ML13057A069: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:February 25, 2013 | ||
Lou Cortopassi, Vice President | Lou Cortopassi, Vice President | ||
and Chief Nuclear Officer | and Chief Nuclear Officer | ||
Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550 | Omaha Public Power District | ||
Fort Calhoun Station FC-2-4 P.O. Box 550 | |||
Fort Calhoun, NE 68023-0550 | Fort Calhoun, NE 68023-0550 | ||
SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000285/2013010) AND REQUEST FOR INFORMATION | |||
Dear Mr. Cortopassi: | |||
Dear Mr. Cortopassi: On April 8, 2013, inspectors from the Nuclear Regulatory Commission (NRC) will perform an | On April 8, 2013, inspectors from the Nuclear Regulatory Commission (NRC) will perform an | ||
Inspection Manual Chapter (IMC) 0350 Team Inspection at Fort Calhoun Station, using applicable portions of NRC Inspection Procedures 95003, "Supplemental Inspection for Repetitive Degraded Cornerstone, Multiple Degraded Cornerstones, Multiple Yellow Inputs or | Inspection Manual Chapter (IMC) 0350 Team Inspection at Fort Calhoun Station, using applicable portions of NRC Inspection Procedures 95003, "Supplemental Inspection for Repetitive Degraded Cornerstone, Multiple Degraded Cornerstones, Multiple Yellow Inputs or | ||
One Red Input," 92702, "Followup on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute | One Red Input," 92702, "Followup on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute | ||
Resolution Confirmatory Orders," and 93806, "Operations Readiness Assessment Team Inspections." This inspection supports the assessment and verification of the issues described in the Restart Checklist enclosed in the Confirmatory Action Letter (CAL) issued to Fort Calhoun | Resolution Confirmatory Orders," and 93806, "Operations Readiness Assessment Team Inspections." This inspection supports the assessment and verification of the issues described in the Restart Checklist enclosed in the Confirmatory Action Letter (CAL) issued to Fort Calhoun | ||
Station on June 11, 2012, and any modifications thereof; and other selected areas to inform the | Station on June 11, 2012, and any modifications thereof; and other selected areas to inform the | ||
NRC's assessment of the safety, organizational, and programmatic issues at the station. This inspection is a part of the IMC 0350 oversight inspection activities. Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff. The inspection will include 2-weeks of onsite inspections by the team. The current inspection schedule is as follows: Preparation Week: April 1, 2013 Onsite weeks: April 8-19, 2013 In order to minimize the impact to your onsite resources and to ensure a productive inspection, | NRC's assessment of the safety, organizational, and programmatic issues at the station. | ||
This inspection is a part of the IMC 0350 oversight inspection activities. Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff. The inspection will include 2-weeks of onsite inspections by the team. The current inspection schedule is as follows: Preparation Week: April 1, 2013 Onsite weeks: April 8-19, 2013 | |||
In order to minimize the impact to your onsite resources and to ensure a productive inspection, | |||
we have enclosed a request for documents and resources needed for this inspection. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or onsite portions of the | we have enclosed a request for documents and resources needed for this inspection. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or onsite portions of the | ||
inspection. | inspection. | ||
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 | UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 | ||
L. Cortopassi - 2 - | L. Cortopassi - 2 - | ||
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Ms. Kelly Root. If there are any questions about this inspection or the material requested, please contact the lead inspector, Brian Larson, | |||
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection | |||
will be Ms. Kelly Root. If there are any questions about this inspection or the material requested, please contact the lead inspector, Brian Larson, | |||
at (817) 200-1172 or email: brian.larson@nrc.gov. | at (817) 200-1172 or email: brian.larson@nrc.gov. | ||
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a | This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office | ||
request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | of Management and Budget, control number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a | ||
request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its | |||
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | Sincerely, | ||
| Line 45: | Line 61: | ||
/RA/ Michael Hay, Chief Project Branch F | /RA/ Michael Hay, Chief Project Branch F | ||
Division of Reactor Projects | Division of Reactor Projects | ||
Docket No.: 50-285 License No.: DPR-40 | Docket No.: 50-285 License No.: DPR-40 | ||
Enclosure: | Enclosure: | ||
Fort Calhoun Station IMC 0350 Inspection - Request for Information (ORAT) cc w/enclosure: Electronic Distribution for Fort Calhoun Station | Fort Calhoun Station IMC 0350 Inspection - Request for Information (ORAT) | ||
L. Cortopassi - 3 - | cc w/enclosure: Electronic Distribution for Fort Calhoun Station | ||
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Acting Deputy Regional Administrator (Steve.Reynolds@nrc.gov) | L. Cortopassi - 3 - | ||
Electronic distribution by RIV | |||
: Regional Administrator (Elmo.Collins@nrc.gov) Acting Deputy Regional Administrator (Steve.Reynolds@nrc.gov) | |||
DRP Director (Kriss.Kennedy@nrc.gov) | DRP Director (Kriss.Kennedy@nrc.gov) | ||
Acting DRS Director (Thomas.Blount@nrc.gov) | Acting DRS Director (Thomas.Blount@nrc.gov) | ||
Manual Chapter 0350 Panel Chairman (Anton.Vegel@nrc.gov) | Manual Chapter 0350 Panel Chairman (Anton.Vegel@nrc.gov) | ||
| Line 59: | Line 81: | ||
Public Affairs Officer (Lara.Uselding@nrc.gov) | Public Affairs Officer (Lara.Uselding@nrc.gov) | ||
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) | Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) | ||
Project Manager and Manual Chapter 0350 Panel Member (Joseph.Sebroski@nrc.gov) Assistant Project Manager and Manual Chapter 0350 Panel Member (Lynnea.Wilkins@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) | Project Manager and Manual Chapter 0350 Panel Member (Joseph.Sebroski@nrc.gov) Assistant Project Manager and Manual Chapter 0350 Panel Member (Lynnea.Wilkins@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) | ||
Regional Counsel (Karla.Fuller@nrc.gov) | Regional Counsel (Karla.Fuller@nrc.gov) | ||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | Congressional Affairs Officer (Jenny.Weil@nrc.gov) | ||
Branch Chief, ORA/ACES (Heather.Gepford@nrc.gov) | Branch Chief, ORA/ACES (Heather.Gepford@nrc.gov) | ||
Enforcement Specialist, ACES (Christi.Maier@nrc.gov) OEMail Resource RIV/ETA: OEDO (John.Cassidy@nrc.gov) | Enforcement Specialist, ACES (Christi.Maier@nrc.gov) | ||
OEMail Resource RIV/ETA: OEDO (John.Cassidy@nrc.gov) | |||
Manual Chapter 0350 Panel Vice-Chairman (Loiuse.Lund@nrc.gov) | Manual Chapter 0350 Panel Vice-Chairman (Loiuse.Lund@nrc.gov) | ||
Manual Chapter 0350 Panel Member (Michael.Markley@nrc.gov) | Manual Chapter 0350 Panel Member (Michael.Markley@nrc.gov) | ||
Manual Chapter 0350 Panel Non-voting Member (Michael.Balazik@nrc.gov) | Manual Chapter 0350 Panel Non-voting Member (Michael.Balazik@nrc.gov) | ||
| Line 73: | Line 99: | ||
F:\NRC\FCS 95003\RFI\FCS 2013010-ORAT RFI LTR-btl.docx ML13057A069 ADAMS: No Yes SUNSI Review Complete Reviewer Initials: | F:\NRC\FCS 95003\RFI\FCS 2013010-ORAT RFI LTR-btl.docx ML13057A069 ADAMS: No Yes SUNSI Review Complete Reviewer Initials: | ||
- 1 - Enclosure FORT CALHOUN STATION IMC 0350 INSPECTION - REQUEST FOR INFORMATION Operations Readiness Assessment Team (ORAT) | Publicly Available Non-Sensitive | ||
Non-publicly Available Sensitive SOE:DRS/OB C:DRP/F BLarson MHay /RA via email/ /RA/ 2 /22/13 2 /25/ 13 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax | |||
- 1 - Enclosure FORT CALHOUN STATION IMC 0350 INSPECTION - REQUEST FOR INFORMATION | |||
Operations Readiness Assessment Team (ORAT) | |||
From: Brian Larson Senior Operations Engineer, NRC RIV | From: Brian Larson Senior Operations Engineer, NRC RIV | ||
817-200-1172 | 817-200-1172 | ||
brian.larson@nrc.gov | |||
Subject: Information Request to Support April 2013 IMC 0350 Team Inspection - ORAT (IPs 95003, 92702, 93806) | brian.larson@nrc.gov | ||
To: Kelly Root Recovery Regulatory Director, Fort Calhoun Station | |||
Subject: Information Request to Support April 2013 IMC 0350 Team Inspection - ORAT (IPs 95003, 92702, 93806) | |||
The following information is requested in order to support inspection preparation activities | The following information is requested in order to support inspection preparation activities | ||
starting April 8, 2013: | starting April 8, 2013: | ||
* Electronically accessible files on Certrec website for: Brian Larson, Clyde Osterholtz, Chris Steely, Thomas Farina and Theresa Buchanan * Documents to facilitate preparation for the onsite inspection weeks using IP 93806, "Operations Readiness Assessment Team Inspections." | |||
* Electronically accessible files on Certrec website for: Brian Larson, Clyde Osterholtz, Chris Steely, Thomas Farina and Theresa Buchanan | |||
* Documents to facilitate preparation for the onsite inspection weeks using IP 93806, "Operations Readiness Assessment Team Inspections." | |||
Inspectors will review the documents listed below during preparation week and identify | Inspectors will review the documents listed below during preparation week and identify | ||
additional documents that will be needed during the onsite inspection weeks. It is | additional documents that will be needed during the onsite inspection weeks. It is | ||
requested that documents identified during preparation week be made available and ready for review on the first day of inspection (April 8, 2013). If you have any questions regarding this information request, please call the inspection team leader as soon as possible. Generic * Documents that relate to establishment of an appropriate safety attitude and proper working atmosphere for Operations Department personnel * Documents that relate to Operations management oversight, including expectations, analyses, self-assessments, corrective actions and improvement plans * Documents that relate to implementation of an Operations program to gather and apply lessons learned from industry experience * Documents that relate to Quality Assurance Department involvement in plant operations * Documents that relate to communication of station goals to Operations Department personnel | requested that documents identified during preparation week be made available and | ||
- 2 - Enclosure 02.02.d * Documents that relate to self-assessment capability as it relates to readiness for operation, including the effectiveness of root cause analysis, corrective actions, and the trending and generic applicability review of self-identified problems * Documents/procedures that describe the deficiency reporting system (corrective action program), including thresholds and prioritization * Documents from any root cause analysis performed for the Operations and Training Departments 02.02.e * Documents that relate to preparing licensed operators for restart (heatup, criticality, low power operations, full power operations) * Documents that relate to preparing licensed operators to respond to alarms (ARPs), abnormal and emergency plant conditions (AOPs, EOPs), instrumentation and control setpoint and display anomalies, and the potential for a high number of challenges to safety systems during startup/testing 02.02.g * Technical Specifications (TS), Updated Safety Analysis Report (USAR) * Documents that relate to preparing licensed operators to recognize, locate and comply with TS * Operations Department procedures with index of numbers and titles * Documents that relate to administrative controls for startup testing activities under TS constraints * List of all licensed operators 02.02.l * FCS Organizational Charts * Documents as they relate to Operations shift manning, Emergency Plan activation and response * Documents that relate to Operations augmented shift staffing during plant restart * Documents that relate to | ready for review on the first day of inspection (April 8, 2013). If you have any questions regarding this information request, please call the inspection team leader as soon as possible. | ||
- 3 - Enclosure * Closure Books to facilitate preparation for the onsite inspection weeks using IMC 0350 Restart Checklist. Inspectors will review the Closure Books listed below during preparation week and identify additional documents that will be needed during the onsite inspection weeks. It | Generic * Documents that relate to establishment of an appropriate safety attitude and proper working atmosphere for Operations Department personnel | ||
is requested that documents identified during preparation week be made available and ready for review on the first day of inspection (April 8, 2013). If you have any questions regarding this information request, please call the inspection team leader as soon as possible. 1. CL 2.b.1 - System Health Reviews a. 2.b.1.5 - Chemical and Volume Control System | * Documents that relate to Operations management oversight, including expectations, analyses, self-assessments, corrective actions and improvement | ||
plans * Documents that relate to implementation of an Operations program to gather and apply lessons learned from industry experience | |||
* Documents that relate to Quality Assurance Department involvement in plant | |||
operations | |||
* Documents that relate to communication of station goals to Operations Department personnel | |||
- 2 - Enclosure | |||
02.02.d * Documents that relate to self-assessment capability as it relates to readiness for operation, including the effectiveness of root cause analysis, corrective actions, and the trending and generic applicability review of self-identified problems | |||
* Documents/procedures that describe the deficiency reporting system (corrective action program), including thresholds and prioritization | |||
* Documents from any root cause analysis performed for the Operations and | |||
Training Departments | |||
02.02.e * Documents that relate to preparing licensed operators for restart (heatup, criticality, low power operations, full power operations) | |||
* Documents that relate to preparing licensed operators to respond to alarms (ARPs), abnormal and emergency plant conditions (AOPs, EOPs), instrumentation and control setpoint and display anomalies, and the potential for a high number of challenges to safety systems during startup/testing | |||
02.02.g * Technical Specifications (TS), Updated Safety Analysis Report (USAR) | |||
* Documents that relate to preparing licensed operators to recognize, locate and comply with TS | |||
* Operations Department procedures | |||
with index of numbers and titles | |||
* Documents that relate to administrative controls for startup testing activities | |||
under TS constraints | |||
* List of all licensed operators | |||
02.02.l * FCS Organizational Charts | |||
* Documents as they relate to Operations shift manning, Emergency Plan activation and response | |||
* Documents that relate to Operations augmented shift staffing during plant restart | |||
* Documents that relate to managemen | |||
t oversight and involvement in the implementation of Operations | |||
evolutions and work controls | |||
- 3 - Enclosure | |||
* Closure Books to facilitate preparation for the onsite inspection weeks using IMC 0350 Restart Checklist. Inspectors will review the Closure Books listed below during preparation week and identify additional documents that will be needed during the onsite inspection weeks. It | |||
is requested that documents identified during preparation week be made available and | |||
ready for review on the first day of inspection (April 8, 2013). If you have any questions regarding this information request, please call the inspection team leader as soon as possible. | |||
1. CL 2.b.1 - System Health Reviews a. 2.b.1.5 - Chemical and Volume Control System | |||
b. 2.b.1.9 - Control Rod Drive System c. 2.b.1.10 - Reactor Coolant System d. 2.b.1.15 - Main Feedwater System | b. 2.b.1.9 - Control Rod Drive System c. 2.b.1.10 - Reactor Coolant System d. 2.b.1.15 - Main Feedwater System | ||
e. 2.b.1.17 - Steam Generator System | e. 2.b.1.17 - Steam Generator System | ||
f. 2.b.1.19 - Instrument Air System | f. 2.b.1.19 - Instrument Air System | ||
g. 2.b.1.23 - Engineered Safeguards System 2. CL 5.c - Procedure Quality a. 5.c.1 - Licensee Assessment of the Fundamental Performance Deficiency of Procedure Quality/Procedure Management b. 5.c.2 - Adequacy of extent of condition and extent of causes c. 5.c.3 - Adequacy of corrective actions d. NCV 2012301-01 - Seven Examples of Inadequate Procedures for the Mitigating Systems Cornerstone e. NCV 2012301-04 - Five Examples of Inadequate Procedures for the Initiating Events Cornerstone f. NCV 2012301-06 - Inadequate Procedures with Four Examples for the Barrier Integrity Cornerstone g. NCV 2011002-01 - Inadequate Operating Instruction Results in a Loss of Auxiliary Feedwater h. NCV 2010004-10 - Inadequate Maintenance Procedure Results in a Plant Shutdown 3. CL 5.e - Configuration Control a. LER 2012-008-0 - Technical Specification Violation for Fuel Movement (VA-66) 4. CL 5.f - Emergency Response | g. 2.b.1.23 - Engineered Safeguards System 2. CL 5.c - Procedure Quality a. 5.c.1 - Licensee Assessment of the Fundamental Performance Deficiency of | ||
Procedure Quality/Procedure Management b. 5.c.2 - Adequacy of extent of condition and extent of causes c. 5.c.3 - Adequacy of corrective actions d. NCV 2012301-01 - Seven Examples of Inadequate Procedures for the Mitigating Systems Cornerstone e. NCV 2012301-04 - Five Examples of Inadequate Procedures for the Initiating Events Cornerstone f. NCV 2012301-06 - Inadequate Procedures with Four Examples for the | |||
Barrier Integrity Cornerstone g. NCV 2011002-01 - Inadequate Operating Instruction Results in a Loss of | |||
Auxiliary Feedwater h. NCV 2010004-10 - Inadequate Maintenance Procedure Results in a Plant | |||
Shutdown 3. CL 5.e - Configuration Control a. LER 2012-008-0 - Technical Specification Violation for Fuel Movement (VA- | |||
66) 4. CL 5.f - Emergency Response | |||
- 4 - Enclosure a. 5.f.7 - Licensee Assessment of the Fundamental Performance Deficiency of Emergency Response Organization b. 5.f.8 - Adequacy of extent of condition and extent of causes | - 4 - Enclosure a. 5.f.7 - Licensee Assessment of the Fundamental Performance Deficiency of Emergency Response Organization b. 5.f.8 - Adequacy of extent of condition and extent of causes | ||
c. 5.f.9 - Adequacy of corrective actions 5. CL 7.a - Operations Organization Ready for Restart a. 7.a.1 - Perform Operational Readiness Assessment Team inspection | c. 5.f.9 - Adequacy of corrective actions 5. CL 7.a - Operations Organization Ready for Restart a. 7.a.1 - Perform Operational Readiness Assessment Team inspection | ||
b. 7.a.2 - Licensee Assessment of the Fundamental Performance Deficiency associated with Site Operational Focus c. 7.a.3 - Adequacy of extent of condition and extent of causes d. 7.a.4 - Adequacy of corrective actions 6. CL 7.b - Systems Ready for Restart and Mode Restraints Properly Addressed a. 7.b.1 - Final system readiness and mode restraint review 7. CL 7.c - Final Review of Corrective Action Program for Restart Items (Ops Only) a. 7.c.1 - Final corrective action program review for restart items prior to restart * Generic documents to facilitate preparation for the onsite inspection weeks. Inspectors will review the documents listed below during preparation week and identify additional documents that will be needed during the onsite inspection weeks. It is requested that | b. 7.a.2 - Licensee Assessment of the Fundamental Performance Deficiency associated with Site Operational Focus c. 7.a.3 - Adequacy of extent of condition and extent of causes d. 7.a.4 - Adequacy of corrective actions 6. CL 7.b - Systems Ready for Restart and Mode Restraints Properly Addressed a. 7.b.1 - Final system readiness and mode restraint review 7. CL 7.c - Final Review of Corrective Action Program for Restart Items (Ops Only) a. 7.c.1 - Final corrective action program review for restart items prior to restart | ||
documents identified during preparation week be made available and ready for review on the first day of inspection (April 8, 2013). If you have any questions regarding this information request, please call the inspection team leader as soon as possible. 1. Documents related to 95003 Recovery Project 2. Documents related to 95003 Collective Evaluation | * Generic documents to facilitate preparation for the onsite inspection weeks. Inspectors will review the documents listed below during preparation week and identify additional documents that will be needed during the onsite inspection weeks. It is requested that | ||
documents identified during preparation week be made available and ready for review on the first day of inspection (April 8, 2013). If you have any questions regarding this information request, please call the inspection team leader as soon as possible. | |||
1. Documents related to 95003 Recovery Project 2. Documents related to 95003 Collective Evaluation | |||
3. Documents related to Fundamental Performance Deficiencies | 3. Documents related to Fundamental Performance Deficiencies | ||
4. Common Factors Analysis Report | 4. Common Factors Analysis Report | ||
}} | }} | ||
Revision as of 21:03, 18 July 2018
| ML13057A069 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 02/25/2013 |
| From: | Hay M C NRC/RGN-IV/DRP |
| To: | Cortopassi L P Omaha Public Power District |
| References | |
| IR-13-010 | |
| Download: ML13057A069 (7) | |
See also: IR 05000285/2013010
Text
February 25, 2013
Lou Cortopassi, Vice President
and Chief Nuclear Officer
Omaha Public Power District
Fort Calhoun Station FC-2-4 P.O. Box 550
Fort Calhoun, NE 68023-0550
SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000285/2013010) AND REQUEST FOR INFORMATION
Dear Mr. Cortopassi:
On April 8, 2013, inspectors from the Nuclear Regulatory Commission (NRC) will perform an
Inspection Manual Chapter (IMC) 0350 Team Inspection at Fort Calhoun Station, using applicable portions of NRC Inspection Procedures 95003, "Supplemental Inspection for Repetitive Degraded Cornerstone, Multiple Degraded Cornerstones, Multiple Yellow Inputs or
One Red Input," 92702, "Followup on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute
Resolution Confirmatory Orders," and 93806, "Operations Readiness Assessment Team Inspections." This inspection supports the assessment and verification of the issues described in the Restart Checklist enclosed in the Confirmatory Action Letter (CAL) issued to Fort Calhoun
Station on June 11, 2012, and any modifications thereof; and other selected areas to inform the
NRC's assessment of the safety, organizational, and programmatic issues at the station.
This inspection is a part of the IMC 0350 oversight inspection activities. Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff. The inspection will include 2-weeks of onsite inspections by the team. The current inspection schedule is as follows: Preparation Week: April 1, 2013 Onsite weeks: April 8-19, 2013
In order to minimize the impact to your onsite resources and to ensure a productive inspection,
we have enclosed a request for documents and resources needed for this inspection. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or onsite portions of the
inspection.
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
L. Cortopassi - 2 -
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection
will be Ms. Kelly Root. If there are any questions about this inspection or the material requested, please contact the lead inspector, Brian Larson,
at (817) 200-1172 or email: brian.larson@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office
of Management and Budget, control number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/ Michael Hay, Chief Project Branch F
Division of Reactor Projects
Docket No.: 50-285 License No.: DPR-40
Enclosure:
Fort Calhoun Station IMC 0350 Inspection - Request for Information (ORAT)
cc w/enclosure: Electronic Distribution for Fort Calhoun Station
L. Cortopassi - 3 -
Electronic distribution by RIV
- Regional Administrator (Elmo.Collins@nrc.gov) Acting Deputy Regional Administrator (Steve.Reynolds@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Acting DRS Director (Thomas.Blount@nrc.gov)
Manual Chapter 0350 Panel Chairman (Anton.Vegel@nrc.gov)
Acting DRP Deputy Director (Michael.Scott@nrc.gov) Acting DRS Deputy Director and Manual Chapter 0350 Panel Member (Jeff.Clark@nrc.gov) Senior Resident Inspector and Manual Chapter 0350 Panel Member (John.Kirkland@nrc.gov)
Resident Inspector (Jacob.Wingebach@nrc.gov)
Branch Chief, DRP/F and Manual Chapter 0350 Panel Member (Michael.Hay@nrc.gov) Senior Project Engineer, DRP/F (Rick.Deese@nrc.gov) Project Engineer, DRP/F (Chris.Smith@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
Project Manager and Manual Chapter 0350 Panel Member (Joseph.Sebroski@nrc.gov) Assistant Project Manager and Manual Chapter 0350 Panel Member (Lynnea.Wilkins@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Branch Chief, ORA/ACES (Heather.Gepford@nrc.gov)
Enforcement Specialist, ACES (Christi.Maier@nrc.gov)
OEMail Resource RIV/ETA: OEDO (John.Cassidy@nrc.gov)
Manual Chapter 0350 Panel Vice-Chairman (Loiuse.Lund@nrc.gov)
Manual Chapter 0350 Panel Member (Michael.Markley@nrc.gov)
Manual Chapter 0350 Panel Non-voting Member (Michael.Balazik@nrc.gov)
F:\NRC\FCS 95003\RFI\FCS 2013010-ORAT RFI LTR-btl.docx ML13057A069 ADAMS: No Yes SUNSI Review Complete Reviewer Initials:
Publicly Available Non-Sensitive
Non-publicly Available Sensitive SOE:DRS/OB C:DRP/F BLarson MHay /RA via email/ /RA/ 2 /22/13 2 /25/ 13 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
- 1 - Enclosure FORT CALHOUN STATION IMC 0350 INSPECTION - REQUEST FOR INFORMATION
Operations Readiness Assessment Team (ORAT)
From: Brian Larson Senior Operations Engineer, NRC RIV
817-200-1172
brian.larson@nrc.gov
To: Kelly Root Recovery Regulatory Director, Fort Calhoun Station
Subject: Information Request to Support April 2013 IMC 0350 Team Inspection - ORAT (IPs 95003, 92702, 93806)
The following information is requested in order to support inspection preparation activities
starting April 8, 2013:
- Electronically accessible files on Certrec website for: Brian Larson, Clyde Osterholtz, Chris Steely, Thomas Farina and Theresa Buchanan
- Documents to facilitate preparation for the onsite inspection weeks using IP 93806, "Operations Readiness Assessment Team Inspections."
Inspectors will review the documents listed below during preparation week and identify
additional documents that will be needed during the onsite inspection weeks. It is
requested that documents identified during preparation week be made available and
ready for review on the first day of inspection (April 8, 2013). If you have any questions regarding this information request, please call the inspection team leader as soon as possible.
Generic * Documents that relate to establishment of an appropriate safety attitude and proper working atmosphere for Operations Department personnel
- Documents that relate to Operations management oversight, including expectations, analyses, self-assessments, corrective actions and improvement
plans * Documents that relate to implementation of an Operations program to gather and apply lessons learned from industry experience
- Documents that relate to Quality Assurance Department involvement in plant
operations
- Documents that relate to communication of station goals to Operations Department personnel
- 2 - Enclosure
02.02.d * Documents that relate to self-assessment capability as it relates to readiness for operation, including the effectiveness of root cause analysis, corrective actions, and the trending and generic applicability review of self-identified problems
- Documents/procedures that describe the deficiency reporting system (corrective action program), including thresholds and prioritization
- Documents from any root cause analysis performed for the Operations and
Training Departments
02.02.e * Documents that relate to preparing licensed operators for restart (heatup, criticality, low power operations, full power operations)
- Documents that relate to preparing licensed operators to respond to alarms (ARPs), abnormal and emergency plant conditions (AOPs, EOPs), instrumentation and control setpoint and display anomalies, and the potential for a high number of challenges to safety systems during startup/testing
02.02.g * Technical Specifications (TS), Updated Safety Analysis Report (USAR)
- Documents that relate to preparing licensed operators to recognize, locate and comply with TS
- Operations Department procedures
with index of numbers and titles
- Documents that relate to administrative controls for startup testing activities
under TS constraints
- List of all licensed operators
02.02.l * FCS Organizational Charts
- Documents as they relate to Operations shift manning, Emergency Plan activation and response
- Documents that relate to Operations augmented shift staffing during plant restart
- Documents that relate to managemen
t oversight and involvement in the implementation of Operations
evolutions and work controls
- 3 - Enclosure
- Closure Books to facilitate preparation for the onsite inspection weeks using IMC 0350 Restart Checklist. Inspectors will review the Closure Books listed below during preparation week and identify additional documents that will be needed during the onsite inspection weeks. It
is requested that documents identified during preparation week be made available and
ready for review on the first day of inspection (April 8, 2013). If you have any questions regarding this information request, please call the inspection team leader as soon as possible.
1. CL 2.b.1 - System Health Reviews a. 2.b.1.5 - Chemical and Volume Control System
b. 2.b.1.9 - Control Rod Drive System c. 2.b.1.10 - Reactor Coolant System d. 2.b.1.15 - Main Feedwater System
e. 2.b.1.17 - Steam Generator System
f. 2.b.1.19 - Instrument Air System
g. 2.b.1.23 - Engineered Safeguards System 2. CL 5.c - Procedure Quality a. 5.c.1 - Licensee Assessment of the Fundamental Performance Deficiency of
Procedure Quality/Procedure Management b. 5.c.2 - Adequacy of extent of condition and extent of causes c. 5.c.3 - Adequacy of corrective actions d. NCV 2012301-01 - Seven Examples of Inadequate Procedures for the Mitigating Systems Cornerstone e. NCV 2012301-04 - Five Examples of Inadequate Procedures for the Initiating Events Cornerstone f. NCV 2012301-06 - Inadequate Procedures with Four Examples for the
Barrier Integrity Cornerstone g. NCV 2011002-01 - Inadequate Operating Instruction Results in a Loss of
Auxiliary Feedwater h. NCV 2010004-10 - Inadequate Maintenance Procedure Results in a Plant
Shutdown 3. CL 5.e - Configuration Control a. LER 2012-008-0 - Technical Specification Violation for Fuel Movement (VA-
66) 4. CL 5.f - Emergency Response
- 4 - Enclosure a. 5.f.7 - Licensee Assessment of the Fundamental Performance Deficiency of Emergency Response Organization b. 5.f.8 - Adequacy of extent of condition and extent of causes
c. 5.f.9 - Adequacy of corrective actions 5. CL 7.a - Operations Organization Ready for Restart a. 7.a.1 - Perform Operational Readiness Assessment Team inspection
b. 7.a.2 - Licensee Assessment of the Fundamental Performance Deficiency associated with Site Operational Focus c. 7.a.3 - Adequacy of extent of condition and extent of causes d. 7.a.4 - Adequacy of corrective actions 6. CL 7.b - Systems Ready for Restart and Mode Restraints Properly Addressed a. 7.b.1 - Final system readiness and mode restraint review 7. CL 7.c - Final Review of Corrective Action Program for Restart Items (Ops Only) a. 7.c.1 - Final corrective action program review for restart items prior to restart
- Generic documents to facilitate preparation for the onsite inspection weeks. Inspectors will review the documents listed below during preparation week and identify additional documents that will be needed during the onsite inspection weeks. It is requested that
documents identified during preparation week be made available and ready for review on the first day of inspection (April 8, 2013). If you have any questions regarding this information request, please call the inspection team leader as soon as possible.
1. Documents related to 95003 Recovery Project 2. Documents related to 95003 Collective Evaluation
3. Documents related to Fundamental Performance Deficiencies
4. Common Factors Analysis Report