IR 05000482/2016005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 28: Line 28:


==Dear Mr. Heflin:==
==Dear Mr. Heflin:==
It was identified that the enclosed inspection plan in a letter to you dated August 31, 2016 (ML16237A073) was improperly marked. The inspection plan contained the markings of "Official Use Only - Sensitive Internal Information/Security-Related Information", however, the inspection plan did not contain information under that category. The inspection plan that was originally placed into ADAMS has been corrected by striking through the markings. The original Mid-Cycle Assessment Letter and the corrected inspection plan are enclosed. Please note that neither the content of the assessment letter, nor the inspection plan has changed. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
It was identified that the enclosed inspection plan in a letter to you dated August 31, 2016 (ML16237A073) was improperly marked. The inspection plan contained the markings of "Official Use Only  
- Sensitive Internal Information/Security
-Related Information", however, the inspection plan did not contain information under that category. The inspection plan that was originally placed into ADAMS has been corrected by striking through the markings. The original Mid-Cycle Assessment Letter and the corrected inspection plan are enclosed. Please note that neither the content of the assessment letter, nor the inspection plan has changed.


Sincerely,/RA/ Thomas R. Hipschman, Team Leader Inspection Program and Assessment Team Division of Reactor Safety Docket Nos.: 50-482 License Nos.: NPF-42
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).


===Enclosures:===
Sincerely,/RA/ Thomas R. Hipschman, Team Lead er Inspection Program and Assessment Team Division of Reactor Safety Docket Nos.: 50-482 License Nos.: NPF-42 Enclosure s: 1. Wolf Creek Generating Station Inspection/
1. Wolf Creek Generating Station Inspection/ Activity Plan 2. 2016 Mid-Cycle Assessment Letter (ML16237A073) Page 1 of 208/30/201609:37:18Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteWolf CreekInspection / Activity Plan07/01/2016-06/30/2018TSB 52B-BIENNIAL PI&R INSPECTION41 IPProblem Identification and Resolution71152B06/27/201607/01/2016INSP-BIENNIAL REQUAL INSPECTION21 IPLicensed Operator Requalification Program7111111B06/27/201607/01/2016EP-1-EP PERFORMANCE INDICATORS11 IPERO Readiness71151-EP0208/01/201608/05/20161 IPAlert & Notification System Reliability71151-EP0308/01/201608/05/20161 IPUnplanned Scrams per 7000 Critical Hrs71151-IE0108/01/201608/05/2016EP-2-BIENNIAL EP PROGRAM INSPECTION11 IPAlert and Notification System Testing711140208/01/201608/05/20161 IPEmergency Preparedness Organization Staffing and Augmentation System711140308/01/201608/05/20161 IPEmergency Action Level and Emergency Plan Changes711140408/01/201608/05/20161 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140508/01/201608/05/201671111.08-INSERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P10/03/201610/14/2016RS 12 PI-RADIATION SAFETY31 IPRadiological Hazard Assessment and Exposure Controls71124.0110/17/201610/21/20161 IPOccupational ALARA Planning and Controls71124.0210/17/201610/21/20161 IPOccupational Exposure Control Effectiveness71151-OR0110/17/201610/21/20161 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0110/17/201610/21/2016INIT EXA-INITIAL EXAM51 INITIAL EXAM WOLF CREEK (11/2017)X0259710/16/201710/20/20171 INITIAL EXAM WOLF CREEK (11/2017)X0259711/13/201711/24/2017RS 13 PI-RADIATION SAFETY21 IPRadiological Hazard Assessment and Exposure Controls71124.0105/08/201705/12/20171 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/08/201705/12/20171 IPOccupational Exposure Control Effectiveness71151-OR0105/08/201705/12/20171 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0105/08/201705/12/2017RS 24-RADIATION SAFETY21 IPOccupational ALARA Planning and Controls71124.0206/12/201706/16/20171 IPOccupational Dose Assessment71124.0406/12/201706/16/2017EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION41 IPFire Protection [Triennial]7111105T10/02/201710/06/20171 IPFire Protection [Triennial]7111105T10/16/201710/20/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Activity Plan 2. 2016 Mid-Cycle Assessment Letter (ML16237A073)
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011
-4511 Page 1 of 2 08/30/2016 09:37:18Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteWolf CreekInspection / Activity Plan 07/01/2016
-06/30/2018TSB 52B-BIENNIAL PI&R INSPECTION 41 IPProblem Identification and Resolution71152B06/27/2016 07/01/2016 INSP-BIENNIAL REQUAL INSPECTION 21 IPLicensed Operator Requalification Program7111111B06/27/2016 07/01/2016 EP-1-EP PERFORMANCE INDICATORS 11 IPERO Readiness71151-EP02 08/01/2016 08/05/2016 1 IPAlert & Notification System Reliability71151-EP03 08/01/2016 08/05/2016 1 IPUnplanned Scrams per 7000 Critical Hrs71151-IE01 08/01/2016 08/05/2016 EP-2-BIENNIAL EP PROGRAM INSPECTION 11 IPAlert and Notification System Testing711140208/01/2016 08/05/2016 1 IPEmergency Preparedness Organization Staffing and Augmentation System711140308/01/2016 08/05/2016 1 IPEmergency Action Level and Emergency Plan Changes711140408/01/2016 08/05/2016 1 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140508/01/2016 08/05/201671111.08-INSERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P10/03/2016 10/14/2016 RS 12 PI-RADIATION SAFETY 31 IPRadiological Hazard Assessment and Exposure Controls71124.0110/17/2016 10/21/2016 1 IPOccupational ALARA Planning and Controls71124.0210/17/2016 10/21/2016 1 IPOccupational Exposure Control Effectiveness71151-OR01 10/17/2016 10/21/2016 1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 10/17/2016 10/21/2016 INIT EXA-INITIAL EXAM 51 INITIAL EXAM WOLF CREEK (11/2017)
X0259710/16/2017 10/20/2017 1 INITIAL EXAM WOLF CREEK (11/2017)
X0259711/13/201711/24/2017 RS 13 PI-RADIATION SAFETY 21 IPRadiological Hazard Assessment and Exposure Controls71124.0105/08/2017 05/12/2017 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/08/2017 05/12/2017 1 IPOccupational Exposure Control Effectiveness71151-OR01 05/08/2017 05/12/2017 1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 05/08/2017 05/12/2017 RS 24-RADIATION SAFETY 21 IPOccupational ALARA Planning and Controls71124.0206/12/2017 06/16/2017 1 IPOccupational Dose Assessment71124.0406/12/2017 06/16/2017 EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION 41 IPFire Protection [Triennial]7111105T10/02/2017 10/06/2017 1 IPFire Protection [Triennial]7111105T10/16/2017 10/20/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


Page 2 of 208/30/201609:37:18Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteWolf CreekInspection / Activity Plan07/01/2016-06/30/2018EP-2-BIENNIAL EP EXERCISE INSPECTION41 IPExercise Evaluation711140111/13/201711/17/20171 IPEmergency Action Level and Emergency Plan Changes711140411/13/201711/17/2017EP-3-EP PERFORMANCE INDICATOR VERIFICATION11 IPDrill/Exercise Performance71151-EP0111/13/201711/17/20171 IPERO Readiness71151-EP0211/13/201711/17/20171 IPAlert & Notification System Reliability71151-EP0311/13/201711/17/20177111108-INSERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P04/02/201804/13/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 2 08/30/2016 09:37:18Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteWolf CreekInspection / Activity Plan 07/01/2016
-06/30/2018 EP-2-BIENNIAL EP EXERCISE INSPECTION 41 IPExercise Evaluation711140111/13/201711/17/2017 1 IPEmergency Action Level and Emergency Plan Changes711140411/13/201711/17/2017 EP-3-EP PERFORMANCE INDICATOR VERIFICATION 11 IPDrill/Exercise Performance71151-EP0111/13/201711/17/2017 1 IPERO Readiness71151-EP0211/13/201711/17/2017 1 IPAlert & Notification System Reliability71151-EP0311/13/201711/17/20177111108-INSERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P04/02/2018 04/13/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


August 31, 2016 Adam C. Heflin, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011
-4511 August 31, 2016 Adam C. Heflin, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839


SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2016005)
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2016005)


