IR 05000280/2014001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 31: Line 31:


===Enclosure:===
===Enclosure:===
Surry Inspection/Activity Plan (03/01/2015 - 06/30/2016) cc Distribution via ListServ
Surry Inspection/Activity Plan (03/01/2015 - 06/30/2016) cc Distribution via ListServ  
 
_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE BDB3 SON SDR2 NAME B. Bishop S. Ninh S. Rose DATE 02/27/2015 02/24/2015 03/02/2015 E-MAIL COPY? YES NO YES NO YES NO Letter to David from Steven D. Rose dated March 4, 2015.
 
SUBJECT: ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2014001 AND 05000281/2014001 DISTRIBUTION: D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSurry Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
Page 1 of 103/04/201509:42:47Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSurryInspection / Activity Plan03/01/2015-06/30/2016TFPI-TRIENNIEL FIRE PROTECTION INSPECTION61,2 IPFire Protection [Triennial]7111105T03/09/201503/13/20151,2 IPFire Protection [Triennial]7111105T03/23/201503/27/2015ISI-UNIT 1 IN-SERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P04/27/201505/01/2015SGISI-UNIT 1 SG IN-SERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P04/27/201505/01/2015RP-RP PUBLIC RAD SAFETY BASELINE21,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0605/18/201505/22/20151,2 IPRadiological Environmental Monitoring Program71124.0705/18/201505/22/20151,2 IPPerformance Indicator Verification7115105/18/201505/22/2015PI&R-PROBLEM IDENTIFICATION AND RESOLUTION41,2 IPProblem Identification and Resolution71152B07/13/201507/17/20151,2 IPProblem Identification and Resolution71152B07/27/201507/31/2015OL EXAM-INITIAL LICENSE EXAM PREP31 SURRY/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIESV2343708/24/201508/28/2015MODS-PLANT MODIFICATIONS INSPECTION31,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T09/14/201509/18/20151,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T09/28/201510/02/2015OL EXAM-INITIAL LICENSE EXAM31 SURRY/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIESV2343709/21/201510/02/2015ISI-UNIT 2 IN-SERVICE INSPECTION12 IPInservice Inspection Activities - PWR7111108P10/19/201510/23/2015RP-RP OCCUPATIONAL BASELINE21,2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/19/201510/23/20151,2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0810/19/201510/23/20151,2 IPPerformance Indicator Verification7115110/19/201510/23/2015SGISI-UNIT 2 SG IN-SERVICE INSPECTION12 IPInservice Inspection Activities - PWR7111108P10/26/201510/30/2015This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 12:55, 14 June 2018

Annual Assessment Letter for Surry Power Station, Units 1 and 2 Report 05000280/2014001 and 05000281/2014001
ML15063A340
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/04/2015
From: Rose S D
NRC/RGN-II/DRP/RPB5
To: Heacock D A
Virginia Electric & Power Co (VEPCO)
References
IR 2014001
Download: ML15063A340 (5)


Text

March 4, 2015

Mr. David President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060

SUBJECT: ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2014001 AND 05000281/2014001

Dear Mr. Heacock:

On February 12, 2015, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Surry Power Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Surry Power Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Surry Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. Additionally, the NRC plans on conducting one non-ROP baseline inspection which includes an Operating License Initial Exam. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4609 with any questions you may have regarding this letter.

Sincerely,/RA/ Steven D. Rose, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37

Enclosure:

Surry Inspection/Activity Plan (03/01/2015 - 06/30/2016) cc Distribution via ListServ

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE BDB3 SON SDR2 NAME B. Bishop S. Ninh S. Rose DATE 02/27/2015 02/24/2015 03/02/2015 E-MAIL COPY? YES NO YES NO YES NO Letter to David from Steven D. Rose dated March 4, 2015.

SUBJECT: ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2014001 AND 05000281/2014001 DISTRIBUTION: D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSurry Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 103/04/201509:42:47Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSurryInspection / Activity Plan03/01/2015-06/30/2016TFPI-TRIENNIEL FIRE PROTECTION INSPECTION61,2 IPFire Protection [Triennial]7111105T03/09/201503/13/20151,2 IPFire Protection [Triennial]7111105T03/23/201503/27/2015ISI-UNIT 1 IN-SERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P04/27/201505/01/2015SGISI-UNIT 1 SG IN-SERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P04/27/201505/01/2015RP-RP PUBLIC RAD SAFETY BASELINE21,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0605/18/201505/22/20151,2 IPRadiological Environmental Monitoring Program71124.0705/18/201505/22/20151,2 IPPerformance Indicator Verification7115105/18/201505/22/2015PI&R-PROBLEM IDENTIFICATION AND RESOLUTION41,2 IPProblem Identification and Resolution71152B07/13/201507/17/20151,2 IPProblem Identification and Resolution71152B07/27/201507/31/2015OL EXAM-INITIAL LICENSE EXAM PREP31 SURRY/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIESV2343708/24/201508/28/2015MODS-PLANT MODIFICATIONS INSPECTION31,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T09/14/201509/18/20151,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T09/28/201510/02/2015OL EXAM-INITIAL LICENSE EXAM31 SURRY/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIESV2343709/21/201510/02/2015ISI-UNIT 2 IN-SERVICE INSPECTION12 IPInservice Inspection Activities - PWR7111108P10/19/201510/23/2015RP-RP OCCUPATIONAL BASELINE21,2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/19/201510/23/20151,2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0810/19/201510/23/20151,2 IPPerformance Indicator Verification7115110/19/201510/23/2015SGISI-UNIT 2 SG IN-SERVICE INSPECTION12 IPInservice Inspection Activities - PWR7111108P10/26/201510/30/2015This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.