ML15224B360: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 6
| page count = 6
}}
}}
=Text=
{{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANYRICHMOND, VIRGINIA 23261Juiy 31, 2015United States Nuclear Regulatory CommissionAttention: Document Control DeskWashington, DC 20555-0001Serial No.SPS-LIC/CGLDocket No.License No.15-373R050-280DPR-32VIRGINIA ELECTRIC AND POWER COMPANYSURRY POWER STATION UNIT 1INSERVICE INSPECTION OWNER'S ACTIVITY REPORT (OAR)In accordance with the requirements of ASME Code Case N-532-5, Virginia Electric andPower Company (Dominion) submits the Inservice Inspection (ISI) Owner's ActivityReport (Form OAR-I) for the Surry Unit I refueling outage S1R26, which ended onMay 27, 2015. This document addresses the reporting requirements for Surry Unit I forthe portion of the third period in the fourth ten-year ISI interval from November 21, 2013to October 13, 2014 and through the duration of the first refueling outage of the firstperiod in the fifth ten-year inservice inspection interval. In our December 9, 2013 letter(Serial No. 13-639), Revised Relief Request SPT-003 stated that the Surry Unit I fourthISI interval was being extended to October 13, 2014, and our November 26, 2013 letter(Serial No. 13-611) identified the fifth ISI interval start date as December 14, 2013.If you have any questions concerning this information,Mrs. Candee G. Lovett at (757) 365-2178.please contactDouglas C. L13wr~nceDirector Station Safety & LicensingSurry Power Station
==Attachment:==
Owner's Activity Report (Form OAR-I), Surry Unit I RefuelingOutage $1R26, First Period of the Fifth ISI IntervalCommitments made in this letter: None1LVj47 Serial No.: 15-373Docket No.: 50-280Page 2 of 2cc: U.S. Nuclear Regulatory CommissionRegion IIMarquis One Tower245 Peachtree Center Avenue NESuite 1200Atlanta, Georgia 30303-1257NRC Senior Resident InspectorSurry Power StationMs. K. Cotton GrossNRC Project Manager -Surry-U. S. Nuclear Regulatory CommissionOne White Flint NorthMail Stop 08 G9A11555 Rockville PikeRockville, Maryland 20852-2738Dr. V. SreenivasNRC Project Manager -North AnnaU. S. Nuclear Regulatory Commission.-,;One White Flint NorthStop 08 G9A11555 Rockville PikeRockville, Maryland 20852-2738Mr. R. A. SmithAuthorized Nuclear InspectorSurry Power Station Serial No.: 15-373Docket No.: 50-280ATTACHMENTOWNER'S ACTIVITY REPORT (FORM OAR-I),SURRY UNIT 1 REFUELING OUTAGE $1 R26,FIRST PERIOD OF THE FIFTH ISI INTERVALVIRGINIA ELECTRIC AND POWER COMPANY(DOMINION)
CASEN-532-5CASES OF ASME BOILER AND PRESSURE VESSEL CODEFORM OAR-i OWNER'S ACTIVITY REPORTR~nnrt Niimh~r£11rrv Pnwor gq[TN Hnn fqlnncl #nnrl qtlrrv VA ~rIrru Prn,,,r-~r ~1~linn ~c7fl I-Inn kIn,1 Pnrri C~Irni VA 9~RR~PlantI Init Nn1Commercial service date 12/22/1972 Refueling outage no. S1R26(if applicable)Current inspection intervalCurrent inspection period5th(1st, 2nd, 3rd, 4th, other)1st(1st, 2nd, 3rd)Edition and Addenda of Section XI applicable to the inspection plans4th Tnf_ 1qqR A and Sth Int. 2004 FDate and revision of inspection plans Surry Unit 1, 4th Int. ISI Plan, Rev 12, Aug. 25, 2014 / 5th Int. ISI Plan, Revision 1, Mar. 12, 2015Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plansN/ACode Cases used for inspection and evaluation:N-586-1(if applicable, including cases modified by Case N-532 and later revisions)CERTIFICATE OF CONFORMANCEI certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by theASME Code, Section XL and (c) the repair/replacement activities and evaluations supporting the completion of $1R26conform to the/eqi, ments of Section XI. (refueling outage number)Signed J'ir] ..... / 1S1 Progam Owner Date y/2-6 /I5 "~Owner or Owner's Designee, TitleCERTIFICATE OF INSERVICE INSPECTIONI, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors andemployed by HSB-GS of Hartford, CT have inspected the items described in thisOwner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by thisreport in accordance with the requirements of Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning therepair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in anymanner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.CommissionsNB-7933 NS, IS; VA883(R)Inspector's SignatureNational Board, State, Province, and EndorsementsDate/ /
Page 1 of 2CASECASES OF ASME BOILER AND PRESSURE VESSEL CODE N- 25FORM OAR-i OWNER'S ACTIVITY REPORTTable 1Items with Flaws or Relevant Conditions That Required Evaluation for Continued ServiceExamination Category and jItem Description Evaluation DescriptionItem Number JNoneNote: There were no items requiring analytical evaluation to include on this table for interval 4 orinterval 5 during this reporting cycle.
Page 2 of.2CASEN-532-5CASES OASME BOILER' ANDPRSSREVESSE COEPRFORM OAR-i OWNER'S ACTIV~~Y REPORTTable 2Abstract of Repair/replacement Activities Required for Continued ServiceCode Class Item Description Date Repair/ReplacementDescription of Work Completed Plan Number1 1-CH-H001 Repair pipe support on line 5/9/2015 2015-08612" RC-i199-1502 and 2" CH-9-1 502 for:2-RC-HCV-1 556B.I1-SI-H005-1 Repair NDE rejected indications on 5/4/2015 2015-088integral attachment on line2" SI-74-1 502 using the guidance ofNuclear Code Case N-586-1.1 2" RC-56-1502 Replace piping for NDE rejected 5/5/2015 2015-082indications.21-RS-MEJ-2A-PIPE Weld repair expansion joint for though- 5/13/2015 2015-098wall leak.21 -RS-MEJ-2B-PIPE Replace expansion joint for 5/20/2015 2015-095through-wall leak.301 -SW-269 Replace pipe tee upstream of 11/24/2014 2014-12601-SW-269 on line number2" WS-171-9107.301-SW-P-lOB Replace discharge spool piece for 6/17/2014 2014-097through-wall leak32" WS-314-9107 Repair fiberglass piping for through- 5/28/2015 2015-113wall leak.348" WC-2-10 Weld repair piping for through-wall 4/28/2015 2015-079corrosion.396" WC-3-10 Weld repair piping for through-wall 4/28/2015 201 5-080corrosion.Note: There were no interval 4 items to be included on this table during this reporting cycle.}}

Revision as of 15:45, 6 June 2018

Surry, Unit 1 - Inservice Inspection Owner'S Activity Report (OAR)
ML15224B360
Person / Time
Site: Surry Dominion icon.png
Issue date: 07/31/2015
From: Lawrence D C
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
15-373
Download: ML15224B360 (6)


Text

VIRGINIA ELECTRIC AND POWER COMPANYRICHMOND, VIRGINIA 23261Juiy 31, 2015United States Nuclear Regulatory CommissionAttention: Document Control DeskWashington, DC 20555-0001Serial No.SPS-LIC/CGLDocket No.License No.15-373R050-280DPR-32VIRGINIA ELECTRIC AND POWER COMPANYSURRY POWER STATION UNIT 1INSERVICE INSPECTION OWNER'S ACTIVITY REPORT (OAR)In accordance with the requirements of ASME Code Case N-532-5, Virginia Electric andPower Company (Dominion) submits the Inservice Inspection (ISI) Owner's ActivityReport (Form OAR-I) for the Surry Unit I refueling outage S1R26, which ended onMay 27, 2015. This document addresses the reporting requirements for Surry Unit I forthe portion of the third period in the fourth ten-year ISI interval from November 21, 2013to October 13, 2014 and through the duration of the first refueling outage of the firstperiod in the fifth ten-year inservice inspection interval. In our December 9, 2013 letter(Serial No.13-639), Revised Relief Request SPT-003 stated that the Surry Unit I fourthISI interval was being extended to October 13, 2014, and our November 26, 2013 letter(Serial No.13-611) identified the fifth ISI interval start date as December 14, 2013.If you have any questions concerning this information,Mrs. Candee G. Lovett at (757) 365-2178.please contactDouglas C. L13wr~nceDirector Station Safety & LicensingSurry Power Station

Attachment:

Owner's Activity Report (Form OAR-I), Surry Unit I RefuelingOutage $1R26, First Period of the Fifth ISI IntervalCommitments made in this letter: None1LVj47 Serial No.: 15-373Docket No.: 50-280Page 2 of 2cc: U.S. Nuclear Regulatory CommissionRegion IIMarquis One Tower245 Peachtree Center Avenue NESuite 1200Atlanta, Georgia 30303-1257NRC Senior Resident InspectorSurry Power StationMs. K. Cotton GrossNRC Project Manager -Surry-U. S. Nuclear Regulatory CommissionOne White Flint NorthMail Stop 08 G9A11555 Rockville PikeRockville, Maryland 20852-2738Dr. V. SreenivasNRC Project Manager -North AnnaU. S. Nuclear Regulatory Commission.-,;One White Flint NorthStop 08 G9A11555 Rockville PikeRockville, Maryland 20852-2738Mr. R. A. SmithAuthorized Nuclear InspectorSurry Power Station Serial No.: 15-373Docket No.: 50-280ATTACHMENTOWNER'S ACTIVITY REPORT (FORM OAR-I),SURRY UNIT 1 REFUELING OUTAGE $1 R26,FIRST PERIOD OF THE FIFTH ISI INTERVALVIRGINIA ELECTRIC AND POWER COMPANY(DOMINION)

CASEN-532-5CASES OF ASME BOILER AND PRESSURE VESSEL CODEFORM OAR-i OWNER'S ACTIVITY REPORTR~nnrt Niimh~r£11rrv Pnwor gq[TN Hnn fqlnncl #nnrl qtlrrv VA ~rIrru Prn,,,r-~r ~1~linn ~c7fl I-Inn kIn,1 Pnrri C~Irni VA 9~RR~PlantI Init Nn1Commercial service date 12/22/1972 Refueling outage no. S1R26(if applicable)Current inspection intervalCurrent inspection period5th(1st, 2nd, 3rd, 4th, other)1st(1st, 2nd, 3rd)Edition and Addenda of Section XI applicable to the inspection plans4th Tnf_ 1qqR A and Sth Int. 2004 FDate and revision of inspection plans Surry Unit 1, 4th Int. ISI Plan, Rev 12, Aug. 25, 2014 / 5th Int. ISI Plan, Revision 1, Mar. 12, 2015Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plansN/ACode Cases used for inspection and evaluation:N-586-1(if applicable, including cases modified by Case N-532 and later revisions)CERTIFICATE OF CONFORMANCEI certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by theASME Code, Section XL and (c) the repair/replacement activities and evaluations supporting the completion of $1R26conform to the/eqi, ments of Section XI. (refueling outage number)Signed J'ir] ..... / 1S1 Progam Owner Date y/2-6 /I5 "~Owner or Owner's Designee, TitleCERTIFICATE OF INSERVICE INSPECTIONI, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors andemployed by HSB-GS of Hartford, CT have inspected the items described in thisOwner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by thisreport in accordance with the requirements of Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning therepair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in anymanner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.CommissionsNB-7933 NS, IS; VA883(R)Inspector's SignatureNational Board, State, Province, and EndorsementsDate/ /

Page 1 of 2CASECASES OF ASME BOILER AND PRESSURE VESSEL CODE N- 25FORM OAR-i OWNER'S ACTIVITY REPORTTable 1Items with Flaws or Relevant Conditions That Required Evaluation for Continued ServiceExamination Category and jItem Description Evaluation DescriptionItem Number JNoneNote: There were no items requiring analytical evaluation to include on this table for interval 4 orinterval 5 during this reporting cycle.

Page 2 of.2CASEN-532-5CASES OASME BOILER' ANDPRSSREVESSE COEPRFORM OAR-i OWNER'S ACTIV~~Y REPORTTable 2Abstract of Repair/replacement Activities Required for Continued ServiceCode Class Item Description Date Repair/ReplacementDescription of Work Completed Plan Number1 1-CH-H001 Repair pipe support on line 5/9/2015 2015-08612" RC-i199-1502 and 2" CH-9-1 502 for:2-RC-HCV-1 556B.I1-SI-H005-1 Repair NDE rejected indications on 5/4/2015 2015-088integral attachment on line2" SI-74-1 502 using the guidance ofNuclear Code Case N-586-1.1 2" RC-56-1502 Replace piping for NDE rejected 5/5/2015 2015-082indications.21-RS-MEJ-2A-PIPE Weld repair expansion joint for though- 5/13/2015 2015-098wall leak.21 -RS-MEJ-2B-PIPE Replace expansion joint for 5/20/2015 2015-095through-wall leak.301 -SW-269 Replace pipe tee upstream of 11/24/2014 2014-12601-SW-269 on line number2" WS-171-9107.301-SW-P-lOB Replace discharge spool piece for 6/17/2014 2014-097through-wall leak32" WS-314-9107 Repair fiberglass piping for through- 5/28/2015 2015-113wall leak.348" WC-2-10 Weld repair piping for through-wall 4/28/2015 2015-079corrosion.396" WC-3-10 Weld repair piping for through-wall 4/28/2015 201 5-080corrosion.Note: There were no interval 4 items to be included on this table during this reporting cycle.