
with the"General Statement of Policy and Procedures
 
for NRC Enforcement
Actions," 10 CFR Part 2, Appendix C, the violation is listed below: Section 6.8.1 of the Palo Verde, Unit 2, Technical Specifications
states in part, that written procedures
shall be established, implemented, and maintained
covering the activities
referenced
in Regulatory
Guide 1.33, Revision 2, February 1978.Appendix A, Section 7.e.(4)of Regulatory
Guide 1.33 references
contamination
control.Palo Verde Radiation Protection
procedure 75RP-ORP01,"Radiological
Posting," Revision 7, Section 3.5, requires that areas identified
as having contamination
levels greater than 100,000 disintegrations
per minute per 100 square centimeters
be posted with radiation warning sign(s)bearing the words: "Caution or Danger, High Contamination
Area." Where practical, radiological
hazard tape should be used to further define area boundaries.
Contrary to the above, on March 8, 1995, the inspectors
identified
an unposted area on the 80-foot elevation of the Unit 2 containment
building where contamination
levels were as high as 150,000 disintegrations
per minute per 100 square centimeters, This is a Severity Level IV violation, applicable
to Unit 2 (Supplement
IV)(529/95-07-01).
Page1 of1  
ENCLOSURE 2 REPLY TO NOTICE OF VIOLATION 50-529/95%7%1
NRC INSPECTION
CONDUCTED MARCH 6 THROUGH MARCH 10, 4995 INSPECTION
REPORT NOs.50-528/529/530/95%7  
Re I to Notice of Violation 50-529 9&0MB Reason for the Violation APS admits the violation.
Re I to Notice of Violation 50-529 9&0MB Reason for the Violation APS admits the violation.
At the time of the inspection, Unit 2 was in a refueling outage, where ASME XI testing was performed on Safety Injection System valve 2JSIB-UV332, and the valve was returned to an operable condition.
At the time of the inspection, Unit 2 was in a refueling outage, where ASME XI testing was performed on Safety Injection System valve 2JSIB-UV332, and the valve was returned to an operable condition. The Radiation Protection Department performed the required weekly survey of the 80-foot containment which was posted as a contaminated area on March 3, 1995, at approximately 11:30 hours and found no leaks or high contamination levels in the general area of valve 2JSIB-UV332.
The Radiation Protection
On March 7, 1995, at approximately 16:22 hours the Shutdown Cooling (SDC) "B"train was placed in operation.
Department
On March 8, 1995, at approximately 16:00 hours the NRC inspector observed water leaking from valve 2JSIB-UV332, and subsequent survey results indicated that this was a
performed the required weekly survey of the 80-foot containment
high contamination area.
which was posted as a contaminated
The previous contamination survey performed on March 3, 1995, did not indicate any leaks on or around the area of valve 2JSIB-UV332.
area on March 3, 1995, at approximately
Additional surveys were performed on March 6th and 7th, 1995, by the Radiation Protection Operations Manager to verify a "Hot Spot" dose rate in close proximityto valve 2JSIB-UV332, and no leakage was identified during these surveys.
11:30 hours and found no leaks or high contamination
Therefore, it is concluded that the valve leak occurred at the approximate time the SDC train "B" was placed in service.
levels in the general area of valve 2JSIB-UV332.
The duration that this condition existed fell between the time that the SDC train "B"was placed in service on March 7, 1995, at 16:22 hours until the condition was Identified on March 8, 1995, at 16:00 hours, approximately 24 hours.
On March 7, 1995, at approximately
Page 1 of 4
16:22 hours the Shutdown Cooling (SDC)"B" train was placed in operation.
 
