ML18095A694: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/29/2018
| issue date = 03/29/2018
| title = ISG-06 NRC Tabletop Prep
| title = ISG-06 NRC Tabletop Prep
| author name = Golla J A
| author name = Golla J
| author affiliation = NRC/NRR/DLP/PLPB
| author affiliation = NRC/NRR/DLP/PLPB
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket =  
| docket =  
| license number =  
| license number =  
| contact person = Golla J A
| contact person = Golla J
| document type = - No Document Type Applies
| document type = - No Document Type Applies
| page count = 1
| page count = 1
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Proposed MP4 ISG-06 R2 NRC Tabletop Content Prep 3/29/2018 ISG-06 Section Content Assigned C.2.2.1 Vendor Oversight Plan (VOP)
Description VOP Ray/Neil/Steve/Ron C.2.2.3 Appropriate Licensee Commitments in Consideration of Early License Amendment Issuance Sample commitments NRC C.2.3 Pre-Application Coordination meetings PPT Pareez D.2.2 New System Architecture Drawings and text Warren/Pareez D.4 I&C System Development Processes PPT and LAR statements Pareez D.5.1.2 Resolution of Topical Report Plant-Specific Action Items Statements Dave Hooten D.8 Secure Development and Operational Environment Statement Dave Herrell Lessons learned from Oconee / Diablo Canyon
+
Mark functions design basis table PPT & Table Mark AR Process SER Inspection items Sample inspection items NRC}}

Latest revision as of 02:59, 6 January 2025

ISG-06 NRC Tabletop Prep
ML18095A694
Person / Time
Issue date: 03/29/2018
From: Joe Golla
NRC/NRR/DLP/PLPB
To:
Golla J
References
Download: ML18095A694 (1)


Text

Proposed MP4 ISG-06 R2 NRC Tabletop Content Prep 3/29/2018 ISG-06 Section Content Assigned C.2.2.1 Vendor Oversight Plan (VOP)

Description VOP Ray/Neil/Steve/Ron C.2.2.3 Appropriate Licensee Commitments in Consideration of Early License Amendment Issuance Sample commitments NRC C.2.3 Pre-Application Coordination meetings PPT Pareez D.2.2 New System Architecture Drawings and text Warren/Pareez D.4 I&C System Development Processes PPT and LAR statements Pareez D.5.1.2 Resolution of Topical Report Plant-Specific Action Items Statements Dave Hooten D.8 Secure Development and Operational Environment Statement Dave Herrell Lessons learned from Oconee / Diablo Canyon

+

Mark functions design basis table PPT & Table Mark AR Process SER Inspection items Sample inspection items NRC