{{#Wiki_filter:" " February 17, 2012 John Senior Vice President-Energy & Supply and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Nuclear Plant 77 Beale Street, Mail Code B32 San Francisco, CA 94105 | {{#Wiki_filter:" " February 17, 2012 | ||
John Senior Vice President-Energy & Supply and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Nuclear Plant 77 Beale Street, Mail Code B32 San Francisco, CA 94105 | |||
SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - PHYSICAL SECURITY REQUIREMENTS FOR INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS INSPECTION REPORT 072-026/2012401 | SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - PHYSICAL SECURITY REQUIREMENTS FOR INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS INSPECTION REPORT 072-026/2012401 | ||
==Dear Mr. Conway:== | ==Dear Mr. Conway:== | ||
On February 2, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed an Independent Spent Fuel Storage Installation Security Inspection at your Diablo Canyon Power Plant, Units 1 and 2. The inspection covered the Physical Security Requirements for Independent Spent Fuel Storage Installations. The enclosed inspection report documents the inspection results, which were discussed on February 2, 2012, with Mr. S. David, Director, Site Services, and other members of your staff. The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. No findings were identified during this inspection. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. If Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | On February 2, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed an Independent Spent Fuel Storage Installation Security Inspection at your Diablo Canyon Power Plant, Units 1 and 2. The inspection covered the Physical Security Requirements for Independent Spent Fuel Storage Installations. The enclosed inspection report documents the inspection results, which were discussed on February 2, 2012, with Mr. S. David, Director, Site Services, and other members of your staff. | ||
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. | |||
No findings were identified during this inspection. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. If Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | |||
Sincerely,/RA/ | Sincerely,/RA/ | ||
Michael C. Hay, Chief Plant Support Branch-1 Division of Reactor Safety Docket No.: 72-026 License No.: SNM 2511 Nonpublic | Michael C. Hay, Chief Plant Support Branch-1 Division of Reactor Safety Docket No.: 72-026 License No.: SNM 2511 | ||
Nonpublic | |||
===Enclosure:=== | ===Enclosure:=== | ||
Revision as of 10:15, 30 July 2018
| ML120481707 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 02/17/2012 |
| From: | Hay M C Plant Support Branch-1 |
| To: | Conway J T Pacific Gas & Electric Co |
| References | |
| IR-12-401 | |
| Download: ML120481707 (4) | |
Text
" " February 17, 2012
John Senior Vice President-Energy & Supply and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Nuclear Plant 77 Beale Street, Mail Code B32 San Francisco, CA 94105
SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - PHYSICAL SECURITY REQUIREMENTS FOR INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS INSPECTION REPORT 072-026/2012401
Dear Mr. Conway:
On February 2, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed an Independent Spent Fuel Storage Installation Security Inspection at your Diablo Canyon Power Plant, Units 1 and 2. The inspection covered the Physical Security Requirements for Independent Spent Fuel Storage Installations. The enclosed inspection report documents the inspection results, which were discussed on February 2, 2012, with Mr. S. David, Director, Site Services, and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings were identified during this inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. If Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,/RA/
Michael C. Hay, Chief Plant Support Branch-1 Division of Reactor Safety Docket No.: 72-026 License No.: SNM 2511
Nonpublic
Enclosure:
NRC Inspection Report 072-026/2012401
w/Attachment:
Supplemental Information cc w/enclosure:
Michael V. Priebe Pacific Gas and Electric Company Diablo Canyon Power Plant Mail Code 104/5/508 P.O. Box 56 Avila Beach, CA 93424 cc w/o enclosure: Thomas R. Baldwin Pacific Gas and Electric Company Diablo Canyon Power Plant Mail Code 104/5/536 P.O. Box 56 Avila Beach, CA 93424