Line 3: Line 3:
| issue date = 03/03/2008
| issue date = 03/03/2008
| title = 2007 Annual Assessment Letter - Seabrook Station 05000443-08-001)
| title = 2007 Annual Assessment Letter - Seabrook Station 05000443-08-001)
| author name = Burritt A L
| author name = Burritt A
| author affiliation = NRC/RGN-I/DRP/PB3
| author affiliation = NRC/RGN-I/DRP/PB3
| addressee name = St.Pierre G
| addressee name = St.Pierre G
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:March 3, 2008
[[Issue date::March 3, 2008]]


Mr. Gene S Site Vice President FPL Energy Seabrook, LLC Seabrook Station c/o Mr. James M. Peschel P.O. Box 300 Seabrook, NH 03874
==SUBJECT:==
 
ANNUAL ASSESSMENT LETTER - SEABROOK STATION (05000443/2008001)
SUBJECT: ANNUAL ASSESSMENT LETTER - SEABROOK STATION (05000443/2008001)


==Dear Mr. St. Pierre:==
==Dear Mr. St. Pierre:==
Line 30: Line 28:
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the Security cornerstone review and resultant inspection plan.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the Security cornerstone review and resultant inspection plan.


Overall, Seabrook operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC
Overall, Seabrook operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan to conduct inspections to review corrective actions to address alloy 82/182 pressurizer butt welds, containment sump modifications and preoperational testing and operation of your independent spent fuel storage installation.
=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan to conduct inspections to review corrective actions to address alloy 82/182 pressurizer butt welds, containment sump modifications and preoperational testing and operation of your independent spent fuel storage installation.
 
The enclosed inspection plan details the inspections, less those related to security scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.


The enclosed inspection plan details the inspections, less those related to security scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.
Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.


G. S In accordance with 10 CFR 2.390 of the NRC
G. S In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


If circumstances arise that cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5069 with any questions you may have regarding this letter or the inspection plan.
If circumstances arise that cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5069 with any questions you may have regarding this letter or the inspection plan.


Sincerely,/RA/
Sincerely,
Arthur L. Burritt, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 50-443 License Nos. NPF-86  
/RA/  
 
Arthur L. Burritt, Chief  
 
Reactor Projects Branch 3  
 
Division of Reactor Projects  
 
Docket Nos. 50-443 License Nos. NPF-86  
 
Enclosure: Seabrook Station Inspection/ Activity Plan
 
cc w/encl:
J. A. Stall, FPL Senior Vice President, Nuclear & CNO M. Warner, Vice President, Nuclear Operations R. S. Kundalkar, FPL Vice President, Nuclear Technical Svcs M. Mashhadi, Senior Attorney, Florida Power & Light Company M. S. Ross, Managing Attorney, Florida Power & Light Company J. M. Peschel, Manager, Regulatory Programs P. Freeman, Plant General Manager K. Wright, Manager, Nuclear Training, Seabrook Station R. Poole, FEMA, Region I Office of the Attorney General, Commonwealth of Mass K. Ayotte, Attorney General, State of NH O. Fitch, Deputy Attorney General, State of NH P. Brann, Assistant Attorney General, State of Maine R. Walker, Director, Radiation Control Program, Dept. of Public Health, Commonwealth of MA C. Pope, Director, Homeland Security & Emergency Management, State of NH J. Giarrusso, MEMA, Commonwealth of Mass D. O'Dowd, Administrator, Radiological Health Section, DPHS, DHHS, State of NH J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company T. Crimmins, Polestar Applied Technology R. Backus, Esquire, Backus, Meyer and Solomon, NH Town of Exeter, State of New Hampshire Board of Selectmen, Town of Amesbury S. Comley, Executive Director, We the People of the United States R. Shadis, New England Coalition Staff M. Metcalf, Seacoast Anti-Pollution League Institute of Nuclear Power Operations (INPO)


