COMMISSION
COMMISSION
September  
September  
19770-0)REGULATORY  
1977 0-0)REGULATORY  
GUIDE* OFFICE OF STANDARDS  
GUIDE* OFFICE OF STANDARDS  
DEVELOPMENT
DEVELOPMENT
REGULATORY  
REGULATORY  
GUIDE 1.132SITE INVESTIGATIONS  
GUIDE 1.132 SITE INVESTIGATIONS  
FOR FOUNDATIONS
FOR FOUNDATIONS
OF NUCLEAR POWER PLANTS
OF NUCLEAR POWER PLANTS  


==A. INTRODUCTION==
==A. INTRODUCTION==
programs as well as specific guidance for conducting Appendix A, "Seismic and Geologic Siting Criteria subsurface investigations, the spacing and depth offor Nuclear Po%%er Plants."  
programs as well as specific guidance for conducting Appendix A, "Seismic and Geologic Siting Criteria subsurface investigations, the spacing and depth of for Nuclear Po%%er Plants." to 10 CFR Part 100, borings, and sampling.
to 10 CFR Part 100, borings, and sampling.


Appendix A provides defini-"'Reactor Site Criteria,"  
Appendix A provides defini-"'Reactor Site Criteria," establishes requirements for lions for some of the terms used in this guide. These conducting site investigations to permit an evaluation terms are identified in the text by anasterisk.
establishes requirements for lions for some of the terms used in this guide. Theseconducting site investigations to permit an evaluation terms are identified in the text by anasterisk.


Appen-of the site and to provide information needed for dix B tabulates methods of conducting subsurface in-seismic response analyses and engineering design. Re- vestigations.
Appen-of the site and to provide information needed for dix B tabulates methods of conducting subsurface in-seismic response analyses and engineering design. Re- vestigations.


and Appendix C gives cfiteria for thequirements include the development of geologic in- spacing and depth of borings.for.safety-related struc-lures in regions of favorable or-uniform conditions.
and Appendix C gives cfiteria for the quirements include the development of geologic in- spacing and depth of borings.for.safety-related struc-lures in regions of favorable or-uniform conditions.


formation relevant to the stratigraphy.
formation relevant to the stratigraphy.
Line 40: Line 38:
lithology.
lithology.


eeecsLtdih.tx ngeologic history, and structural geology of the site References cited in'.he text and appendices are listedand the evaluation of the engineering properties of in Appendix D.., Appendix E contains asubsurface materials, bibliogr.aphical.liting oLreated material.
eeecsLtdih.tx n geologic history, and structural geology of the site References cited in'.he text and appendices are listed and the evaluation of the engineering properties of in Appendix D.., Appendix E contains a subsurface materials, bibliogr.aphical.liting oLreated material.Safety-related site characteristics are identified in .DISCUSSION
detail in Rcgulatory Guide 1.70. "Standard For- l.,Cenera., mat and Content of Safety Analysis Reports for Sii'6i'inve.itigations for nuclear power plants are* Nuclear Power Plants." Regulatory'
Guide 4.7. e .*sne to determine the geotechnical charac-"General Site Suitability Criteria for Nuclear Poyer ,;eristics of a site that affect the design, performance, Stations," discusses major site characteristics thi'a- ,and afety of plants. The investigations produce the feet site suitabilitv.


Safety-related site characteristics are identified in .DISCUSSION
.... .information needed to define the overall site geology This guide describes programs of sitiinv stihtions that is necessary for an understanding of subsurface that would normally meet the needifor evalua[ing conditions and for identifying potential geologic and the safety of the site from the standpý'int per- earthquake hazards that may exist at the site.formance of foundations and earthwor'46&er most Investigations for hazards such as faulting.anticipated loading conditions, including earth- landslides, cavernous rocks, ground subsidence, and quakes. It also describe.6 ite investigations required soil liquefaction are especially important.
detail in Rcgulatory Guide 1.70. "Standard For- l.,Cenera.,
mat and Content of Safety Analysis Reports for Sii'6i'inve.itigations for nuclear power plants are* Nuclear Power Plants."
Regulatory'
Guide 4.7. e .*sne to determine the geotechnical charac-"General Site Suitability Criteria for Nuclear Poyer ,;eristics of a site that affect the design, performance, Stations,"
discusses major site characteristics thi'a- ,and afety of plants. The investigations produce thefeet site suitabilitv.


.... .information needed to define the overall site geologyThis guide describes programs of sitiinv stihtions that is necessary for an understanding of subsurface that would normally meet the needifor evalua[ing conditions and for identifying potential geologic andthe safety of the site from the standpý'int per- earthquake hazards that may exist at the site.formance of foundations and earthwor'46&er most Investigations for hazards such as faulting.
to evaluate geotec needed, for engineering anffy1.i$
Ma, deslgn. The site investiga- Site investigations also provide information needed tions discus ind Nide are applicable to both to define local foundation and groundwater condi-S' t ions as well as the geotechnical parameters needed land uandi.cfflo~re si;. This guide does not deal with tosa hydr Ai.i lions, except for groundwater for engineering analysis and design of foundations icasu _"Its, nor does .it discuss geophysical and earthworks.


anticipated loading conditions, including earth- landslides, cavernous rocks, ground subsidence, andquakes. It also describe.6 ite investigations required soil liquefaction are especially important.
Geotechnical parameters needed for* iethodlM subsurface exploration.
 
to evaluate geotec needed, forengineering anffy1.i$
Ma, deslgn. The site investiga- Site investigations also provide information neededtions discus ind Nide are applicable to both to define local foundation and groundwater condi-S' t ions as well as the geotechnical parameters neededland uandi.cfflo~re si;. This guide does not deal with tosahydr Ai.i lions, except for groundwater for engineering analysis and design of foundations icasu _"Its, nor does .it discuss geophysical and earthworks.
 
Geotechnical parameters needed for* iethodlM  
subsurface exploration.


analysis and design include, but are not limited to.IV those used to evaluate the bearing capacity o' foun-This guide provides general guidance and recom- dation materials, lateral earth pressures against walls.mend'ations for developing site-specific investigation the stability of cuts and slopes in soil and rock. the ef-USNRC REGULATORY  
analysis and design include, but are not limited to.IV those used to evaluate the bearing capacity o' foun-This guide provides general guidance and recom- dation materials, lateral earth pressures against walls.mend'ations for developing site-specific investigation the stability of cuts and slopes in soil and rock. the ef-USNRC REGULATORY  
GUIDES CooIMo-iit Q106111i I. -.'It ft, If-. -I.,''tv  
GUIDES CooIMo-iit Q106111i I. -.'It ft, If-. -I.,''tv 1i .11.- C. .tn'-'s, Uj ýj N-iI'. "It -I, Reu ir Guw. wei. mun' lia'leIi ufewnix 'b i natlke t'.ivlalbli!  
1i .11.- C. .tn'-'s, Uj ýj N-iI'. "It -I,Reu ir Guw. wei. mun' lia'leIi ufewnix 'b i natlke t'.ivlalbli!  
to tht! public methods Leloitv C ......'....... r) ..V.Ni-troi'v,.  
to tht! public methods Leloitv C ......'.......  
r) ..V.Ni-troi'v,.  
1) C. 20 f;, At iiiio I ttajInlS*t'
1) C. 20 f;, At iiiio I ttajInlS*t'
tCC elitalie.
tCC elitalie.


to to.' NRC %iff,1 Pl'ti~~i'ie iit stCic Vliti of the Cows, v~ainsequlatt~oiri.
to to.' NRC %iff, 1 Pl'ti~~i'ie iit stCic Vliti of the Cows, v~ains equlatt~oiri.


to d.,fnieasi teh". ht t ta''tLv t h. ital ,n t'.ahl.z~tnq soccii~c~l problenti Th,-uil,  
to d.,fnieasi teh". ht t ta''tLv t h. ital ,n t'.ahl.z~tnq soccii~c~l problenti Th,-uil, %. ,, ...it th-' 10 1i~,i~ twi. li.'.wl iuas It suisi 111l1itIs ,Cuftt-l%.  
%. ,, ...it th-' 10 1i~,i~ twi. li.'.wl iuasIt suisi 111l1itIs  
Of i ittIa i giltiaI.nC" let J1tltiiCrinht.
,Cuftt-l%.  
Of i ittIa i giltiaI.nC"  
let J1tltiiCrinht.


Rgu~ljustv u-df-Mýuhiidt tanl :, UI'~l0 T 1,d ifll'fnt I isis thin"tl " UIou in lbme qoalIM wall be- accetil 7. fl eit rh .i-iI "a7faaca  
Rgu~ljustv u-df-Mýuhiidt tanl :, UI'~l0 T 1,d ifll'fnt I isis thin"tl " UIou in lbme qoalIM wall be- accetil 7. fl eit rh .i-iI "a7faaca 7. T PI ,l'ViiWe..t InS.iftle it fthoy lriaval! J1 ( eAr for the,5 fiuolfut rtlluitii.
7. T PI ,l'ViiWe..t InS.iftle it fthoy lriaval!  
J1 ( eAr for the,5 fiuolfut rtlluitii.


lit Ifil, isisin.tce of conl~nasince  
lit Ifil, isisin.tce of conl~nasince  
3 V rash tnil Mm. wmi Trtalcia- ftOcatalort filitfaof at wirt sil r licesne lv vhe Comnnswn'ii.
3 V rash tnil Mm. wmi Trtalcia- ftOcatalort filitfa of at wirt sil r licesne lv vhe Comnnswn'ii.


'I 1 nsinr.stfa'  
'I 1 nsinr.stfa'  
SaIml i9 tt atl.s'uCjfmminti ind %uiiio loiii t'th'."to t1O! .-ia'"A'
SaIml i9 tt atl.s'u Cjfmminti ind %uiiio loiii t'th'."to t1O! .-ia'"A'a.i CinmtflS nl uprw n..1 [ ni Ini~ivsi.n c in... i-1,' tMuth ii.j I.'.I 'u, W -111W.11111t W ta e. inlQi fo,"'.~1 1 Iiteat'l .15 .s iftiia -ia .tim -f .c iinillit.
 
====a. i CinmtflS ====
nl uprw n..1 [ ni Ini~ivsi.n c in... i-1,' tMuth ii.j I.'.I 'u, W -111W.11111t Wta e. inlQi fo,"'.~11 Iiteat'l  
.15 .s iftiia -ia .tim -f .c iinillit.


Clthitafs tOO1 n .t 1, ...... s I. rat, I~ s .%,ai q Ilt iwt ni-r 0ie I.ta'csu  
Clthitafs tOO1 n .t 1, ...... s I. rat, I~ s .%,ai q Ilt iwt ni-r 0ie I.ta'csu 'l t i ia tcim.','fl i hin't ifliiiiiii w t'i ivitth al'-t'r C liva~ aniit Its wifes to-i'ia ,,*I~u~~ ,"nm liiiiis .tI4" h .th inthiutm nl I" t ,,,i 'U Si.aoi' htt.t'a"S  
'l t i iatcim.','fl i hin't ifliiiiiii w t'i ivitth al'-t'r C liva~ aniit Its wifes to-i'ia ,,*I~u~~  
,"nm liiiiis .tI4" h .th inthiutm nl I" t ,,,i 'U Si.aoi' htt.t'a"S  
i sn a.t .' et vthai ft- ru ,ili.ni hs tit ...... a'S'Saa1amr.'  
i sn a.t .' et vthai ft- ru ,ili.ni hs tit ...... a'S'Saa1amr.'  
U -ill Ii" ()it ... ........a.gstas JlijllIi ii.a, iis'rtaI  
U -ill Ii" ()it ... ........a.gstas JlijllIi ii.a, iis'rtaI i;iI'US:a .a...;aifa  
i;iI'US:a  
.a...;aifa  
*Caa',a -  
*Caa',a -  
fect of earthquake-induced motions through underly-ing deposits on the response of soils and structures (including the potential for inducing liquefaction insoils). and those needed to estimate the expected set-tement of structures.
fect of earthquake-induced motions through underly-ing deposits on the response of soils and structures (including the potential for inducing liquefaction in soils). and those needed to estimate the expected set-tement of structures.


Geotechnical parameters arcalso needed for analysis and design of plant area fills,structural fills, backfills.
Geotechnical parameters arc also needed for analysis and design of plant area fills, structural fills, backfills.


and earth and rockfill dams.dikes, and other water retention or flood protection structures.
and earth and rockfill dams.dikes, and other water retention or flood protection structures.


Site information needed to assess the functional in.tegrity of foundations with respect to geologic andgeotechnical considerations include:a. The geologic origin, types, thicknesses.
Site information needed to assess the functional in.tegrity of foundations with respect to geologic and geotechnical considerations include: a. The geologic origin, types, thicknesses.


se.quence. depth. location, and areal extent of soil antrock strata and the degree and extent of theiiweathering:
se.quence. depth. location, and areal extent of soil ant rock strata and the degree and extent of theii weathering:
h. Orientation and characteristics of foliations bedding.
h. Orientation and characteristics of foliations bedding. jointing, a !d faulting in rock, c. Groundwater c,,nditions:
d. The static and dynamic engineering proper ties of subsurface materials:
e. Information regarding the results of in vestigations of' adverse geological conditions such a, cavities, joints, faults. fissures.


jointing, a !d faulting in rock,c. Groundwater c,,nditions:
or unfavorable soi conditions:
d. The static and dynamic engineering properties of subsurface materials:
f. Information related to man's activities such a withdrawal of fluids from or addition of fluids to th subsurface, extraction of minerals, or loading effect of dams or reservoirs:  
e. Information regarding the results of investigations of' adverse geological conditions such a,cavities, joints, faults. fissures.
and g. Information detailing any other geologic con dition discovered at the site that may affect the desig or performance of the plant or the location of struc tures.2. Reconnaissance Investigations and Literatur Reviews Planning of subsurface investigations and the ii terpretation of data require thorough understandir of the general geology of the site. This can be ol rained by a reveiw. either preceding or accompanyir the subsurface investigation, of available documei tary materials and results of previous investigation In most cases, a preliminary study of the site geolol can be done by review of existing current an historical documentary materials and by study aerial photographs and other remote sensir imagery. Possible sources of current and historic documentary information may include: a. Geology and engineering departments State and loce! universities, b. State government agencies such as the State ,* Geological Survey, c. U.S. Government agencies such as the U.S.Geological Survey and the U.S. Army Corps of Engineers.
 
or unfavorable soiconditions:
f. Information related to man's activities such awithdrawal of fluids from or addition of fluids to thsubsurface, extraction of minerals, or loading effectof dams or reservoirs:  
andg. Information detailing any other geologic condition discovered at the site that may affect the desigor performance of the plant or the location of structures.2. Reconnaissance Investigations and Literatur ReviewsPlanning of subsurface investigations and the iiterpretation of data require thorough understandir of the general geology of the site. This can be olrained by a reveiw. either preceding or accompanyir the subsurface investigation, of available documeitary materials and results of previous investigation In most cases, a preliminary study of the site geololcan be done by review of existing current anhistorical documentary materials and by studyaerial photographs and other remote sensirimagery.
 
Possible sources of current and historicdocumentary information may include:a. Geology and engineering departments State and loce! universities, b. State government agencies such as the State,* Geological Survey,c. U.S. Government agencies such as the U.S.Geological Survey and the U.S. Army Corps ofEngineers.


d. Topographic maps.e. Geologic and geophysical maps," f. Engineering geologic maps.g. Soil survey maps." Ih. Geologic reports and other geological literature, i. Geotechnical reports and other geotechnical literature.
d. Topographic maps.e. Geologic and geophysical maps," f. Engineering geologic maps.g. Soil survey maps." Ih. Geologic reports and other geological literature, i. Geotechnical reports and other geotechnical literature.


j. Well records and water supply reports.k. Oil well records.I. Hydrologic maps.m. Hydrologic and tidal data and flood records,s n. Climate and rainfall records.o. Mining history, old mine plans. and sub-sidence records.C p. Seismic data and historical earthquake s records.q. Newspaper records of landslides, floods.-earthquakes.
j. Well records and water supply reports.k. Oil well records.I. Hydrologic maps.m. Hydrologic and tidal data and flood records, s n. Climate and rainfall records.o. Mining history, old mine plans. and sub-sidence records.C p. Seismic data and historical earthquake s records.q. Newspaper records of landslides, floods.-earthquakes.
 
subsidence, and other events oflgeologic n or geotechnical significance, r. Records of performance of other structures inthe vicinity, andes. Personal communication with local inhabi-tants and local professionals.
 
Special or unusual problems such as swelling soilsIg and shales (subject to large volume changes withb- changes in moisture),
occurrences of gas, cavities inIg soluble rocks, subsidence caused by mining or pump-I- ing ofwater.
 
gas. or oil from wells, and possible uplifts. due to pressurization from pumping of water, gas, ord oil into the subsurface may require consultation with)d individuals, institutions, or firms having experience of in the area with such problems.
 
al The site investigation includes detailed surface ex-ploration of the immediate site area and adjacent en-virons. Further detailed surface exploration also mayof be required in areas remote to the immediate plantsite to complete the geologic evaluation of the site or1.132-20Ia.--M
to conduct detailed investigations of surface faultingor other features.
 
Surface exploration needed for theassessment of the site geology is site dependent andmay be carried out with the use of any appropriate combination of geological, geophysical (seismicrefraction),
or engineering techniques.


Normally thisincludes the following:
subsidence, and other events oflgeologic n or geotechnical significance, r. Records of performance of other structures in the vicinity, and e s. Personal communication with local inhabi-tants and local professionals.
a. Detailed mapping of topographic, hydrologic, and surface geologic features, as ap-propriate for the particular site conditions, withscales and contour intervals suitable for analysis andengineering design. For offshore sites, coastal sites,or sites located near lakes or rivers this includestopography and detailed hydrographi, surveys to theextent that they are needed for site evaluation andengineering design.b. Detailed geologic interpretations of aerialphotographs and other remote-sensing imagery, asappropriate for the particular site conditions, to as-sist in identifying rock outcrops, soil conditions, evidence of past landslides or soil liquefaction, faults,fracture traces, and lineaments.


c. Detailed onsite mapping of local engineering geology and soils.d. Mapping of surface water features such asrivers, streams, or lakes and local surface drainagechannels, ponds, springs, and sinks at the site.3. Groundwater Investigations Knowledge of groundwater conditions.
Special or unusual problems such as swelling soils Ig and shales (subject to large volume changes with b- changes in moisture), occurrences of gas, cavities in Ig soluble rocks, subsidence caused by mining or pump-I- ing ofwater. gas. or oil from wells, and possible uplift s. due to pressurization from pumping of water, gas, or d oil into the subsurface may require consultation with)d individuals, institutions, or firms having experience of in the area with such problems.al The site investigation includes detailed surface ex-ploration of the immediate site area and adjacent en-virons. Further detailed surface exploration also may of be required in areas remote to the immediate plant site to complete the geologic evaluation of the site or 1.132-2 0I a.--M
to conduct detailed investigations of surface faulting or other features.


theirrelationship to surface waters, and variations as-sociated with seasons or tides is needed for founda-tion analyses.
Surface exploration needed for the assessment of the site geology is site dependent and may be carried out with the use of any appropriate combination of geological, geophysical (seismic refraction), or engineering techniques.


Groundwater conditions should beobserved in borings at the time they are made:however, for engineering applications, such datamust be supplemented by groundwater observations made by means of properly installed wells orpiezometers*
Normally this includes the following:
that are read at regular intervals fromthe time of their installation at least through the con-struction period. The U.S. Army Corps of Engineers'
a. Detailed mapping of topographic, hydrologic, and surface geologic features, as ap-propriate for the particular site conditions, with scales and contour intervals suitable for analysis and engineering design. For offshore sites, coastal sites, or sites located near lakes or rivers this includes topography and detailed hydrographi, surveys to the extent that they are needed for site evaluation and engineering design.b. Detailed geologic interpretations of aerial photographs and other remote-sensing imagery, as appropriate for the particular site conditions, to as-sist in identifying rock outcrops, soil conditions, evidence of past landslides or soil liquefaction, faults, fracture traces, and lineaments.
manual on groundwater and pore pressure observa-tions in embuinkment dams and their foundations (Ref. I) provides guidance on acceptable mrthods forthe installation and maintenance of piezometer andobservation well* instrumentation.


Piezometer orwell installations should be made in as many loca-tions as needed to define groundwater conditions.
c. Detailed onsite mapping of local engineering geology and soils.d. Mapping of surface water features such as rivers, streams, or lakes and local surface drainage channels, ponds, springs, and sinks at the site.3. Groundwater Investigations Knowledge of groundwater conditions.


When the possibility of perched groundwater tablesor artesian pressures is indicated by borings or otherevidence, piezometer installation should be made tomeasure each piezometric level independently.
their relationship to surface waters, and variations as-sociated with seasons or tides is needed for founda-tion analyses.


Careshould be taken in the design and installation ofpiezometers to prevent hydraulic communication between aquifers.
Groundwater conditions should be observed in borings at the time they are made: however, for engineering applications, such data must be supplemented by groundwater observations made by means of properly installed wells or piezometers*
that are read at regular intervals from the time of their installation at least through the con-struction period. The U.S. Army Corps of Engineers'
manual on groundwater and pore pressure observa-tions in embuinkment dams and their foundations (Ref. I) provides guidance on acceptable mrthods for the installation and maintenance of piezometer and observation well* instrumentation.


The occurrence of artesian pressurein borings should be noted on boring logs. and theirheads should be measured and logged.Where construction dewatering is required, piezometers or observation wells should be used dur-ing construction to monitor the groundwater surfaceand pore pressures beneath the excavation and in theadjacent ground. The guide does not covergroundwater monitoring needed during construction in plants that have permanent dewatering systems in-corporated in their design.4. Subsurface Investigations a. GeneralThe appropriate depth, layout, spacing.
Piezometer or well installations should be made in as many loca-tions as needed to define groundwater conditions.


and sampl-ing requirements for subsurface investigations aredictated by the foundation requirements and by thecomplexity of the subsurface conditions.
When the possibility of perched groundwater tables or artesian pressures is indicated by borings or other evidence, piezometer installation should be made to measure each piezometric level independently.


Methods ofconducting subsurface investigations are tabulated inAppendix B, and criteria for the spacing and depth ofborings for safety-related structures, where favorable or uniform geologic conditions exist. are given in Ap-pendix C.Subsurface explorations for less critical founda-tions of power plants should be carried out with spac-ing and depth of penetration as necessary to definethe general geologic and foundation conditions of thesite. Subsurface investigations in areas remote fromplant foundations may be needed to complete thegeologic description of the site and confirm geologicand foundation conditions and should also becarefully planned.Subsurface conditions may be considered favorable or uniform if the geologic and stratigraphic features to be defined can be correlated from one bor-ing or sounding*
Care should be taken in the design and installation of piezometers to prevent hydraulic communication between aquifers.
location to the next with relatively smooth variations in thicknesses or properties of thegeologic units. An occasional anomaly or a limitednumber of unexpected lateral variations may occur.Uniform conditions permit the maximum spacing ofborings for adequate definition of the subsurface con-ditions at the site.Occasionally soil or rock deposits may be en-countered in which the deposition patterns are socomplex that only the major stratigraphic boundaries are correlatable, and material types or properties mayvary within major geologic units in an apparently random manner from one boring to another.


Thenumber and distribution of borings needed for theseconditions will exceed those indicated in Appendix Cand are determined by the degree of resolution needed in the definition of foundation properties.
The occurrence of artesian pressure in borings should be noted on boring logs. and their heads should be measured and logged.Where construction dewatering is required, piezometers or observation wells should be used dur-ing construction to monitor the groundwater surface and pore pressures beneath the excavation and in the adjacent ground. The guide does not cover groundwater monitoring needed during construction in plants that have permanent dewatering systems in-corporated in their design.4. Subsurface Investigations a. General The appropriate depth, layout, spacing. and sampl-ing requirements for subsurface investigations are dictated by the foundation requirements and by the complexity of the subsurface conditions.


1.132-3 The cumulative thicknesses of the various materialtypes, their degree of variability, and ranges of thematerial properties must be defined.If there is evidence suggesting the presence of localadverse anomalies or discontinuities such as cavities.
Methods of conducting subsurface investigations are tabulated in Appendix B, and criteria for the spacing and depth of borings for safety-related structures, where favorable or uniform geologic conditions exist. are given in Ap-pendix C.Subsurface explorations for less critical founda-tions of power plants should be carried out with spac-ing and depth of penetration as necessary to define the general geologic and foundation conditions of the site. Subsurface investigations in areas remote from plant foundations may be needed to complete the geologic description of the site and confirm geologic and foundation conditions and should also be carefully planned.Subsurface conditions may be considered favorable or uniform if the geologic and stratigraphic features to be defined can be correlated from one bor-ing or sounding*
location to the next with relatively smooth variations in thicknesses or properties of the geologic units. An occasional anomaly or a limited number of unexpected lateral variations may occur.Uniform conditions permit the maximum spacing of borings for adequate definition of the subsurface con-ditions at the site.Occasionally soil or rock deposits may be en-countered in which the deposition patterns are so complex that only the major stratigraphic boundaries are correlatable, and material types or properties may vary within major geologic units in an apparently random manner from one boring to another. The number and distribution of borings needed for these conditions will exceed those indicated in Appendix C and are determined by the degree of resolution needed in the definition of foundation properties.


sinkholes, fissures, faults, brecciation.
1.132-3 The cumulative thicknesses of the various material types, their degree of variability, and ranges of the material properties must be defined.If there is evidence suggesting the presence of local adverse anomalies or discontinuities such as cavities.sinkholes, fissures, faults, brecciation.


and lenses orpockets of unsuitable material, supplementary bor-ings or soundings at a spacing small enough to detectand delineate these features are needed. It is impor-tant that these borings should penetrate all suspectzones or extend to depths below which their presencewould not influence the safety of the structures.
and lenses or pockets of unsuitable material, supplementary bor-ings or soundings at a spacing small enough to detect and delineate these features are needed. It is impor-tant that these borings should penetrate all suspect zones or extend to depths below which their presence would not influence the safety of the structures.


Geophysical investigations may be used to supple-ment the boring and sounding program.in planning the exploration program for a site,consideration should also be given to the possibility that the locations of structures may be changed, andthat such changes may require additional exploration to adequately define subsurface conditions at thefinal locations.
Geophysical investigations may be used to supple-ment the boring and sounding program.in planning the exploration program for a site, consideration should also be given to the possibility that the locations of structures may be changed, and that such changes may require additional exploration to adequately define subsurface conditions at the final locations.


The location and spacing of borings, soundings.
The location and spacing of borings, soundings.


and exploratory excavations should be chosencarefully to adequately define subsurface conditions.
and exploratory excavations should be chosen carefully to adequately define subsurface conditions.
 
A uniform grid may not provide the most effective distribution of exploration locations unless the siteconditions are very uniform.
 
The location of initialborings should be determined on the basis of condi-tions indicated by preliminary investigations.
 
Loca-tions for subsequent or supplemental explorations should be chosen in a manner so as to result in thebest definition of the foundation conditions on thebasis of conclusions derived from earlier exploratory work.Whereve feasible, the locations of subsurface ex-plorations should be chosen to permit the construc- tion of geological cross sections in important subsur-face views of the site.It is essential to verify during construction that insitu conditions have been realistically estimated dur-ing analysis and design. Excavations made duringconstruction provide opportunities for obtaining ad-ditional geologic and geotechnical data. All construc- tion excavations for safety-related structures andother excavations important to the verification ofsubsurface conditions should be geologically mappedand logged in detail. Particular attention should begiven to the identification of thin strata or othergeologic features that may be important to founda-tion behavior but. because of their limited extent,were previously undetected in the investigations program.
 
If subsurface conditions substantially differfrom those anticipated, casting doubt on the ade-quacy of the design or expected performance of thefoundation.
 
there may be a need for additional ex-ploration and redesign.
 
b. lnvestigations Related to SpeciflC
Site Conditions Investigations for specific site conditions should in-clude the following:
(I) Rock. The engineering characteristics ofrocks are related primarily to their structure.
 
bed-ding. jointing, fracturing, weathering, and physicalproperties.


Core samples are needed to observe anddefine these features.
A uniform grid may not provide the most effective distribution of exploration locations unless the site conditions are very uniform. The location of initial borings should be determined on the basis of condi-tions indicated by preliminary investigations.


Suitable coring methods shouldbe employed in sampling, and rocks should besampled to a depth below which rock characteristics do not influence foundation performance.
Loca-tions for subsequent or supplemental explorations should be chosen in a manner so as to result in the best definition of the foundation conditions on the basis of conclusions derived from earlier exploratory work.Whereve feasible, the locations of subsurface ex-plorations should be chosen to permit the construc-tion of geological cross sections in important subsur-face views of the site.It is essential to verify during construction that in situ conditions have been realistically estimated dur-ing analysis and design. Excavations made during construction provide opportunities for obtaining ad-ditional geologic and geotechnical data. All construc-tion excavations for safety-related structures and other excavations important to the verification of subsurface conditions should be geologically mapped and logged in detail. Particular attention should be given to the identification of thin strata or other geologic features that may be important to founda-tion behavior but. because of their limited extent, were previously undetected in the investigations program. If subsurface conditions substantially differ from those anticipated, casting doubt on the ade-quacy of the design or expected performance of the foundation.


Deeperborings'mav be needed to investigate zones critical tothe evaluation of the site geology.
there may be a need for additional ex-ploration and redesign.b. lnvestigations Related to SpeciflC Site Conditions Investigations for specific site conditions should in-clude the following: (I) Rock. The engineering characteristics of rocks are related primarily to their structure.


Within the depthintervals influencing foundation performance.
bed-ding. jointing, fracturing, weathering, and physical properties.


zonesof poor core recovery, low RQD (Rock QualityDesignation).*
Core samples are needed to observe and define these features.
dropping of rods. lost drilling fluidcirculation.


zones requiring casing. and other zoneswhere drilling difficulties are encountered should beinvestigated by means of suitable logging or in situobservation methods to determine the nature.geometry.
Suitable coring methods should be employed in sampling, and rocks should be sampled to a depth below which rock characteristics do not influence foundation performance.


and spacing of any discontinuities oranomolous zones. %%'here soil-filled voids, channels, or fissures are encountered.
Deeper borings'mav be needed to investigate zones critical to the evaluation of the site geology. Within the depth intervals influencing foundation performance.


representative samples*of the filling materials are needed. Where there isevidence of significant residual stresses, they shouldbe evaluated on the basis of in situ stress or strainmeasurements.
zones of poor core recovery, low RQD (Rock Quality Designation).*  
dropping of rods. lost drilling fluid circulation.


(2) Granular Soils. Investigations of granularsoils should include borings with splitspoon samplingand Standard Penetration Tests with sufficient coverage to define the soil profile and variations ofsoil conditions.
zones requiring casing. and other zones where drilling difficulties are encountered should be investigated by means of suitable logging or in situ observation methods to determine the nature.geometry.


Soundings with cone penetration tests may also be used to provide useful supplemental data if the device is properly calibrated to site condi-tions.Suitable samples should be obtained for soil iden-tification and classification, in situ density determina- tions. mechanical analyses, and anticipated laboratory testing.
and spacing of any discontinuities or anomolous zones. %%'here soil-filled voids, channels, or fissures are encountered.


In these investigations, it is impor-tant to obtain the best possible undistrbed samples*for testing to determine whether the sands are suf-ficiently dense to preclude liquefaction or damagingcyclic deformation.
representative samples*of the filling materials are needed. Where there is evidence of significant residual stresses, they should be evaluated on the basis of in situ stress or strain measurements.


The number and distribution ofsamples will depend on testing requirements and thevariability of the soil conditions.
(2) Granular Soils. Investigations of granular soils should include borings with splitspoon sampling and Standard Penetration Tests with sufficient coverage to define the soil profile and variations of soil conditions.


In general, however,samples should be included from at least one prin-cipal boring* at the location of each Category I struc-ture. Samples should be obtained at regular intervals in depth and when changes in materials occur.Criteria for the distribution of samples are given inregulatory position
Soundings with cone penetration tests may also be used to provide useful supplemental data if the device is properly calibrated to site condi-tions.Suitable samples should be obtained for soil iden-tification and classification, in situ density determina- tions. mechanical analyses, and anticipated laboratory testing. In these investigations, it is impor-tant to obtain the best possible undistrbed samples*for testing to determine whether the sands are suf-ficiently dense to preclude liquefaction or damaging cyclic deformation.
5.Granular soils containing coarse gravels andboulders are among the most difficult materials to.132-4U
sample. Obtaining good quality samples in thesecoarser soils often requires the use of trenches, pits.or other accessible excavations*  
into the zones of in-terest. Also, extreme care is necessary in interpreting results from $he Standard Penetration Test in thesematerials.


Often such data are misleading and mayhave to be disregarded.
The number and distribution of samples will depend on testing requirements and the variability of the soil conditions.


When sampling of thesecoarse soils is difficult.
In general, however, samples should be included from at least one prin-cipal boring* at the location of each Category I struc-ture. Samples should be obtained at regular intervals in depth and when changes in materials occur.Criteria for the distribution of samples are given in regulatory position 5.Granular soils containing coarse gravels and boulders are among the most difficult materials to.132-4 U
sample. Obtaining good quality samples in these coarser soils often requires the use of trenches, pits.or other accessible excavations*
into the zones of in-terest. Also, extreme care is necessary in interpreting results from $he Standard Penetration Test in these materials.


informationthat may be lostwhen the soil is later classified in the lhboratory should be recorded in the field. This information should include observed estimates of percent cobbles,boulders, and coarse material and their hardness.
Often such data are misleading and may have to be disregarded.


shape, surface coating.
When sampling of these coarse soils is difficult.


and degree of weathering ofcoarse materials.
informationthat may be lost when the soil is later classified in the lhboratory should be recorded in the field. This information should include observed estimates of percent cobbles, boulders, and coarse material and their hardness.shape, surface coating. and degree of weathering of coarse materials.


(3) Moderately v Compressible or Normally Con-solidated Clay' or Clay ve Soils. The properties of afine grained soil are related to its in situ structure.*
(3) Moderately v Compressible or Normally Con-solidated Clay' or Clay ve Soils. The properties of a fine grained soil are related to its in situ structure.*
and therefore the recovery and testing of good un-disturbed samples are necessary.
and therefore the recovery and testing of good un-disturbed samples are necessary.


Criteria for the dis-tribution and methods for obtaining undisturbed samples are discussed in regulatory position  
Criteria for the dis-tribution and methods for obtaining undisturbed samples are discussed in regulatory position 5.(4) Stibsurjaice Cavilies.
5.(4) Stibsurjaice Cavilies.
 
Subsurface cavities mayoccur in water-soluble rocks. lavas, or weakly in-durated sedimentary rocks as the result of subterra- nean solutioning and erosion.
 
Because of the widedistribution of carbonate rocks in the United States.the occurrence of features such as cavities, sinkholes.
 
and solution-widened joint openings is common. Forthis reason, it is best to thoroughly investigate anysite on carbonate rock for solution features to deter-mine their influence on the performance of founda-tions.Investigations may be carried out with boringsalone or in conjunction with accessible excavations, soundings, pumping tests, pressure tests, geophysical surveys, or a combination of such methods.
 
The in-vestigation program will depend on the details of thesite geology and the foundation design.Indications of the presence of cavities, such aszones of lost drilling fluid circulation, water flo\%inginto or out of drillholes, mud fillings, poor corerecovery, dropping or settling of drilling rods.anomalies in geophysical surveys, or in situ tests thatsuggest voids, should be followed up with moredetailed investigations.
 
These investigations shouldinclude excavation to expose solution features or ad-ditional borings that trace out such features.


The occurrence, distribution, and geometry of sub-surface cavities are highly unpredictable, and nopreconstruction exploration program can ensure thatall significant subsurface voids will be fully revealed.
Subsurface cavities may occur in water-soluble rocks. lavas, or weakly in-durated sedimentary rocks as the result of subterra-nean solutioning and erosion. Because of the wide distribution of carbonate rocks in the United States.the occurrence of features such as cavities, sinkholes.


Experience has shown that solution features may re-main undetected even where the area has been in-vestigated by a large number of borings.
and solution-widened joint openings is common. For this reason, it is best to thoroughly investigate any site on carbonate rock for solution features to deter-mine their influence on the performance of founda-tions.Investigations may be carried out with borings alone or in conjunction with accessible excavations, soundings, pumping tests, pressure tests, geophysical surveys, or a combination of such methods. The in-vestigation program will depend on the details of the site geology and the foundation design.Indications of the presence of cavities, such as zones of lost drilling fluid circulation, water flo\%ing into or out of drillholes, mud fillings, poor core recovery, dropping or settling of drilling rods.anomalies in geophysical surveys, or in situ tests that suggest voids, should be followed up with more detailed investigations.


Therefore, where a site is on solution-susceptible rock, it maysometimes be necessary to inspect the rock after strip-ping or excavation is complete and the rock is ex-posed. Remedial grouting or other corrective measures should be employed where necessary.
These investigations should include excavation to expose solution features or ad-ditional borings that trace out such features.The occurrence, distribution, and geometry of sub-surface cavities are highly unpredictable, and no preconstruction exploration program can ensure that all significant subsurface voids will be fully revealed.Experience has shown that solution features may re-main undetected even where the area has been in-vestigated by a large number of borings. Therefore, where a site is on solution-susceptible rock, it may sometimes be necessary to inspect the rock after strip-ping or excavation is complete and the rock is ex-posed. Remedial grouting or other corrective measures should be employed where necessary.


(5) Materials Lb.suitahhle Jbr Fotmdatitnhs.
(5) Materials Lb.suitahhle Jbr Fotmdatitnhs.


Bor-ings and representative sampling and testing shouldbe completed to delineate the boundaries of un-suitable materials, These boundaries should be usedto define the required excavation limits.(6) Borrow Materials.
Bor-ings and representative sampling and testing should be completed to delineate the boundaries of un-suitable materials, These boundaries should be used to define the required excavation limits.(6) Borrow Materials.
 
Exploration of borrowsources requires the determination of the locationand amount of borrow fill materials available.
 
Investigations in the borrow areas should be of suf-ficient hori.,;mal and vertical intervals small enoughto determine the material variability and should in-clude adequate sampling of representative materials for laboratory testing.c. Sam...ntAll soil and rock samples obtained for testingshould be representative.
 
In many cases, to establish physical properties it is netcssary to obtain un-disturbed samples that preserve the in situ structure of the soil. The recovery of undisturbed samples isdiscussed in Section B.6 of this guide.Sampling of soils should include.
 
as a minimum.recovery of samples for all principal borings atregular intervals and at changes in strata. A numberof samples sufficient to permit laboratory determina- tion of average material properties and to indicatetheir variability is necessary.
 
Alternating splitspoon and undi!;Iurbed samples with depth is recom-mended. Where sampling is not continuous, theelevations at which samples are taken should be stag-gered from boring to boring so as to provide con-tinuous coverage of samples within the soil column.In supplementary borings,*
sampling may be con-fined to the zone of specific interest.
 
Relatively thin zones of weak or unstable soils maybe contained within more competent materials andmay affect the engincering properties of the soil orrock. Continuous sampling in subsequent borings isneeded through these suspect zones. Where it is notpossible to obtain continuous samples in a single bor-ing. samples may be obtained from adjacent closelyspaced borings in the immediate vicinity and may beused as representative of the material in the omitteddepth intervals.


Such a set of borings should be con-sidered equivalent to one principal boring.d. Determining the Engineering Properties of Sub-surface Materials The shear strengths of foundation materials in allzones subjected to significant imposed stresses must01.132-5
Exploration of borrow sources requires the determination of the location and amount of borrow fill materials available.
--Ibe determined to establish whether they are adequateto support the imposed loads with an appropriate margin of safety. Similarly, it is necessary both todetermine the compressibilities and swelling poten-tials of all materials in zones subjected to significant changes of compressive stresses and to establish thatthe deformations will be acceptable.


In some casesthese determinations may be made by suitable in situtests and classification tests. Other situations may re-quire the laboratory testing of undisturbed samples.Determination of dynamic modulus and dampingvalues for soil strata is required
Investigations in the borrow areas should be of suf-ficient hori.,;mal and vertical intervals small enough to determine the material variability and should in-clude adequate sampling of representative materials for laboratory testing.c. Sam...nt All soil and rock samples obtained for testing should be representative.
'or earthquake response analyses.


These determinations may bemade by laboratory testing of suitable undisturbed samples in conjunction with appropriate in situ tests.5. Methods and Procedures for ExpLuratory DrillingIn nearly ever%, site investigation, the primarymeans Of subsurface exploration are borings andborehole sampling.
In many cases, to establish physical properties it is netcssary to obtain un-disturbed samples that preserve the in situ structure of the soil. The recovery of undisturbed samples is discussed in Section B.6 of this guide.Sampling of soils should include. as a minimum.recovery of samples for all principal borings at regular intervals and at changes in strata. A number of samples sufficient to permit laboratory determina- tion of average material properties and to indicate their variability is necessary.


Drilling methods and procedures should be compatible with sampling requirements and the methods of sample recovery.
Alternating splitspoon and undi!;Iurbed samples with depth is recom-mended. Where sampling is not continuous, the elevations at which samples are taken should be stag-gered from boring to boring so as to provide con-tinuous coverage of samples within the soil column.In supplementary borings,*
sampling may be con-fined to the zone of specific interest.Relatively thin zones of weak or unstable soils may be contained within more competent materials and may affect the engincering properties of the soil or rock. Continuous sampling in subsequent borings is needed through these suspect zones. Where it is not possible to obtain continuous samples in a single bor-ing. samples may be obtained from adjacent closely spaced borings in the immediate vicinity and may be used as representative of the material in the omitted depth intervals.


The top of the hole should be protected by asuitable surface casing where needed. Below groundsurface, the borehole should be protected by drillingmud or casing. as necessary, to prevent caving anddisturbance of materials to be sampled.
Such a set of borings should be con-sidered equivalent to one principal boring.d. Determining the Engineering Properties of Sub-surface Materials The shear strengths of foundation materials in all zones subjected to significant imposed stresses must 0 1.132-5
--I be determined to establish whether they are adequate to support the imposed loads with an appropriate margin of safety. Similarly, it is necessary both to determine the compressibilities and swelling poten-tials of all materials in zones subjected to significant changes of compressive stresses and to establish that the deformations will be acceptable.


The use ofdrilling mud is preferred to prevent disturbance whenobtaining undisturbed samples of granular soils.However, casing may be used if proper steps aretaken to prevent disturbance of the soil beingsampled and to prevent upward movement of soilinto the casing, Washing with open-ended pipe forcleaning or advancing sample borcholes should notbe permitted.
In some cases these determinations may be made by suitable in situ tests and classification tests. Other situations may re-quire the laboratory testing of undisturbed samples.Determination of dynamic modulus and damping values for soil strata is required 'or earthquake response analyses.


Bottom-discharge bits should be usedonly with low-to-medium fluid pressure and withupward-deflected jets.The groundwater or drilling mud level should bemeasured at the -start and end of each work day forborings in progress, at the completion of drilling, andat least 24 hours after drilling is completed, In addi-tion to pertinent information normally recorded, alldepths and amounts of water or drilling mud losses,together with depths at which circulation isrecovered, should be recorded and reported on bor-ing logs and on geological cross sections.
These determinations may be made by laboratory testing of suitable undisturbed samples in conjunction with appropriate in situ tests.5. Methods and Procedures for ExpLuratory Drilling In nearly ever%, site investigation, the primary means Of subsurface exploration are borings and borehole sampling.


Logs andsections should also reflect incidents of settling ordropping of drill rods, abnormally low resistance todrilling or advance of samplers, core losses, in-stability or heave of the side and bottom ofborcholes, influx of groundwater, and any otherspecial feature or occurrence.
Drilling methods and procedures should be compatible with sampling requirements and the methods of sample recovery.The top of the hole should be protected by a suitable surface casing where needed. Below ground surface, the borehole should be protected by drilling mud or casing. as necessary, to prevent caving and disturbance of materials to be sampled. The use of drilling mud is preferred to prevent disturbance when obtaining undisturbed samples of granular soils.However, casing may be used if proper steps are taken to prevent disturbance of the soil being sampled and to prevent upward movement of soil into the casing, Washing with open-ended pipe for cleaning or advancing sample borcholes should not be permitted.


Details of information that should be presented on logs of subsurface in-vestigations are given in regulatory position
Bottom-discharge bits should be used only with low-to-medium fluid pressure and with upward-deflected jets.The groundwater or drilling mud level should be measured at the -start and end of each work day for borings in progress, at the completion of drilling, and at least 24 hours after drilling is completed, In addi-tion to pertinent information normally recorded, all depths and amounts of water or drilling mud losses, together with depths at which circulation is recovered, should be recorded and reported on bor-ing logs and on geological cross sections.
2.Depths should be measured to the nearest tenth ofa foot and be correlatable to the elevation datumused for the site. Elevations of points in the boreholeshould also be determined with an accuracy of +/-0. Ift. Deviation surveys should be run in all boreholes that are used for crosshole seismic tests and in allboreholes where deviations are significant to the useof data obtained.


After use, it is advisable to grouteach borehole with cement to prevent vertical move-ment of groundwater in the borehole.
Logs and sections should also reflect incidents of settling or dropping of drill rods, abnormally low resistance to drilling or advance of samplers, core losses, in-stability or heave of the side and bottom of borcholes, influx of groundwater, and any other special feature or occurrence.


6. Recovery of Undisturbed Soil SamplesThe best undisturbed samples are often obtainedby carefully performed hand trimming of block sam-pies in accessible excavations.
Details of information that should be presented on logs of subsurface in-vestigations are given in regulatory position 2.Depths should be measured to the nearest tenth of a foot and be correlatable to the elevation datum used for the site. Elevations of points in the borehole should also be determined with an accuracy of +/-0. I ft. Deviation surveys should be run in all boreholes that are used for crosshole seismic tests and in all boreholes where deviations are significant to the use of data obtained.


However, it is normal-ly not practical to obtain enough block samples at therequisite spacings and depths by this method alone. Itis customary, where possible, to use thin-wall tubesamplers in borings for the major part of the un-disturbed sampling.
After use, it is advisable to grout each borehole with cement to prevent vertical move-ment of groundwater in the borehole.6. Recovery of Undisturbed Soil Samples The best undisturbed samples are often obtained by carefully performed hand trimming of block sam-pies in accessible excavations.


Criteria for obtaining un-disturbed tube samples are given in regulatory posi-tion 5.The recovery of undisturbed samples of goodquality is dependent on rigorous attention to detailsor equipment and procedures.
However, it is normal-ly not practical to obtain enough block samples at the requisite spacings and depths by this method alone. It is customary, where possible, to use thin-wall tube samplers in borings for the major part of the un-disturbed sampling.


Proper cleaning of thehole. by methods that do not produce avoidable dis-turbance of the soil, is necessary before sampling.
Criteria for obtaining un-disturbed tube samples are given in regulatory posi-tion 5.The recovery of undisturbed samples of good quality is dependent on rigorous attention to details or equipment and procedures.


The sampler should be advanced in a manner thatdoes not produce avoidable disturbance.
Proper cleaning of the hole. by methods that do not produce avoidable dis-turbance of the soil, is necessary before sampling.The sampler should be advanced in a manner that does not produce avoidable disturbance.


For exam-ple, when using fixed-piston-type samplers.
For exam-ple, when using fixed-piston-type samplers.


the drill-ing rig should be firmly anchored, or the pistonshould be fixed to an external anchor, to prevent itsmoving upward during the push of the sampling tube.Care should be taken to ensure that the sample is notdisturbed during its removal from the borehole or indisassembling the sampler.
the drill-ing rig should be firmly anchored, or the piston should be fixed to an external anchor, to prevent its moving upward during the push of the sampling tube.Care should be taken to ensure that the sample is not disturbed during its removal from the borehole or in disassembling the sample
 
References
2 and 3provide descriptions of suitable proccedures for ob-taining undisturbed samples.With the conscientious use of proper field tech-niques, undisturbed samples in normally con-solidated clays and silts can usually be recovered bymeans of fixed-piston-type thin-wall tube samplerswithout serious difficulty.
 
Recovery of good un-disturbed samples in sands requires greater care thanin clays, but with proper care and attention to detail,they can also be obtained with fixed-piston-type thin-wall tube samplers in most sands that are free ofbouiders and gravel size particles.
 
Appendix B lists anumber of sampling methods that are suitable for usein these and other materials.
 
Undisturbed samples of boulders, gravels, or sand-gravel mixtures generally are difficult to obtain, andoften it is necessary to use hand sampling methods intest pits, shafts, or other accessible excavations to getgood samples.When obtaining undisturbed samples of granularsoils below the groundwater table, dewatering bymeans of well points or other suitable methods may1.132-6 he required.
 
Osterberg and Varaksin (Ref. 4) describea sampling program using dewatering of a shaft insand with a frozen surrounding annulus.
 
Samplessuitable for density determination, though not fortests of mnichanical properties.
 
may sometimes be ob-tained boreholes with the help of chemicalstabilization or impregnation (Refs. 5. 6). Specialprcautions are required when toxic chemicals areused. Also. where aquifers are involved, it may not beadvisable to injeit chemicals or grouts into them.Useful discussions of methods of sampling granularsoils are given by l-vorslev (Ref. 7) and Barton(Rer. 8).7. Handling.


Field Storage, and Transporting of Sam-plesTreatoiient of samples after their recovery from theground is as critica0l to their quality as the procedures used in obtaining them. Samples of cohesionless soilsare particularly sensitive to disturbance in handlingand require extreme care during removal from theborehole, removal from the sampler.
====r. References ====
2 and 3 provide descriptions of suitable proccedures for ob-taining undisturbed samples.With the conscientious use of proper field tech-niques, undisturbed samples in normally con-solidated clays and silts can usually be recovered by means of fixed-piston-type thin-wall tube samplers without serious difficulty.


and subsequent handling in order to prevent disturbance from impactand vibration (Ref. 2). Special precautions are re-quired in transporting undisturbed samples becauseof their sensitivity to vibration and impact. Theyshould be kept in a vertical position at all times.should be well padded to isolate them from vibration and impacts.
Recovery of good un-disturbed samples in sands requires greater care than in clays, but with proper care and attention to detail, they can also be obtained with fixed-piston-type thin-wall tube samplers in most sands that are free of bouiders and gravel size particles.


and should be transported with extremecare. Transportation by commercial carriers is notadvisable.
Appendix B lists a number of sampling methods that are suitable for use in these and other materials.


Block samples should be handled bymethods that give them equivalent protection fromdisturbance.
Undisturbed samples of boulders, gravels, or sand-gravel mixtures generally are difficult to obtain, and often it is necessary to use hand sampling methods in test pits, shafts, or other accessible excavations to get good samples.When obtaining undisturbed samples of granular soils below the groundwater table, dewatering by means of well points or other suitable methods may 1.132-6 he required.


All undisturbed samples should beproperly sealed and protected against moisture loss.Disturbed samples*
Osterberg and Varaksin (Ref. 4) describe a sampling program using dewatering of a shaft in sand with a frozen surrounding annulus. Samples suitable for density determination, though not for tests of mnichanical properties.
may be sealed in the same wayas undisturbed samples.


if in tubes. or may be placedin suitably marked, noncorroding.
may sometimes be ob-tained boreholes with the help of chemical stabilization or impregnation (Refs. 5. 6). Special prcautions are required when toxic chemicals are used. Also. where aquifers are involved, it may not be advisable to injeit chemicals or grouts into them.Useful discussions of methods of sampling granular soils are given by l-vorslev (Ref. 7) and Barton (Rer. 8).7. Handling.


airtight con-tainers.
Field Storage, and Transporting of Sam-ples Treatoiient of samples after their recovery from the ground is as critica0l to their quality as the procedures used in obtaining them. Samples of cohesionless soils are particularly sensitive to disturbance in handling and require extreme care during removal from the borehole, removal from the sampler. and subsequent handling in order to prevent disturbance from impact and vibration (Ref. 2). Special precautions are re-quired in transporting undisturbed samples because of their sensitivity to vibration and impact. They should be kept in a vertical position at all times.should be well padded to isolate them from vibration and impacts. and should be transported with extreme care. Transportation by commercial carriers is not advisable.


Large representative samples may be placedin plastic bags, in tightly woven cloth, or in noncor-roding cans or other vessels that do not permit loss offine particles by sifting.
Block samples should be handled by methods that give them equivalent protection from disturbance.


Such samples may be trans-ported by any convenient means.Rock cores need to be stored and transported indurable boxes provided with suitable dividers to pre-vent shifting of the cores in any direction.
All undisturbed samples should be properly sealed and protected against moisture loss.Disturbed samples* may be sealed in the same way as undisturbed samples. if in tubes. or may be placed in suitably marked, noncorroding.


Theyshould be clearly labeled to identify the site, the bor-ing number, the core interval, and the top and hot-tom depths of the core. If the box has a removable lid, labeling should be placed on both the outside andinside of the box, as well as on the lid. Special con-tainers may be required to protect samples to be usedfor fluid content determinations and shale samples tobe used for tests of mechanical properties fromchanges in fluid content.
airtight con-tainers. Large representative samples may be placed in plastic bags, in tightly woven cloth, or in noncor-roding cans or other vessels that do not permit loss of fine particles by sifting. Such samples may be trans-ported by any convenient means.Rock cores need to be stored and transported in durable boxes provided with suitable dividers to pre-vent shifting of the cores in any direction.


Core samples should betransported with the care necessary to avoid breakageor disturbance.
They should be clearly labeled to identify the site, the bor-ing number, the core interval, and the top and hot-tom depths of the core. If the box has a removable lid, labeling should be placed on both the outside and inside of the box, as well as on the lid. Special con-tainers may be required to protect samples to be used for fluid content determinations and shale samples to be used for tests of mechanical properties from changes in fluid content. Core samples should be transported with the care necessary to avoid breakage or disturbance.


C. REGULATORY  
C. REGULATORY  
POSITIONrhe site investigations program needed to deter-mine foundation conditions at a nuclear po%ker plantsite is highly dependent on actual site conditions.
POSITION rhe site investigations program needed to deter-mine foundation conditions at a nuclear po%ker plant site is highly dependent on actual site conditions.


Theprogram should he flexible and adjusted as the site in-vestigation proceeds with the advice of experienced personnel familiar with ti, site. The staff will revie\%the results of each site investigation program on acase-by-case basis and make an independent evaluv,-tion of foundation conditions in order to judge theadequacy of the information presented.
The program should he flexible and adjusted as the site in-vestigation proceeds with the advice of experienced personnel familiar with ti, site. The staff will revie\%the results of each site investigation program on a case-by-case basis and make an independent evaluv,-tion of foundation conditions in order to judge the adequacy of the information presented.


1. General Site Iniestigation Site investigations for nuclear power plants Si.ouldbe adequaite.
1. General Site Iniestigation Site investigations for nuclear power plants Si.ould be adequaite.


in terms of thoroughness.
in terms of thoroughness.


ofthe methods used. quality of execution o ' the work.and documentation.
of the methods used. quality of execution o ' the work.and documentation.


to permit an accurate determina- tion of the geologic and geotechnical conditions thataffect the design. performance, and safe(ty of theplant. The investigations should provide information needed to assess foundation conditions at the site ::ndto perform engineering analysis and design withreasonable assurance that foundation conditions have been realistically estimated.
to permit an accurate determina- tion of the geologic and geotechnical conditions that affect the design. performance, and safe(ty of the plant. The investigations should provide information needed to assess foundation conditions at the site ::nd to perform engineering analysis and design with reasonable assurance that foundation conditions have been realistically estimated.


Information to be developed should, as ap-propriate.
Information to be developed should, as ap-propriate.
Line 362: Line 264:
hydrologic.
hydrologic.


hydrographic, and geologic maps: (2) plot plans.showing locations of major structures and explora-tions: (3) boring logs and logs of trenches and excava-tions: and (4) geologic profiles showing excavation limits for structures and geophysical data such astime-distance plots. profiles, and inhole surveys.Positions of all boreholes.
hydrographic, and geologic maps: (2) plot plans.showing locations of major structures and explora-tions: (3) boring logs and logs of trenches and excava-tions: and (4) geologic profiles showing excavation limits for structures and geophysical data such as time-distance plots. profiles, and inhole surveys.Positions of all boreholes.


piezometers.
piezometers.
Line 368: Line 270:
observation wells. soundings.
observation wells. soundings.


trenches, exploration pits. andgeophysical investigations should be surveyed in bothplan and elevation and should be shown on plotplans. geologic sections, and maps. All surveysshould be related to a fixed datum. The above infor-mation should be in sufficient detail and be in-tegrated to develop an overall view of the project andthe geologic and geotechnical conditions affecting it.2. Logs of Subsurface Imestigations Boring logs should contain the date when the bor-ing was made. the location of the boring withreference to the coordinate system used for the site.the depths of borings, and the elevations with respect*to a permanent bench mark.The logs should also include the elevations or thetop and bottom of borings and the level at which thewater table and the boundaries of soil or rock stratawere encountered, the classification and description of the soil and rock layers, blow count values ob-tained from Standard Penetration Tests, percentrecovery of rock core, and Rock Quality Designation
trenches, exploration pits. and geophysical investigations should be surveyed in both plan and elevation and should be shown on plot plans. geologic sections, and maps. All surveys should be related to a fixed datum. The above infor-mation should be in sufficient detail and be in-tegrated to develop an overall view of the project and the geologic and geotechnical conditions affecting it.2. Logs of Subsurface Imestigations Boring logs should contain the date when the bor-ing was made. the location of the boring with reference to the coordinate system used for the site.the depths of borings, and the elevations with respect*to a permanent bench mark.The logs should also include the elevations or the top and bottom of borings and the level at which the water table and the boundaries of soil or rock strata were encountered, the classification and description of the soil and rock layers, blow count values ob-tained from Standard Penetration Tests, percent recovery of rock core, and Rock Quality Designation
1.132-7 I-(RQD). Results of field permeability  
1.132-7 I-(RQD). Results of field permeability  
*tests andborehole logging should also be included on logs. Thetype of tools used in making the boring should berecorded.
*tests and borehole logging should also be included on logs. The type of tools used in making the boring should be recorded.
 
It' the tools were changed, the depth atwhich the change was made and the reason for thechange should be noted. Notes should be provided ofeverything significant to the interpretation of subsur-face conditions, such as lost drilling fluid, rod drops,and changes in drilling rate. Incomplete or aban-doned borings should be described with the same careas successfully completed borings.
 
Logs of trenchesand exploratory excavations should be presented in aformat similar to the boring logs. The location of allexplorations should be shown on the geologic sectiontogether with elevations and important data.3. Procedures for Subsurface lnvestigations Some techniques widely used for subsurface in-vestigations are listed in Appendix B. It also cites ap-propriate standards and references procedures frompublished literaturelwith general guidelines on the ap-plicability, limitations, and potential pitfalls in theiruse. Additional suitable techniques are provided byother literature listed in Appendix D. The use or in-vestigations and sampling techniques other thanthose indicated in this guide is acceptable when it canbe shown that the alternative methods yield satisfac- tory results.


The attainment of satisfactory results indriiling, sampling, and testing is dependent on thetechniques used, on care in details of operations, andon timely recognition of and correction of potential sources of error. Field operations should be super-vised by experienced professional personnel at the.site of operations, and systematic standards of prac-tice should be followed.
It' the tools were changed, the depth at which the change was made and the reason for the change should be noted. Notes should be provided of everything significant to the interpretation of subsur-face conditions, such as lost drilling fluid, rod drops, and changes in drilling rate. Incomplete or aban-doned borings should be described with the same care as successfully completed borings. Logs of trenches and exploratory excavations should be presented in a format similar to the boring logs. The location of all explorations should be shown on the geologic section together with elevations and important data.3. Procedures for Subsurface lnvestigations Some techniques widely used for subsurface in-vestigations are listed in Appendix B. It also cites ap-propriate standards and references procedures from published literaturelwith general guidelines on the ap-plicability, limitations, and potential pitfalls in their use. Additional suitable techniques are provided by other literature listed in Appendix D. The use or in-vestigations and sampling techniques other than those indicated in this guide is acceptable when it can be shown that the alternative methods yield satisfac-tory results. The attainment of satisfactory results in driiling, sampling, and testing is dependent on the techniques used, on care in details of operations, and on timely recognition of and correction of potential sources of error. Field operations should be super-vised by experienced professional personnel at the.site of operations, and systematic standards of prac-tice should be followed.


Procedures and equipment used to carry out the field operations should bedocumented, as should all conditions encountered inall phases of investigations.
Procedures and equipment used to carry out the field operations should be documented, as should all conditions encountered in all phases of investigations.


Experienced personnel thoroughly familiar with sampling and testingprocedures should also inspect and document sampl-ing results and transfer samples from the field tostorage or laboratory facilities.
Experienced personnel thoroughly familiar with sampling and testing procedures should also inspect and document sampl-ing results and transfer samples from the field to storage or laboratory facilities.


4. Spacing and Depth of Subsurface Investigations Criteria for the spacing and depth of subsurface ex-ploration at locations or safety-related structures forfavorable or uniform gcologic conditions are given inAppendix C. The application of these criteria is dis-cussed in Section B.4 of this guide, The investigative effort required for a nuclear power plant should begreatest at the locations of Category I structures andmay vary in intensity and scope in other areas ac-cording to their spatial and geolgical relations to thesite.5. SamplingSampling of soils should include, as a minimum,the recovery of samples at regular intervals and atchanges in materials.
4. Spacing and Depth of Subsurface Investigations Criteria for the spacing and depth of subsurface ex-ploration at locations or safety-related structures for favorable or uniform gcologic conditions are given in Appendix C. The application of these criteria is dis-cussed in Section B.4 of this guide, The investigative effort required for a nuclear power plant should be greatest at the locations of Category I structures and may vary in intensity and scope in other areas ac-cording to their spatial and geolgical relations to the site.5. Sampling Sampling of soils should include, as a minimum, the recovery of samples at regular intervals and at changes in materials.


Alternating splitspoon and un-disturbed samples with depth is recommended.
Alternating splitspoon and un-disturbed samples with depth is recommended.


For granular soils, samples should be taken atdepth intervals no greater than 5 feet. Beyond a depthof 50 feet below foundation level, the depth intervalfor sampling may be increased to 10 feet. Also it isrecommended tital onw or more borings for each ma-jor structure be contiuously sampled.
For granular soils, samples should be taken at depth intervals no greater than 5 feet. Beyond a depth of 50 feet below foundation level, the depth interval for sampling may be increased to 10 feet. Also it is recommended tital onw or more borings for each ma-jor structure be contiuously sampled. The borirg should be reamed and cleaned between samples. Re-quirements fe" undisturbed sampling of granular soils will depend on actual site conditions and re-quirements for laboratory testing. Some general guidelines for recovering undisturbed samples are given in Section B.4.b(2) and Section B.6 of the dis-cussion of this guide. Experimentation with different sampling techniques may be n,:cessary to determine the method best suited to local soil conditions.
 
The borirgshould be reamed and cleaned between samples.


Re-quirements fe" undisturbed sampling of granularsoils will depend on actual site conditions and re-quirements for laboratory testing.
For compressible or normally consolidated clays.undisturbed samples should be continuous throughout the compressible strata in one or more principal borings for each major structure.


Some generalguidelines for recovering undisturbed samples aregiven in Section B.4.b(2)
These samples should be obtained by means of suitable fixed-piston-type thin-wall tube samplers or by methods that yield samples of equivalent quality.Borings used for undisturbed sampling of soils should be at least 3 inches in diameter.
and Section B.6 of the dis-cussion of this guide. Experimentation with different sampling techniques may be n,:cessary to determine the method best suited to local soil conditions.


For compressible or normally consolidated clays.undisturbed samples should be continuous throughout the compressible strata in one or moreprincipal borings for each major structure.
Criteria for obtaining undisturbed tube samples include the fol-lowing: a. Tubes should meet the specifications of ASTM Standard D 1587-67 (Ref. 9): b. The Area Ratio* of the sampler should not exceed 13 percent and preferably should not exceed 10 percent: c. The Specific Recovery Ratio* should be between 90 and 100 percent: tubes with less recovery may be acceptable if it appears that the sample may have just broken off and otherwise appears essential- ly undisturbed:
d. The Inside Clearance Ratio* should be the minimum required for complete sample recovery, e. Samples recovered should contain no visible distortion of strata or opening or softening or materials brought about by the sampling procedure.


Thesesamples should be obtained by means of suitablefixed-piston-type thin-wall tube samplers or bymethods that yield samples of equivalent quality.Borings used for undisturbed sampling of soilsshould be at least 3 inches in diameter.
6. Retention of Samples, Rock Core, and Records Samples and rock cores from principal borings should be retained at least until the power plant is licensed to operate and all matters relating to the in-terpretation of subsurface conditions at the site have been resolved.


Criteria forobtaining undisturbed tube samples include the fol-lowing:a. Tubes should meet the specifications ofASTM Standard D 1587-67 (Ref. 9):b. The Area Ratio* of the sampler should notexceed 13 percent and preferably should not exceed10 percent:c. The Specific Recovery Ratio* should bebetween 90 and 100 percent:
The need to retain samples and core beyond this time is a matter of judgment and should 6 1.132-8 II
tubes with less recoverymay be acceptable if it appears that the sample mayhave just broken off and otherwise appears essential- ly undisturbed:
b 0 he evaluated on a case-by-case basis. Soil samples in tubes will deteriorate with time and will not be suitable for any undisturbed testing. However, they may be used as a visual record of what the foundation material is like. Similarly, core or rock subject to slaking and rapid weathering such as shale will also deteriorate.
d. The Inside Clearance Ratio* should be theminimum required for complete sample recovery, e. Samples recovered should contain no visibledistortion of strata or opening or softening ormaterials brought about by the sampling procedure.


6. Retention of Samples, Rock Core, and RecordsSamples and rock cores from principal boringsshould be retained at least until the power plant islicensed to operate and all matters relating to the in-terpretation of subsurface conditions at the site havebeen resolved.
It is recommended that photographs of scil samples and rock core togedher with field and final logs of all borings and record samples with material descriptions be preserved for a permanent record. Other important records of the subsurface in-vestigations program should also be preserved.
 
The need to retain samples and corebeyond this time is a matter of judgment and should61.132-8II
b0he evaluated on a case-by-case basis. Soil samples intubes will deteriorate with time and will not besuitable for any undisturbed testing.
 
However, theymay be used as a visual record of what the foundation material is like. Similarly, core or rock subject toslaking and rapid weathering such as shale will alsodeteriorate.
 
It is recommended that photographs ofscil samples and rock core togedher with field andfinal logs of all borings and record samples withmaterial descriptions be preserved for a permanent record. Other important records of the subsurface in-vestigations program should also be preserved.


==D. IMPLEMENTATION==
==D. IMPLEMENTATION==
This guide will be used by the staff to evaluate theresults of site investigations, including the adequacyand quality of data provided to define foundation conditions and the geotechnical parameters neededfor engineering analysis and design. submitted in con-nection with construction permit applications docketed after June 1. 1978. The staff will also usethis guide to evaluate the results of any new site in-vestigations performed after June 1, 1978. by aperson whose construction permit was issued on orbefore June 1. 1978.1.132-9 APPENDIX  
This guide will be used by the staff to evaluate the results of site investigations, including the adequacy and quality of data provided to define foundation conditions and the geotechnical parameters needed for engineering analysis and design. submitted in con-nection with construction permit applications docketed after June 1. 1978. The staff will also use this guide to evaluate the results of any new site in-vestigations performed after June 1, 1978. by a person whose construction permit was issued on or before June 1. 1978.1.132-9 APPENDIX A DEFINITIONS
ADEFINITIONS
For the convenience of the user, the following terms are presented with their definitions as used in this guide: Accessible exca'ation-an excavation made for the purpose of investigating and sampling materials or conditions below the ground surface, of such shape and dimensions as to permit the entry of personnel for direct examination, testing, or sampling.Area Ratio- (Ca) of a sampling device is defined as: D: -13 a De where Do is the outside diameter of that part of the sampling device that is forced into the soil, and De is the inside diameter, normally the diameter of the cut-ting edge.Boring-ian exploratory hole in soil or rock, or both, made by removal of materials in the form of samples or cuttings (cf. soundings).
For the convenience of the user, the following terms are presented with their definitions as used inthis guide:Accessible exca'ation-an excavation made for thepurpose of investigating and sampling materials orconditions below the ground surface, of such shapeand dimensions as to permit the entry of personnel for direct examination, testing, or sampling.
Disturbed sample-a sarpple whose internal struc-ture has been altered to such a degree that it does not reasonably approximate that of the material in situ.Such a sample may be completely remolded, or it may bear a resemblance to an undisturbed sample in having preserved the gross shape given it by a sampl-ing device.Geoteclmical-of or pertaining to the earth sciences (geology, soils, seismology, and groundwater hydrology)  
 
and that part of civil engineering which deals with the interrelationship between the geologic environment and the works of man.In situ test-a test performed on in-place soil or rock for the purpose of determining some physical property.
Area Ratio- (Ca) of a sampling device is definedas:D: -13a Dewhere Do is the outside diameter of that part of thesampling device that is forced into the soil, and De isthe inside diameter, normally the diameter of the cut-ting edge.Boring-ian exploratory hole in soil or rock, orboth, made by removal of materials in the form ofsamples or cuttings (cf. soundings).
Disturbed sample-a sarpple whose internal struc-ture has been altered to such a degree that it does notreasonably approximate that of the material in situ.Such a sample may be completely remolded, or itmay bear a resemblance to an undisturbed sample inhaving preserved the gross shape given it by a sampl-ing device.Geoteclmical-of or pertaining to the earth sciences(geology, soils, seismology, and groundwater hydrology)  
and that part of civil engineering whichdeals with the interrelationship between the geologicenvironment and the works of man.In situ test-a test performed on in-place soil orrock for the purpose of determining some physicalproperty.
 
As used in this guide, it includesgeophysical measurements.
 
Inside Clearance Ratio (Ci) of a sampling device isdefined as:Di -Dei Dewhere Di is the inside diameter of the sample tube orliner and D. is the diameter
.of the cutting edge.Observation well-an open boring that permitsmeasuring the level or elevation of the groundwater table.Piezoineter-a device or instrument for measuring pore pressure or hydraulic potential at a level orpoint below the ground surface.Principal borings-those exploratory holes that areused as the primary source of subsurface informa-tion. They are used to explore and sample all soil orrock strata wi~hin the interval penetrated to definethe geology of the site and to determine the properties of the subsurface materials.
 
Not included are boringsfrom which no samples are taken, borings used to in-vestigate specific or limited intervals, or borings soclose to others that the information yielded repre-sents essentially a single location.


Representative sample-a sample that (1) containsapproximately the same mineral constituents of thestratum from which it is taken, in the same propor-tions, and with the same grain-size distribution and(2) is uncontaminated by foreign materials orchemical alteration.
As used in this guide, it includes geophysical measurements.


Rock Quality Designation (RQD)-an indirectmeasurement of the degree of rock fracturing andjointing and rock quality.
Inside Clearance Ratio (Ci) of a sampling device is defined as: Di -De i De where Di is the inside diameter of the sample tube or liner and D. is the diameter .of the cutting edge.Observation well-an open boring that permits measuring the level or elevation of the groundwater table.Piezoineter-a device or instrument for measuring pore pressure or hydraulic potential at a level or point below the ground surface.Principal borings-those exploratory holes that are used as the primary source of subsurface informa-tion. They are used to explore and sample all soil or rock strata wi~hin the interval penetrated to define the geology of the site and to determine the properties of the subsurface materials.


It is calculated by summingthe lengths of all hard and sound pieces of recovered core longer than 4 inches (10cm) and dividing thesum by the total length of core run.Sounding-an exploratory penetration below theground surface by means of a device that is used tomeasure or observe some in situ property of thematerials penetrated.
Not included are borings from which no samples are taken, borings used to in-vestigate specific or limited intervals, or borings so close to others that the information yielded repre-sents essentially a single location.Representative sample-a sample that (1) contains approximately the same mineral constituents of the stratum from which it is taken, in the same propor-tions, and with the same grain-size distribution and (2) is uncontaminated by foreign materials or chemical alteration.


usually without recovery ofsamples or cuttings.
Rock Quality Designation (RQD)-an indirect measurement of the degree of rock fracturing and jointing and rock quality. It is calculated by summing the lengths of all hard and sound pieces of recovered core longer than 4 inches (10cm) and dividing the sum by the total length of core run.Sounding-an exploratory penetration below the ground surface by means of a device that is used to measure or observe some in situ property of the materials penetrated.


Specific Recovery Ratio-(R.)  
usually without recovery of samples or cuttings.Specific Recovery Ratio-(R.)  
in the advance of asample tube is defined as:Rs=where AL is the increment of length of sample in thetube corresponding to an increment AH of sampleradvance.Soil structure-a complex physical-mechanical property, defined by the sizes, shapes, and arrange-ments of the constituent grains and intergranular matter and the bonding and capillary forces actingamong the constituents.
in the advance of a sample tube is defined as: Rs=where AL is the increment of length of sample in the tube corresponding to an increment AH of sampler advance.Soil structure-a complex physical-mechanical property, defined by the sizes, shapes, and arrange-ments of the constituent grains and intergranular matter and the bonding and capillary forces acting among the constituents.


Supplementary borings or supplementary soundings-borings or soundings that are made in ad-dition to principal borings for some specific orlimited purpose.Undisturbed sample-a sample obtained andtreated in such a way that disturbance of its.original structure is minimal, making it suitable forlaboratory testing of material properties that dependon structure.
Supplementary borings or supplementary soundings-borings or soundings that are made in ad-dition to principal borings for some specific or limited purpose.Undisturbed sample-a sample obtained and treated in such a way that disturbance of its.original structure is minimal, making it suitable for laboratory testing of material properties that depend on structure.


1.132-10  
1.132-10  
APPENDIX  
APPENDIX B METHODS OF SUBSURFACE  
BMETHODS OF SUBSURFACE  
EXPLORATION'
EXPLORATION'
METHODPROCEDURE
METHOD PROCEDURE A PPLI CA BI LITY LIMITATIONS
A PPLI CA BI LITYLIMITATIONS
METHODS OF ACCESS FOR SAMPLING, TEST. OR OBSERVATION
METHODS OF ACCESS FOR SAMPLING,  
7-=Pits, Trenches, Shafts, Tunnels Auger Boring Hollow Stem Auger Boring Wash Boring Rotary Drilling Excavation made by hand, large auger, or digging machinery. (Ref. 7)Boring advanced by hand auger or power auger.(Ref. 7)Boring advanced by means of continuous-flight helix auger with hollow center stem. (Ref. 10)Boring advanced by chopping with light bit and by jetting with upward-deflected jet. (Ref. 7)Boring advanced by ro-tating drilling bit;cuttings removed by circulating drilling fluid. (Ref. 7)Visual observation, photo-graphy, disturbed and un-disturbed sampling, in sitt.testing of soil and rock.Recovery of remolded samples, and determining groundwater levels. Access for undisturbed sampling of cohesive soils.Access for undisturbed or representative sampling through hollow stem with thin-wall tube sampler, core barrel, or split-barrel sampler.Cleaning out and advancing hole in soil between sample intervals.
TEST. OR OBSERVATION
7-=Pits, Trenches, Shafts, TunnelsAuger BoringHollow Stem AugerBoringWash BoringRotary DrillingExcavation made by hand,large auger, or diggingmachinery.


(Ref. 7)Boring advanced by handauger or power auger.(Ref. 7)Boring advanced by meansof continuous-flight helixauger with hollow centerstem. (Ref. 10)Boring advanced bychopping with lightbit and by jettingwith upward-deflected jet. (Ref. 7)Boring advanced by ro-tating drilling bit;cuttings removed bycirculating drillingfluid. (Ref. 7)Visual observation, photo-graphy, disturbed and un-disturbed sampling, in sitt.testing of soil and rock.Recovery of remolded samples,and determining groundwater levels. Access for undisturbed sampling of cohesive soils.Access for undisturbed orrepresentative samplingthrough hollow stem withthin-wall tube sampler,core barrel, or split-barrel sampler.Cleaning out and advancing hole in soil between sampleintervals.
Cleaning out and advanc-ing hole in soil or rock between sample intervals.
 
Cleaning out and advanc-ing hole in soil or rockbetween sample intervals.


Depth of unprotected excava-tions is limited by ground-water or safety considerations.
Depth of unprotected excava-tions is limited by ground-water or safety considerations.


Will not penetrate boulders ormost rock.Should not be used with plug ingranular soils. Not suitablefor undisturbed sampling inloose sand or silt. (Ref. I1)Suitable for use with samplingoperations in soil only if donewith low water velocities andwith upward-deflected jet.Drilling mud should be used ingranular soils. Bottom discharge bits are not suitable for use withundisturbed sampling in soils un-less combined with protruding corebarrel, as in Denison -.ampler,or with upward-deflected jets.Scc also Rers. 32-40.
Will not penetrate boulders or most rock.Should not be used with plug in granular soils. Not suitable for undisturbed sampling in loose sand or silt. (Ref. I1)Suitable for use with sampling operations in soil only if done with low water velocities and with upward-deflected jet.Drilling mud should be used in granular soils. Bottom discharge bits are not suitable for use with undisturbed sampling in soils un-less combined with protruding core barrel, as in Denison -.ampler, or with upward-deflected jets.Scc also Rers. 32-40.


APPENDIX  
APPENDIX B (Continued)
B (Continued)
METHODS OF SUBSURFACE  
METHODS OF SUBSURFACE  
EXPLORATION
EXPLORATION
METHODPROCEDURE
METHOD PROCEDURE APPLICABILITY
APPLICABILITY
LIMITATIONS
LIMITATIONS
METHODS OF ACCESS FOR SAMPLING,  
METHODS OF ACCESS FOR SAMPLING, TEST, OR OBSERVATION
TEST, OR OBSERVATION
Percussion Drilling Boring advanced by air-operated impact hammer.I~Cable Drilling Continuous Sampling or Displacement Boring Boring advanced by repeated dropping of heavy bit: removal of cuttings by bailing.(Ref. 7)Boring advanced by repeated pushing of sampler or closed sampler is pushed to desired depth, and sample is taken. (Ref. 7)Detection of voids and zones of weakness in rock by changes in drill rate or resistance.
Percussion DrillingBoring advanced byair-operated impacthammer.I~Cable DrillingContinuous Sampling orDisplacement BoringBoring advanced byrepeated dropping ofheavy bit: removalof cuttings by bailing.(Ref. 7)Boring advanced byrepeated pushing ofsampler or closedsampler is pushedto desired depth, andsample is taken. (Ref. 7)Detection of voids andzones of weakness inrock by changes in drillrate or resistance.
 
Accessfor in situ testing orlogging.Advancing hole in soilor rock. Access forsampling, in situ testing,or logging in rock. Pene-tration of hard layers,gravel, or boulders inauger borings.Recovery of representative samples of cohesive soilsand undisturbed samples insome cohesive soils.Causes severe disturbance in soils-not suitable for use with undis-turbed sampling methods.Effects of advance and withdrawal of sampler result in disturbed sections at top and bottom ofsample. In some soils, entiresample may be disturbed.
 
Bestsuited for use in cohesivesoils. Continuous sampling incohesionless soils may be made bysuccessive reaming and cleaningof hole between sampling.
 
Not suitable for use in soil


====s. METHODS OF SAMPLING ====
Access for in situ testing or logging.Advancing hole in soil or rock. Access for sampling, in situ testing, or logging in rock. Pene-tration of hard layers, gravel, or boulders in auger borings.Recovery of representative samples of cohesive soils and undisturbed samples in some cohesive soils.Causes severe disturbance in soils-not suitable for use with undis-turbed sampling methods.Effects of advance and withdrawal of sampler result in disturbed sections at top and bottom of sample. In some soils, entire sample may be disturbed.
SOIL AND ROCK'Hand-Cut Blockor Cylindrical Sample:See also Reference
31.Sample is cut byhand from soil ex-posed in excavation.


(Refs. 12, 13)Highest quality undisturbed samples in all soilsand in soft rock.Requires accessible excavation and dewatering if below watertable, Extreme care is requiredin sampling cohesionless soils.
Best suited for use in cohesive soils. Continuous sampling in cohesionless soils may be made by successive reaming and cleaning of hole between sampling.Not suitable for use in soils.METHODS OF SAMPLING SOIL AND ROCK'Hand-Cut Block or Cylindrical Sample:See also Reference
31.Sample is cut by hand from soil ex-posed in excavation.(Refs. 12, 13)Highest quality undisturbed samples in all soils and in soft rock.Requires accessible excavation and dewatering if below water table, Extreme care is required in sampling cohesionless soils.


SAPPENDIX
S APPENDIX B (Continued)
B (Continued)
METHODS OF SUBSURFACE  
METHODS OF SUBSURFACE  
EXPLORATION
EXPLORATION
METHODPROCEDURE
METHOD PROCEDURE APPLICABILITY
APPLICABILITY
LIMITATIONS
LIMITATIONS
METHODS OF SAMPLING  
METHODS OF SAMPLING SOIL AND ROCK Fixed-Piston Sampler Hydraulic Piston Sampler (Osterberg)
SOIL AND ROCKFixed-Piston SamplerHydraulic PistonSampler(Osterberg)
Thin-walled tube is pushed into soil, with fixed piston in contact with top of sample during push. (Refs. 2, 7)Thin-walled tube is pushed into soil by hydraulic pressure.Fixed piston in contact with top of sample during push. (Refs. 2, 14)Undisturbed samples in cohesive soils, silts, and sands above or below the water table.Undisturbed samples in cohesive soils, silts and sands above or below the water table.Some types do not have a positive means to prevent piston movement.Not possible to determine amount of sampler penetration during push. Does not have vacuumi-breaker in piston.t'.Free-Piston Sampler Thin-walled tube is pushed into soil.Piston rests on top of soil sample during push. (Ref. 2)Undisturbed samples in stiff cohesive soils.Representative samples in soft to medium cohesive soils and silts.May not be suitable for sampling in cohesionless soils. Free piston provides no control of specific recovery ratio.
Thin-walled tube ispushed into soil, withfixed piston in contactwith top of sample duringpush. (Refs. 2, 7)Thin-walled tube ispushed into soil byhydraulic pressure.
 
Fixed piston in contactwith top of sample duringpush. (Refs. 2, 14)Undisturbed samples incohesive soils, silts,and sands above orbelow the water table.Undisturbed samples incohesive soils, siltsand sands above or belowthe water table.Some types do not have a positivemeans to prevent piston movement.
 
Not possible to determine amountof sampler penetration duringpush. Does not have vacuumi-breaker in piston.t'.Free-Piston SamplerThin-walled tube ispushed into soil.Piston rests on topof soil sample duringpush. (Ref. 2)Undisturbed samples instiff cohesive soils.Representative samples insoft to medium cohesivesoils and silts.May not be suitable for samplingin cohesionless soils. Freepiston provides no control ofspecific recovery ratio.


APPENDIX  
APPENDIX B (Continued)
B (Continued)
METHODS OF SUBSURFACE  
METHODS OF SUBSURFACE  
EXPLORATION
EXPLORATION
METHODPROCEDURE
METHOD PROCEDURE APPLICABILITY
APPLICABILITY
LIMITATIONS
LIMITATIONS
METHODS OF SAMPLING  
METHODS OF SAMPLING SOIL AND ROCK Open Drive Sampler Thin-walled, open tube is pushed into soil.(Refs. 7, 12)Undisturbed samples in stiff cohesive soils.Representative samples in soft to medium cohe-sive soils and silts.Continuous undisturbed samples up to 20m long in very soft to soft clays.Swedish Foil Sampler Sample tube is pushed into soil while stainless steel strips unrolling from spools envelop sample. Piston. fixed by chain from surface, maintains contact with top of sample. (Refs. 13.15)Thin-walled tube is pushed into soil by spring above sampler while outer core bit reams hole. Cuttings removed by circulating drilling fluid. (Ref. 13)Small diameter of tubes may not be suitable for sampling in cohesionless soils or for undis-turbed sampling in uncased bore-holes. No control of specific recovery ratio.Not suitable for use in soils containing gravel, sand layers, or shells, which may rupture foils and damage samples. Diffi-culty may be encountered in alternating hard and soft layers with squeezing of soft layers and reduction in thickness.
SOIL AND ROCKOpen DriveSamplerThin-walled, open tubeis pushed into soil.(Refs. 7, 12)Undisturbed samples instiff cohesive soils.Representative samplesin soft to medium cohe-sive soils and silts.Continuous undisturbed samples up to 20mlong in very soft tosoft clays.Swedish FoilSamplerSample tube is pushedinto soil while stainless steel strips unrolling from spools envelopsample. Piston. fixedby chain from surface,maintains contact withtop of sample. (Refs. 13.15)Thin-walled tube ispushed into soil byspring above samplerwhile outer core bitreams hole. Cuttingsremoved by circulating drilling fluid. (Ref. 13)Small diameter of tubes may not besuitable for sampling incohesionless soils or for undis-turbed sampling in uncased bore-holes. No control of specificrecovery ratio.Not suitable for use in soilscontaining gravel, sand layers,or shells, which may rupturefoils and damage samples.
 
Diffi-culty may be encountered inalternating hard and soft layerswith squeezing of soft layers andreduction in thickness.


Requiresexperienced operator.
Requires experienced operator.Pitcher Sampler Undisturbed samples in hard, brittle, cohesive soils and sands with cementation.


Pitcher SamplerUndisturbed samples inhard, brittle, cohesivesoils and sands withcementation.
Representa- tive samples in soft to medium cohesive soils and silts. Disturbed samples may be obtained in cohesion-less materials with variable success.Frequently ineffective in cohesionless soils.


Representa- tive samples in soft tomedium cohesive soils andsilts. Disturbed samplesmay be obtained in cohesion- less materials with variablesuccess.Frequently ineffective incohesionless soils.
0 APPENDIX B (Continued)
 
0APPENDIX
B (Continued)
METHODS OF SUBSURFACE  
METHODS OF SUBSURFACE  
EXPLORATION
EXPLORATION
METHODPROCEDURE
METHOD PROCEDURE APPLICABILITY
APPLICABILITY
LIMITATIONS
LIMITATIONS
METHODS OF SAMPLING  
METHODS OF SAMPLING SOIL AND ROCK Denison Sampler Split-Barrel or Splitspoon Sampler Auger Sampling g', Hole is advanced and reamed by core drill while sample is re-tained in nonrotating inner core barrel with corecatcher.
SOIL AND ROCKDenison SamplerSplit-Barrel or Splitspoon SamplerAuger Samplingg',Hole is advanced andreamed by core drillwhile sample is re-tained in nonrotating inner core barrel withcorecatcher.


Cuttingsremoved by circulating drilling fluid.(Refs. 12. 13)Split-barrel tube isdriven into soil byblows of falling ram.Sampling is carriedout in conjunction with Standard Pene-tration Test. (Ref. 9)Auger drill used toadvance hole is with-drawn at intervals forrecovery of soil samplesfrom auger flights.(Ref. 9)Undisturbed samples instiff to hard cohesivesoil, sands with cemen-tation. and soft rocks.Disturbed samples maybe obtained in cohesion- less materials withvariable success.Representative samplesin soils other thancoarse granular soils.Determine boundaries of soil layers andobtain samplesfor soil classification.
Cuttings removed by circulating drilling fluid.(Refs. 12. 13)Split-barrel tube is driven into soil by blows of falling ram.Sampling is carried out in conjunction with Standard Pene-tration Test. (Ref. 9)Auger drill used to advance hole is with-drawn at intervals for recovery of soil samples from auger flights.(Ref. 9)Undisturbed samples in stiff to hard cohesive soil, sands with cemen-tation. and soft rocks.Disturbed samples may be obtained in cohesion-less materials with variable success.Representative samples in soils other than coarse granular soils.Determine boundaries of soil layers and obtain samples for soil classification.


Not suitable for undisturbed sampling in loose cohesionless soils or soft cohesive soils.Samples are disturbed and notsuitable for tests of physicalproperties.
Not suitable for undisturbed sampling in loose cohesionless soils or soft cohesive soils.Samples are disturbed and not suitable for tests of physical properties.


Samples not suitable for physicalproperties or density tests.Large errors in locating strataboundaries may occur without closeattention to details of procedure.
Samples not suitable for physical properties or density tests.Large errors in locating strata boundaries may occur without close attention to details of procedure.(Ref. 13) In some soils, particle breakdown by auger or sorting effects may result in errors in determining gradation.


(Ref. 13) In some soils,particle breakdown by augeror sorting effects may result inerrors in determining gradation.
APPENDIX B (Continued)
 
APPENDIX  
B (Continued)
METHODS OF SUBSURFACE  
METHODS OF SUBSURFACE  
EXPLORATION
EXPLORATION
METHODPROCEDURE
METHOD PROCEDURE APPLICABILITY
APPLICABILITY
LIMITATIONS
LIMITATIONS
METHODS OF SAMPLING  
METHODS OF SAMPLING SOIL AND ROCK Rotary Core Barrel 0%Shot Core Boring (Calyx)Hole is advanced by core bit while core sample is retained within core barrel or within station-ary inner tube. Cuttings removed by circulating drilling fluid.(Ref. 9)Boring advanced by ro-tating single core barrel, which cuts by grinding with chilled steel shot fed with circulating wash water.Used shot and coarser cuttings are deposited in an annular cup, or calyx, above the core barrel.(Ref. 7)Reinforcing rod is grouted into small-diameter hole, then overcored to obtain an annular core sample. (Ref. 16)Cuttings are recovered from wash water or drilling fluid.Core samples in compe-tent rock and hard soils with single-tube core barrel. Core samples in poor or broken rock may be obtainable with double-tube core barrel with bottom-discharge bit.Large diameter cores and accessit'-  
SOIL AND ROCKRotary CoreBarrel0%Shot CoreBoring(Calyx)Hole is advanced by corebit while core sample isretained within corebarrel or within station-ary inner tube. Cuttingsremoved by circulating drilling fluid.(Ref. 9)Boring advanced by ro-tating single corebarrel, which cuts bygrinding with chilledsteel shot fed withcirculating wash water.Used shot and coarsercuttings are deposited inan annular cup, or calyx,above the core barrel.(Ref. 7)Reinforcing rod isgrouted into small-diameter hole, thenovercored to obtainan annular coresample. (Ref. 16)Cuttings are recovered from wash water ordrilling fluid.Core samples in compe-tent rock and hard soilswith single-tube corebarrel. Core samples inpoor or broken rock maybe obtainable with double-tube core barrel withbottom-discharge bit.Large diameter cores andaccessit'-  
boreholes in rock.Core samples in rock with preservation of joints and other zones of weakness.Samples useful in con-junction with other data for identification of major strata.Because recovery is poorest in zones of weakness, samples gener-ally fail to yield positive infor-mation on soft seams, joints. o:'other defects in rock.Cannot be used in drilling at large angles to the vertical.Often ineffective in securing small diameter cores.Samples are not well suited to tests of physical properties.
boreholes inrock.Core samples in rockwith preservation ofjoints and other zonesof weakness.


Samples useful in con-junction with otherdata for identification of major strata.Because recovery is poorest inzones of weakness, samples gener-ally fail to yield positive infor-mation on soft seams, joints. o:'other defects in rock.Cannot be used in drilling atlarge angles to the vertical.
Oriented Integral Sampling Wash Sampling or Cuttings Sampling Sample quality is not adequate for site investigations for nuclear facilities.


Often ineffective in securingsmall diameter cores.Samples are not well suited totests of physical properties.
APPENDIX B (Continued)
 
OrientedIntegralSamplingWash Samplingor CuttingsSamplingSample quality is not adequatefor site investigations for nuclear facilities.
 
APPENDIX  
B (Continued)
METHODS OF SUBSURFACE  
METHODS OF SUBSURFACE  
EXPLORATION
EXPLORATION
METHODPROCEDURE
METHOD PROCEDURE APPLICABILITY
APPLICABILITY
LIMITATIONS
LIMITATIONS
METHODS OF SAMPLING  
METHODS OF SAMPLING SOIL AND ROCK Subm ersible Vibratory (Vibracore)
SOIL AND ROCKSubm ersibleVibratory (Vibracore)
Sampler Underwater Piston Corer Core tube is driven into soil by vibrator.(Ref. 17)Core tube attached to drop weight is driven into soil by gravity after a controlled height of free fall.Cable-supported piston remains in contact with soil surface during drive.(Ref. 18)Open core tube attached to drop weight is driven into soil by gravity after free fall. (Ref. IN)Continuous representa- tive samples in uncon-solidated marine sedi-ments.Representative samples in unconsolidated marine sediments.
SamplerUnderwater Piston CorerCore tube is driveninto soil by vibrator.


(Ref. 17)Core tube attached todrop weight is driveninto soil by gravityafter a controlled height of free fall.Cable-supported pistonremains in contact withsoil surface during drive.(Ref. 18)Open core tube attachedto drop weight is driveninto soil by gravity afterfree fall. (Ref. IN)Continuous representa- tive samples in uncon-solidated marine sedi-ments.Representative samplesin unconsolidated marinesediments.
Representative samples at shallow depth in unconsolidated marine sediments.


Representative samplesat shallow depth inunconsolidated marinesediments.
Because of high area ratio and effects of vibration, samples may be disturbed.


Because of high area ratio andeffects of vibration, samples maybe disturbed.
Samples may be seriously disturbed. (Ref. 19)No control of specific recover%ratio. Samples are disturbed.


Samples may be seriously disturbed.
-.1, Gravity Corer METHODS OF IN SITU TESTING OF SOIL AND ROCK Standard Penetration Test Split-barrel sampler is driven into soil by blows of falling weight. Blow count for each 6 in.of penetration is recorded.(Ref. 9)Blow count may be used as an index of consistency or density of soil. May be used for detection of changes in consistency or relative density in clay or sands. a be used with empirical relationships to estimate relative density of clean sand.FExtremelv unreliable in silts, silty sands, or soils containing gravel. In sands below water table, positive head must be main-tained in borehole.


(Ref. 19)No control of specific recover%ratio. Samples are disturbed.
Determination of relative density in sands requires site-specific correlation or highly conservative use of published correlations.


-.1,Gravity CorerMETHODS OF IN SITU TESTING OF SOIL AND ROCKStandardPenetration TestSplit-barrel sampler isdriven into soil by blowsof falling weight. Blowcount for each 6 in.of penetration is recorded.
Results are sensitive to details of apparatus and procedure.


(Ref. 9)Blow count may be used asan index of consistency ordensity of soil. May beused for detection ofchanges in consistency or relative density inclay or sands. a beused with empirical relationships to estimaterelative density of cleansand.FExtremelv unreliable in silts,silty sands, or soils containing gravel. In sands below watertable, positive head must be main-tained in borehole.
APPENDIX B (Continued)
 
Determination of relative density in sandsrequires site-specific correlation or highly conservative use ofpublished correlations.
 
Resultsare sensitive to details ofapparatus and procedure.
 
APPENDIX  
B (Continued)
METHODS OF SUBSURFACE  
METHODS OF SUBSURFACE  
EXPLORATION
EXPLORATION
METHODPROCEDURE
METHOD PROCEDURE A PPL.ICA BIILITY LIMITATIONS
A PPL.ICA BIILITYLIMITATIONS
METHODS OF IN SITU TESTING OF SOIl. AND ROCK Dutch Cone Penetrometer co Field Vane Shear Test Steel cone is pushed into soil and followed by subsequent advance of friction sleeve.Resistance is measured during both phases of advance. (Ref. 20), Four-bladed vane is pushed into undisturbed soil. then rotated to cause shear failure on cylindrical surface.Torsional resistance versus angular deflec-tion is recorded. (Ref. 9)Expendable steel cone is driven into soil by blows of falling weight. Blow count versus penetration is recorded. (Ref. 13)Steel loading plate is placed on horizontal surface and is stati-cally loaded, usually by hydraulic jack. Settle-ment versus time is recorded for each load increment. (Ref. 9)Detection of changes in consistency or relative density in clays or sands.Used to estimate static undrained shear strength of clay. Used with empiri-cal relationships to obtain estimate of static compres-sibility of sand.Used to estimate in situ undrained shear strength and sensitivity of clays.Strength estimates require onsite verification by other methods of testing.Not suitable for use in silt, sand.or soils containing appreciable amounts of gravel or shells. May yield unconservative estimates of shear strength in fissured clay soils or where strength is strain-rate dependent.
METHODS OF IN SITU TESTING OF SOIl. AND ROCKDutch ConePenetrometer coField VaneShear TestSteel cone is pushedinto soil and followedby subsequent advanceof friction sleeve.Resistance is measuredduring both phases ofadvance.
 
(Ref. 20),Four-bladed vane ispushed into undisturbed soil. then rotated tocause shear failure oncylindrical surface.Torsional resistance versus angular deflec-tion is recorded.
 
(Ref. 9)Expendable steel cone isdriven into soil by blowsof falling weight. Blowcount versus penetration is recorded.
 
(Ref. 13)Steel loading plate isplaced on horizontal surface and is stati-cally loaded, usually byhydraulic jack. Settle-ment versus time isrecorded for each loadincrement.
 
(Ref. 9)Detection of changes inconsistency or relativedensity in clays or sands.Used to estimate staticundrained shear strengthof clay. Used with empiri-cal relationships to obtainestimate of static compres-sibility of sand.Used to estimate in situundrained shear strengthand sensitivity of clays.Strength estimates require onsiteverification by other methods oftesting.Not suitable for use in silt, sand.or soils containing appreciable amounts of gravel or shells. Mayyield unconservative estimates ofshear strength in fissured claysoils or where strength is strain-rate dependent.


Provides no quantitative infor-mation on soil properties.
Provides no quantitative infor-mation on soil properties.


Results can be extrapolated toloaded areas larger than bearingplate only if properties of soilare uniform laterally and withdepth.0Drive-Point Penetrometer Plate BearingTest (Soil)Detection of gross changesin consistency or relativedensity.
Results can be extrapolated to loaded areas larger than bearing plate only if properties of soil are uniform laterally and with depth.0 Drive-Point Penetrometer Plate Bearing Test (Soil)Detection of gross changes in consistency or relative density. May be used in some coarse granular soils.Estimation of strength and moduli of soil. May be used at ground surface, in excava-tions, or in boreholes.
 
May be used insome coarse granular soils.Estimation of strength andmoduli of soil. May be usedat ground surface, in excava-tions, or in boreholes.


0  
0  
Line 605: Line 421:
METHODS OF SUBSURFACE  
METHODS OF SUBSURFACE  
EXPLORATION
EXPLORATION
METHODPROCEDURE
METHOD PROCEDURE APPLICABILITY
APPLICABILITY
LIMITATIONS
LIMITATIONS
METHODS OF IN SITU TESTING OF SOIL AND ROCKPlate BearingTest or PlateJacking Test(Rock)Pressure MeterTest (Dilatometer Test)7-Field PumpingTestDirect ShearTestBearing pad on rocksurface is statically loaded by hydraulic jack. Deflection versus load is recorded.
METHODS OF IN SITU TESTING OF SOIL AND ROCK Plate Bearing Test or Plate Jacking Test (Rock)Pressure Meter Test (Dilatometer Test)7-Field Pumping Test Direct Shear Test Bearing pad on rock surface is statically loaded by hydraulic jack. Deflection versus load is recorded.(Ref. 21)Uniform radial pressure is applied hydraulically over a length of borehole several times its diame-ter. Change in diameter versus pressure is recorded.(Ref. 21)Water is pumped from or into aquifer at constant rate through penetrating well. Change in piezo-metric level is measured at well and at one or more observation wells. Pumping pressures and flow rates are recorded. (Refs. 22. 23)Block of in situ rock is isolated to permit shearing along a preselected sur-face. Normal and shearing loads are applied by jacking.Loads and displacements are recorded. (Ref. 24)Estimation of elastic moduli of rock masses. May be used at ground surface, in exca-vations, in tunnels, or in borcholes.
 
(Ref. 21)Uniform radial pressureis applied hydraulically over a length of boreholeseveral times its diame-ter. Change in diameterversus pressure is recorded.
 
(Ref. 21)Water is pumped from orinto aquifer at constantrate through penetrating well. Change in piezo-metric level is measuredat well and at one or moreobservation wells. Pumpingpressures and flow rates arerecorded.


(Refs. 22. 23)Block of in situ rock isisolated to permit shearingalong a preselected sur-face. Normal and shearingloads are applied by jacking.Loads and displacements arerecorded.
Estimation of elastic moduli of rocks and estimation of shear strengths and compress-ibility of soils by empirical relationships.


(Ref. 24)Estimation of elastic moduliof rock masses. May be usedat ground surface, in exca-vations, in tunnels, or inborcholes.
Estimation of in situ permea-bility of soils and rock mass.Measurement of shearing resistance of rock mass in situ.Results can be extrapolated to loaded areas larger than bearing pad only if rock properties are uniform over volume of interest and if diameter of bearing pad is larger than average spacing of joints or other discontinuities.


Estimation of elastic moduliof rocks and estimation ofshear strengths and compress- ibility of soils by empirical relationships.
Test results represent properties only of materials in near vicinity of borehole.


Estimation of in situ permea-bility of soils and rock mass.Measurement of shearingresistance of rock mass insitu.Results can be extrapolated toloaded areas larger than bearingpad only if rock properties areuniform over volume of interestand if diameter of bearing padis larger than average spacing ofjoints or other discontinuities.
Results may be mis-leading in testing materials whose properties may be anisotropic.


Test results represent properties only of materials in near vicinityof borehole.
Apparent permeability may be greatly influenced by local features.
 
Results may be mis-leading in testing materials whose properties may beanisotropic.
 
Apparent permeability may begreatly influenced by localfeatures.


Effective permeability of rock is dependent primarily on frequency and distribution ofjoints.
Effective permeability of rock is dependent primarily on frequency and distribution ofjoints.


Test result in rock isrepresentative only to extent thatsegment penetrated by borehole.
Test result in rock is representative only to extent that segment penetrated by borehole.is representative of joint system of rock mass.Tests are costly. Usually variability of rock mass requires a sufficient number of tests to provide statistical control.


is representative of joint systemof rock mass.Tests are costly. Usuallyvariability of rock mass requiresa sufficient number of tests toprovide statistical control.
APPENDIX B (Continued)
 
APPENDIX  
B (Continued)
METHODS OF SUBSURFACE  
METHODS OF SUBSURFACE  
EXPLORATION
EXPLORATION
METHODPROCEDURE
METHOD PROCEDURE A PPIC A BI LITY L.IMITATIONS
A PPIC A BI LITYL.IMITATIONS
METHODS OF IN SITU TESTING OF SOIL AND ROCK 0 Pressure Tunnel Test Radial Jacking Test Borehole Jack Test Borehole Deformation Meter Hydraulic pressure is applied to sealed-off length of circular tunnel, and diametral deformations are measured.(Ref. 21)Radial pressure is applied to a length of circular tunnel by flat jacks. Dia-metral deformations are measured.Load is applied to wall of borehole by two diametric- ally opposed jacks. Deform-ations and pressures are recorded. (Ref. 25)Device for measurement of diameters (deformation meter) is placed in bore-hole, and hole is overcored to relieve stresses on annular rock core contain-ing deformation meter.Diameters (usually 3) are measured before and after overcoring.
METHODS OF IN SITU TESTING OF SOIL AND ROCK0Pressure TunnelTestRadial JackingTestBorehole JackTestBoreholeDeformation MeterHydraulic pressure isapplied to sealed-off length of circulartunnel, and diametral deformations are measured.
 
(Ref. 21)Radial pressure is appliedto a length of circulartunnel by flat jacks. Dia-metral deformations aremeasured.
 
Load is applied to wall ofborehole by two diametric- ally opposed jacks. Deform-ations and pressures arerecorded.
 
(Ref. 25)Device for measurement ofdiameters (deformation meter) is placed in bore-hole, and hole is overcored to relieve stresses onannular rock core contain-ing deformation meter.Diameters (usually  
3) aremeasured before and afterovercoring.


Modulus of rockis measured by laboratory tests on core; stressesare computed by elastictheory. (Ref, 26)Determination of elasticconstants of the rock massin situ.Same as pressure tunnel test.Determination of elasticmodulus of rock in situ.Capable of applying greaterpressures than dilatome- ters.Measurement of absolutestresses in situ.Volume of rock tested is dependent on tunnel diameter.
Modulus of rock is measured by laboratory tests on core; stresses are computed by elastic theory. (Ref, 26)Determination of elastic constants of the rock mass in situ.Same as pressure tunnel test.Determination of elastic modulus of rock in situ.Capable of applying greater pressures than dilatome-ters.Measurement of absolute stresses in situ.Volume of rock tested is dependent on tunnel diameter.


Cracking dueto tensile hoop stresses mayaffect apparent stiffness of rock.Same as pressure tunnel test.Apparent stiffness may be affectedby development of tension cracks.Stress field is affected byborehole.
Cracking due to tensile hoop stresses may affect apparent stiffness of rock.Same as pressure tunnel test.Apparent stiffness may be affected by development of tension cracks.Stress field is affected by borehole.


Analysis subject tolimitations of elastic theory.Two boreholes at different orien-tations are required for determi-nation of complete stress field.Questionable results in rockswith strongly time-dependent properties.
Analysis subject to limitations of elastic theory.Two boreholes at different orien-tations are required for determi-nation of complete stress field.Questionable results in rocks with strongly time-dependent properties.


APPENDIX  
APPENDIX B (Continued)
B (Continued)
METHODS OF SUBSURFACE  
METHODS OF SUBSURFACE  
EXPLORATION
EXPLORATION
METHODPROCEDURE
METHOD PROCEDURE APPLICABILITY
APPLICABILITY
LIMITATIONS
LIMITATIONS
METHODS OF IN SITU TESTING OF SOIL AND ROCKInclusion Stressmeter Borehole StrainGaugeIL-)Rigid stress indicating device (stressmeter)  
METHODS OF IN SITU TESTING OF SOIL AND ROCK Inclusion Stressmeter Borehole Strain Gauge IL-)Rigid stress indicating device (stressmeter)  
isplaced in borehole, andhole is overcored torelieve stresses on annu-lar core containing stress-meter. In situ stressesare computed by elastictheory. (Ref. 26)Strain gauge is cementedto bottom (end) of bore-hole. and gauge is over-cored to relieve stresseson core containing straingauge. Stresses are computedfrom resulting strains andfrom modulus obtained bylaboratory tests on core.(Ref. 26)Slot is drilled in rocksurface producing stressrelief in adjacent rock.Flat jack is grouted intoslot and hydraulically pressurized.
is placed in borehole, and hole is overcored to relieve stresses on annu-lar core containing stress-meter. In situ stresses are computed by elastic theory. (Ref. 26)Strain gauge is cemented to bottom (end) of bore-hole. and gauge is over-cored to relieve stresses on core containing strain gauge. Stresses are computed from resulting strains and from modulus obtained by laboratory tests on core.(Ref. 26)Slot is drilled in rock surface producing stress relief in adjacent rock.Flat jack is grouted into slot and hydraulically pressurized.
 
Pressurerequired to reversedeformations produced bystress relief is observed.


(Refs. 26. 27)Measurement of absolutestresses in situ. Requiresonly one core drill size.Measurement of one corn po-nent of normal stress insitu. Does not requireknowledge of rock modulus.Same as above.Stress field is affected byexcavation or tunnel. Interpre- tation of test results subjectto assumption that loading andunloading moduli are equal.Questionable results in rockwith strongly time-dependent pruperties.
Pressure required to reverse deformations produced by stress relief is observed.(Refs. 26. 27)Measurement of absolute stresses in situ. Requires only one core drill size.Measurement of one corn po-nent of normal stress in situ. Does not require knowledge of rock modulus.Same as above.Stress field is affected by excavation or tunnel. Interpre-tation of test results subject to assumption that loading and unloading moduli are equal.Questionable results in rock with strongly time-dependent pruperties.


Measurement of absolutestresses in situ. Doesnot require accurate knowl-edge of rock modulus.Same as above.Flat Jack Test APPENDIX  
Measurement of absolute stresses in situ. Does not require accurate knowl-edge of rock modulus.Same as above.Flat Jack Test APPENDIX B (Continued)
B (Continued)
METHODS OF SUBSURFACE  
METHODS OF SUBSURFACE  
EXPLORATION
EXPLORATION
METHODPROCEDURE
METHOD PROCEDURE APPLICABILITY
APPLICABILITY
LIMITATIONS
LIMITATIONS
METHODS OF IN SITU TESTING OF SOIL AND ROCKHydraulic Fracturing TestCrosshole Seismic TestUphole/Downhole SeismicTest Acoustic VelocityLogFluid is pumped into scaled-off portion of boreholewith pressure increasing until fracture occurs.(Ref. 26)Seismic signal is trans-mitted from source inone borehole to receiv-er(s) in other bore-hole(s),  
METHODS OF IN SITU TESTING OF SOIL AND ROCK Hydraulic Fracturing Test Crosshole Seismic Test Uphole/Downhole SeismicTest Acoustic Velocity Log Fluid is pumped into scaled-off portion of borehole with pressure increasing until fracture occurs.(Ref. 26)Seismic signal is trans-mitted from source in one borehole to receiv-er(s) in other bore-hole(s), and transit time is recorded. (Ref. 28)Seismic signal is transmitted between borehole and ground surface, and transit time is recorded. (Ref. 28)Logging tool contains transmitting transducer and two receiving trans-ducers separated by fixed gage length. Signal is transmitted through rock adjacent to borehole and transit time over the gage length is recorded as difference in arrival times at the receivers.(Refs. 29. 30)In situ measurement of com-pression wave velocity and shear wave velocity in soils and rocks.In situ measurement of com-pression wave velocity and shear wave velocity in soils and rocks.Measurement of compression wave velocity.
and transittime is recorded.
 
(Ref. 28)Seismic signal istransmitted betweenborehole and groundsurface, and transittime is recorded.
 
(Ref. 28)Logging tool containstransmitting transducer and two receiving trans-ducers separated by fixedgage length. Signal istransmitted through rockadjacent to borehole andtransit time over thegage length is recordedas difference in arrivaltimes at the receivers.
 
(Refs. 29. 30)In situ measurement of com-pression wave velocity andshear wave velocity in soilsand rocks.In situ measurement of com-pression wave velocity andshear wave velocity in soilsand rocks.Measurement of compression wave velocity.
 
Used primar-ily in rocks to Obtainestimate of porosity.
 
Requires deviation survey ofboreholes to eliminate errorsdue to deviation of holes fromvertical.


Refraction of signalthrough adjacent high-velocity beds must be considered ininterpretation.
Used primar-ily in rocks to Obtain estimate of porosity.Requires deviation survey of boreholes to eliminate errors due to deviation of holes from vertical.


Apparent velocity obtained istime-average for all stratabetween source and receiver.
Refraction of signal through adjacent high-velocity beds must be considered in interpretation.


Results represent only thematerial immediately adjacentto the borehole.
Apparent velocity obtained is time-average for all strata between source and receiver.Results represent only the material immediately adjacent to the borehole.


Can be obtainedonly in uncased, fluid-filled borehole.
Can be obtained only in uncased, fluid-filled borehole.


Use is limited tomaterials with P-wave veloritygreater than that of boreholefluid.Estimation of minor principal stress.Affected by anisotropy of tensilestrength of rock.0  
Use is limited to materials with P-wave velority greater than that of borehole fluid.Estimation of minor principal stress.Affected by anisotropy of tensile strength of rock.0  
APPENDIX  
APPENDIX B (Continued)
B (Continued)
METHODS OF SUBSURFACE  
METHODS OF SUBSURFACE  
EXPLORATION
EXPLORATION
METHODPROCEDURE
METHOD PROCEDURE A PPIJCABSILITY
A PPIJCABSILITY
ILIMITATIONS
ILIMITATIONS
METHODS OF IN SITU TESTING OF SOIL AND ROCK3-D VelocityLogElectrical Resistivity LogLogging tool containstransmitting transducer and receiving transducer separated by fixed gagelength. Signal is trans-mitted through rockadjacent to borehole.
METHODS OF IN SITU TESTING OF SOIL AND ROCK 3-D Velocity Log Electrical Resistivity Log Logging tool contains transmitting transducer and receiving transducer separated by fixed gage length. Signal is trans-mitted through rock adjacent to borehole.
 
andwave train at receiveris recorded.
 
(Ref. 31)Apparent electrical resis-tivity of soil or rock inneighborhood of boreholeis measured by in-holelogging tool containing one of a wide variety ofelectrode configurations.


(Refs. 29. 30)Measurement of compression wave and shear wave velocityties in rock. Detection ofvoid spaces. open fractures, and zones of weakness.
and wave train at receiver is recorded. (Ref. 31)Apparent electrical resis-tivity of soil or rock in neighborhood of borehole is measured by in-hole logging tool containing one of a wide variety of electrode configurations.(Refs. 29. 30)Measurement of compression wave and shear wave velocity ties in rock. Detection of void spaces. open fractures, and zones of weakness.Appropriate combinations of resistivity logs can be used to estimate porosity and degree of water saturation in rocks.In soils, may be used as qualitative indication of changes in void ratio or water content, for correla-tion ofstrata between boreholes, and for location of strata boundaries.


Appropriate combinations ofresistivity logs can be usedto estimate porosity and degreeof water saturation in rocks.In soils, may be used asqualitative indication ofchanges in void ratio orwater content, for correla-tion ofstrata betweenboreholes, and for locationof strata boundaries.
Correlation of strata between boreholes and location of strata boundaries.


Correlation of stratabetween boreholes andlocation of strataboundaries.
Provides an approximation to water content and can be run in cased or uncased, fluid-filled or empty boreholes, Results represent only the material immediately adjacent to the borehole.


Provides anapproximation to watercontent and can be run incased or uncased, fluid-filled or empty boreholes, Results represent only thematerial immediately adjacentto the borehole.
Can be obtained only in uncased, Iluid-filled borehole.


Can be obtainedonly in uncased, Iluid-filled borehole.
Correction required for variation in hole size. Use is limited to materials with P-wave velocity greater than that of borehole fluid.Can be obtained only in uncased borcholes.


Correction requiredfor variation in hole size. Useis limited to materials with P-wave velocity greater than thatof borehole fluid.Can be obtained only in uncasedborcholes.
Hole must be fluid filled, or electrodes must be pressed against wall of hole.Apparent resistivity values are strongly affected by changes in hole diameter, strata thickness, resistivity contrast between adja-cent strata. resistivity of drilling fluid, etc.Because of very strong borehole effects, results are generally not of sufficient accuracy for quantitative engineering uses.t-J Neutron Log Neutrons are emitted into rock or soil around bore-hole by a neutron source in the logging tool, and a detector isolated from the source responds to either slow neutrons or secondary gamma rays.Response of detector is recorded. (Refs. 29. 30)  
 
APPENDIX B (Continued)
Hole must be fluidfilled, or electrodes must bepressed against wall of hole.Apparent resistivity values arestrongly affected by changes inhole diameter, strata thickness, resistivity contrast between adja-cent strata. resistivity ofdrilling fluid, etc.Because of very strong boreholeeffects, results are generally not of sufficient accuracy forquantitative engineering uses.t-JNeutron LogNeutrons are emitted intorock or soil around bore-hole by a neutron sourcein the logging tool, anda detector isolated fromthe source responds toeither slow neutrons orsecondary gamma rays.Response of detector isrecorded.
 
(Refs. 29. 30)  
APPENDIX  
B (Continued)
METHODS OF SUBSURFACE  
METHODS OF SUBSURFACE  
EXPLORATION
EXPLORATION
METHODPROCEDURE
METHOD PROCEDURE APPLICA BILITY IEMITATIONS
APPLICA BILITYIEMITATIONS
METHODS OF IN SITU TESTING OF SOIL AND ROCK Gamma-Gamma Log ("Density Log")Gamma rays are emitted into rock around the borehole by a source in the logging tool, and a detector isolated from the source responds to back-scattered gamma rays. Response of de-tector is recorded.(Ref. 29)Film-type or television camera in a suitable protective container is used for observation of walls of borehole.(Ref. 32)Estimation of bulk density in rocks, qualitative indi-cation of changes in densi-ty of soils. May be run in empty or fluid-Filled holes.Detection and mapping of joints, seams, cavities, or other visually observable features in rock. Can be used in empty, uncased holes or in holes filled with clear water.Effects of borehole size and density of drilling fluid must be accounted for. Presently not suitable for qualitative estimate of density in soils other than those of -rock-like" character.
METHODS OF IN SITU TESTING OF SOIL AND ROCKGamma-Gamma Log("Density Log")Gamma rays are emittedinto rock around theborehole by a source inthe logging tool, and adetector isolated fromthe source responds toback-scattered gammarays. Response of de-tector is recorded.


(Ref. 29)Film-type or television camera in a suitableprotective container is used for observation of walls of borehole.
Cannot be used in cased boreholes, Results are affected by any condition that affects visi-bility.4'" Borehole Cameras APPENDIX C SPACING AND DEPTH OF SUBSURFACE  
 
(Ref. 32)Estimation of bulk densityin rocks, qualitative indi-cation of changes in densi-ty of soils. May be run inempty or fluid-Filled holes.Detection and mapping ofjoints, seams, cavities, orother visually observable features in rock. Can beused in empty, uncased holesor in holes filled withclear water.Effects of borehole size anddensity of drilling fluid mustbe accounted for. Presently not suitable for qualitative estimate of density in soilsother than those of -rock-like"
character.
 
Cannot be used incased boreholes, Results are affected by anycondition that affects visi-bility.4'"BoreholeCameras APPENDIX  
CSPACING AND DEPTH OF SUBSURFACE  
EXPLORATIONS  
EXPLORATIONS  
FOR SAFETY-RELATED'  
FOR SAFETY-RELATED'  
FOUNDATIONS
FOUNDATIONS
TYPE OF STRUCTURE
TYPE OF STRUCTURE General SPACING OF BORINGS' OR SOUNDINGS For favorable, uniform geologic conditions, where continuity of subsurface strata is found. spacing should be as indicated for the type of structure with at least one boring at the location of every safety-related or Seismic Category I structure.
GeneralSPACING OF BORINGS'  
OR SOUNDINGS
For favorable, uniform geologic conditions, wherecontinuity of subsurface strata is found. spacing shouldbe as indicated for the type of structure with at least oneboring at the location of every safety-related or SeismicCategory I structure.


Where variable conditions arefound, spacing should be smaller, as needed, to obtain aclear picture of soil or rock properties and theirvariability.
Where variable conditions are found, spacing should be smaller, as needed, to obtain a clear picture of soil or rock properties and their variability.


Where cavities or other discontinuities ofengineering significance may occur, the normalexploratory work should be supplemented by borings orsoundings at a spacing small enough to detect suchfeatures.
Where cavities or other discontinuities of engineering significance may occur, the normal exploratory work should be supplemented by borings or soundings at a spacing small enough to detect such features.tb.j MINIMUM DEPTH OF PENETRATION
The depth of borings should be determined on the basis of the type of structure and geologic conditions.


tb.jMINIMUM DEPTH OF PENETRATION
All borings should be extended to a depth sufficient to define the site geology and to sample all materials that may swell during excavation, may consolidate subsequent to construction, may be unstable under earthquake loading, or whose physical properties would affect foundation behavior or stability.
The depth of borings should be determined on the basisof the type of structure and geologic conditions.


Allborings should be extended to a depth sufficient todefine the site geology and to sample all materials thatmay swell during excavation, may consolidate subsequent to construction, may be unstable underearthquake loading, or whose physical properties wouldaffect foundation behavior or stability.
Where soils are very thick, the maximum required depth for engineering purposes, denoted dmax, may be taken as the depth at which the change in the vertical stress during or after construction for the combined foundation loading is less than 10% of the in situ effective overburden stress. It may also be taken as the depth at which the shear wave velocity of the soil mass exceeds 3.000 ft/sec. It may be necessary to include in the investigation program several borings needed to complete information to establish the soil model for soil-structure interaction studies. These borings may be required to penetrate depths greater than those depths required for general ený;inecring purposes.


Where soils arevery thick, the maximum required depth for engineering purposes, denoted dmax, may be taken as the depth atwhich the change in the vertical stress during or afterconstruction for the combined foundation loading is lessthan 10% of the in situ effective overburden stress. Itmay also be taken as the depth at which the shear wavevelocity of the soil mass exceeds 3.000 ft/sec. It may benecessary to include in the investigation program severalborings needed to complete information to establish thesoil model for soil-structure interaction studies.
Borings should be deep enough to define and evaluate the potential for deep soil stability problems at the site. Generally all borings should extend at least 30 feet below the lowest part of the foundation.


Theseborings may be required to penetrate depths greaterthan those depths required for general ený;inecring purposes.
If competent rock is encountered at lesser depths than those given, borings should penetrate to the greatest depth where discontinuities or zones of weakness can affect foundations and should penetrate at least 20 ft into sound rock. For weathered shale or soft rock.depths should be as for soils.'As dctcrmincd by I tt'jt1 lii ocaiiivns of .,ife .-relted structure.-  
 
Borings should be deep enough to define andevaluate the potential for deep soil stability problems atthe site. Generally all borings should extend at least 30feet below the lowest part of the foundation.
 
Ifcompetent rock is encountered at lesser depths thanthose given, borings should penetrate to the greatestdepth where discontinuities or zones of weakness canaffect foundations and should penetrate at least 20 ftinto sound rock. For weathered shale or soft rock.depths should be as for soils.'As dctcrmincd by I tt'jt1 lii ocaiiivns of .,ife .-relted structure.-  
and facififics.
and facififics.


Line 771: Line 525:
shafts or other accessible excvations that meet depth requirements.
shafts or other accessible excvations that meet depth requirements.


APPENDIX  
APPENDIX C SPACING AND DEPTH OF SUBSURFACE  
CSPACING AND DEPTH OF SUBSURFACE  
EXPLORATIONS  
EXPLORATIONS  
FOR SAFETY-RELATED
FOR SAFETY-RELATED
3FOUNDATIONS
3 FOUNDATIONS
TYPE OF STRUCTURE
TYPE OF STRUCTURE Structures including buildings, retaining walls.concrete dams.Earth dams, dikes, levees, and embankments.
Structures including buildings, retaining walls.concrete dams.Earth dams, dikes, levees,and embankments.


Deep cuts,6canalsSPACING OF BORINGS4 OR SOUNDINGS
Deep cuts, 6 canals SPACING OF BORINGS 4 OR SOUNDINGS Principal borings: at least one boring beneath every safety-related structure.
Principal borings:  
at least one boring beneath everysafety-related structure.


For larger, heavier structures, such as the containment and auxiliary buildings, at leastone boring per 10,000 sq ft (approximately  
For larger, heavier structures, such as the containment and auxiliary buildings, at least one boring per 10,000 sq ft (approximately  
100 ftspacing)  
100 ft spacing) and, in addition, a number of borings along the periphery, at corners, and other selected locations.
and, in addition, a number of borings along theperiphery, at corners, and other selected locations.


Oneboring per 100 linear ft for essentially linear structures.?
One boring per 100 linear ft for essentially linear structures.?
Principal borings:  
Principal borings: one per 100 linear ft along axis of structure and at critical locations perpendicular to the axis to establish geological sections and groundwater conditions for analysis.'
one per 100 linear ft along axis ofstructure and at critical locations perpendicular to theaxis to establish geological sections and groundwater conditions for analysis.'
Principal borings: one per 200 linear ft along the alignment and at critical locations perpendicular to the alignment to establish geologic sections for analysis.!
Principal borings:  
one per 200 linear ft along thealignment and at critical locations perpendicular to thealignment to establish geologic sections for analysis.!
MINIMUM DEPTH OF PENETRATION
MINIMUM DEPTH OF PENETRATION
Principal borings:  
Principal borings: at least one-fourth of the principal borings anid a minimum of one boring per structure to penetrate into sound rock or to a depth equal to dmax.Others to a de;th below foundation elevation equal to the width of structure or to a depth equal to the foundation depth below the original ground surface.whichever is greater.'Principal borings: one per 200 linear ft to dmax. Others should penetrate all strata whose strength would affect stability.
at least one-fourth of the principal borings anid a minimum of one boring per structure topenetrate into sound rock or to a depth equal to dmax.Others to a de;th below foundation elevation equal tothe width of structure or to a depth equal to thefoundation depth below the original ground surface.whichever is greater.'
Principal borings:  
one per 200 linear ft to dmax. Othersshould penetrate all strata whose strength would affectstability.


For water-impounding structures, to sufficient depth to define all aquifers and zones of underseepage that could affect performance of structure.-
For water-impounding structures, to sufficient depth to define all aquifers and zones of underseepage that could affect performance of structure.-
Principal borings:  
Principal borings: one per 200 linear ft to penetrate into sound rock or to dmax. Others to a depth below the bottom elevation of"cavation equal to the depth of cut or to below, the lowest potential failure zone of the slope.! Borings should penetrate pervious strata below which groundwater may influence stability.
one per 200 linear ft to penetrate intosound rock or to dmax. Others to a depth below thebottom elevation of"cavation equal to the depth of cutor to below, the lowest potential failure zone of theslope.! Borings should penetrate pervious strata belowwhich groundwater may influence stability.


0%AIso supplementary borings or soundings which are design dependent or nccessary to define anomalies.
0%AIso supplementary borings or soundings which are design dependent or nccessary to define anomalies.
Line 809: Line 552:


where loss of strength due to excessive deformations would affect ultimate site safety.0  
where loss of strength due to excessive deformations would affect ultimate site safety.0  
_____ --- ____APPENDIX  
_____ --- ____APPENDIX C SPACING AND DEPTH OF SUBSURFACE  
CSPACING AND DEPTH OF SUBSURFACE  
EXPLORATIONS  
EXPLORATIONS  
FOR SAFETY-RELATED3 FOUNDATIONS
FOR SAFETY-RELATED3 FOUNDATIONS
TYPE OF STRUCTURE
TYPE OF STRUCTURE Pipelines Tunnels SPACING OF BORIN(;S 4 OR SOUNDINGS Principal borings: This may vary depending on how well site conditions are understood from other plant site borings. For variable conditions, one per 100 linear ft for buried pipelines:  
Pipelines TunnelsSPACING OF BORIN(;S4 OR SOUNDINGS
at least one boring for each footing for pipelines above ground.'Principal borings: one per 100 linear ft.'MINiNMUM DEPTH OF PENETRATION
Principal borings:  
Principal borings: For buried pipelines, one per 200 linear ft to penetrate into sound rock or to dmax. Others to 5 times the pipe diameters below the invert elevation.
This may vary depending on how wellsite conditions are understood from other plant siteborings.
 
For variable conditions, one per 100 linear ftfor buried pipelines:  
at least one boring for each footingfor pipelines above ground.'Principal borings:  
one per 100 linear ft.'MINiNMUM  
DEPTH OF PENETRATION
Principal borings:  
For buried pipelines, one per 200linear ft to penetrate into sound rock or to dmax. Othersto 5 times the pipe diameters below the invert elevation.


For pipelines above ground. depths as for foundation structures.
For pipelines above ground. depths as for foundation structures.


Principal borings:  
Principal borings: one per 200 linear ft to penetrate into sound rock or to diiax. Others to 5 times the tunnel diameter below the invert elevation,'
one per 200 linear ft to penetrate intosound rock or to diiax. Others to 5 times the tunneldiameter below the invert elevation,'
1.-j-j Reservoirs, impoundments Principal borings: one per 50,000 ft' of interior area of the impoundment.
1.-j-jReservoirs, impoundments Principal borings:  
one per 50,000 ft' of interior area ofthe impoundment.


in addition to borings at thelocations of dams or dikes.'Principal borings:  
in addition to borings at the locations of dams or dikes.'Principal borings: at least one-fourth.
at least one-fourth.


but no fewer thanone, of the principal borings to penetrate into soundrock or to dmax. Others to a depth of 25 ft belowrc.esrvoir bottom elevation.'
but no fewer than one, of the principal borings to penetrate into sound rock or to dmax. Others to a depth of 25 ft below rc.esrvoir bottom elevation.', Stippkllcn~iery horing, o~r %on ing ai nce'%JrY to define zin-naliics.
, Stippkllcn~iery horing, o~r %on ing ai nce'%JrY  
to define zin-naliics.


APPENDIX  
APPENDIX D REFERENCES
DREFERENCES
1. U.S. Army Corps of Engineers, Instrumentation of Earth and Rock-Fill Dams (Groundwater and Pore Pressure Observations), Engineer Manual EM 1 110-2-1908. 1972.2. U.S. Army Corps of Engineers, Soil Sampling.Engineer Manual EM 1110-2-1907.
1. U.S. Army Corps of Engineers, Instrumentation of Earth and Rock-Fill Dams (Groundwater and PorePressure Observations),  
Engineer Manual EM 1 110-2-1908. 1972.2. U.S. Army Corps of Engineers, Soil Sampling.
 
Engineer Manual EM 1110-2-1907.


1972, Ch. 3, 4.3. U.S. Navy, Design Manual, Soil Mechanics, Founidations, andl Earth Structures.
1972, Ch. 3, 4.3. U.S. Navy, Design Manual, Soil Mechanics, Founidations, andl Earth Structures.


A',-1 VF,,l C DM-7.Dept. of the Navy, Naval Facilities Engineering Command.
A',-1 VF,,l C DM-7.Dept. of the Navy, Naval Facilities Engineering Command. Alexandria.


Alexandria.
Virginia, 1971.4. Osterberg, J.O., and S. Varaksin, "Determina- tion of Relative Density of Sand Below Groundwater Table.~ Evaluation of Relative Densit' and Its Role in Geotechnical Projects inrowiving Cohesiohless Soils.American Society for Testing and Materials.
 
Virginia,  
1971.4. Osterberg, J.O., and S. Varaksin,  
"Determina- tion of Relative Density of Sand Below Groundwater Table.~ Evaluation of Relative Densit' and Its Role inGeotechnical Projects inrowiving Cohesiohless Soils.American Society for Testing and Materials.


Philadelphia.
Philadelphia.


STP 523. 1973, pp. 364-376.5. Karol. R. H.. "Use of Chemical Grouts to Sam-pie Sands,~ Sampling of Soil adl Rock, AmericanSociety for Testing and Materials, Philadelphia, STP483, 19*71. pp. 51-59.6. Windisch.
STP 523. 1973, pp. 364-376.5. Karol. R. H.. "Use of Chemical Grouts to Sam-pie Sands,~ Sampling of Soil adl Rock, American Society for Testing and Materials, Philadelphia, STP 483, 19*71. pp. 51-59.6. Windisch.


S. J.. and M. Soulie. "Technique forStudy of Granular Materials."  
S. J.. and M. Soulie. "Technique for Study of Granular Materials." J. Soil Mlech. Found.Dir.. American Society of Civil Engineers.
J. Soil Mlech. Found.Dir.. American Society of Civil Engineers.


V. 96(SM4). 1970, pp. 1113:1126.
V. 96 (SM4). 1970, pp. 1113:1126.


7. Hvorslev.
7. Hvorslev.


IM. J.. Subsurface Exploration andSampling o0 Soils .lr Civil Engineering PurposeS.
IM. J.. Subsurface Exploration and Sampling o0 Soils .lr Civil Engineering PurposeS.


U.S.Army Waterways Experiment Station, Vicksburg, Mississippi.
U.S.Army Waterways Experiment Station, Vicksburg, Mississippi.


1949. pp, 51-71. 83-139, 156-157.8. Barton. C. MI.. "Borehole Sampling ofSaturated Uncemented Sands and Grouts,"Groundwater  
1949. pp, 51-71. 83-139, 156-157.8. Barton. C. MI.. "Borehole Sampling of Saturated Uncemented Sands and Grouts," Groundwater  
12(3). 1974. pp. 170-181.9, A merican Society for Testing and Materials,
12(3). 1974. pp. 170-181.9, A merican Society for Testing and Materials, 1974 .I ntunl Book of' ,.ISTAI S.S'wlftr ls' Port' 19.Philadelphia.
1974 .I ntunl Book of' ,.ISTAI S.S'wlftr ls' Port' 19.Philadelphia.


1974, pp. 192,194.
1974, pp. 192,194. 206-207, 224-229.261.263, 317-320.


206-207,  
Special proC'lhires),or T'sfing sait (o41 Rock' or Engiineering Purposes.
224-229.261.263,
317-320.


Special proC'lhires),or T'sfing sait (o41Rock' or Engiineering Purposes.
American Society for Testing and Materials, Philadelphia, STP 479, 1969, Ii. Peck. R. B.. W. E. Hanson, and T. 11,Thorn-burn. Foundation Engineering.


American Society forTesting and Materials, Philadelphia, STP 479, 1969,Ii. Peck. R. B.. W. E. Hanson, and T. 11,Thorn- burn. Foundation Engineering.
John Wiley and Sons, Inc.. New York, 2nd ed.. 1974. pp. 105-106.12, U.S. Dept. of Interior, Bureau of Reclamation, Earth Manual, Ist ed.. Denver, Colorado, 1960, pp.346-379.13. Terziaghi.
 
John Wiley and Sons,Inc.. New York, 2nd ed.. 1974. pp. 105-106.12, U.S. Dept. of Interior, Bureau of Reclamation, Earth Manual, Ist ed.. Denver, Colorado,  
1960, pp.346-379.13. Terziaghi.


K.. and R. B. Peck. Soil Alechlnics in Engineering Practice.
K.. and R. B. Peck. Soil Alechlnics in Engineering Practice.


2nd ed., John Wiley andSons, Inc., New York. 1963. pp. 299-300.308-314.
2nd ed., John Wiley and Sons, Inc., New York. 1963. pp. 299-300.308-314.


322-324.14. Osterberg.
322-324.14. Osterberg.


J. 0., "New Piston Type SoilSampler.'*  
J. 0., "New Piston Type Soil Sampler.'*  
Engineering Newiv-Record  
Engineering Newiv-Record  
148. 1952, pp.77-78.15. Kjellman, W.. T. Kallstanins, and 0. Wager."Soil Sampler with Metal F",<,,- Royal SwedishGeotechnical Institute.
148. 1952, pp.77-78.15. Kjellman, W.. T. Kallstanins, and 0. Wager."Soil Sampler with Metal F",<,,- Royal Swedish Geotechnical Institute.


Proceeding No. I.Stockholm.
Proceeding No. I.Stockholm.


Sweden. 1950.16. Rocha. M., "A Method of Obtaining IntegralSamples of Rock Masses,"  
Sweden. 1950.16. Rocha. M., "A Method of Obtaining Integral Samples of Rock Masses," Association of Engineer-ing Geologists.
Association of Engineer- ing Geologists.


Bulletin*  
Bulletin*  
10(I). 1973. pp. 77-82,17. Tirez. G. B.. "Recent Trends in Underwater Soil Sampling Methods."  
10(I). 1973. pp. 77-82, 17. Tirez. G. B.. "Recent Trends in Underwater Soil Sampling Methods." Underwater Soil Samtpling.
Underwater Soil Samtpling.
 
Testing.
 
and Construction Control.


American Societyfor Testing and Materials.
Testing. and Construction Control. American Society for Testing and Materials.


Philadelphia.
Philadelphia.


STP 501.1972. pp. 42-54.18. Nooranz.
STP 501.1972. pp. 42-54.18. Nooranz. I., "Underwater Soil Sampling and Testing-A  
 
State-of-the-Art Review." Underwater Soil Sampling.
I., "Underwater Soil Sampling andTesting-A  
State-of-the-Art Review."  
Underwater Soil Sampling.


Testing, and Construction Control.American Society for Testing and Materials, Philadelphia.
Testing, and Construction Control.American Society for Testing and Materials, Philadelphia.


STP 501, 1972. pp. 3-41.19. McCoy, F. W., Jr., "An Analysis of PistonCoring Through Corehead Camera Photography',"
STP 501, 1972. pp. 3-41.19. McCoy, F. W., Jr., "An Analysis of Piston Coring Through Corehead Camera Photography'," Underwater Soil Sampling.
Underwater Soil Sampling.
 
Testing.


and Construction Control.
Testing. and Construction Control. American Society for Testing and Materials.
 
American Society for Testing and Materials.


Philadelphia, STP 501, 1972. pp. 90-105.20. Schmertmann.
Philadelphia, STP 501, 1972. pp. 90-105.20. Schmertmann.


J. H., "Suggested Method forDeep Static-Core Penetration Test." Speciall'roc&'durt's fi)r Testilng Soil anil Rock otr ligitlcr'irhg Purposes, American Society for Testing a11dMaterials, Philadelphia.
J. H., "Suggested Method for Deep Static-Core Penetration Test." Special l'roc&'durt's fi)r Testilng Soil anil Rock otr ligitlcr'irhg Purposes, American Society for Testing a11d Materials, Philadelphia.


STI1 479, 1970. pp. 71-77,IL stio K, (1,, "111 8i4t1 " (m 1 the I ckSons, Inc,, Now York, Ch. 5, 1968K pp. 126-144,22. Cedergrvn, H, R., Seepage.
STI1 479, 1970. pp. 71-77, IL stio K, (1,, "111 8i4t1 " (m 1 the I ck Sons, Inc,, Now York, Ch. 5, 1968K pp. 126-144, 22. Cedergrvn, H, R., Seepage. Drainage, and Flow D3. Sead'im, 3. L.. "Inflone~c of" hnestim tl'l. \Viler on the Behavior of Rock Masses." Rock Mechanics in Engineering Practice.


Drainage, and FlowD3. Sead'im,
K. G. Stagg and 0. C.132-28 ( 1 I ZienkiewicL, eds., John Wiley and Sons, Inc., New York, 1968, Ch. 3.24, D)odds, R. K., "Suggested Method of Test for In Situ Shear Strength of Rock." Special lProcedures.lr Testing Soil wdl Rock jor Engineering Purposes.American Society for Testing and Materials, Philadelphia, STP 479. 1970, pp. 618-628.25. Goodman. R. E.. T. K. Van, and P. E. Henze."Measurement of Rock Deformability in Bore-holes.** Proceedings ofthe Tenth Symposiumn on Rock Mlechanics, A.fustin, Texas. 1968. pp. 523-555.26. Roberts. A.. "The Measurement of Strain and Stress in Rock Masses,'" Rock Mechanics in Engineer-ing Practice.
3. L.. "Inflone~c of" hnestim tl'l. \Vileron the Behavior of Rock Masses."
Rock Mechanics inEngineering Practice.
 
K. G. Stagg and 0. C.132-28( 1 IZienkiewicL,  
eds., John Wiley and Sons, Inc., NewYork, 1968, Ch. 3.24, D)odds, R. K., "Suggested Method of Test forIn Situ Shear Strength of Rock." Special lProcedures
.lr Testing Soil wdl Rock jor Engineering Purposes.
 
American Society for Testing and Materials, Philadelphia, STP 479. 1970, pp. 618-628.25. Goodman.
 
R. E.. T. K. Van, and P. E. Henze."Measurement of Rock Deformability in Bore-holes.**  
Proceedings ofthe Tenth Symposiumn on RockMlechanics, A.fustin, Texas. 1968. pp. 523-555.26. Roberts.
 
A.. "The Measurement of Strain andStress in Rock Masses,'"  
Rock Mechanics in Engineer- ing Practice.


K. G. Stagg and 0. C. Zienkiewicz.
K. G. Stagg and 0. C. Zienkiewicz.


eds.,John Wile), and Sons. Inc., New York, 1968, pp. 166-191, 194.27. Rocha. M., "New Techniques in Delor-mability Testing or In Situ Rock Masses,"  
eds., John Wile), and Sons. Inc., New York, 1968, pp. 166-191, 194.27. Rocha. M., "New Techniques in Delor-mability Testing or In Situ Rock Masses," Deter-inination of the in Situ Atodiduvs of Deformation of Rock, American Society for Testing and Materials, Philadelphia.
Deter-inination of the in Situ Atodiduvs of Deformation ofRock, American Society for Testing and Materials, Philadelphia.
 
STP 477, 1970.28. Ballard.


R. F., Jr. and F. G. McLean, "SeismicField Methods for In Situ Moduli,"  
STP 477, 1970.28. Ballard. R. F., Jr. and F. G. McLean, "Seismic Field Methods for In Situ Moduli," in Situ Measure-nerit of Soil Properties.
in Situ Measure-nerit of Soil Properties.


Proceedings of the Specialty Conference of the Geotechnical Engineering Divi-sion. American Society of Civil Engineers.
Proceedings of the Specialty Conference of the Geotechnical Engineering Divi-sion. American Society of Civil Engineers.


Raleigh,North Carolina,  
Raleigh, North Carolina, 1975, pp. 121-150.29. Schlumberger Ltd.. Log Interpretations.
1975, pp. 121-150.29. Schlumberger Ltd.. Log Interpretations.


Vol.I (Principles),  
Vol.I (Principles), Schlumberger.
Schlumberger.


Ltd., New York. 1972.Ch. 3-9.30. Haun, J. D., and L. W. Leroy. editors, Subsur-face Geology in Petroleum Exploration.
Ltd., New York. 1972.Ch. 3-9.30. Haun, J. D., and L. W. Leroy. editors, Subsur-face Geology in Petroleum Exploration.
Line 976: Line 656:
A. Sjionposiwt.
A. Sjionposiwt.


Colorado School of Mines. Golden. Colorado, Ch.14. 15, 21. 1958.31. Gever, R. L. and J. I Myung. "The 3-DVelocity Log: a Tool for In Situ Determination of theElastic Moduli of Rocks." Proceedings ofthe TweljihSymposi .111on Rock AMechanics.
Colorado School of Mines. Golden. Colorado, Ch.14. 15, 21. 1958.31. Gever, R. L. and J. I Myung. "The 3-D Velocity Log: a Tool for In Situ Determination of the Elastic Moduli of Rocks." Proceedings ofthe Tweljih Symposi .111on Rock AMechanics.
 
Rolla/. Missouri.


1971, pp. 71-107.32. Lundgren.
Rolla/. Missouri.1971, pp. 71-107.32. Lundgren.


R., F. C. Sturges.
R., F. C. Sturges. and L. S. Cluff."General Guide for Use of Borehole Cameras-A Guide." Special Procedures for Testing Soil anil Rock for Engineering Purposes.


and L. S. Cluff."General Guide for Use of Borehole Cameras-A
American Society for Testing and Materials, Philadelphia.
Guide." Special Procedures for Testing Soil anil Rockfor Engineering Purposes.


American Society forTesting and Materials, Philadelphia.
STP 479. 1970.pp. 56-61.1.132-29 APPENDIX E BIBLIOGRAPHY
 
Bates. E. R.. "I)Deection of Subsurface Cavities." MI iscellaneous Paper. S-73-40. U.S. A rm \Vaterways I-xperiment Station. Vicksburg.
STP 479. 1970.pp. 56-61.1.132-29 APPENDIX  
EBIBLIOGRAPHY
Bates. E. R.. "I)Deection of Subsurface Cavities."
MI iscellaneous Paper. S-73-40.
 
U.S. A rm \Vaterways I-xperiment Station.
 
Vicksburg.


NIississippi.
NIississippi.


1973.Calhoon.
1973.Calhoon. NI. [.. "'Pressurc-.Mctcr Field Tcsting of Soils." Civil E'ntgine'ring  
 
NI. [.. "'Pressurc-.Mctcr Field Tcsting ofSoils." Civil E'ntgine'ring  
39(7), 1969. pp. 71-74.(;hIssop.
39(7), 1969. pp. 71-74.(;hIssop.


R.. "-The Rise of Geotechnology and ItsInillnence on I-neineering Practice.'"  
R.. "-The Rise of Geotechnology and Its Inillnence on I-neineering Practice.'" Ieihtlh Rankine Leclure: Gvcechnique  
Ieihtlh RankineLeclure:  
1iI,2), 1968. pp. 105-150.Hlall. W. J.. N. M. Newmark. and A. J. Hendron..Jr.. "Classification.
Gvcechnique  
1iI,2), 1968. pp. 105-150.Hlall. W. J.. N. M. Newmark.


and A. J. Hendron..Jr.. "Classification.
Elngineering Properties and Field Exploratioll of Soils, Intact Rock. and In Situ Mas-s.es.'" US. AEC Report WASH-130).  
 
Elngineering Properties and FieldExploratioll of Soils, Intact Rock. and In Situ Mas-s.es.'" US. AEC Report WASH-130).  
1974.iMisterek.
1974.iMisterek.


1). L., "'Analysis of Dlata from RadialJack in Tests.-"  
1). L., "'Analysis of Dlata from Radial Jack in Tests.-" /)eet'rmiaiiog tlf the In Sint .Mthldult of I)Ml10rmnlclion of Rock. American Societv Ifor Testing and MIate-,ials.
/)eet'rmiaiiog tlf the In Sint .Mthldult of I)Ml10rmnlclion of Rock. American Societv IforTesting and MIate-,ials.


Plhiladelphia.
Plhiladelphia.


STI' 477. 1970.pp, 27-38.Osterberg,  
STI' 477. 1970.pp, 27-38.Osterberg, .1. 0.. "An Improved Ilydraulic Piston Sampler." Proceedings olf the Eihth /Inerlariona al COnh'rrence on Soil Aflechanics aniid Fotundatlion h'ngin'erinr, Mloscow. LUSSR, Vol. 1.2. 1973. pp. 317-321.Sh1a.nllnon.
.1. 0.. "An Improved Ilydraulic PistonSampler."  
Proceedings olf the Eihth /Inerlariona alCOnh'rrence on Soil Aflechanics aniid Fotundatlion h'ngin'erinr, Mloscow.


LUSSR, Vol. 1.2. 1973. pp. 317-321.Sh1a.nllnon.
Wilson. Inc., and Agbahian-.lacobsen Associates, "'Soil Behavior Under IEarthquake l.oading Conrditions:  
 
Wilson. Inc., and Agbahian-.lacobsen Associates,  
"'Soil Behavior Under IEarthquake l.oading Conrditions:  
State-of-tle-A  
State-of-tle-A  
rt -valuatil tof"Soil Characteristics fur Seismic Response An:iy.sis.'
rt -valuatil tof" Soil Characteristics fur Seismic Response An:iy.sis.'
U.S. .\I:C Report. 1972.Task Committee for Foundation D)esign Manual."'SUbsurface In\Vest6iation for I)esiun and Construc- ion of' Foundations of Buildi ngs.'" ..1oil Alech.Fo"und. lv.. A\merican Society of Civil I-ngincers.
U.S. .\I:C Report. 1972.Task Committee for Foundation D)esign Manual."'SUbsurface In\Vest6iation for I)esiun and Construc-ion of' Foundations of Buildi ngs.'" ..1oil Alech.Fo"und. lv.. A\merican Society of Civil I-ngincers.
 
1972. V. 98(SM5):
pp. 481-490.


V.98(SN16:  
1972. V. 98(SM5): pp. 481-490. V.98(SN16:  
pp. 557-578. V. 98(SNI!7):  
pp. 557-578. V. 98(SNI!7):  
pp. 749-764.
pp. 749-764. V. 9,(SNIX):  
 
pp. 771-785.Wallace. G. 11.. I. .1. Slehir. and 1. :A. Anderson.-Radial Jacking Test for Arch Dams." !'roceedings of Mie 1*'0ih S/.rmtp.iti on R j( A .k.Aut11in.
V. 9,(SNIX):  
pp. 771-785.Wallace.
 
G. 11.. I. .1. Slehir. and 1. :A. Anderson.
 
-Radial Jacking Test for Arch Dams." !'roceedings of Mie 1*'0ih S/.rmtp.iti on R j( A  
.k.Aut11in.


1968. pp. 633-660.01.132-30}}
1968. pp. 633-660.0 1.132-30}}


{{RG-Nav}}
{{RG-Nav}}

Revision as of 18:33, 13 July 2018

Site Investigations for Foundations of Nuclear Power Plants
ML13350A266
Person / Time
Issue date: 09/30/1977
From:
NRC/OSD
To:
References
RG-1.132
Download: ML13350A266 (30)


U.S. NUCLEAR REGULATORY

COMMISSION

September

1977 0-0)REGULATORY

GUIDE* OFFICE OF STANDARDS

DEVELOPMENT

REGULATORY

GUIDE 1.132 SITE INVESTIGATIONS

FOR FOUNDATIONS

OF NUCLEAR POWER PLANTS

A. INTRODUCTION

programs as well as specific guidance for conducting Appendix A, "Seismic and Geologic Siting Criteria subsurface investigations, the spacing and depth of for Nuclear Po%%er Plants." to 10 CFR Part 100, borings, and sampling.

Appendix A provides defini-"'Reactor Site Criteria," establishes requirements for lions for some of the terms used in this guide. These conducting site investigations to permit an evaluation terms are identified in the text by anasterisk.

Appen-of the site and to provide information needed for dix B tabulates methods of conducting subsurface in-seismic response analyses and engineering design. Re- vestigations.

and Appendix C gives cfiteria for the quirements include the development of geologic in- spacing and depth of borings.for.safety-related struc-lures in regions of favorable or-uniform conditions.

formation relevant to the stratigraphy.

lithology.

eeecsLtdih.tx n geologic history, and structural geology of the site References cited in'.he text and appendices are listed and the evaluation of the engineering properties of in Appendix D.., Appendix E contains a subsurface materials, bibliogr.aphical.liting oLreated material.Safety-related site characteristics are identified in .DISCUSSION

detail in Rcgulatory Guide 1.70. "Standard For- l.,Cenera., mat and Content of Safety Analysis Reports for Sii'6i'inve.itigations for nuclear power plants are* Nuclear Power Plants." Regulatory'

Guide 4.7. e .*sne to determine the geotechnical charac-"General Site Suitability Criteria for Nuclear Poyer ,;eristics of a site that affect the design, performance, Stations," discusses major site characteristics thi'a- ,and afety of plants. The investigations produce the feet site suitabilitv.

.... .information needed to define the overall site geology This guide describes programs of sitiinv stihtions that is necessary for an understanding of subsurface that would normally meet the needifor evalua[ing conditions and for identifying potential geologic and the safety of the site from the standpý'int per- earthquake hazards that may exist at the site.formance of foundations and earthwor'46&er most Investigations for hazards such as faulting.anticipated loading conditions, including earth- landslides, cavernous rocks, ground subsidence, and quakes. It also describe.6 ite investigations required soil liquefaction are especially important.

to evaluate geotec needed, for engineering anffy1.i$

Ma, deslgn. The site investiga- Site investigations also provide information needed tions discus ind Nide are applicable to both to define local foundation and groundwater condi-S' t ions as well as the geotechnical parameters needed land uandi.cfflo~re si;. This guide does not deal with tosa hydr Ai.i lions, except for groundwater for engineering analysis and design of foundations icasu _"Its, nor does .it discuss geophysical and earthworks.

Geotechnical parameters needed for* iethodlM subsurface exploration.

analysis and design include, but are not limited to.IV those used to evaluate the bearing capacity o' foun-This guide provides general guidance and recom- dation materials, lateral earth pressures against walls.mend'ations for developing site-specific investigation the stability of cuts and slopes in soil and rock. the ef-USNRC REGULATORY

GUIDES CooIMo-iit Q106111i I. -.'It ft, If-. -I.,tv 1i .11.- C. .tn'-'s, Uj ýj N-iI'. "It -I, Reu ir Guw. wei. mun' lia'leIi ufewnix 'b i natlke t'.ivlalbli!

to tht! public methods Leloitv C ......'....... r) ..V.Ni-troi'v,.

1) C. 20 f;, At iiiio I ttajInlS*t'

tCC elitalie.

to to.' NRC %iff, 1 Pl'ti~~i'ie iit stCic Vliti of the Cows, v~ains equlatt~oiri.

to d.,fnieasi teh". ht t tatLv t h. ital ,n t'.ahl.z~tnq soccii~c~l problenti Th,-uil, %. ,, ...it th-' 10 1i~,i~ twi. li.'.wl iuas It suisi 111l1itIs ,Cuftt-l%.

Of i ittIa i giltiaI.nC" let J1tltiiCrinht.

Rgu~ljustv u-df-Mýuhiidt tanl :, UI'~l0 T 1,d ifll'fnt I isis thin"tl " UIou in lbme qoalIM wall be- accetil 7. fl eit rh .i-iI "a7faaca 7. T PI ,l'ViiWe..t InS.iftle it fthoy lriaval! J1 ( eAr for the,5 fiuolfut rtlluitii.

lit Ifil, isisin.tce of conl~nasince

3 V rash tnil Mm. wmi Trtalcia- ftOcatalort filitfa of at wirt sil r licesne lv vhe Comnnswn'ii.

'I 1 nsinr.stfa'

SaIml i9 tt atl.s'u Cjfmminti ind %uiiio loiii t'th'."to t1O! .-ia'"A'a.i CinmtflS nl uprw n..1 [ ni Ini~ivsi.n c in... i-1,' tMuth ii.j I.'.I 'u, W -111W.11111t W ta e. inlQi fo,"'.~1 1 Iiteat'l .15 .s iftiia -ia .tim -f .c iinillit.

Clthitafs tOO1 n .t 1, ...... s I. rat, I~ s .%,ai q Ilt iwt ni-r 0ie I.ta'csu 'l t i ia tcim.','fl i hin't ifliiiiiii w t'i ivitth al'-t'r C liva~ aniit Its wifes to-i'ia ,,*I~u~~ ,"nm liiiiis .tI4" h .th inthiutm nl I" t ,,,i 'U Si.aoi' htt.t'a"S

i sn a.t .' et vthai ft- ru ,ili.ni hs tit ...... a'S'Saa1amr.'

U -ill Ii" ()it ... ........a.gstas JlijllIi ii.a, iis'rtaI i;iI'US:a .a...;aifa

  • Caa',a -

fect of earthquake-induced motions through underly-ing deposits on the response of soils and structures (including the potential for inducing liquefaction in soils). and those needed to estimate the expected set-tement of structures.

Geotechnical parameters arc also needed for analysis and design of plant area fills, structural fills, backfills.

and earth and rockfill dams.dikes, and other water retention or flood protection structures.

Site information needed to assess the functional in.tegrity of foundations with respect to geologic and geotechnical considerations include: a. The geologic origin, types, thicknesses.

se.quence. depth. location, and areal extent of soil ant rock strata and the degree and extent of theii weathering:

h. Orientation and characteristics of foliations bedding. jointing, a !d faulting in rock, c. Groundwater c,,nditions:

d. The static and dynamic engineering proper ties of subsurface materials:

e. Information regarding the results of in vestigations of' adverse geological conditions such a, cavities, joints, faults. fissures.

or unfavorable soi conditions:

f. Information related to man's activities such a withdrawal of fluids from or addition of fluids to th subsurface, extraction of minerals, or loading effect of dams or reservoirs:

and g. Information detailing any other geologic con dition discovered at the site that may affect the desig or performance of the plant or the location of struc tures.2. Reconnaissance Investigations and Literatur Reviews Planning of subsurface investigations and the ii terpretation of data require thorough understandir of the general geology of the site. This can be ol rained by a reveiw. either preceding or accompanyir the subsurface investigation, of available documei tary materials and results of previous investigation In most cases, a preliminary study of the site geolol can be done by review of existing current an historical documentary materials and by study aerial photographs and other remote sensir imagery. Possible sources of current and historic documentary information may include: a. Geology and engineering departments State and loce! universities, b. State government agencies such as the State ,* Geological Survey, c. U.S. Government agencies such as the U.S.Geological Survey and the U.S. Army Corps of Engineers.

d. Topographic maps.e. Geologic and geophysical maps," f. Engineering geologic maps.g. Soil survey maps." Ih. Geologic reports and other geological literature, i. Geotechnical reports and other geotechnical literature.

j. Well records and water supply reports.k. Oil well records.I. Hydrologic maps.m. Hydrologic and tidal data and flood records, s n. Climate and rainfall records.o. Mining history, old mine plans. and sub-sidence records.C p. Seismic data and historical earthquake s records.q. Newspaper records of landslides, floods.-earthquakes.

subsidence, and other events oflgeologic n or geotechnical significance, r. Records of performance of other structures in the vicinity, and e s. Personal communication with local inhabi-tants and local professionals.

Special or unusual problems such as swelling soils Ig and shales (subject to large volume changes with b- changes in moisture), occurrences of gas, cavities in Ig soluble rocks, subsidence caused by mining or pump-I- ing ofwater. gas. or oil from wells, and possible uplift s. due to pressurization from pumping of water, gas, or d oil into the subsurface may require consultation with)d individuals, institutions, or firms having experience of in the area with such problems.al The site investigation includes detailed surface ex-ploration of the immediate site area and adjacent en-virons. Further detailed surface exploration also may of be required in areas remote to the immediate plant site to complete the geologic evaluation of the site or 1.132-2 0I a.--M

to conduct detailed investigations of surface faulting or other features.

Surface exploration needed for the assessment of the site geology is site dependent and may be carried out with the use of any appropriate combination of geological, geophysical (seismic refraction), or engineering techniques.

Normally this includes the following:

a. Detailed mapping of topographic, hydrologic, and surface geologic features, as ap-propriate for the particular site conditions, with scales and contour intervals suitable for analysis and engineering design. For offshore sites, coastal sites, or sites located near lakes or rivers this includes topography and detailed hydrographi, surveys to the extent that they are needed for site evaluation and engineering design.b. Detailed geologic interpretations of aerial photographs and other remote-sensing imagery, as appropriate for the particular site conditions, to as-sist in identifying rock outcrops, soil conditions, evidence of past landslides or soil liquefaction, faults, fracture traces, and lineaments.

c. Detailed onsite mapping of local engineering geology and soils.d. Mapping of surface water features such as rivers, streams, or lakes and local surface drainage channels, ponds, springs, and sinks at the site.3. Groundwater Investigations Knowledge of groundwater conditions.

their relationship to surface waters, and variations as-sociated with seasons or tides is needed for founda-tion analyses.

Groundwater conditions should be observed in borings at the time they are made: however, for engineering applications, such data must be supplemented by groundwater observations made by means of properly installed wells or piezometers*

that are read at regular intervals from the time of their installation at least through the con-struction period. The U.S. Army Corps of Engineers'

manual on groundwater and pore pressure observa-tions in embuinkment dams and their foundations (Ref. I) provides guidance on acceptable mrthods for the installation and maintenance of piezometer and observation well* instrumentation.

Piezometer or well installations should be made in as many loca-tions as needed to define groundwater conditions.

When the possibility of perched groundwater tables or artesian pressures is indicated by borings or other evidence, piezometer installation should be made to measure each piezometric level independently.

Care should be taken in the design and installation of piezometers to prevent hydraulic communication between aquifers.

The occurrence of artesian pressure in borings should be noted on boring logs. and their heads should be measured and logged.Where construction dewatering is required, piezometers or observation wells should be used dur-ing construction to monitor the groundwater surface and pore pressures beneath the excavation and in the adjacent ground. The guide does not cover groundwater monitoring needed during construction in plants that have permanent dewatering systems in-corporated in their design.4. Subsurface Investigations a. General The appropriate depth, layout, spacing. and sampl-ing requirements for subsurface investigations are dictated by the foundation requirements and by the complexity of the subsurface conditions.

Methods of conducting subsurface investigations are tabulated in Appendix B, and criteria for the spacing and depth of borings for safety-related structures, where favorable or uniform geologic conditions exist. are given in Ap-pendix C.Subsurface explorations for less critical founda-tions of power plants should be carried out with spac-ing and depth of penetration as necessary to define the general geologic and foundation conditions of the site. Subsurface investigations in areas remote from plant foundations may be needed to complete the geologic description of the site and confirm geologic and foundation conditions and should also be carefully planned.Subsurface conditions may be considered favorable or uniform if the geologic and stratigraphic features to be defined can be correlated from one bor-ing or sounding*

location to the next with relatively smooth variations in thicknesses or properties of the geologic units. An occasional anomaly or a limited number of unexpected lateral variations may occur.Uniform conditions permit the maximum spacing of borings for adequate definition of the subsurface con-ditions at the site.Occasionally soil or rock deposits may be en-countered in which the deposition patterns are so complex that only the major stratigraphic boundaries are correlatable, and material types or properties may vary within major geologic units in an apparently random manner from one boring to another. The number and distribution of borings needed for these conditions will exceed those indicated in Appendix C and are determined by the degree of resolution needed in the definition of foundation properties.

1.132-3 The cumulative thicknesses of the various material types, their degree of variability, and ranges of the material properties must be defined.If there is evidence suggesting the presence of local adverse anomalies or discontinuities such as cavities.sinkholes, fissures, faults, brecciation.

and lenses or pockets of unsuitable material, supplementary bor-ings or soundings at a spacing small enough to detect and delineate these features are needed. It is impor-tant that these borings should penetrate all suspect zones or extend to depths below which their presence would not influence the safety of the structures.

Geophysical investigations may be used to supple-ment the boring and sounding program.in planning the exploration program for a site, consideration should also be given to the possibility that the locations of structures may be changed, and that such changes may require additional exploration to adequately define subsurface conditions at the final locations.

The location and spacing of borings, soundings.

and exploratory excavations should be chosen carefully to adequately define subsurface conditions.

A uniform grid may not provide the most effective distribution of exploration locations unless the site conditions are very uniform. The location of initial borings should be determined on the basis of condi-tions indicated by preliminary investigations.

Loca-tions for subsequent or supplemental explorations should be chosen in a manner so as to result in the best definition of the foundation conditions on the basis of conclusions derived from earlier exploratory work.Whereve feasible, the locations of subsurface ex-plorations should be chosen to permit the construc-tion of geological cross sections in important subsur-face views of the site.It is essential to verify during construction that in situ conditions have been realistically estimated dur-ing analysis and design. Excavations made during construction provide opportunities for obtaining ad-ditional geologic and geotechnical data. All construc-tion excavations for safety-related structures and other excavations important to the verification of subsurface conditions should be geologically mapped and logged in detail. Particular attention should be given to the identification of thin strata or other geologic features that may be important to founda-tion behavior but. because of their limited extent, were previously undetected in the investigations program. If subsurface conditions substantially differ from those anticipated, casting doubt on the ade-quacy of the design or expected performance of the foundation.

there may be a need for additional ex-ploration and redesign.b. lnvestigations Related to SpeciflC Site Conditions Investigations for specific site conditions should in-clude the following: (I) Rock. The engineering characteristics of rocks are related primarily to their structure.

bed-ding. jointing, fracturing, weathering, and physical properties.

Core samples are needed to observe and define these features.

Suitable coring methods should be employed in sampling, and rocks should be sampled to a depth below which rock characteristics do not influence foundation performance.

Deeper borings'mav be needed to investigate zones critical to the evaluation of the site geology. Within the depth intervals influencing foundation performance.

zones of poor core recovery, low RQD (Rock Quality Designation).*

dropping of rods. lost drilling fluid circulation.

zones requiring casing. and other zones where drilling difficulties are encountered should be investigated by means of suitable logging or in situ observation methods to determine the nature.geometry.

and spacing of any discontinuities or anomolous zones. %%'here soil-filled voids, channels, or fissures are encountered.

representative samples*of the filling materials are needed. Where there is evidence of significant residual stresses, they should be evaluated on the basis of in situ stress or strain measurements.

(2) Granular Soils. Investigations of granular soils should include borings with splitspoon sampling and Standard Penetration Tests with sufficient coverage to define the soil profile and variations of soil conditions.

Soundings with cone penetration tests may also be used to provide useful supplemental data if the device is properly calibrated to site condi-tions.Suitable samples should be obtained for soil iden-tification and classification, in situ density determina- tions. mechanical analyses, and anticipated laboratory testing. In these investigations, it is impor-tant to obtain the best possible undistrbed samples*for testing to determine whether the sands are suf-ficiently dense to preclude liquefaction or damaging cyclic deformation.

The number and distribution of samples will depend on testing requirements and the variability of the soil conditions.

In general, however, samples should be included from at least one prin-cipal boring* at the location of each Category I struc-ture. Samples should be obtained at regular intervals in depth and when changes in materials occur.Criteria for the distribution of samples are given in regulatory position 5.Granular soils containing coarse gravels and boulders are among the most difficult materials to.132-4 U

sample. Obtaining good quality samples in these coarser soils often requires the use of trenches, pits.or other accessible excavations*

into the zones of in-terest. Also, extreme care is necessary in interpreting results from $he Standard Penetration Test in these materials.

Often such data are misleading and may have to be disregarded.

When sampling of these coarse soils is difficult.

informationthat may be lost when the soil is later classified in the lhboratory should be recorded in the field. This information should include observed estimates of percent cobbles, boulders, and coarse material and their hardness.shape, surface coating. and degree of weathering of coarse materials.

(3) Moderately v Compressible or Normally Con-solidated Clay' or Clay ve Soils. The properties of a fine grained soil are related to its in situ structure.*

and therefore the recovery and testing of good un-disturbed samples are necessary.

Criteria for the dis-tribution and methods for obtaining undisturbed samples are discussed in regulatory position 5.(4) Stibsurjaice Cavilies.

Subsurface cavities may occur in water-soluble rocks. lavas, or weakly in-durated sedimentary rocks as the result of subterra-nean solutioning and erosion. Because of the wide distribution of carbonate rocks in the United States.the occurrence of features such as cavities, sinkholes.

and solution-widened joint openings is common. For this reason, it is best to thoroughly investigate any site on carbonate rock for solution features to deter-mine their influence on the performance of founda-tions.Investigations may be carried out with borings alone or in conjunction with accessible excavations, soundings, pumping tests, pressure tests, geophysical surveys, or a combination of such methods. The in-vestigation program will depend on the details of the site geology and the foundation design.Indications of the presence of cavities, such as zones of lost drilling fluid circulation, water flo\%ing into or out of drillholes, mud fillings, poor core recovery, dropping or settling of drilling rods.anomalies in geophysical surveys, or in situ tests that suggest voids, should be followed up with more detailed investigations.

These investigations should include excavation to expose solution features or ad-ditional borings that trace out such features.The occurrence, distribution, and geometry of sub-surface cavities are highly unpredictable, and no preconstruction exploration program can ensure that all significant subsurface voids will be fully revealed.Experience has shown that solution features may re-main undetected even where the area has been in-vestigated by a large number of borings. Therefore, where a site is on solution-susceptible rock, it may sometimes be necessary to inspect the rock after strip-ping or excavation is complete and the rock is ex-posed. Remedial grouting or other corrective measures should be employed where necessary.

(5) Materials Lb.suitahhle Jbr Fotmdatitnhs.

Bor-ings and representative sampling and testing should be completed to delineate the boundaries of un-suitable materials, These boundaries should be used to define the required excavation limits.(6) Borrow Materials.

Exploration of borrow sources requires the determination of the location and amount of borrow fill materials available.

Investigations in the borrow areas should be of suf-ficient hori.,;mal and vertical intervals small enough to determine the material variability and should in-clude adequate sampling of representative materials for laboratory testing.c. Sam...nt All soil and rock samples obtained for testing should be representative.

In many cases, to establish physical properties it is netcssary to obtain un-disturbed samples that preserve the in situ structure of the soil. The recovery of undisturbed samples is discussed in Section B.6 of this guide.Sampling of soils should include. as a minimum.recovery of samples for all principal borings at regular intervals and at changes in strata. A number of samples sufficient to permit laboratory determina- tion of average material properties and to indicate their variability is necessary.

Alternating splitspoon and undi!;Iurbed samples with depth is recom-mended. Where sampling is not continuous, the elevations at which samples are taken should be stag-gered from boring to boring so as to provide con-tinuous coverage of samples within the soil column.In supplementary borings,*

sampling may be con-fined to the zone of specific interest.Relatively thin zones of weak or unstable soils may be contained within more competent materials and may affect the engincering properties of the soil or rock. Continuous sampling in subsequent borings is needed through these suspect zones. Where it is not possible to obtain continuous samples in a single bor-ing. samples may be obtained from adjacent closely spaced borings in the immediate vicinity and may be used as representative of the material in the omitted depth intervals.

Such a set of borings should be con-sidered equivalent to one principal boring.d. Determining the Engineering Properties of Sub-surface Materials The shear strengths of foundation materials in all zones subjected to significant imposed stresses must 0 1.132-5

--I be determined to establish whether they are adequate to support the imposed loads with an appropriate margin of safety. Similarly, it is necessary both to determine the compressibilities and swelling poten-tials of all materials in zones subjected to significant changes of compressive stresses and to establish that the deformations will be acceptable.

In some cases these determinations may be made by suitable in situ tests and classification tests. Other situations may re-quire the laboratory testing of undisturbed samples.Determination of dynamic modulus and damping values for soil strata is required 'or earthquake response analyses.

These determinations may be made by laboratory testing of suitable undisturbed samples in conjunction with appropriate in situ tests.5. Methods and Procedures for ExpLuratory Drilling In nearly ever%, site investigation, the primary means Of subsurface exploration are borings and borehole sampling.

Drilling methods and procedures should be compatible with sampling requirements and the methods of sample recovery.The top of the hole should be protected by a suitable surface casing where needed. Below ground surface, the borehole should be protected by drilling mud or casing. as necessary, to prevent caving and disturbance of materials to be sampled. The use of drilling mud is preferred to prevent disturbance when obtaining undisturbed samples of granular soils.However, casing may be used if proper steps are taken to prevent disturbance of the soil being sampled and to prevent upward movement of soil into the casing, Washing with open-ended pipe for cleaning or advancing sample borcholes should not be permitted.

Bottom-discharge bits should be used only with low-to-medium fluid pressure and with upward-deflected jets.The groundwater or drilling mud level should be measured at the -start and end of each work day for borings in progress, at the completion of drilling, and at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after drilling is completed, In addi-tion to pertinent information normally recorded, all depths and amounts of water or drilling mud losses, together with depths at which circulation is recovered, should be recorded and reported on bor-ing logs and on geological cross sections.

Logs and sections should also reflect incidents of settling or dropping of drill rods, abnormally low resistance to drilling or advance of samplers, core losses, in-stability or heave of the side and bottom of borcholes, influx of groundwater, and any other special feature or occurrence.

Details of information that should be presented on logs of subsurface in-vestigations are given in regulatory position 2.Depths should be measured to the nearest tenth of a foot and be correlatable to the elevation datum used for the site. Elevations of points in the borehole should also be determined with an accuracy of +/-0. I ft. Deviation surveys should be run in all boreholes that are used for crosshole seismic tests and in all boreholes where deviations are significant to the use of data obtained.

After use, it is advisable to grout each borehole with cement to prevent vertical move-ment of groundwater in the borehole.6. Recovery of Undisturbed Soil Samples The best undisturbed samples are often obtained by carefully performed hand trimming of block sam-pies in accessible excavations.

However, it is normal-ly not practical to obtain enough block samples at the requisite spacings and depths by this method alone. It is customary, where possible, to use thin-wall tube samplers in borings for the major part of the un-disturbed sampling.

Criteria for obtaining un-disturbed tube samples are given in regulatory posi-tion 5.The recovery of undisturbed samples of good quality is dependent on rigorous attention to details or equipment and procedures.

Proper cleaning of the hole. by methods that do not produce avoidable dis-turbance of the soil, is necessary before sampling.The sampler should be advanced in a manner that does not produce avoidable disturbance.

For exam-ple, when using fixed-piston-type samplers.

the drill-ing rig should be firmly anchored, or the piston should be fixed to an external anchor, to prevent its moving upward during the push of the sampling tube.Care should be taken to ensure that the sample is not disturbed during its removal from the borehole or in disassembling the sample

r. References

2 and 3 provide descriptions of suitable proccedures for ob-taining undisturbed samples.With the conscientious use of proper field tech-niques, undisturbed samples in normally con-solidated clays and silts can usually be recovered by means of fixed-piston-type thin-wall tube samplers without serious difficulty.

Recovery of good un-disturbed samples in sands requires greater care than in clays, but with proper care and attention to detail, they can also be obtained with fixed-piston-type thin-wall tube samplers in most sands that are free of bouiders and gravel size particles.

Appendix B lists a number of sampling methods that are suitable for use in these and other materials.

Undisturbed samples of boulders, gravels, or sand-gravel mixtures generally are difficult to obtain, and often it is necessary to use hand sampling methods in test pits, shafts, or other accessible excavations to get good samples.When obtaining undisturbed samples of granular soils below the groundwater table, dewatering by means of well points or other suitable methods may 1.132-6 he required.

Osterberg and Varaksin (Ref. 4) describe a sampling program using dewatering of a shaft in sand with a frozen surrounding annulus. Samples suitable for density determination, though not for tests of mnichanical properties.

may sometimes be ob-tained boreholes with the help of chemical stabilization or impregnation (Refs. 5. 6). Special prcautions are required when toxic chemicals are used. Also. where aquifers are involved, it may not be advisable to injeit chemicals or grouts into them.Useful discussions of methods of sampling granular soils are given by l-vorslev (Ref. 7) and Barton (Rer. 8).7. Handling.

Field Storage, and Transporting of Sam-ples Treatoiient of samples after their recovery from the ground is as critica0l to their quality as the procedures used in obtaining them. Samples of cohesionless soils are particularly sensitive to disturbance in handling and require extreme care during removal from the borehole, removal from the sampler. and subsequent handling in order to prevent disturbance from impact and vibration (Ref. 2). Special precautions are re-quired in transporting undisturbed samples because of their sensitivity to vibration and impact. They should be kept in a vertical position at all times.should be well padded to isolate them from vibration and impacts. and should be transported with extreme care. Transportation by commercial carriers is not advisable.

Block samples should be handled by methods that give them equivalent protection from disturbance.

All undisturbed samples should be properly sealed and protected against moisture loss.Disturbed samples* may be sealed in the same way as undisturbed samples. if in tubes. or may be placed in suitably marked, noncorroding.

airtight con-tainers. Large representative samples may be placed in plastic bags, in tightly woven cloth, or in noncor-roding cans or other vessels that do not permit loss of fine particles by sifting. Such samples may be trans-ported by any convenient means.Rock cores need to be stored and transported in durable boxes provided with suitable dividers to pre-vent shifting of the cores in any direction.

They should be clearly labeled to identify the site, the bor-ing number, the core interval, and the top and hot-tom depths of the core. If the box has a removable lid, labeling should be placed on both the outside and inside of the box, as well as on the lid. Special con-tainers may be required to protect samples to be used for fluid content determinations and shale samples to be used for tests of mechanical properties from changes in fluid content. Core samples should be transported with the care necessary to avoid breakage or disturbance.

C. REGULATORY

POSITION rhe site investigations program needed to deter-mine foundation conditions at a nuclear po%ker plant site is highly dependent on actual site conditions.

The program should he flexible and adjusted as the site in-vestigation proceeds with the advice of experienced personnel familiar with ti, site. The staff will revie\%the results of each site investigation program on a case-by-case basis and make an independent evaluv,-tion of foundation conditions in order to judge the adequacy of the information presented.

1. General Site Iniestigation Site investigations for nuclear power plants Si.ould be adequaite.

in terms of thoroughness.

of the methods used. quality of execution o ' the work.and documentation.

to permit an accurate determina- tion of the geologic and geotechnical conditions that affect the design. performance, and safe(ty of the plant. The investigations should provide information needed to assess foundation conditions at the site ::nd to perform engineering analysis and design with reasonable assurance that foundation conditions have been realistically estimated.

Information to be developed should, as ap-propriate.

include (I) topographic.

hydrologic.

hydrographic, and geologic maps: (2) plot plans.showing locations of major structures and explora-tions: (3) boring logs and logs of trenches and excava-tions: and (4) geologic profiles showing excavation limits for structures and geophysical data such as time-distance plots. profiles, and inhole surveys.Positions of all boreholes.

piezometers.

observation wells. soundings.

trenches, exploration pits. and geophysical investigations should be surveyed in both plan and elevation and should be shown on plot plans. geologic sections, and maps. All surveys should be related to a fixed datum. The above infor-mation should be in sufficient detail and be in-tegrated to develop an overall view of the project and the geologic and geotechnical conditions affecting it.2. Logs of Subsurface Imestigations Boring logs should contain the date when the bor-ing was made. the location of the boring with reference to the coordinate system used for the site.the depths of borings, and the elevations with respect*to a permanent bench mark.The logs should also include the elevations or the top and bottom of borings and the level at which the water table and the boundaries of soil or rock strata were encountered, the classification and description of the soil and rock layers, blow count values ob-tained from Standard Penetration Tests, percent recovery of rock core, and Rock Quality Designation

1.132-7 I-(RQD). Results of field permeability

  • tests and borehole logging should also be included on logs. The type of tools used in making the boring should be recorded.

It' the tools were changed, the depth at which the change was made and the reason for the change should be noted. Notes should be provided of everything significant to the interpretation of subsur-face conditions, such as lost drilling fluid, rod drops, and changes in drilling rate. Incomplete or aban-doned borings should be described with the same care as successfully completed borings. Logs of trenches and exploratory excavations should be presented in a format similar to the boring logs. The location of all explorations should be shown on the geologic section together with elevations and important data.3. Procedures for Subsurface lnvestigations Some techniques widely used for subsurface in-vestigations are listed in Appendix B. It also cites ap-propriate standards and references procedures from published literaturelwith general guidelines on the ap-plicability, limitations, and potential pitfalls in their use. Additional suitable techniques are provided by other literature listed in Appendix D. The use or in-vestigations and sampling techniques other than those indicated in this guide is acceptable when it can be shown that the alternative methods yield satisfac-tory results. The attainment of satisfactory results in driiling, sampling, and testing is dependent on the techniques used, on care in details of operations, and on timely recognition of and correction of potential sources of error. Field operations should be super-vised by experienced professional personnel at the.site of operations, and systematic standards of prac-tice should be followed.

Procedures and equipment used to carry out the field operations should be documented, as should all conditions encountered in all phases of investigations.

Experienced personnel thoroughly familiar with sampling and testing procedures should also inspect and document sampl-ing results and transfer samples from the field to storage or laboratory facilities.

4. Spacing and Depth of Subsurface Investigations Criteria for the spacing and depth of subsurface ex-ploration at locations or safety-related structures for favorable or uniform gcologic conditions are given in Appendix C. The application of these criteria is dis-cussed in Section B.4 of this guide, The investigative effort required for a nuclear power plant should be greatest at the locations of Category I structures and may vary in intensity and scope in other areas ac-cording to their spatial and geolgical relations to the site.5. Sampling Sampling of soils should include, as a minimum, the recovery of samples at regular intervals and at changes in materials.

Alternating splitspoon and un-disturbed samples with depth is recommended.

For granular soils, samples should be taken at depth intervals no greater than 5 feet. Beyond a depth of 50 feet below foundation level, the depth interval for sampling may be increased to 10 feet. Also it is recommended tital onw or more borings for each ma-jor structure be contiuously sampled. The borirg should be reamed and cleaned between samples. Re-quirements fe" undisturbed sampling of granular soils will depend on actual site conditions and re-quirements for laboratory testing. Some general guidelines for recovering undisturbed samples are given in Section B.4.b(2) and Section B.6 of the dis-cussion of this guide. Experimentation with different sampling techniques may be n,:cessary to determine the method best suited to local soil conditions.

For compressible or normally consolidated clays.undisturbed samples should be continuous throughout the compressible strata in one or more principal borings for each major structure.

These samples should be obtained by means of suitable fixed-piston-type thin-wall tube samplers or by methods that yield samples of equivalent quality.Borings used for undisturbed sampling of soils should be at least 3 inches in diameter.

Criteria for obtaining undisturbed tube samples include the fol-lowing: a. Tubes should meet the specifications of ASTM Standard D 1587-67 (Ref. 9): b. The Area Ratio* of the sampler should not exceed 13 percent and preferably should not exceed 10 percent: c. The Specific Recovery Ratio* should be between 90 and 100 percent: tubes with less recovery may be acceptable if it appears that the sample may have just broken off and otherwise appears essential- ly undisturbed:

d. The Inside Clearance Ratio* should be the minimum required for complete sample recovery, e. Samples recovered should contain no visible distortion of strata or opening or softening or materials brought about by the sampling procedure.

6. Retention of Samples, Rock Core, and Records Samples and rock cores from principal borings should be retained at least until the power plant is licensed to operate and all matters relating to the in-terpretation of subsurface conditions at the site have been resolved.

The need to retain samples and core beyond this time is a matter of judgment and should 6 1.132-8 II

b 0 he evaluated on a case-by-case basis. Soil samples in tubes will deteriorate with time and will not be suitable for any undisturbed testing. However, they may be used as a visual record of what the foundation material is like. Similarly, core or rock subject to slaking and rapid weathering such as shale will also deteriorate.

It is recommended that photographs of scil samples and rock core togedher with field and final logs of all borings and record samples with material descriptions be preserved for a permanent record. Other important records of the subsurface in-vestigations program should also be preserved.

D. IMPLEMENTATION

This guide will be used by the staff to evaluate the results of site investigations, including the adequacy and quality of data provided to define foundation conditions and the geotechnical parameters needed for engineering analysis and design. submitted in con-nection with construction permit applications docketed after June 1. 1978. The staff will also use this guide to evaluate the results of any new site in-vestigations performed after June 1, 1978. by a person whose construction permit was issued on or before June 1. 1978.1.132-9 APPENDIX A DEFINITIONS

For the convenience of the user, the following terms are presented with their definitions as used in this guide: Accessible exca'ation-an excavation made for the purpose of investigating and sampling materials or conditions below the ground surface, of such shape and dimensions as to permit the entry of personnel for direct examination, testing, or sampling.Area Ratio- (Ca) of a sampling device is defined as: D: -13 a De where Do is the outside diameter of that part of the sampling device that is forced into the soil, and De is the inside diameter, normally the diameter of the cut-ting edge.Boring-ian exploratory hole in soil or rock, or both, made by removal of materials in the form of samples or cuttings (cf. soundings).

Disturbed sample-a sarpple whose internal struc-ture has been altered to such a degree that it does not reasonably approximate that of the material in situ.Such a sample may be completely remolded, or it may bear a resemblance to an undisturbed sample in having preserved the gross shape given it by a sampl-ing device.Geoteclmical-of or pertaining to the earth sciences (geology, soils, seismology, and groundwater hydrology)

and that part of civil engineering which deals with the interrelationship between the geologic environment and the works of man.In situ test-a test performed on in-place soil or rock for the purpose of determining some physical property.

As used in this guide, it includes geophysical measurements.

Inside Clearance Ratio (Ci) of a sampling device is defined as: Di -De i De where Di is the inside diameter of the sample tube or liner and D. is the diameter .of the cutting edge.Observation well-an open boring that permits measuring the level or elevation of the groundwater table.Piezoineter-a device or instrument for measuring pore pressure or hydraulic potential at a level or point below the ground surface.Principal borings-those exploratory holes that are used as the primary source of subsurface informa-tion. They are used to explore and sample all soil or rock strata wi~hin the interval penetrated to define the geology of the site and to determine the properties of the subsurface materials.

Not included are borings from which no samples are taken, borings used to in-vestigate specific or limited intervals, or borings so close to others that the information yielded repre-sents essentially a single location.Representative sample-a sample that (1) contains approximately the same mineral constituents of the stratum from which it is taken, in the same propor-tions, and with the same grain-size distribution and (2) is uncontaminated by foreign materials or chemical alteration.

Rock Quality Designation (RQD)-an indirect measurement of the degree of rock fracturing and jointing and rock quality. It is calculated by summing the lengths of all hard and sound pieces of recovered core longer than 4 inches (10cm) and dividing the sum by the total length of core run.Sounding-an exploratory penetration below the ground surface by means of a device that is used to measure or observe some in situ property of the materials penetrated.

usually without recovery of samples or cuttings.Specific Recovery Ratio-(R.)

in the advance of a sample tube is defined as: Rs=where AL is the increment of length of sample in the tube corresponding to an increment AH of sampler advance.Soil structure-a complex physical-mechanical property, defined by the sizes, shapes, and arrange-ments of the constituent grains and intergranular matter and the bonding and capillary forces acting among the constituents.

Supplementary borings or supplementary soundings-borings or soundings that are made in ad-dition to principal borings for some specific or limited purpose.Undisturbed sample-a sample obtained and treated in such a way that disturbance of its.original structure is minimal, making it suitable for laboratory testing of material properties that depend on structure.

1.132-10

APPENDIX B METHODS OF SUBSURFACE

EXPLORATION'

METHOD PROCEDURE A PPLI CA BI LITY LIMITATIONS

METHODS OF ACCESS FOR SAMPLING, TEST. OR OBSERVATION

7-=Pits, Trenches, Shafts, Tunnels Auger Boring Hollow Stem Auger Boring Wash Boring Rotary Drilling Excavation made by hand, large auger, or digging machinery. (Ref. 7)Boring advanced by hand auger or power auger.(Ref. 7)Boring advanced by means of continuous-flight helix auger with hollow center stem. (Ref. 10)Boring advanced by chopping with light bit and by jetting with upward-deflected jet. (Ref. 7)Boring advanced by ro-tating drilling bit;cuttings removed by circulating drilling fluid. (Ref. 7)Visual observation, photo-graphy, disturbed and un-disturbed sampling, in sitt.testing of soil and rock.Recovery of remolded samples, and determining groundwater levels. Access for undisturbed sampling of cohesive soils.Access for undisturbed or representative sampling through hollow stem with thin-wall tube sampler, core barrel, or split-barrel sampler.Cleaning out and advancing hole in soil between sample intervals.

Cleaning out and advanc-ing hole in soil or rock between sample intervals.

Depth of unprotected excava-tions is limited by ground-water or safety considerations.

Will not penetrate boulders or most rock.Should not be used with plug in granular soils. Not suitable for undisturbed sampling in loose sand or silt. (Ref. I1)Suitable for use with sampling operations in soil only if done with low water velocities and with upward-deflected jet.Drilling mud should be used in granular soils. Bottom discharge bits are not suitable for use with undisturbed sampling in soils un-less combined with protruding core barrel, as in Denison -.ampler, or with upward-deflected jets.Scc also Rers. 32-40.

APPENDIX B (Continued)

METHODS OF SUBSURFACE

EXPLORATION

METHOD PROCEDURE APPLICABILITY

LIMITATIONS

METHODS OF ACCESS FOR SAMPLING, TEST, OR OBSERVATION

Percussion Drilling Boring advanced by air-operated impact hammer.I~Cable Drilling Continuous Sampling or Displacement Boring Boring advanced by repeated dropping of heavy bit: removal of cuttings by bailing.(Ref. 7)Boring advanced by repeated pushing of sampler or closed sampler is pushed to desired depth, and sample is taken. (Ref. 7)Detection of voids and zones of weakness in rock by changes in drill rate or resistance.

Access for in situ testing or logging.Advancing hole in soil or rock. Access for sampling, in situ testing, or logging in rock. Pene-tration of hard layers, gravel, or boulders in auger borings.Recovery of representative samples of cohesive soils and undisturbed samples in some cohesive soils.Causes severe disturbance in soils-not suitable for use with undis-turbed sampling methods.Effects of advance and withdrawal of sampler result in disturbed sections at top and bottom of sample. In some soils, entire sample may be disturbed.

Best suited for use in cohesive soils. Continuous sampling in cohesionless soils may be made by successive reaming and cleaning of hole between sampling.Not suitable for use in soils.METHODS OF SAMPLING SOIL AND ROCK'Hand-Cut Block or Cylindrical Sample:See also Reference

31.Sample is cut by hand from soil ex-posed in excavation.(Refs. 12, 13)Highest quality undisturbed samples in all soils and in soft rock.Requires accessible excavation and dewatering if below water table, Extreme care is required in sampling cohesionless soils.

S APPENDIX B (Continued)

METHODS OF SUBSURFACE

EXPLORATION

METHOD PROCEDURE APPLICABILITY

LIMITATIONS

METHODS OF SAMPLING SOIL AND ROCK Fixed-Piston Sampler Hydraulic Piston Sampler (Osterberg)

Thin-walled tube is pushed into soil, with fixed piston in contact with top of sample during push. (Refs. 2, 7)Thin-walled tube is pushed into soil by hydraulic pressure.Fixed piston in contact with top of sample during push. (Refs. 2, 14)Undisturbed samples in cohesive soils, silts, and sands above or below the water table.Undisturbed samples in cohesive soils, silts and sands above or below the water table.Some types do not have a positive means to prevent piston movement.Not possible to determine amount of sampler penetration during push. Does not have vacuumi-breaker in piston.t'.Free-Piston Sampler Thin-walled tube is pushed into soil.Piston rests on top of soil sample during push. (Ref. 2)Undisturbed samples in stiff cohesive soils.Representative samples in soft to medium cohesive soils and silts.May not be suitable for sampling in cohesionless soils. Free piston provides no control of specific recovery ratio.

APPENDIX B (Continued)

METHODS OF SUBSURFACE

EXPLORATION

METHOD PROCEDURE APPLICABILITY

LIMITATIONS

METHODS OF SAMPLING SOIL AND ROCK Open Drive Sampler Thin-walled, open tube is pushed into soil.(Refs. 7, 12)Undisturbed samples in stiff cohesive soils.Representative samples in soft to medium cohe-sive soils and silts.Continuous undisturbed samples up to 20m long in very soft to soft clays.Swedish Foil Sampler Sample tube is pushed into soil while stainless steel strips unrolling from spools envelop sample. Piston. fixed by chain from surface, maintains contact with top of sample. (Refs. 13.15)Thin-walled tube is pushed into soil by spring above sampler while outer core bit reams hole. Cuttings removed by circulating drilling fluid. (Ref. 13)Small diameter of tubes may not be suitable for sampling in cohesionless soils or for undis-turbed sampling in uncased bore-holes. No control of specific recovery ratio.Not suitable for use in soils containing gravel, sand layers, or shells, which may rupture foils and damage samples. Diffi-culty may be encountered in alternating hard and soft layers with squeezing of soft layers and reduction in thickness.

Requires experienced operator.Pitcher Sampler Undisturbed samples in hard, brittle, cohesive soils and sands with cementation.

Representa- tive samples in soft to medium cohesive soils and silts. Disturbed samples may be obtained in cohesion-less materials with variable success.Frequently ineffective in cohesionless soils.

0 APPENDIX B (Continued)

METHODS OF SUBSURFACE

EXPLORATION

METHOD PROCEDURE APPLICABILITY

LIMITATIONS

METHODS OF SAMPLING SOIL AND ROCK Denison Sampler Split-Barrel or Splitspoon Sampler Auger Sampling g', Hole is advanced and reamed by core drill while sample is re-tained in nonrotating inner core barrel with corecatcher.

Cuttings removed by circulating drilling fluid.(Refs. 12. 13)Split-barrel tube is driven into soil by blows of falling ram.Sampling is carried out in conjunction with Standard Pene-tration Test. (Ref. 9)Auger drill used to advance hole is with-drawn at intervals for recovery of soil samples from auger flights.(Ref. 9)Undisturbed samples in stiff to hard cohesive soil, sands with cemen-tation. and soft rocks.Disturbed samples may be obtained in cohesion-less materials with variable success.Representative samples in soils other than coarse granular soils.Determine boundaries of soil layers and obtain samples for soil classification.

Not suitable for undisturbed sampling in loose cohesionless soils or soft cohesive soils.Samples are disturbed and not suitable for tests of physical properties.

Samples not suitable for physical properties or density tests.Large errors in locating strata boundaries may occur without close attention to details of procedure.(Ref. 13) In some soils, particle breakdown by auger or sorting effects may result in errors in determining gradation.

APPENDIX B (Continued)

METHODS OF SUBSURFACE

EXPLORATION

METHOD PROCEDURE APPLICABILITY

LIMITATIONS

METHODS OF SAMPLING SOIL AND ROCK Rotary Core Barrel 0%Shot Core Boring (Calyx)Hole is advanced by core bit while core sample is retained within core barrel or within station-ary inner tube. Cuttings removed by circulating drilling fluid.(Ref. 9)Boring advanced by ro-tating single core barrel, which cuts by grinding with chilled steel shot fed with circulating wash water.Used shot and coarser cuttings are deposited in an annular cup, or calyx, above the core barrel.(Ref. 7)Reinforcing rod is grouted into small-diameter hole, then overcored to obtain an annular core sample. (Ref. 16)Cuttings are recovered from wash water or drilling fluid.Core samples in compe-tent rock and hard soils with single-tube core barrel. Core samples in poor or broken rock may be obtainable with double-tube core barrel with bottom-discharge bit.Large diameter cores and accessit'-

boreholes in rock.Core samples in rock with preservation of joints and other zones of weakness.Samples useful in con-junction with other data for identification of major strata.Because recovery is poorest in zones of weakness, samples gener-ally fail to yield positive infor-mation on soft seams, joints. o:'other defects in rock.Cannot be used in drilling at large angles to the vertical.Often ineffective in securing small diameter cores.Samples are not well suited to tests of physical properties.

Oriented Integral Sampling Wash Sampling or Cuttings Sampling Sample quality is not adequate for site investigations for nuclear facilities.

APPENDIX B (Continued)

METHODS OF SUBSURFACE

EXPLORATION

METHOD PROCEDURE APPLICABILITY

LIMITATIONS

METHODS OF SAMPLING SOIL AND ROCK Subm ersible Vibratory (Vibracore)

Sampler Underwater Piston Corer Core tube is driven into soil by vibrator.(Ref. 17)Core tube attached to drop weight is driven into soil by gravity after a controlled height of free fall.Cable-supported piston remains in contact with soil surface during drive.(Ref. 18)Open core tube attached to drop weight is driven into soil by gravity after free fall. (Ref. IN)Continuous representa- tive samples in uncon-solidated marine sedi-ments.Representative samples in unconsolidated marine sediments.

Representative samples at shallow depth in unconsolidated marine sediments.

Because of high area ratio and effects of vibration, samples may be disturbed.

Samples may be seriously disturbed. (Ref. 19)No control of specific recover%ratio. Samples are disturbed.

-.1, Gravity Corer METHODS OF IN SITU TESTING OF SOIL AND ROCK Standard Penetration Test Split-barrel sampler is driven into soil by blows of falling weight. Blow count for each 6 in.of penetration is recorded.(Ref. 9)Blow count may be used as an index of consistency or density of soil. May be used for detection of changes in consistency or relative density in clay or sands. a be used with empirical relationships to estimate relative density of clean sand.FExtremelv unreliable in silts, silty sands, or soils containing gravel. In sands below water table, positive head must be main-tained in borehole.

Determination of relative density in sands requires site-specific correlation or highly conservative use of published correlations.

Results are sensitive to details of apparatus and procedure.

APPENDIX B (Continued)

METHODS OF SUBSURFACE

EXPLORATION

METHOD PROCEDURE A PPL.ICA BIILITY LIMITATIONS

METHODS OF IN SITU TESTING OF SOIl. AND ROCK Dutch Cone Penetrometer co Field Vane Shear Test Steel cone is pushed into soil and followed by subsequent advance of friction sleeve.Resistance is measured during both phases of advance. (Ref. 20), Four-bladed vane is pushed into undisturbed soil. then rotated to cause shear failure on cylindrical surface.Torsional resistance versus angular deflec-tion is recorded. (Ref. 9)Expendable steel cone is driven into soil by blows of falling weight. Blow count versus penetration is recorded. (Ref. 13)Steel loading plate is placed on horizontal surface and is stati-cally loaded, usually by hydraulic jack. Settle-ment versus time is recorded for each load increment. (Ref. 9)Detection of changes in consistency or relative density in clays or sands.Used to estimate static undrained shear strength of clay. Used with empiri-cal relationships to obtain estimate of static compres-sibility of sand.Used to estimate in situ undrained shear strength and sensitivity of clays.Strength estimates require onsite verification by other methods of testing.Not suitable for use in silt, sand.or soils containing appreciable amounts of gravel or shells. May yield unconservative estimates of shear strength in fissured clay soils or where strength is strain-rate dependent.

Provides no quantitative infor-mation on soil properties.

Results can be extrapolated to loaded areas larger than bearing plate only if properties of soil are uniform laterally and with depth.0 Drive-Point Penetrometer Plate Bearing Test (Soil)Detection of gross changes in consistency or relative density. May be used in some coarse granular soils.Estimation of strength and moduli of soil. May be used at ground surface, in excava-tions, or in boreholes.

0

rn~_APPE'B (Continued)

METHODS OF SUBSURFACE

EXPLORATION

METHOD PROCEDURE APPLICABILITY

LIMITATIONS

METHODS OF IN SITU TESTING OF SOIL AND ROCK Plate Bearing Test or Plate Jacking Test (Rock)Pressure Meter Test (Dilatometer Test)7-Field Pumping Test Direct Shear Test Bearing pad on rock surface is statically loaded by hydraulic jack. Deflection versus load is recorded.(Ref. 21)Uniform radial pressure is applied hydraulically over a length of borehole several times its diame-ter. Change in diameter versus pressure is recorded.(Ref. 21)Water is pumped from or into aquifer at constant rate through penetrating well. Change in piezo-metric level is measured at well and at one or more observation wells. Pumping pressures and flow rates are recorded. (Refs. 22. 23)Block of in situ rock is isolated to permit shearing along a preselected sur-face. Normal and shearing loads are applied by jacking.Loads and displacements are recorded. (Ref. 24)Estimation of elastic moduli of rock masses. May be used at ground surface, in exca-vations, in tunnels, or in borcholes.

Estimation of elastic moduli of rocks and estimation of shear strengths and compress-ibility of soils by empirical relationships.

Estimation of in situ permea-bility of soils and rock mass.Measurement of shearing resistance of rock mass in situ.Results can be extrapolated to loaded areas larger than bearing pad only if rock properties are uniform over volume of interest and if diameter of bearing pad is larger than average spacing of joints or other discontinuities.

Test results represent properties only of materials in near vicinity of borehole.

Results may be mis-leading in testing materials whose properties may be anisotropic.

Apparent permeability may be greatly influenced by local features.

Effective permeability of rock is dependent primarily on frequency and distribution ofjoints.

Test result in rock is representative only to extent that segment penetrated by borehole.is representative of joint system of rock mass.Tests are costly. Usually variability of rock mass requires a sufficient number of tests to provide statistical control.

APPENDIX B (Continued)

METHODS OF SUBSURFACE

EXPLORATION

METHOD PROCEDURE A PPIC A BI LITY L.IMITATIONS

METHODS OF IN SITU TESTING OF SOIL AND ROCK 0 Pressure Tunnel Test Radial Jacking Test Borehole Jack Test Borehole Deformation Meter Hydraulic pressure is applied to sealed-off length of circular tunnel, and diametral deformations are measured.(Ref. 21)Radial pressure is applied to a length of circular tunnel by flat jacks. Dia-metral deformations are measured.Load is applied to wall of borehole by two diametric- ally opposed jacks. Deform-ations and pressures are recorded. (Ref. 25)Device for measurement of diameters (deformation meter) is placed in bore-hole, and hole is overcored to relieve stresses on annular rock core contain-ing deformation meter.Diameters (usually 3) are measured before and after overcoring.

Modulus of rock is measured by laboratory tests on core; stresses are computed by elastic theory. (Ref, 26)Determination of elastic constants of the rock mass in situ.Same as pressure tunnel test.Determination of elastic modulus of rock in situ.Capable of applying greater pressures than dilatome-ters.Measurement of absolute stresses in situ.Volume of rock tested is dependent on tunnel diameter.

Cracking due to tensile hoop stresses may affect apparent stiffness of rock.Same as pressure tunnel test.Apparent stiffness may be affected by development of tension cracks.Stress field is affected by borehole.

Analysis subject to limitations of elastic theory.Two boreholes at different orien-tations are required for determi-nation of complete stress field.Questionable results in rocks with strongly time-dependent properties.

APPENDIX B (Continued)

METHODS OF SUBSURFACE

EXPLORATION

METHOD PROCEDURE APPLICABILITY

LIMITATIONS

METHODS OF IN SITU TESTING OF SOIL AND ROCK Inclusion Stressmeter Borehole Strain Gauge IL-)Rigid stress indicating device (stressmeter)

is placed in borehole, and hole is overcored to relieve stresses on annu-lar core containing stress-meter. In situ stresses are computed by elastic theory. (Ref. 26)Strain gauge is cemented to bottom (end) of bore-hole. and gauge is over-cored to relieve stresses on core containing strain gauge. Stresses are computed from resulting strains and from modulus obtained by laboratory tests on core.(Ref. 26)Slot is drilled in rock surface producing stress relief in adjacent rock.Flat jack is grouted into slot and hydraulically pressurized.

Pressure required to reverse deformations produced by stress relief is observed.(Refs. 26. 27)Measurement of absolute stresses in situ. Requires only one core drill size.Measurement of one corn po-nent of normal stress in situ. Does not require knowledge of rock modulus.Same as above.Stress field is affected by excavation or tunnel. Interpre-tation of test results subject to assumption that loading and unloading moduli are equal.Questionable results in rock with strongly time-dependent pruperties.

Measurement of absolute stresses in situ. Does not require accurate knowl-edge of rock modulus.Same as above.Flat Jack Test APPENDIX B (Continued)

METHODS OF SUBSURFACE

EXPLORATION

METHOD PROCEDURE APPLICABILITY

LIMITATIONS

METHODS OF IN SITU TESTING OF SOIL AND ROCK Hydraulic Fracturing Test Crosshole Seismic Test Uphole/Downhole SeismicTest Acoustic Velocity Log Fluid is pumped into scaled-off portion of borehole with pressure increasing until fracture occurs.(Ref. 26)Seismic signal is trans-mitted from source in one borehole to receiv-er(s) in other bore-hole(s), and transit time is recorded. (Ref. 28)Seismic signal is transmitted between borehole and ground surface, and transit time is recorded. (Ref. 28)Logging tool contains transmitting transducer and two receiving trans-ducers separated by fixed gage length. Signal is transmitted through rock adjacent to borehole and transit time over the gage length is recorded as difference in arrival times at the receivers.(Refs. 29. 30)In situ measurement of com-pression wave velocity and shear wave velocity in soils and rocks.In situ measurement of com-pression wave velocity and shear wave velocity in soils and rocks.Measurement of compression wave velocity.

Used primar-ily in rocks to Obtain estimate of porosity.Requires deviation survey of boreholes to eliminate errors due to deviation of holes from vertical.

Refraction of signal through adjacent high-velocity beds must be considered in interpretation.

Apparent velocity obtained is time-average for all strata between source and receiver.Results represent only the material immediately adjacent to the borehole.

Can be obtained only in uncased, fluid-filled borehole.

Use is limited to materials with P-wave velority greater than that of borehole fluid.Estimation of minor principal stress.Affected by anisotropy of tensile strength of rock.0

APPENDIX B (Continued)

METHODS OF SUBSURFACE

EXPLORATION

METHOD PROCEDURE A PPIJCABSILITY

ILIMITATIONS

METHODS OF IN SITU TESTING OF SOIL AND ROCK 3-D Velocity Log Electrical Resistivity Log Logging tool contains transmitting transducer and receiving transducer separated by fixed gage length. Signal is trans-mitted through rock adjacent to borehole.

and wave train at receiver is recorded. (Ref. 31)Apparent electrical resis-tivity of soil or rock in neighborhood of borehole is measured by in-hole logging tool containing one of a wide variety of electrode configurations.(Refs. 29. 30)Measurement of compression wave and shear wave velocity ties in rock. Detection of void spaces. open fractures, and zones of weakness.Appropriate combinations of resistivity logs can be used to estimate porosity and degree of water saturation in rocks.In soils, may be used as qualitative indication of changes in void ratio or water content, for correla-tion ofstrata between boreholes, and for location of strata boundaries.

Correlation of strata between boreholes and location of strata boundaries.

Provides an approximation to water content and can be run in cased or uncased, fluid-filled or empty boreholes, Results represent only the material immediately adjacent to the borehole.

Can be obtained only in uncased, Iluid-filled borehole.

Correction required for variation in hole size. Use is limited to materials with P-wave velocity greater than that of borehole fluid.Can be obtained only in uncased borcholes.

Hole must be fluid filled, or electrodes must be pressed against wall of hole.Apparent resistivity values are strongly affected by changes in hole diameter, strata thickness, resistivity contrast between adja-cent strata. resistivity of drilling fluid, etc.Because of very strong borehole effects, results are generally not of sufficient accuracy for quantitative engineering uses.t-J Neutron Log Neutrons are emitted into rock or soil around bore-hole by a neutron source in the logging tool, and a detector isolated from the source responds to either slow neutrons or secondary gamma rays.Response of detector is recorded. (Refs. 29. 30)

APPENDIX B (Continued)

METHODS OF SUBSURFACE

EXPLORATION

METHOD PROCEDURE APPLICA BILITY IEMITATIONS

METHODS OF IN SITU TESTING OF SOIL AND ROCK Gamma-Gamma Log ("Density Log")Gamma rays are emitted into rock around the borehole by a source in the logging tool, and a detector isolated from the source responds to back-scattered gamma rays. Response of de-tector is recorded.(Ref. 29)Film-type or television camera in a suitable protective container is used for observation of walls of borehole.(Ref. 32)Estimation of bulk density in rocks, qualitative indi-cation of changes in densi-ty of soils. May be run in empty or fluid-Filled holes.Detection and mapping of joints, seams, cavities, or other visually observable features in rock. Can be used in empty, uncased holes or in holes filled with clear water.Effects of borehole size and density of drilling fluid must be accounted for. Presently not suitable for qualitative estimate of density in soils other than those of -rock-like" character.

Cannot be used in cased boreholes, Results are affected by any condition that affects visi-bility.4'" Borehole Cameras APPENDIX C SPACING AND DEPTH OF SUBSURFACE

EXPLORATIONS

FOR SAFETY-RELATED'

FOUNDATIONS

TYPE OF STRUCTURE General SPACING OF BORINGS' OR SOUNDINGS For favorable, uniform geologic conditions, where continuity of subsurface strata is found. spacing should be as indicated for the type of structure with at least one boring at the location of every safety-related or Seismic Category I structure.

Where variable conditions are found, spacing should be smaller, as needed, to obtain a clear picture of soil or rock properties and their variability.

Where cavities or other discontinuities of engineering significance may occur, the normal exploratory work should be supplemented by borings or soundings at a spacing small enough to detect such features.tb.j MINIMUM DEPTH OF PENETRATION

The depth of borings should be determined on the basis of the type of structure and geologic conditions.

All borings should be extended to a depth sufficient to define the site geology and to sample all materials that may swell during excavation, may consolidate subsequent to construction, may be unstable under earthquake loading, or whose physical properties would affect foundation behavior or stability.

Where soils are very thick, the maximum required depth for engineering purposes, denoted dmax, may be taken as the depth at which the change in the vertical stress during or after construction for the combined foundation loading is less than 10% of the in situ effective overburden stress. It may also be taken as the depth at which the shear wave velocity of the soil mass exceeds 3.000 ft/sec. It may be necessary to include in the investigation program several borings needed to complete information to establish the soil model for soil-structure interaction studies. These borings may be required to penetrate depths greater than those depths required for general ený;inecring purposes.

Borings should be deep enough to define and evaluate the potential for deep soil stability problems at the site. Generally all borings should extend at least 30 feet below the lowest part of the foundation.

If competent rock is encountered at lesser depths than those given, borings should penetrate to the greatest depth where discontinuities or zones of weakness can affect foundations and should penetrate at least 20 ft into sound rock. For weathered shale or soft rock.depths should be as for soils.'As dctcrmincd by I tt'jt1 lii ocaiiivns of .,ife .-relted structure.-

and facififics.

'Includc.

shafts or other accessible excvations that meet depth requirements.

APPENDIX C SPACING AND DEPTH OF SUBSURFACE

EXPLORATIONS

FOR SAFETY-RELATED

3 FOUNDATIONS

TYPE OF STRUCTURE Structures including buildings, retaining walls.concrete dams.Earth dams, dikes, levees, and embankments.

Deep cuts, 6 canals SPACING OF BORINGS 4 OR SOUNDINGS Principal borings: at least one boring beneath every safety-related structure.

For larger, heavier structures, such as the containment and auxiliary buildings, at least one boring per 10,000 sq ft (approximately

100 ft spacing) and, in addition, a number of borings along the periphery, at corners, and other selected locations.

One boring per 100 linear ft for essentially linear structures.?

Principal borings: one per 100 linear ft along axis of structure and at critical locations perpendicular to the axis to establish geological sections and groundwater conditions for analysis.'

Principal borings: one per 200 linear ft along the alignment and at critical locations perpendicular to the alignment to establish geologic sections for analysis.!

MINIMUM DEPTH OF PENETRATION

Principal borings: at least one-fourth of the principal borings anid a minimum of one boring per structure to penetrate into sound rock or to a depth equal to dmax.Others to a de;th below foundation elevation equal to the width of structure or to a depth equal to the foundation depth below the original ground surface.whichever is greater.'Principal borings: one per 200 linear ft to dmax. Others should penetrate all strata whose strength would affect stability.

For water-impounding structures, to sufficient depth to define all aquifers and zones of underseepage that could affect performance of structure.-

Principal borings: one per 200 linear ft to penetrate into sound rock or to dmax. Others to a depth below the bottom elevation of"cavation equal to the depth of cut or to below, the lowest potential failure zone of the slope.! Borings should penetrate pervious strata below which groundwater may influence stability.

0%AIso supplementary borings or soundings which are design dependent or nccessary to define anomalies.

critical abutment conditions.

etc.Includes temporary cuts, open during construction.

where loss of strength due to excessive deformations would affect ultimate site safety.0

_____ --- ____APPENDIX C SPACING AND DEPTH OF SUBSURFACE

EXPLORATIONS

FOR SAFETY-RELATED3 FOUNDATIONS

TYPE OF STRUCTURE Pipelines Tunnels SPACING OF BORIN(;S 4 OR SOUNDINGS Principal borings: This may vary depending on how well site conditions are understood from other plant site borings. For variable conditions, one per 100 linear ft for buried pipelines:

at least one boring for each footing for pipelines above ground.'Principal borings: one per 100 linear ft.'MINiNMUM DEPTH OF PENETRATION

Principal borings: For buried pipelines, one per 200 linear ft to penetrate into sound rock or to dmax. Others to 5 times the pipe diameters below the invert elevation.

For pipelines above ground. depths as for foundation structures.

Principal borings: one per 200 linear ft to penetrate into sound rock or to diiax. Others to 5 times the tunnel diameter below the invert elevation,'

1.-j-j Reservoirs, impoundments Principal borings: one per 50,000 ft' of interior area of the impoundment.

in addition to borings at the locations of dams or dikes.'Principal borings: at least one-fourth.

but no fewer than one, of the principal borings to penetrate into sound rock or to dmax. Others to a depth of 25 ft below rc.esrvoir bottom elevation.', Stippkllcn~iery horing, o~r %on ing ai nce'%JrY to define zin-naliics.

APPENDIX D REFERENCES

1. U.S. Army Corps of Engineers, Instrumentation of Earth and Rock-Fill Dams (Groundwater and Pore Pressure Observations), Engineer Manual EM 1 110-2-1908. 1972.2. U.S. Army Corps of Engineers, Soil Sampling.Engineer Manual EM 1110-2-1907.

1972, Ch. 3, 4.3. U.S. Navy, Design Manual, Soil Mechanics, Founidations, andl Earth Structures.

A',-1 VF,,l C DM-7.Dept. of the Navy, Naval Facilities Engineering Command. Alexandria.

Virginia, 1971.4. Osterberg, J.O., and S. Varaksin, "Determina- tion of Relative Density of Sand Below Groundwater Table.~ Evaluation of Relative Densit' and Its Role in Geotechnical Projects inrowiving Cohesiohless Soils.American Society for Testing and Materials.

Philadelphia.

STP 523. 1973, pp. 364-376.5. Karol. R. H.. "Use of Chemical Grouts to Sam-pie Sands,~ Sampling of Soil adl Rock, American Society for Testing and Materials, Philadelphia, STP 483, 19*71. pp. 51-59.6. Windisch.

S. J.. and M. Soulie. "Technique for Study of Granular Materials." J. Soil Mlech. Found.Dir.. American Society of Civil Engineers.

V. 96 (SM4). 1970, pp. 1113:1126.

7. Hvorslev.

IM. J.. Subsurface Exploration and Sampling o0 Soils .lr Civil Engineering PurposeS.

U.S.Army Waterways Experiment Station, Vicksburg, Mississippi.

1949. pp, 51-71.83-139, 156-157.8. Barton. C. MI.. "Borehole Sampling of Saturated Uncemented Sands and Grouts," Groundwater

12(3). 1974. pp. 170-181.9, A merican Society for Testing and Materials, 1974 .I ntunl Book of' ,.ISTAI S.S'wlftr ls' Port' 19.Philadelphia.

1974, pp. 192,194. 206-207, 224-229.261.263, 317-320.

Special proC'lhires),or T'sfing sait (o41 Rock' or Engiineering Purposes.

American Society for Testing and Materials, Philadelphia, STP 479, 1969, Ii. Peck. R. B.. W. E. Hanson, and T. 11,Thorn-burn. Foundation Engineering.

John Wiley and Sons, Inc.. New York, 2nd ed.. 1974. pp. 105-106.12, U.S. Dept. of Interior, Bureau of Reclamation, Earth Manual, Ist ed.. Denver, Colorado, 1960, pp.346-379.13. Terziaghi.

K.. and R. B. Peck. Soil Alechlnics in Engineering Practice.

2nd ed., John Wiley and Sons, Inc., New York. 1963. pp. 299-300.308-314.

322-324.14. Osterberg.

J. 0., "New Piston Type Soil Sampler.'*

Engineering Newiv-Record

148. 1952, pp.77-78.15. Kjellman, W.. T. Kallstanins, and 0. Wager."Soil Sampler with Metal F",<,,- Royal Swedish Geotechnical Institute.

Proceeding No. I.Stockholm.

Sweden. 1950.16. Rocha. M., "A Method of Obtaining Integral Samples of Rock Masses," Association of Engineer-ing Geologists.

Bulletin*

10(I). 1973. pp. 77-82, 17. Tirez. G. B.. "Recent Trends in Underwater Soil Sampling Methods." Underwater Soil Samtpling.

Testing. and Construction Control. American Society for Testing and Materials.

Philadelphia.

STP 501.1972. pp. 42-54.18. Nooranz. I., "Underwater Soil Sampling and Testing-A

State-of-the-Art Review." Underwater Soil Sampling.

Testing, and Construction Control.American Society for Testing and Materials, Philadelphia.

STP 501, 1972. pp. 3-41.19. McCoy, F. W., Jr., "An Analysis of Piston Coring Through Corehead Camera Photography'," Underwater Soil Sampling.

Testing. and Construction Control. American Society for Testing and Materials.

Philadelphia, STP 501, 1972. pp.90-105.20. Schmertmann.

J. H., "Suggested Method for Deep Static-Core Penetration Test." Special l'roc&'durt's fi)r Testilng Soil anil Rock otr ligitlcr'irhg Purposes, American Society for Testing a11d Materials, Philadelphia.

STI1 479, 1970. pp. 71-77, IL stio K, (1,, "111 8i4t1 " (m 1 the I ck Sons, Inc,, Now York, Ch. 5, 1968K pp. 126-144, 22. Cedergrvn, H, R., Seepage. Drainage, and Flow D3. Sead'im, 3. L.. "Inflone~c of" hnestim tl'l. \Viler on the Behavior of Rock Masses." Rock Mechanics in Engineering Practice.

K. G. Stagg and 0. C.132-28 ( 1 I ZienkiewicL, eds., John Wiley and Sons, Inc., New York, 1968, Ch. 3.24, D)odds, R. K., "Suggested Method of Test for In Situ Shear Strength of Rock." Special lProcedures.lr Testing Soil wdl Rock jor Engineering Purposes.American Society for Testing and Materials, Philadelphia, STP 479. 1970, pp. 618-628.25. Goodman. R. E.. T. K. Van, and P. E. Henze."Measurement of Rock Deformability in Bore-holes.** Proceedings ofthe Tenth Symposiumn on Rock Mlechanics, A.fustin, Texas. 1968. pp. 523-555.26. Roberts. A.. "The Measurement of Strain and Stress in Rock Masses,'" Rock Mechanics in Engineer-ing Practice.

K. G. Stagg and 0. C. Zienkiewicz.

eds., John Wile), and Sons. Inc., New York, 1968, pp. 166-191, 194.27. Rocha. M., "New Techniques in Delor-mability Testing or In Situ Rock Masses," Deter-inination of the in Situ Atodiduvs of Deformation of Rock, American Society for Testing and Materials, Philadelphia.

STP 477, 1970.28. Ballard. R. F., Jr. and F. G. McLean, "Seismic Field Methods for In Situ Moduli," in Situ Measure-nerit of Soil Properties.

Proceedings of the Specialty Conference of the Geotechnical Engineering Divi-sion. American Society of Civil Engineers.

Raleigh, North Carolina, 1975, pp. 121-150.29. Schlumberger Ltd.. Log Interpretations.

Vol.I (Principles), Schlumberger.

Ltd., New York. 1972.Ch. 3-9.30. Haun, J. D., and L. W. Leroy. editors, Subsur-face Geology in Petroleum Exploration.

A. Sjionposiwt.

Colorado School of Mines. Golden. Colorado, Ch.14. 15, 21. 1958.31. Gever, R. L. and J. I Myung. "The 3-D Velocity Log: a Tool for In Situ Determination of the Elastic Moduli of Rocks." Proceedings ofthe Tweljih Symposi .111on Rock AMechanics.

Rolla/. Missouri.1971, pp.71-107.32. Lundgren.

R., F. C. Sturges. and L. S. Cluff."General Guide for Use of Borehole Cameras-A Guide." Special Procedures for Testing Soil anil Rock for Engineering Purposes.

American Society for Testing and Materials, Philadelphia.

STP 479. 1970.pp. 56-61.1.132-29 APPENDIX E BIBLIOGRAPHY

Bates. E. R.. "I)Deection of Subsurface Cavities." MI iscellaneous Paper. S-73-40. U.S. A rm \Vaterways I-xperiment Station. Vicksburg.

NIississippi.

1973.Calhoon. NI. [.. "'Pressurc-.Mctcr Field Tcsting of Soils." Civil E'ntgine'ring

39(7), 1969. pp. 71-74.(;hIssop.

R.. "-The Rise of Geotechnology and Its Inillnence on I-neineering Practice.'" Ieihtlh Rankine Leclure: Gvcechnique

1iI,2), 1968. pp. 105-150.Hlall. W. J.. N. M. Newmark. and A. J. Hendron..Jr.. "Classification.

Elngineering Properties and Field Exploratioll of Soils, Intact Rock. and In Situ Mas-s.es.'" US. AEC Report WASH-130).

1974.iMisterek.

1). L., "'Analysis of Dlata from Radial Jack in Tests.-" /)eet'rmiaiiog tlf the In Sint .Mthldult of I)Ml10rmnlclion of Rock. American Societv Ifor Testing and MIate-,ials.

Plhiladelphia.

STI' 477. 1970.pp, 27-38.Osterberg, .1. 0.. "An Improved Ilydraulic Piston Sampler." Proceedings olf the Eihth /Inerlariona al COnh'rrence on Soil Aflechanics aniid Fotundatlion h'ngin'erinr, Mloscow. LUSSR, Vol. 1.2. 1973. pp. 317-321.Sh1a.nllnon.

Wilson. Inc., and Agbahian-.lacobsen Associates, "'Soil Behavior Under IEarthquake l.oading Conrditions:

State-of-tle-A

rt -valuatil tof" Soil Characteristics fur Seismic Response An:iy.sis.'

U.S. .\I:C Report. 1972.Task Committee for Foundation D)esign Manual."'SUbsurface In\Vest6iation for I)esiun and Construc-ion of' Foundations of Buildi ngs.'" ..1oil Alech.Fo"und. lv.. A\merican Society of Civil I-ngincers.

1972. V. 98(SM5): pp. 481-490. V.98(SN16:

pp. 557-578. V. 98(SNI!7):

pp. 749-764. V. 9,(SNIX):

pp. 771-785.Wallace. G. 11.. I. .1. Slehir. and 1. :A. Anderson.-Radial Jacking Test for Arch Dams." !'roceedings of Mie 1*'0ih S/.rmtp.iti on R j( A .k.Aut11in.

1968. pp. 633-660.0 1.132-30