ML16200A087: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:LA CROSSE | {{#Wiki_filter:LA CROSSE BOILIN G WATER REACTOR LICENSE TERMINATION PLAN CHAPTER 3 IDENTIFICATION OF REMAINING SITE DISMANTLEMENT ACTIVITIES | ||
La CrossLicense TRevision3.Iden3.1.3.2.3.2.3.2.3 3 | |||
3 3 | 3 3 | ||
3 3 | 3 3 | ||
| Line 28: | Line 30: | ||
3 33.2.3.3.3.3. | 3 33.2.3.3.3.3. | ||
3.3. | 3.3. | ||
3.3.3.3.4se Boiling | 3.3.3.3.4se Boiling WTermination n 0 ntification o fIntroductio nCompleted 1.Overvi2.Disman.2.2.1.For.2.2.2.Sea.2.2.3.Dec.2.2.4.Prim.2.2.5.Alt.2.2.6.Gas.2.2.7.Fue.2.2.8.Com.2.2.9.Hyd.2.2.10.W.2.2.11.De.2.2.12.Ov.2.2.13.Sta.2.2.14.Lo.2.2.15.Hi.2.2.16.Ci.2.2.17.Co.2.2.18.Fu.2.2.19.Ste.2.2.20.60.2.2.21.Tu.2.2.22.He.2.2.23.Li.2.2.24.El3.AdditioFuture Dec o1.Reactor2.Turbine3.Waste TStorage4.LACBWWater Reacto rPlan f Remainin gn ................. | ||
and Ongoin gew .............. | |||
ntlement of Srced Circula tal Injection Scay Heat Co mary Purifi cernate Core seous Wast eel Element Smponent Co draulic Val vWell Water S yemineralize dverhead Sto ration and C oow Pressure igh Pressure irculating Wondensate S yull-Flow Co neam Turbin e0-Megawatt Gurbine Oil a neating, Vent iquid Waste ectrical Dis tonal Activiti ommissioni nr Building .. | |||
e Building aTreatment Be Building .. | |||
WR Crib Hor TABLE Og Site Disma n................... | |||
.g Decommis................... | |||
.Systems an dtion System | |||
.System ........ | |||
.oling Syste mcation Syste mSpray Syst ee Disposal S yStorage Welloling Water ve Accumul aystem .......... | |||
.d Water Sys trage Tank ... | |||
.ontrol Air S yService Wa tService W aWater System ystem and F endensate De me ................. | |||
.Generator ....nd Hydroge nilation, and ACollection Stribution Sy ses ............... | |||
.ng Activitie s................... | |||
.and Turbine OBuilding, Ga s................... | |||
.ouse ............ | |||
.3-i OF CONTEntlement A c................... | |||
.ssioning Ac t................... | |||
.d Componen | |||
................... | |||
.................... | |||
.m ................ | |||
.m ................ | |||
.em ............... | |||
.ystem ......... | |||
. .................. | |||
.System ..... | |||
.ator System | |||
.................... | |||
.tem ............. | |||
.................... | |||
.ystem ......... | |||
.ter System . | |||
.ater System . | |||
................... | |||
.eedwater H emineralizer | |||
................... | |||
.................... | |||
.n Seal Oil S yAir Conditi oSystems ...... | |||
.stem ........... | |||
.................... | |||
.s and Tasks . | |||
.................... | |||
.Office Buil ds Storage T a................... | |||
.................... | |||
.ENTS ctivities ....... | |||
.................... | |||
.tivities and T................... | |||
.nts ............... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.eaters .......... | |||
.System ....... | |||
.................... | |||
.................... | |||
.ystem.......... | |||
.oning (HVA................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.ding ............ | |||
.ank Vault a n................... | |||
.................... | |||
.................... | |||
.................... | |||
.Tasks .......... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.AC) Systems | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.nd LSA ................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.................... | |||
.... 3-1... 3-1... 3-3... 3-3... 3-3... 3-3... 3-4... 3-4... 3-4... 3-4... 3-4... 3-4... 3-5... 3-5... 3-5... 3-5... 3-5... 3-6... 3-6... 3-6... 3-6... 3-6... 3-6... 3-7... 3-7... 3-7... 3-7... 3-8... 3-8... 3-8... 3-8... 3-9. 3-11. 3-12. 3-13 La CrossLicense TRevision3.3.3.3. | |||
3.3.3.4.3.4. | 3.3.3.4.3.4. | ||
3.4.3.4.3.4.43.4.3.5. Table 3-1Table 3-2Table 3-3Table 3-4 se Boiling WTermination n 0 5.Mainte6.Ventila7.LegacyRadiologic a1.Contro2.Occupa3.Exposu4.Radioa5.ProjectReferences 1Status o2Radiati3Project4GeneraWater Reacto rPlan nance Eat S hation Stack .. | |||
y Waste ....... | |||
al Impacts o fl Mechanis mational Exp oure to the P uactive Waste t Milestones | |||
................... | |||
of Major L Aion Exposur eted Waste Q ual Project M ir hack and 1 B................... | |||
.................... | |||
.f Decommis ms to Mitiga tosure ........... | |||
.ublic ............ | |||
.Projections | |||
................... | |||
.................... | |||
.LIST ACBWR Syse Projection suantities .... | |||
Revision as of 04:54, 30 June 2018
| ML16200A087 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 06/27/2016 |
| From: | LaCrosseSolutions |
| To: | Office of Nuclear Material Safety and Safeguards |
| References | |
| Download: ML16200A087 (24) | |
Text
LA CROSSE BOILIN G WATER REACTOR LICENSE TERMINATION PLAN CHAPTER 3 IDENTIFICATION OF REMAINING SITE DISMANTLEMENT ACTIVITIES
La CrossLicense TRevision3.Iden3.1.3.2.3.2.3.2.3 3
3 3
3 3
3 3
3 3
3 3
3 3
3 3
3 3
3 3
3 3
3 33.2.3.3.3.3.
3.3.
3.3.3.3.4se Boiling WTermination n 0 ntification o fIntroductio nCompleted 1.Overvi2.Disman.2.2.1.For.2.2.2.Sea.2.2.3.Dec.2.2.4.Prim.2.2.5.Alt.2.2.6.Gas.2.2.7.Fue.2.2.8.Com.2.2.9.Hyd.2.2.10.W.2.2.11.De.2.2.12.Ov.2.2.13.Sta.2.2.14.Lo.2.2.15.Hi.2.2.16.Ci.2.2.17.Co.2.2.18.Fu.2.2.19.Ste.2.2.20.60.2.2.21.Tu.2.2.22.He.2.2.23.Li.2.2.24.El3.AdditioFuture Dec o1.Reactor2.Turbine3.Waste TStorage4.LACBWWater Reacto rPlan f Remainin gn .................
and Ongoin gew ..............
ntlement of Srced Circula tal Injection Scay Heat Co mary Purifi cernate Core seous Wast eel Element Smponent Co draulic Val vWell Water S yemineralize dverhead Sto ration and C oow Pressure igh Pressure irculating Wondensate S yull-Flow Co neam Turbin e0-Megawatt Gurbine Oil a neating, Vent iquid Waste ectrical Dis tonal Activiti ommissioni nr Building ..
e Building aTreatment Be Building ..
WR Crib Hor TABLE Og Site Disma n...................
.g Decommis...................
.Systems an dtion System
.System ........
.oling Syste mcation Syste mSpray Syst ee Disposal S yStorage Welloling Water ve Accumul aystem ..........
.d Water Sys trage Tank ...
.ontrol Air S yService Wa tService W aWater System ystem and F endensate De me .................
.Generator ....nd Hydroge nilation, and ACollection Stribution Sy ses ...............
.ng Activitie s...................
.and Turbine OBuilding, Ga s...................
.ouse ............
.3-i OF CONTEntlement A c...................
.ssioning Ac t...................
.d Componen
...................
....................
.m ................
.m ................
.em ...............
.ystem .........
. ..................
.System .....
.ator System
....................
.tem .............
....................
.ystem .........
.ter System .
.ater System .
...................
.eedwater H emineralizer
...................
....................
.n Seal Oil S yAir Conditi oSystems ......
.stem ...........
....................
.s and Tasks .
....................
.Office Buil ds Storage T a...................
....................
.ENTS ctivities .......
....................
.tivities and T...................
.nts ...............
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
.eaters ..........
.System .......
....................
....................
.ystem..........
.oning (HVA...................
....................
....................
....................
....................
.ding ............
.ank Vault a n...................
....................
....................
....................
.Tasks ..........
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
.AC) Systems
....................
....................
....................
....................
....................
....................
.nd LSA ...................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
.... 3-1... 3-1... 3-3... 3-3... 3-3... 3-3... 3-4... 3-4... 3-4... 3-4... 3-4... 3-4... 3-5... 3-5... 3-5... 3-5... 3-5... 3-6... 3-6... 3-6... 3-6... 3-6... 3-6... 3-7... 3-7... 3-7... 3-7... 3-8... 3-8... 3-8... 3-8... 3-9. 3-11. 3-12. 3-13 La CrossLicense TRevision3.3.3.3.
3.3.3.4.3.4.
3.4.3.4.3.4.43.4.3.5. Table 3-1Table 3-2Table 3-3Table 3-4 se Boiling WTermination n 0 5.Mainte6.Ventila7.LegacyRadiologic a1.Contro2.Occupa3.Exposu4.Radioa5.ProjectReferences 1Status o2Radiati3Project4GeneraWater Reacto rPlan nance Eat S hation Stack ..
y Waste .......
al Impacts o fl Mechanis mational Exp oure to the P uactive Waste t Milestones
...................
of Major L Aion Exposur eted Waste Q ual Project M ir hack and 1 B...................
....................
.f Decommis ms to Mitiga tosure ...........
.ublic ............
.Projections
...................
....................
.LIST ACBWR Syse Projection suantities .....
.ilestones .....
.3-ii B Diesel Ge n...................
....................
.sioning Act ite the Reco n...................
....................
...................
....................
....................
.OF TABLEstems and C os for Deco m...................
....................
.nerator Buil d...................
....................
.ivities .........
.ntamination
...................
....................
....................
....................
....................
.ES omponents ammissioning
....................
....................
.ding ............
....................
....................
....................
.of Remedia t...................
....................
....................
....................
....................
.as of June 2 0...................
....................
....................
....................
....................
....................
....................
.ted Areas ....
....................
....................
....................
....................
....................
.015 .............
....................
....................
....................
.. 3-14. 3-14. 3-15. 3-15. 3-16. 3-16. 3-16. 3-17. 3-18. 3-19... 3-2. 3-16. 3-17. 3-18 La CrossLicense TRevisionALARAACM AMSL BSFR CCW CST D-Plan/PSDARFESW FRS G-3 GSTV HPSW HVAC kVA ISFSI LACBWLPSW LSA LSE LTP NRC ODCMOHST REMP RPV RWP WTB se Boiling WTermination n 0 A As LAsb AboBulkComCon/ R DecFuelFinaGenGas HighHeatkilo-IndeWR La CLowLowLACLiceNucM Off-OveRad ReacRad WasWater Reacto rPlan LIST OF Low As Rea estos Conta iove Mean S ek Survey Fo rmponent Co ondensate Sto rcommissioni nl Element S tal Radiation noa Fossil St aStorage Ta nh Pressure S ting Ventila t-Volt-Ampeependent Sp eCrosse Boili nw Pressure S ew Specific A cCBWR Site Eense Termin alear Regula t-site Dose C arhead Stora giological E nctor Pressur eiation Wor kste Treatme n r ACRONYMsonably Ac hining Mater iea Level r Release oling Wate rrage Tank ng Plan/Pos ttorage Well Survey ation nk Vault ervice Wat etion Air Co nre ent Fuel Sto rng Water R eervice Wate rctivity Enclosure ation Plan tory Commi salculation Mge Tank nvironmenta le Vessel k Permit nt Building 3-iii MS AND ABhievable ial t Shutdown er nditioning rage Install aeactor r ssion Manual l Monitorin gBBREVIATDecommiss ation g Program TIONS ioning Acti vvities Repor tt La CrossLicense TRevision se Boiling WTermination n 0 Water Reacto rPlan r Page Inte n3-iv ntionally Le fft Blank La CrossLicense TRevision3.Id3.1.InIn accordthe remathe time remediatiEstimate released projectedwill be Crosse BDecomm to proceeThe LACalternati vDecomm DECON sites. C ulocated i nDecommregulatorState andDecommof 10 CFinvolve LACBWthe technapproval DecommSafety andecommioperationThe remdescribeddiscussedmajor remspecific ecomponese Boiling WTermination n 0 dentificat introductio ndance with 1aining majo rof submitt aion and an as of the o cto unrestric d volumes o fundertaken Boiling Waissioning A ced. CBWR site ve, as des cissioning o falternative iurrently, La Cn Andrews, missioning ary agencies d local reg umissioning a cFR 50.82(a)(
6any un-rev iWR. If an ac tnical specif ibefore imp lmissioning a cnd Health Pissioning do ns, especiall ymaining dec d in section d in section smaining co mequipment rents that hav Water Reacto rPlan ion of Remn 10CFR50.82 r dismantle mal. The in foassessment occupational rted areas d uf radioactiv epursuant t oater React octivities Rep owill be de cribed in Nf Nuclear Fis continge nCrosseSolutiTexas and a tactivities ar ein accorda nulatory age nctivities at L A6) and (a)(7
)iewed safe ttivity requir eications or llementing t hctivities are Program, a n not pose a ny those duri nontaminatio n3.3. The s ps 3.3.2 thro umponents of remediation e been or ar er maining Si (a)(9)(ii)(B ment and de cformation in cof the poten tradiation d ouring the co e waste that o the curre nor (LACBWort (D-Plan/contaminat eNUREG-058Facilities, Snt upon cont iions (Solutiot the Energ ye being conce with pl ancies are lis tACBWR wi). At the ti mty question ses prior NR Clicense, a s uhe activity i nconducted nd Waste Mny greater ra ng major m an and dismpecific syste mugh 3.3.7.
Tcontaminat econsiderati oe to be rem o3-1 ite Disman), the Licen scontaminati ocludes thos etial radiolog ose and the mpletion o f will be gen ent 10 CFR 5WR) Decom/PSDAR) (1ed and dis m86 GenericSupplement inued accessons) has accySolutions faoordinated want adminis tted in sectio ill be condu cme of LTP ss or chang eC approval uubmittal wi ln question.
under the SManagement diological o raintenance a nmantlement m consider aThese sectio ned plant sys tons. Table 3oved. ntlement Ase Terminat ion activities e areas andical conditi oquantity o ff the schedu erated are al s50 license, mmissioning
- 1) and do n omantled in a cEnvironme1, Volume 1s to one or mcess to low-lacility locat ewith the a ptrative proc en 8.7.2 of Lcted in acco rsubmittal, t hes in the Tunder 10 CF ll be made Solutions RaProgram r safety ris knd outage e vactivities t hations that wns provide atems and, as 3-1 contain sActivities ion Plan (L Ts for the de cequipment ons that ma yf radioactiv uled tasks arso included.are consis tPlan andot depend u pccordance wental Impac1 (2). Comore low le vlevel waste ded in Clive, Upplicable F eedures. A pLTP Chapte rrdance with he remainin gTechnical S R 50.59(c)(
2to the NR Cadiation Pr oActivities ck than those cvolutions.
that will b ewill be take nan overview s appropriat es a list of mTP) must id ecommission ithat need f uy be encoun te material te provided. These acti tent with t hd Post-Shu tpon LTP ap pwith the D Ect Stateme nompletion o vel waste di sdisposal fac iUtah. ederal andpplicable Fedr 8. the require mg activities dpecification 2), or a cha nC for revie wotection Pro gconducted dconducted de performe dn into accou nand descri be, a descript imajor system entify ing at urther tered. to be The vities he La tdown proval ECON nt on f the sposal ilities State deral, ments do not ns for nge to w and gram, during during d are nt are be the ion of s and La CrossLicense TRevision ForcedReactoReactoMain SDecayPrimarFeedwSeal InAlternGaseoFuel ECompoHydraWell WDeminOverhStationLow PHigh PCirculCondeHeaterSteam 60-MeMain CTurbin se Boiling WTermination n 0 TableSystem or d Circulatio nor Vessel In tor Vessel Steam in Re y Heat Cooli nry Purificati owater in Rea cnjection Sys tnate Core Sp rus Waste D iElement Sto ronent Cooli nulic Valve AWater Syste mneralized W aead Storage n and Contr oPressure Ser vPressure Ser vating Water ensate and F ers Turbine egawatt Gen Condenser
&ne Bldg. Ma iWater Reacto rPlan e 3-1 Staas Componenn System ternals actor Bldg.
ng System on System ctor Bldg.
tem ray System isposal Syst erage Well S yng Water (
CAccumulato rm ater System Tank (OHS ol Air Syste mvice Water vice Water System eedwater T aerator & Accessori ein Steam r atus of Ma joof June 20 1nt PRRInInIoIn9050em Aystem CCCW) Inr SystemInInInT) Inm In30ORanks and DplRRes 15R3-2 or LACBW15 artially Re mRemoved fro mRemoved fro mn place n place- Dra ion Exchang en place 0% removed0% removedAll except u nContents re mn place- 70
%n place- Dra in Place - Iso n place- Dra in place- Dra in place 0% removedOperational Remains in p lDrained- Conlace, All Fe eRemoved Removed 5% RemoveRemoved WR Systems Stamoved m site m site ined ers in place; d d nderground smoved- Drain% Removedined lated from Tined- 50% reined d lace - pum pndensate Sto edwater He aed and Compoatus 90% remov storage tank ned Turbine/Rea cemoved ps de-energi zrage Tank r eaters remov eonents ed removed ctor Bldg.
zed emain in ed La CrossLicense TRevisionTab TurbinTurbinLiquidFuel THVACElectriAsbestAfter thdemonstrreduced twill be decommi3.2.C3.2.1.In excessaddition
disposal
waste. Waste stoClass B/Cwere shiprod bladAttachmeremoved fuel asse the stora g3.2.2.3.2.2.1.The ForcCirculati se Boiling WTermination n 0 ble 3-1 (co nSystem or ne Bldg. Co nne Oil and Hd Waste Col lTransfer Bri dC Systems ical System stos Abatem ee balance rated to be to the area atransferred issioning ac tCompleted aOverviews of 2 millio to the Rea cof the RP Vored in the FC waste (i.e pped for dis pdes was fil lents to the Rfrom the Rmblies and fge racks an dDismantlForceced Circul aon pumps, aWater Reacto rPlan ntinued) SaComponenndensate an dHydrogen Se alection Syst edge s ent of the site below the uaround the Iback to D ativities com pand Ongoingw n pounds o fctor Pressu rV included dFuel Eleme n., resins, fil tposal in Jun eled with l oRPV were reactor Buil dfuel debris wd installed c olement of S yd Circulatio nation syste mauxiliary oil r Status of M aas of June 2 0nt d Feed Ral Oil Pems InRInIn75is remedi aunrestricted Independent airyland un dpleted to dat g Decommisf metallic w are Vessel (
Rdisposition ont Storage Wters, and wa se 2007. Th eow-density cremoved an dding and wa were placed omponents wystems and n System m and atten dpumps, an d3-3 ajor LACBW015 Removed artially Re mn place - Pa rRemoved n place - Pa rn place- Dis c5% complet ated and t hrelease crit eSpent Fuel der the 10e are provid ssioning Acaste have be RPV) and s of irradiate dWell (FESW
)ste barrel c oe RPV cont acellular co nd all other as shipped f oin dry cask were remove dComponentdant oil sy shydraulic c WR SystemStamoved rtially Oper artially Oper aconnected te he levels o eria, the 10 Storage Ins CFR Part 5ded in sectio nctivities and een remove dspent fuel s td hardware a) was proce sontents) and aining the re ancrete with appurtenanc or disposal i nstorage in t hd from the Fts stems have oupling oil pms and Com atus ational ational f residual CFR Part 5 0tallation (I S50 license.
n 3.2. Tasks d, shipped, a ntorage rack sand all oth essed and co lpackaged inactor intern athe reacto res were cu tn June 200 7he ISFSI in FESW. been drain epumps have ponents radioactivit y0 license w SFSI) and th Spent fue lnd disposed
- s. Remova ler Class B allected with n three liner als and 29 c or head inst at. The RP V7. After all September 2ed. The F o been electr iy are ill be e site l and of in l and and C other s that ontrol alled. V was spent 2012, orced ically La CrossLicense TRevisiondisconnedensity cnozzles wreactor cdisposed 3.2.2.2.The SealCirculati 90% rem3.2.2.3.The Deccooler, a This syst3.2.2.4.The Primregeneratresins hacoolers a3.2.2.5.
The Alte(HPSW) duplex stsystem inand 80%compone3.2.2.6.This systrecombinexceptiontunnel. 3.2.2.7.The Fuel11 feet b38,000 gpumps, ofuel and
well and se Boiling WTermination n 0 cted. All 1cellular con cwere cut to cavity was aof. Pumps Seal Il Injection son pumps a nmoved. Decaycay Heat C ond intercon ntem is drain ePrimamary Purifi ctive cooler, ave been re mand 90% of t hAlternernate Core pumps, wh itrainers and n the React o% of the p ients are drai nGaseotem routed ning, monit on of the un dFuel El Element St oby 11 feet ballons of w aone heat ex cfuel debris, ia fixative wWater Reacto rPlan 16 inch and crete. Four allow rem oalso cut at and piping injection Sy system prov ind the 29 c oy Heat Cool iooling syste mnecting pipi ned and inop eary Purificat ication systepurificatio nmoved and the piping h anate Core S pSpray syste ich took su ctwo motor-oor Building wiping in th ened and are rous Waste Dmain cond eoring and hderground g aElement Sto rorage Well (by approxi mater. The F Echanger, on einstalled co mwas applied t or 20 inch Fo r16 inch For coval of the the biologi cn the shield estem ided coolin gontrol rod dr ing System m was a si nng used to rerable. ion System m was a hn cooler, pu mthe system have been re mpray Systemm consiste dction from t hoperated va lwas remove de Turbine Bready for di sisposal Sys tenser gasse sholdup for as storage ta nrage Well (FESW) is amately 42 f eESW coolin ge ion excha nmponents, a no the walls.
3-4 rced Circul aced Circula treactor pre scal shield, sed cubicles rg and sealin give units.
Tngle high p rremove core high pressu rmp, two io nhas been d rmoved and d id of two di ehe river and lves installe dd due to int eBuilding h asmantlemen ttem s through v adecay. Th nks and the a stainless st eeet deep.
Wg system is cnger, piping
,nd storage r aThe system ation syste mtion inlet no ssure vessel segmented iremain. g water for This system iressure clos decay heat re, closed l on exchange rrained. Theisposed as r aesel-driven Hdischarged d in parallel erference wi as been re mt. arious com phis system hgas storage eel lined co nWhen full, connected t o, valves, an dacks have b em has been d rm piping wa szzles and f
- o. Piping l ointo manag ethe seals o nis drained a nsed loop co nfollowing roop system rs and filter se Primary P uadioactive wHigh Pressu rto the react
- o. Approxi mth the react omoved. Reponents for has been r etank in the Tncrete struct uit contain eo the well a nd instrumen teen remove drained and i ss filled wit hour 16 inch oocated withi eable pieces n the two F ond approxi mntaining a preactor shut dconsisting
- s. Ion exc hurification pwaste. .
re Service Wor vessel th rmately 50%
oor vessel re memaining s ydrying, filt eemoved withTurbine Bu iure that me aed approxi mnd consists otation. All d from the st os inoperable.
h low outlet n the , and orced mately pump, down. of a hange pump, Water rough of the moval ystem ering, h the ilding asures mately of two spent orage La CrossLicense TRevision3.2.2.8.The Comvarious hbarrier bcooling wsystem is3.2.2.9.
The funcforce to the Forceair comp drained.
3.2.2.10.Water fosuction tsystem sucooling wdown flaequipmenisolated fAdminist3.2.2.11.
The Demof 19,100are two sVirgin WdemineraStation (
G3.2.2.12.
The Oveintegral pthe FESWOHST acThe OHSSpray sydrained ase Boiling WTermination n 0 Compmponent Co oheat exchan gbetween ra dwater to R es approxima tHydraction of the Hoperate the ed Circulati oressors, wa tWell Wor this syste through stai upplied wat ewater for th eash tank an dnt and seal wfrom the R etration Buil dDeminmineralized W0 gallons an dsections of aWater Tank palized water G-3). The s yOverherhead Stor apart of, the RW, cask po octed as a re ST also sup pystem, and wand inopera bWater Reacto rPlan ponent Cool ioling Water gers and pu mioactive sy seactor Buil dtely 70% co maulic Valve AHydraulic Vfive piston-ton and Mai nter pumps, a nWater Syste mm was sup pnless steel er to the pl ae two Turbi d sample c owater for t heactor/Turbi nding and Cri bneralized WWater Syste md an upper Van integral a provided wa tthroughout ystem has b ehead Storag eage Tank (
OReactor Bui ol, and uppe rceiver for r eplied the w awas a backu pble. r ing Water Sy(CCW) sys tmps in the Rstems and sding Air Co nmplete. Accumulato rValve Accu mtype valve an Steam sys tnd other eq um plied from tstrainers, a nant and offic ene Buildin gooler. The he Circulati nne building.
b House. ater System m consists oVirgin Wate rluminum ta nter to the Dethe plant.
Ween drained.
e Tank OHST) is a 4lding. The r cavity dur iejecting ref uater for the Ep source for 3-5 ystem tem provide dReactor Buil dsecondary c nditioner c or System mulator syste mactuators, w htems. The huipment hav etwo sealed snd discharg ee for sanita rg air-conditiowell water ng Water pu m Well wate rof a lower Cr Tank, whi cnk located omineralized Water was d 45,000-gall oOHST serveing cask lo aueling wate rEmergency Cthe Seal I njd controlle dding during ooling syst eompressors. m was to s uhich operat ehydraulic s ye also been submersible ed into int ery and drink ioning units system als omps. The Wr pump #3 sCondensate Sch has a cap aon the Turbi nd Water tran sdemineraliz eon tank loc aed as a rese rading operat ir using the PCore Spray snjection syst ed quality co oplant opera tems. The The dism aupply the ne ced the five rystem has b eelectrically deep well egrated pres sing purpose and the hea to supplied wWell Water supplies po tStorage Tan kacity of 29, 7ne Building sfer pumps, wed in batche sated at the trvoir for w aions. Duri nPrimary Pu rsystem and em. The s yoling water ttion, servin gsystem pro vantlement o fcessary hyd rrotoport val veen drained. disconnecte dpumps that sure tanks. s. It was u sting boiler bwater for la uSystem has table water tk with a ca p780 gallons.
office roof.
which distri bs at Genoa Ftop of, and ater used to ng operation rification s yReactor Bu iystem is cur rto the g as a vided f this raulic ves in The d and took The sed as blow-undry been to the pacity Both The buted Fossil is an flood s, the ystem. ilding rently La CrossLicense TRevision3.2.2.13.There areact as a vsupply toused as n3.2.2.14.Two vertstrainer uwas the system isriver watto allow 3.2.2.15.The purp(G-3) maThe inter(WTB) ihydrants the fire sby the re m3.2.2.16.Circulati nopen sucjoin a cocondenseWater entube sidewhich diLACBWpumps ha3.2.2.17.The Condpressure Tank (CS3.2.2.18.The Fullremoved piping hase Boiling WTermination n 0 Statioe two singl evolume stor ao the statio nneeded. Low Ptical pumps unit. The L normal sups currently uter ingress i ndismantlem eHigh Ppose of the Haintains HP Srnal loop se rinterior hos eand the L Auppression smoval of is oCirculng water is dction bays i nommon 60 i ner, the 60 in cnters the top
- e. The 42 i nscharges to tWR Crib Ho uave been de
-Condedensate Sys tto the sucti oST), this sys tFull-Fl-Flow Con dionic impu ave been remWater Reacto rPlan n and Contr
-stage posit iage unit for tn and the co nPressure Ser vlocated in t how Pressur epply to the Hused as the dn the turbin eent which is Pressure Se rHPSW systeSW system rved the Tu re stations a nCBWR Cribsystem for Golation valv elating Wate rdrawn into tn the LACB nch pipe le ach pipe bra nsection of t hnch conden sthe seal wel use. The C-energized.
ensate Syste tem took co non of the re atem has bee nFlow Conde ndensate De mrities from tmoved. r ol Air Syste ive displace mthe station.
ntrol air sy svice Water She LACBWe Service W HPSW systdilution wa te building t uapproximat ervice Water em is to su ppressure.
Trbine Buildi nnd sprinkle rb House spr iG-3. Curren tes and instal lr System the intake fl uWR Crib Hading to th enches into t whe condense rser circulati nl from G-3 lCirculating Wm and Feed wndensed ste aactor feed p un drained a nnsate Demi nmineralizer the condens 3-6 m ment lubric aThe air rece stems. This System R Crib Ho uater (LPS Wem throug hter supply f ounnel area.
ely 30% co mSystem ply fire sup The HPSW ng, Reactor Br systems.
inklers. Th etly, the syst eling pipe bl aume from t hHouse. Eac he main con dwo 42 inch p ir tube side ang water ou tlocated appr Water Syste mwater Heate ram from the umps. With nd most of t hneralizer Sys tSystem co nate water g oated type co meiver outlet l isystem is cuse supplied W) system su ph the moto r-or conducti nThe origin amplete. pression w asystem is dBuilding, a nThe extern ae external lo em is isolat eanks to allo whe river by t wh pump disc hdenser in thipe to the t oand is disch atlet lines tie roximately 6 m is curren trs condenser hthe excepti ohe piping ha stem nsisted of r eoing back t ompressors.
ines join to fcurrently sti lthe system upplied the C-driven HP Sng liquid w aal system ha sater. The a ddivided into nd Waste Tr al loop sup pop was cro sed from the Tw only exter nwo pumps l oharges into he Turbine Bop section o farged from t hinto a com m600 feet do wtly inopera bhotwell and don of the C os been remo vesin-filled s eo the reacto The air rec eform a head ell operable athrough a d uCCW cooler SW pump.
aste dischar gs been simp djacent coal two main leatment Bu iplies outsid ess-connecte dTurbine Bu inal fire loop ocated in se p42 inch pip eBuilding.
Af the water bhe bottom s emon 60 inc hwnstream fro mble as the s ydelivered it uondensate St oved. ervice tank sr. All tank seivers er for and is uplex s and This ges of lified plant oops. ilding e fire d with ilding use. parate e that At the boxes. ection h line m the ystem under orage s that s and La CrossLicense TRevision3.2.2.19.The turbirated at 6pressure have bee3.2.2.20.The 60 76,800 kVlubricati nthrough abeen com3.2.2.21.The Turblubricati nreductioncomplete3.2.2.22.
The Reacfor drawiair condi337,500 Bbuilding from the350 feet
exhaust sparticula tincludes
which hidetectingVentilati
vault arethe gas svault thr oCurrentlyuse of st ase Boiling WTermination n 0 Steamine was a h i60 MW. Thelement.
Tn removed.
60-MeMW generVA. The gng system, aa reduction gmpletely re mTurbinbine Oil Sy sng and cool in gear. Thi sely removed
.Heatinctor Buildi ning fresh ai ritioning uni tBtu/hr capa cthrough op e building u shigh and is system was te radiation an isokinet istorically h ag particulate on for the Was of the bustorage tank ough the co ny, both systeack fans tha tWater Reacto rPlan m Turbine igh pressure he turbine c oThe Steam Tegawatt Ge nator was agenerator w and excited gear. The mmoved, unconne Oil and Hstem receiv eing oil to t hs system, w
- i. ng, Ventilat ig Ventilati or into the b ut air inlet in ccity steam cenings betw sing stack bconstructed equipped wdetector.
Aic nozzle, l oas drawn ai rand gaseou sWTB was pr ouilding and evault. The nnecting tun nems are de-et are energiz r , condensin gonsisted of aTurbine, as wnerator a high-spee as cooled bby a separa tmain and res enditionally r eHydrogen S eed cooled o ihe turbine a nith exceptio ion, and Air on System u tuilding and fcluded a filt coil that wa seen and arolowers thro uof structur awith convent iA monitorin gocated dow nr from the s ts activity.
ovided by a 2exhausted t hstack blow enel and disc henergized. Bed by temp o3-7 g, reaction, ta high press uwell as so md, turbine-dby a hydrog te exciter a terve exciter seleased and deal Oil Syste mil from the lnd generato n of the dr aConditioni ntilized two 3for circulati ner box asse ms used whe nund the bi-pugh the ex hal concrete wional and hi g system is instream of ttack exhaus t2000 cfm e xhe air throu gers then ex hharged the aBuilding ve norary power.
tandem comure and inte rme steam sy sdriven wougen system, ttached to t hs have been disposition em lube oil co or bearings, ained clean ang (HVAC)
S30 ton, 12,0 0ng the air th rmbly, face an heating w aparting doo rhaust stack fwith an alu migh-efficien cinstalled wi tthe high-ef ft to the mo nxhaust fan t hgh a duct o uhausted the aair from the bntilation is c u mpound, reh ermediate pr estem piping und-rotor mlubricated bhe end of t hremoved.
Ted. olers to sup pexciter bea rand dirty oi Systems 00 cfm air croughout th eand bypass das required.
r sections a nfor the facil iminum nozzl ecy filters an dth the exha uficiency filt enitoring syst ehat drew air fut the floor oair from the building thr ourrently sup peat 3600 rp messure and aand compomachine rat eby a force dhe generator The generat oply the nec erings, and e xl tanks, has conditioning e building.
dampers, an d Air enter end was exh aity. The st ae at the top.
d monitore dust system, wers. The s yem, is capa bfrom the shi of the build igas storag eough the sta cplied throu gm unit a low-onents ed at -flow shaft or has essary xciter been units Each d one ed the austed ack is The d by a which ystem, ble of elded ing to e tank ck. gh the La CrossLicense TRevision3.2.2.23.The Liqustorage t ain the tu nThe Reacconsists pump, twretentionFollowinliquid wawater disSpent resquantity transferr edisposal.
CurrentlydischargeThe air o3.2.2.24.
The plansite has abuildingsthe stack3.2.3.Other comTheconTheConTherackThe"CoThe3.3.FThe planremaininse Boiling WTermination n 0 Liquiduid Waste S yank vault, a nnnel betwee nctor Buildi nof two rete nwo sump pun tanks. ng processi naste from e ascharge outf lsin was tran savailable fed to an a p y, the liqui des at LACB Woperated pu mElectrnt is disconn ea 480 volt 5 0s. Tempora rk. Additionmpleted de ce abatementntaining mat ee abatemenntaining M ae placement ks from the e disconnec told and Dar ke draining a nFuture Deco ns for the de ng site struc tWater Reacto rPlan d Waste Co lystem colle cnd the tunn en the Reacto ng Liquid Wntion tanks, umps, and t hng and sam pach system wlow. This wsferred to t hfor shipme npproved shi pd waste coll eWR are thr omp discharg erical Distrib uected from o00 kVa tran sry power is al Activitie sommissioni n, packaging erial. nt, packagi naterial (AC Mof all spent FESW. tion of LA Ck" status.
nd removal ommissioni ncontaminati otures are p rr llection Syst cts the liqui del into two s tr Building aWaste Syste m each with he necessar ypling to de mwas then di swas the norm he spent resi nnt to an a ppping conta iection syste mough the Eas tes to the inle tution Syste moff-site pow esformer pro vtied to exis s ng activities and dispos ang and dis pM). fuel into dr yCBWR from of other mis cng Activitie son, dismant lresented in t3-8 ems d waste fro mtorage tanks and the Turb im, which is sa capacity oy piping to monstrate c oscharged to al liquid eff ln receiving tpproved pro iner, dewat em pumps ar et Turbine b ut of the liqu im er in suppor tviding pow eting overhe a include:
al of know nposal of k ny storage in toff-site ele ccellaneous s ys and Tasks lement and athe followi nm the Turbin e (4500 gall oine Buildin gseparate fro mof 6000 gal lroute the wompliance wthe commo fluent releas etank and he locessing fa cered, packa ge not opera building sum pid waste mo nrt of Cold a ner to multipl ad cranes a nn and readil ynown and rthe ISFSI f actrical powe rystem pipin ganticipated eng sections.
e Building, tons and 300 0g. m the Liqui lons, a liqu iwaste liquid with the rel eon G-3/LAC e pathway f old until ther ecility. The ged and shipble. The o np using an a initor, whichnd Dark stat ue power ca rnd power to y accessible readily acc eacility and t hr and placi ng. end-state co The meth othe WTB, t h0 gallons) l od Waste Sy id waste tr ato and fro mease criteri aBWR circu lor LACBWRe was a suf firesin was pped for o fnly liquid ef fir operated ph is still oper aus. Current lrts througho u exhaust fa nlead and/o ressible As bhe removal o ng LACBWRndition(s) f oods to rem ehe gas ocated ystem, ansfer m the a, the lating R. ficient then ff-site fluent pump. able. ly the ut the ns for r lead bestos f fuel R in a or the ediate La CrossLicense TRevisioncontaminremediat3.3.1.The Reacellipsoid aand it exfor the u pThe buildincludinglayer of structure
concrete The shelTurbine Reactor Bremoval closed byleaves ththe northA 50 tonReactor supportedthe 5-tonHatches of the ca bThe remaremoved and the i dSystems overheadsize reduthe wasteWater anOnce thebuilding activity wonce the In preparelevationwill allo wse Boiling WTermination n 0 nated struc tion issues.
Reactor Bctor Buildi nal bottom.
Ixtends 26 fe epper hemisp ding contai ng the RPV a nconcrete to is support eapproximat ell includes t Building.
IBuilding th aand dry cas y a weather he Reactor Bheast quadra nn traveling pBuilding.
d by colum nn hoists are aat several p obles and eq uaining com
- p. Area pre pdentificatio nor compond crane or lo cuce. The sy se loading ar end sludge a re tank has bdemolition.
will allow f otank is prep ration for t hn. As neces sw for the pe rWater Reacto rPlan tures, syste mBuilding g is a right It has an ov eet 6 inches bherical dom ned most of tnd biologic aan elevatio ned on a fou nely 3 feet th iwo airlocks In addition, at is intende dk storage, a ntight, insul aBuilding 1 t ont and ente rspolar crane wThe bridge ns around th ealso long e nositions in t huipment. ponents and sparation and n and mitiga tnents will b ecal hoists.
Sstems will b eea in the Tu rre currently been adequa t Keeping a sor the collec tared for de mhe building sary, prior t orformance o fr ms, and eqcircular cyl ierall interna lbelow grade e, which is 0the equipm eal shielding.
n of 727 fe endation con sick. . The pers othere is al sd to accom mn opening wated, roll-up
,o 10 feet bel os the pipe tu nwith a 5 to ncompletely e inside of t hnough to rea che main and systems in t hset-up for c tion of any he removed uSome syste me either loa drbine Buildi ninside the Otely charact essociated pi ption of any lmolition. demolition, o dismantle mf hot work a3-9 quipment dinder buildinl height of 1 4level. The 0.60 inch thi ent associat e The interi oet 10 inches sisting of c oonnel airlo cso an 8 feet modate large was created i, bi-parting ow grade le vnnel. n auxiliary hspans the he building.
ch down th rintermediat he Reactor Bommodity r ehazardous mutilizing m ems or compo nded into shi png. OHST. Theerized, a fixping and co mliquids. Thi sthe FESWment, the FE Sactivities req udo not inv ong with a h e44 feet and asteel shell tick. ed with the nor of the she lAbove Meaoncrete-stee lck connects by 10 feet pieces of e qin the Reac tdoor. The mvel either at hoist is loc abuilding a n The lifting rough hatch wte floors ma yBuilding wi lemoval will material.
echanical mnents might pping contai ne tank will bxative will bmponents i ns piping wil will be dis mSW will be duired to re molve any uemispherica lan inside di athickness is nuclear stea mll is lined w ian Sea Lev el piles and athe Reacto rfreight do oquipment.
Ttor Building majority of pthe northw eated in the und travels o cables of b oways into t hy be opened ll be draine d include ra dmeans with srequire hot wners or will be dewatere dbe applied i nn place whil el be disman tmantled fromdecontamin amove the stai nunique safe tl dome and sameter of 6 01.16 inch, e m supply sy ith a 9-inch
-el (AMSL).
a pile cappi nr Building tor opening i To facilitate
. The open ipipe penetr aest quadrant upper part on circular toth the 50-to nhe basement to allow pa d, dismantleddiological su rsupport fro mwork activi tbe transpor td and deslu dn preparati oe performin gtled and re mm the main ated to level nless steel Fty or semi-0 feet, xcept ystem, -thick The ng of to the n the RPV ing is ations t or at of the tracks n and area. ssage d, and rveys m the ties to ted to dged. on for g this moved floor s that FESW La CrossLicense TRevisionliner. Asections liner wil lTurbine Bwill be dEnergySoDemolitiAfter comwill be rwith propbasementThe rAsbeDismDismpipinDismRemeThe rThe expoto meet tis identi fmethod wdeeper dopen air
- process, tOnce surreach excwalls do segmentethe steel
sprung stReactor BThe therpackaginconcrete
- removal, loaded inthe wastedisposal se Boiling WTermination n 0 Associated e qof the FES Wl be lifted b yBuilding.
Odecontamin aolutions Tecion Limits (
3mmodity re mremediated tper contam it will inclu dremoval of astos Abate mmantle and r emantle and rng as well as mantle and r eediation of t hremoval of aosed concre tthe open-air fied within twill be used depth, then ademolition
.then a struc trveys have cavator equ iwn to grad eed and remo liner segm etructure an dBuilding.
Trmal shield ng as mixed will be re mthe remai nnto appropri ae container site in Cliv eWater Reacto rPlan quipment (
HW liner will by the overh eOnce the FE ated to the chnical Sup p3). moval is co mto levels th aination cont rde: any identifie dment (to be pmove the 6, 0emove the the auxiliar ymove the c ohe sump. any lead shi ete will then bdemolition the first cou pto remove ta wire saw w If large s etural evalua tdemonstrat eipped with ae level. A fved using c uentation and d associated The remaini nwill be se gwaste. Af tmoved, com pning portion ate containe rwill be tra ne, Utah.
r HVAC, etc.
)be size redu cead crane, pSW liner h aextent nece port Docum emplete, the bat will allo wrols per Re fd Hazardou serformed b y000-gallon rtwo Forced y oil pumps
.ondensate p uelding. be surveyed criteria spe cple of inche the contami nwill be use dections of ction will be ced that the oa pneumatic fter the aboutting torch eremoval of ventilation ng interio r cgmented usi nter the ther mpletely expo sof the stee lrs and truck nsferred to a3-10 ) and pipin gced using pl ackaged an das been rem ossary to all ent (TSD)
Rasement ele vw demolitio nference 3.
Ts Waste. y a qualified retention ta nCirculatio
- n. urification i oto determi ncified in Re fs of concre tnated mater id to remove ontaminate dcompleted. open-air de mhammer wive grade i nes from the tthe steel lin system willconcrete wil lng a wire smal shield i ssing the ste el liner will ed to a rail ta rail car ang will also lasma cuttin gd placed in toved, the c olow open-ai rRS-TD-3131 9vation (621 n of above gThe prepara tSubcontrac tnks. n Pumps, i non exchange rne the scope ference 3. I fte, a scabbli nial. If the c ocontaminat ed concrete mmolition cri till be used tnternal steel top down to ner to the gr ol be install el then be remsaw into m as removed, tel liner. Subbe remove dtrans-load f and then shi pbe remove dg. Sized pi ethe waste s toncrete unde r demolitio n96-005, LACfoot) of the ground stru ction of the Rtor). ncluding th ers. of the reme df unaccepta bng method oontaminatio ed areas ab omust be re mteria have bto break the shell is ex pthe ground ound elevati ed over the moved to t hanageable pthe remain dbsequent to
- d. Demoliti oacility in W ipped to the
- d. Contami neces of the F taging area irlying the Fn as specifi CBWR OpeReactor Bu ictures in op eReactor Bu ie inlet and odiation nec eble contami nor air ham mn is detecte dove the limi tmoved durin gbeen met, a interior co nposed, it w ielevation.
Won is complremainder ohe thermal s hpieces for s pder of the in tinterior co non debris w iinona, MN wEnergySolunated ESW in the FESW ed in n Air ilding en air ilding outlet essary nation mering d at a ts for g this high ncrete ill be When ete, a of the hield. pecial terior ncrete ill be where utions La CrossLicense TRevisionThe rema"bowl" bFinal Rad3.3.2.The Turswitchgetravelingcrane hasthe main The Turlaboratorventilati nservices.
Turbine OCommodand mecreciprocameet pacloading ais properAfter radsystems,
specifiedcriteria wwith the
of inchescontaminbe used tan acceptUtah. ARadiationWhen albuilding and strucsequenceto allow
requiremThe majoto be treadisposal facility ishipped se Boiling WTermination n 0 aining struc below 636 f odiation Sur vTurbine Brbine Build iar, and oth eg bridge cra ns access to mfloor. The Trbine Offic ery, shops, c ong and air c In gener aOffice Buil ddity remova lchanical m eating saws wckaging and area located rly shipped adioactive co mcomponentd in Referen will be remo vReactor Co ns of concretenated materi to remove c table radioacAll structural n Work Per ml structural will be de mctural concr e within the Topen acce sments. Mist iority of the cated as low lfacility. W an Winona, to the En eWater Reacto rPlan tural concr eoot elevatio nvey (FRS) in Building aning housed er pneumati cne with a 5 major equip mTurbine Bui e Building counting roo mconditionin gal, these ar eding is 110 fel has begun eans to dis mwill be the p rwaste disp oon the gro uand dispose dmmodity re mts and stru cce 3 is met
.ved, segreg antainment, i fe, a scabbli nal. If the c oontaminate dctive waste decontami nmits (RWP) surfaces ha molished. Alete will be Turbine Bui ss to load oing method sconstruction level radioa caste will be lMN where ergySolutionsr ete outside t hn, concrete paccordance nd Turbine Othe steam c, mechanic aton auxilia rment items llding is 105 contained om, personn eg equipment eas were se peet by 50 fe eand will co nmantle radi orimary met hosal criteri aund floor in td of at an of f-moval is co ctural surfa
- c. Structural ated, properl yf unaccepta bng method o ontaminatio nd areas. All disposal fac nation activi tand under t hve been de cl remaining demolished lding will b eout areas.
s will be ut idebris resu lctive waste aloaded into athe waste cs disposal s3-11 he liner bel opile cap and with LTP COffice Buil dturbine an dal and hydr ary hoist ca plocated belo wfeet by 79 foffices, the el change r o, rest room sparated fro met and 45 fe entinue in th eoactive pipi nhods used. Sa. Waste w ithe northwe sf-site facilitymplete, sur vces to ensu rmaterials t hy packaged able contami nr air hamm en is detecte dradioactive ility, prima rties will be he oversight contaminate dsystems an dto the gro ue performed Concrete wilized durin glting from t hand will be sappropriate ccontainer w isite in Cli vow the 636piles) will rChapter 5.
ding d generator, aulic syste mpacity spans w the floor tfeet and 60 fControl R ooom, decont s, storeroo mm power pl aet tall. e Turbine B ung and co mSystem piec eill be pack ast corner of
. veys will b ere that the hat do not mand dispose dnation is ide nering metho dd at a deepe rwaste will rily the Ene rperformed iof Radiatio nd to the op d componen tund level slfrom the to pwill be pro cg building dhe demolitio shipped to t hcontainers a nill be trans fve, Utah.
foot elevati remain and main con dms and equi pthe Turbin ethrough nu mfeet tall.
oom, locke ramination fam, and spac eant equipm euilding utili zmponents.
es and wast eaged and st othe Turbin ee performed open-air d emeet the op ed of as radi ontified with id will be us r depth, the nbe loaded a nrgySolutions in accordan cn Protection en-air dem ots, interior s tab. The g ep down and cessed to mdemolition t on of the str uhe licensed rnd trucked t oferred to a rIf possible,on (i.e., co nbe subjecte ddenser, ele cpment. A 3 e Building.
merous hatc hr room faci lfacilities, he ae for other ent spaces.
zing cutting Band sawse will be si zored in the we Building u nof all rem aemolition c ren-air demo oactive wast ein the first c oed to remo vn a wire sa wnd transpor t facility in Cce with app rpersonnel.
olition limit structural su reneral demofrom west t omeet disposa o minimize ucture is ex pradioactive wo a rail tran srail car and some mat ncrete d to a ctrical 0-ton The hes in lities, ating, plant The tools s and zed to waste ntil it aining riteria lition e. As ouple ve the w will ted to Clive, roved s, the rfaces lition o east l site dust. pected waste s-load d then erials La CrossLicense TRevisionincludingaccordanof Matercan be rerecycle othe preseof a 193-When thexcavatobuilding removal,Some exdischargebelow gr3.3.3.The WTBand equiplevel solbasementbottom wThe gradsteel spe nthe shielpiping, cfacility, cconditionThe basegained b drums.
exchangeThe Gas 14 feet hthe WTBelevationcomponecubic feeuntil suc hsome assThe LowIt was usse Boiling WTermination n 0 g structural cnce with N Urials and Eq ecycled or r eor disposal aence of any r-6 Micro R i nhe Turbine Br with app rslab and f oundergrounxamples of e line. The rade (636 fo oWaste TrB is locate dpment for dlid radioact it floor is at which exten dde floor of t hnt resin rec elded cubicl econtainers, aconsisting o fning units.
ement of th ey removal oThe other aer, the WTB Storage Ta nigh walls a nB. The vau ln 617 feet.
ents for dry iet tanks are lh time that tsociated pipi nw Specific A csed to store Water Reacto rPlan concrete wi lUREG-1575, uipment Maeleased for dat a non-rad iresidual radi onstrument o rBuilding ha sropriate too loundation to nd utilities wundergrou nslab and f oot elevation) reatment B ud to the nort hdecontamina tive waste. elevation 6 3d to a depth ohe WTB coneiving tank ae were two and pumps.
f a steam cl ee WTB consof floor shi earea, to whi csump and pnk Vault (G Snd 2 feet thi clt is 3 feet bThe Gas Ding, filterin glocated in t hhey were b ang. The re mctivity (LS Aprocessed, r ll be radiolo gSupplemen tanual (MARdisposal at a ioactive dis poactive con tr similar.
s been demls (pneuma t meet disp owill also be rnd utilities oundation
- w. uilding, Gasheast of the tion and the The WTB 30 feet and hof 626 feet.
ntains a shi eand resin reback-washa b The main eaning boot hsists of two eld plugs, wch access is pump, and a dSTV) is a 2 9ck floors, w abelow grad eDecay Syst eg, recombin ihe GSTV. T hatch release dmainder of t hA) Storage B upackaged a n3-12 gically surv et 1, Multi-AgRSAME) (4)
.non-radiol oposal site w itamination b molished, th etic hammer, osal site req uremoved, su rmight be galls will be s Storage TaReactor Bu icollection, is 34 feet bhas a 3 foot elded comp aceiving and ble radioac tfloor of th h, a deconta mshielded c uwas used for gained by dditional wa s9 foot by 31 falls, and cei le with a su mem routed ming, monito rhe tanks ha dd via the sta che Gas Deca yuilding is lo nd sealed l oeyed and re lgency Radi
- a. Materials ogical landfi ill be subje cy undergoi ne foundatio n loading b uquirements.
rveyed, pac kgas, water, removed t oank Vault ailding. The processing, by 42 feet adeep sump wartment wh itransfer eq utive liquid we WTB als omination si nubicles. On ethe storage a stairway, ste storage sfoot underg rling located mp that ext emain cond ering and ho d the capabi lck. The tan ky system ha scated south wow level dr yleased for u nation Surve yreleased fo rll. All bulk cted to a fin ang an aggreg n slab will bucket, etc.) During sla bkaged and p rmiscellan eo a minimu mand LSA St oe building c ostorage, an dand 20 feet with 8 inch ich houses auipment. L owaste filter so housed a nk, and heati e cubicle, t oof high ac tcontains th space. round concr ebelow grou nends to a d eenser gases oldup for de lity to store ks remain in s been remo west of the Ty active wa snrestricted uy and Asses sr unrestrictematerial se nal assessme nate survey bbe exposed.will remov b and foun droperly dis peous piping
,m depth of 3orage Buildontained fac id disposal otall. The Wthick walls aa 320 ft3 staiocated outs is and dewa tdecontami nng/ventilati oo which acc etivity solid we dewaterin ete structur end just outs iepth of 22 f ethrough v acay. Two radioactive place alon gved. Turbine Bui lste material suse in sment d use nt for nt for by use An e the dation posed. , and 3 feet ding ilities f low WTB and a inless ide of tering nation on/air ess is waste g ion e with ide of eet or arious 1,600 gases g with lding. s, and La CrossLicense TRevisionsealed loBuilding Commodutilizing Band sawbe cleanebe sized waste loasite facil iAfter comopen air demolitioIf unacc scabblingthe contacontaminradioacti vWhen allabove grthe concrGSTV lowith Chawill be ufrom the will be sappropriacontainerClive, Ut3.3.4.The LACplant. Tcooling wdiesel-dr circulati nIn additi ofacility, aRadiologinterior athat the sse Boiling WTermination n 0 ow level act iis 27 feet b ydity remov acutting too lws and reci ped and a fix ato meet pac kading area i nity. mmodity re mdemolition con criteria weptable co ng method or amination i snated areas.
ve waste di sl structural rade portion srete floor s located belo wapter 5. Co nutilized duri ndemolition shipped to t hate containe rr will be tra ntah. LACBWRCBWR CribThe structur ewater to va riven high png water pu mon to the G-3and conseq ugical survey sand exterior structure ca nWater Reacto rPlan ivity compo ny 80 feet an dl has begu nls and mec hprocating sa wative will b ekaging and wn the Turbi nmoval is co mcriteria per Rwill be remo vntamination air hammer is detected a All radio asposal facili tsurfaces ha vs of each b ulab will be rw 636 foot encrete will b eng building of each of he licensed rs and truc knsferred to aR Crib Houb House is l oe served as rious LACBpressure ser vmps. The L A3 Crib Hous uently, will rs, either FS Sstructural s un be release dr nents. No l id 15 feet tal ln and will hanical mea nws will be t he applied pr iwaste dispo sne Building umplete, the Reference 3 ved, segreg ais identifie ding method wat a deeper active wast ety. ve been dec uilding will bremoved.
Televation wi e processed tdemolition the structur eradioactive ked to a rail a rail car anduse ocated on t hthe intake BWR plant vice water pACBWR Crie, the LAC Bremain inta cS or MARSAurface and s yd for unrestri c3-13 iquid waste sl. continue i nns to disma nhe primary mior to dism asal criteria.
Wuntil it is pr ointerior co
- n. Structural ated, packag d within th ewill be use ddepth, the ne will be l oontaminate dbe demolis hThe remaini nll remain a nto meet dis pto minimiz ee will be tr ewaste disp otrans-load fd then shipp ehe bank of tfor the Cir csystems.
Tpumps, low ib House is 3BWR Crib Hct and undis tAME free r eystems of t hcted use.
s were store n the WTB,ntle radioac tmethods use dantlement.
SWaste will boperly ship pncrete surfa cmaterial th aged and disp oe first cou pd to remove tn a wire s aoaded and td to the ope hed. The e nng structur and be subje cposal site re qe dust. All eated as lo wosal facility
.facility in Wed to the En ethe Mississi culating W aThe LACBWpressure s e35 feet by 4 5House also c uturbed by t helease surv ehe LACBWRd in this bu i, GSTV antive piping
- d. The inte rSystem piec ebe packaged ped and disp oces will be rat does not mosed of as r ple of inch ethe contami naw will be transported n-air demol ntire LSA b ual concrete fcted to a F Rquirements. constructio nw-level radi
- o. Waste w iWinona, MN ergySolutionippi River t oater System, WR Crib Hoervice wate r5 feet and 1 5urrently ser vhe decommi eys will be pR Crib Hou silding. The d LSA Buiand compo nriors of tank ses and wast eand stored iosed of at a nremediated tmeet the op eadioactive wes of concr enated materiused to re mto an acce plition criteri auilding, incl ufor the WT BRS in accor dMisting me tn debris res uoactive wast eill be loade dwhere the wns disposal so the west o which pro vouse contai nr pumps an 5 feet tall.
ves the activ essioning pr operformed ose to demon LSA ilding nents. s will e will in the n off-to the en-air waste. ete, a al. If move ptable a, the uding B and dance thods ulting e and d into waste site in of the vided ns the d the e G-3 ocess. on the strate La CrossLicense TRevision3.3.5.The MaiwindowsThe 1B Dcontains The buildshaped hThese twincludingthese str uradioacti vto a rail tcar and tmaterialsunrestric trecycled
or dispospresence
a 193-6 M3.3.6.The LACan outsid15 inchescluster o fsides on tThe VenOnce ch demolitiofixative wDemolitisystem wremoved of the vexcavatothe inter ithe concrmethods and barr resulting
and will
appropriase Boiling WTermination n 0 Maintenaintenance E as constructe dDiesel Gene rthe Electric ding is con saving large swo structur eg the concr euctures will ve waste di strans-load f athen shippe ds, includin gted use in a cor released sal at a no nof any resi dMicro R ins tVentilati oCBWR Ventde diameter s at the bot tf 78 piles.
Tthe southea sntilation St aaracterizati oon criteria pwill be appli ion will be will be em pusing mec hventilation srs will saw ior of stack.
rete debris.
will be util iicade the f afrom the d ebe shipped tate containe rWater Reacto rPlan ance Eat S hat Shack is d over a con crator Buildi nal Equipme nstructed of cst dimensio nes will be rete foundati obe treated a ssposal facili tacility in Wi nd to the En g structural ccordance wfor disposal n-radioactiv edual radioac ttrument or s ion Stack tilation Stacof 7 feet at tom to 6 in cThe foundati st and south wack will be on is compl per Referen ced to the id eperformed fployed to p rhanical han dstack will band break t h An openin gThe concre tized during all zones in emolition o fto the licens rs and truc kr hack and 1 Ba 20 feet bcrete slab.
ng is attache dnt Room, D iconcrete blo s of 31 feet bradiological lon slabs.
Cs low-level rty. Waste w inona, MN wergySolutionconcrete wwith MARSAat a non-ra de disposal s tive contam iimilar. k is a 350 fethe top and ches at the t oon mat is 4 0west corners radiologica lete, interio rce 3 and de mentified surf afrom the to provide acce sd tools dow nbe removedhe concrete g at the bott ote foundatio nall demolit ithe vicinit yf these stru ced radioacti vked to a rail 3-14 B Diesel Ge ny 40 feet a nd to the sou tiesel Gener ack and stee lby 38 feet a nly characte rConstruction radioactive will be loade dwhere the w ans disposal will be rad AME. Mate diological l aite will be ination by u nfeet high, ta p25 feet at t hop. The 4 f0 foot squar
- e. lly characte rr concrete s umolished. Iaces to miti gp down. I tss to the e xn to the low ed with exc ainto manag eom of the st an mat will beon to mini my of the ve nctures will bve waste di strans-load fnerator Bui lnd 15 feet t theast corne rator Room, al beams an dnd 13 feet t arized and t hdebris resu lwaste and wd into appro paste contain esite in Cli vdiologically rials releas eandfill. All bsubjected t oundergoing apered, reinf ohe base. T hfeet thick f oe concrete b arized and t hurfaces wil lIf remediati ogate any loo st is anticipa txterior of t her 40 foot e lavators and eable sectio nack will be me taken dow nmize dust.
Pntilation st abe treated a ssposal facili tfacility in Wlding all steel-si dr of the Tur band an emp td braces. T hall. hen complelting from twill be shipp epriate conta ier will be tr ave, Utah.
Isurveyed aed for unres tbulk materi ao a final a san aggregate orced concr ehe wall thic koundation m ase formed when complel be remed ion is not p rse contamin aated that a t rhe stack.
Tlevation. T hpneumatic ns and drop made to all on to 3 feet bProject pers oack. All co s low-level rty. Waste wWinona, MN ded building bine Buildin gty Battery Rhe building tely demol ithe demoliti oed to the lic einers and tr uansferred to If possible, and release dtricted use c aal sent for r essessment f osurvey by uete structur ekness varies at rests on awithout tria netely demol iiated to op eracticable, t hation. raveling sc aThe stack w ihe bottom 4 0breakers.
the section sow the remo vbelow grade.
onal will m onstruction dradioactive wwill be loade dwhere the wwith g and Room. is L-ished, on of ensed ucked a rail some d for an be ecycle or the use of e with from a pile ngular ished. en air hen a affold ill be 0 feet The s into val of Wet onitor debris waste d into waste La CrossLicense TRevisioncontainerClive, Ut3.3.7.ApproximLACBWroads insremoval will be p r3.4.RThe decoSolutionsprogramsSolutionssufficien taccordanStandardReasonabcontrols
radioacti vwritten pThe currEffluent
Manual the varioare routithe publialso impowaste maand outaproceduD-Plan/PenvironmNo alteRadDeca poContinueMonitoriand 10 Cse Boiling WTermination n 0 r will be tra ntah. Legacy Wmately 75 c uWR Site Enc lside the L Sof part of arocessed as Radiologicalommissioni ns Radiation s are and ws Radiation t informati once with 1 0ds For Prot ebly Achiev athe gener ave waste in plant proced urent Radiat iMonitorin g(ODCM) (5ous deconta minely inspe cic, and the eortant to no tanagement cages, and d eures for w hPSDAR, themental impa csite-specif ier the concl udiation dose commission ositive envi red applicati ong Progra mCFR 50, Ap pWater Reacto rPlan nsferred to aWaste ubic yards losure (LS ESE, the und ea wall in th elow-level r al Impacts o fng activities Protection Pwill continue Protection on to demo n0 CFR 19, Nection Agai nable (ALARation, charaaccordance ures. ion Protecti g and Radi5) will be usmination an dcted by the environmentte that deco mconsiderati oecommissio nhich approe decommicts in that:
ic factors p eusions preseto the pu bliing is not aronmental i mon of the cu rms at LACBpendix I. R ar a rail car andof stockpil eE) fence lin eerlayment s e Turbine B uadioactive w af Decommis sdescribed a rProgram an dto be impl eProgram a nnstrate that Notices, Insnst RadiatioRA) The Scterization, with the ap pon Programiological Effsed to prote d decommis sNuclear Re gt are protec tmmissionin gons as those ning activit ioval is bei nssioning w iertaining to nted in NU Rc will be mi nan imminen tmpact. rrent and f uBWR ensure adiological E3-15 d then shipp eed deconstr ue. The deband from t huilding. Al laste during dsioning Act re and will bd Radioacti vemented as nd written sdecommissstructions Aon and to molutions Raprocessing,proved Sol um, Waste Mffluent Mon ct the work esioning acti vgulatory Co mted during f ag activities i nencountere es conduct eng sought ill be acc othe decom mREG-0586 (
snimal. t health or suture Radiat is public pr oEnvironmen ted to the En euction debri bris consisti nhe roads a nl of the sto cdecommissi oivities be conducte dve Waste Mdescribed i site proced usioning acti vAnd Report smaintain radi adioactive W, handling, utions RadiatManagementitoring anders and the vities. Thes mmission (
Nacility deco mnvolve the s ed during pl ed to date.
in this L omplished wmissioning see LTP Ch asafety conc eion Protecti ootection in tal Monitor iergySolutionis is stored ng of asph and concrete ckpiled dec ooning. d under the Management n the D-Pl aures are int evities will bs To Workation expos uWaste Manashipping, tion Protect
- iProgram, ad Offsite Dpublic, as ae well-esta bNRC) to en smmissionin game radiati oant operati oThere areTP. As dwith no si gof the LA Capter 8). ern and wil on and Rad iaccordance ing Progra mns disposal sinside the alt removed debris fro monstruction dprovisions oProgram.
Tan/PSDAR.
ended to pr obe perform ekers, 10 CFRures As Lo wagement Pr oand dispos aion Progra mand Radiol oDose Calcu lapplicable, dblished pro gsure that wo rg activities.
on protectio nons, mainte ne no addit idescribed i ngnificant a dCBWR woulll generally iological Ef fwith 10 C Fm (REMP) resite in south from m the debris of the These The ovide ed in R 20, w As ogram al of m, and ogical lation during grams rkers, It is n and nance ional n the dverse ld have fluent FR 20 eports La CrossLicense TRevisionfor LACactivitie s3.4.1.Due to tdismantleConsequremediatradiologispecifieddescribed3.4.2.Table 3-2This dosExposureinformatifor remaiDecommAsbReaWaTurRemWaTot3.4.3.ContinueEffluent
public pr se Boiling WTermination n 0 CBWR to ds is bounded Control Mthe large sc oed, FRS ofently, a sy sed prior to pical conditi od in 10 CF Rd in LTP Ch Occupati2 provides tse estimate e Projectio nion gathere dining deco mTable 3-missioning Abestos and o tactor Buildi naste Treatme nrbine Buildi nmaining Str uaste Processi ntal for Dec oExposureed applicati oTechnical Srotection in aWater Reacto rPlan date conclu dby the eval uMechanismsope of rem af areas ma ystematic ap pperforming Fon of area sR 20.1402 h aapter 5.
ional Expos the cumulat iis docume nns for LACBd for report immissioning a-2 RadiActActivity ther Hazard ong nt Building ng uctures ng (include sommissioni ne to the Pu bon of Solu tSpecificatio naccordance w r de that the uation in N Us to Mitigataining struc ty be perfo rproach will FRS and ons where co as been demure ive site dos ented in En eBWR Decoming of year lactivities is eiation Expo stivity ous Materia ls shipping a nng Activitie sblic tions' Radian and Radiowith 10 CF R3-16 public ex pUREG-0586, te the Reco ntures and s yrmed in pa rbe employngoing deco mmpliance wmonstrated.
e estimates ergySolutionmmissionin gly site dose estimated to sure Projecl Abatement nd prep) s ation Prote cological Env R 20 and 10 Cposure as a
, which con cntaminatio nystems that rallel with yed to ensummissionin gwith the un r These mefor the dec ons TSD RS(6). This ie. The tota lo be approxi mctions for D e t ction, Radi ovironmental CFR 50, Ap presult of dcludes the i mn of Remed iwill be de cdecommiss iure that are ag activities drestricted r eeasures an d ommissioninS-TD-31319 6information l radiation emately 130.
3ecommissio Expo(person188191018130oactive Wa sMonitoring pendix I.
decommissi ompact is min iiated Areas contaminate dioning acti vas are adeq udo not impa celease critermechanismng of LACB6-007, Radiis in additi exposure est i3 person-re mning osure n-rem) 8.6 1.4 .6 .6 .8 8.2 0.3 ste, RadioloProgram a soning imal. d and vities.
uately ct the ria as ms are BWR. iation on to imate m. ogical ssures La CrossLicense TRevision3.4.4.The RadiprocessinActivatedlow leveof waste ConUseExpExpConConTable 3-3the decoreferred ttotal vol ufeet. Acbe shippeWADebriDebDebAADry A(Mix se Boiling WTermination n 0 Radioactioactive Wa ng, handlin gd and conta mel radioactiv generated d untaminated wed disposab lpended abrapended resinntamination ntaminated e3 provides pmmissionin gto as "rip
&ume of lowctual waste ved to the lic eSTE TYPEis: Concrete bris: Reba r bris: Metal Asphalt Soils Asbestos Active Wast e(DAW) xed Waste Water Reacto rPlan tive Waste Pste Manage mg, shipping, minated sys te waste ex puring deco mwater; le protective sive and ab sns and filter scontrol matequipment uprojections og of LACB& ship" vers ew-level radi ovolumes an densed Energ yTableWASTECLASSA A A A A A e A A r Projections ment Prograand dispo stems, struct upected to bemmissioning clothing; sorbent mate s; erials (e.g.,
sused in the d eof waste claWR. As Ses performi noactive wast ed classificat iySolutions ra 3-3 ProE SWAWE(l20,0881,82542,873030563-17 m is used t osal of radi oures, and co me generatedinclude: rials; strippable c oecommissio nssifications Solutions hasng significa ne for dispo sions may v aadioactive wojected WasASTE EIGHT lbs.)026,177 89,249 27,476 41,575 777,268 00,776 0,880 6,222 Totalo control the oactive was tmponents re pduring dec ooatings, plas tning proces sand quantit is elected to nt on-site d esal has beenary. The va swaste dispos aste Quantit iPACKDENS(lb./f85853050741712110l Estimated V characteriz ate during dpresent the lommissioni ntic enclosur es. ies that willuse an ap pecontaminat in estimated st majority oal facility in ies KING SITY ft3) 5 5 0 0 4 7 2 0 Volume ation, gener adecommissi olargest volu mng. Other fes); and be generat eproach com mion activitie sat 393,696 of this wast eClive, Uta hWASTE VOLUME(ft3)235,60310,463 60,916 10,832 38,882 17,693 2,574 16,733 393,696ation, oning. me of forms ed by monly s, the cubic e will h. E La CrossLicense TRevisionWAClean(DebriCleaDRecyRecy3.4.5.Table 3-4 Date Q2/201Q2/201Q2/201Q3/201Q3/201Q3/201Q4/201Q4/201Q4/201Q4/201se Boiling WTermination n 0 STE TYPEn Backfill -
is to Landfil lan Asphalt Disposalcle - Metalsycle - RebarProject M4 lists the c u16 16 16 16 17 17 17 18 18 18 Water Reacto rPlan WASTECLASSl)Clean DebrisClean DebrisScrap MetalScrap MetalMilestones urrent sched uTable MilestoneSubmit LTLicense TMobilizat iStack DemLTP ApprComponenBuilding DTransport aSite RemeFRS Comr Table 3E SWAWE(l19,74,81,895ule for the r ee 3-4 Gee TP to NRCransfer Co mion Comple tmolition Co mroval by NR nt Removal Demolition Cation and D iediation Co mmplete 3-18 3-3 Contin uASTE EIGHT lbs.)747,21174,17503,06454,659Totalemaining de ceneral Pro jemplete te mplete C Complete Complete isposal Co mmplete ued PACKDENS(lb./f75502030l Estimated Vcommission iect Milesto nmplete KING SITY ft3) 5000Volume ing activitie snes WASTE VOLUME(ft3)263,29797,48490,15431,822482,757s. E La CrossLicense TRevision Date Q1/201Q1/201Q1/201Q1/202Q1/202Note: 3.5.R1. DD2. USN3. ED4. URD5. R6. EP se Boiling WTermination n 0 19 19 19 20 20 Circumstanc ecannot be co mReferences Dairyland Po Decommissi oU.S. Nuclear tatement on November 2 0EnergySoluti Demolition LU.S. Nuclear Radiation Su rDecember 2 0Radiological EnergySolutirojections f oWater Reacto rPlan MilestoneSite Rest oSubmit ReSubmit LiLicense TLACBWRs can change dmpleted as outl iwer Cooper aoning Activi tRegulatory Decommiss002. ons Techni cLimits. Regulatory rvey and As 006. Effluent M oons Techni cor LACBWRr Table 3e oration Com pemaining F Ricense Tran sransfer to D R License T eduring decom mined in this sc hative, LAC Bties Report (Commissio nsioning of N ucal Support DCommissio nsessment of onitoring an dcal Support DR Decommis3-19 3-4 Contin uplete RS Reports sfer to Dairy lairyland Apermination Amissioning. I fhedule, Soluti oBWR Decom(D-Plan/PS Dn NUREG-0uclear Facil iDocument Rn NUREG-1Materials a nd Offsite Do
- Document, Rssioning.
ued land Amen dpproved by NApproval by f Solutions deteons will provid emmissioning DAR), Revi s0586, Gener iities, Suppl eRS-TD-3131 91575, Suppl end Equipme nose Calculati RS-TD-3131 dment Requ eNRC NRC ermines that t he an updated s cPlan and P osion - Marc hic Environ mement 1, Vo l96-005, La Cement 1, M unt Manual (
Mon Manual (96-007, Ra dest to NRC he decommissi ochedule to the ost Shutdow nh 2014. mental Impac tlume 1 - Crosse Ope nulti-Agency MARSAME(ODCM). diation Exp ooning NRC. n t n Air E) - osure