{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713
[[Issue date::October 12, 2017]]


Mr. Brian Sullivan Site Vice President Entergy Nuclear Operations, Inc.
October 12, 2017 Mr. Brian Sullivan Site Vice President Entergy Nuclear Operations, Inc.


Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
Line 30: Line 29:
On September 5, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Pilgrim Nuclear Power Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
On September 5, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Pilgrim Nuclear Power Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.


NRC inspectors documented two findings of very low security significance (Green) in this report. Each of these findings involved violations of NRC requirements. Further, inspectors documented two licensee-identified violations which were determined to be of very low security significance in this report. The NRC is treating these violations as non-cited violations consistent with Section 2.3.2.a of the Enforcement Policy.
NRC inspectors documented two findings of very low security significance (Green) in this report. Each of these findings involved violations of NRC requirements. Further, inspectors documented two licensee-identified violations which were determined to be of very low security significance in this report. The NRC is tr eating these violations as non-cited violations consistent with Section 2.3.2.a of the Enforcement Policy.


If you contest any of these violations or their significance, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Pilgrim Nuclear Power Station.
If you contest any of these violations or their significance, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Pilgrim  


One cross-cutting aspect was assigned to the finding in the area of Problem Identification and Resolution, Evaluation. Specifically, Entergy failed to thoroughly evaluate issues to ensure that resolutions address causes and extent of conditions commensurate with their safety significance [P.2]. If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; and the NRC resident inspector at the Pilgrim Nuclear Power Station. Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from Enclosure, the transmittal documented is decontrolled. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
Nuclear Power Station.
 
One cross-cutting aspect was assigned to the finding in the area of Problem Identification and Resolution, Evaluation. Specifically, Entergy failed to thoroughly evaluate issues to ensure that resolutions address causes and extent of conditions commensurate with their safety significance [P.2]. If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; and the NRC resident inspector at the Pilgrim Nuclear Power Station.
 
Enclosure contains Sens itive Unclassified Non-Safeguards Information. When separated from  
 
Enclosure, the transmittal documented is decontrolled. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."


However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Line 44: Line 49:


===w/Attachment:===
===w/Attachment:===
Supplementary Information cc w/o encl; w/o OUO-SRI: Distribution via ListServ  
Supplementary Information  
 
cc w/o encl; w/o OUO-SRI: Distribution via ListServ  
 
cc w/encl; w/OUO-SRI:
P. Beabout, Protective Services Department
 
Section Manager J. Giarrusso, SLO, Massachusetts Emergency


cc w/encl; w/OUO-SRI: P. Beabout, Protective Services Department Section Manager J. Giarrusso, SLO, Massachusetts Emergency Management Agency (MEMA)  
Management Agency (MEMA)  


ML17285A026 (Cover letter) ADAMS ACCESSION NUMBER: ML17285A025 (Cover letter w/enclosure) Cover Letter: SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter w/  
ML17285A026 (Cover letter) ADAMS ACCESSION NUMBER:
ML17285A025 (Cover letter w/enclosure)
Cover Letter: SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter w/  


===Enclosure:===
===Enclosure:===
SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRS RI/DRP RI/DRS NAME J Bream K Hussar D Caron/J Bream for A Burritt R McKinley DATE 09/20/2017 09/20/2017 09/20/2017 09/28/2017 10/12/2017
SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRS RI/DRP RI/DRS NAME J Bream K Hussar D Caron/J Bream for A Burritt R McKinley DATE 09/20/2017 09/20/2017 09/20/2017 09/28/2017 10/12/2017
}}
}}

Revision as of 10:59, 29 June 2018

Pilgrim Nuclear Power Station - Baseline Security Inspection Report 05000293/2017403, (Letter Only)
ML17285A026
Person / Time
Site: Pilgrim
Issue date: 10/12/2017
From: Raymond McKinley
Plant Support Branch 1
To: Brian Sullivan
Entergy Nuclear Operations
McKinley R R
References
IR 2017403
Download: ML17285A026 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713

October 12, 2017 Mr. Brian Sullivan Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508

SUBJECT: PILGRIM NUCLEAR POWER STATION - BASELINE SECURITY INSPECTION REPORT 05000293/2017403

Dear Mr. Sullivan:

On September 5, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Pilgrim Nuclear Power Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

NRC inspectors documented two findings of very low security significance (Green) in this report. Each of these findings involved violations of NRC requirements. Further, inspectors documented two licensee-identified violations which were determined to be of very low security significance in this report. The NRC is tr eating these violations as non-cited violations consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest any of these violations or their significance, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Pilgrim

Nuclear Power Station.

One cross-cutting aspect was assigned to the finding in the area of Problem Identification and Resolution, Evaluation. Specifically, Entergy failed to thoroughly evaluate issues to ensure that resolutions address causes and extent of conditions commensurate with their safety significance [P.2]. If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; and the NRC resident inspector at the Pilgrim Nuclear Power Station.

Enclosure contains Sens itive Unclassified Non-Safeguards Information. When separated from

Enclosure, the transmittal documented is decontrolled. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,/RA/ Raymond R. McKinley, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-293 License No. DPR-35

Enclosure:

Inspection Report 05000293/2017403

w/Attachment:

Supplementary Information

cc w/o encl; w/o OUO-SRI: Distribution via ListServ

cc w/encl; w/OUO-SRI:

P. Beabout, Protective Services Department

Section Manager J. Giarrusso, SLO, Massachusetts Emergency

Management Agency (MEMA)

ML17285A026 (Cover letter) ADAMS ACCESSION NUMBER:

ML17285A025 (Cover letter w/enclosure)

Cover Letter: SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter w/

Enclosure:

SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRS RI/DRP RI/DRS NAME J Bream K Hussar D Caron/J Bream for A Burritt R McKinley DATE 09/20/2017 09/20/2017 09/20/2017 09/28/2017 10/12/2017