===Enclosure:===
Seabrook Station Inspection/ Activity Plan cc w/encl: J. A. Stall, FPL Senior Vice President, Nuclear & CNO M. Warner, Vice President, Nuclear Operations R. S. Kundalkar, FPL Vice President, Nuclear Technical Svcs M. Mashhadi, Senior Attorney, Florida Power & Light Company M. S. Ross, Managing Attorney, Florida Power & Light Company J. M. Peschel, Manager, Regulatory Programs P. Freeman, Plant General Manager K. Wright, Manager, Nuclear Training, Seabrook Station R. Poole, FEMA, Region I Office of the Attorney General, Commonwealth of Mass K. Ayotte, Attorney General, State of NH O. Fitch, Deputy Attorney General, State of NH P. Brann, Assistant Attorney General, State of Maine R. Walker, Director, Radiation Control Program, Dept. of Public Health, Commonwealth of MA C. Pope, Director, Homeland Security & Emergency Management, State of NH J. Giarrusso, MEMA, Commonwealth of Mass D. O'Dowd, Administrator, Radiological Health Section, DPHS, DHHS, State of NH J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company T. Crimmins, Polestar Applied Technology R. Backus, Esquire, Backus, Meyer and Solomon, NH Town of Exeter, State of New Hampshire Board of Selectmen, Town of Amesbury S. Comley, Executive Director, We the People of the United States R. Shadis, New England Coalition Staff M. Metcalf, Seacoast Anti-Pollution League Institute of Nuclear Power Operations (INPO)
G. S If circumstances arise that cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5069 with any questions you may have regarding this letter or the inspection plan.
G. S If circumstances arise that cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5069 with any questions you may have regarding this letter or the inspection plan.


Sincerely,Arthur L. Burritt, Chief Reactor Projects Branch 3 Division of Reactor Projects  
Sincerely, Arthur L. Burritt, Chief Reactor Projects Branch 3  
 
Division of Reactor Projects  
 
Distribution w/encl: (via e-mail)
S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP A. Burritt, DRP L. Cline, DRP W. Raymond, DRP, Sr. Resident Inspector P. Presby, DRP, Actg Resident Inspector M. Gamberoni, DRS D. Roberts, DRS D. Screnci, PLO N. Sheehan, PLO DRS Branch Chiefs G. West, RI OEDO H. Chernoff, NRR J. Lubinski, NRR E. Miller, NRR, PM R. Ennis, NRR, Backup T. Valentine, NRR Region I Docket Room (with concurrences)
JWT1@nrc.gov
 
RidsNrrDirslpab@nrc.gov ROPreports@nrc.gov
 
SUNSI REVIEW COMPLETE: _LC____(Reviewers Initials)
 
DOCUMENT NAME: S:\\ROP-8 EOC REVIEW\\ANNUAL ASSESSMENT LETTERS\\BRANCH 3\\SEABROOK EOC LETTER.DOC
 
After declaring this document An Official Agency Record it will be released to the Public.
 
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy
 
ML080600389 OFFICE RI/DRP
 
RI/DRP
 
NAME LCline/ LC ABurritt/ ALB DATE 02/ 26/08 02/27/08
 
Seabrook Inspection / Activity Plan 01/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 02/28/2008 10:25:41 Report 22
 
7112101
- OCC RAD SAFETY - ACCESS Baseline Inspections Access Control to Radiologically Significant Areas 01/14/2008 01/18/2008
 
7112101 IP
 
ISFSI
- ISFSI INSPECTIONS Other Routine Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 01/28/2008 10/31/2008
 
60854.1 IP Other Routine Operation of an Independent Spent Fuel Storage Installation at Operating Plants 01/28/2008 10/31/2008
 
60855.1 IP
 
7112102
- OCC RAD SAFETY - ALARA Baseline Inspections ALARA Planning and Controls 04/14/2008 04/18/2008
 
