IR 05000346/2010405: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 1: | Line 1: | ||
{{Adams|number = ML100541411}} | {{Adams | ||
| number = ML100541411 | |||
| issue date = 02/19/2010 | |||
| title = IR 05000346-10-405, (Dnms), on 01/28/2010, Davis-Besse Nuclear Power Station, NRC ISFSI Security Inspection Report. Cover Letter | |||
| author name = Lipa C A | |||
| author affiliation = NRC/RGN-III/DNMS/DB | |||
| addressee name = Allen B | |||
| addressee affiliation = FirstEnergy Nuclear Operating Co | |||
| docket = 05000346, 07200014 | |||
| license number = NPF-003 | |||
| contact person = | |||
| document report number = IR-10-405 | |||
| document type = Inspection Report, Letter | |||
| page count = 2 | |||
}} | |||
{{IR-Nav| site = 05000346 | year = 2010 | report number = 405 }} | {{IR-Nav| site = 05000346 | year = 2010 | report number = 405 }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:Official Use Only Security-Related Information Official Use Only - Security-Related Information February 19, 2010 | {{#Wiki_filter:Official Use Only Security-Related Information UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 Official Use Only | ||
- Security-Related Information February 19, 2010 | |||
Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760 | Mr. Barry Allen Site Vice President | ||
FirstEnergy Nuclear Operating Company | |||
Davis-Besse Nuclear Power Station | |||
5501 North State Route 2, Mail Stop A-DB-3080 | |||
Oak Harbor, OH 43449-9760 | |||
SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION - NRC ISFSI SECURITY INSPECTION REPORT 05000346/2010405 (DNMS) | SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION - NRC ISFSI SECURITY INSPECTION REPORT 05000346/2010405 (DNMS) | ||
| Line 26: | Line 49: | ||
===Enclosure:=== | ===Enclosure:=== | ||
IR 05000346/2010405 (DNMS) | IR 05000346/2010405 (DNMS) | ||
cc w/encl: M. Parker, Security Manager, Davis-Besse NPS G. Wolf, Regulatory Assurance, Davis-Besse NPS C. O'Claire, State Liaison Officer Ohio Emergency Management Agency cc w/o encl: Distribution via ListServ | cc w/encl: M. Parker, Security Manager, Davis-Besse NPS G. Wolf, Regulatory Assurance, Davis-Besse NPS C. O'Claire, State Liaison Officer Ohio Emergency Management Agency cc w/o encl: Distribution via ListServ | ||
}} | }} | ||
Revision as of 01:02, 24 August 2018
| ML100541411 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 02/19/2010 |
| From: | Lipa C A NRC/RGN-III/DNMS/DB |
| To: | Allen B FirstEnergy Nuclear Operating Co |
| References | |
| IR-10-405 | |
| Download: ML100541411 (2) | |
Text
Official Use Only Security-Related Information UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 Official Use Only
- Security-Related Information February 19, 2010
Mr. Barry Allen Site Vice President
FirstEnergy Nuclear Operating Company
Davis-Besse Nuclear Power Station
5501 North State Route 2, Mail Stop A-DB-3080
Oak Harbor, OH 43449-9760
SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION - NRC ISFSI SECURITY INSPECTION REPORT 05000346/2010405 (DNMS)
Dear Mr. Allen:
On January 28, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection of the Independent Spent Fuel Storage Installation (ISFSI) at the Davis-Besse Nuclear Power Station (NPS), Oak Harbor, Ohio. The purpose of the inspection was to evaluate whether the protection of the ISFSI was in compliance with the Davis-Besse Physical Security Plan (PSP), and the NRC Orders EA-02-104, "Order for Interim Safeguards and Security Compensatory Measures (ICMs) for Davis-Besse NPS," dated October 16, 2002 and EA-03-097, "Order for Implementation of Additional Security Measures (ASMs) Associated with Access Authorization for Davis-Besse NPS," dated August 18, 2004. In addition, the inspectors verified the location of your instrument calibrators, and determined whether their use and storage was conducted safely and in accordance with 10 CFR Part 20 requirements. At the conclusion of the on-site inspection on January 28, 2010, the inspector discussed the inspection findings with members of your security and radiation protection staff.
Based on the results of this inspection, no findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related discussion contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
Enclosure Contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled.
Official Use Only Security-Related Information Official Use Only Security-Related Information We will gladly discuss any questions you may have regarding this inspection.
Sincerely,/RA/ Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 050-00346, 072-00014 License No. NPF-3, General License (ISFSI)
Nonpublic
Enclosure:
cc w/encl: M. Parker, Security Manager, Davis-Besse NPS G. Wolf, Regulatory Assurance, Davis-Besse NPS C. O'Claire, State Liaison Officer Ohio Emergency Management Agency cc w/o encl: Distribution via ListServ