==Dear Mr. Heflin:==
==Dear Mr. Heflin:==
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Wolf Creek Generating Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015, through June 30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Wolf Creek Generating Station operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Wolf Creek Generating Station during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. Although plant performance was within the Licensee Response Column, the NRC has not yet finalized the significance of Apparent Violation 05000482/2016008-01, "Failure to Adequately Establish and Adjust Preventive Maintenance for Emergency Diesel Generator Excitation System Diodes." This apparent violation is described in Inspection Report 05000482/2016008 (ML16235A132), issued in August 19, 2016. The final safety significance determination may affect the NRC's assessment of plant performance and the enclosed inspection plan. The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," and Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans." In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program." In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 817-200-1141 with any questions you have regarding this letter.
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC)
completed its mid-cycle performance review of Wolf Creek Generating Station
. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015, through June 30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Wolf Creek Generating Station operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Wolf Creek Generating Station during the most recent quarter was within the Licensee Response Column of the NRC
's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e.,
Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e.,
Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. Although plant performance was within the Licensee Response Column, the NRC has not yet finalized the significance of Apparent Violation 05000482/2016008
-01, "Failure to Adequately Establish and Adjust Preventive Maintenance for Emergency Diesel Generator Excitation System Diodes
." This apparent violation is described in Inspection Report 05000482/2016008 (ML16235A132), issued in August 19, 2016. The final safety significance determination may affect the NRC's assessment of plant performance and the enclosed inspection plan.


Sincerely,/RA/ Nicholas H. Taylor, Chief Projects Branch B Division of Reactor Projects Docket No.: 50-482 License No.: NPF-42  
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan.
 
The inspections listed during the second half of the inspection plan are tentative and may be revised at the end
-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non
-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA
-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond
-Design-Basis External Events
," and Order EA
-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191,
"Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi
-Unit Dose Assessment Plans." In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re
-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid
-cycle assessment process beginning in calendar year 2017. This will be the final mid
-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program."
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
 
Please contact me at 817-200-1141 with any questions you have regarding this letter.
 
Sincerely,/RA/ Nicholas H. Taylor, Chief Projects Branch B Division of Reactor Projects Docket No.: 50
-482 License No.: NPF
-42  


===Enclosure:===
===Enclosure:===
Wolf Creek Generating Station Inspection/Activity Plan Page 1 of 208/30/201609:37:18Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteWolf CreekInspection / Activity Plan07/01/2016-06/30/2018TSB 52B-BIENNIAL PI&R INSPECTION41 IPProblem Identification and Resolution71152B06/27/201607/01/2016INSP-BIENNIAL REQUAL INSPECTION21 IPLicensed Operator Requalification Program7111111B06/27/201607/01/2016EP-1-EP PERFORMANCE INDICATORS11 IPERO Readiness71151-EP0208/01/201608/05/20161 IPAlert & Notification System Reliability71151-EP0308/01/201608/05/20161 IPUnplanned Scrams per 7000 Critical Hrs71151-IE0108/01/201608/05/2016EP-2-BIENNIAL EP PROGRAM INSPECTION11 IPAlert and Notification System Testing711140208/01/201608/05/20161 IPEmergency Preparedness Organization Staffing and Augmentation System711140308/01/201608/05/20161 IPEmergency Action Level and Emergency Plan Changes711140408/01/201608/05/20161 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140508/01/201608/05/201671111.08-INSERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P10/03/201610/14/2016RS 12 PI-RADIATION SAFETY31 IPRadiological Hazard Assessment and Exposure Controls71124.0110/17/201610/21/20161 IPOccupational ALARA Planning and Controls71124.0210/17/201610/21/20161 IPOccupational Exposure Control Effectiveness71151-OR0110/17/201610/21/20161 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0110/17/201610/21/2016INIT EXA-INITIAL EXAM51 INITIAL EXAM WOLF CREEK (11/2017)X0259710/16/201710/20/20171 INITIAL EXAM WOLF CREEK (11/2017)X0259711/13/201711/24/2017RS 13 PI-RADIATION SAFETY21 IPRadiological Hazard Assessment and Exposure Controls71124.0105/08/201705/12/20171 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/08/201705/12/20171 IPOccupational Exposure Control Effectiveness71151-OR0105/08/201705/12/20171 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0105/08/201705/12/2017RS 24-RADIATION SAFETY21 IPOccupational ALARA Planning and Controls71124.0206/12/201706/16/20171 IPOccupational Dose Assessment71124.0406/12/201706/16/2017EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION41 IPFire Protection [Triennial]7111105T10/02/201710/06/20171 IPFire Protection [Triennial]7111105T10/16/201710/20/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Wolf Creek Generating Station Inspection/Activity Plan Page 1 of 2 08/30/2016 09:37:18Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteWolf CreekInspection / Activity Plan 07/01/2016
-06/30/2018TSB 52B-BIENNIAL PI&R INSPECTION 41 IPProblem Identification and Resolution71152B06/27/2016 07/01/2016 INSP-BIENNIAL REQUAL INSPECTION 21 IPLicensed Operator Requalification Program7111111B06/27/2016 07/01/2016 EP-1-EP PERFORMANCE INDICATORS 11 IPERO Readiness71151-EP02 08/01/2016 08/05/2016 1 IPAlert & Notification System Reliability71151-EP03 08/01/2016 08/05/2016 1 IPUnplanned Scrams per 7000 Critical Hrs71151-IE01 08/01/2016 08/05/2016 EP-2-BIENNIAL EP PROGRAM INSPECTION 11 IPAlert and Notification System Testing711140208/01/2016 08/05/2016 1 IPEmergency Preparedness Organization Staffing and Augmentation System711140308/01/2016 08/05/2016 1 IPEmergency Action Level and Emergency Plan Changes711140408/01/2016 08/05/2016 1 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140508/01/2016 08/05/201671111.08-INSERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P10/03/2016 10/14/2016 RS 12 PI-RADIATION SAFETY 31 IPRadiological Hazard Assessment and Exposure Controls71124.0110/17/2016 10/21/2016 1 IPOccupational ALARA Planning and Controls71124.0210/17/2016 10/21/2016 1 IPOccupational Exposure Control Effectiveness71151-OR01 10/17/2016 10/21/2016 1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 10/17/2016 10/21/2016 INIT EXA-INITIAL EXAM 51 INITIAL EXAM WOLF CREEK (11/2017)
X0259710/16/2017 10/20/2017 1 INITIAL EXAM WOLF CREEK (11/2017)
X0259711/13/201711/24/2017 RS 13 PI-RADIATION SAFETY 21 IPRadiological Hazard Assessment and Exposure Controls71124.0105/08/2017 05/12/2017 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/08/2017 05/12/2017 1 IPOccupational Exposure Control Effectiveness71151-OR01 05/08/2017 05/12/2017 1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 05/08/2017 05/12/2017 RS 24-RADIATION SAFETY 21 IPOccupational ALARA Planning and Controls71124.0206/12/2017 06/16/2017 1 IPOccupational Dose Assessment71124.0406/12/2017 06/16/2017 EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION 41 IPFire Protection [Triennial]7111105T10/02/2017 10/06/2017 1 IPFire Protection [Triennial]7111105T10/16/2017 10/20/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
 
Page 2 of 2 08/30/2016 09:37:18Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteWolf CreekInspection / Activity Plan 07/01/2016
-06/30/2018 EP-2-BIENNIAL EP EXERCISE INSPECTION 41 IPExercise Evaluation711140111/13/201711/17/2017 1 IPEmergency Action Level and Emergency Plan Changes711140411/13/201711/17/2017 EP-3-EP PERFORMANCE INDICATOR VERIFICATION 11 IPDrill/Exercise Performance71151-EP0111/13/201711/17/2017 1 IPERO Readiness71151-EP0211/13/201711/17/2017 1 IPAlert & Notification System Reliability71151-EP0311/13/201711/17/20177111108-INSERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P04/02/2018 04/13/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
 
ML16237A073 SUNSI ReviewBy: NHT ADAMS Yes NoPublicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE: RIV SPE:DRP/B D: DRS D: DRP C: DRP/B NAME DProulx AVegel TWPruett NTaylor SIGNATURE
/RA/ /RA Jeff Clark for/
/RA/ /RA/ DATE 8/22/16 8/22/16 8/23/16 8/24/16 Letter to Adam from Nicholas H. Taylor dated August 31, 2016
 
