ML113330259: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 13: Line 13:
| page count = 1
| page count = 1
}}
}}
=Text=
{{#Wiki_filter:November 29, 2011
Christopher J. Schwarz Site Vice President Arkansas Nuclear One Entergy Operations, Inc.
1448 SR 333 Russellville, AR 72802-0967
==SUBJECT:==
NOTIFICATION OF RELOCATION OF U. S. NUCLEAR REGULATORY COMMISSION REGION IV OFFICES 
==Dear Mr. Schwarz,==
On December 16, 2011, the Region IV offices will be relocat ed to another buildi ng in Arlington, Texas. Beginning December 16, 2011, all routine correspondence should be sent to the following address:
U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511
Should you visit Region IV, visitors will be registered by and receive a Region IV visitor badge from the NRC receptionist office located on the 1 st floor of the building. The NRC is the sole occupant of the building.
The telephone extensions for NRC staff members will remain the same as currently being used; however, the dialing prefix will change to (817) 200-1xxx. If you are unable to reach an NRC staff member, the main switchboard telephone number is (817) 200-1100. Should you or your staff have any questions or require additional information, please contact me at (817) 860-8445 before December 16, 2011, or (817) 200-1445, December 16, 2011 and later. 
Sincerely, 
      /RA/        Ray V. Azua, Acting Chief Reactor Projects Branch E Division of Reactor Projects
Dockets:  50-313; 50-368 Licenses:  DPR-51; NPF-6
cc:  Electronic Distribution UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125}}

Revision as of 10:56, 31 July 2018

Notification of Relocation of Us Nuclear Regulatory Commission Region Iv Offices
ML113330259
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 11/29/2011
From: Azua R V
NRC/RGN-IV/DRP/RPB-E
To: Schwarz C J
Entergy Operations
References
Download: ML113330259 (1)


Text

November 29, 2011

Christopher J. Schwarz Site Vice President Arkansas Nuclear One Entergy Operations, Inc.

1448 SR 333 Russellville, AR 72802-0967

SUBJECT:

NOTIFICATION OF RELOCATION OF U. S. NUCLEAR REGULATORY COMMISSION REGION IV OFFICES

Dear Mr. Schwarz,

On December 16, 2011, the Region IV offices will be relocat ed to another buildi ng in Arlington, Texas. Beginning December 16, 2011, all routine correspondence should be sent to the following address:

U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511

Should you visit Region IV, visitors will be registered by and receive a Region IV visitor badge from the NRC receptionist office located on the 1 st floor of the building. The NRC is the sole occupant of the building.

The telephone extensions for NRC staff members will remain the same as currently being used; however, the dialing prefix will change to (817) 200-1xxx. If you are unable to reach an NRC staff member, the main switchboard telephone number is (817) 200-1100. Should you or your staff have any questions or require additional information, please contact me at (817) 860-8445 before December 16, 2011, or (817) 200-1445, December 16, 2011 and later.

Sincerely,

/RA/ Ray V. Azua, Acting Chief Reactor Projects Branch E Division of Reactor Projects

Dockets: 50-313; 50-368 Licenses: DPR-51; NPF-6

cc: Electronic Distribution UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125