{{#Wiki_filter:LGS UFSAR CHAPTER 17 17-i REV. 13, SEPTEMBER 2006 CHAPTER 17 - QUALITY ASSURANCE TABLE OF CONTENTS | {{#Wiki_filter:LGS UFSAR | ||
CHAPTER 17 17-i REV. 13, SEPTEMBER 2006 CHAPTER 17 - QUALITY ASSURANCE | |||
TABLE OF CONTENTS 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION | |||
17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE | |||
APPENDIX 17.2B - Deleted. | APPENDIX 17.2B - Deleted. | ||
| Line 23: | Line 29: | ||
APPENDIX 17.2.II - Deleted. | APPENDIX 17.2.II - Deleted. | ||
17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section is not applicable to the LGS UFSAR. | LGS UFSAR CHAPTER 17 17.2-1 REV. 13, SEPTEMBER 2006 CHAPTER 17 - QUALITY ASSURANCE | ||
17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION | |||
This section is not applicable to the LGS UFSAR. | |||
17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE | |||
The licensee is responsible for the operation and maintenance of Limerick Generating Station | |||
(LGS). These activities are presently conducted in accordance with the NRC approved Quality | |||
Assurance Topical Report (QATR) which descr ibes the formal and comprehensive control methods established to assure compliance with 10CFR50, Appendix B. | |||
The QATR describes how the Quality Assurance Pr ogram is to be functionally implemented with due regard to the safety and health of the public and the personnel on site. The LGS Quality | |||
Assurance Program as described by the QA TR is incorporated herein by reference.}} | |||
Revision as of 00:34, 30 June 2018
| ML16357A151 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 09/19/2016 |
| From: | Exelon Generation Co |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16357A167 | List:
|
| References | |
| Download: ML16357A151 (2) | |
Text
CHAPTER 17 17-i REV. 13, SEPTEMBER 2006 CHAPTER 17 - QUALITY ASSURANCE
TABLE OF CONTENTS 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION
17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE
APPENDIX 17.2B - Deleted.
APPENDIX 17.2.I - Deleted.
APPENDIX 17.2.II - Deleted.
LGS UFSAR CHAPTER 17 17.2-1 REV. 13, SEPTEMBER 2006 CHAPTER 17 - QUALITY ASSURANCE
17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION
This section is not applicable to the LGS UFSAR.
17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE
The licensee is responsible for the operation and maintenance of Limerick Generating Station
(LGS). These activities are presently conducted in accordance with the NRC approved Quality
Assurance Topical Report (QATR) which descr ibes the formal and comprehensive control methods established to assure compliance with 10CFR50, Appendix B.
The QATR describes how the Quality Assurance Pr ogram is to be functionally implemented with due regard to the safety and health of the public and the personnel on site. The LGS Quality