On February 16, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance assessment of Columbia Generating Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The NRC determined the performance at Columbia Generating Station, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC's Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. M. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (817) 200-1148 with any questions you have regarding this letter.
On February 16, 2017, t he U.S. Nuclear Regulatory Commission (NRC)
completed its end-of-cycle performance assessment of Columbia Generating Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.


Sincerely,/RA/ Jeremy R. Groom, Chief Project Branch A Division of Reactor Projects Docket Nos. 05000397 License Nos. NPF-21  
The NRC determined the performance at Columbia Generating Station, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC's Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e.,
Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
 
The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
 
This inspection plan does not include the plan for security
-related inspections, which will be sent via separate, non
-publicly available correspondence.
 
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011
-4511 M. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
 
Please contact me at (817) 200
-1148 with any questions you have regarding this letter.
 
Sincerely,/RA/ Jeremy R. Groom, Chief Project Branch A Division of Reactor Projects Docket Nos.
 
05000397 License Nos. NPF-21  


===Enclosure:===
===Enclosure:===
Columbia Generating Station Inspection/ Activity Plan  
Columbia Generating Station Inspection/ Activity Plan  


SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: RDA/dll Yes No Publicly Available Sensitive NRC-002 OFFICE SPE: DRP/A D:DRS DD:DRP C: DRP/A NAME RAlexander AVegel RLantz JGroom SIGNATURE /RA/ /RA JClark for/ /RA/ /RA/ DATE 02/16/2017 2/23/17 2/27/17 2/13/17 Columbia Generating StatiInspection / Activity Plan01/01/2017-12/31/2018UnitNumberReport 22No. of Staffon SitePlanned DatesStart EndInspection ActivityTitlePage 1 of 202/23/2017 11:42:394EXAM-INITIAL EXAM 2 01/23/201701/27/2017X02586INITIAL EXAM CGS (02/2017) 2 02/27/201703/09/2017X02586INITIAL EXAM CGS (02/2017)2SITSCRAM-SPECIAL INSP - SCRAM W/ COMPLICATIONS 2 01/08/201706/10/2017IP93812Special Inspection1EP-1-BIENNIAL EP PROGRAM INSPECTION 2 01/30/201702/03/2017IP7111402Alert and Notification System Testing 2 01/30/201702/03/2017IP7111403Emergency Preparedness Organization Staffing and Augmentation System 2 01/30/201702/03/2017IP7111404Emergency Action Level and Emergency Plan Changes 2 01/30/201702/03/2017IP7111405Correction of Emergency Preparedness Weaknesses and Deficiencies1EP-2-EP PERFORMANCE INDICATOR VERIFICATION 2 01/30/201702/03/2017IP71151-EP01Drill/Exercise Performance 2 01/30/201702/03/2017IP71151-EP02ERO Readiness 2 01/30/201702/03/2017IP71151-EP03Alert & Notification System Reliability5TSB 52B-BIENNIAL PI&R 2 02/13/201702/17/2017IP71152BProblem Identification and Resolution 2 02/27/201703/03/2017IP71152BProblem Identification and Resolution171111.08-INSERVICE INSPECTION 2 05/22/201705/26/2017IP7111108GInservice Inspection Activities - BWR2RS 12 PI-RADIATION SAFETY 2 05/22/201705/26/2017IP71124.01Radiological Hazard Assessment and Exposure Controls 2 05/22/201705/26/2017IP71124.02Occupational ALARA Planning and Controls 2 05/22/201705/26/2017IP71151-OR01Occupational Exposure Control Effectiveness 2 05/22/201705/26/2017IP71151-PR01RETS/ODCM Radiological Effluent Occurrences4RS 5678-RS TEAM 2 09/11/201709/15/2017IP71124.05Radiation Monitoring Instrumentation 2 09/11/201709/15/2017IP71124.06Radioactive Gaseous and Liquid Effluent Treatment 2 09/11/201709/15/2017IP71124.07Radiological Environmental Monitoring Program 2 09/11/201709/15/2017IP71124.08Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation3EB1-17T-CGS 50.59 EVALUATIONS OF CHANGES, TEST, 2 10/02/201710/06/2017IP7111117TEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications4EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION 2 04/09/201804/13/2018IP7111105TFire Protection [Triennial]This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: RDA/dll Yes No Publicly Available Sensitive NRC-002 OFFICE SPE: DRP/A D:DRS DD:DRP C: DRP/A NAME RAlexander AVegel RLantz JGroom SIGNATURE
/RA/ /RA JClark for/ /RA/ /RA/ DATE 02/16/2017 2/23/17 2/27/17 2/13/17 Columbia Generating StatiInspection / Activity Plan 01/01/2017
-12/31/2018 UnitNumberReport 22 No. of Staff on SitePlanned Dates Start EndInspection ActivityTitlePage 1 of 202/23/2017 11:42:39 4EXAM-INITIAL EXAM 2 01/23/2017 01/27/2017 X02586INITIAL EXAM CGS (02/2017)
2 02/27/2017 03/09/2017 X02586INITIAL EXAM CGS (02/2017)
2SITSCRAM-SPECIAL INSP - SCRAM W/ COMPLICATIONS 2 01/08/2017 06/10/2017 IP93812Special Inspection 1EP-1-BIENNIAL EP PROGRAM INSPECTION 2 01/30/2017 02/03/2017 IP7111402Alert and Notification System Testing 2 01/30/2017 02/03/2017 IP7111403Emergency Preparedness Organization Staffing and Augmentation System 2 01/30/2017 02/03/2017 IP7111404Emergency Action Level and Emergency Plan Changes 2 01/30/2017 02/03/2017 IP7111405Correction of Emergency Preparedness Weaknesses and Deficiencies 1EP-2-EP PERFORMANCE INDICATOR VERIFICATION 2 01/30/2017 02/03/2017 IP71151-EP01Drill/Exercise Performance 2 01/30/2017 02/03/2017 IP71151-EP02 ERO Readiness 2 01/30/2017 02/03/2017 IP71151-EP03 Alert & Notification System Reliabilit y5TSB 52B-BIENNIAL PI&R 2 02/13/2017 02/17/2017 IP71152BProblem Identification and Resolution 2 02/27/2017 03/03/2017 IP71152BProblem Identification and Resolution 171111.08-INSERVICE INSPECTION 2 05/22/2017 05/26/2017 IP7111108GInservice Inspection Activities - BWR 2RS 12 PI-RADIATION SAFETY 2 05/22/2017 05/26/2017 IP71124.01Radiological Hazard Assessment and Exposure Controls 2 05/22/2017 05/26/2017 IP71124.02Occupational ALARA Planning and Controls 2 05/22/2017 05/26/2017 IP71151-OR01Occupational Exposure Control Effectiveness 2 05/22/2017 05/26/2017 IP71151-PR01RETS/ODCM Radiological Effluent Occurrences 4RS 5678-RS TEAM 2 09/11/2017 09/15/2017 IP71124.05Radiation Monitoring Instrumentation 2 09/11/2017 09/15/2017 IP71124.06Radioactive Gaseous and Liquid Effluent Treatment 2 09/11/2017 09/15/2017 IP71124.07Radiological Environmental Monitoring Program 2 09/11/2017 09/15/2017 IP71124.08Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3EB1-17T-CGS 50.59 EVALUATIONS OF CHANGES, TEST, 2 10/02/2017 10/06/2017 IP7111117TEvaluations of Changes, Tests, and Exper iments and Permanent Plant Modifications 4EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION 2 04/09/2018 04/13/2018 IP7111105TFire Protection [Triennial]
This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


Columbia Generating StatiInspection / Activity Plan01/01/2017-12/31/2018UnitNumberReport 22No. of Staffon SitePlanned DatesStart EndInspection ActivityTitlePage 2 of 202/23/2017 11:42:394EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION 2 04/23/201804/27/2018IP7111105TFire Protection [Triennial]4EP-1-EP EXERCISE INSPECTION 2 03/26/201803/30/2018IP7111401Exercise Evaluation 2 03/26/201803/30/2018IP7111404Emergency Action Level and Emergency Plan Changes1EP-3-EP PERFORMANCE INDICATORS 2 03/26/201803/30/2018IP71151-EP01Drill/Exercise Performance 2 03/26/201803/30/2018IP71151-EP02ERO Readiness 2 03/26/201803/30/2018IP71151-EP03Alert & Notification System Reliability1EB1-07T-CGS HEAT SINK PERFORMANCE 2 05/14/201805/18/2018IP7111107THeat Sink Performance2RS 24-RAD SAFETY 2 05/21/201805/25/2018IP71124.02Occupational ALARA Planning and Controls 2 05/21/201805/25/2018IP71124.04Occupational Dose Assessment2RS 13PI-RAD SAFETY 2 09/10/201809/14/2018IP71124.01Radiological Hazard Assessment and Exposure Controls 2 09/10/201809/14/2018IP71124.03In-Plant Airborne Radioactivity Control and Mitigation 2 09/10/201809/14/2018IP71151-OR01Occupational Exposure Control Effectiveness 2 09/10/201809/14/2018IP71151-PR01RETS/ODCM Radiological Effluent Occurrences3BRQ-BRQ INSPECTION 2 10/15/201812/31/2018IP7111111BLicensed Operator Requalification Program3EB1-21N-CGS DESIGN BASES PROGRAMS INSPECTION 2 10/22/201811/09/2018IP7111121NComponent Design Bases Inspection (Programs)Comments:This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Columbia Generating StatiInspection / Activity Plan 01/01/2017
-12/31/2018 UnitNumberReport 22 No. of Staff on SitePlanned Dates Start EndInspection ActivityTitlePage 2 of 202/23/2017 11:42:39 4EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION 2 04/23/2018 04/27/2018 IP7111105TFire Protection [Triennial]
4EP-1-EP EXERCISE INSPECTION 2 03/26/2018 03/30/2018 IP7111401Exercise Evaluation 2 03/26/2018 03/30/2018 IP7111404Emergency Action Level and Emergency Plan Changes 1EP-3-EP PERFORMANCE INDICATORS 2 03/26/2018 03/30/2018 IP71151-EP01Drill/Exercise Performance 2 03/26/2018 03/30/2018 IP71151-EP02 ERO Readiness 2 03/26/2018 03/30/2018 IP71151-EP03 Alert & Notification System Reliabilit y1EB1-07T-CGS HEAT SINK PERFORMANCE 2 05/14/2018 05/18/2018 IP7111107THeat Sink Performance 2RS 24-RAD SAFETY 2 05/21/2018 05/25/2018 IP71124.02Occupational ALARA Planning and Controls 2 05/21/2018 05/25/2018 IP71124.04Occupational Dose Assessment 2RS 13PI-RAD SAFETY 2 09/10/2018 09/14/2018 IP71124.01Radiological Hazard Assessment and Exposure Controls 2 09/10/2018 09/14/2018 IP71124.03In-Plant Airborne Radioactivity Control and Mitigation 2 09/10/2018 09/14/2018 IP71151-OR01Occupational Exposure Control Effectiveness 2 09/10/2018 09/14/2018 IP71151-PR01RETS/ODCM Radiological Effluent Occurrences 3BRQ-BRQ INSPECTION 2 10/15/2018 12/31/2018 IP7111111BLicensed Operator Requalification Program 3EB1-21N-CGS DESIGN BASES PROGRAMS INSPECTION 2 10/22/201811/09/2018 IP7111121NComponent Design Bases Inspection (Programs)
Comments:
This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 21:42, 29 June 2018

Annual Assessment Letter for Columbia Generating Station (Report 05000397/2016006)
ML17059D545
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/01/2017
From: Groom J R
NRC/RGN-IV/DRP/RPB-A
To: Reddemann M E
Energy Northwest
JEREMY GROOM
References
IR 2016006
Download: ML17059D545 (5)


Text

March 1, 2017

Mr. Mark Chief Executive Officer Energy Northwest MD 1023 76 North Power Plant Loop P.O. Box 968 Richland, WA 99352

SUBJECT: ANNUAL ASSESSMENT LETTER FOR COLUMBIA GENERATING STATION (REPORT 05000397/2016006)

Dear Mr. Reddemann:

On February 16, 2017, t he U.S. Nuclear Regulatory Commission (NRC)

completed its end-of-cycle performance assessment of Columbia Generating Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Columbia Generating Station, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC's Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e.,

Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include the plan for security

-related inspections, which will be sent via separate, non

-publicly available correspondence.

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011

-4511 M. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (817) 200

-1148 with any questions you have regarding this letter.

Sincerely,/RA/ Jeremy R. Groom, Chief Project Branch A Division of Reactor Projects Docket Nos.

05000397 License Nos. NPF-21

Enclosure:

Columbia Generating Station Inspection/ Activity Plan

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: RDA/dll Yes No Publicly Available Sensitive NRC-002 OFFICE SPE: DRP/A D:DRS DD:DRP C: DRP/A NAME RAlexander AVegel RLantz JGroom SIGNATURE

/RA/ /RA JClark for/ /RA/ /RA/ DATE 02/16/2017 2/23/17 2/27/17 2/13/17 Columbia Generating StatiInspection / Activity Plan 01/01/2017

-12/31/2018 UnitNumberReport 22 No. of Staff on SitePlanned Dates Start EndInspection ActivityTitlePage 1 of 202/23/2017 11:42:39 4EXAM-INITIAL EXAM 2 01/23/2017 01/27/2017 X02586INITIAL EXAM CGS (02/2017)

2 02/27/2017 03/09/2017 X02586INITIAL EXAM CGS (02/2017)

