{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD. | ||
Mr. Bryan Hanson Senior Vice President, Exelon Generation, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 | KING OF PRUSSIA, PA 19406 | ||
-2713 August 28, 2017 Mr. Bryan Hanson Senior Vice President, Exelon Generation, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 | |||
SUBJECT: UPDATED INSPECTION PLAN FOR THREE MILE ISLAND STATION, UNIT 1 (REPORT 05000289/2017005) | SUBJECT: UPDATED INSPECTION PLAN FOR THREE MILE ISLAND STATION, UNIT 1 (REPORT 05000289/2017005 | ||
) | |||
==Dear Mr. Hanson:== | ==Dear Mr. Hanson:== | ||
The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Three Mile Island, Unit 1. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. Please contact me at 610-337-5046 with any questions you have regarding this letter. | The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Three Mile Island, Unit 1 | ||
. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security | |||
-related inspections, which will be sent via separate, non | |||
-publicly available correspondence. | |||
Please contact me at 610-337-5046 with any questions you have regarding this letter. | |||
Sincerely,/RA/ | Sincerely,/RA/ | ||
Silas R. Kennedy, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos. 50-289 License Nos. | Silas R. Kennedy, Chief Reactor Projects Branch 6 | ||
Division of Reactor Projects | |||
Docket Nos. | |||
50-289 License Nos. | |||
DPR-50 Enclosure | |||
Three Mile Island Inspection Plan | : Three Mile Island Inspection Plan | ||
cc: Distribution via ListServ | cc: Distribution via ListServ | ||
ML17240A015 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME CSafouri/CF SKennedy/SRK DATE 8/22/17 8/2817 Report | ML17240A015 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME CSafouri/CF SKennedy/SRK DATE 8/22/17 8/2817 Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteThree Mile IslandInspection / Activity Plan 07/01/2017 | ||
-06/30/2019 Page 1 of 3 08/09/2017 12:56:546/26EXAM-TMI INITIAL OL EXAM 41 FY17-TMI INITIAL OPERATOR LICENSING EXAM U0194406/26/2017 07/07/2017TI-191-FUKUSHIMA LESSONS LEARNED 41 IPInspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/19107/24/2017 07/28/201771124-REMP11 IPRadiological Environmental Monitoring Program71124.0708/28/2017 09/01/2017 1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 08/28/2017 09/01/201771124-HP INSPECTION 11 IPRadiological Hazard Assessment and Exposure Controls71124.0109/25/2017 09/29/2017 1 IPOccupational ALARA Planning and Controls71124.0209/25/2017 09/29/2017 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0309/25/2017 09/29/2017 1 IPOccupational Dose Assessment71124.0409/25/2017 09/29/20177111108P-INSERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P09/25/2017 10/06/201771124.08-RADWASTE11 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/06/201711/10/201771124-HP INSPECTION 11 IPRadiological Hazard Assessment and Exposure Controls71124.0111/13/201711/17/2017 1 IPOccupational ALARA Planning and Controls71124.0211/13/201711/17/2017 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/13/201711/17/2017 1 IPOccupational Dose Assessment71124.0411/13/201711/17/2017 1 IPOccupational Exposure Control Effectiveness71151-OR0111/13/201711/17/2017 EP-EP PROGRAM INSPECTION 11 IPAlert and Notification System Testing711140203/05/2018 03/09/2018 1 IPEmergency Preparedness Organization Staffing and Augmentation System711140303/05/2018 03/09/2018 1 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140503/05/2018 03/09/2018 1 IPPerformance Indicator Verification7115103/05/2018 03/09/201871124-RAD SAFETY INSP 11 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0602/12/2018 02/16/2018 1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 02/12/2018 02/16/20187111121M-DESIGN BASES ASSURANCE INSPECTION (TEAM) | |||
