{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 16, 2017 Mr. Joseph Vice President, Nuclear Licensing Tennessee Valley Authority | ||
1101 Market Street, LP 3D-C | |||
Chattanooga, TN 37402-2801 | |||
SUBJECT: SEQUOYAH NUCLEAR PLANT - CYBER SECURITY FOLLOW-UP INSPECTION REPORT 05000327/2017406 AND 05000328/2017406 | SUBJECT: SEQUOYAH NUCLEAR PLANT - CYBER SECURITY FOLLOW-UP INSPECTION REPORT 05000327/2017406 AND 05000328/2017406 | ||
| Line 30: | Line 31: | ||
No NRC-identified or self-revealing findings were identified during this inspection. | No NRC-identified or self-revealing findings were identified during this inspection. | ||
However, inspectors documented a licensee-identified violation which was determined to be of very low security significance. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II, the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Sequoyah Nuclear Plant. | However, inspectors documented a licensee-identified violation which was determined to be of very low security significance. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. | ||
If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II, the Director, Office of Enforcement; the | |||
Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Sequoyah Nuclear Plant. | |||
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." | This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." | ||
Sincerely,/RA/ Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79 | However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). | ||
Sincerely,/RA/ Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety | |||
Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79 | |||
===Enclosure:=== | ===Enclosure:=== | ||
| Line 42: | Line 51: | ||
Supplemental Information (OUO) | Supplemental Information (OUO) | ||
cc: (See page 3) cc: Erin K. Henderson Senior Management, Fleet Regulatory Operations Tennessee Valley Authority 1101 Market Street, LP 5A-C Chattanooga, TN 37402-2801 | cc: (See page 3) cc: Erin K. Henderson Senior Management, Fleet Regulatory Operations Tennessee Valley Authority | ||
1101 Market Street, LP 5A-C | |||
Chattanooga, TN 37402-2801 | |||
Mr. P. P. Pratt Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 POB 2A-SQN Soddy Daisy, TN 37384-2000 | |||
Mr. D. G. Dimopoulos | |||
Director, Plant Support Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 OPS 4A-SQN Soddy Daisy, TN 37384-2000 | |||
Mr. Michael W. McBrearty Manager, Site Licensing Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 OPS 4A-SQN Soddy Daisy, TN 37384-2000 | |||
Mr. F. E. Marcussen Director, Nuclear Security Tennessee Valley Authority | |||
1101 Market Street, LP 1A Chattanooga, TN 37402-2801 | |||
Mr. | Mr. Brian E. Brigman | ||
Senior Manager, Site Security Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, MPB 1A-SQN Soddy Daisy, TN 37384-200 | |||
___ ____ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE PJB4 DWS5 AJB3 SMS NAME P. Braaten D. Strickland A. Blamey S. Shaeffer DATE 3/15/2017 3/15/2017 3/15/2017 3/16/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO | ___ ____ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE PJB4 DWS5 AJB3 SMS NAME P. Braaten D. Strickland A. Blamey S. Shaeffer DATE 3/15/2017 3/15/2017 3/15/2017 3/16/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO | ||
}} | }} | ||
Revision as of 21:06, 29 June 2018
| ML17081A426 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 03/16/2017 |
| From: | Shaeffer S M NRC/RGN-II/DRS/EB2 |
| To: | Shea J W Tennessee Valley Authority |
| References | |
| IR 2017406 | |
| Download: ML17081A426 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 16, 2017 Mr. Joseph Vice President, Nuclear Licensing Tennessee Valley Authority
Chattanooga, TN 37402-2801
SUBJECT: SEQUOYAH NUCLEAR PLANT - CYBER SECURITY FOLLOW-UP INSPECTION REPORT 05000327/2017406 AND 05000328/2017406
Dear Mr. Shea:
On February 1, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Sequoyah Nuclear Plant, Units 1 and 2 and discussed the results of this inspection with Mr. Michael Durr and other members of your staff. The results of this inspection are documented in the enclosed report.
No NRC-identified or self-revealing findings were identified during this inspection.
However, inspectors documented a licensee-identified violation which was determined to be of very low security significance. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II, the Director, Office of Enforcement; the
Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Sequoyah Nuclear Plant.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,/RA/ Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety
Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79
Enclosure:
Inspection Report 05000327/2017406 and 05000328/2017406
w/Attachment:
Supplemental Information (OUO)
cc: (See page 3) cc: Erin K. Henderson Senior Management, Fleet Regulatory Operations Tennessee Valley Authority
Chattanooga, TN 37402-2801
Mr. P. P. Pratt Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 POB 2A-SQN Soddy Daisy, TN 37384-2000
Mr. D. G. Dimopoulos
Director, Plant Support Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 OPS 4A-SQN Soddy Daisy, TN 37384-2000
Mr. Michael W. McBrearty Manager, Site Licensing Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 OPS 4A-SQN Soddy Daisy, TN 37384-2000
Mr. F. E. Marcussen Director, Nuclear Security Tennessee Valley Authority
1101 Market Street, LP 1A Chattanooga, TN 37402-2801
Mr. Brian E. Brigman
Senior Manager, Site Security Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, MPB 1A-SQN Soddy Daisy, TN 37384-200
___ ____ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE PJB4 DWS5 AJB3 SMS NAME P. Braaten D. Strickland A. Blamey S. Shaeffer DATE 3/15/2017 3/15/2017 3/15/2017 3/16/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO