ML18068A070: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18068A070
| number = ML18068A070
| issue date = 03/09/2018
| issue date = 03/09/2018
| title = 2018/03/09 Clinch River ESP Saf - Email Capture Address for Correspondence with TVA on the Clinch River ESP
| title = Clinch River ESP Saf - Email Capture Address for Correspondence with TVA on the Clinch River ESP
| author name =  
| author name =  
| author affiliation = NRC
| author affiliation = NRC
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 ClinchRiverESPSafPEm Resource From: Keim, Andrea Sent: Friday, March 09, 2018 9:04 AM To: Fetter, Allen; rjschiele@tva.gov Cc: ClinchRiverESPSafPEm Resource; Savw oir, Nicholas; Natividad, Phil; olivier.lareynie@asn.fr; Galletti, Greg
{{#Wiki_filter:1 ClinchRiverESPSafPEm Resource From:
Keim, Andrea Sent:
Friday, March 09, 2018 9:04 AM To:
Fetter, Allen; rjschiele@tva.gov Cc:
ClinchRiverESPSafPEm Resource; Savwoir, Nicholas; Natividad, Phil; olivier.lareynie@asn.fr; Galletti, Greg


==Subject:==
==Subject:==
RE: Email capture address for corresponden ce with TVA on the Clinch River ESPHi Ray, As discussed in a phone call on March 8, 2018. NRC QA Implementation Inspection Planned for April 16 - 20, 2018. Entrance meeting tentatively scheduled for Monday, April 16, 2018 at 2:00PM.
RE: Email capture address for correspondence with TVA on the Clinch River ESP Hi Ray, As discussed in a phone call on March 8, 2018.
Web site for NRC Inspection Manual Chapters and Inspection Procedures for QA Implementation Inspection (IMC 2501, IP 350017, IP36100) https://www.nrc.gov/reactors/new-reactors/oversi ght/quality-assurance/qual-assure-license.html Prior to inspection (if available electronically)
NRC QA Implementation Inspection Planned for April 16 - 20, 2018.
* List of Corporate, Nuclear Power Group and Clinch River Procedures by name used to support the ESP and NQAP.
Entrance meeting tentatively scheduled for Monday, April 16, 2018 at 2:00PM.
* NEPD-2
Web site for NRC Inspection Manual Chapters and Inspection Procedures for QA Implementation Inspection (IMC 2501, IP 350017, IP36100) https://www.nrc.gov/reactors/new-reactors/oversight/quality-assurance/qual-assure-license.html Prior to inspection (if available electronically)
* NEPD-5
List of Corporate, Nuclear Power Group and Clinch River Procedures by name used to support the ESP and NQAP.
* NEPD-6
NEPD-2 NEPD-5 NEPD-6 NEPD-8 NPG-SPP-22.300 NPG-SPP-09.0 NPG-SPP-12-7 NPG-SPP-03-16 NPG-SPP-06.6.2 NPG-SPP-31.2 NPG-SPP-32.2 SMRDP-1 SMRDP-2 SMRDP-11 Implementing Procedures for the following:
* NEPD-8
Part 21 Software Implementation/Procedure Manual or Software Program Manual Design Control Procurement Document Control Instructions Procedures and Drawings Document Control Control of Purchased Material Equipment, and Services  
* NPG-SPP- 22.300
* NPG-SPP-09.0
* NPG-SPP-12-7
* NPG-SPP-03-16
* NPG-SPP-06.6.2
* NPG-SPP-31.2
* NPG-SPP-32.2
* SMRDP-1
* SMRDP-2
* SMRDP-11 Implementing Procedures for the following:
* Part 21
* Software Implementation/Procedure Manual or Software Program Manual
* Design Control
* Procurement Document Control
* Instructions Procedures and Drawings
* Document Control
* Control of Purchased Material Equipment, and Services 2* Inspections
* Test Control
* Nonconforming Material Parts or Components
* Corrective Actions
* Quality Assurance Records
* Audits
* Schedule and Itinerary of Clinch River Nuclear Site meetings the week of April 16-20
* List of Internal and External Audits from past 3 years
* Current Schedule of Audits
* ASL for Clinch River Nuclear Site
* List of Nonconformances and corrective action reports from the last 2 years Have on-site
* QA Manual and Implementing procedures
* Clinch River Org Chart
* List of Personnel/POCs and contact numbers to reach during the inspection
* Updated schedule of Clinch River meetings during the inspection.
* Current contracts with entities performing safety related work at Clinch River Nuclear Site in support of ESPA  Thank you. We look forward to your cooperation.


2 Inspections Test Control Nonconforming Material Parts or Components Corrective Actions Quality Assurance Records Audits Schedule and Itinerary of Clinch River Nuclear Site meetings the week of April 16-20 List of Internal and External Audits from past 3 years Current Schedule of Audits ASL for Clinch River Nuclear Site List of Nonconformances and corrective action reports from the last 2 years Have on-site QA Manual and Implementing procedures Clinch River Org Chart List of Personnel/POCs and contact numbers to reach during the inspection Updated schedule of Clinch River meetings during the inspection.
Current contracts with entities performing safety related work at Clinch River Nuclear Site in support of ESPA Thank you. We look forward to your cooperation.
Andrea Keim Reactor Operations Engineer NRO/DCIP/QVIB-2 301-415-1671  
Andrea Keim Reactor Operations Engineer NRO/DCIP/QVIB-2 301-415-1671  


Hearing Identifier: ClinchRiver_ESP_SafDocs_Public Email Number: 8   Mail Envelope Properties   (DM5PR0901MB22167E39A189571386EE52CAECDE0)
Hearing Identifier:
ClinchRiver_ESP_SafDocs_Public Email Number:
8 Mail Envelope Properties (DM5PR0901MB22167E39A189571386EE52CAECDE0)  


==Subject:==
==Subject:==
RE: Email capture address for correspondence with TVA on the Clinch River ESP Sent Date:   3/9/2018 9:03:49 AM Received Date: 3/9/2018 9:04:00 AM From:   Keim, Andrea Created By:   Andrea.Keim@nrc.gov Recipients:     "ClinchRiverESPSafPEm Resource" <ClinchRiverESPSafPEm.Resource@nrc.gov> Tracking Status: None "Savwoir, Nicholas" <Nicholas.Savwoir@nrc.gov> Tracking Status: None "Natividad, Phil" <Phil.Natividad@nrc.gov>
RE: Email capture address for correspondence with TVA on the Clinch River ESP Sent Date:
Tracking Status: None "olivier.lareynie@asn.fr" <o livier.lareynie@asn.fr> Tracking Status: None "Galletti, Greg" <Greg.Galletti@nrc.gov> Tracking Status: None "Fetter, Allen" <Allen.Fetter@nrc.gov>
3/9/2018 9:03:49 AM Received Date:
Tracking Status: None "rjschiele@tva.gov" <rjschiele@tva.gov> Tracking Status: None  
3/9/2018 9:04:00 AM From:
 
Keim, Andrea Created By:
Post Office:   DM5PR0901MB2216.namprd09.prod.outlook.com
Andrea.Keim@nrc.gov Recipients:  
 
"ClinchRiverESPSafPEm Resource" <ClinchRiverESPSafPEm.Resource@nrc.gov>
Files     Size     Date & Time MESSAGE   2470     3/9/2018 9:04:00 AM
Tracking Status: None "Savwoir, Nicholas" <Nicholas.Savwoir@nrc.gov>
 
Tracking Status: None "Natividad, Phil" <Phil.Natividad@nrc.gov>
Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Tracking Status: None "olivier.lareynie@asn.fr" <olivier.lareynie@asn.fr>
Tracking Status: None "Galletti, Greg" <Greg.Galletti@nrc.gov>
Tracking Status: None "Fetter, Allen" <Allen.Fetter@nrc.gov>
Tracking Status: None "rjschiele@tva.gov" <rjschiele@tva.gov>
Tracking Status: None Post Office:
DM5PR0901MB2216.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2470 3/9/2018 9:04:00 AM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:}}

Latest revision as of 06:39, 6 January 2025

Clinch River ESP Saf - Email Capture Address for Correspondence with TVA on the Clinch River ESP
ML18068A070
Person / Time
Site: Clinch River
Issue date: 03/09/2018
From:
NRC
To:
NRC/NRO/DNRL/EPB
References
Download: ML18068A070 (3)


Text

1 ClinchRiverESPSafPEm Resource From:

Keim, Andrea Sent:

Friday, March 09, 2018 9:04 AM To:

Fetter, Allen; rjschiele@tva.gov Cc:

ClinchRiverESPSafPEm Resource; Savwoir, Nicholas; Natividad, Phil; olivier.lareynie@asn.fr; Galletti, Greg

Subject:

RE: Email capture address for correspondence with TVA on the Clinch River ESP Hi Ray, As discussed in a phone call on March 8, 2018.

NRC QA Implementation Inspection Planned for April 16 - 20, 2018.

Entrance meeting tentatively scheduled for Monday, April 16, 2018 at 2:00PM.

Web site for NRC Inspection Manual Chapters and Inspection Procedures for QA Implementation Inspection (IMC 2501, IP 350017, IP36100) https://www.nrc.gov/reactors/new-reactors/oversight/quality-assurance/qual-assure-license.html Prior to inspection (if available electronically)

List of Corporate, Nuclear Power Group and Clinch River Procedures by name used to support the ESP and NQAP.

NEPD-2 NEPD-5 NEPD-6 NEPD-8 NPG-SPP-22.300 NPG-SPP-09.0 NPG-SPP-12-7 NPG-SPP-03-16 NPG-SPP-06.6.2 NPG-SPP-31.2 NPG-SPP-32.2 SMRDP-1 SMRDP-2 SMRDP-11 Implementing Procedures for the following:

Part 21 Software Implementation/Procedure Manual or Software Program Manual Design Control Procurement Document Control Instructions Procedures and Drawings Document Control Control of Purchased Material Equipment, and Services

2 Inspections Test Control Nonconforming Material Parts or Components Corrective Actions Quality Assurance Records Audits Schedule and Itinerary of Clinch River Nuclear Site meetings the week of April 16-20 List of Internal and External Audits from past 3 years Current Schedule of Audits ASL for Clinch River Nuclear Site List of Nonconformances and corrective action reports from the last 2 years Have on-site QA Manual and Implementing procedures Clinch River Org Chart List of Personnel/POCs and contact numbers to reach during the inspection Updated schedule of Clinch River meetings during the inspection.

Current contracts with entities performing safety related work at Clinch River Nuclear Site in support of ESPA Thank you. We look forward to your cooperation.

Andrea Keim Reactor Operations Engineer NRO/DCIP/QVIB-2 301-415-1671

Hearing Identifier:

ClinchRiver_ESP_SafDocs_Public Email Number:

8 Mail Envelope Properties (DM5PR0901MB22167E39A189571386EE52CAECDE0)

Subject:

RE: Email capture address for correspondence with TVA on the Clinch River ESP Sent Date:

3/9/2018 9:03:49 AM Received Date:

3/9/2018 9:04:00 AM From:

Keim, Andrea Created By:

Andrea.Keim@nrc.gov Recipients:

"ClinchRiverESPSafPEm Resource" <ClinchRiverESPSafPEm.Resource@nrc.gov>

Tracking Status: None "Savwoir, Nicholas" <Nicholas.Savwoir@nrc.gov>

Tracking Status: None "Natividad, Phil" <Phil.Natividad@nrc.gov>

Tracking Status: None "olivier.lareynie@asn.fr" <olivier.lareynie@asn.fr>

Tracking Status: None "Galletti, Greg" <Greg.Galletti@nrc.gov>

Tracking Status: None "Fetter, Allen" <Allen.Fetter@nrc.gov>

Tracking Status: None "rjschiele@tva.gov" <rjschiele@tva.gov>

Tracking Status: None Post Office:

DM5PR0901MB2216.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2470 3/9/2018 9:04:00 AM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received: