{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
[[Issue date::August 28, 2013]]
-4352 August 28, 2013 Ms. Karen Fili Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362
 
-9637
Ms. Karen Fili Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637


SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000263/2013503
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000263/2013503


==Dear Ms. Fili:==
==Dear Ms. Fili:==
On July 26, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Monticello Nuclear Generating Plant. The enclosed report documents the results of this inspection, which were discussed on July 26, 2013, with Mr. K. Jepson and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. No findings were identified during this inspection. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its Enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
On July 26, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a n inspection at your Monticello Nuclear Generating Plant
. The enclosed report documents the results of this inspection, which were discussed on July 26, 2013, with Mr. K. Jepson and other members of your staff.
 
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
 
No findings were identified during this inspection.


Sincerely,/RA/ Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice,"
a copy of this letter and its Enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,/RA/ Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50
-263 License No. DPR-22  


===Enclosure:===
===Enclosure:===
Inspection Report 05000263/2013503;  
Inspection Report 05000 263/2013503;  


===w/Attachment:===
===w/Attachment:===
Supplemental Information cc w/encl: Distribution via ListServŽ Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION III Docket No: 50-263 License No: DPR-22 Report No: 0500263/2013503 Licensee: Northern States Power Company, Minnesota Facility: Monticello Nuclear Generating Plant Location: Monticello, MN Dates: July 22 through 26, 2013 Inspectors: R. Jickling, Senior Emergency Preparedness Inspector J. Beavers, Emergency Preparedness Inspector P. Voss, Resident Inspector Approved by: R. Skokowski, Chief Plant Support Branch Division of Reactor Safety 1 Enclosure  
Supplemental Information cc w/encl:
Distribution via ListServŽ
 
Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION III Docket No
: 50-263 License N o: DPR-22 Report No: 0500263/2013503 Licensee:
Northern States Power Company, Minnesota Facility:
Monticello Nuclear Generating Plant Location:
Monticello, MN Dates: July 22 through 26, 2013 Inspectors:
R. Jickling, Senior Emergency Preparedness Inspector J. Beavers, Emergency Preparedness Inspector P. Voss, Resident Inspector Approved by:
R. Skokowski, Chief Plant Support Branch Division of Reactor Safety 1 Enclosure


=SUMMARY OF FINDINGS=
=SUMMARY OF FINDINGS=
IR 05000263/2013503; 07/22/2013 - 07/26/2013; Monticello Nuclear Generating Plant; Baseline Emergency Preparedness Biennial Exercise Inspection. This report covers a one-week period of announced baseline inspection by two regional inspectors and one resident inspector. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter 0609, "Significance Determination Process" (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in
IR 05000263/2013503; 07/22/2013 - 07/26/2013; Monticello Nuclear Generating Plant


NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.
; Baseline Emergency Preparedness Biennial Exercise Inspection.
 
This report covers a one-week period of announced baseline inspection by two regional inspectors and one resident inspector. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter 0609, "Significance Determination Process" (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.


===A. NRC-Identified===
===A. NRC-Identified===
and Self-Revealed Findings  
and Self-Revealed Findings
 
===Cornerstone: Emergency Preparedness===


===Cornerstone: Emergency Preparedness No findings were identified.===
No findings were identified.


===B. Licensee-Identified Violations===
===B. Licensee-Identified Violations===
No violations were identified.
No violations were identified.


Line 54: Line 77:


===Cornerstone:===
===Cornerstone:===
Emergency Preparedness
Emergency Preparedness 1EP1 Exercise Evaluation (71114.01)
{{a|1EP1}}
 
==1EP1 Exercise Evaluation==
{{IP sample|IP=IP 71114.01}}
===.1 Exercise Evaluation===
===.1 Exercise Evaluation===


Line 63: Line 84:
The inspectors reviewed the July 23, 2013, Biennial Emergency Preparedness Exercise objectives and scenario to ensure the exercise would acceptably test major elements of the licensee's emergency plan and to verify that the exercise's simulated problems provided an acceptable framework to support demonstration of the licensee's capability to implement its plan. The inspectors also reviewed records of other drills and exercises conducted in 2011, 2012, and 2013, to verify that those drills' scenarios were sufficiently different from the scenario used in the July 23, 2013, exercise.
The inspectors reviewed the July 23, 2013, Biennial Emergency Preparedness Exercise objectives and scenario to ensure the exercise would acceptably test major elements of the licensee's emergency plan and to verify that the exercise's simulated problems provided an acceptable framework to support demonstration of the licensee's capability to implement its plan. The inspectors also reviewed records of other drills and exercises conducted in 2011, 2012, and 2013, to verify that those drills' scenarios were sufficiently different from the scenario used in the July 23, 2013, exercise.


The inspectors evaluated the licensee's exercise performance, focusing on the risk-significant activities of emergency classification, notification, and protective action decision making, implementation of accident mitigation strategies, and correction of past exercise weaknesses in the following emergency response facilities:    Control Room Simulator (CRS); Technical Support Center (TSC); and  Emergency Operations Facility (EOF) The inspectors also assessed the licensee's recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensee's emergency plan.
The inspectors evaluated the licensee's exercise performance, focusing on the risk-significant activities of emergency classification, notification, and protective action decision making, implementation of accident mitigation strategies, and correction of past exercise weaknesses in the following emergency response facilities:    Control Room Simulator (CRS);
Technical Support Center (TSC);
and  Emergency Operations Facility (EOF)
The inspectors also assessed the licensee's recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensee's emergency plan.


The inspectors attended post-exercise critiques in the CRS, TSC, and EOF to evaluate the licensee's initial self-assessment of its exercise performance. The inspectors later met with the licensee's lead exercise evaluators and managers to obtain the licensee's findings and assessments of its exercise participants' performances. These self-assessments were then compared with the inspectors' independent observations and assessments to assess the licensee's ability to adequately critique its exercise performance. Documents reviewed are listed in the Attachment to this report.
The inspectors attended post
-exercise critiques in the CRS, TSC, and EOF to evaluate the licensee's initial self
-assessment of its exercise performance. The inspectors later met with the licensee's lead exercise evaluators and managers to obtain the licensee's findings and assessments of its exercise participants' performances. These self
-assessments were then compared with the inspectors' independent observations and assessments to assess the licensee's ability to adequately critique its exercise performance. Documents reviewed are listed in the Attachment to this report.


This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01-06.
This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01
-06.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified.


3 Enclosure
1EP8 Exercise Evaluation  
{{a|1EP8}}
- Scenario Review (71114.08)
==1EP8 Exercise Evaluation - Scenario Review==
{{IP sample|IP=IP 71114.08}}


====a. Inspection Scope====
====a. Inspection Scope====
Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC using IP 71114.08, "Exercise Evaluation - Scenario Review," to determine if the exercise would test major elements of the Emergency Plan, as required by 10 CFR 50.47(b)(14). This inspection activity represents one sample on a biennial cycle. The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis. This review of the exercise objectives and scenario constituted one sample as defined in IP 71114.08-06.
Prior to the inspection activity, the inspectors conducted an in
-office review of the exercise objectives and scenario submitted to the NRC using IP 71114.08, "Exercise Evaluation
- Scenario Review,
" to determine if the exercise would test major elements of the Emergency Plan, as required by 10 CFR 50.47(b)(14). This inspection activity represents one sample on a biennial cycle.
 
The inspectors reviewed various documents
, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.
 
This review of the exercise objectives and scenario constituted one sample as defined in IP 71114.08
-06.


====b. Findings====
====b. Findings====
Line 87: Line 122:
===Cornerstone:===
===Cornerstone:===
Emergency Preparedness
Emergency Preparedness
{{a|4OA1}}
{{a|4OA1}}
==4OA1 Performance Indicator Verification==
==4OA1 Performance Indicator Verification==
{{IP sample|IP=IP 71151}}
 
(71151)
 
===.1 Drill/Exercise Performance===
===.1 Drill/Exercise Performance===


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors sampled licensee submittals for the Drill/Exercise Performance Indicator (PI) for the period from the second quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6, was used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, assessments of PI opportunities during pre-designated control room simulator training sessions, and performance during other drills. Documents reviewed are listed in the Attachment to this report.
The inspectors sampled licensee submittals for the Drill/Exercise Performance Indicator (PI) for the period from the second quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99
-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6, was used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, assessments of  
 
PI opportunities during pre
-designated control room simulator training sessions, and performance during other drills. Documents reviewed are listed in the Attachment to this report.


This inspection constituted one Drill/Exercise Performance (DEP) sample as defined in IP 71151-05.
This inspection constituted one Drill/Exercise Performance (DEP) sample as defined in IP 71151-05.
Line 99: Line 141:
====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified.
4 Enclosure


===.2 Emergency Response Organization Drill Participation===
===.2 Emergency Response Organization Drill Participation===


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors sampled licensee submittals for the Emergency Response Organization (ERO) Drill Participation PI for the period from the second quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6, was used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, performance during the 2012 and 2013 drills, and revisions of the roster of personnel assigned to key ERO positions. Documents reviewed are listed in the Attachment to this report.
The inspectors sampled licensee submittals for the Emergency Response Organization (ERO) Drill Participation PI for the period from the second quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99
-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6, was used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, performance during the 2012 and 2013 drills, and revisions of the roster of personnel assigned to key ERO positions. Documents reviewed are listed in the Attachment to this report.


This inspection constituted one ERO Drill Participation sample as defined in IP 71151-05.
This inspection constituted one ERO Drill Participation sample as defined in  
 
IP 71151-05.


====b. Findings====
====b. Findings====
Line 115: Line 158:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors sampled licensee submittals for the Alert and Notification System (ANS) PI for the period from the second quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6, was used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI Guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests. Documents reviewed are listed in the Attachment to this report.
The inspectors sampled licensee submittals for the Alert and Notification System (ANS) PI for the period from the second quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99
-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6, was used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI Guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests. Documents reviewed are listed in the Attachment to this report.


This inspection constituted one ANS sample as defined in IP 71151-05.
This inspection constituted one ANS sample as defined in IP 71151-05.
Line 121: Line 165:
====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified.
{{a|4OA6}}
{{a|4OA6}}
==4OA6 Management Meetings==
==4OA6 Management Meetings==


===.1 Exit Meeting Summary On July 26, 2013, the inspectors presented the biennial exercise inspection results to Mr. K. Jepson and other members of the licensee staff.===
===.1 Exit Meeting Summary===
The licensee acknowledged the issues presented.
 
On July 26, 2013, the inspectors presented the biennial exercise inspection results to Mr. K. Jepson and other members of the licensee staff. The licensee acknowledged the issues presented.
 
The inspectors confirmed that none of the potential report input discussed was considered proprietary.


5 Enclosure The inspectors confirmed that none of the potential report input discussed was considered proprietary.
===.2 Public and Media Briefing===


===.2 Public and Media Briefing On July 26, 2013, the inspector summarized the NRC's preliminary exercise inspection conclusions at a public and media briefing hosted by the Department of Homeland Security and the Federal Emergency Management Agency Region V Field Office staff at the Wright County Government Center in Buffalo, Minnesota. ATTACHMENT:===
On July 26, 2013, the inspector summarized the NRC's preliminary exercise inspection conclusions at a public and media briefi ng hosted by the Department of Homeland Security and the Federal Emergency Management Agency Region V Field Office staff at the Wright County Government Center in Buffalo, Minnesota
. ATTACHMENT:


=SUPPLEMENTAL INFORMATION=
=SUPPLEMENTAL INFORMATION=


==KEY POINTS OF CONTACT==
Attachment
Licensee  
SUPPLEMENTAL INFORMATION KEY POINTS OF CONTAC
: [[contact::K. Jepson]], Acting Site Vice President  
T Licensee K. Jepson
: [[contact::L. Anderson]], Emergency Preparedness Manager  
, Acting Site Vice President
: [[contact::D. Bosnic]], Production Manger  
: [[contact::L. Anderson]], Emergency Preparedness Manager
: [[contact::J. Callahan]], Corporate Emergency Preparedness Manager  
: [[contact::D. Bosnic]], Production Manger
: [[contact::D. Crofoot]], Nuclear Oversight Supervisor  
: [[contact::J. Callahan]], Corporate Emergency Preparedness Manager
: [[contact::K. Hougen]], Emergency Preparedness Coordinator  
: [[contact::D. Crofoot]], Nuclear Oversight Supervisor
: [[contact::M. Kelly]], Performance Assessment Manager  
: [[contact::K. Hougen]], Emergency Preparedness Coordinator
: [[contact::P. Kissinger]], Regulatory Affairs Manager  
: [[contact::M. Kelly]], Performance Assessment Manager
: [[contact::N. Knapp]], Emergency Preparedness Coordinator  
: [[contact::P. Kissinger]], Regulatory Affairs Manager
: [[contact::L. Narikawa]], Emergency Preparedness Coordinator  
: [[contact::N. Knapp]], Emergency Preparedness Coordinator
: [[contact::S. O'Connor]], Regulatory Affairs Analyst  
: [[contact::L. Narikawa]], Emergency Preparedness Coordinator
: [[contact::K. Petersen]], Chemistry Manager  
: [[contact::S. O'Connor]], Regulatory Affairs Analyst
: [[contact::T. Shortell]], Training Manager  
: [[contact::K. Petersen]],
: [[contact::J. Sternisha]], Fleet General Manager  
Chemistry Manager
: [[contact::K. Thomas]], Emergency Preparedness Coordinator  
: [[contact::T. Shortell]], Training Manager
: [[contact::K. VanGrinsven]], Emergency Preparedness Coordinator  
: [[contact::J. Sternisha]], Fleet General Manager
: [[contact::E. Weinkam]], Nuclear Emergency Preparedness Director Nuclear Regulatory Commission  
: [[contact::K. Thomas]], Emergency Preparedness Coordinator
: [[contact::P. Voss]], Resident Inspector  
: [[contact::K. VanGrinsven]], Emergency Preparedness Coordinator
: [[contact::M. Ziolkowski]], Reactor Engineer  
: [[contact::E. Weinkam]], Nuclear Emergency Preparedness Director
==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED==
Nuclear Regulatory Commission  
: [[contact::P. Voss]], Resident Inspector
: [[contact::M. Ziolkowski]], Reactor Engineer
LIST OF ITEMS OPENED, CLOSED, AND DISCUS
SED Opened, Closed, and Discussed
None
Attachment
LIST OF DOCUMENTS REVIEWED The following is a partial list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspector reviewed the documents in their entirety, but rather that selected sections or portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
1EP1 Exercise Evaluation
A.2-001; Emergency Organization; Revision 54
A.2-101; Classification of Emergencies; Revision 46
A.2-103; Alert; Revision 20
A.2-104; Site Area Emergency; Revision 20
A.2-105; General Emergency; Revision 20
A.2-106; Activation and Operation of the TSC; Revision 34
A.2-107; Activation and Operation of the OSC; Revision 107
A.2-201; Onsite Protective Action; Revision 18
A.2-204; Offsite Protective Action Recommendations; Revision 25
A.2-205; Personnel Accountability; Revision 16
A.2-208; Core Damage Assessment; Revision 10
A.2-406; Offsite Dose Projection; Revision 23
A.2-802; Activation and Operation of the EOF; Revision 15
A.2-807; Offsite Dose Assessment & Protective Action Recommendations; Revision 22
Monticello Nuclear Generating Plant Emergency Plan Exercise Manual
; July 23, 2013
Two Year List of Corrective Action Program Drill Issues; August 2011
- July 2013
Two Years of Drill and Exercise Reports; August 2011
- July 2013
AR 01391539; Accountability
is Tied to Evacuation
in the Emergency Plan
AR 01391537; Exercise
-Control of Operators Outside the Control Room Question
AR 01391529; Exercise
-Simulator
and Field Team Communications Improvements
AR 01391518; Exercise
-Radiological Data Realism Issues
AR 01391400; Exercise
-Core Damage Not Conducted
for All Available Indications
 
Attachment
AR 01391285; Exercise-SAE News Release Incorrectly Stated No Radiation Release
AR 01391171; Exercise
-Accountability Not Completed
in 30 Minutes
or Maintained
AR 01391166; Exercise
-OSC Chemistry Coordinator Position Not Staffed
in 60 Minutes
AR 01391160; Exercise
-TSC Contamination Controls Delay
AR 01391142; Exercise
-Inaccurate Press Releases
AR 01391102; Exercise
-Scenario Confusing
for Radiation
Release Rate
s and Hydrogen
AR 01391089; Exercise
-Mock Media Did Not Provide
Challenging Questions
AR 01391073; Exercise
-Majority
of JIC Personnel Did Not Receive Dialogics Callout
1EP8  Exercise Evaluation
- Scenario Review
Monticello Nuclear Generating Plant
Evaluated Exercise Scenario; April 2013
4OA1 Performance Indicator Verification
EPWI-01.06; Emergency Plan Performance Indicator Program; Revision 13
ANS Siren Data; 2nd quarter 2012
- 1st quarter 2013
DEP Opportunity Data; 2nd quarter 2012
- 1st quarter 2013
ERO Personnel Participation Data; 2nd quarter 2012
- 1st quarter 2013
AR 01391514; DEP Performance Indicator Incorrectly Counted Wind Speed
as Accurate


===Opened, Closed, and Discussed===
Attachment
None
LIST OF ACRONYMS USE
Attachment
D ADAMS Agencywide Documents Access and Management System
==LIST OF DOCUMENTS REVIEWED==
ANS Alert and Notification System
The following is a partial list of documents reviewed during the inspection.
AR Action Request
: Inclusion on this list does not imply that the NRC inspector reviewed the documents in their entirety, but rather that selected sections or portions of the documents were evaluated as part of the overall inspection effort.
CFR Code of Federal Regulations
: Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
CRS Control Room Simulator
: 1EP1 Exercise Evaluation A.2-001; Emergency Organization; Revision 54 A.2-101; Classification of Emergencies; Revision 46 A.2-103; Alert; Revision 20 A.2-104; Site Area Emergency; Revision 20 A.2-105; General Emergency; Revision 20 A.2-106; Activation and Operation of the TSC; Revision 34 A.2-107; Activation and Operation of the OSC; Revision 107 A.2-201; Onsite Protective Action; Revision 18 A.2-204; Offsite Protective Action Recommendations; Revision 25 A.2-205; Personnel Accountability; Revision 16 A.2-208; Core Damage Assessment; Revision 10 A.2-406; Offsite Dose Projection; Revision 23 A.2-802; Activation and Operation of the EOF; Revision 15 A.2-807; Offsite Dose Assessment & Protective Action Recommendations; Revision 22 Monticello Nuclear Generating Plant Emergency Plan Exercise Manual; July 23, 2013 Two Year List of Corrective Action Program Drill Issues; August 2011 - July 2013 Two Years of Drill and Exercise Reports; August 2011 - July 2013
DEP Drill and Exercise Performance
: AR 01391539; Accountability is Tied to Evacuation in the Emergency Plan
DRS Division of Reactor Safety
: AR 01391537; Exercise-Control of Operators Outside the Control Room Question
EOF Emergency Operations Facility
: AR 01391529; Exercise-Simulator and Field Team Communications Improvements
EP Emergency Preparedness
: AR 01391518; Exercise-Radiological Data Realism Issues
ERO Emergency Response Organization
: AR 01391400; Exercise-Core Damage Not Conducted for All Available Indications Attachment
IP Inspection Procedure
: AR 01391285; Exercise-SAE News Release Incorrectly Stated No Radiation Release
IR Inspection Report
: AR 01391171; Exercise-Accountability Not Completed in 30 Minutes or Maintained
JIC Joint Information Center NEI Nuclear Energy Institute
: AR 01391166; Exercise-OSC Chemistry Coordinator Position Not Staffed in 60 Minutes
NRC U.S. Nuclear Regulatory Commission
: AR 01391160; Exercise-TSC Contamination Controls Delay
OSC Operations Support Center
: AR 01391142; Exercise-Inaccurate Press Releases
PAR Protective Action Recommendation
: AR 01391102; Exercise-Scenario Confusing for Radiation Release Rates and Hydrogen
PARS Publicly Available Records System
: AR 01391089; Exercise-Mock Media Did Not Provide Challenging Questions
PI Performance Indicator
: AR 01391073; Exercise-Majority of JIC Personnel Did Not Receive Dialogics Callout 1EP8
SAE Site Area Emergency
: Exercise Evaluation - Scenario Review Monticello Nuclear Generating Plant Evaluated Exercise Scenario; April 2013 4OA1 Performance Indicator Verification
SDP Significance Determination Process
: EPWI-01.06; Emergency Plan Performance Indicator Program; Revision 13 ANS Siren Data; 2nd quarter 2012 - 1st quarter 2013 DEP Opportunity Data; 2nd quarter 2012 - 1st quarter 2013 ERO Personnel Participation Data; 2nd quarter 2012 - 1st quarter 2013
: AR 01391514; DEP Performance Indicator Incorrectly Counted Wind Speed as Accurate Attachment
==LIST OF ACRONYMS==
: [[USED]] [[]]
: [[ADAMS]] [[Agencywide Documents Access and Management System]]
: [[ANS]] [[Alert and Notification System]]
: [[AR]] [[Action Request]]
: [[CFR]] [[Code of Federal Regulations]]
: [[CRS]] [[Control Room Simulator]]
: [[DEP]] [[Drill and Exercise Performance]]
: [[DRS]] [[Division of Reactor Safety]]
: [[EOF]] [[Emergency Operations Facility]]
: [[EP]] [[Emergency Preparedness]]
: [[ERO]] [[Emergency Response Organization]]
: [[IP]] [[Inspection Procedure]]
: [[IR]] [[Inspection Report]]
: [[JIC]] [[Joint Information Center]]
: [[NEI]] [[Nuclear Energy Institute]]
: [[NRC]] [[]]
: [[U.S.]] [[Nuclear Regulatory Commission]]
: [[OSC]] [[Operations Support Center]]
: [[PAR]] [[Protective Action Recommendation]]
: [[PARS]] [[Publicly Available Records System]]
: [[PI]] [[Performance Indicator]]
: [[SAE]] [[Site Area Emergency]]
: [[SDP]] [[Significance Determination Process]]
TSC Technical Support Center
TSC Technical Support Center
Ms. Karen Fili Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello,
 
: [[MN]] [[55362-9637]]
Ms. Karen Fili
: [[SUBJEC]] [[T: MONTICELLO NUCLEAR GENERATING]]
Site Vice President
: [[PLANT]] [[]]
Monticello Nuclear Generating Plant
: [[BASELI]] [[NE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION]]
Northern States Power Company, Minnesota
: [[REPORT]] [[05000263/2013503 Dear Ms. Fili: On July 26, 2013, the U.S. Nuclear Regulatory Commission (]]
2807 West County Road 75
NRC) completed an inspection at your Monticello Nuclear Generating Plant. The enclosed report documents the results of this inspection, which
Monticello, MN 55362
were discussed on July 26, 2013, with Mr. K. Jepson and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. No findings
-9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT
were identified during this inspection. In accordance with
BASELINE EMERGENCY PREPAREDNESS BIENNIAL
: [[10 CFR]] [[2.390 of the]]
EXERCISE INSPECTION REPORT 05000263/2013503 Dear Ms. Fili:
NRC's "Rules of Practice," a copy of this letter and its Enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public
On July 26, 2013, the  
Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site
: [[contact::U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Monticello Nuclear Generating Plant. The enclosed report documents the results of this inspection]], which
at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely,
were discussed on July 26, 2013, with Mr. K. Jepson and other members of your staff.
/RA/  Richard
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. No findings
: [[A.]] [[Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-263 License No.]]
were identified during this inspection.
: [[DPR]] [[-22 Enclosure: Inspection Report 05000263/2013503;   w/Attachment:  Supplemental Information cc w/encl: Distribution via ListServŽ     DOCUMENT NAME:]]
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
: [[MON]] [[2013 503]]
Enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public
: [[EP]] [[RDJ.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy]]
Document Room or from the Publicly Available Records System (PARS)
: [[OFFICE]] [[]]
component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site
: [[RIII]] [[]]
at http://www.nrc.gov/reading
: [[RIII]] [[]]
-rm/adams.html
: [[RIII]] [[]]
(the Public Electronic Reading Room).
: [[RIII]] [[]]
Sincerely,
: [[NAME]] [[RJickling: DFunk  RSkokowski]]
 
: [[DATE]] [[08/28/13  08/28/13  08/28/13]]
/RA/  Richard  
: [[OFFICI]] [[AL]]
: [[contact::A. Skokowski]], Chief
: [[RECORD]] [[]]
Plant Support Branch
: [[COPY]] [[Letter to Karen Fili from Richard Skokowski dated August 28, 2013 SUBJECT: MONTICELLO NUCLEAR GENERATING]]
Division of Reactor Safety
: [[PLANT]] [[]]
Docket No. 50
: [[BASELI]] [[NE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000263/2013503]]
-263 License No. DPR
-22 Enclosure:
Inspection Report 05000263/2013503;
w/Attachment:  Supplemental Information
cc w/encl:
Distribution via ListServŽ
DOCUMENT NAME: MON 2013 503 EP RDJ.docx
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII   RIII   RIII   RIII   NAME RJickling:
DFunk  RSkokowski
DATE 08/28/13  08/28/13  08/28/13   OFFICIAL RECORD COPY
 
Letter to Karen Fili from Richard Skokowski dated August 28, 2013
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT
BASELINE EMERGENCY PREPAREDNESS BIENNIAL
EXERCISE INSPECTION REPORT 05000263/2013503
}}
}}

Revision as of 09:58, 4 July 2018

IR 05000263-13-503; on 07/22/2013 - 07/26/2013; Monticello Nuclear Generating Plant; Baseline Emergency Preparedness Biennial Exercise Inspection
ML13240A353
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/28/2013
From: Skokowski R A
Plant Support Branch II
To: Fili K D
Northern States Power Co
Rick Skokowski
References
IR-13-503
Download: ML13240A353 (13)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532

-4352 August 28, 2013 Ms. Karen Fili Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362

-9637

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000263/2013503

Dear Ms. Fili:

On July 26, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a n inspection at your Monticello Nuclear Generating Plant

. The enclosed report documents the results of this inspection, which were discussed on July 26, 2013, with Mr. K. Jepson and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during this inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice,"

a copy of this letter and its Enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50

-263 License No. DPR-22

Enclosure:

Inspection Report 05000 263/2013503;

w/Attachment:

Supplemental Information cc w/encl:

Distribution via ListServŽ

Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION III Docket No

50-263 License N o: DPR-22 Report No: 0500263/2013503 Licensee:

Northern States Power Company, Minnesota Facility:

Monticello Nuclear Generating Plant Location:

Monticello, MN Dates: July 22 through 26, 2013 Inspectors:

R. Jickling, Senior Emergency Preparedness Inspector J. Beavers, Emergency Preparedness Inspector P. Voss, Resident Inspector Approved by:

R. Skokowski, Chief Plant Support Branch Division of Reactor Safety 1 Enclosure

SUMMARY OF FINDINGS

IR 05000263/2013503; 07/22/2013 - 07/26/2013; Monticello Nuclear Generating Plant

Baseline Emergency Preparedness Biennial Exercise Inspection.

This report covers a one-week period of announced baseline inspection by two regional inspectors and one resident inspector. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter 0609, "Significance Determination Process" (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.

A. NRC-Identified

and Self-Revealed Findings

Cornerstone: Emergency Preparedness

No findings were identified.

B. Licensee-Identified Violations

No violations were identified.

REPORT DETAILS

REACTOR SAFETY

Cornerstone:

Emergency Preparedness 1EP1 Exercise Evaluation (71114.01)

.1 Exercise Evaluation

a. Inspection Scope

The inspectors reviewed the July 23, 2013, Biennial Emergency Preparedness Exercise objectives and scenario to ensure the exercise would acceptably test major elements of the licensee's emergency plan and to verify that the exercise's simulated problems provided an acceptable framework to support demonstration of the licensee's capability to implement its plan. The inspectors also reviewed records of other drills and exercises conducted in 2011, 2012, and 2013, to verify that those drills' scenarios were sufficiently different from the scenario used in the July 23, 2013, exercise.

The inspectors evaluated the licensee's exercise performance, focusing on the risk-significant activities of emergency classification, notification, and protective action decision making, implementation of accident mitigation strategies, and correction of past exercise weaknesses in the following emergency response facilities: Control Room Simulator (CRS);

Technical Support Center (TSC);

and Emergency Operations Facility (EOF)

The inspectors also assessed the licensee's recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensee's emergency plan.

The inspectors attended post

-exercise critiques in the CRS, TSC, and EOF to evaluate the licensee's initial self

-assessment of its exercise performance. The inspectors later met with the licensee's lead exercise evaluators and managers to obtain the licensee's findings and assessments of its exercise participants' performances. These self

-assessments were then compared with the inspectors' independent observations and assessments to assess the licensee's ability to adequately critique its exercise performance. Documents reviewed are listed in the Attachment to this report.

This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01

-06.

b. Findings

No findings were identified.

1EP8 Exercise Evaluation

- Scenario Review (71114.08)

a. Inspection Scope

Prior to the inspection activity, the inspectors conducted an in

-office review of the exercise objectives and scenario submitted to the NRC using IP 71114.08, "Exercise Evaluation

- Scenario Review,

" to determine if the exercise would test major elements of the Emergency Plan, as required by 10 CFR 50.47(b)(14). This inspection activity represents one sample on a biennial cycle.

The inspectors reviewed various documents

, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.

This review of the exercise objectives and scenario constituted one sample as defined in IP 71114.08

-06.

b. Findings

No findings were identified.

OTHER ACTIVITIES

Cornerstone:

Emergency Preparedness

4OA1 Performance Indicator Verification

(71151)

.1 Drill/Exercise Performance

a. Inspection Scope

The inspectors sampled licensee submittals for the Drill/Exercise Performance Indicator (PI) for the period from the second quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99

-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6, was used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, assessments of

PI opportunities during pre

-designated control room simulator training sessions, and performance during other drills. Documents reviewed are listed in the Attachment to this report.

This inspection constituted one Drill/Exercise Performance (DEP) sample as defined in IP 71151-05.

b. Findings

No findings were identified.

.2 Emergency Response Organization Drill Participation

a. Inspection Scope

The inspectors sampled licensee submittals for the Emergency Response Organization (ERO) Drill Participation PI for the period from the second quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99

-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6, was used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, performance during the 2012 and 2013 drills, and revisions of the roster of personnel assigned to key ERO positions. Documents reviewed are listed in the Attachment to this report.

This inspection constituted one ERO Drill Participation sample as defined in

IP 71151-05.

b. Findings

No findings were identified.

.3 Alert and Notification System

a. Inspection Scope

The inspectors sampled licensee submittals for the Alert and Notification System (ANS) PI for the period from the second quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99

-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6, was used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI Guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests. Documents reviewed are listed in the Attachment to this report.

This inspection constituted one ANS sample as defined in IP 71151-05.

b. Findings

No findings were identified.

4OA6 Management Meetings

.1 Exit Meeting Summary

On July 26, 2013, the inspectors presented the biennial exercise inspection results to Mr. K. Jepson and other members of the licensee staff. The licensee acknowledged the issues presented.

The inspectors confirmed that none of the potential report input discussed was considered proprietary.

.2 Public and Media Briefing

On July 26, 2013, the inspector summarized the NRC's preliminary exercise inspection conclusions at a public and media briefi ng hosted by the Department of Homeland Security and the Federal Emergency Management Agency Region V Field Office staff at the Wright County Government Center in Buffalo, Minnesota

. ATTACHMENT:

SUPPLEMENTAL INFORMATION

Attachment

SUPPLEMENTAL INFORMATION KEY POINTS OF CONTAC

T Licensee K. Jepson

, Acting Site Vice President

L. Anderson, Emergency Preparedness Manager
D. Bosnic, Production Manger
J. Callahan, Corporate Emergency Preparedness Manager
D. Crofoot, Nuclear Oversight Supervisor
K. Hougen, Emergency Preparedness Coordinator
M. Kelly, Performance Assessment Manager
P. Kissinger, Regulatory Affairs Manager
N. Knapp, Emergency Preparedness Coordinator
L. Narikawa, Emergency Preparedness Coordinator
S. O'Connor, Regulatory Affairs Analyst
K. Petersen,

Chemistry Manager

T. Shortell, Training Manager
J. Sternisha, Fleet General Manager
K. Thomas, Emergency Preparedness Coordinator
K. VanGrinsven, Emergency Preparedness Coordinator
E. Weinkam, Nuclear Emergency Preparedness Director

Nuclear Regulatory Commission

P. Voss, Resident Inspector
M. Ziolkowski, Reactor Engineer

LIST OF ITEMS OPENED, CLOSED, AND DISCUS

SED Opened, Closed, and Discussed

None

Attachment

LIST OF DOCUMENTS REVIEWED The following is a partial list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspector reviewed the documents in their entirety, but rather that selected sections or portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

1EP1 Exercise Evaluation

A.2-001; Emergency Organization; Revision 54

A.2-101; Classification of Emergencies; Revision 46

A.2-103; Alert; Revision 20

A.2-104; Site Area Emergency; Revision 20

A.2-105; General Emergency; Revision 20

A.2-106; Activation and Operation of the TSC; Revision 34

A.2-107; Activation and Operation of the OSC; Revision 107

A.2-201; Onsite Protective Action; Revision 18

A.2-204; Offsite Protective Action Recommendations; Revision 25

A.2-205; Personnel Accountability; Revision 16

A.2-208; Core Damage Assessment; Revision 10

A.2-406; Offsite Dose Projection; Revision 23

A.2-802; Activation and Operation of the EOF; Revision 15

A.2-807; Offsite Dose Assessment & Protective Action Recommendations; Revision 22

Monticello Nuclear Generating Plant Emergency Plan Exercise Manual

July 23, 2013

Two Year List of Corrective Action Program Drill Issues; August 2011

- July 2013

Two Years of Drill and Exercise Reports; August 2011

- July 2013

AR 01391539; Accountability

is Tied to Evacuation

in the Emergency Plan

AR 01391537; Exercise

-Control of Operators Outside the Control Room Question

AR 01391529; Exercise

-Simulator

and Field Team Communications Improvements

AR 01391518; Exercise

-Radiological Data Realism Issues

AR 01391400; Exercise

-Core Damage Not Conducted

for All Available Indications

Attachment

AR 01391285; Exercise-SAE News Release Incorrectly Stated No Radiation Release

AR 01391171; Exercise

-Accountability Not Completed

in 30 Minutes

or Maintained

AR 01391166; Exercise

-OSC Chemistry Coordinator Position Not Staffed

in 60 Minutes

AR 01391160; Exercise

-TSC Contamination Controls Delay

AR 01391142; Exercise

-Inaccurate Press Releases

AR 01391102; Exercise

-Scenario Confusing

for Radiation

Release Rate

s and Hydrogen

AR 01391089; Exercise

-Mock Media Did Not Provide

Challenging Questions

AR 01391073; Exercise

-Majority

of JIC Personnel Did Not Receive Dialogics Callout

1EP8 Exercise Evaluation

- Scenario Review

Monticello Nuclear Generating Plant

Evaluated Exercise Scenario; April 2013

4OA1 Performance Indicator Verification

EPWI-01.06; Emergency Plan Performance Indicator Program; Revision 13

ANS Siren Data; 2nd quarter 2012

- 1st quarter 2013

DEP Opportunity Data; 2nd quarter 2012

- 1st quarter 2013

ERO Personnel Participation Data; 2nd quarter 2012

- 1st quarter 2013

AR 01391514; DEP Performance Indicator Incorrectly Counted Wind Speed

as Accurate

Attachment

LIST OF ACRONYMS USE

D ADAMS Agencywide Documents Access and Management System

ANS Alert and Notification System

AR Action Request

CFR Code of Federal Regulations

CRS Control Room Simulator

DEP Drill and Exercise Performance

DRS Division of Reactor Safety

EOF Emergency Operations Facility

EP Emergency Preparedness

ERO Emergency Response Organization

IP Inspection Procedure

IR Inspection Report

JIC Joint Information Center NEI Nuclear Energy Institute

NRC U.S. Nuclear Regulatory Commission

OSC Operations Support Center

PAR Protective Action Recommendation

PARS Publicly Available Records System

PI Performance Indicator

SAE Site Area Emergency

SDP Significance Determination Process

TSC Technical Support Center

Ms. Karen Fili

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362

-9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT

BASELINE EMERGENCY PREPAREDNESS BIENNIAL

EXERCISE INSPECTION REPORT 05000263/2013503 Dear Ms. Fili:

On July 26, 2013, the

U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Monticello Nuclear Generating Plant. The enclosed report documents the results of this inspection, which

were discussed on July 26, 2013, with Mr. K. Jepson and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. No findings

were identified during this inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

Enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records System (PARS)

component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site

at http://www.nrc.gov/reading

-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA/ Richard

A. Skokowski, Chief

Plant Support Branch

Division of Reactor Safety

Docket No. 50

-263 License No. DPR

-22 Enclosure:

Inspection Report 05000263/2013503;

w/Attachment: Supplemental Information

cc w/encl:

Distribution via ListServŽ

DOCUMENT NAME: MON 2013 503 EP RDJ.docx

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII RIII RIII NAME RJickling:

DFunk RSkokowski

DATE 08/28/13 08/28/13 08/28/13 OFFICIAL RECORD COPY

Letter to Karen Fili from Richard Skokowski dated August 28, 2013

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT

BASELINE EMERGENCY PREPAREDNESS BIENNIAL

EXERCISE INSPECTION REPORT 05000263/2013503