7112102 IP
 
7111108P
- INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 04/14/2008 04/18/2008
 
7111108P IP
 
TI-172
- TI-172 RCS DISSIMILIAR METAL WELDS Generic Safety Inspectio Reactor Coolant System Dissimiliar Metal Butt Welds 04/14/2008 04/18/2008
 
2515/172 IP
 
7111108P
- INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 04/21/2008 04/25/2008
 
7111108P IP
 
TI-166
- CONTAINMENT SUMP MODIFICATIONS Safety Issues Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
04/21/2008 04/25/2008
 
2515/166 IP
 
TRI FIRE
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections Fire Protection [Triennial]
07/14/2008 07/18/2008
 
7111105T IP Baseline Inspections Fire Protection [Triennial]
07/28/2008 08/01/2008
 
7111105T IP
 
7112202
- PUB RAD SAFETY - RADWASTE Baseline Inspections Radioactive Material Processing and Transportation 09/29/2008 10/03/2008
 
7112202 IP
 
TI 171
- TI 171 Generic Safety Inspectio Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 10/20/2008 10/24/2008
 
2515/171 IP
 
7112103
- OCC RAD SAFETY - INSTRUMENTS Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 11/03/2008 11/07/2008
 
7112103 IP
 
EP
- EP EXERCISE EVALUATION EP Baseline Inspection Exercise Evaluation 11/03/2008 11/07/2008
 
7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 11/03/2008 11/07/2008
 
7111404 IP Baseline Inspections Drill/Exercise Performance 11/03/2008 11/07/2008
 
71151-EP01 IP Baseline Inspections ERO Drill Participation 11/03/2008 11/07/2008
 
71151-EP02 IP Baseline Inspections Alert & Notification System 11/03/2008 11/07/2008
 
71151-EP03 IP
 
71152B
- PI&R Baseline Inspections Identification and Resolution of Problems 11/17/2008 11/21/2008
 
71152B IP Baseline Inspections Identification and Resolution of Problems 12/01/2008 12/05/2008
 
71152B IP


Distribution w/encl:
71121
(via e-mail)
- OCC RAD SAFETY Baseline Inspections Access Control to Radiologically Significant Areas 01/26/2009 01/30/2009
S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP A. Burritt, DRP L. Cline, DRP W. Raymond, DRP, Sr. Resident Inspector P. Presby, DRP, Actg Resident Inspector M. Gamberoni, DRS D. Roberts, DRS D. Screnci, PLO N. Sheehan, PLO DRS Branch Chiefs G. West, RI OEDO H. Chernoff, NRR J. Lubinski, NRR E. Miller, NRR, PM R. Ennis, NRR, Backup T. Valentine, NRR Region I Docket Room (with concurrences) JWT1@nrc.gov RidsNrrDirslpab@nrc.gov ROPreports@nrc.gov