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2016005)
DISTRIBUTION
: Regional Administrator (Kriss.Kennedy@nrc.gov)


Page 2 of 208/30/201609:37:18Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteWolf CreekInspection / Activity Plan07/01/2016-06/30/2018EP-2-BIENNIAL EP EXERCISE INSPECTION41 IPExercise Evaluation711140111/13/201711/17/20171 IPEmergency Action Level and Emergency Plan Changes711140411/13/201711/17/2017EP-3-EP PERFORMANCE INDICATOR VERIFICATION11 IPDrill/Exercise Performance71151-EP0111/13/201711/17/20171 IPERO Readiness71151-EP0211/13/201711/17/20171 IPAlert & Notification System Reliability71151-EP0311/13/201711/17/20177111108-INSERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P04/02/201804/13/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Douglas.Dodson@nrc.gov)
Resident Inspector (Fabian.Thomas@nrc.gov)
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
Wolf Creek Administrative Assistant (Susan.Galemore@nrc.gov
) Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Fred.Lyon@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)


ML16237A073 SUNSI ReviewBy: NHT ADAMS Yes NoPublicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE: RIV SPE:DRP/B D: DRS D: DRP C: DRP/B NAME DProulx AVegel TWPruett NTaylor SIGNATURE /RA/ /RA Jeff Clark for/ /RA/ /RA/ DATE 8/22/16 8/22/16 8/23/16 8/24/16 Letter to Adam from Nicholas H. Taylor dated August 31, 2016
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
Director, DIRS, NRR (Chris.Miller@nrc.gov)
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
DRP Branch Chiefs (R4DRPBC@nrc.gov)
DRS Branch Chiefs (R4DRSBC@nrc.gov)
ROPreports.Resource@nrc.g ov ROPassessment.Resource@nrc.gov


SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2016005) DISTRIBUTION: Regional Administrator (Kriss.Kennedy@nrc.gov)
ML16256A117
Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Douglas.Dodson@nrc.gov) Resident Inspector (Fabian.Thomas@nrc.gov) Branch Chief, DRP/B (Nick.Taylor@nrc.gov) Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) Project Engineer, DRP/B (Steven.Janicki@nrc.gov) Wolf Creek Administrative Assistant (Susan.Galemore@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Project Manager (Fred.Lyon@nrc.gov) Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)
/ PACKAGE: ML16256A118 SUNSI Review By: EDU ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE TL:IPAT NAME THipschman SIGNATURE
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) RIV RSLO (Bill.Maier@nrc.gov) Director, DIRS, NRR (Chris.Miller@nrc.gov) Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov) Director, DORL, NRR (Anne.Boland@nrc.gov) Deputy Director, DORL, NRR (George.Wilson@nrc.gov) Director, NSIR (Brian.Holian@nrc.gov) Director, DPR, NSIR (Marissa.Bailey@nrc.gov) DRP Branch Chiefs (R4DRPBC@nrc.gov) DRS Branch Chiefs (R4DRSBC@nrc.gov) ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov
/RA/ DATE 9/12/16 Letter to Adam from Thomas R. Hipschman dated September 12, 2016


ML16256A117 / PACKAGE: ML16256A118 SUNSI Review By: EDU ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE TL:IPAT NAME THipschman SIGNATURE /RA/ DATE 9/12/16 Letter to Adam from Thomas R. Hipschman dated September 12, 2016 SUBJECT: ERRATA FOR MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2016005) DISTRIBUTION: Regional Administrator (Kriss.Kennedy@nrc.gov) Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Douglas.Dodson@nrc.gov) Resident Inspector (Fabian.Thomas@nrc.gov) Administrative Assistant (Susan.Galemore@nrc.gov) Branch Chief, DRP/B (Nick.Taylor@nrc.gov) Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) Project Engineer, DRP/B (Steven.Janicki@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Project Manager (Fred.Lyon@nrc.gov) Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) RIV RSLO (Bill.Maier@nrc.gov) Director, DIRS, NRR (Chris.Miller@nrc.gov) Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov) Director, DORL, NRR (Anne.Boland@nrc.gov) Deputy Director, DORL, NRR (George.Wilson@nrc.gov) Director, NSIR (Brian.Holian@nrc.gov) Director, DPR, NSIR (Marissa.Bailey@nrc.gov) DRP Branch Chiefs (G-R4-DRP-BC@nrc.gov) DRS Branch Chiefs (R4DRS-BC1@nrc.gov) ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov
SUBJECT:
ERRATA FOR MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2016005)
DISTRIBUTION
: Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Douglas.Dodson@nrc.gov)
Resident Inspector (Fabian.Thomas@nrc.gov)
Administrative Assistant (Susan.Galemore@nrc.gov)
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov
) Project Manager (Fred.Lyon@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov) Director, DIRS, NRR (Chris.Miller@nrc.gov)
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
DRP Branch Chiefs (G
-R4-DRP-BC@nrc.gov)
DRS Branch Chiefs (R4DRS
-BC1@nrc.gov)
ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov
}}
}}

Revision as of 03:19, 30 June 2018

Errata for Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2016005)
ML16256A117
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/12/2016
From: Hipschman T R
Division of Reactor Safety IV
To: Heflin A C
Wolf Creek
Hipschman T R
Shared Package
ML16256A118 List:
References
ML16237A073 IR 2016005
Download: ML16256A117 (11)


Text

September 12, 2016

Adam C. Heflin, President, Chief Executive Officer and Chief Nuclear Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839

SUBJECT: ERRATA FOR MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2016005)

Dear Mr. Heflin:

It was identified that the enclosed inspection plan in a letter to you dated August 31, 2016 (ML16237A073) was improperly marked. The inspection plan contained the markings of "Official Use Only

- Sensitive Internal Information/Security

-Related Information", however, the inspection plan did not contain information under that category. The inspection plan that was originally placed into ADAMS has been corrected by striking through the markings. The original Mid-Cycle Assessment Letter and the corrected inspection plan are enclosed. Please note that neither the content of the assessment letter, nor the inspection plan has changed.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Thomas R. Hipschman, Team Lead er Inspection Program and Assessment Team Division of Reactor Safety Docket Nos.: 50-482 License Nos.: NPF-42 Enclosure s: 1. Wolf Creek Generating Station Inspection/

Activity Plan 2. 2016 Mid-Cycle Assessment Letter (ML16237A073)

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011

-4511 Page 1 of 2 08/30/2016 09:37:18Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteWolf CreekInspection / Activity Plan 07/01/2016

-06/30/2018TSB 52B-BIENNIAL PI&R INSPECTION 41 IPProblem Identification and Resolution71152B06/27/2016 07/01/2016 INSP-BIENNIAL REQUAL INSPECTION 21 IPLicensed Operator Requalification Program7111111B06/27/2016 07/01/2016 EP-1-EP PERFORMANCE INDICATORS 11 IPERO Readiness71151-EP02 08/01/2016 08/05/2016 1 IPAlert & Notification System Reliability71151-EP03 08/01/2016 08/05/2016 1 IPUnplanned Scrams per 7000 Critical Hrs71151-IE01 08/01/2016 08/05/2016 EP-2-BIENNIAL EP PROGRAM INSPECTION 11 IPAlert and Notification System Testing711140208/01/2016 08/05/2016 1 IPEmergency Preparedness Organization Staffing and Augmentation System711140308/01/2016 08/05/2016 1 IPEmergency Action Level and Emergency Plan Changes711140408/01/2016 08/05/2016 1 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140508/01/2016 08/05/201671111.08-INSERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P10/03/2016 10/14/2016 RS 12 PI-RADIATION SAFETY 31 IPRadiological Hazard Assessment and Exposure Controls71124.0110/17/2016 10/21/2016 1 IPOccupational ALARA Planning and Controls71124.0210/17/2016 10/21/2016 1 IPOccupational Exposure Control Effectiveness71151-OR01 10/17/2016 10/21/2016 1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 10/17/2016 10/21/2016 INIT EXA-INITIAL EXAM 51 INITIAL EXAM WOLF CREEK (11/2017)