On March 8, 1995, at approximately
Radiation Protection Technicians missed an opportunity to identify the condition during routine Containment walkdowns which are conducted on a shiftly basis.
16:00 hours the NRC inspector observed water leaking from valve 2JSIB-UV332, and subsequent
The cause of this condition has been determined to be that management expectations were not met by "roving" Containment Radiation Protection Technicians to ensure that routine surveys provide the level of detail and are comprehensive in identifying changing plant conditions.
survey results indicated that this was a high contamination
Although Radiation Technicians typically tour all major elevations of Containment including the 80-foot elevation, no documentation existed to determine whether this particular area had been checked or toured on a shiftly basis during the time the valve was leaking.
area.The previous contamination
Corrective Actions Taken and Results Achlev d APS Radiation Protection initiated the following actions to immediately correct the condition:
survey performed on March 3, 1995, did not indicate any leaks on or around the area of valve 2JSIB-UV332.
~
Additional
The area was surveyed and posted as a High Contamination Area (HCA)~
surveys were performed on March 6th and 7th, 1995, by the Radiation Protection
~
Operations
A drip catch was installed under the valve to contain the leakage until the valve was repaired.
Manager to verify a"Hot Spot" dose rate in close proximity to valve 2JSIB-UV332, and no leakage was identified
~
during these surveys.Therefore, it is concluded that the valve leak occurred at the approximate
The area was decontaminated and released from HCA controls.
time the SDC train"B" was placed in service.The duration that this condition existed fell between the time that the SDC train"B" was placed in service on March 7, 1995, at 16:22 hours until the condition was Identified
~
on March 8, 1995, at 16:00 hours, approximately
Work request No. 887461 was generated to repair the valve.
24 hours.Page 1 of 4  
~
Radiation Protection
All elevations of the Unit 2 Containment (including grating) were surveyed for loose contamination.
Technicians
No other unposted areas were discovered that required HCA controls.
missed an opportunity
Page 2 of 4
to identify the condition during routine Containment
 
walkdowns which are conducted on a shiftly basis.The cause of this condition has been determined
~
to be that management
Night Order &#xb9;95-003 was generated to immediately to communicate Radiation Protection Management's expectations regarding "Roving" Radiation Protection duties in Containment.
expectations
The Radiation Protection Operations staff was briefed by management on March 9, 1995, regarding these expectations.
were not met by"roving" Containment
Corrective Actions That WIII Be Taken To Avoid Fu her Violations APS will implement the following actions to prevent recurrence:
Radiation Protection
Night Order &#xb9;95-003 was revised on April 21, 1995, to provide further clarification on management expectations for performing routine surveys, performing toursfinspections of plant areas, and personal accountability.
Technicians
The Radiation Protection Operations Department Leader distributed these expectations to each member of the Radiation Protection staff on April 21, 1995.
to ensure that routine surveys provide the level of detail and are comprehensive
This condition will be reviewed in Industry Events Training as part of the second quarter Radiation Protection Technician Continuing Training Program.
in identifying
As part of the review, Radiation Protection Management will re-enforce expectations for the "level of detail" and comprehensiveness that is expected when performing routine surveys and conducting shiftly tours or "roving" checks of plant areas.
changing plant conditions.
Page 3 of 4
Although Radiation Technicians
 