61 IPDesign Bases Assurance Inspection (Teams)7111121M03/12/2018 03/16/2018 1 IPDesign Bases Assurance Inspection (Teams)7111121M03/26/2018 03/30/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | |||
Report | Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteThree Mile IslandInspection / Activity Plan 07/01/2017 | ||
-06/30/2019 Page 2 of 3 08/09/2017 12:56:5471152B-PI&R BIENNIAL 11 IPProblem Identification and Resolution71152B04/30/2018 05/04/2018 1 IPProblem Identification and Resolution71152B05/14/2018 05/18/201871124-RAD SAFETY INSP 11 IPRadiological Hazard Assessment and Exposure Controls71124.0106/11/2018 06/15/2018 1 IPOccupational ALARA Planning and Controls71124.0206/11/2018 06/15/2018 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0306/11/2018 06/15/2018 1 IPOccupational Dose Assessment71124.0406/11/2018 06/15/201871124-RAD INSTRUMENTATION 11 IPRadiation Monitoring Instrumentation71124.0509/10/2018 09/14/20186/24EXAM-TMI INITIAL OL EXAM 41 FY19 TM I EXAM (JUNE 2019) | |||
U0197605/27/2019 05/31/2019 1 FY19 TM I EXAM (JUNE 2019) | |||
U0197606/24/2019 06/28/201971124-RAD SAFETY INSPECTION 11 IPRadiological Hazard Assessment and Exposure Controls71124.0111/12/201811/16/2018 1 IPOccupational ALARA Planning and Controls71124.0211/12/201811/16/2018 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/12/201811/16/2018 1 IPOccupational Dose Assessment71124.0411/12/201811/16/2018 1 IPOccupational Exposure Control Effectiveness71151-OR0111/12/201811/16/2018REQUAL-TMI REQUAL INSP WITH P/F RESULTS 21 IPLicensed Operator Requalification Program - Annual Review7111111A03/18/2019 03/22/2019 1 IPLicensed Operator Requalification Program7111111B03/18/2019 03/22/20197111121N-EQ PROGRAM 31 IPDesign Bases Assurance Inspection (Programs)7111121N01/28/2019 02/01/2019 1 IPDesign Bases Assurance Inspection (Programs)7111121N02/11/2019 02/15/201971124-RAD SAFETY 01,02,03,04 11 IPRadiological Hazard Assessment and Exposure Controls71124.0102/11/2019 02/15/2019 1 IPOccupational ALARA Planning and Controls71124.0202/11/2019 02/15/2019 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0302/11/2019 02/15/2019 1 IPOccupational Dose Assessment71124.0402/11/2019 02/15/2019 EP-EP EXERCISE INSPECTION 51 IPExercise Evaluation711140105/06/2019 05/10/2019 1 IPPerformance Indicator Verification7115105/06/2019 05/10/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | |||
Report | Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteThree Mile IslandInspection / Activity Plan 07/01/2017 | ||
-06/30/2019 Page 3 of 3 08/09/2017 12:56:5471124.07-RAD SAFETY REMP 11 IPRadiological Environmental Monitoring Program71124.0706/10/2019 06/14/2019 1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 06/10/2019 06/14/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | |||
}} | }} | ||
Revision as of 14:15, 29 June 2018
| ML17240A015 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 08/28/2017 |
| From: | Kennedy S R NRC/RGN-I/DRP/PB6 |
| To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
| Kennedy S R | |
| References | |
| IR 2017005 | |
| Download: ML17240A015 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406
-2713 August 28, 2017 Mr. Bryan Hanson Senior Vice President, Exelon Generation, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT: UPDATED INSPECTION PLAN FOR THREE MILE ISLAND STATION, UNIT 1 (REPORT 05000289/2017005
)
Dear Mr. Hanson:
The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Three Mile Island, Unit 1
. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security
-related inspections, which will be sent via separate, non
-publicly available correspondence.
Please contact me at 610-337-5046 with any questions you have regarding this letter.
Sincerely,/RA/
Silas R. Kennedy, Chief Reactor Projects Branch 6
Division of Reactor Projects
Docket Nos.
50-289 License Nos.
DPR-50 Enclosure
- Three Mile Island Inspection Plan
cc: Distribution via ListServ
ML17240A015 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME CSafouri/CF SKennedy/SRK DATE 8/22/17 8/2817 Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteThree Mile IslandInspection / Activity Plan 07/01/2017
-06/30/2019 Page 1 of 3 08/09/2017 12:56:546/26EXAM-TMI INITIAL OL EXAM 41 FY17-TMI INITIAL OPERATOR LICENSING EXAM U0194406/26/2017 07/07/2017TI-191-FUKUSHIMA LESSONS LEARNED 41 IPInspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/19107/24/2017 07/28/201771124-REMP11 IPRadiological Environmental Monitoring Program71124.0708/28/2017 09/01/2017 1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 08/28/2017 09/01/201771124-HP INSPECTION 11 IPRadiological Hazard Assessment and Exposure Controls71124.0109/25/2017 09/29/2017 1 IPOccupational ALARA Planning and Controls71124.0209/25/2017 09/29/2017 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0309/25/2017 09/29/2017 1 IPOccupational Dose Assessment71124.0409/25/2017 09/29/20177111108P-INSERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P09/25/2017 10/06/201771124.08-RADWASTE11 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/06/201711/10/201771124-HP INSPECTION 11 IPRadiological Hazard Assessment and Exposure Controls71124.0111/13/201711/17/2017 1 IPOccupational ALARA Planning and Controls71124.0211/13/201711/17/2017 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/13/201711/17/2017 1 IPOccupational Dose Assessment71124.0411/13/201711/17/2017 1 IPOccupational Exposure Control Effectiveness71151-OR0111/13/201711/17/2017 EP-EP PROGRAM INSPECTION 11 IPAlert and Notification System Testing711140203/05/2018 03/09/2018 1 IPEmergency Preparedness Organization Staffing and Augmentation System711140303/05/2018 03/09/2018 1 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140503/05/2018 03/09/2018 1 IPPerformance Indicator Verification7115103/05/2018 03/09/201871124-RAD SAFETY INSP 11 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0602/12/2018 02/16/2018 1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 02/12/2018 02/16/20187111121M-DESIGN BASES ASSURANCE INSPECTION (TEAM)
61 IPDesign Bases Assurance Inspection (Teams)7111121M03/12/2018 03/16/2018 1 IPDesign Bases Assurance Inspection (Teams)7111121M03/26/2018 03/30/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteThree Mile IslandInspection / Activity Plan 07/01/2017
-06/30/2019 Page 2 of 3 08/09/2017 12:56:5471152B-PI&R BIENNIAL 11 IPProblem Identification and Resolution71152B04/30/2018 05/04/2018 1 IPProblem Identification and Resolution71152B05/14/2018 05/18/201871124-RAD SAFETY INSP 11 IPRadiological Hazard Assessment and Exposure Controls71124.0106/11/2018 06/15/2018 1 IPOccupational ALARA Planning and Controls71124.0206/11/2018 06/15/2018 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0306/11/2018 06/15/2018 1 IPOccupational Dose Assessment71124.0406/11/2018 06/15/201871124-RAD INSTRUMENTATION 11 IPRadiation Monitoring Instrumentation71124.0509/10/2018 09/14/20186/24EXAM-TMI INITIAL OL EXAM 41 FY19 TM I EXAM (JUNE 2019)
U0197605/27/2019 05/31/2019 1 FY19 TM I EXAM (JUNE 2019)
U0197606/24/2019 06/28/201971124-RAD SAFETY INSPECTION 11 IPRadiological Hazard Assessment and Exposure Controls71124.0111/12/201811/16/2018 1 IPOccupational ALARA Planning and Controls71124.0211/12/201811/16/2018 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0311/12/201811/16/2018 1 IPOccupational Dose Assessment71124.0411/12/201811/16/2018 1 IPOccupational Exposure Control Effectiveness71151-OR0111/12/201811/16/2018REQUAL-TMI REQUAL INSP WITH P/F RESULTS 21 IPLicensed Operator Requalification Program - Annual Review7111111A03/18/2019 03/22/2019 1 IPLicensed Operator Requalification Program7111111B03/18/2019 03/22/20197111121N-EQ PROGRAM 31 IPDesign Bases Assurance Inspection (Programs)7111121N01/28/2019 02/01/2019 1 IPDesign Bases Assurance Inspection (Programs)7111121N02/11/2019 02/15/201971124-RAD SAFETY 01,02,03,04 11 IPRadiological Hazard Assessment and Exposure Controls71124.0102/11/2019 02/15/2019 1 IPOccupational ALARA Planning and Controls71124.0202/11/2019 02/15/2019 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0302/11/2019 02/15/2019 1 IPOccupational Dose Assessment71124.0402/11/2019 02/15/2019 EP-EP EXERCISE INSPECTION 51 IPExercise Evaluation711140105/06/2019 05/10/2019 1 IPPerformance Indicator Verification7115105/06/2019 05/10/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteThree Mile IslandInspection / Activity Plan 07/01/2017
-06/30/2019 Page 3 of 3 08/09/2017 12:56:5471124.07-RAD SAFETY REMP 11 IPRadiological Environmental Monitoring Program71124.0706/10/2019 06/14/2019 1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 06/10/2019 06/14/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.