SUNSI REVIEW COMPLETE: _LC____(Reviewer's Initials)
7112101 IP This report does not include INPO and OUTAGE activities.
DOCUMENT NAME: S:\ROP-8 EOC REVIEW\ANNUAL ASSESSMENT LETTERS\BRANCH 3\SEABROOK EOC LETTER.DOC After declaring this document "An Official Agency Record" it will be released to the Public. To receive a copy of this document, indicate in the box:
" C" = Copy without attachment/enclosure " E" = Copy with attachment/enclosure " N" = No copy ML080600389 OFFICE RI/DRP RI/DRP NAME LCline/ LC ABurritt/ ALB DATE 02/ 26/08 02/27/08 Seabrook Inspection / Activity Plan 01/01/2008
-06/30/2009 Inspection Type Inspection Activit y Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 02/28/2008 10:25:41 Report 22 1 7112101-OCC RAD SAFETY - ACCES S Baseline Inspections A ccess Control to Radiologically Significant Areas 01/14/2008 01/18/2008 1 7112101 IP 1 ISFSI-ISFSI INSPECTIONS Other Routine Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 01/28/2008 10/31/2008 1 60854.1 IP Other Routine Operation of an Independent Spent Fuel Storage Installation at Operating Plants 01/28/2008 10/31/2008 1 60855.1 IP 1 7112102-OCC RAD SAFETY - ALAR A Baseline Inspections A LARA Planning and Controls 04/14/2008 04/18/2008 1 7112102 IP 1 7111108P-INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 04/14/2008 04/18/2008 1 7111108P IP 1 TI-172-TI-172 RCS DISSIMILIAR METAL WELDS Generic Safety Inspecti o Reactor Coolant System Dissimiliar Metal Butt Welds 04/14/2008 04/18/2008 1 2515/172 IP 1 7111108P-INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 04/21/2008 04/25/2008 1 7111108P IP 1 TI-166-CONTAINMENT SUMP MODIFICATIONS Safety Issues Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
04/21/2008 04/25/2008 1 2515/166 IP 4 TRI FIRE-TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections Fire Protection [Triennial]
07/14/2008 07/18/2008 1 7111105T IP Baseline Inspections Fire Protection [Triennial]
07/28/2008 08/01/2008 1 7111105T IP 1 7112202-PUB RAD SAFETY - RADWAST E Baseline Inspections Radioactive Material Processing and Transportation 09/29/2008 10/03/2008 1 7112202 IP 3 TI 171-TI 171 Generic Safety Inspecti o Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 10/20/2008 10/24/2008 1 2515/171 IP 1 7112103-OCC RAD SAFETY - INSTRUMENTS Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 11/03/2008 11/07/2008 1 7112103 IP 4 EP-EP EXERCISE EVALUATION EP Baseline Inspection Exercise Evaluation 11/03/2008 11/07/2008 1 7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 11/03/2008 11/07/2008 1 7111404 IP Baseline Inspections Drill/Exercise Performance 11/03/2008 11/07/2008 1 71151-EP01 IP Baseline Inspections ERO Drill Participation 11/03/2008 11/07/2008 1 71151-EP02 IP Baseline Inspections A lert & Notification System 11/03/2008 11/07/2008 1 71151-EP03 IP 4 71152B-PI&R Baseline Inspections Identification and Resolution of Problems 11/17/2008 11/21/2008 1 71152B IP Baseline Inspections Identification and Resolution of Problems 12/01/2008 12/05/2008 1 71152B IP 1 71121-OCC RAD SAFET Y Baseline Inspections A ccess Control to Radiologically Significant Areas 01/26/2009 01/30/2009 1 7112101 IP This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.


Seabrook Inspection / Activity Plan 01/01/2008
Seabrook Inspection / Activity Plan 01/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 02/28/2008 10:25:41 Report 22
-06/30/2009 Inspection Type Inspection Activit y Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 02/28/2008 10:25:41 Report 22 1 71121-OCC RAD SAFET Y Baseline Inspections A LARA Planning and Controls 01/26/2009 01/30/2009 1 7112102 IP 4 6/15EXAM-OPERATOR LICENSING INITIAL EXAMS Not Applicable FY-09 SEABROOK INITIAL OPERATOR LICENSING EXAM 05/11/2009 05/15/2009 1 U01759 Not Applicable FY-09 SEABROOK INITIAL OPERATOR LICENSING EXAM 06/15/2009 06/26/2009 1 U01759 3 MODS-PERMANENT PLANT MODIFICATIONS Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 03/09/2009 03/13/2009 1 7111117B IP Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 03/23/2009 03/27/2009 1 7111117B IP This report does not include INPO and OUTAGE activities.
 
71121
- OCC RAD SAFETY Baseline Inspections ALARA Planning and Controls 01/26/2009 01/30/2009
 
7112102 IP
 
6/15EXAM
- OPERATOR LICENSING INITIAL EXAMS Not Applicable FY-09 SEABROOK INITIAL OPERATOR LICENSING EXAM 05/11/2009 05/15/2009
 
U01759 Not Applicable FY-09 SEABROOK INITIAL OPERATOR LICENSING EXAM 06/15/2009 06/26/2009
 
U01759
 
MODS
- PERMANENT PLANT MODIFICATIONS Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 03/09/2009 03/13/2009
 
7111117B IP Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 03/23/2009 03/27/2009
 
7111117B IP This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 17:54, 14 January 2025

2007 Annual Assessment Letter - Seabrook Station 05000443-08-001)
ML080600389
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/03/2008
From: Arthur Burritt
Reactor Projects Branch 3
To: St.Pierre G
Florida Power & Light Energy Seabrook
BURRITT AL
References
IR-08-001
Download: ML080600389 (5)


Text

March 3, 2008

SUBJECT:

ANNUAL ASSESSMENT LETTER - SEABROOK STATION (05000443/2008001)

Dear Mr. St. Pierre:

On February 12, 2008, the NRC staff completed its performance review of Seabrook Station (Seabrook). Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the Security cornerstone review and resultant inspection plan.

Overall, Seabrook operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan to conduct inspections to review corrective actions to address alloy 82/182 pressurizer butt welds, containment sump modifications and preoperational testing and operation of your independent spent fuel storage installation.

The enclosed inspection plan details the inspections, less those related to security scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.

Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

G. S In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise that cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5069 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Arthur L. Burritt, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Docket Nos. 50-443 License Nos. NPF-86

Enclosure: Seabrook Station Inspection/ Activity Plan

cc w/encl:

J. A. Stall, FPL Senior Vice President, Nuclear & CNO M. Warner, Vice President, Nuclear Operations R. S. Kundalkar, FPL Vice President, Nuclear Technical Svcs M. Mashhadi, Senior Attorney, Florida Power & Light Company M. S. Ross, Managing Attorney, Florida Power & Light Company J. M. Peschel, Manager, Regulatory Programs P. Freeman, Plant General Manager K. Wright, Manager, Nuclear Training, Seabrook Station R. Poole, FEMA, Region I Office of the Attorney General, Commonwealth of Mass K. Ayotte, Attorney General, State of NH O. Fitch, Deputy Attorney General, State of NH P. Brann, Assistant Attorney General, State of Maine R. Walker, Director, Radiation Control Program, Dept. of Public Health, Commonwealth of MA C. Pope, Director, Homeland Security & Emergency Management, State of NH J. Giarrusso, MEMA, Commonwealth of Mass D. O'Dowd, Administrator, Radiological Health Section, DPHS, DHHS, State of NH J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company T. Crimmins, Polestar Applied Technology R. Backus, Esquire, Backus, Meyer and Solomon, NH Town of Exeter, State of New Hampshire Board of Selectmen, Town of Amesbury S. Comley, Executive Director, We the People of the United States R. Shadis, New England Coalition Staff M. Metcalf, Seacoast Anti-Pollution League Institute of Nuclear Power Operations (INPO)

G. S If circumstances arise that cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5069 with any questions you may have regarding this letter or the inspection plan.

Sincerely, Arthur L. Burritt, Chief Reactor Projects Branch 3

Division of Reactor Projects

Distribution w/encl: (via e-mail)

S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP A. Burritt, DRP L. Cline, DRP W. Raymond, DRP, Sr. Resident Inspector P. Presby, DRP, Actg Resident Inspector M. Gamberoni, DRS D. Roberts, DRS D. Screnci, PLO N. Sheehan, PLO DRS Branch Chiefs G. West, RI OEDO H. Chernoff, NRR J. Lubinski, NRR E. Miller, NRR, PM R. Ennis, NRR, Backup T. Valentine, NRR Region I Docket Room (with concurrences)

JWT1@nrc.gov

RidsNrrDirslpab@nrc.gov ROPreports@nrc.gov

SUNSI REVIEW COMPLETE: _LC____(Reviewers Initials)

DOCUMENT NAME: S:\\ROP-8 EOC REVIEW\\ANNUAL ASSESSMENT LETTERS\\BRANCH 3\\SEABROOK EOC LETTER.DOC

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy

ML080600389 OFFICE RI/DRP

RI/DRP

NAME LCline/ LC ABurritt/ ALB DATE 02/ 26/08 02/27/08

Seabrook Inspection / Activity Plan 01/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 02/28/2008 10:25:41 Report 22

7112101

- OCC RAD SAFETY - ACCESS Baseline Inspections Access Control to Radiologically Significant Areas 01/14/2008 01/18/2008

7112101 IP

ISFSI

- ISFSI INSPECTIONS Other Routine Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 01/28/2008 10/31/2008

60854.1 IP Other Routine Operation of an Independent Spent Fuel Storage Installation at Operating Plants 01/28/2008 10/31/2008

60855.1 IP

7112102

- OCC RAD SAFETY - ALARA Baseline Inspections ALARA Planning and Controls 04/14/2008 04/18/2008

7112102 IP

7111108P

- INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 04/14/2008 04/18/2008

7111108P IP

TI-172

- TI-172 RCS DISSIMILIAR METAL WELDS Generic Safety Inspectio Reactor Coolant System Dissimiliar Metal Butt Welds 04/14/2008 04/18/2008

2515/172 IP

7111108P

- INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 04/21/2008 04/25/2008

7111108P IP

TI-166

- CONTAINMENT SUMP MODIFICATIONS Safety Issues Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

04/21/2008 04/25/2008

2515/166 IP

TRI FIRE

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections Fire Protection [Triennial]

07/14/2008 07/18/2008

7111105T IP Baseline Inspections Fire Protection [Triennial]

07/28/2008 08/01/2008

7111105T IP

7112202

- PUB RAD SAFETY - RADWASTE Baseline Inspections Radioactive Material Processing and Transportation 09/29/2008 10/03/2008

7112202 IP

TI 171

- TI 171 Generic Safety Inspectio Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 10/20/2008 10/24/2008

2515/171 IP

7112103

- OCC RAD SAFETY - INSTRUMENTS Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 11/03/2008 11/07/2008

7112103 IP

EP

- EP EXERCISE EVALUATION EP Baseline Inspection Exercise Evaluation 11/03/2008 11/07/2008

7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 11/03/2008 11/07/2008

7111404 IP Baseline Inspections Drill/Exercise Performance 11/03/2008 11/07/2008

71151-EP01 IP Baseline Inspections ERO Drill Participation 11/03/2008 11/07/2008

71151-EP02 IP Baseline Inspections Alert & Notification System 11/03/2008 11/07/2008

71151-EP03 IP

71152B

- PI&R Baseline Inspections Identification and Resolution of Problems 11/17/2008 11/21/2008

71152B IP Baseline Inspections Identification and Resolution of Problems 12/01/2008 12/05/2008

71152B IP

71121

- OCC RAD SAFETY Baseline Inspections Access Control to Radiologically Significant Areas 01/26/2009 01/30/2009

7112101 IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Seabrook Inspection / Activity Plan 01/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 02/28/2008 10:25:41 Report 22

71121

- OCC RAD SAFETY Baseline Inspections ALARA Planning and Controls 01/26/2009 01/30/2009

7112102 IP

6/15EXAM

- OPERATOR LICENSING INITIAL EXAMS Not Applicable FY-09 SEABROOK INITIAL OPERATOR LICENSING EXAM 05/11/2009 05/15/2009

U01759 Not Applicable FY-09 SEABROOK INITIAL OPERATOR LICENSING EXAM 06/15/2009 06/26/2009

U01759

MODS

- PERMANENT PLANT MODIFICATIONS Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 03/09/2009 03/13/2009

7111117B IP Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 03/23/2009 03/27/2009

7111117B IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.