X0259710/16/2017 10/20/2017 1 INITIAL EXAM WOLF CREEK (11/2017)

X0259711/13/201711/24/2017 RS 13 PI-RADIATION SAFETY 21 IPRadiological Hazard Assessment and Exposure Controls71124.0105/08/2017 05/12/2017 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/08/2017 05/12/2017 1 IPOccupational Exposure Control Effectiveness71151-OR01 05/08/2017 05/12/2017 1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 05/08/2017 05/12/2017 RS 24-RADIATION SAFETY 21 IPOccupational ALARA Planning and Controls71124.0206/12/2017 06/16/2017 1 IPOccupational Dose Assessment71124.0406/12/2017 06/16/2017 EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION 41 IPFire Protection [Triennial]7111105T10/02/2017 10/06/2017 1 IPFire Protection [Triennial]7111105T10/16/2017 10/20/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 2 08/30/2016 09:37:18Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteWolf CreekInspection / Activity Plan 07/01/2016

-06/30/2018 EP-2-BIENNIAL EP EXERCISE INSPECTION 41 IPExercise Evaluation711140111/13/201711/17/2017 1 IPEmergency Action Level and Emergency Plan Changes711140411/13/201711/17/2017 EP-3-EP PERFORMANCE INDICATOR VERIFICATION 11 IPDrill/Exercise Performance71151-EP0111/13/201711/17/2017 1 IPERO Readiness71151-EP0211/13/201711/17/2017 1 IPAlert & Notification System Reliability71151-EP0311/13/201711/17/20177111108-INSERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P04/02/2018 04/13/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011

-4511 August 31, 2016 Adam C. Heflin, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2016005)

Dear Mr. Heflin:

On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC)

completed its mid-cycle performance review of Wolf Creek Generating Station

. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015, through June 30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Wolf Creek Generating Station operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Wolf Creek Generating Station during the most recent quarter was within the Licensee Response Column of the NRC

's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e.,

Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e.,

Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. Although plant performance was within the Licensee Response Column, the NRC has not yet finalized the significance of Apparent Violation 05000482/2016008

-01, "Failure to Adequately Establish and Adjust Preventive Maintenance for Emergency Diesel Generator Excitation System Diodes

." This apparent violation is described in Inspection Report 05000482/2016008 (ML16235A132), issued in August 19, 2016. The final safety significance determination may affect the NRC's assessment of plant performance and the enclosed inspection plan.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the second half of the inspection plan are tentative and may be revised at the end

-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non

-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA

-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond

-Design-Basis External Events

," and Order EA

-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191,

"Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi

-Unit Dose Assessment Plans." In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re

-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid

-cycle assessment process beginning in calendar year 2017. This will be the final mid

-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program."

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 817-200-1141 with any questions you have regarding this letter.

Sincerely,/RA/ Nicholas H. Taylor, Chief Projects Branch B Division of Reactor Projects Docket No.: 50

-482 License No.: NPF

-42

Enclosure:

Wolf Creek Generating Station Inspection/Activity Plan Page 1 of 2 08/30/2016 09:37:18Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteWolf CreekInspection / Activity Plan 07/01/2016

-06/30/2018TSB 52B-BIENNIAL PI&R INSPECTION 41 IPProblem Identification and Resolution71152B06/27/2016 07/01/2016 INSP-BIENNIAL REQUAL INSPECTION 21 IPLicensed Operator Requalification Program7111111B06/27/2016 07/01/2016 EP-1-EP PERFORMANCE INDICATORS 11 IPERO Readiness71151-EP02 08/01/2016 08/05/2016 1 IPAlert & Notification System Reliability71151-EP03 08/01/2016 08/05/2016 1 IPUnplanned Scrams per 7000 Critical Hrs71151-IE01 08/01/2016 08/05/2016 EP-2-BIENNIAL EP PROGRAM INSPECTION 11 IPAlert and Notification System Testing711140208/01/2016 08/05/2016 1 IPEmergency Preparedness Organization Staffing and Augmentation System711140308/01/2016 08/05/2016 1 IPEmergency Action Level and Emergency Plan Changes711140408/01/2016 08/05/2016 1 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140508/01/2016 08/05/201671111.08-INSERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P10/03/2016 10/14/2016 RS 12 PI-RADIATION SAFETY 31 IPRadiological Hazard Assessment and Exposure Controls71124.0110/17/2016 10/21/2016 1 IPOccupational ALARA Planning and Controls71124.0210/17/2016 10/21/2016 1 IPOccupational Exposure Control Effectiveness71151-OR01 10/17/2016 10/21/2016 1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 10/17/2016 10/21/2016 INIT EXA-INITIAL EXAM 51 INITIAL EXAM WOLF CREEK (11/2017)

