{{#Wiki_filter:August 28. 2017 Mr. John Dent, Jr. Vice President-Nuclear and CNO Nebraska Public Power District Cooper Nuclear Station 72676 648A Avenue P.O. Box 98 Brownville, NE 68321 | {{#Wiki_filter:August 28. 2017 Mr. John Dent, Jr. | ||
Vice President | |||
-Nuclear and CNO Nebraska Public Power District Cooper Nuclear Station 72676 648A Avenue P.O. Box 98 Brownville, NE 68321 | |||
SUBJECT: UPDATED INSPECTION PLAN FOR COOPER NUCLEAR STATION (REPORT 05000298/2017005) | SUBJECT: UPDATED INSPECTION PLAN FOR COOPER NUCLEAR STATION (REPORT 05000298/2017005) | ||
==Dear Mr. Dent:== | ==Dear Mr. Dent:== | ||
The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Cooper Nuclear Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 817-200-1144 with any questions you have regarding this letter. | The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Cooper Nuclear Station. The U.S. Nuclear Regulatory Commission ( | ||
NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. | |||
This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non | |||
-publicly available correspondence. | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | |||
-rm/adams.html (the Public Electronic Reading Room). | |||
Please contact me at 817-200-1144 with any questions you have regarding this letter. | |||
Sincerely,/RA/ Jason Kozal, Chief Division of Reactor Projects UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011 | |||
-4511 Docket No. | |||
50-298 License No. | |||
DPR-46 | |||
===Enclosure:=== | ===Enclosure:=== | ||
Inspection Plan for Cooper Nuclear Station | Inspection Plan for Cooper Nuclear Station | ||
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: CHY Yes No Publicly Available Sensitive NRC-002 OFFICE BC:DRP/C NAME JKozal SIGNATURE /RA/ DATE 8/28/17 Report | SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: CHY Yes No Publicly Available Sensitive NRC-002 OFFICE BC:DRP/C NAME JKozal SIGNATURE | ||
/RA/ DATE 8/28/17 Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteCooperInspection / Activity Plan 07/01/2017 | |||
-06/30/2019 Page 1 of 2 08/25/2017 08:18:35 ISFSI-LOADING INSPECTION 11 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.107/24/2017 07/28/2017 BRQ-BRQ INSPECTION 31 IPLicensed Operator Requalification Program7111111B10/02/2017 10/06/2017 EB1-21N-CNS DESIGN BASIS PROGRAMS INSPECTION 31 IPDesign Bases Assurance Inspection (Programs)7111121N08/14/2017 09/01/2017 RS 5678-RS TEAM41 IPRadiation Monitoring Instrumentation71124.0510/02/2017 10/06/2017 1 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0610/02/2017 10/06/2017 1 IPRadiological Environmental Monitoring Program71124.0710/02/2017 10/06/2017 1 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0810/02/2017 10/06/2017 RS 24-RAD SAFETY 21 IPOccupational ALARA Planning and Controls71124.0202/12/2018 02/16/2018 1 IPOccupational Dose Assessment71124.0402/12/2018 02/16/2018EXAM-INITIAL EXAM 31 INITIAL EXAM COOPER (12/18) | |||
X0262408/27/2018 08/31/2018 1 INITIAL EXAM COOPER (12/18) | |||
X0262409/24/2018 09/28/2018 EB1-21M-COOPER DESIGN BASES ASSURANCE TEAMS 61 IPDesign Bases Assurance Inspection (Teams)7111121M04/02/2018 04/20/2018 EP-1-EP EXERCISE INSPECTION 41 IPExercise Evaluation711140107/30/2018 08/03/2018 1 IPEmergency Action Level and Emergency Plan Changes711140407/30/2018 08/03/2018 1 IPDrill/Exercise Performance71151-EP01 07/30/2018 08/03/2018 1 IPERO Readiness71151-EP02 07/30/2018 08/03/2018 1 IPAlert & Notification System Reliability71151-EP03 07/30/2018 08/03/2018 EB1-07T-CNS HEAT SINK PERFORMANCE 21 IPHeat Sink Performance7111107T08/20/2018 08/24/20187111108-INSERVICE INSPECTION RF30 11 IPInservice Inspection Activities - BWR7111108G10/08/2018 10/19/2018 RS 12PI-RAD SAFETY 21 IPRadiological Hazard Assessment and Exposure Controls71124.0110/15/2018 10/19/2018 1 IPOccupational ALARA Planning and Controls71124.0210/15/2018 10/19/2018 1 IPOccupational Exposure Control Effectiveness71151-OR01 10/15/2018 10/19/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | |||
Report | Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteCooperInspection / Activity Plan 07/01/2017 | ||
-06/30/2019 Page 2 of 2 08/25/2017 08:18:35 RS 12PI-RAD SAFETY 21 IPOccupational Exposure Control Effectiveness71151-OR01 10/15/2018 10/19/2018 EB2-05XT-TRIENNIAL FIRE PROTECTION INSPECTION 41 IPFire Protection - NFPA 805 (Triennial)7111105X04/15/2019 04/19/2019 1 IPFire Protection - NFPA 805 (Triennial)7111105X04/29/2019 05/03/2019 EP-1-EP PROGRAM INSPECTION 11 IPAlert and Notification System Testing711140205/06/2019 05/10/2019 1 IPEmergency Preparedness Organization Staffing and Augmentation System711140305/06/2019 05/10/2019 1 IPEmergency Action Level and Emergency Plan Changes711140405/06/2019 05/10/2019 1 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140505/06/2019 05/10/2019 1 IPDrill/Exercise Performance71151-EP01 05/06/2019 05/10/2019 1 IPERO Readiness71151-EP02 05/06/2019 05/10/2019 1 IPAlert & Notification System Reliability71151-EP03 05/06/2019 05/10/2019 RS 13 PI-RP INSPECTION 31 IPRadiological Hazard Assessment and Exposure Controls71124.0105/20/2019 05/24/2019 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/20/2019 05/24/2019 1 IPOccupational Exposure Control Effectiveness71151-OR01 05/20/2019 05/24/2019 1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 05/20/2019 05/24/2019 PI&R-BIENNIAL PI&R INSPECTION 41 IPProblem Identification and Resolution71152B06/24/2019 06/28/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | |||
}} | }} | ||
Revision as of 14:09, 29 June 2018
| ML17242A212 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 08/28/2017 |
| From: | Kozal J W NRC/RGN-IV/DRP |
| To: | Dent J Nebraska Public Power District (NPPD) |
| JASON KOZAL | |
| References | |
| IR 2017005 | |
| Download: ML17242A212 (5) | |
Text
August 28. 2017 Mr. John Dent, Jr.
Vice President
-Nuclear and CNO Nebraska Public Power District Cooper Nuclear Station 72676 648A Avenue P.O. Box 98 Brownville, NE 68321
SUBJECT: UPDATED INSPECTION PLAN FOR COOPER NUCLEAR STATION (REPORT 05000298/2017005)
Dear Mr. Dent:
The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Cooper Nuclear Station. The U.S. Nuclear Regulatory Commission (
NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non
-publicly available correspondence.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 817-200-1144 with any questions you have regarding this letter.
Sincerely,/RA/ Jason Kozal, Chief Division of Reactor Projects UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011
-4511 Docket No.
50-298 License No.
Enclosure:
Inspection Plan for Cooper Nuclear Station
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: CHY Yes No Publicly Available Sensitive NRC-002 OFFICE BC:DRP/C NAME JKozal SIGNATURE
/RA/ DATE 8/28/17 Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteCooperInspection / Activity Plan 07/01/2017
-06/30/2019 Page 1 of 2 08/25/2017 08:18:35 ISFSI-LOADING INSPECTION 11 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.107/24/2017 07/28/2017 BRQ-BRQ INSPECTION 31 IPLicensed Operator Requalification Program7111111B10/02/2017 10/06/2017 EB1-21N-CNS DESIGN BASIS PROGRAMS INSPECTION 31 IPDesign Bases Assurance Inspection (Programs)7111121N08/14/2017 09/01/2017 RS 5678-RS TEAM41 IPRadiation Monitoring Instrumentation71124.0510/02/2017 10/06/2017 1 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0610/02/2017 10/06/2017 1 IPRadiological Environmental Monitoring Program71124.0710/02/2017 10/06/2017 1 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0810/02/2017 10/06/2017 RS 24-RAD SAFETY 21 IPOccupational ALARA Planning and Controls71124.0202/12/2018 02/16/2018 1 IPOccupational Dose Assessment71124.0402/12/2018 02/16/2018EXAM-INITIAL EXAM 31 INITIAL EXAM COOPER (12/18)
X0262408/27/2018 08/31/2018 1 INITIAL EXAM COOPER (12/18)
X0262409/24/2018 09/28/2018 EB1-21M-COOPER DESIGN BASES ASSURANCE TEAMS 61 IPDesign Bases Assurance Inspection (Teams)7111121M04/02/2018 04/20/2018 EP-1-EP EXERCISE INSPECTION 41 IPExercise Evaluation711140107/30/2018 08/03/2018 1 IPEmergency Action Level and Emergency Plan Changes711140407/30/2018 08/03/2018 1 IPDrill/Exercise Performance71151-EP01 07/30/2018 08/03/2018 1 IPERO Readiness71151-EP02 07/30/2018 08/03/2018 1 IPAlert & Notification System Reliability71151-EP03 07/30/2018 08/03/2018 EB1-07T-CNS HEAT SINK PERFORMANCE 21 IPHeat Sink Performance7111107T08/20/2018 08/24/20187111108-INSERVICE INSPECTION RF30 11 IPInservice Inspection Activities - BWR7111108G10/08/2018 10/19/2018 RS 12PI-RAD SAFETY 21 IPRadiological Hazard Assessment and Exposure Controls71124.0110/15/2018 10/19/2018 1 IPOccupational ALARA Planning and Controls71124.0210/15/2018 10/19/2018 1 IPOccupational Exposure Control Effectiveness71151-OR01 10/15/2018 10/19/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteCooperInspection / Activity Plan 07/01/2017
-06/30/2019 Page 2 of 2 08/25/2017 08:18:35 RS 12PI-RAD SAFETY 21 IPOccupational Exposure Control Effectiveness71151-OR01 10/15/2018 10/19/2018 EB2-05XT-TRIENNIAL FIRE PROTECTION INSPECTION 41 IPFire Protection - NFPA 805 (Triennial)7111105X04/15/2019 04/19/2019 1 IPFire Protection - NFPA 805 (Triennial)7111105X04/29/2019 05/03/2019 EP-1-EP PROGRAM INSPECTION 11 IPAlert and Notification System Testing711140205/06/2019 05/10/2019 1 IPEmergency Preparedness Organization Staffing and Augmentation System711140305/06/2019 05/10/2019 1 IPEmergency Action Level and Emergency Plan Changes711140405/06/2019 05/10/2019 1 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140505/06/2019 05/10/2019 1 IPDrill/Exercise Performance71151-EP01 05/06/2019 05/10/2019 1 IPERO Readiness71151-EP02 05/06/2019 05/10/2019 1 IPAlert & Notification System Reliability71151-EP03 05/06/2019 05/10/2019 RS 13 PI-RP INSPECTION 31 IPRadiological Hazard Assessment and Exposure Controls71124.0105/20/2019 05/24/2019 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/20/2019 05/24/2019 1 IPOccupational Exposure Control Effectiveness71151-OR01 05/20/2019 05/24/2019 1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 05/20/2019 05/24/2019 PI&R-BIENNIAL PI&R INSPECTION 41 IPProblem Identification and Resolution71152B06/24/2019 06/28/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.