[[Issue date::August 20, 2015]] | [[Issue date::August 20, 2015]] | ||
Mr. Edward D. Halpin, Senior Vice President & Chief Nuclear Officer Pacific Gas and Electric Company P. O. Box 3 Mail Code 104/6/601 | Mr. Edward D. Halpin, Senior Vice President | ||
& Chief Nuclear Officer Pacific Gas and Electric Company P. O. Box 3 Mail Code 104/6/601 | |||
Avila Beach, C A 93424 | |||
SUBJECT: NRC INSPECTION REPORT 050 | |||
This letter refers to the inspection conducted on July 21 - 23, 2015, at your permanently shut down Humboldt Bay Power Plant, Unit 3 facility in Eureka, | -00133/15-009 Dear Mr. Halpin | ||
: | |||
This letter refers to the inspection conducted on July 21 - 23, 2015, at your permanently shut down Humboldt Bay Power Plant, Unit 3 facility in Eureka, Californi The purpose of the inspection was to determine whether decommissioning activities were being conducted safely and in conformance with the U.S. Nuclear Regulatory Commission (NRC) requirement The results of the inspection were discussed with members of your staff at the conclusion of the onsite inspection on July 23, 201 During this inspection, NRC staff examined activities conducted under your license as they relate to public health and safety to confirm compliance with the Commission's rules and regulations | |||
, and with the conditions of your l icens Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personne The enclosed report presents the results of this inspectio No violations were identified and no response to this letter is require In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's documents system (ADAMS), accessible from the NRC's Web site at https://www.nrc.gov/reading | |||
-rm/adams.htm To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the public without redactio UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011 | |||
-4511 E. Halpin | |||
-2- Should you have any questions concerning this inspection, please contact Dr. Gerald Schlapper, Health Physicist | |||
, at 817-200-1273 or the undersigned at 817 | |||
-200-119 | |||
Sincerely,/RA by Lee Brookhart Acting For/ Ray L. Kellar, P. E., Chief Repository and Spent Fuel Safety Branch Division of Nuclear Materials Safety Docket No: 050-00133 License No: DPR-7 | Sincerely,/RA by Lee Brookhart Acting For/ | ||
Ray L. Kellar, P. E. | |||
, Chief Repository and Spent Fuel Safety Branch Division of Nuclear Materials Safety Docket No: 050-00133 License No: DPR-7 | |||
===Enclosure:=== | ===Enclosure:=== | ||
NRC Inspection Report 050-00133/15-009 cc: See next page cc: Thomas | NRC Inspection Report 050 | ||
-00133/15-009 cc: See next page | |||
cc: Thomas | |||
}} | }} | ||
Revision as of 20:59, 30 June 2018
| ML15232A138 | |
| Person / Time | |
|---|---|
| Site: | Humboldt Bay |
| Issue date: | 08/20/2015 |
| From: | Kellar R L NRC/RGN-IV/DNMS/RSFSB |
| To: | Halpin E D Pacific Gas & Electric Co |
| Brookhart L E | |
| References | |
| IR 2015009 | |
| Download: ML15232A138 (13) | |
Text
August 20, 2015
Mr. Edward D. Halpin, Senior Vice President
& Chief Nuclear Officer Pacific Gas and Electric Company P. O. Box 3 Mail Code 104/6/601
Avila Beach, C A 93424
SUBJECT: NRC INSPECTION REPORT 050
-00133/15-009 Dear Mr. Halpin
This letter refers to the inspection conducted on July 21 - 23, 2015, at your permanently shut down Humboldt Bay Power Plant, Unit 3 facility in Eureka, Californi The purpose of the inspection was to determine whether decommissioning activities were being conducted safely and in conformance with the U.S. Nuclear Regulatory Commission (NRC) requirement The results of the inspection were discussed with members of your staff at the conclusion of the onsite inspection on July 23, 201 During this inspection, NRC staff examined activities conducted under your license as they relate to public health and safety to confirm compliance with the Commission's rules and regulations
, and with the conditions of your l icens Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personne The enclosed report presents the results of this inspectio No violations were identified and no response to this letter is require In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's documents system (ADAMS), accessible from the NRC's Web site at https://www.nrc.gov/reading
-rm/adams.htm To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the public without redactio UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011
-4511 E. Halpin
-2- Should you have any questions concerning this inspection, please contact Dr. Gerald Schlapper, Health Physicist
, at 817-200-1273 or the undersigned at 817
-200-119
Sincerely,/RA by Lee Brookhart Acting For/
Ray L. Kellar, P. E.
, Chief Repository and Spent Fuel Safety Branch Division of Nuclear Materials Safety Docket No: 050-00133 License No: DPR-7
Enclosure:
NRC Inspection Report 050
-00133/15-009 cc: See next page
cc: Thomas