typically tour all major elevations
Date When Full Com llance Will Be Achieved Full compliance was achieved on March 8, 1995, when the area was surveved and posted as a HCA. The area was decontaminated and released from HCA controls on March 9, 1995.
of Containment
Page 4 of 4}}
including the 80-foot elevation, no documentation
existed to determine whether this particular
area had been checked or toured on a shiftly basis during the time the valve was leaking.Corrective
Actions Taken and Results Achlev d APS Radiation Protection
initiated the following actions to immediately
correct the condition:
~The area was surveyed and posted as a High Contamination
Area (HCA)~~A drip catch was installed under the valve to contain the leakage until the valve was repaired.~The area was decontaminated
and released from HCA controls.~Work request No.887461 was generated to repair the valve.~All elevations
of the Unit 2 Containment (including
grating)were surveyed for loose contamination.
No other unposted areas were discovered
that required HCA controls.Page 2 of 4  
~Night Order&#xb9;95-003 was generated to immediately
to communicate
Radiation Protection
Management's
expectations
regarding"Roving" Radiation Protection
duties in Containment.
The Radiation Protection
Operations
staff was briefed by management
on March 9, 1995, regarding these expectations.
Corrective
Actions That WIII Be Taken To Avoid Fu her Violations
APS will implement the following actions to prevent recurrence:
Night Order&#xb9;95-003 was revised on April 21, 1995, to provide further clarification
on management
expectations
for performing
routine surveys, performing
toursfinspections
of plant areas, and personal accountability.
The Radiation Protection
Operations
Department
Leader distributed
these expectations
to each member of the Radiation Protection
staff on April 21, 1995.This condition will be reviewed in Industry Events Training as part of the second quarter Radiation Protection
Technician
Continuing
Training Program.As part of the review, Radiation Protection
Management
will re-enforce
expectations
for the"level of detail" and comprehensiveness
that is expected when performing
routine surveys and conducting
shiftly tours or"roving" checks of plant areas.Page 3 of 4  
Date When Full Com llance Will Be Achieved Full compliance
was achieved on March 8, 1995, when the area was surveved and posted as a HCA.The area was decontaminated
and released from HCA controls on March 9, 1995.Page 4 of 4
}}

Latest revision as of 00:23, 8 January 2025

Forwards Response to NRC Re Violations Noted in Insp Repts 50-528/95-07-01,50-529/95-07-01 & 50-530/95-07-01 on 950306-10.Corrective Actions:Surveyed Area & Posted as High Contamination Area
ML17311A832
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/27/1995
From: Stewart W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9505020298
Download: ML17311A832 (11)


Text

F a.roarWv (AC(.ELI'.RATEDI'll)(iI'l<OC:I:.SSli('3 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CCESSION NBR:9505020298 DOC.DATE: 95/04/27 NOTARIZED: NO DOCKET N

FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION F

STEWART,W.L.

Arizona Public Service Co.

(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

F

SUBJECT:

Forwards response to NRC 950410 ltr re violations noted in insp repts 50-528/95-07-01,50-529/95-07-01

& 50-530/95-07-01 on 950306-10.Corrective actions:surveyed area

& posted as high contamination area.

DISTRIBUTION CODE:

IEOID COPIES RECEIVED:LTRI ENCL I

SIZE:

/

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:STANDARDIZED PLANT Standardized plant.

Standardized plant.

05000528 I

05000529 05000530 RECIPIENT ID CODE/NAME PD4-2 PD TRAN,L ERNAL: ACRS AEOD/SPD/RAB AEOD/TTC gZM CENTER P NRR/DORS/OEAB'UDOCS-ABSTRACT OGC/HDS2 EXTERNAL: LITCO BRYCE,J H

NRC PDR COPIES LTTR ENCL 1

1 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME HOLIAN, B THOMAS, C AEOD/DEIB AEOD/SPD/RRAB DEDRO NRR/DISP/PI PB NRR/DRCH/HHFB OE DIR RGN4 FILE 01 NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 D

U iO'I'I I 0 Al.l."RlDS" Rl:.Cll'II'.i'I'S PI.L:XSI: III I.P I'S 'I'0 ICFDL'CI:. (i';X&'I'I.!CONT%( I"I'III: DOC('),Ilii"I'OiTIZOI.

DESK. IZOOil I'I 37 (I".Xl:5&4.'(h33 ('I'0 I:I.I!1lli:X'I'I'.YOl'liX'Aill I'ROTI DIS'I'RIIIL"I'ION I.IS'I'S I'OR D()('.I'ill'.i'I'S5 ()( ')ON"I'l;I'.I)'

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL 22

Arizona Public Service Companv 10CFR2.201 102-03335-WLS/AKK/RJH April 27, 1995 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001

Dear Sirs:

SubJect:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Reply to Notice of Violation 50-528/529/530/9&071 Arizona Public Service Company (APS) has reviewed NRC Inspection Report 50-528/529/530/95-07 and the Notice of Violation (NOV) dated April 10, 1995.

Pursuant to the provisions of 10 CFR 2.201, APS'esponse is enclosed.

Enclosure 1 to this letter is a restatement of the NOV. APS'esponse is provided in Enclosure 2.

This NRC inspection focused on radiation protection activities associated with the Unit 2 Refueling Outage. The NRC inspectors noted that the APS Radiation Protection program was satisfactory overall to support outage related activities and noted improvements in establishment of more challenging ALARA goals and more detailed pre-job briefings.

However, a

need exists for additional improvement in radioactive material and contamination control.

As stated by the NRC, although general housekeeping was adequate, improvements are necessary in staging and control of outage equipment and tools. Minor problems were observed in the control of trash and extra protective clothing items. The inspectors concluded that this area of the program needs additional attention and that Radiation Protection Technicians should be more aggressive in their efforts to identify problems.

ln an effort to improve radioactive material control, Radiation Protection and Maintenance Management are forming a group to address contaminated tool issues.

The current guidelines are under evaluation to include necessary enhancements identified by the Palo Verde corrective action program.

Radiation Protection Management has increased monitoring of this area to ensure improvements are effective.

t 9505020298 950427 PDR ADOCK 05000528 9

PDR

U. S. Nuclear Regulatory Commission

~

~

ATlN: Document Control Desk Reply to NOV 50-528/95-07-01 Page 3 bcc:

J. M. Levine (7602)

M. D. Shea (7297)

J. B. Steward (7902)

J. P. Gaffney (7397)

A. K. Krainik (7636)

B. A. Grabo (7636)

G. R. Overbeck (7602)

J. C. Velotta (6156)

C. K. Seaman (7992)

C. E. Williams (7992)

J. A. Scott (7295)

J. H. Thompson (7602)

R. E. Younger (7997)

T. R. Bradish (7962)

N. E. Meador (7636)

P. M. Myers (7636)

Source Document Library (7747)

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Reply to NOV 50-528/95-07-01 Page 2 Should you have any questions, please contact Angela Krainik at (602) 393-5421.

Sincerely,

/I'/~

RI5 WLS/AKK/RJH/pv

Enclosures:

Restatement of Notice of Violation 2.

Reply to Notice of Violation CC:

L. J. Callan K. E. Perkins B. E. Holian K. E, Johnston

ENCLOSURE 1 RESTATEMENT OF NOTICE OF VIOLATION50-529/95%71 NRC INSPECTION CONDUCTED MARCH 6 THROUGH MARCH 10, 1995 INSPECTION REPORT NOs. 50-528/529/530/957

Restatement of Notice of Violation 50-529 9&47%1 During an NRC inspection conducted on March 6 through March 10, 1995, one vio'lation of NRC requirements was identwed.

ln accordance with the "General Statement of Policy and Procedures for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, the violation is listed below:

Section 6.8.1 of the Palo Verde, Unit 2, Technical Specifications states in part, that written procedures shall be established, implemented, and maintained covering the activities referenced in Regulatory Guide 1.33, Revision 2,

February 1978.

Appendix A, Section 7.e.(4) of Regulatory Guide 1.33 references contamination control.

Palo Verde Radiation Protection procedure 75RP-ORP01, "Radiological Posting,"

Revision 7, Section 3.5, requires that areas identified as having contamination levels greater than 100,000 disintegrations per minute per 100 square centimeters be posted with radiation warning sign(s) bearing the words: "Caution or Danger, High Contamination Area." Where practical, radiological hazard tape should be used to further define area boundaries.

Contrary to the above, on March 8, 1995, the inspectors identified an unposted area on the 80-foot elevation of the Unit 2 containment building where contamination levels were as high as 150,000 disintegrations per minute per 100 square centimeters, This is a Severity Level IV violation, applicable to Unit 2 (Supplement IV)

(529/95-07-01).

Page1 of1

ENCLOSURE 2 REPLY TO NOTICE OF VIOLATION50-529/95%7%1 NRC INSPECTION CONDUCTED MARCH 6 THROUGH MARCH 10, 4995 INSPECTION REPORT NOs. 50-528/529/530/95%7

Re I to Notice of Violation 50-529 9&0MB Reason for the Violation APS admits the violation.

At the time of the inspection, Unit 2 was in a refueling outage, where ASME XI testing was performed on Safety Injection System valve 2JSIB-UV332, and the valve was returned to an operable condition. The Radiation Protection Department performed the required weekly survey of the 80-foot containment which was posted as a contaminated area on March 3, 1995, at approximately 11:30 hours and found no leaks or high contamination levels in the general area of valve 2JSIB-UV332.

On March 7, 1995, at approximately 16:22 hours the Shutdown Cooling (SDC) "B"train was placed in operation.

On March 8, 1995, at approximately 16:00 hours the NRC inspector observed water leaking from valve 2JSIB-UV332, and subsequent survey results indicated that this was a

high contamination area.

The previous contamination survey performed on March 3, 1995, did not indicate any leaks on or around the area of valve 2JSIB-UV332.

Additional surveys were performed on March 6th and 7th, 1995, by the Radiation Protection Operations Manager to verify a "Hot Spot" dose rate in close proximityto valve 2JSIB-UV332, and no leakage was identified during these surveys.

Therefore, it is concluded that the valve leak occurred at the approximate time the SDC train "B" was placed in service.

The duration that this condition existed fell between the time that the SDC train "B"was placed in service on March 7, 1995, at 16:22 hours until the condition was Identified on March 8, 1995, at 16:00 hours, approximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Page 1 of 4

Radiation Protection Technicians missed an opportunity to identify the condition during routine Containment walkdowns which are conducted on a shiftly basis.

The cause of this condition has been determined to be that management expectations were not met by "roving" Containment Radiation Protection Technicians to ensure that routine surveys provide the level of detail and are comprehensive in identifying changing plant conditions.

Although Radiation Technicians typically tour all major elevations of Containment including the 80-foot elevation, no documentation existed to determine whether this particular area had been checked or toured on a shiftly basis during the time the valve was leaking.

Corrective Actions Taken and Results Achlev d APS Radiation Protection initiated the following actions to immediately correct the condition:

~

The area was surveyed and posted as a High Contamination Area (HCA)~

~

A drip catch was installed under the valve to contain the leakage until the valve was repaired.

~

The area was decontaminated and released from HCA controls.

~

Work request No. 887461 was generated to repair the valve.

~

All elevations of the Unit 2 Containment (including grating) were surveyed for loose contamination.

No other unposted areas were discovered that required HCA controls.

Page 2 of 4

~

Night Order ¹95-003 was generated to immediately to communicate Radiation Protection Management's expectations regarding "Roving" Radiation Protection duties in Containment.

The Radiation Protection Operations staff was briefed by management on March 9, 1995, regarding these expectations.

Corrective Actions That WIII Be Taken To Avoid Fu her Violations APS will implement the following actions to prevent recurrence:

Night Order ¹95-003 was revised on April 21, 1995, to provide further clarification on management expectations for performing routine surveys, performing toursfinspections of plant areas, and personal accountability.

The Radiation Protection Operations Department Leader distributed these expectations to each member of the Radiation Protection staff on April 21, 1995.

This condition will be reviewed in Industry Events Training as part of the second quarter Radiation Protection Technician Continuing Training Program.

As part of the review, Radiation Protection Management will re-enforce expectations for the "level of detail" and comprehensiveness that is expected when performing routine surveys and conducting shiftly tours or "roving" checks of plant areas.

Page 3 of 4

Date When Full Com llance Will Be Achieved Full compliance was achieved on March 8, 1995, when the area was surveved and posted as a HCA. The area was decontaminated and released from HCA controls on March 9, 1995.

Page 4 of 4