Line 23: Line 23:
Mr. William F. Maguire, Site Vice President Entergy Operations, Inc.
Mr. William F. Maguire, Site Vice President Entergy Operations, Inc.


River Bend Station 5485 US Highway 61N St. Francisville, LA 70775
River Bend Station  
 
5485 US Highway 61N St. Francisville, LA 70775


SUBJECT: RIVER BEND STATION, NRC SECURITY INSPECTION REPORT 05000458/2017405
SUBJECT: RIVER BEND STATION, NRC SECURITY INSPECTION REPORT 05000458/2017405


==Dear Mr. Maguire:==
==Dear Mr. Maguire:==
On April 27, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your River Bend Station, and the NRC inspectors discussed the results of this inspection with Mr. M. Chase, Director, Regulatory and Performance Improvement, and other members of your staff. The results of this inspection are documented in the enclosed report. NRC inspectors documented one finding of very low security significance (Green) in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
On April 27, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your River Bend Station, and the NRC inspectors discussed the results of this inspection with Mr. M. Chase, Director, Regulatory and Performance Improvement, and other members of your staff. The results of this inspection are documented in the enclosed report.
 
NRC inspectors documented one finding of very low security significance (Green) in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a  
 
of the Enforcement Policy.


If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspectors at the River Bend Station.
If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspectors at the River Bend Station.
Line 34: Line 40:
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV and the NRC resident inspectors at River Bend Station.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV and the NRC resident inspectors at River Bend Station.


A cross-cutting aspect is assigned to this finding in the area of problem identification and resolution, evaluation. Specifically, the licensee failed to thoroughly evaluate issues to ensure that resolutions address causes and extent of conditions commensurate with their safety significance (P.2). In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
A cross-cutting aspect is assigned to this finding in the area of problem identification and resolution, evaluation. Specifically, the licensee failed to thoroughly evaluate issues to ensure that resolutions address causes and extent of conditions commensurate with their safety significance (P.2). In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withhol ding," of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).


Sincerely,/RA/
Sincerely,/RA/
Jeremy R. Groom, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-458 License No. NPF-47 Nonpublic  
Jeremy R. Groom, Chief Plant Support Branch 1 Division of Reactor Safety  
 
Docket No. 50-458 License No. NPF-47  
 
Nonpublic  


===Enclosure:===
===Enclosure:===

Revision as of 18:51, 29 June 2018

River Bend Station, NRC Security Inspection Report 05000458/2017405
ML17151B100
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/31/2017
From: Groom J R
Plant Support Branch-1
To: Maguire W F
Entergy Operations
References
IR 2017405
Download: ML17151B100 (3)


Text

May 31, 2017

Mr. William F. Maguire, Site Vice President Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N St. Francisville, LA 70775

SUBJECT: RIVER BEND STATION, NRC SECURITY INSPECTION REPORT 05000458/2017405

Dear Mr. Maguire:

On April 27, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your River Bend Station, and the NRC inspectors discussed the results of this inspection with Mr. M. Chase, Director, Regulatory and Performance Improvement, and other members of your staff. The results of this inspection are documented in the enclosed report.

NRC inspectors documented one finding of very low security significance (Green) in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a

of the Enforcement Policy.

If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspectors at the River Bend Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV and the NRC resident inspectors at River Bend Station.

A cross-cutting aspect is assigned to this finding in the area of problem identification and resolution, evaluation. Specifically, the licensee failed to thoroughly evaluate issues to ensure that resolutions address causes and extent of conditions commensurate with their safety significance (P.2). In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withhol ding," of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,/RA/

Jeremy R. Groom, Chief Plant Support Branch 1 Division of Reactor Safety

Docket No. 50-458 License No. NPF-47

Nonpublic

Enclosure:

Inspection Report 05000458/2017405 w/Attachment

Electronic Copy for River Bend Station

ML17151B095 Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword: SUNSI Review By: Yes No Publicly Available Sensitive _______MD 3.4 A.3 ADAMS ACCESSION NUMBER: ML17151B100 Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword: SUNSI Review By: Yes No Publicly Available Sensitive NRC-002 OFFICE SPSI:PSB1 PSI:PSB1 C:PSB1 C:PBC C:PSB1 NAME DHolman JBuchanan JGroom JKozal JGroom SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ DATE 5/12/17 5/12/17 5/24/17 5/30/17 5/31/17