{{#Wiki_filter:STPEGS UFSAR     TC 6-1 Revision 18     TABLE OF CONTENTS CHAPTER 6 ENGINEERED SAFETY FEATURES
{{#Wiki_filter:STPEGS UFSAR TC 6-1 Revision 1 8     TABLE OF CONTENTS CHAPTER 6 ENGINEERED SAFETY FEATURES


Section Title Page  6.1 ENGINEERED SAFETY FEATURES MATERIALS 6.1-1 6.1.1 Metallic Materials 6.1-1 6.1.2 Organic Materials 6.1-3 6.1.3 Post Accident Chemistry 6.1-5 6.1.4 Post Accident Sump Solution Chemistry Adjustment 6.1-5    6.2 CONTAINMENT SYSTEMS 6.2-1 6.2.1 Containment Functional Design 6.2-1 6.2.2 Containment Heat Removal Systems 6.2-29 6.2.3 Secondary Containment Functional Design   (Does not apply to STPEGS) 6.2-40 6.2.4 Containment Isolation System 6.2-40 6.2.5 Combustible Gas Control in Containment 6.2-47 6.2.6 Containment Leakage Testing 6.2-49    6.3 EMERGENCY CORE COOLING SYSTEM 6.3-l 6.3.l Design Bases 6.3-l 6.3.2 System Design 6.3-2 6.3.3 Performance Evaluation 6.3-17 6.3.4 Tests and Inspections 6.3-25 6.3.5 Instrumentation Requirements 6.3-27    6.4 HABITABILITY SYSTEMS 6.4-l 6.4.l Design Bases 6.4-l 6.4.2 System Design 6.4-2 6.4.3 System Operational Procedures 6.4-5 6.4.4 Design Evaluation 6.4-5 6.4.5 Testing and Inspection 6.4-7 6.4.6 Instrumentation Requirement 6.4-9    6.5 FISSION PRODUCT REMOVAL AND CONTROL SYSTEMS 6.5-l 6.5.l Engineered Safety Feature Filter Systems 6.5-l 6.5.2 Containment Spray System - Iodine Removal 6.5-4 6.5.3 Fission Product Control Systems 6.5-8 STPEGS UFSAR   TABLE OF CONTENTS (Continued)
Section Title Page  6.1 ENGINEERED SAFETY FEATURES MATERIALS 6.1-1 6.1.1 Metallic Materials 6.1-1 6.1.2 Organic Materials 6.1-3 6.1.3 Post Accident Chemistry 6.1-5 6.1.4 Post Accident Sump Solution Chemistry Adjustment 6.1-5    6.2 CONTAINMENT SYSTEMS 6.2-1 6.2.1 Containment Functional Design 6.2-1 6.2.2 Containment Heat Removal Systems 6.2-29 6.2.3 Secondary Containment Functional Design (Does not apply to STPEGS) 6.2-40 6.2.4 Containment Isolation System 6.2-40 6.2.5 Combustible Gas Control in Containment 6.2-47 6.2.6 Containment Leakage Testing 6.2-49    6.3 EMERGENCY CORE COOLING SYSTEM 6.3-l 6.3.l Design Bases 6.3-l 6.3.2 System Design 6.3-2 6.3.3 Performance Evaluation 6.3-17 6.3.4 Tests and Inspections 6.3-25 6.3.5 Instrumentation Requirements 6.3-27    6.4 HABITABILITY SYSTEMS 6.4-l 6.4.l Design Bases 6.4-l 6.4.2 System Design 6.4-2 6.4.3 System Operational Procedures 6.4-5 6.4.4 Design Evaluation 6.4-5 6.4.5 Testing and Inspection 6.4-7 6.4.6 Instrumentation Requirement 6.4-9    6.5 FISSION PRODUCT REMOVAL AND CONTROL SYSTEMS 6.5-l 6.5.l Engineered Safety Feature Filter Systems 6.5-l 6.5.2 Containment Spray System  
CHAPTER 6 Section Title Page  TC 6-2 Revision 18     6.6 INSERVICE INSPECTION OF ASME CODE CLASS 2 AND   CLASS 3 COMPONENTS 6.6-l 6.6.l Components Subject to Inspection 6.6-l 6.6.2 Accessibility 6.6-l 6.6.3 Examination Techniques and Procedures 6.6-2 6.6.4 Inspection Intervals 6.6-2 6.6.5 Examination Categories and Requirements 6.6-2 6.6.6 Evaluation of Examination Results 6.6-2 6.6.7 System Pressure Tests 6.6-3 6.6.8 Augmented Inservice Inspection 6.6-3    6.7 MAIN STEAM ISOLATION VALVE LEAKAGE CONTROL 6.7-1  SYSTEM TC 6-3 Revision 18   LIST OF TABLES CHAPTER 6   Table Title Page 6.1-1 Engineered Safety Features Materials 6.1-7 6.1-3 Protective Coatings on Westinghouse-Supplied  Equipment Inside Containment 6.1-11 6.1-4 Coating Schedule for Surfaces Inside   Containment (Excluding NSSS Scope of Supply) 6.1-12    6.2.1.1-1 Containment Design Accidents 6.2-56 6.2.1.1-2 DBA Calculated Pressures in Containment 6.2-58 6.2.1.1-3 Containment Data Used in P/T Analysis 6.2-59 6.2.1.1-4 Not Used    6.2.1.1-5 Engineered Safety Features System Information 6.2-61 6.2.1.1-7 Modeling of Structural Heat Sinks for Containment Analyses  6.2-62 6.2.1.1-8 Thermophysical Properties of Structural Heat Sink Materials for Containment Analysis 6.2-65 6.2.1.1-9 Containment Heat Sink Surface Heat Transfer Model 6.2-66 6.2.1.1-10 Accident Chronology for DBA LOCA 6.2-67 6.2.1.1-14 Summary of Containment MSLB P/T Analysis Results 6.2-68 6.2.1.1-15 Accident Chronology for DBA MSLB (Peak Temperature Case) 6.2-70 6.2.1.2-1 (Item G) Short-Term Mass and Energy Release Rates for Subcompartment Analyses for Pressurizer Spray Line DEG Break 6.2-72 6.2.1.2-1 (Item J) Short-Term Mass and Energy Release Rates for Subcompartment Analyses for MSLB 6.2-82 6.2.1.2-1 (Item K) Short-Term Mass and Energy Release Rates for Subcompartment Analyses for Main Feedwater Line Break   6.2-83 6.2.1.2-1 (Item L) Short-Term Mass and Energy Release Rates for Subcompartment Analyses for CVCS Letdown Line Break - Radioactive Pipe 6.2-85  Chase Subcompartment Blowdown 6.2.1.2-1 (Item M) Short-Term Mass and Energy Release Rates for Subcompartment Analyses for CVCS Letdown Line Break - RHR 1A Valve Room Subcompartment Analyses 6.2-86 6.2.1.2-1 (Item N) Short-Term Mass and Energy Release Rates for Subcompartment Analyses for CVCS Letdown Line Break - Regenerative Heat Exchanger Subcompartment Blowdown 6.2-88 6.2.1.2-1 (Item P) Short-Term Mass and Energy Release Rates for Subcompartment Analysis for RHR 12" Line DEG 6.2-89 6.2.1.2-1 (Item Q) Short-Term Mass and Energy Release Rates for Subcompartment Analysis for FW 16" DEG Break at SG Nozzle Connection, HFP, FW @ 460 F  6.2-97 LIST OF TABLES (Continued)   CHAPTER 6 Table Title Page    TC 6-4 Revision 18   6.2.1.2-5A Steam Generator Loop Compartment Peak Pressure Summary for RHR Line Break Analysis 6.2-94 6.2.1.2-5B Steam Generator Loop Compartment Peak Pressure Summary for FWLB Analysis 6.2-96 6.2.1.2-6 Steam Generator Loop Compartment Pressure - Junction Properties for RHR/SI Analysis (42-Node Model) 6.2-98 6.2.1.2-6A Steam Generator Loop Compartment Pressure Analysis - Junction Properties for FWLB Analysis 6.2-102    6.2.1.2-7A Steam Generator Loop Compartment Analysis - Force Coefficient (Area Projections) for Steam Generator Subjected to RHR Line Break   6.2-104 6.2.1.2-7B Steam Generator Loop Compartment Analysis - Moment Coefficient (Area Projections) for Steam Generator Subjected to RHR Line Break   6.2-105 6.2.1.2-7C Steam Generator Loop Compartment Analysis - Force Coefficient (Area Projections) for Steam Generator Subjected to FWLB  6.2-106 6.2.1.2-7D Steam Generator Loop Compartment Analysis - Moment Coefficient (Area Projections) for Steam Generator Subjected to FWLB  6.2-107 6.2.1.2-8A Steam Generator Loop Compartment Analysis - Force Coefficient (Area Projections) for Reactor Coolant Pump Subjected to RHR Line Break   6.2-108 6.2.1.2-8B Steam Generator Loop Compartment Analysis - Moment Coefficient (Area Projections) for Reactor Coolant Pump Subjected to RHR Line Break   6.2-109 6.2.1.2-9 Pressurizer Subcompartment Analysis Spray Line Break 6.2-110 6.2.1.2-13 Main Steam Line and Feedwater Line Subcompartment Analysis 6.2-111 6.2.1.2-14 Main Steam Line and Feedwater Subcompartment   Analysis Junction Description - Steam Line Break Analysis 6.2-112 6.2.1.2-15 Regenerative Heat Exchanger Subcompartment Nodal   Description 6.2-113 STPEGS UFSAR   LIST OF TABLES (Continued)   CHAPTER 6 Table Title Page    TC 6-5 Revision 18   6.2.1.2-16  Regenerative Heat Exchanger Subcompartment Junction Description 6.2-114 6.2.1.2-17  Radioactive Pipe Chase Subcompartment Nodal Description 6.2-115 6.2.1.2-18  Radioactive Pipe Chase Subcompartment Junction Description 6.2-116 6.2.1.2-19  RHR1A Valve Room Subcompartment Nodal Description 6.2-117 6.2.1.2-20  RHR1A Valve Room Subcompartment Junction Description 6.2-118 6.2.1.3-1  System Parameter Initial Conditions 6.2-119 6.2.1.3-2  LOCA - Total Pumped ECCS Flow Rate for Two Trains of SI Operating   6.2-120 6.2.1.3-3  LOCA - Total Pumped ECCS Flow Rate for Three Trains of SI Operating   6.2-121 6.2.1.3-4  Double-Ended Hot Let Break Blowdown Mass and Energy Releases   6.2-122 6.2.1.3-5A Double-Ended Pump Suction Break Mass and Energy Releases (Minimum SI)    6.2-125 6.2.1.3-5B Double-Ended Pump Suction Break Mass and Energy Releases (Maximum SI)    6.2-132 6.2.1.3-6  Decay Heat Data Based on ANS-51.1-1979 Plus 2 Sigma Uncertainty   6.2-141 6.2.1.3-6A  Decay Heat Based on Standard Review Plan ASB 9-2 Correlations   6.2-142 6.2.1.3-7  Not Used  6.2.1.3-8  Not Used  6.2.1.3-9  Double-Ended Pump Suction Break Principal Parameters During Reflood (Minimum SI)  6.2-144 6.2.1.3-10  Double-Ended Pump Suction Break Principal Parameters During Reflood (Maximum SI)  6.2-145 6.2.1.3-11  Not Used  6.2.1.3-12  Not Used  6.2.1.3-13  Double-Ended Pump Suction Break Mass Balance (Minimum SI)  6.2-146 6.2.1.3-14  Double-Ended Pump Suction Break Mass Balance (Maximum SI)  6.2-147 6.2.1.3-15  Double-Ended Hot Let Break Mass Balance 6.2-148 6.2.1.3-16  Double-Ended Pump Suction Break Energy Balance (Minimum SI)  6.2-149 6.2.1.3-17  Double-Ended Pump Suction Break Energy Balance (Maximum SI)  6.2-150 6.2.1.3-18  Double-Ended Hot Leg Break Energy Balance 6.2-151 6.2.1.4-l Mass and Energy Release Rates for Main Steam Line Break - 1.4 ft2 Double-Ended Rupture at 30% Power (MSIV Failure) 6.2-152 STPEGS UFSAR   LIST OF TABLES (Continued)   CHAPTER 6 Table Title Page    TC 6-6 Revision 18   6.2.1.4-2 Mass and Energy Release Rates for Main Steam Line   Break - 1.4 ft2 Double-Ended Rupture at 0% Power (MSIV Failure)  6.2-156    6.2.1.5-1 Blowdown Mass and Energy Releases 6.2-160 6.2.1.5-1a Broken Loop Injection Spill During Blowdown 6.2-161 6.2.1.5-2 Reflood Mass and Energy Releases 6.2-162 6.2.1.5-3 Active Heat Sink Data for Minimum Post LOCA Containment Pressure  6.2-163 6.2.1.5-4 Passive Heat Sink Data for Minimum Post LOCA Containment Pressure  6.2-164    6.2.2-1 Containment Spray System - Design Parameters 6.2-166 6.2.2-2 Design Data for the Reactor Containment Fan Cooler (RCFC) System  6.2-167 6.2.2-3 Failure Modes and Effect Analysis - Containment   Heat Removal Active Failure 6.2-170 6.2.2-4 CSS Pump NPSH Parameters 6.2-174 6.2.2-5 Estimate of CSS Spray Mass Flow Rates for   Various Regions 6.2-175 6.2.4-1 Containment Isolation System Failure   Modes and Effect Analysis 6.2-176    6.2.6-1 Systems Which Need not be Vented During Type A Testing 6.2-184 6.2.6-3 Containment Isolation Valves to be Leak Tested in Opposite Direction 6.2-186    6.3-1 Emergency Core Cooling System Component Parameters 6.3-32 6.3-2 ECCS Relief Valve Data 6.3-34 6.3-3 Motor-Operated Valves in ECCS 6.3-35 6.3-4 Materials Employed for Emergency Core Cooling System Components 6.3-37 6.3-5 Single Active Failure Analysis for Emergency  Core Cooling System Components Short Term Phase 6.3-39 6.3-6 Emergency Core Cooling System Recirculation   Piping - Passive Failure Analysis, Long-Term Phase 6.3-40 6.3-7 Manual Actions Required for Safety Injection Modes of Operation 6.3-41 6.3-8 Emergency Core Cooling System Shared Functions   Evaluation 6.3-42 6.3-10 Emergency Core Cooling System - Safeguards   Operations Failure Modes and Effects Analysis 6.3-43 STPEGS UFSAR   LIST OF TABLES (Continued)   CHAPTER 6 Table Title Page    TC 6-7 Revision 18   6.3-11 ECCS Check Valves to be Leak Tested 6.3-48 6.3-12 ECCS Active Powered Components 6.3-49 6.3-13 Air-Operated Valves in the ECCS 6.3-51 6.3-14 Solenoid-Operated Valves in the ECCS 6.3-52    6.4-1 Equipment to Which the Control Room Operators Could Require Access During an Emergency 6.4-11    6.4-2 Control Room Dose Analysis 6.4-12    6.5-1 Comparison of Engineered Safety Feature Filter   Systems with Regulatory Guide l.52, Rev. 2, Requirements 6.5-11 6.5-2 Input Parameters for Determining Iodine Removal Coefficients 6.5.14 6.5-3 Input Parameters to Determine Minimum pH for Sump Solution 6.5-15 6.5-4 Input Parameters to Determine Maximum pH for Sump Solution 6.5-16 STPEGS UFSAR   LIST OF FIGURES (Continued)
- Iodine Removal 6.5-4 6.5.3 Fission Product Control Systems 6.5-8 STPEGS UFSAR TABLE OF CONTENTS (Continued)
CHAPTER 6 Figure  Reference Number Title Number    TC 6-8 Revision 18   6.2.1.1-3 Not used  6.2.1.1-25 Containment Pressure - 1.4 ft2 Double-Ended  MSLB  (0% Power, MSIV Failure)   6.2.1.1-26 Not Used  6.2.1.1-27 Containment Temperature - 1.4 ft2 Double-Ended MSLB  (0% Power, MSIV Failure)   6.2.1.1-28 Condensing Heat Transfer Coefficient - 1.4 ft2 Double-Ended MSLB  (0% Power, MSIV Failure)   6.2.1.1-29 Total Vapor Region Energy - 1.4 ft2 Double-Ended  MSLB  (0% Power, MSIV Failure)   6.2.1.1-30 Containment Pressure - LOCA DEHL   6.2.1.1-31 Containment Temperatures - LOCA DEHL   6.2.1.1-32 Heat Transfer Coefficient - LOCA DEHL   6.2.1.1-33 Containment Pressure -LOCA  DEPS (Minimum SI)   6.2.1.1-34 Containment Temperatures - LOCA  DEPS (Minimum SI)   6.2.1.1-35 Heat Transfer Coefficient - LOCA  DEPS (Minimum SI)   6.2.1.1-36 Containment Pressure - LOCA  DEPS (Maximum SI)   6.2.1.1-37 Containment Temperatures - LOCA  DEPS (Maximum SI)   6.2.1.1-38 Heat Transfer Coefficient - LOCA  DEPS (Maximum SI)
 
STPEGS UFSAR   LIST OF FIGURES (Continued)
CHAPTER 6
CHAPTER 6 Figure  Reference Number Title Number    TC 6-9 Revision 18
 
* The drawings below are reference drawings only and are     not to be revised. 6.2.1.2-3 Steam Generator Loop Compartment   Node Arrangement   El. (-)11'33" - (Sheet 1 of 8) 6C18-9-N-05001-2*  El. (-)2'-0" - (Sheet 2 of 8) 6C18-9-N-05002-2*  El. 19'0-" - (Sheet 3 of 8) 6C18-9-N-05003-2*  El. (-)37'3" - (Sheet 4 of 8) 6C18-9-N-05004-2*  El. 52'0" - (Sheet 5 of 8) 6C18-9-N-05005-1*  El. 68'0" - (Sheet 6 of 8) 6C18-9-N-05006-2*  Section AA - (Sheet 7 of 8) 6C18-9-N-05007-3*  Section BB - (Sheet 8 of 8) 6C18-9-N-05008-2*    6.2.1.2-4 Pressurizer Compartment Nodes Between:   El. 69'-9" & 85'-0" - (Sheet 1 of 3) 6C18-9-N-05006-4*  El. 46'-7" & 69'-9" - (Sheet 2 of 3) 6C18-9-N-05005-2*                                  (Sheet 3 of 3) 6C18-9-N-05008-4*    6.2.1.2-5 Surge Line Subcompartment Nodes Between:   El. 46'-4" & 69'-9" - (Sheet 1 of 5) 6C18-9-N-05005-2*  El. 37'-3" & 43'-4" - (Sheet 2 of 5) 6C18-9-N-05004-3*  El. 19'-0" & 37'-3" - (Sheet 3 of 5) 6C18-9-N-05003-3*  El. 5'-9" & 19'-0" -  (Sheet 4 of 5) 6C18-9-N-05002-3*                                  (Sheet 5 of 5) 6C18-9-N-05008-2*    6.2.1.2-6 Main Steamline and Feedwater Line   Subcompartment Nodes Between:   El. 19'-0" & 37'-3" - (Sheet 1 of 3) 6C18-9-N-05003-3*  El. 37'-3" & 52'-0" - (Sheet 2 of 3) 6C18-9-N-05004-3*  El. 52'-0" & 68'-0" - (Sheet 3 of 3) 6C18-9-N-05005-2*    6.2.1.2-7 Regenerative Heat Exchanger   Subcompartment Nodes Between   El. 37'-3" & 52'-0"  6C18-9-N-05004-4*    6.2.1.2-8 Radioactive Pipe Chase Between   Elevations 29' & 37'-3" 5C15-9-P-05029-1*    6.2.1.2-9 RHR 1A and 1B Valve Room Subcompartment STPEGS UFSAR   LIST OF FIGURES (Continued)
Section Title Page  TC 6-2 Revision 1 8     6.6 INSERVICE INSPECTION OF ASME CODE CLASS 2 AND CLASS 3 COMPONENTS 6.6-l 6.6.l Components Subject to Inspection 6.6-l 6.6.2 Accessibility 6.6-l 6.6.3 Examination Techniques and Procedures 6.6-2 6.6.4 Inspection Intervals 6.6-2 6.6.5 Examination Categories and Requirements 6.6-2 6.6.6 Evaluation of Examination Results 6.6-2 6.6.7 System Pressure Tests 6.6-3 6.6.8 Augmented Inservice Inspection 6.6-3    6.7 MAIN STEAM ISOLATION VALVE LEAKAGE CONTROL 6.7-1  SYSTEM TC 6-3 Revision 1 8   LIST OF TABLES CHAPTER 6 Table Title Page 6.1-1 Engineered Safety Features Materials 6.1-7 6.1-3 Protective Coatings on Westinghouse
CHAPTER 6 Figure  Reference Number Title Number    TC 6-10 Revision 18   Nodes Between:   El. 37'3" and 52'0" - (Sheet 1 of 2) 6C18-9-N-05004-4*                                  (Sheet 2 of 2) 6C18-9-N-05003-4*    6.2.1.2-11 Node and Junction Diagram for Steam   Loop Compartment (4 Sheets)   6.2.1.2-11A Nodalization Diagram for Steam Generator Loop Compartment for FWLB Analysis (8 sheets)     6.2.1.2-12 Pressurizer Subcompartment Nodal Model     6.2.1.2-13 Surge Line Subcompartment Nodal Model     6.2.1.2-14 Main Steam and Feedwater Line   Subcompartment Nodal Model     6.2.1.2-15 Regenerative Heat Exchanger Subcompartment   Nodal Model    6.2.1.2-16 Radioactive Pipe Chase Subcompartment   Nodal Model   6.2.1.2-17 RHR Valve Room Subcompartment Nodal   Model  6.2.1.2-20A Steam Generator Loop Compartment Pressurization Analysis, 12" RHR Break in Node 15  (11 sheets)     6.2.1.2-20B Steam Generator Loop Compartment Pressurization Analysis, 12" RHR Break in Node 4  (11 sheets)     6.2.1.2-20C Steam Generator Loop Compartment Pressurization Analysis, 12" RHR Break in Node 12  (11 sheets)     6.2.1.2-20D Steam Generator Loop Compartment STPEGS UFSAR   LIST OF FIGURES (Continued)
-Supplied  Equipment Inside Containment 6.1-11 6.1-4 Coating Schedule for Surfaces Inside Containment (Excluding NSSS Scope of Supply) 6.1-12    6.2.1.1-1 Containment Design Accidents 6.2-56 6.2.1.1-2 DBA Calculated Pressures in Containment 6.2-58 6.2.1.1-3 Containment Data Used in P/T Analysis 6.2-59 6.2.1.1-4 Not Used    6.2.1.1-5 Engineered Safety Features System Information 6.2-61 6.2.1.1-7 Modeling of Structural Heat Sinks for Containment Analyses  6.2-62 6.2.1.1-8 Thermophysical Properties of Structural Heat Sink Materials for Containment Analysis 6.2-65 6.2.1.1-9 Containment Heat Sink Surface Heat Transfer Model 6.2-66 6.2.1.1-10 Accident Chronology for DBA LOCA 6.2-67 6.2.1.1-14 Summary of Containment MSLB P/T Analysis Results 6.2-68 6.2.1.1-15 Accident Chronology for DBA MSLB (Peak Temperature Case) 6.2-70 6.2.1.2-1 (Item G)
CHAPTER 6 Figure  Reference Number Title Number    TC 6-11 Revision 18   Pressurization Analysis, 16" FWLB  (Nodes 1& 17)    6.2.1.2-21A Steam Generator Forces and Moments Analysis - Steam Generator Forces due to RHR Break in Nodes 15 (6 sheets)      6.2.1.2-21B Steam Generator Loop Compartment Forces and Moments on Steam Generator due to FWLB (11 sheets)    6.2.1.2-22A Reactor Coolant Pump Forces and Moments due to RHR Break in Node 15 (6 sheets)    6.2.1.2-23 Pressurizer P-T Analysis (3 Sheets)   6.2.1.2-25 MSLB Subcompartment P-T Analysis (2 Sheets)   6.2.1.2-26 MFWLB Subcompartment Analysis (2 sheets)   6.2.1.2-27 Calculated Pressures Regenerative Heat Exchanger Subcompartment   6.2.1.2-28 Calculated Pressures Radioactive Pipe Chase Subcompartment   6.2.1.2-29 Calculated Pressures RHR 1A & 1B  Valve Room Subcompartment   6.2.1.2-30 Steam Generator Loop Compartment Force and Moment Coordinate System   6.2.1.5-1 STPEGS Large Break LOCA Analysis,   DECLG CD=0.8, SI, High TAVG, Containment Backpressure   6.2.1.5-2 Containment Fan Cooler Performance Curves STPEGS UFSAR   LIST OF FIGURES (Continued)
Short-Term Mass and Energy Release Rates for Subcompartment Analyses for Pressurizer Spray Line DEG Break 6.2-72 6.2.1.2-1 (Item J)
CHAPTER 6 Figure  Reference Number Title Number    TC 6-12 Revision 18   6.2.1.5-3 STPEGS Large Break LOCA Analysis, DECLG CD=0.8, Min SI, High TAVG,  Containment Heat Transfer Coefficient 6.2.2-1 P&ID Containment Spray System 5N10-9-F-05037#1  5N10-9-F-05037#2    6.2.2-3 Composite Piping, Reactor Containment   Building - Plan - El. 83'-0" - Area 12    (Sheet 1 of 4) 5C15-9-P-05025-6  Plan - El. 83'-0" - Area 13    (Sheet 2 of 4) 5C15-9-P-05026-5  Plan - El. 83'-0" - Area 14    (Sheet 3 of 4) 5C15-9-P-05027-5  Plan - El. 83'-0" - Area 15    (Sheet 4 of 4) 5C15-9-P-05028-6    6.2.2-4 P&ID HVAC Reactor Containment 5V14-9-V-00016#1  Building, Fan Coolers Subsystem 5V14-9-V-00016#2    6.2.2-6 Reactor Containment Building CSS   Spray Coverage Plan - El. (-)11'-3" 6C18-9-N-05001-2*    6.2.2-7 Reactor Containment Building CSS   Spray Coverage Plan - El. (-)2'-0" 6C18-9-N-05002-2*    6.2.2-8 Reactor Containment Building CSS   Spray Coverage Plan - El. 19'-0" 6C18-9-N-05003-2*    6.2.2-9 Reactor Containment Building CSS   Spray Coverage Plan - El. 37'-3" 6C18-9-N-05004-2*    6.2.2-10 Reactor Containment Building CSS   Spray Coverage Plan - El. 52'-0" 6C18-9-N-05005-1*
Short-Term Mass and Energy Release Rates for Subcompartment Analyses for MSLB 6.2-82 6.2.1.2-1 (Item K)
STPEGS UFSAR   LIST OF FIGURES (Continued)
Short-Term Mass and Energy Release Rates for Subcompartment Analyses for Main Feedwater Line Break 6.2-83 6.2.1.2-1 (Item L)
CHAPTER 6 Figure  Reference Number Title Number    TC 6-13 Revision 18       6.2.2-11 Reactor Containment Building CSS   Spray Coverage Plan - El. 68'-0" 6C18-9-N-05006-2*    6.2.2-12 Reactor Containment Building CSS   Spray Coverage Section B-B 6C18-9-N-05007-1*  6.2.2-13 HVAC Reactor Containment Building   Plan El. (-)11'-3" Area 13 5V14-9-V-00083    6.2.2-14 HVAC Reactor Containment Building   Enlarged Plant and Section RCFC 5V14-9-V-00090    6.2.4-1 Containment Penetrations (100 Sheets)     6.2.4-2 Arrangement of Sump Piping     6.2.6-1 P&ID Containment Leak Rate Test 5C56-0-F-05058  (CLRT) Pressurization System     6.3-1 P&ID Safety Injection System 5N12-9-F-05013#1  5N12-9-F-05013#2    6.3-2 P&ID Safety Injection System 5N12-9-F-05014#1  5N12-9-F-05014#2    6.3-3 P&ID Safety Injection System 5N12-9-F-05015#1  5N12-9-F-05015#2      6.3-4 P&ID Safety Injection System 5N12-9-F-05016#1  5N12-9-F-05016#2 6.3-5 Emergency Core Cooling System,   Process Flow Diagram   6.3-6 Low Head SI Pump Performance Curves   6.3-7 High Head SI Pump Performance Curve STPEGS UFSAR   LIST OF FIGURES (Continued)
Short-Term Mass and Energy Release Rates for Subcompartment Analyses for CVCS Letdown Line Break  
CHAPTER 6 Figure  Reference Number Title Number    TC 6-14 Revision 18   6.3-8 RWST Level Setpoints   6.4-1 Control Room Envelope   6.4-2 Control Room Layout    6.5-1 Containment Sump pH vs. Time   6.5-2 Drop Size Distribution for the Sprayed Region}}
- Radioactive Pipe 6.2-85  Chase Subcompartment Blowdown 6.2.1.2-1 (Item M)
Short-Term Mass and Energy Release Rates for Subcompartment Analyses for CVCS Letdown Line Break  
- RHR 1A Valve Room Subcompartment Analyses 6.2-86 6.2.1.2-1 (Item N)
Short-Term Mass and Energy Release Rates for Subcompartment Analyses for CVCS Letdown Line Break  
- Regenerative Heat Exchanger Subcompartment Blowdown 6.2-88 6.2.1.2-1 (Item P)
Short-Term Mass and Energy Release Rates for Subcompartment Analysis for RHR 12" Line DEG 6.2-89 6.2.1.2-1 (Item Q)
Short-Term Mass and Energy Release Rates for Subcompartment Analysis for FW 16" DEG Break at SG Nozzle Connection, HFP, FW @ 460 F  6.2-97 LIST OF TABLES (Continued)
CHAPTER 6 Table Title Page    TC 6-4 Revision 1 8   6.2.1.2-5A Steam Generator Loop Compartment Peak Pressure Summary for RHR Line Break Analysis 6.2-94 6.2.1.2-5B Steam Generator Loop Compartment Peak Pressure Summary for FWLB Analysis 6.2-96 6.2.1.2-6 Steam Generator Loop Compartment Pressure  
- Junction Properties for RHR/SI Analysis (42
-Node Model) 6.2-98 6.2.1.2-6A Steam Generator Loop Compartment Pressure Analysis  
- Junction Properties for FWLB Analysis 6.2-102    6.2.1.2-7A Steam Generator Loop Compartment Analysis  
- Force Coefficient (Area Projections) for Steam Generator Subjected to RHR Line Break 6.2-104 6.2.1.2-7B Steam Generator Loop Compartment Analysis  
- Moment Coefficient (Area Projections) for Steam Generator Subjected to RHR Line Break 6.2-105 6.2.1.2-7C Steam Generator Loop Compartment Analysis  
- Force Coefficient (Area Projections) for Steam Generator Subjected to FWLB  6.2-106 6.2.1.2-7D Steam Generator Loop Compartment Analysis  
- Moment Coefficient (Area Projections) for Steam Generator Subjected to FWLB  6.2-107 6.2.1.2-8A Steam Generator Loop Compartment Analysis  
- Force Coefficient (Area Projections) for Reactor Coolant Pump Subjected to RHR Line Break 6.2-108 6.2.1.2-8B Steam Generator Loop Compartment Analysis  
- Moment Coefficient (Area Projections) for Reactor Coolant Pump Subjected to RHR Line Break 6.2-109 6.2.1.2-9 Pressurizer Subcompartment Analysis Spray Line Break 6.2-110 6.2.1.2-13 Main Steam Line and Feedwater Line Subcompartment Analysis 6.2-111 6.2.1.2-14 Main Steam Line and Feedwater Subcompartment Analysis Junction Description  
- Steam Line Break Analysis 6.2-112 6.2.1.2-15 Regenerative Heat Exchanger Subcompartment Nodal Description 6.2-113 STPEGS UFSAR LIST OF TABLES (Continued)
CHAPTER 6 Table Title Page    TC 6-5 Revision 1 8   6.2.1.2-16  Regenerative Heat Exchanger Subcompartment Junction Description 6.2-114 6.2.1.2-17  Radioactive Pipe Chase Subcompartment Nodal Description 6.2-115 6.2.1.2-18  Radioactive Pipe Chase Subcompartment Junction Description 6.2-116 6.2.1.2-19  RHR1A Valve Room Subcompartment Nodal Description 6.2-117 6.2.1.2-20  RHR1A Valve Room Subcompartment Junction Description 6.2-118 6.2.1.3-1  System Parameter Initial Conditions 6.2-119 6.2.1.3-2  LOCA - Total Pumped ECCS Flow Rate for Two Trains of SI Operating 6.2-120 6.2.1.3-3  LOCA - Total Pumped ECCS Flow Rate for Three Trains of SI Operating 6.2-121 6.2.1.3-4  Double-Ended Hot Let Break Blowdown Mass and Energy Releases 6.2-122 6.2.1.3-5A Double-Ended Pump Suction Break Mass and Energy Releases (Minimum SI)    6.2-125 6.2.1.3-5B Double-Ended Pump Suction Break Mass and Energy Releases (Maximum SI)    6.2-132 6.2.1.3-6  Decay Heat Data Based on ANS
-51.1-1979 Plus 2 Sigma Uncertainty 6.2-141 6.2.1.3-6A  Decay Heat Based on Standard Review Plan ASB 9
-2 Correlations 6.2-142 6.2.1.3-7  Not Used  6.2.1.3-8  Not Used  6.2.1.3-9  Double-Ended Pump Suction Break Principal Parameters During Reflood (Minimum SI)  6.2-144 6.2.1.3-10  Double-Ended Pump Suction Break Principal Parameters During Reflood (Maximum SI)  6.2-145 6.2.1.3-11  Not Used  6.2.1.3-12  Not Used  6.2.1.3-13  Double-Ended Pump Suction Break Mass Balance (Minimum SI)  6.2-146 6.2.1.3-14  Double-Ended Pump Suction Break Mass Balance (Maximum SI)  6.2-147 6.2.1.3-15  Double-Ended Hot Let Break Mass Balance 6.2-148 6.2.1.3-16  Double-Ended Pump Suction Break Energy Balance (Minimum SI)  6.2-149 6.2.1.3-17  Double-Ended Pump Suction Break Energy Balance (Maximum SI)  6.2-150 6.2.1.3-18  Double-Ended Hot Leg Break Energy Balance 6.2-151 6.2.1.4-l Mass and Energy Release Rates for Main Steam Line Break - 1.4 ft2 Double-Ended Rupture at 30% Power (MSIV Failure) 6.2-152 STPEGS UFSAR LIST OF TABLES (Continued)
CHAPTER 6 Table Title Page    TC 6-6 Revision 1 8   6.2.1.4-2 Mass and Energy Release Rates for Main Steam Line Break - 1.4 ft2 Double-Ended Rupture at 0% Power (MSIV Failure)  6.2-156    6.2.1.5-1 Blowdown Mass and Energy Releases 6.2-160 6.2.1.5-1a Broken Loop Injection Spill During Blowdown 6.2-161 6.2.1.5-2 Reflood Mass and Energy Releases 6.2-162 6.2.1.5-3 Active Heat Sink Data for Minimum Post LOCA Containment Pressure  6.2-163 6.2.1.5-4 Passive Heat Sink Data for Minimum Post LOCA Containment Pressure  6.2-164    6.2.2-1 Containment Spray System  
- Design Parameters 6.2-166 6.2.2-2 Design Data for the Reactor Containment Fan Cooler (RCFC) System  6.2-167 6.2.2-3 Failure Modes and Effect Analysis  
- Containment Heat Removal Active Failure 6.2-170 6.2.2-4 CSS Pump NPSH Parameters 6.2-174 6.2.2-5 Estimate of CSS Spray Mass Flow Rates for Various Regions 6.2-175 6.2.4-1 Containment Isolation System Failure Modes and Effect Analysis 6.2-176    6.2.6-1 Systems Which Need not be Vented During Type A Testing 6.2-184 6.2.6-3 Containment Isolation Valves to be Leak Tested in Opposite Direction 6.2-186    6.3-1 Emergency Core Cooling System Component Parameters 6.3-32 6.3-2 ECCS Relief Valve Data 6.3-34 6.3-3 Motor-Operated Valves in ECCS 6.3-35 6.3-4 Materials Employed for Emergency Core Cooling System Components 6.3-37 6.3-5 Single Active Failure Analysis for Emergency  Core Cooling System Components Short Term Phase 6.3-39 6.3-6 Emergency Core Cooling System Recirculation Piping - Passive Failure Analysis, Long
-Term Phase 6.3-40 6.3-7 Manual Actions Required for Safety Injection Modes of Operation 6.3-41 6.3-8 Emergency Core Cooling System Shared Functions Evaluation 6.3-42 6.3-10 Emergency Core Cooling System  
- Safeguards Operations Failure Modes and Effects Analysis 6.3-43 STPEGS UFSAR LIST OF TABLES (Continued)
CHAPTER 6 Table Title Page    TC 6-7 Revision 1 8   6.3-11 ECCS Check Valves to be Leak Tested 6.3-48 6.3-12 ECCS Active Powered Components 6.3-49 6.3-13 Air-Operated Valves in the ECCS 6.3-51 6.3-14 Solenoid-Operated Valves in the ECCS 6.3-52    6.4-1 Equipment to Which the Control Room Operators Could Require Access During an Emergency 6.4-11    6.4-2 Control Room Dose Analysis 6.4-12    6.5-1 Comparison of Engineered Safety Feature Filter Systems with Regulatory Guide l.52, Rev. 2, Requirements 6.5-11 6.5-2 Input Parameters for Determining Iodine Removal Coefficients 6.5.14 6.5-3 Input Parameters to Determine Minimum pH for Sump Solution 6.5-15 6.5-4 Input Parameters to Determine Maximum pH for Sump Solution 6.5-16 STPEGS UFSAR LIST OF FIGURES (Continued
)
CHAPTER 6
 
Figure  Reference Number Title Number    TC 6-8 Revision 1 8   6.2.1.1-3 Not used  6.2.1.1-25 Containment Pressure  
- 1.4 ft2 Double-Ended  MSLB  (0% Power, MSIV Failure) 6.2.1.1-26 Not Used  6.2.1.1-27 Containment Temperature  
- 1.4 ft2 Double-Ended MSLB  (0% Power, MSIV Failure) 6.2.1.1-28 Condensing Heat Transfer Coefficient  
- 1.4 ft2 Double-Ended MSLB  (0% Power, MSIV Failure) 6.2.1.1-29 Total Vapor Region Energy - 1.4 ft2 Double-Ended  MSLB  (0% Power, MSIV Failure) 6.2.1.1-30 Containment Pressure  
- LOCA DEHL 6.2.1.1-31 Containment Temperatures  
- LOCA DEHL 6.2.1.1-32 Heat Transfer Coefficient  
- LOCA DEHL 6.2.1.1-33 Containment Pressure  
-LOCA  DEPS (Minimum SI) 6.2.1.1-34 Containment Temperatures  
- LOCA  DEPS (Minimum SI) 6.2.1.1-35 Heat Transfer Coefficient  
- LOCA  DEPS (Minimum SI) 6.2.1.1-36 Containment Pressure  
- LOCA  DEPS (Maximum SI) 6.2.1.1-37 Containment Temperatures  
- LOCA  DEPS (Maximum SI) 6.2.1.1-38 Heat Transfer Coefficient  
- LOCA  DEPS (Maximum SI)
 
STPEGS UFSAR LIST OF FIGURES (Continued
)
CHAPTER 6
 
Figure  Reference Number Title Number    TC 6-9 Revision 1 8
* The drawings below are reference drawings only and are not to be revised.
6.2.1.2-3 Steam Generator Loop Compartment Node Arrangement El. (-)11'33" - (Sheet 1 of 8) 6C18-9-N-05001-2*  El. (-)2'-0" - (Sheet 2 of 8) 6C18-9-N-05002-2*  El. 19'0-" - (Sheet 3 of 8) 6C18-9-N-05003-2*  El. (-)37'3" - (Sheet 4 of 8) 6C18-9-N-05004-2*  El. 52'0"  
- (Sheet 5 of 8) 6C18-9-N-05005-1*  El. 68'0"  
- (Sheet 6 of 8) 6C18-9-N-05006-2*  Section AA  
- (Sheet 7 of 8) 6C18-9-N-05007-3*  Section BB  
- (Sheet 8 of 8) 6C18-9-N-05008-2*    6.2.1.2-4 Pressurizer Compartment Nodes Between:
El. 69'-9" & 85'-0" - (Sheet 1 of 3) 6C18-9-N-05006-4*  El. 46'-7" & 69'-9" - (Sheet 2 of 3) 6C18-9-N-05005-2*                                  (Sheet 3 of 3) 6C18-9-N-05008-4*    6.2.1.2-5 Surge Line Subcompartment Nodes Between:
El. 46'-4" & 69'-9" - (Sheet 1 of 5) 6C18-9-N-05005-2*  El. 37'-3" & 43'-4" - (Sheet 2 of 5) 6C18-9-N-05004-3*  El. 19'-0" & 37'-3" - (Sheet 3 of 5) 6C18-9-N-05003-3*  El. 5'-9" & 19'-0" -  (Sheet 4 of 5) 6C18-9-N-05002-3*                                  (Sheet 5 of 5) 6C18-9-N-05008-2*    6.2.1.2-6 Main Steamline and Feedwater Line Subcompartment Nodes Between:
El. 19'-0" & 37'-3" - (Sheet 1 of 3) 6C18-9-N-05003-3*  El. 37'-3" & 52'-0" - (Sheet 2 of 3) 6C18-9-N-05004-3*  El. 52'-0" & 68'-0" - (Sheet 3 of 3) 6C18-9-N-05005-2*    6.2.1.2-7 Regenerative Heat Exchanger Subcompartment Nodes Between El. 37'-3" & 52'-0"  6C18-9-N-05004-4*    6.2.1.2-8 Radioactive Pipe Chase Between Elevations 29' & 37'
-3" 5C15-9-P-05029-1*    6.2.1.2-9 RHR 1A and 1B Valve Room Subcompartment
 
STPEGS UFSAR LIST OF FIGURES (Continued
)
CHAPTER 6
 
Figure  Reference Number Title Number    TC 6-10 Revision 1 8   Nodes Between:
El. 37'3" and 52'0"  
- (Sheet 1 of 2) 6C18-9-N-05004-4*                                  (Sheet 2 of 2) 6C18-9-N-05003-4*    6.2.1.2-11 Node and Junction Diagram for Steam Loop Compartment (4 Sheets) 6.2.1.2-11A Nodalization Diagram for Steam Generator Loop Compartment for FWLB Analysis (8 sheets) 6.2.1.2-12 Pressurizer Subcompartment Nodal Model 6.2.1.2-13 Surge Line Subcompartment Nodal Model 6.2.1.2-14 Main Steam and Feedwater Line Subcompartment Nodal Model 6.2.1.2-15 Regenerative Heat Exchanger Subcompartment Nodal Model    6.2.1.2-16 Radioactive Pipe Chase Subcompartment Nodal Model 6.2.1.2-17 RHR Valve Room Subcompartment Nodal Model  6.2.1.2-20A Steam Generator Loop Compartment Pressurization Analysis, 12" RHR Break in Node 15  (11 sheets) 6.2.1.2-20B Steam Generator Loop Compartment Pressurization Analysis, 12" RHR Break in Node 4  (11 sheets) 6.2.1.2-20C Steam Generator Loop Compartment Pressurization Analysis, 12" RHR Break in Node 12  (11 sheets) 6.2.1.2-20D Steam Generator Loop Compartment  
 
STPEGS UFSAR LIST OF FIGURES (Continued
)
CHAPTER 6
 
Figure  Reference Number Title Number    TC 6-11 Revision 1 8   Pressurization Analysis, 16" FWLB  (Nodes 1& 17)    6.2.1.2-21A Steam Generator Forces and Moments Analysis  
- Steam Generator Forces due to RHR Break in Nodes 15 (6 sheets)      6.2.1.2-21B Steam Generator Loop Compartment Forces and Moments on Steam Generator due to FWLB (11 sheets)    6.2.1.2-22A Reactor Coolant Pump Forces and Moments due to RHR Break in Node 15 (6 sheets)    6.2.1.2-23 Pressurizer P
-T Analysis (3 Sheets) 6.2.1.2-25 MSLB Subcompartment P
-T Analysis (2 Sheets) 6.2.1.2-26 MFWLB Subcompartment Analysis (2 sheets) 6.2.1.2-27 Calculated Pressures Regenerative Heat Exchanger Subcompartment 6.2.1.2-28 Calculated Pressures Radioactive Pipe Chase Subcompartment 6.2.1.2-29 Calculated Pressures RHR 1A & 1B  Valve Room Subcompartment 6.2.1.2-30 Steam Generator Loop Compartment Force and Moment Coordinate System 6.2.1.5-1 STPEGS Large Break LOCA Analysis, DECLG CD=0.8, SI, High T AVG, Containment Backpressure 6.2.1.5-2 Containment Fan Cooler Performance Curves
 
STPEGS UFSAR LIST OF FIGURES (Continued
)
CHAPTER 6
 
Figure  Reference Number Title Number    TC 6-12 Revision 1 8   6.2.1.5-3 STPEGS Large Break LOCA Analysis, DECLG CD=0.8, Min SI, High T AVG,  Containment Heat Transfer Coefficient 6.2.2-1 P&ID Containment Spray System 5N10-9-F-05037#1  5N10-9-F-05037#2    6.2.2-3 Composite Piping, Reactor Containment Building  
- Plan - El. 83'-0" - Area 12    (Sheet 1 of 4) 5C15-9-P-05025-6  Plan - El. 83'-0" - Area 13    (Sheet 2 of 4) 5C15-9-P-05026-5  Plan - El. 83'-0" - Area 14    (Sheet 3 of 4) 5C15-9-P-05027-5  Plan - El. 83'-0" - Area 15    (Sheet 4 of 4) 5C15-9-P-05028-6    6.2.2-4 P&ID HVAC Reactor Containment 5V14-9-V-00016#1  Building, Fan Coolers Subsystem 5V14-9-V-00016#2    6.2.2-6 Reactor Containment Building CSS Spray Coverage Plan  
- El. (-)11'-3" 6C18-9-N-05001-2*    6.2.2-7 Reactor Containment Building CSS Spray Coverage Plan  
- El. (-)2'-0" 6C18-9-N-05002-2*    6.2.2-8 Reactor Containment Building CSS Spray Coverage Plan  
- El. 19'-0" 6C18-9-N-05003-2*    6.2.2-9 Reactor Containment Building CSS Spray Coverage Plan  
- El. 37'-3" 6C18-9-N-05004-2*    6.2.2-10 Reactor Containment Building CSS Spray Coverage Plan  
- El. 52'-0" 6C18-9-N-05005-1*
STPEGS UFSAR LIST OF FIGURES (Continued
)
CHAPTER 6
 
Figure  Reference Number Title Number    TC 6-13 Revision 1 8       6.2.2-11 Reactor Containment Building CSS Spray Coverage Plan  
- El. 68'-0" 6C18-9-N-05006-2*    6.2.2-12 Reactor Containment Building CSS Spray Coverage Section B
-B 6C18-9-N-05007-1*  6.2.2-13 HVAC Reactor Containment Building Plan El. (
-)11'-3" Area 13 5V14-9-V-00083    6.2.2-14 HVAC Reactor Containment Building Enlarged Plant and Section RCFC 5V14-9-V-00090    6.2.4-1 Containment Penetrations (100 Sheets) 6.2.4-2 Arrangement of Sump Piping 6.2.6-1 P&ID Containment Leak Rate Test 5C56-0-F-05058  (CLRT) Pressurization System 6.3-1 P&ID Safety Injection System 5N12-9-F-05013#1  5N12-9-F-05013#2    6.3-2 P&ID Safety Injection System 5N12-9-F-05014#1  5N12-9-F-05014#2    6.3-3 P&ID Safety Injection System 5N12-9-F-05015#1  5N12-9-F-05015#2      6.3-4 P&ID Safety Injection System 5N12-9-F-05016#1  5N12-9-F-05016#2 6.3-5 Emergency Core Cooling System, Process Flow Diagram 6.3-6 Low Head SI Pump Performance Curves 6.3-7 High Head SI Pump Performance Curve
 
STPEGS UFSAR LIST OF FIGURES (Continued
)
CHAPTER 6
 
Figure  Reference Number Title Number    TC 6-14 Revision 1 8   6.3-8 RWST Level Setpoints 6.4-1 Control Room Envelope 6.4-2 Control Room Layout    6.5-1 Containment Sump pH vs. Time 6.5-2 Drop Size Distribution for the Sprayed Region}}

Revision as of 04:33, 30 June 2018

South Texas, Units 1 and 2, Revision 18 to Updated Safety Analysis Report, Chapter 6, Table of Contents
ML16207A548
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/28/2016
From:
South Texas
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16207A547 List: ... further results
References
NOC-AE-16003371
Download: ML16207A548 (14)


Text

STPEGS UFSAR TC 6-1 Revision 1 8 TABLE OF CONTENTS CHAPTER 6 ENGINEERED SAFETY FEATURES

Section Title Page 6.1 ENGINEERED SAFETY FEATURES MATERIALS 6.1-1 6.1.1 Metallic Materials 6.1-1 6.1.2 Organic Materials 6.1-3 6.1.3 Post Accident Chemistry 6.1-5 6.1.4 Post Accident Sump Solution Chemistry Adjustment 6.1-5 6.2 CONTAINMENT SYSTEMS 6.2-1 6.2.1 Containment Functional Design 6.2-1 6.2.2 Containment Heat Removal Systems 6.2-29 6.2.3 Secondary Containment Functional Design (Does not apply to STPEGS) 6.2-40 6.2.4 Containment Isolation System 6.2-40 6.2.5 Combustible Gas Control in Containment 6.2-47 6.2.6 Containment Leakage Testing 6.2-49 6.3 EMERGENCY CORE COOLING SYSTEM 6.3-l 6.3.l Design Bases 6.3-l 6.3.2 System Design 6.3-2 6.3.3 Performance Evaluation 6.3-17 6.3.4 Tests and Inspections 6.3-25 6.3.5 Instrumentation Requirements 6.3-27 6.4 HABITABILITY SYSTEMS 6.4-l 6.4.l Design Bases 6.4-l 6.4.2 System Design 6.4-2 6.4.3 System Operational Procedures 6.4-5 6.4.4 Design Evaluation 6.4-5 6.4.5 Testing and Inspection 6.4-7 6.4.6 Instrumentation Requirement 6.4-9 6.5 FISSION PRODUCT REMOVAL AND CONTROL SYSTEMS 6.5-l 6.5.l Engineered Safety Feature Filter Systems 6.5-l 6.5.2 Containment Spray System

- Iodine Removal 6.5-4 6.5.3 Fission Product Control Systems 6.5-8 STPEGS UFSAR TABLE OF CONTENTS (Continued)

CHAPTER 6

Section Title Page TC 6-2 Revision 1 8 6.6 INSERVICE INSPECTION OF ASME CODE CLASS 2 AND CLASS 3 COMPONENTS 6.6-l 6.6.l Components Subject to Inspection 6.6-l 6.6.2 Accessibility 6.6-l 6.6.3 Examination Techniques and Procedures 6.6-2 6.6.4 Inspection Intervals 6.6-2 6.6.5 Examination Categories and Requirements 6.6-2 6.6.6 Evaluation of Examination Results 6.6-2 6.6.7 System Pressure Tests 6.6-3 6.6.8 Augmented Inservice Inspection 6.6-3 6.7 MAIN STEAM ISOLATION VALVE LEAKAGE CONTROL 6.7-1 SYSTEM TC 6-3 Revision 1 8 LIST OF TABLES CHAPTER 6 Table Title Page 6.1-1 Engineered Safety Features Materials 6.1-7 6.1-3 Protective Coatings on Westinghouse

-Supplied Equipment Inside Containment 6.1-11 6.1-4 Coating Schedule for Surfaces Inside Containment (Excluding NSSS Scope of Supply) 6.1-12 6.2.1.1-1 Containment Design Accidents 6.2-56 6.2.1.1-2 DBA Calculated Pressures in Containment 6.2-58 6.2.1.1-3 Containment Data Used in P/T Analysis 6.2-59 6.2.1.1-4 Not Used 6.2.1.1-5 Engineered Safety Features System Information 6.2-61 6.2.1.1-7 Modeling of Structural Heat Sinks for Containment Analyses 6.2-62 6.2.1.1-8 Thermophysical Properties of Structural Heat Sink Materials for Containment Analysis 6.2-65 6.2.1.1-9 Containment Heat Sink Surface Heat Transfer Model 6.2-66 6.2.1.1-10 Accident Chronology for DBA LOCA 6.2-67 6.2.1.1-14 Summary of Containment MSLB P/T Analysis Results 6.2-68 6.2.1.1-15 Accident Chronology for DBA MSLB (Peak Temperature Case) 6.2-70 6.2.1.2-1 (Item G)

Short-Term Mass and Energy Release Rates for Subcompartment Analyses for Pressurizer Spray Line DEG Break 6.2-72 6.2.1.2-1 (Item J)

Short-Term Mass and Energy Release Rates for Subcompartment Analyses for MSLB 6.2-82 6.2.1.2-1 (Item K)

Short-Term Mass and Energy Release Rates for Subcompartment Analyses for Main Feedwater Line Break 6.2-83 6.2.1.2-1 (Item L)

Short-Term Mass and Energy Release Rates for Subcompartment Analyses for CVCS Letdown Line Break

- Radioactive Pipe 6.2-85 Chase Subcompartment Blowdown 6.2.1.2-1 (Item M)

Short-Term Mass and Energy Release Rates for Subcompartment Analyses for CVCS Letdown Line Break

- RHR 1A Valve Room Subcompartment Analyses 6.2-86 6.2.1.2-1 (Item N)

Short-Term Mass and Energy Release Rates for Subcompartment Analyses for CVCS Letdown Line Break

- Regenerative Heat Exchanger Subcompartment Blowdown 6.2-88 6.2.1.2-1 (Item P)

Short-Term Mass and Energy Release Rates for Subcompartment Analysis for RHR 12" Line DEG 6.2-89 6.2.1.2-1 (Item Q)

Short-Term Mass and Energy Release Rates for Subcompartment Analysis for FW 16" DEG Break at SG Nozzle Connection, HFP, FW @ 460 F 6.2-97 LIST OF TABLES (Continued)

CHAPTER 6 Table Title Page TC 6-4 Revision 1 8 6.2.1.2-5A Steam Generator Loop Compartment Peak Pressure Summary for RHR Line Break Analysis 6.2-94 6.2.1.2-5B Steam Generator Loop Compartment Peak Pressure Summary for FWLB Analysis 6.2-96 6.2.1.2-6 Steam Generator Loop Compartment Pressure

- Junction Properties for RHR/SI Analysis (42

-Node Model) 6.2-98 6.2.1.2-6A Steam Generator Loop Compartment Pressure Analysis

- Junction Properties for FWLB Analysis 6.2-102 6.2.1.2-7A Steam Generator Loop Compartment Analysis

- Force Coefficient (Area Projections) for Steam Generator Subjected to RHR Line Break 6.2-104 6.2.1.2-7B Steam Generator Loop Compartment Analysis

- Moment Coefficient (Area Projections) for Steam Generator Subjected to RHR Line Break 6.2-105 6.2.1.2-7C Steam Generator Loop Compartment Analysis

- Force Coefficient (Area Projections) for Steam Generator Subjected to FWLB 6.2-106 6.2.1.2-7D Steam Generator Loop Compartment Analysis

- Moment Coefficient (Area Projections) for Steam Generator Subjected to FWLB 6.2-107 6.2.1.2-8A Steam Generator Loop Compartment Analysis

- Force Coefficient (Area Projections) for Reactor Coolant Pump Subjected to RHR Line Break 6.2-108 6.2.1.2-8B Steam Generator Loop Compartment Analysis

- Moment Coefficient (Area Projections) for Reactor Coolant Pump Subjected to RHR Line Break 6.2-109 6.2.1.2-9 Pressurizer Subcompartment Analysis Spray Line Break 6.2-110 6.2.1.2-13 Main Steam Line and Feedwater Line Subcompartment Analysis 6.2-111 6.2.1.2-14 Main Steam Line and Feedwater Subcompartment Analysis Junction Description

- Steam Line Break Analysis 6.2-112 6.2.1.2-15 Regenerative Heat Exchanger Subcompartment Nodal Description 6.2-113 STPEGS UFSAR LIST OF TABLES (Continued)

CHAPTER 6 Table Title Page TC 6-5 Revision 1 8 6.2.1.2-16 Regenerative Heat Exchanger Subcompartment Junction Description 6.2-114 6.2.1.2-17 Radioactive Pipe Chase Subcompartment Nodal Description 6.2-115 6.2.1.2-18 Radioactive Pipe Chase Subcompartment Junction Description 6.2-116 6.2.1.2-19 RHR1A Valve Room Subcompartment Nodal Description 6.2-117 6.2.1.2-20 RHR1A Valve Room Subcompartment Junction Description 6.2-118 6.2.1.3-1 System Parameter Initial Conditions 6.2-119 6.2.1.3-2 LOCA - Total Pumped ECCS Flow Rate for Two Trains of SI Operating 6.2-120 6.2.1.3-3 LOCA - Total Pumped ECCS Flow Rate for Three Trains of SI Operating 6.2-121 6.2.1.3-4 Double-Ended Hot Let Break Blowdown Mass and Energy Releases 6.2-122 6.2.1.3-5A Double-Ended Pump Suction Break Mass and Energy Releases (Minimum SI) 6.2-125 6.2.1.3-5B Double-Ended Pump Suction Break Mass and Energy Releases (Maximum SI) 6.2-132 6.2.1.3-6 Decay Heat Data Based on ANS

-51.1-1979 Plus 2 Sigma Uncertainty 6.2-141 6.2.1.3-6A Decay Heat Based on Standard Review Plan ASB 9

-2 Correlations 6.2-142 6.2.1.3-7 Not Used 6.2.1.3-8 Not Used 6.2.1.3-9 Double-Ended Pump Suction Break Principal Parameters During Reflood (Minimum SI) 6.2-144 6.2.1.3-10 Double-Ended Pump Suction Break Principal Parameters During Reflood (Maximum SI) 6.2-145 6.2.1.3-11 Not Used 6.2.1.3-12 Not Used 6.2.1.3-13 Double-Ended Pump Suction Break Mass Balance (Minimum SI) 6.2-146 6.2.1.3-14 Double-Ended Pump Suction Break Mass Balance (Maximum SI) 6.2-147 6.2.1.3-15 Double-Ended Hot Let Break Mass Balance 6.2-148 6.2.1.3-16 Double-Ended Pump Suction Break Energy Balance (Minimum SI) 6.2-149 6.2.1.3-17 Double-Ended Pump Suction Break Energy Balance (Maximum SI) 6.2-150 6.2.1.3-18 Double-Ended Hot Leg Break Energy Balance 6.2-151 6.2.1.4-l Mass and Energy Release Rates for Main Steam Line Break - 1.4 ft2 Double-Ended Rupture at 30% Power (MSIV Failure) 6.2-152 STPEGS UFSAR LIST OF TABLES (Continued)

CHAPTER 6 Table Title Page TC 6-6 Revision 1 8 6.2.1.4-2 Mass and Energy Release Rates for Main Steam Line Break - 1.4 ft2 Double-Ended Rupture at 0% Power (MSIV Failure) 6.2-156 6.2.1.5-1 Blowdown Mass and Energy Releases 6.2-160 6.2.1.5-1a Broken Loop Injection Spill During Blowdown 6.2-161 6.2.1.5-2 Reflood Mass and Energy Releases 6.2-162 6.2.1.5-3 Active Heat Sink Data for Minimum Post LOCA Containment Pressure 6.2-163 6.2.1.5-4 Passive Heat Sink Data for Minimum Post LOCA Containment Pressure 6.2-164 6.2.2-1 Containment Spray System

- Design Parameters 6.2-166 6.2.2-2 Design Data for the Reactor Containment Fan Cooler (RCFC) System 6.2-167 6.2.2-3 Failure Modes and Effect Analysis

- Containment Heat Removal Active Failure 6.2-170 6.2.2-4 CSS Pump NPSH Parameters 6.2-174 6.2.2-5 Estimate of CSS Spray Mass Flow Rates for Various Regions 6.2-175 6.2.4-1 Containment Isolation System Failure Modes and Effect Analysis 6.2-176 6.2.6-1 Systems Which Need not be Vented During Type A Testing 6.2-184 6.2.6-3 Containment Isolation Valves to be Leak Tested in Opposite Direction 6.2-186 6.3-1 Emergency Core Cooling System Component Parameters 6.3-32 6.3-2 ECCS Relief Valve Data 6.3-34 6.3-3 Motor-Operated Valves in ECCS 6.3-35 6.3-4 Materials Employed for Emergency Core Cooling System Components 6.3-37 6.3-5 Single Active Failure Analysis for Emergency Core Cooling System Components Short Term Phase 6.3-39 6.3-6 Emergency Core Cooling System Recirculation Piping - Passive Failure Analysis, Long

-Term Phase 6.3-40 6.3-7 Manual Actions Required for Safety Injection Modes of Operation 6.3-41 6.3-8 Emergency Core Cooling System Shared Functions Evaluation 6.3-42 6.3-10 Emergency Core Cooling System

- Safeguards Operations Failure Modes and Effects Analysis 6.3-43 STPEGS UFSAR LIST OF TABLES (Continued)

CHAPTER 6 Table Title Page TC 6-7 Revision 1 8 6.3-11 ECCS Check Valves to be Leak Tested 6.3-48 6.3-12 ECCS Active Powered Components 6.3-49 6.3-13 Air-Operated Valves in the ECCS 6.3-51 6.3-14 Solenoid-Operated Valves in the ECCS 6.3-52 6.4-1 Equipment to Which the Control Room Operators Could Require Access During an Emergency 6.4-11 6.4-2 Control Room Dose Analysis 6.4-12 6.5-1 Comparison of Engineered Safety Feature Filter Systems with Regulatory Guide l.52, Rev. 2, Requirements 6.5-11 6.5-2 Input Parameters for Determining Iodine Removal Coefficients 6.5.14 6.5-3 Input Parameters to Determine Minimum pH for Sump Solution 6.5-15 6.5-4 Input Parameters to Determine Maximum pH for Sump Solution 6.5-16 STPEGS UFSAR LIST OF FIGURES (Continued

)

CHAPTER 6

Figure Reference Number Title Number TC 6-8 Revision 1 8 6.2.1.1-3 Not used 6.2.1.1-25 Containment Pressure

- 1.4 ft2 Double-Ended MSLB (0% Power, MSIV Failure) 6.2.1.1-26 Not Used 6.2.1.1-27 Containment Temperature

- 1.4 ft2 Double-Ended MSLB (0% Power, MSIV Failure) 6.2.1.1-28 Condensing Heat Transfer Coefficient

- 1.4 ft2 Double-Ended MSLB (0% Power, MSIV Failure) 6.2.1.1-29 Total Vapor Region Energy - 1.4 ft2 Double-Ended MSLB (0% Power, MSIV Failure) 6.2.1.1-30 Containment Pressure

- LOCA DEHL 6.2.1.1-31 Containment Temperatures

- LOCA DEHL 6.2.1.1-32 Heat Transfer Coefficient

- LOCA DEHL 6.2.1.1-33 Containment Pressure

-LOCA DEPS (Minimum SI) 6.2.1.1-34 Containment Temperatures

- LOCA DEPS (Minimum SI) 6.2.1.1-35 Heat Transfer Coefficient

- LOCA DEPS (Minimum SI) 6.2.1.1-36 Containment Pressure

- LOCA DEPS (Maximum SI) 6.2.1.1-37 Containment Temperatures

- LOCA DEPS (Maximum SI) 6.2.1.1-38 Heat Transfer Coefficient

- LOCA DEPS (Maximum SI)

STPEGS UFSAR LIST OF FIGURES (Continued

)

CHAPTER 6

Figure Reference Number Title Number TC 6-9 Revision 1 8

  • The drawings below are reference drawings only and are not to be revised.

6.2.1.2-3 Steam Generator Loop Compartment Node Arrangement El. (-)11'33" - (Sheet 1 of 8) 6C18-9-N-05001-2* El. (-)2'-0" - (Sheet 2 of 8) 6C18-9-N-05002-2* El. 19'0-" - (Sheet 3 of 8) 6C18-9-N-05003-2* El. (-)37'3" - (Sheet 4 of 8) 6C18-9-N-05004-2* El. 52'0"

- (Sheet 5 of 8) 6C18-9-N-05005-1* El. 68'0"

- (Sheet 6 of 8) 6C18-9-N-05006-2* Section AA

- (Sheet 7 of 8) 6C18-9-N-05007-3* Section BB

- (Sheet 8 of 8) 6C18-9-N-05008-2* 6.2.1.2-4 Pressurizer Compartment Nodes Between:

El. 69'-9" & 85'-0" - (Sheet 1 of 3) 6C18-9-N-05006-4* El. 46'-7" & 69'-9" - (Sheet 2 of 3) 6C18-9-N-05005-2* (Sheet 3 of 3) 6C18-9-N-05008-4* 6.2.1.2-5 Surge Line Subcompartment Nodes Between:

El. 46'-4" & 69'-9" - (Sheet 1 of 5) 6C18-9-N-05005-2* El. 37'-3" & 43'-4" - (Sheet 2 of 5) 6C18-9-N-05004-3* El. 19'-0" & 37'-3" - (Sheet 3 of 5) 6C18-9-N-05003-3* El. 5'-9" & 19'-0" - (Sheet 4 of 5) 6C18-9-N-05002-3* (Sheet 5 of 5) 6C18-9-N-05008-2* 6.2.1.2-6 Main Steamline and Feedwater Line Subcompartment Nodes Between:

El. 19'-0" & 37'-3" - (Sheet 1 of 3) 6C18-9-N-05003-3* El. 37'-3" & 52'-0" - (Sheet 2 of 3) 6C18-9-N-05004-3* El. 52'-0" & 68'-0" - (Sheet 3 of 3) 6C18-9-N-05005-2* 6.2.1.2-7 Regenerative Heat Exchanger Subcompartment Nodes Between El. 37'-3" & 52'-0" 6C18-9-N-05004-4* 6.2.1.2-8 Radioactive Pipe Chase Between Elevations 29' & 37'

-3" 5C15-9-P-05029-1* 6.2.1.2-9 RHR 1A and 1B Valve Room Subcompartment

STPEGS UFSAR LIST OF FIGURES (Continued

)

CHAPTER 6

Figure Reference Number Title Number TC 6-10 Revision 1 8 Nodes Between:

El. 37'3" and 52'0"

- (Sheet 1 of 2) 6C18-9-N-05004-4* (Sheet 2 of 2) 6C18-9-N-05003-4* 6.2.1.2-11 Node and Junction Diagram for Steam Loop Compartment (4 Sheets) 6.2.1.2-11A Nodalization Diagram for Steam Generator Loop Compartment for FWLB Analysis (8 sheets) 6.2.1.2-12 Pressurizer Subcompartment Nodal Model 6.2.1.2-13 Surge Line Subcompartment Nodal Model 6.2.1.2-14 Main Steam and Feedwater Line Subcompartment Nodal Model 6.2.1.2-15 Regenerative Heat Exchanger Subcompartment Nodal Model 6.2.1.2-16 Radioactive Pipe Chase Subcompartment Nodal Model 6.2.1.2-17 RHR Valve Room Subcompartment Nodal Model 6.2.1.2-20A Steam Generator Loop Compartment Pressurization Analysis, 12" RHR Break in Node 15 (11 sheets) 6.2.1.2-20B Steam Generator Loop Compartment Pressurization Analysis, 12" RHR Break in Node 4 (11 sheets) 6.2.1.2-20C Steam Generator Loop Compartment Pressurization Analysis, 12" RHR Break in Node 12 (11 sheets) 6.2.1.2-20D Steam Generator Loop Compartment

STPEGS UFSAR LIST OF FIGURES (Continued

)

CHAPTER 6

Figure Reference Number Title Number TC 6-11 Revision 1 8 Pressurization Analysis, 16" FWLB (Nodes 1& 17) 6.2.1.2-21A Steam Generator Forces and Moments Analysis

- Steam Generator Forces due to RHR Break in Nodes 15 (6 sheets) 6.2.1.2-21B Steam Generator Loop Compartment Forces and Moments on Steam Generator due to FWLB (11 sheets) 6.2.1.2-22A Reactor Coolant Pump Forces and Moments due to RHR Break in Node 15 (6 sheets) 6.2.1.2-23 Pressurizer P

-T Analysis (3 Sheets) 6.2.1.2-25 MSLB Subcompartment P

-T Analysis (2 Sheets) 6.2.1.2-26 MFWLB Subcompartment Analysis (2 sheets) 6.2.1.2-27 Calculated Pressures Regenerative Heat Exchanger Subcompartment 6.2.1.2-28 Calculated Pressures Radioactive Pipe Chase Subcompartment 6.2.1.2-29 Calculated Pressures RHR 1A & 1B Valve Room Subcompartment 6.2.1.2-30 Steam Generator Loop Compartment Force and Moment Coordinate System 6.2.1.5-1 STPEGS Large Break LOCA Analysis, DECLG CD=0.8, SI, High T AVG, Containment Backpressure 6.2.1.5-2 Containment Fan Cooler Performance Curves

STPEGS UFSAR LIST OF FIGURES (Continued

)

CHAPTER 6

Figure Reference Number Title Number TC 6-12 Revision 1 8 6.2.1.5-3 STPEGS Large Break LOCA Analysis, DECLG CD=0.8, Min SI, High T AVG, Containment Heat Transfer Coefficient 6.2.2-1 P&ID Containment Spray System 5N10-9-F-05037#1 5N10-9-F-05037#2 6.2.2-3 Composite Piping, Reactor Containment Building

- Plan - El. 83'-0" - Area 12 (Sheet 1 of 4) 5C15-9-P-05025-6 Plan - El. 83'-0" - Area 13 (Sheet 2 of 4) 5C15-9-P-05026-5 Plan - El. 83'-0" - Area 14 (Sheet 3 of 4) 5C15-9-P-05027-5 Plan - El. 83'-0" - Area 15 (Sheet 4 of 4) 5C15-9-P-05028-6 6.2.2-4 P&ID HVAC Reactor Containment 5V14-9-V-00016#1 Building, Fan Coolers Subsystem 5V14-9-V-00016#2 6.2.2-6 Reactor Containment Building CSS Spray Coverage Plan

- El. (-)11'-3" 6C18-9-N-05001-2* 6.2.2-7 Reactor Containment Building CSS Spray Coverage Plan

- El. (-)2'-0" 6C18-9-N-05002-2* 6.2.2-8 Reactor Containment Building CSS Spray Coverage Plan

- El. 19'-0" 6C18-9-N-05003-2* 6.2.2-9 Reactor Containment Building CSS Spray Coverage Plan

- El. 37'-3" 6C18-9-N-05004-2* 6.2.2-10 Reactor Containment Building CSS Spray Coverage Plan

- El. 52'-0" 6C18-9-N-05005-1*

STPEGS UFSAR LIST OF FIGURES (Continued

)

CHAPTER 6

Figure Reference Number Title Number TC 6-13 Revision 1 8 6.2.2-11 Reactor Containment Building CSS Spray Coverage Plan

- El. 68'-0" 6C18-9-N-05006-2* 6.2.2-12 Reactor Containment Building CSS Spray Coverage Section B

-B 6C18-9-N-05007-1* 6.2.2-13 HVAC Reactor Containment Building Plan El. (

-)11'-3" Area 13 5V14-9-V-00083 6.2.2-14 HVAC Reactor Containment Building Enlarged Plant and Section RCFC 5V14-9-V-00090 6.2.4-1 Containment Penetrations (100 Sheets) 6.2.4-2 Arrangement of Sump Piping 6.2.6-1 P&ID Containment Leak Rate Test 5C56-0-F-05058 (CLRT) Pressurization System 6.3-1 P&ID Safety Injection System 5N12-9-F-05013#1 5N12-9-F-05013#2 6.3-2 P&ID Safety Injection System 5N12-9-F-05014#1 5N12-9-F-05014#2 6.3-3 P&ID Safety Injection System 5N12-9-F-05015#1 5N12-9-F-05015#2 6.3-4 P&ID Safety Injection System 5N12-9-F-05016#1 5N12-9-F-05016#2 6.3-5 Emergency Core Cooling System, Process Flow Diagram 6.3-6 Low Head SI Pump Performance Curves 6.3-7 High Head SI Pump Performance Curve

STPEGS UFSAR LIST OF FIGURES (Continued

)

CHAPTER 6

Figure Reference Number Title Number TC 6-14 Revision 1 8 6.3-8 RWST Level Setpoints 6.4-1 Control Room Envelope 6.4-2 Control Room Layout 6.5-1 Containment Sump pH vs. Time 6.5-2 Drop Size Distribution for the Sprayed Region