| Line 1: | Line 1: | ||
{{Adams|number = ML082760765}} | {{Adams | ||
| number = ML082760765 | |||
| issue date = 10/02/2008 | |||
| title = IR 05000458-08-007, on 08/21/2008, for River Bend, Inspection Site-Specific Implementation of B.5.B Phase 2 and 3, Mitigating Strategies Temporary Instruction | |||
| author name = Lantz R E | |||
| author affiliation = NRC/RGN-IV/DRS/OB | |||
| addressee name = Perito M | |||
| addressee affiliation = Entergy Operations, Inc | |||
| docket = 05000458 | |||
| license number = NPF-047 | |||
| contact person = Lynn berger | |||
| document report number = IR-08-007 | |||
| document type = Letter, Inspection Report | |||
| page count = 3 | |||
}} | |||
{{IR-Nav| site = 05000458 | year = 2008 | report number = 007 }} | {{IR-Nav| site = 05000458 | year = 2008 | report number = 007 }} | ||
| Line 7: | Line 21: | ||
[[Issue date::October 2, 2008]] | [[Issue date::October 2, 2008]] | ||
Michael Perito Vice President, Operations Entergy Operations, Inc. River Bend Station 5485 US Highway 61N St. Francisville, LA | Michael Perito Vice President, Operations Entergy Operations, Inc. River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 | ||
SUBJECT: | SUBJECT: RIVER BEND STATION - NRC INSPECTION SITE-SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES TEMPORARY INSTRUCTION INSPECTION REPORT 05000458/2008007 | ||
==Dear Mr. Perito:== | ==Dear Mr. Perito:== | ||
On August 21, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a site-specific implementation of B.5.b, Phase 2 and 3, temporary instruction team inspection of your River Bend Station. The enclosed report documents the team's results, which were discussed on August 21, 2008, with you and other members of your staff. The inspection examined activities conducted under your license as they relate to the implementation of B.5.b, Phase 2 and 3, mitigating strategies, your compliance with the Commission's rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel. Based on the results of this inspection, no findings of significance were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. Entergy Operations, Inc. 2 | On August 21, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a site-specific implementation of B.5.b, Phase 2 and 3, temporary instruction team inspection of your River Bend Station. The enclosed report documents the team's results, which were discussed on August 21, 2008, with you and other members of your staff. | ||
The inspection examined activities conducted under your license as they relate to the implementation of B.5.b, Phase 2 and 3, mitigating strategies, your compliance with the Commission's rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel. Based on the results of this inspection, no findings of significance were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. Entergy Operations, Inc. 2 If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1). | |||
Sincerely,/RA/ | Sincerely,/RA/ | ||
Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety | Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety Docket: 50-458 License: NPF-47 cc w/o enclosure: Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 | ||
Senior Vice President and COO Entergy Operations, Inc. P.O. Box 31995 Jackson, MS 39286-1995 | |||
Vice President, Oversight Entergy Operations, Inc. P.O. Box 31995 Jackson, MS 39286-1995 | |||
Senior Manager, Nuclear Safety & Licensing Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 | |||
Manager, Licensing Entergy Operations, Inc. River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Entergy Operations, Inc. 3 Associate General Counsel Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 | |||
}} | }} | ||
Revision as of 14:55, 28 August 2018
| ML082760765 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 10/02/2008 |
| From: | Lantz R E Operations Branch IV |
| To: | Mike Perito Entergy Operations |
| Lynn berger | |
| References | |
| IR-08-007 | |
| Download: ML082760765 (3) | |
Text
October 2, 2008
Michael Perito Vice President, Operations Entergy Operations, Inc. River Bend Station 5485 US Highway 61N St. Francisville, LA 70775
SUBJECT: RIVER BEND STATION - NRC INSPECTION SITE-SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES TEMPORARY INSTRUCTION INSPECTION REPORT 05000458/2008007
Dear Mr. Perito:
On August 21, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a site-specific implementation of B.5.b, Phase 2 and 3, temporary instruction team inspection of your River Bend Station. The enclosed report documents the team's results, which were discussed on August 21, 2008, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to the implementation of B.5.b, Phase 2 and 3, mitigating strategies, your compliance with the Commission's rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel. Based on the results of this inspection, no findings of significance were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. Entergy Operations, Inc. 2 If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,/RA/
Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety Docket: 50-458 License: NPF-47 cc w/o enclosure: Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995
Senior Vice President and COO Entergy Operations, Inc. P.O. Box 31995 Jackson, MS 39286-1995
Vice President, Oversight Entergy Operations, Inc. P.O. Box 31995 Jackson, MS 39286-1995
Senior Manager, Nuclear Safety & Licensing Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995
Manager, Licensing Entergy Operations, Inc. River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Entergy Operations, Inc. 3 Associate General Counsel Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995