X0259710/16/2017 10/20/2017 1 INITIAL EXAM WOLF CREEK (11/2017)

X0259711/13/201711/24/2017 RS 13 PI-RADIATION SAFETY 21 IPRadiological Hazard Assessment and Exposure Controls71124.0105/08/2017 05/12/2017 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/08/2017 05/12/2017 1 IPOccupational Exposure Control Effectiveness71151-OR01 05/08/2017 05/12/2017 1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 05/08/2017 05/12/2017 RS 24-RADIATION SAFETY 21 IPOccupational ALARA Planning and Controls71124.0206/12/2017 06/16/2017 1 IPOccupational Dose Assessment71124.0406/12/2017 06/16/2017 EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION 41 IPFire Protection [Triennial]7111105T10/02/2017 10/06/2017 1 IPFire Protection [Triennial]7111105T10/16/2017 10/20/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 2 08/30/2016 09:37:18Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteWolf CreekInspection / Activity Plan 07/01/2016

-06/30/2018 EP-2-BIENNIAL EP EXERCISE INSPECTION 41 IPExercise Evaluation711140111/13/201711/17/2017 1 IPEmergency Action Level and Emergency Plan Changes711140411/13/201711/17/2017 EP-3-EP PERFORMANCE INDICATOR VERIFICATION 11 IPDrill/Exercise Performance71151-EP0111/13/201711/17/2017 1 IPERO Readiness71151-EP0211/13/201711/17/2017 1 IPAlert & Notification System Reliability71151-EP0311/13/201711/17/20177111108-INSERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P04/02/2018 04/13/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

ML16237A073 SUNSI ReviewBy: NHT ADAMS Yes NoPublicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE: RIV SPE:DRP/B D: DRS D: DRP C: DRP/B NAME DProulx AVegel TWPruett NTaylor SIGNATURE

/RA/ /RA Jeff Clark for/

/RA/ /RA/ DATE 8/22/16 8/22/16 8/23/16 8/24/16 Letter to Adam from Nicholas H. Taylor dated August 31, 2016

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2016005)

DISTRIBUTION

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Douglas.Dodson@nrc.gov)

Resident Inspector (Fabian.Thomas@nrc.gov)

Branch Chief, DRP/B (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

Wolf Creek Administrative Assistant (Susan.Galemore@nrc.gov

) Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Fred.Lyon@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Director, DIRS, NRR (Chris.Miller@nrc.gov)

Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

Director, DPR, NSIR (Marissa.Bailey@nrc.gov)

DRP Branch Chiefs (R4DRPBC@nrc.gov)

DRS Branch Chiefs (R4DRSBC@nrc.gov)

ROPreports.Resource@nrc.g ov ROPassessment.Resource@nrc.gov

ML16256A117

/ PACKAGE: ML16256A118 SUNSI Review By: EDU ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE TL:IPAT NAME THipschman SIGNATURE

/RA/ DATE 9/12/16 Letter to Adam from Thomas R. Hipschman dated September 12, 2016

SUBJECT:

ERRATA FOR MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2016005)

DISTRIBUTION

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Douglas.Dodson@nrc.gov)

Resident Inspector (Fabian.Thomas@nrc.gov)

Administrative Assistant (Susan.Galemore@nrc.gov)

Branch Chief, DRP/B (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov

) Project Manager (Fred.Lyon@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov) Director, DIRS, NRR (Chris.Miller@nrc.gov)

Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

Director, DPR, NSIR (Marissa.Bailey@nrc.gov)

DRP Branch Chiefs (G

-R4-DRP-BC@nrc.gov)

DRS Branch Chiefs (R4DRS

-BC1@nrc.gov)

ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov