IR 05000247/2008402: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 1: | Line 1: | ||
{{Adams|number = ML082270684}} | {{Adams | ||
| number = ML082270684 | |||
| issue date = 08/14/2008 | |||
| title = IR 05000247-08-402, IR 05000286-08-402, on 07/07/2008 - 07/11/2008, Indian Point Energy Center, Access Control, Fitness for Duty-Security Force Working Hours (Letter Only) | |||
| author name = Trapp J M | |||
| author affiliation = NRC/RGN-I/DRS/PSB1 | |||
| addressee name = Pollock J | |||
| addressee affiliation = Entergy Nuclear Operations, Inc | |||
| docket = 05000247, 05000286 | |||
| license number = DPR-026, DPR-064 | |||
| contact person = | |||
| document report number = IR-08-402 | |||
| document type = Inspection Report, Letter | |||
| page count = 8 | |||
}} | |||
{{IR-Nav| site = 05000247 | year = 2008 | report number = 402 }} | {{IR-Nav| site = 05000247 | year = 2008 | report number = 402 }} | ||
| Line 14: | Line 28: | ||
==Dear Mr. Pollock:== | ==Dear Mr. Pollock:== | ||
On July 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Indian Point Energy Center. The inspection covered one or more of the key attributes of the security cornerstone of the NRC=s Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed on July 11, 2008, with Mr. Patric Conroy, Director, Nuclear Safety Assurance, and other members of your staff. | On July 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Indian Point Energy Center. The inspection covered one or more of the key attributes of the security cornerstone of the NRC | ||
=s Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed on July 11, 2008, with Mr. Patric Conroy, Director, Nuclear Safety Assurance, and other members of your staff. | |||
The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commission | ||
=s rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | |||
This report documents three NRC identified findings of very low security significance (i.e. Green as determined by the Physical Protection Significance Determination Process). The deficiencies were promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of the inspection before the inspectors left the site. The findings had cross-cutting aspects in the area of Human Performance, including work practices and resources. Additionally, a licensee-identified violation which was determined to be of very low security significance is listed in this report. | This report documents three NRC identified findings of very low security significance (i.e. Green as determined by the Physical Protection Significance Determination Process). The deficiencies were promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of the inspection before the inspectors left the site. The findings had cross-cutting aspects in the area of Human Performance, including work practices and resources. Additionally, a licensee-identified violation which was determined to be of very low security significance is listed in this report. | ||
| Line 25: | Line 41: | ||
When separated from its Enclosure, this document is DECONTROLLED. If you contest these non-cited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Indian Point Energy Center (IPEC). | When separated from its Enclosure, this document is DECONTROLLED. If you contest these non-cited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Indian Point Energy Center (IPEC). | ||
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC=s document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection. | In accordance with 10 CFR 2.390 of the NRC | ||
=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC | |||
=s document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter | |||
=s enclosure will not be available for public inspection. | |||
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1). | In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1). | ||
Sincerely,/RA/ James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-247, 50-286 License Nos. DPR-26, DPR-64 | Sincerely,/RA/ James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety | ||
Docket Nos. 50-247, 50-286 License Nos. DPR-26, DPR-64 | |||
===Enclosure:=== | ===Enclosure:=== | ||
| Line 37: | Line 58: | ||
Supplemental Information (OUO-SRI) If you contest these non-cited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Indian Point Energy Center (IPEC). | Supplemental Information (OUO-SRI) If you contest these non-cited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Indian Point Energy Center (IPEC). | ||
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC=s document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection. | In accordance with 10 CFR 2.390 of the NRC | ||
=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC | |||
=s document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter | |||
=s enclosure will not be available for public inspection. | |||
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1). | In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1). | ||
| Line 47: | Line 71: | ||
===w/Attachment:=== | ===w/Attachment:=== | ||
Supplemental Information (OUO-SRI) | Supplemental Information (OUO-SRI) | ||
cc w/o encl; w/o OUO-SRI: Senior Vice President, Entergy Nuclear Operations Vice President, Operations, Entergy Nuclear Operations Vice President, Oversight, Entergy Nuclear Operations Senior Manager, Nuclear Safety and Licensing, Entergy Nuclear Operations Senior Vice President and COO, Entergy Nuclear Operations Assistant General Counsel, Entergy Nuclear Operations Manager, Licensing, Entergy Nuclear Operations C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law A. Donahue, Mayor, Village of Buchanan J. G. Testa, Mayor, City of Peekskill R. Albanese, Four County Coordinator S. Lousteau, Treasury Department, Entergy Services, Inc. | SUNSI Review Complete: ___JMT____ (Reviewer | ||
=s Initials) ADAMS ACCESSION NO. ML082270684 DOCUMENT NAME: G:\DRS\Plant Support Branch 1\Security\Dimitriadis\2008 BI IPEC July 11, 2008 Rev5.doc After declaring this document AAn Official Agency Record | |||
@ letter will be released to the Public. To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS RI/DRS RI/DRS RI/DRP RI/DRS NAME ADimitriadis/cmm/AXD GSmith/AXD for WSchmidt/WAC for MGray/MXG JTrapp/JMT | |||
DATE 08/12/08 08/12/08 08/13/08 08/13/08 08/14/08 OFFICIAL COPY cc w/encl; w/OUO-SRI: | |||
D. Gagnon, Site Security Manager, Indian Point Energy Center J. Spath, New York State Energy Research, SLO Designee F. Tabert, Assistant Director, NY State, Department of Homeland Security M. Balboni, Deputy Secretary for Public Safety | |||
cc w/o encl; w/o OUO-SRI: | |||
Senior Vice President, Entergy Nuclear Operations Vice President, Operations, Entergy Nuclear Operations Vice President, Oversight, Entergy Nuclear Operations Senior Manager, Nuclear Safety and Licensing, Entergy Nuclear Operations Senior Vice President and COO, Entergy Nuclear Operations Assistant General Counsel, Entergy Nuclear Operations Manager, Licensing, Entergy Nuclear Operations C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law A. Donahue, Mayor, Village of Buchanan J. G. Testa, Mayor, City of Peekskill R. Albanese, Four County Coordinator S. Lousteau, Treasury Department, Entergy Services, Inc. | |||
Chairman, Standing Committee on Energy, NYS Assembly Chairman, Standing Committee on Environmental Conservation, NYS Assembly Chairman, Committee on Corporations, Authorities, and Commissions M. Slobodien, Director, Emergency Planning P. Eddy, NYS Department of Public Service Assemblywoman Sandra Galef, NYS Assembly T. Seckerson, County Clerk, Westchester County Board of Legislators A. Spano, Westchester County Executive R. Bondi, Putnam County Executive C. Vanderhoef, Rockland County Executive E. A. Diana, Orange County Executive T. Judson, Central NY Citizens Awareness Network M. Elie, Citizens Awareness Network D. Lochbaum, Nuclear Safety Engineer, Union of Concerned Scientists Public Citizen's Critical Mass Energy Project M. Mariotte, Nuclear Information & Resources Service F. Zalcman, Pace Law School, Energy Project L. Puglisi, Supervisor, Town of Cortlandt Congressman John Hall Congresswoman Nita Lowey Senator Hillary Rodham Clinton Senator Charles Schumer G. Shapiro, Senator Clinton's Staff J. Riccio, Greenpeace P. Musegaas, Riverkeeper, Inc. | Chairman, Standing Committee on Energy, NYS Assembly Chairman, Standing Committee on Environmental Conservation, NYS Assembly Chairman, Committee on Corporations, Authorities, and Commissions M. Slobodien, Director, Emergency Planning P. Eddy, NYS Department of Public Service Assemblywoman Sandra Galef, NYS Assembly T. Seckerson, County Clerk, Westchester County Board of Legislators A. Spano, Westchester County Executive R. Bondi, Putnam County Executive C. Vanderhoef, Rockland County Executive E. A. Diana, Orange County Executive T. Judson, Central NY Citizens Awareness Network M. Elie, Citizens Awareness Network D. Lochbaum, Nuclear Safety Engineer, Union of Concerned Scientists Public Citizen's Critical Mass Energy Project M. Mariotte, Nuclear Information & Resources Service F. Zalcman, Pace Law School, Energy Project L. Puglisi, Supervisor, Town of Cortlandt Congressman John Hall Congresswoman Nita Lowey Senator Hillary Rodham Clinton Senator Charles Schumer G. Shapiro, Senator Clinton's Staff J. Riccio, Greenpeace P. Musegaas, Riverkeeper, Inc. | ||
| Line 56: | Line 87: | ||
M. Kaplowitz, Chairman of County Environment & Health Committee A. Reynolds, Environmental Advocates D. Katz, Executive Director, Citizens Awareness Network K. Coplan, Pace Environmental Litigation Clinic M. Jacobs, IPSEC W. Little, Associate Attorney, NYSDEC M. J. Greene, Clearwater, Inc. | M. Kaplowitz, Chairman of County Environment & Health Committee A. Reynolds, Environmental Advocates D. Katz, Executive Director, Citizens Awareness Network K. Coplan, Pace Environmental Litigation Clinic M. Jacobs, IPSEC W. Little, Associate Attorney, NYSDEC M. J. Greene, Clearwater, Inc. | ||
R. Christman, Manager Training and Development A. J. Kremer, New York Affordable Reliable Electricity Alliance (NY AREA) Distribution w/o encl; w/o OUO-SRI: (via e-mail) S. Collins, RA M. Dapas, DRA S. Williams, RI OEDO R. Nelson, NRR M. Kowal, NRR J. Boska, PM, NRR J. Hughey, NRR M. Gray, DRP B. Bickett, DRP C. Hott - Indian Point 2 T. Koonce, RI - Indian Point 3 Region I Docket Room (w/concurrences) | R. Christman, Manager Training and Development A. J. Kremer, New York Affordable Reliable Electricity Alliance (NY AREA) Distribution w/o encl; w/o OUO-SRI | ||
ROPreport Resources M. Gamberoni, DRS D. Roberts, DRS J. Trapp, DRS Distribution w/encl; w/OUO-SRI: (via e-mail) P. Cataldo, DRP - Senior Resident Inspector G. Malone, DRP - Senior Resident Inspector D. Riffle, NSIR A. Dimitriadis, Senior Physical Security Inspector | : (via e-mail) S. Collins, RA M. Dapas, DRA S. Williams, RI OEDO R. Nelson, NRR M. Kowal, NRR J. Boska, PM, NRR J. Hughey, NRR M. Gray, DRP B. Bickett, DRP C. Hott - Indian Point 2 T. Koonce, RI - Indian Point 3 Region I Docket Room (w/concurrences) | ||
ROPreport Resources M. Gamberoni, DRS D. Roberts, DRS J. Trapp, DRS | |||
Distribution w/encl; w/OUO-SRI | |||
: (via e-mail) P. Cataldo, DRP - Senior Resident Inspector G. Malone, DRP - Senior Resident Inspector D. Riffle, NSIR A. Dimitriadis, Senior Physical Security Inspector | |||
}} | }} | ||
Revision as of 01:49, 29 August 2018
| ML082270684 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 08/14/2008 |
| From: | Trapp J M Plant Support Branch 1 |
| To: | Joseph E Pollock Entergy Nuclear Operations |
| References | |
| IR-08-402 | |
| Download: ML082270684 (8) | |
Text
August 14, 2008
Mr. Joseph Pollock Site Vice President Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
SUBJECT: INDIAN POINT ENERGY CENTER - NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT NOS. 05000247/2008402 AND 05000286/2008402
Dear Mr. Pollock:
On July 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Indian Point Energy Center. The inspection covered one or more of the key attributes of the security cornerstone of the NRC
=s Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed on July 11, 2008, with Mr. Patric Conroy, Director, Nuclear Safety Assurance, and other members of your staff.
The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commission
=s rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
This report documents three NRC identified findings of very low security significance (i.e. Green as determined by the Physical Protection Significance Determination Process). The deficiencies were promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of the inspection before the inspectors left the site. The findings had cross-cutting aspects in the area of Human Performance, including work practices and resources. Additionally, a licensee-identified violation which was determined to be of very low security significance is listed in this report.
However, because of the very low security significance and because they are entered into your corrective action program, the NRC is treating these violations as non-cited violations (NCVs)
consistent with Section VI.A.1 of the NRC Enforcement Policy.
When separated from its Enclosure, this document is DECONTROLLED. If you contest these non-cited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Indian Point Energy Center (IPEC).
In accordance with 10 CFR 2.390 of the NRC
=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC
=s document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter
=s enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,/RA/ James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety
Docket Nos. 50-247, 50-286 License Nos. DPR-26, DPR-64
Enclosure:
Inspection Report Nos. 05000247/2008402 and 05000286/2008402
w/Attachment:
Supplemental Information (OUO-SRI) If you contest these non-cited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Indian Point Energy Center (IPEC).
In accordance with 10 CFR 2.390 of the NRC
=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC
=s document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter
=s enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,/RA/ James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-247, 50-286 License Nos. DPR-26, DPR-64
Enclosure:
Inspection Report Nos. 05000247/2008402 and 05000286/2008402
w/Attachment:
Supplemental Information (OUO-SRI)
SUNSI Review Complete: ___JMT____ (Reviewer
=s Initials) ADAMS ACCESSION NO. ML082270684 DOCUMENT NAME: G:\DRS\Plant Support Branch 1\Security\Dimitriadis\2008 BI IPEC July 11, 2008 Rev5.doc After declaring this document AAn Official Agency Record
@ letter will be released to the Public. To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS RI/DRS RI/DRS RI/DRP RI/DRS NAME ADimitriadis/cmm/AXD GSmith/AXD for WSchmidt/WAC for MGray/MXG JTrapp/JMT
DATE 08/12/08 08/12/08 08/13/08 08/13/08 08/14/08 OFFICIAL COPY cc w/encl; w/OUO-SRI:
D. Gagnon, Site Security Manager, Indian Point Energy Center J. Spath, New York State Energy Research, SLO Designee F. Tabert, Assistant Director, NY State, Department of Homeland Security M. Balboni, Deputy Secretary for Public Safety
cc w/o encl; w/o OUO-SRI:
Senior Vice President, Entergy Nuclear Operations Vice President, Operations, Entergy Nuclear Operations Vice President, Oversight, Entergy Nuclear Operations Senior Manager, Nuclear Safety and Licensing, Entergy Nuclear Operations Senior Vice President and COO, Entergy Nuclear Operations Assistant General Counsel, Entergy Nuclear Operations Manager, Licensing, Entergy Nuclear Operations C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law A. Donahue, Mayor, Village of Buchanan J. G. Testa, Mayor, City of Peekskill R. Albanese, Four County Coordinator S. Lousteau, Treasury Department, Entergy Services, Inc.
Chairman, Standing Committee on Energy, NYS Assembly Chairman, Standing Committee on Environmental Conservation, NYS Assembly Chairman, Committee on Corporations, Authorities, and Commissions M. Slobodien, Director, Emergency Planning P. Eddy, NYS Department of Public Service Assemblywoman Sandra Galef, NYS Assembly T. Seckerson, County Clerk, Westchester County Board of Legislators A. Spano, Westchester County Executive R. Bondi, Putnam County Executive C. Vanderhoef, Rockland County Executive E. A. Diana, Orange County Executive T. Judson, Central NY Citizens Awareness Network M. Elie, Citizens Awareness Network D. Lochbaum, Nuclear Safety Engineer, Union of Concerned Scientists Public Citizen's Critical Mass Energy Project M. Mariotte, Nuclear Information & Resources Service F. Zalcman, Pace Law School, Energy Project L. Puglisi, Supervisor, Town of Cortlandt Congressman John Hall Congresswoman Nita Lowey Senator Hillary Rodham Clinton Senator Charles Schumer G. Shapiro, Senator Clinton's Staff J. Riccio, Greenpeace P. Musegaas, Riverkeeper, Inc.
M. Kaplowitz, Chairman of County Environment & Health Committee A. Reynolds, Environmental Advocates D. Katz, Executive Director, Citizens Awareness Network K. Coplan, Pace Environmental Litigation Clinic M. Jacobs, IPSEC W. Little, Associate Attorney, NYSDEC M. J. Greene, Clearwater, Inc.
R. Christman, Manager Training and Development A. J. Kremer, New York Affordable Reliable Electricity Alliance (NY AREA) Distribution w/o encl; w/o OUO-SRI
- (via e-mail) S. Collins, RA M. Dapas, DRA S. Williams, RI OEDO R. Nelson, NRR M. Kowal, NRR J. Boska, PM, NRR J. Hughey, NRR M. Gray, DRP B. Bickett, DRP C. Hott - Indian Point 2 T. Koonce, RI - Indian Point 3 Region I Docket Room (w/concurrences)
ROPreport Resources M. Gamberoni, DRS D. Roberts, DRS J. Trapp, DRS
Distribution w/encl; w/OUO-SRI