2SITSCRAM-SPECIAL INSP - SCRAM W/ COMPLICATIONS 2 01/08/2017 06/10/2017 IP93812Special Inspection 1EP-1-BIENNIAL EP PROGRAM INSPECTION 2 01/30/2017 02/03/2017 IP7111402Alert and Notification System Testing 2 01/30/2017 02/03/2017 IP7111403Emergency Preparedness Organization Staffing and Augmentation System 2 01/30/2017 02/03/2017 IP7111404Emergency Action Level and Emergency Plan Changes 2 01/30/2017 02/03/2017 IP7111405Correction of Emergency Preparedness Weaknesses and Deficiencies 1EP-2-EP PERFORMANCE INDICATOR VERIFICATION 2 01/30/2017 02/03/2017 IP71151-EP01Drill/Exercise Performance 2 01/30/2017 02/03/2017 IP71151-EP02 ERO Readiness 2 01/30/2017 02/03/2017 IP71151-EP03 Alert & Notification System Reliabilit y5TSB 52B-BIENNIAL PI&R 2 02/13/2017 02/17/2017 IP71152BProblem Identification and Resolution 2 02/27/2017 03/03/2017 IP71152BProblem Identification and Resolution 171111.08-INSERVICE INSPECTION 2 05/22/2017 05/26/2017 IP7111108GInservice Inspection Activities - BWR 2RS 12 PI-RADIATION SAFETY 2 05/22/2017 05/26/2017 IP71124.01Radiological Hazard Assessment and Exposure Controls 2 05/22/2017 05/26/2017 IP71124.02Occupational ALARA Planning and Controls 2 05/22/2017 05/26/2017 IP71151-OR01Occupational Exposure Control Effectiveness 2 05/22/2017 05/26/2017 IP71151-PR01RETS/ODCM Radiological Effluent Occurrences 4RS 5678-RS TEAM 2 09/11/2017 09/15/2017 IP71124.05Radiation Monitoring Instrumentation 2 09/11/2017 09/15/2017 IP71124.06Radioactive Gaseous and Liquid Effluent Treatment 2 09/11/2017 09/15/2017 IP71124.07Radiological Environmental Monitoring Program 2 09/11/2017 09/15/2017 IP71124.08Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3EB1-17T-CGS 50.59 EVALUATIONS OF CHANGES, TEST, 2 10/02/2017 10/06/2017 IP7111117TEvaluations of Changes, Tests, and Exper iments and Permanent Plant Modifications 4EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION 2 04/09/2018 04/13/2018 IP7111105TFire Protection [Triennial]

This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Columbia Generating StatiInspection / Activity Plan 01/01/2017

-12/31/2018 UnitNumberReport 22 No. of Staff on SitePlanned Dates Start EndInspection ActivityTitlePage 2 of 202/23/2017 11:42:39 4EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION 2 04/23/2018 04/27/2018 IP7111105TFire Protection [Triennial]

4EP-1-EP EXERCISE INSPECTION 2 03/26/2018 03/30/2018 IP7111401Exercise Evaluation 2 03/26/2018 03/30/2018 IP7111404Emergency Action Level and Emergency Plan Changes 1EP-3-EP PERFORMANCE INDICATORS 2 03/26/2018 03/30/2018 IP71151-EP01Drill/Exercise Performance 2 03/26/2018 03/30/2018 IP71151-EP02 ERO Readiness 2 03/26/2018 03/30/2018 IP71151-EP03 Alert & Notification System Reliabilit y1EB1-07T-CGS HEAT SINK PERFORMANCE 2 05/14/2018 05/18/2018 IP7111107THeat Sink Performance 2RS 24-RAD SAFETY 2 05/21/2018 05/25/2018 IP71124.02Occupational ALARA Planning and Controls 2 05/21/2018 05/25/2018 IP71124.04Occupational Dose Assessment 2RS 13PI-RAD SAFETY 2 09/10/2018 09/14/2018 IP71124.01Radiological Hazard Assessment and Exposure Controls 2 09/10/2018 09/14/2018 IP71124.03In-Plant Airborne Radioactivity Control and Mitigation 2 09/10/2018 09/14/2018 IP71151-OR01Occupational Exposure Control Effectiveness 2 09/10/2018 09/14/2018 IP71151-PR01RETS/ODCM Radiological Effluent Occurrences 3BRQ-BRQ INSPECTION 2 10/15/2018 12/31/2018 IP7111111BLicensed Operator Requalification Program 3EB1-21N-CGS DESIGN BASES PROGRAMS INSPECTION 2 10/22/201811/09/2018 IP7111121NComponent Design Bases Inspection (Programs)

Comments:

This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.