IR 05000334/2011008: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:"."* ttnu,oroW+**tt May 13, 20LLMr. PaulA. HardenSite Vice PresidentFirstEnergy Nuclear Operating CompanyBeaver Valley Power StationP.O. Box4, Route 168Shippingport, PA 15077
{{#Wiki_filter:"."* ttnu,oro W+**tt UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KlNG OF PRUSSTA. PA 19406-1415 May 13, 20LL Mr. Paul Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box4, Route 168 Shippingport, PA 15077


SUBJECT: BEAVER VALLEY POWER STATION - NRC TEMPORARY INSTRUCTION2515t 183 INSPECTION REPORT 05000334/201 1 008 AND 05000412t201 1oO8
SUBJECT: BEAVER VALLEY POWER STATION - NRC TEMPORARY INSTRUCTION 2515t 183 INSPECTION REPORT 05000334/201 1 008 AND 05000412t201 1oO8


==Dear Mr. Harden:==
==Dear Mr. Harden:==
On April 29,2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection atyour Beaver Valley Power Station Units 1 and 2, using Temporary instrubtion 2St 5/183,"Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event." The enclosedinspection report documents the inspection results which were discussed on April 2g, 2011, withyou and other members of your staff.The objective of this inspectio.n was to promptly assess the capabilities of Beaver Valley powerStation to respond to extrlordinary consequenbes similar to those that have recently oicurred atthe Japanese Fukushima Daiichi Nuclear Station. The results from this inspection, ilong withthe results from this inspection performed at other operating commercial nuclear piants in theUnited States will be used to evaluate the U.S. nuclear indrlstry's readiness to saiely respond tosimilar events. These results will also help the NRC to determine if additional regulitory actionsare warranted.All of the potential issues and observations identified by this inspection are contained in thisreport. The NRC's Reactor Oversight Process will further evaluate any issues to determine ifthey are re^gulatory findings or violations. Any resulting findings or violations will be documentedby the NRC in a separate report. You are not required to resfond to this letter.
On April 29,2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Beaver Valley Power Station Units 1 and 2, using Temporary instrubtion 2St 5/183,"Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event." The enclosed inspection report documents the inspection results which were discussed on April 2g, 2011, with you and other members of your staff.The objective of this inspectio.n was to promptly assess the capabilities of Beaver Valley power Station to respond to extrlordinary consequenbes similar to those that have recently oicurred at the Japanese Fukushima Daiichi Nuclear Station. The results from this inspection, ilong with the results from this inspection performed at other operating commercial nuclear piants in the United States will be used to evaluate the U.S. nuclear indrlstry's readiness to saiely respond to similar events. These results will also help the NRC to determine if additional regulitory actions are warranted.


P. HardenIn accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letterand its enclosure will be made available electronically for public inspection in the NRCPublic Document Room or from the Publicly Available Records (PARS) component ofNRC's Agency Documents Access and Management System (ADAMS), accessible from theNRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic ReadingRoom).
All of the potential issues and observations identified by this inspection are contained in this report. The NRC's Reactor Oversight Process will further evaluate any issues to determine if they are re^gulatory findings or violations.


Sincerely,,-\ n"..V T( /\ I0^(\.Za^,r-,1-.-, /,\ L'oe^-Lawrence T. Doerflein, Chief IEngineering Branch 2 'Division of Reactor SafetyDocket Nos.: 50-334, 50-412License Nos.: DPR-66, NPF-73
Any resulting findings or violations will be documented by the NRC in a separate report. You are not required to resfond to this letter. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,,-\ n"..V T( /\ I0^(\.Za^,r-,1-.-, /,\ L'oe^-Lawrence T. Doerflein, Chief I Engineering Branch 2 'Division of Reactor Safety Docket Nos.: 50-334, 50-412 License Nos.: DPR-66, NPF-73  


===Enclosure:===
===Enclosure:===
Inspection Report Nos. 0500033412011008 and 0500041212011008cc w/encl: Distribution via ListServ
Inspection Report Nos. 0500033412011008 and 0500041212011008 cc w/encl: Distribution via ListServ
}}
}}

Revision as of 05:45, 8 August 2018

IR 05000334/2011008 and 05000412/2011008; 03/31/2011 - 04/29/2011; Beaver Valley Power Station, Units 1 and 2; Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event
ML111310328
Person / Time
Site: Beaver Valley
Issue date: 05/13/2011
From: Doerflein L T
Engineering Region 1 Branch 2
To: Harden P A
FirstEnergy Nuclear Operating Co
Shared Package
ML111300540 List:
References
IR-11-008
Download: ML111310328 (27)


Text

"."* ttnu,oro W+**tt UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KlNG OF PRUSSTA. PA 19406-1415 May 13, 20LL Mr. Paul Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box4, Route 168 Shippingport, PA 15077

SUBJECT: BEAVER VALLEY POWER STATION - NRC TEMPORARY INSTRUCTION 2515t 183 INSPECTION REPORT 05000334/201 1 008 AND 05000412t201 1oO8

Dear Mr. Harden:

On April 29,2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Beaver Valley Power Station Units 1 and 2, using Temporary instrubtion 2St 5/183,"Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event." The enclosed inspection report documents the inspection results which were discussed on April 2g, 2011, with you and other members of your staff.The objective of this inspectio.n was to promptly assess the capabilities of Beaver Valley power Station to respond to extrlordinary consequenbes similar to those that have recently oicurred at the Japanese Fukushima Daiichi Nuclear Station. The results from this inspection, ilong with the results from this inspection performed at other operating commercial nuclear piants in the United States will be used to evaluate the U.S. nuclear indrlstry's readiness to saiely respond to similar events. These results will also help the NRC to determine if additional regulitory actions are warranted.

All of the potential issues and observations identified by this inspection are contained in this report. The NRC's Reactor Oversight Process will further evaluate any issues to determine if they are re^gulatory findings or violations.

Any resulting findings or violations will be documented by the NRC in a separate report. You are not required to resfond to this letter. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).

Sincerely,,-\ n"..V T( /\ I0^(\.Za^,r-,1-.-, /,\ L'oe^-Lawrence T. Doerflein, Chief I Engineering Branch 2 'Division of Reactor Safety Docket Nos.: 50-334, 50-412 License Nos.: DPR-66, NPF-73

Enclosure:

Inspection Report Nos. 0500033412011008 and 0500041212011008 cc w/encl: Distribution via ListServ